Sei sulla pagina 1di 2

Federal Register / Vol. 73, No.

71 / Friday, April 11, 2008 / Notices 19833

These rates will go into effect once the preferred alternative or consideration of proposal could be a candidate for
Corps lifts the restrictions on the some other project alternative referral to the CEQ.
operation of the Wolf Creek Dam and (including the no action alternative or a
Draft EISs
the interim operating plan becomes new alternative). EPA intends to work
unnecessary. with the lead agency to reduce these EIS No. 20070488, ERP No. D–DOE–
The referenced repayment studies are impacts. A09800–00, Programmatic—
available for examination at 1166 Designation of Energy Corridors in 11
EU—Environmentally Unsatisfactory Western States, Preferred Location of
Athens Tech Road, Elberton, Georgia
30635–6711. The Proposed Rate The EPA review has identified Future Oil, Gas, and Hydrogen
Schedules CBR–1–G, CSI–1–G, CEK–1– adverse environmental impacts that are Pipelines and Electricity
G, CM–1–G, CC–1–H, CK–1–G, and of sufficient magnitude that they are Transmission and Distribution
CTV–1–G are also available. unsatisfactory from the standpoint of Facilities on Federal Land, AZ, CA,
public health or welfare or CO, ID, MT, NV, NM, UT, WA and
Dated: March 31, 2008.
environmental quality. EPA intends to WY.
Leon Jourolmon, Summary: EPA expressed
work with the lead agency to reduce
Acting Administrator. these impacts. If the potentially environmental concerns about potential
[FR Doc. E8–7761 Filed 4–10–08; 8:45 am] unsatisfactory impacts are not corrected underestimation of wetlands in the
BILLING CODE 6450–01–P at the final EIS stage, this proposal will designated corridors.
be recommended for referral to the CEQ. Rating EC2.
EIS No. 20080042, ERP No. D–AFS–
Adequacy of the Impact Statement
ENVIRONMENTAL PROTECTION J65508–MT, Debaugan Fuels
AGENCY Category 1—Adequate Reduction Project, Proposed Fuels
[ER–FRL–6697–8] EPA believes the draft EIS adequately Reduction Activities, Lolo National
sets forth the environmental impact(s) of Forest, Superior Ranger District,
Environmental Impact Statements and the preferred alternative and those of Mineral County, MT.
Regulations; Availability of EPA the alternatives reasonably available to Summary: EPA expressed
Comments the project or action. No further analysis environmental concerns about water
or data collection is necessary, but the quality impacts. EPA requested
Availability of EPA comments additional analysis and information to
reviewer may suggest the addition of
prepared pursuant to the Environmental assess and mitigate impacts of the
clarifying language or information.
Review Process (ERP), under section management actions.
309 of the Clean Air Act and section Category 2—Insufficient Information Rating EC2.
102(2) (c) of the National Environmental The draft EIS does not contain EIS No. 20080047, ERP No. D–USN–
Policy Act as amended. Requests for sufficient information for EPA to fully A11080–00, Atlantic Fleet Active
copies of EPA comments can be directed assess environmental impacts that Sonar Training Program, To Provide
to the Office of Federal Activities at should be avoided in order to fully Mid- and High-Frequency Active
202–564–7167. protect the environment, or the EPA Sonar Technology and the Improved
Summary of Rating Definitions; reviewer has identified new reasonably Extended Echo Ranging (IEER) System
Environmental Impact of the Action available alternatives that are within the during Atlantic Fleet Training
spectrum of alternatives analyzed in the Exercises, Along the East Coast of
LO—Lack of Objections draft EIS, which could reduce the United States (US) and in the Gulf of
The EPA review has not identified environmental impacts of the action. Mexico.
any potential environmental impacts The identified additional information, Summary: EPA does not object to the
requiring substantive changes to the data, analyses, or discussion should be proposed action.
proposal. The review may have included in the final EIS. Rating LO.
disclosed opportunities for application EIS No. 20080054, ERP No. D–DOE–
Category 3—Inadequate
of mitigation measures that could be J05080–MT, MATL 230–kV
accomplished with no more than minor EPA does not believe that the draft Transmission Line Project, To
changes to the proposal. EIS adequately assesses potentially Construct, Operate, Maintain, and
significant environmental impacts of the Connect a 230-kV Electric
EC—Environmental Concerns action, or the EPA reviewer has Transmission Line, Issuance of
The EPA review has identified identified new, reasonably available Presidential Permit for Right-to-Way
environmental impacts that should be alternatives that are outside of the Grant, Cascade, Teton, Chouteau,
avoided in order to fully protect the spectrum of alternatives analyzed in the Pondera, Toole and Glacier Counties,
environment. Corrective measures may draft EIS, which should be analyzed in MT.
require changes to the preferred order to reduce the potentially Summary: EPA expressed
alternative or application of mitigation significant environmental impacts. EPA environmental concerns about water
measures that can reduce the believes that the identified additional quality and wetland impacts. EPA
environmental impact. EPA would like information, data, analyses, or recommended a modified preferred
to work with the lead agency to reduce discussions are of such a magnitude that alternative that would better optimize
these impacts. they should have full public review at the environmental, social and economic
a draft stage. EPA does not believe that trade-offs for this project. EPA requested
EO—Environmental Objections the draft EIS is adequate for the additional information regarding
mstockstill on PROD1PC66 with NOTICES

The EPA review has identified purposes of the NEPA and/or section mitigation of impacts.
significant environmental impacts that 309 review, and thus should be formally Rating EC2.
must be avoided in order to provide revised and made available for public
adequate protection for the comment in a supplemental or revised Final EISs
environment. Corrective measures may draft EIS. On the basis of the potential EIS No. 20070457, ERP No. F–UAF–
require substantial changes to the significant impacts involved, this B15000–MA, Final

VerDate Aug<31>2005 19:21 Apr 10, 2008 Jkt 214001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\11APN1.SGM 11APN1
19834 Federal Register / Vol. 73, No. 71 / Friday, April 11, 2008 / Notices

Recommendations and Associated Contact: John F. Sullivan, III, P.E. Amended Notices
Actions for the 104th Fighter Wing 919–856–4346 Ext. 122 EIS No. 20080111, Draft EIS, COE, 00,
Massachusetts Air National Guard, Base EIS No. 20080126, Draft EIS, AFS, ID,
Programmatic—Hydropower
Realignment and Closure, Corralled Bear Project, Management of
Rehabilitations, Dissolved Oxygen
Implementation, Westfield-Barnes Vegetation, Hazardous Fuels, and
and Minimum Flow Regimes at Wolf
Airport, Westfield, MA. Access, Plus Watershed
Creek Dam, Kentucky and Center Hill
Summary: EPA had no objection to Improvements, Palouse Ranger
and Dale Hollow Dams, Tennessee,
the project and encouraged the National District, Clearwater National Forest,
Implementation, Comment Period
Guard Bureau to work closely with local Latah County, ID, Comment Period
Ends: 05/19/2008, Contact: Kara Ends: 05/12/2008, Contact: Chip Hall
communities. 615–736–7666.
EIS No. 20080062, ERP No. F–USA– Chadwick 208–875–1131.
EIS No. 20080127, Final Supplement, Revision to FR Notice Published 03/
A11079–00, Permanent Home 28/2008: EIS is withdrawn due to Non-
FHW, MT, US 93 Highway Ninepipe/
Stationing of the 2/25th Stryker Distribution of the document.
Ronan Improvement Project, from
Brigade Combat Team (SBECT), To
Dublin Gulch Road/Red Horn Road, Dated: April 8, 2008.
Address a Full Range of Alternatives
Funding, Special-Use-Permit, NPDES Ken Mittelholtz,
for Permanently Stationing the 2/25th
Permit and U.S. Army COE Section Environmental Protection Specialist, Office
SBCT, Hawaii and Honolulu
404 Permit, Lake County, MT, Wait of Federal Activities.
Counties, HI; Anchorage and
Period Ends: 05/05/2008, Contact: [FR Doc. E8–7787 Filed 4–10–08; 8:45 am]
Southeast Fairbanks Boroughs, AK; El
Craig Genzlinger, P.E. 406–449–5302.
Paso, Pueblo, and Fremont Counties, EIS No. 20080128, Draft Supplement,
BILLING CODE 6560–50–P
CO. MMS, 00, Gulf of Mexico Outer
Summary: EPA’s previous concerns Continental Shelf Oil and Gas Lease
have been resolved; therefore, EPA does ENVIRONMENTAL PROTECTION
Sales: 2009–2012 Western Planning AGENCY
not object to the proposed project. Area Sales: 210 in 2009, 215 in 2010,
EIS No. 20080073, ERP No. F–FHW– and 218 in 2011, and Central [EPA–HQ–ORD–2008–0268; FRL–8553–3]
F40812–IL, Prairie Parkway Study, Planning Area Sales: 208 in 2009, 213
Transportation System Improvement in 2010, 216 in 2011, and 222 in 2012, Board of Scientific Counselors,
between I–80 and I–88, Widening IL– TX, LA, MS, AL and FL, Comment Executive Committee Meeting—May
47 to 4 Lanes from I–80 to Caton Farm Period Ends: 06/03/2008, Contact: Dr. 2008
Road, Funding, U.S. Army COE Mary Boatman 703–737–1662. AGENCY: Environmental Protection
section 404, Grundy, Kendall and EIS No. 20080129, Draft EIS, FHW, UT, Agency (EPA).
Kane Counties, IL. Layton Interchange Project, ACTION: Notice of meeting.
Summary: EPA continues to have Improvements on I–15 (Exit–330) to
environmental concerns about water Provide Unrestricted Access Across SUMMARY: Pursuant to the Federal
quality and aquatic life impacts due to the Unicon Pacific Railroad and to Advisory Committee Act, Public Law
road salt and other pollutants. Address Traffic Congestion on Gentile 92–463, the Environmental Protection
Dated: April 8, 2008. St. in West Layton, Layton City, UT, Agency, Office of Research and
Ken Mittelholtz, Comment Period Ends: 05/27/2008, Development (ORD), gives notice of one
Contact: Doug Atkin 801–963–0182. meeting of the Board of Scientific
Environmental Protection Specialist, Office
of Federal Activities.
EIS No. 20080130, Final EIS, AFS, 00, Counselors (BOSC) Executive
Mt. Ashland Late-Successional Committee.
[FR Doc. E8–7784 Filed 4–10–08; 8:45 am]
Reserve Habitat Restoration and Fuels
BILLING CODE 6560–50–P
Reduction Project, To Promote and DATES: The meeting will be held on
Maintain Late-Successional Habitat, Tuesday, May 6, 2008, from 8 a.m. to
Oak Knoll Ranger District, Klamath 4:30 p.m., and will continue on
ENVIRONMENTAL PROTECTION Wednesday, May 7, 2008, from 8:30 a.m.
National Forest, Siskiyou County, CA
AGENCY until 3:30 p.m. All times noted are
and Jackson County, OR, Wait Period
Ends: 05/05/2008, Contact: Susan central time. The meeting may adjourn
[ER–FRL–6697–7] early if all business is finished. Requests
Stresser 530–841–4538.
Environmental Impacts Statements; EIS No. 20080131, Final EIS, AFS, CA, for the draft agenda or for making oral
Notice of Availability Eldorado National Forest Public presentations at the meeting will be
Wheeled Motorized Travel accepted up to 1 business day before the
Responsible Agency: Office of Federal Management Project, Proposes to meeting.
Activities, General Information (202) Regulate Unmanaged Public Wheeled ADDRESSES: The meeting will be held at
564–7167 or http://www.epa.gov/ Motor Vehicle, Implementation, the Office of Research and
compliance/nepa/. Alphine, Amador, El Dorado and Development, National Health and
Weekly receipt of Environmental Impact Placer Counties, CA, Wait Period Environmental Effects Research
Statements Ends: 05/05/2008, Contact: Laura Laboratory, Gulf Ecology Division, 1
Filed 03/31/2008 Through 04/04/2008 Hierholzer 530–647–5382. Sabine Island Drive, Gulf Breeze,
Pursuant to 40 CFR 1506.9. EIS No. 20080132, Final EIS, USN, VA, Florida 32561. Submit your comments,
EIS No. 20080125, Draft EIS, FHW, NC, Marine Corps Base Quantico (MCBQ) identified by Docket ID No. EPA–HQ–
I–26 Connector Project, Proposed Virginia Project, Proposes ORD–2008–0268, by one of the
mstockstill on PROD1PC66 with NOTICES

Multi-Land Freeway from I–40 to US Development of the Westside of following methods:


19–23–70 North of Asheville, MCBQ and the 2005 Base • http://www.regulations.gov: Follow
Funding, U.S. Coast Guard Permit, US Realignment and Closure Action at the on-line instructions for submitting
Army COE Section 10 and 404 Permit, MCBQ, Implementation, Quantico, comments.
Buncombe County, Asheville, NC, VA, Wait Period Ends: 05/05/2008, • E-mail: Send comments by
Comment Period Ends: 05/19/2008, Contact: Jeff Gardner 703–432–6784. electronic mail (e-mail) to: