Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
DESIGN
CALCULATIONS
0
REV
3-Dec-13
DATE
FOR CONSTRUCTION
REVISION DESCRIPTION
RNO
CHK
BY
FUP
AUTH
BY
CONTRACT TITLE :
SUBJECT :
EXCAVATION SUPPORT USING SHEET PILE AS RETAINING WALL
DESIGNED BY :
ALR
CHECKED BY :
RNO
AUTHORISED BY : FUP
DATE :
3-Dec-13
CALC. NO.:
P1120/DC/013
ITEM:
P1120: Therma South Energy Units 1 & 2
Design Criteria and CalculationsEXCAVATION SUPPORT USING SHEET PILE AS
RETAINING WALL
REF.
Calc. No : P1120/DC/013
Sheet No.
1 of 9
CALCULATIONS
Design Brief
`
Constructions of septic vaults on site were changed to pre-cast rather than in-situ. Each location was found
short in space to perform open excavation. Engineering department opted to use sheet piles retaining wall
to each excavation. Walls and struts are used which are reflected to shown computations. Design was
based as per latest edition of National Structural Code of the Philippines 6th edition (NSCP 2010). Load
combinations are as per Strength Design (LRFD) with adequate factor of safety.
Geotechnical soil properties are as per Onshore Geotechnical Design Basis Report of TSE PROJECT
UNITS 1 & 2 2x150 MW Coal-fired power plant
Free Earth Method used for sheet pile analysis
Design Loads
1. Dead Loads
Dead Loads are as per transferred forces based from idealized soil strata shown in the
computations below
2. Live Loads
Surcharge Load
30 kPa
3. Wind Load
4. Earthquake Loads
Design Parameters
1. Materials
FSP IV (Fy)
294.3 Mpa
2. Others
Load Combination using Allowable Stress Design (ASD)
D+F
D+H+F+L+T
D + H + F + (Lr or R)
D + H + F + 0.75[L + T + (Lr or R)]
D + H + F + (W or E/1.4)
(203-8)
(203-9)
(203-10)
(203-11)
(203-12)
ITEM:
P1120: Therma South Energy Units 1 & 2
Design Criteria and CalculationsEXCAVATION SUPPORT USING SHEET PILE AS
RETAINING WALL
REF.
Calc. No : P1120/DC/013
Sheet No.
2 of 9
CALCULATIONS
ITEM:
P1120: Therma South Energy Units 1 & 2
Design Criteria and CalculationsEXCAVATION SUPPORT USING SHEET PILE AS
RETAINING WALL
REF.
Calc. No : P1120/DC/013
Sheet No.
3 of 9
CALCULATIONS
ITEM:
P1120: Therma South Energy Units 1 & 2
Design Criteria and CalculationsEXCAVATION SUPPORT USING SHEET PILE AS
RETAINING WALL
REF.
Calc. No : P1120/DC/013
Sheet No.
4 of 9
CALCULATIONS
ITEM:
P1120: Therma South Energy Units 1 & 2
Design Criteria and CalculationsEXCAVATION SUPPORT USING SHEET PILE AS
RETAINING WALL
REF.
Calc. No : P1120/DC/013
Sheet No.
5 of 9
CALCULATIONS
ITEM:
P1120: Therma South Energy Units 1 & 2
Design Criteria and CalculationsEXCAVATION SUPPORT USING SHEET PILE AS
RETAINING WALL
REF.
Calc. No : P1120/DC/013
Sheet No.
6 of 9
CALCULATIONS
ITEM:
P1120: Therma South Energy Units 1 & 2
Design Criteria and CalculationsEXCAVATION SUPPORT USING SHEET PILE AS
RETAINING WALL
REF.
Calc. No : P1120/DC/013
Sheet No.
7 of 9
CALCULATIONS
ITEM:
P1120: Therma South Energy Units 1 & 2
Design Criteria and CalculationsEXCAVATION SUPPORT USING SHEET PILE AS
RETAINING WALL
REF.
Calc. No : P1120/DC/013
Sheet No.
8 of 9
CALCULATIONS
ITEM:
P1120: Therma South Energy Units 1 & 2
Design Criteria and CalculationsEXCAVATION SUPPORT USING SHEET PILE AS
RETAINING WALL
REF.
Calc. No : P1120/DC/013
Sheet No.
9 of 9
CALCULATIONS