1.0
PLANT DETAILS :
1.1
service
auxiliaries,
The
is
given below :
11 KV UNIT BUS 1A
11 KV UNIT BUS 1B
TRF 1
TRF 2
I/C 2
I/C 1
B/C
SHEET 3 OF 20
SHEET 4 OF 20
2.0
TESTING OBJECTIVES :
2.1
The
objectives
of
these
tests
on
the
415
Volts
unit
to
perform,
meets
the
design
and
contact
SHEET 5 OF 20
3.0
TESTING PROPOSAL :
3.1
Every
415
LT
switchgear
consists
of
number
of
using
which
standard
will
be
check
lists
recorded
in
and
the
test
testing
schedule.
3.2
Certain
protections
and
inter-tripping
tests
will
be
3.4
3.5
or
abnormality
and
that
report
is
prepared
SHEET 6 OF 20
4.0
SERVICES REQUIRED :
4.1
Volts
of
D.C
4.3
CALIBARATION
SOURCE
METERS/TRANSDUCERS.
4.4
KID
FOR
CALIBARATION
OF
SHEET 7 OF 20
5.0
SAFETY PRECAUTIONS :
In an emergency situation.
By agreement with the working party.
On instruction of the test team leader.
5.2
5.2.1
All
the
members
of
the
testing
team
and
persons
5.2.3
5.2.4
5.2.5
5.2.6
All
handrail,
stairs,
guards
and
trench
covers
5.2.8
should
be
in
force
for
the
installations to be energised.
5.2.9
The
operating
about testing.
personnel
should
be
kept
informed
SHEET 8 OF 20
6.0
EMERGENCY PROCEDURE :
6.1
6.2
6.3
6.4
for
the
particular
isolated immediately.
equipment/area
should
be
SHEET 9 OF 20
7.0
7.1
2.
3.
7.2
7.3
7.4
all
sources
of
supply
and
safety
procedure
SHEET 10 OF 20
7.7
7.8
SHEET 11 OF 20
8.0
COMMISSIONING PROCEDURE :
8.1.1
8.1.2
and
415
Volts
circuit
breaker
wherever
required.
GENERAL CHECKS:
i)
ii)
SHEET 12 OF 20
v)
MOVES FREELY.
vi)
x)
xi)
CHECK
TRANSFORMER SECONDARY
SHEET 13 OF 20
xii) ENSURE
SHEET 14 OF 20
8.2.1
8.2.2
Check
that
communications
have
been
stabilised
charging
breakers
are
between
in
isolated
Emergency
position.
switchboard
Also
tie
No-1
and
8.2.5
Ensure
that
all
fuses
the
in service.
outgoing
feeder
breakers,
volts
circuit
breakers
for
the
power
SHEET 15 OF 20
8.2.7
8.3.1
8.3.2
8.3.3
close and open the breaker from local and check that
the status indications are correct.
8.3.4
Carry out the tests 8.3.2 & 8.3.3 for the next
incomer and
Switchgear.
8.3.5
8.3.6
SHEET 16 OF 20
8.3.7
8.3.8
8.3.9
8.3.10
energise
8.3.12
abnormal
current.
Check
the
transformer
8.3.14
8.3.15
SHEET 17 OF 20
voltage
relays
are
in
picked
up(energised)
8.3.17
8.3.18
8.3.19
8.3.20
8.3.21
8.3.22
8.3.23
8.3.24
SHEET 18 OF 20
8.3.25
8.3.26
8.3.27
8.3.28
Note
the
ammeter
on
the
breaker
11
KV
side
of
the
with
the
Check
externally
for
any
abnormality
transformer B
8.3.30
8.3.31
8.3.32
8.3.33
8.3.34
If
everything
with
the
transformers
and
the
LT
SHEET 19 OF 20
8.3.35
the
transformers
and
the
415
Volts
LT
of
11
KV
outgoing
feeder
and
power
transformers.
9. COMPLETION CRITERIA
SHEET 20 OF 20
10. APPENDICES
DRAWINGS
MANUALS
: O &
LOG SHEETS :
I)
VALUES
OF LT SWITCHGEAR
II)
III)
UNDERVOLTAGE,OVERCURRENT& EARTHFAULT
SETTINGS RECOMMENDED/KEPT