Sei sulla pagina 1di 10

LEIGHTON

DESIGN
CALCULATIONS

0
REV

3-Dec-13
DATE

FOR CONSTRUCTION
REVISION DESCRIPTION

RNO
CHK
BY

FUP
AUTH
BY

CONTRACT TITLE :

P1120-THERMA SOUTH ENERGY UNITS 1 & 2

SUBJECT :
EXCAVATION SUPPORT USING SHEET PILE AS RETAINING WALL

DESIGNED BY :

ALR

CHECKED BY :

RNO

AUTHORISED BY : FUP
DATE :

3-Dec-13

CALC. NO.:

P1120/DC/013

Doc. No. QMS F050; Rev. No. 0; 01.07.03

ITEM:
P1120: Therma South Energy Units 1 & 2
Design Criteria and CalculationsEXCAVATION SUPPORT USING SHEET PILE AS
RETAINING WALL
REF.

Calc. No : P1120/DC/013

Sheet No.

1 of 9

CALCULATIONS
Design Brief
`
Constructions of septic vaults on site were changed to pre-cast rather than in-situ. Each location was found
short in space to perform open excavation. Engineering department opted to use sheet piles retaining wall
to each excavation. Walls and struts are used which are reflected to shown computations. Design was
based as per latest edition of National Structural Code of the Philippines 6th edition (NSCP 2010). Load
combinations are as per Strength Design (LRFD) with adequate factor of safety.

Assumption and Design Concept

Geotechnical soil properties are as per Onshore Geotechnical Design Basis Report of TSE PROJECT
UNITS 1 & 2 2x150 MW Coal-fired power plant
Free Earth Method used for sheet pile analysis

Design Loads
1. Dead Loads
Dead Loads are as per transferred forces based from idealized soil strata shown in the
computations below
2. Live Loads
Surcharge Load

30 kPa

3. Wind Load

Wind Loads will not be considered for the analysis

4. Earthquake Loads

EQ Loads will not be considered for the analysis

Design Parameters
1. Materials

FSP IV (Fy)

294.3 Mpa

2. Others
Load Combination using Allowable Stress Design (ASD)
D+F
D+H+F+L+T
D + H + F + (Lr or R)
D + H + F + 0.75[L + T + (Lr or R)]
D + H + F + (W or E/1.4)

(203-8)
(203-9)
(203-10)
(203-11)
(203-12)

Doc. No. QMS F051; Rev. No. 0; 01.07.03

ITEM:
P1120: Therma South Energy Units 1 & 2
Design Criteria and CalculationsEXCAVATION SUPPORT USING SHEET PILE AS
RETAINING WALL
REF.

Calc. No : P1120/DC/013

Sheet No.

2 of 9

CALCULATIONS

Doc. No. QMS F051; Rev. No. 0; 01.07.03

ITEM:
P1120: Therma South Energy Units 1 & 2
Design Criteria and CalculationsEXCAVATION SUPPORT USING SHEET PILE AS
RETAINING WALL
REF.

Calc. No : P1120/DC/013

Sheet No.

3 of 9

CALCULATIONS

Doc. No. QMS F051; Rev. No. 0; 01.07.03

ITEM:
P1120: Therma South Energy Units 1 & 2
Design Criteria and CalculationsEXCAVATION SUPPORT USING SHEET PILE AS
RETAINING WALL
REF.

Calc. No : P1120/DC/013

Sheet No.

4 of 9

CALCULATIONS

Doc. No. QMS F051; Rev. No. 0; 01.07.03

ITEM:
P1120: Therma South Energy Units 1 & 2
Design Criteria and CalculationsEXCAVATION SUPPORT USING SHEET PILE AS
RETAINING WALL
REF.

Calc. No : P1120/DC/013

Sheet No.

5 of 9

CALCULATIONS

Doc. No. QMS F051; Rev. No. 0; 01.07.03

ITEM:
P1120: Therma South Energy Units 1 & 2
Design Criteria and CalculationsEXCAVATION SUPPORT USING SHEET PILE AS
RETAINING WALL
REF.

Calc. No : P1120/DC/013

Sheet No.

6 of 9

CALCULATIONS

Doc. No. QMS F051; Rev. No. 0; 01.07.03

ITEM:
P1120: Therma South Energy Units 1 & 2
Design Criteria and CalculationsEXCAVATION SUPPORT USING SHEET PILE AS
RETAINING WALL
REF.

Calc. No : P1120/DC/013

Sheet No.

7 of 9

CALCULATIONS

Doc. No. QMS F051; Rev. No. 0; 01.07.03

ITEM:
P1120: Therma South Energy Units 1 & 2
Design Criteria and CalculationsEXCAVATION SUPPORT USING SHEET PILE AS
RETAINING WALL
REF.

Calc. No : P1120/DC/013

Sheet No.

8 of 9

CALCULATIONS

Doc. No. QMS F051; Rev. No. 0; 01.07.03

ITEM:
P1120: Therma South Energy Units 1 & 2
Design Criteria and CalculationsEXCAVATION SUPPORT USING SHEET PILE AS
RETAINING WALL
REF.

Calc. No : P1120/DC/013

Sheet No.

9 of 9

CALCULATIONS

Doc. No. QMS F051; Rev. No. 0; 01.07.03