INTRODUCTION

As a complement to BIH Project Quality Plan, this Inspection and Test Plans (ITPs) summarize activities for each product supplied under BIH scope and include verification/inspection a
for monitoring & measurement conformity to the above purchase order. Each chapter will be pass to the relevant VENDOR if any, who will use this as a basis for their Inspection and tes
Minimum inspection and test requirements envisaged for the requisition packages of fabrication and equipment items as detailed within each chapter below shall form the working docu
by the authorised parties at VENDOR manufacturing plant.
All authorised parties are to sign and date each completed activities on the respective locations of the VENDOR at the time of inspection.
CHAPTER
CHAPTER A
CHAPTER B
CHAPTER C
CHAPTER D
CHAPTER E
CHAPTER F
CHAPTER G

PURCHASE ORDER
704-262
704-262
704-341
704-567
704-294
704-403
704-240

COMMODITY
Cover coil bunlde fabrication including external loos
Cover structural steel fabrication including refractor
Cover damper c/w seal air fan fabrication
Cover silencer fabrication
Cover spreader/lifting beam equipments - If Requir
Cover loose items (Instrumentations & Valves) - If R
Cover Tube Finning - If Required

INTERVENTION POINTS

Review R:
BIH/GE/CU/TP/EU will perform a documentation review of the inspection or test.
Observed O:
BIH/GE/CU/TP/EU is notified of the timing of the inspection or test. The inspection or test is performed as scheduled, regardless of whether the BIH/CU/TP/EU or his representative is p
Records of the inspection will be offered to the BIH/GE/CU/TP/EU by vendor
as evidenceW:
of compliance.
Witnessed
BIH/GE/CU/TP/EU is notified of the timing of the inspection or test and a HOLD is placed on the inspection or test until BIH/GE/CU/TP/EU or his representative is in attendance.
Vendor shall not proceed with the next step
until
the inspection
has been witnessed and approved by the designated parties unless written authorisation by BIH/GE/CU/TP/EU is received.
Approval
A
BIH/GE/CU/TP/EU approval request of the quality documentation require that has to be done before the relevant manufacturing stages begin.
Initial Observed I/O
BIH/GE/CU/TP/EU is notified of the timing of the inspection for the first operation only thereafter is Monitoring. The inspection or test is performed as scheduled, regardless of whether t
Records of the inspection will be offered to the BIH/GE/CU/TP/EU by vendor
as evidenceM
of compliance.
Monitoring
Surveillance activity (random inspection) by BIH/GE/CU/TP/EU and review of documents/records. Notification is not required.

NOTIFICATION OF INSPECTIONS (NOI)


Fourteen (14) working days notification required for all inspection required to be OBSERVED and/or WITNESS intervention points.

AUTHORISED PARTIES
VENDOR
Manufactures and/or suppliers of the good in
accordance
with the requirements specified by BIH purchase order.
BIH
Boustead International Heaters Inspector or its representative
O&G
GE O&G Nuovo Pignone Inspector or its representative
CU
Customer Inspector(s) or its representative
TP
Third Party Inspector(s) (if any)-European Community directive, ASME AI, NoBo,
EU
End User Inspector(s) or its representative

SPECIAL NOTES
1) All supplier and sub-supplier shall be ISO 9001 accrediated.
2) WHRU Package (including damper) shall compliance to ATEX 95 Product Directive 94/9/EC to Zone 2.Self certification is acceptable.
3) WHRU Electrical shall be ATEX certified.ATEX product certification require to Zone 2, Gas Group II B, and Temperature Class T3. Self certification not acceptable.
4) WHRU Instrumentation shall be ATEX certified.ATEX product certification require to Zone 1, Gas Group II B, and Temperature Class T3.Self certification not acceptable.
5) Inspection, testing and measuring equipment and instruments shall be ISO 17025 or UKAS or equivalent national accreditation laboratories.

CO-BPXO-12-0376

DOC NO:

704

ETD-001/C
of 25

SHEET:

KZ01-ME-REQ-53-0016

REVISION:

FAC1-H-804001/804002/804003

DATE:

scope and include verification/inspection as a basis


this as a basis for their Inspection and testing plan.
chapter below shall form the working document for quality verification

l bunlde fabrication including external loose piping


uctural steel fabrication including refractory installation

eader/lifting beam equipments - If Required


se items (Instrumentations & Valves) - If Required

e BIH/CU/TP/EU or his representative is present.

his representative is in attendance.

med as scheduled, regardless of whether the BIH/CU/TP/EU or his representative is present.

8-May-15

Boustead
Activity ref no

5021002000

A1

5021002002

A1.1

Activity Description

Documents Preparation & Submission


Welding Data
a) WPS/PQR
b) Weld Plan (Preliminary)
c) List of Welder
d) Weld Repair Procedure
e) Consumables Handling Proc
Note:- Item (a) & (b) to be compile and submit as a book.

5021002004

5021002006

A1.2

A1.3

NDT Procedure
a)Dye Penetrant Inspection (DPI)
b)Magnetic Particle Inspection (MPI)
c) Ultrasonic Testing (UT)
d) Radiography Testing (RT)
e) Positive Material Identification (PMI)
f) Ferrite Testing Procedure
g) Hardness Testing Procedure
Others Quality Control Procedure
a) Quality Control Dossier Index
b) Hydro Test Procedures inc Calibration Certs
c) Stress Relieving Procedure
d) Surface Treatment Procedure
e) Pickling and Passivation Procedure
f) Pigging Procedure
g) Bending Procedure
h) Refractory Installation Procedure including storage and
preservation instructions
i) Packing/Protecting Procedure
j) Fabrication Material Traceability Procedure

Boustead
Activity ref no

5021002008
5021002010

A2
A3

5021002012

A4

Activity Description

Pre Inspection Meeting (PIM)


Quality Management Audit-if any
Materials Inspection, Identification,Traceability and
Certification incl. Weld Consumables
Raw Material i.e. Plate, Pipe, Forgings, Fittings, Castings, Fasteners,
Finned Tube etc
a) Material test Certificates
-Reviewof souce material's
-Chemical and Mechanical properties including metallurgical
-Type of Certificate
- Verify supplementary test if any

5021002014

A4.1
b) Physical Verification of Receive Materials
-Check on material traceability, dimensions, marking
and surface finishes.
- Check on qty receive
- Flange Face protection
- Material Segregation (Alloy & Non-Alloy)

5021002016

Welding Consumables i.e. Flux, Wire, Rod, Electrode etc..


a) Consumables test Certificates
-Reviewof souce material's
-Chemical and Mechanical properties including metallurgical
-Type of Certificate
- Verify supplementary test if any

5021002018
A4.2

Boustead
A4.2

Activity ref no

5021002020

Activity Description

b) Physical Verification of Receive Consumables


- Check Storage in good condition
- Check Oven, quiver in good condition
- Issuance of consumables

Boustead
Activity ref no

5021002022

A4.3

5021002024

A5

5021002026

A5.1

5021002028

A5.2

Activity Description

Positive Material Identification (PMI)


-100% on Pressure Part Components
-100% on each batch of weld consumables prior any welding take
place.
Fabrication
Marking, Cutting, Forming, Bending & etc..
- Check dimension
- Check surface damage/imperfections
- Identification transfer of cut materials
- Check stub/nozzle opening
Joint preparation & Fit-Up Configuration
- Check edge preparation & Fit-Up configuration (i.e.bevel angle,
root opening, root face, root gap)
- Check correct material been fit-up
- Check tack welding (i.e.filler, welder, preheat etc..)
- Dimensional check before weld (i.e. alignment, length, ovality,
straightness etc..)
a) Welding Operation
-Check preheat & preheat maintainance
- Check interpass temperature & cleanliness
- Check electrical parameters
- Check welding machine calibration
- Check Correct Consumables (i.e.filler, shield & purge gas, grinding
disc)
- Check Welder Qualifications

5021002030

b) Internal Root Penetration


-Check root penetration, root concavity, burn throughs, shrinkage
and undercut.

5021002032
A5.3

Boustead
Activity ref no

A5.3

5021002034

Activity Description

c) Completed Weld
-Check weld surface is regular, weld cap and height of excess weld
metal, concavity.
-Check weld width is consistent and weld prep. completely filled, or
leg length is correct and throat thickness right.
-Check toes of weld for fusion.
-Check that spatter/arc well remove
-Check surrounded weld area free from mechanical damage.

d) Weld Repair-if any

5021002036
5021002038

A6

5021002040

A6.1

5021002042

A7

5021002044

A7.1

Heat Treatments
Post Weld Heat Treatments (PWHT)-ASME VIII Div.1
-100% of butt welds > 4"
-100% of butt welds > 16mm wt
-100% of branch welds
-100% of attachement welds >13mm throat thickness
Non Destructive Testing (NDT)
RT/UT [subject to geometry]
-10% of full penetration butt welds in each frame or structure.
-100% of full penetration butt welds in primary members including
splice joints.
-100% of full penetration lifting lugs welds (including pad eyes)
-One radiograph of each junction and one intermediate shot of all
longitudinal welds.

Boustead
Activity ref no

5021002046

A7.2

5021002048

A7.3

5021002050

A7.4

5021002052
5021002054

A8
A9

5021002056

A9.1

5021002058
5021002060

A9.2
A10

Activity Description

MPI/LPI
-10% of full penetration butt welds in each frame or structure.
-10% of all fillet welds in major/primary joints.
-100% of full penetration butt welds in primary members including
splice joints.
-100% of full penetration lifting lugs welds (including pad eyes)
-100% of weld rat holes corner joints.

Hardness- Max 225 HBW (HRB 97,6).


i) Base Metal (BM)
-5% of heat (minimum 1 item), 1 test for every item in sample
ii) Groove Welds (Weld Cap/Root/HAZ)
-No PWHT or Furnace PWHT: 1 test per weld of 5% of the welds

Positive material identification (PMI)


-10% on weld & base metal
Final Visual & Dimensional Inspection
Pressure Testing
Hydrostatic Testing-Shop
- Check equipments used in good
- Check calibration certficates (gauges, charts reorder)
- Check water analysis certficiates
- Check area of test
- Check test pressure
- No buckling or erosion
Internal Coil Drying & Cleanliness
Name Plate Stamping & Rubbing/Photo-if any

Boustead
Activity ref no

5021002062
5021002064
5021002066
5021002068
5021002070
5021002072
5021002074
5021002076
5021002078
5021002080

A10.1
A10.2
A11

5021002082

A11.3

5021002084

A12

5021002086

A12.1

5021002088
5021002090
5021002092
5021002094
5021002096

A13
A14
A14
A14.1
A14.2

A11.1

A11.2

Activity Description

ASME U Stamp
CE Marking/ Stamping
Surface Treatments & Insulation
Painting and Protective Coatings
a) Surface Preparations
b) 1st Coat- Primer
c) 2nd Coat-Intermediate
d) 3rd Coat- Final Coat
e) Coating Test
Pickling & Passivations
Insulation
- Check surface finish which should be free from flux stains,
continuous and smooth.
-Check coating thickness and weight which for steel articles.
-Check for uniformity of coating and distortion.
Final Inspection & Cleanliness
- Check of Cleanliness and Dryness
- Check of Paint, Ru-st Prevention and Galvanizing
- Check of Protection of Flange face
- Check of Marking for Construction
- Check of Name Plate installation/location
- Check of Quantity
- Check overall item/equipment installed.
Packing/Shipping
Punch List/NCR Closing
Quality Dossier
ASME Data Reports
Manufacturer Record Book

Boustead
Activity ref no

5021002098

A15

Activity Description

Inspection Release Note

WHRU INSPECTION & TEST PLAN


CHAPTER A- Coilwork Fabrication
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

684-262-129
684-262-132
684-262-194
684-262-201
684-262-202
684-262C spec

ASME IX, ASME VIII Div.1, ASME Approved Welding Data


B31.3, API 560, API RP 582,
ITN07770.60

684-262C spec

ASME VIII Div.1, ASME B31.3,


API 560, ASME V,ITN02196,
ITN07051, ITN07050,
ITN07049, ITN07039

VENDOR

BIH

Approved NDT Procedure

WHRU INSPECTION & TEST PLAN


CHAPTER A- Coilwork Fabrication
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

Purchase Order
Quality Management System (QMS)

Purchase Order
IS0 9001/ISO TS 29001

Minute of Meeting (MoM)


Audit Reports

Vendor Internal Incoming Material Inspection


Procedure

Purchase Order, Delivery


Order, ASME II Part A, ASTM

Material Receiving Inspection


Reports (MRIR), Material Test
Certificates

Vendor Internal Incoming Material Inspection


Procedure

Vendor Internal Incoming Material Inspection


Procedure

Purchase Order, Delivery


Order, ASME II Part A, ASTM

Purchase Order, Delivery


Order, ASME II Part A, ASTM

Material Receiving Inspection


Reports (MRIR), Material Test
Certificates

VENDOR

BIH

Material Receiving Inspection


Reports (MRIR), Material Test
Certificates

WHRU INSPECTION & TEST PLAN


CHAPTER A- Coilwork Fabrication
Controlling Document/Procedure

Vendor Internal Incoming Material Inspection


Procedure, 684-262-202

Acceptance Criteria

Purchase Order, Delivery


Order, ASME II Part C, AWS
A5.01

Verifying Document

Material Receiving Inspection


Reports (MRIR), Consumables
Test Certificates

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER A- Coilwork Fabrication
Controlling Document/Procedure

684-262-144

684-04 Series Drawing

684-04 Series Drawing


684-262-129
684-262-132

Acceptance Criteria

VENDOR

BIH

ASME II Part A, ASTM A182,


PMI Test Reports
ASTM A312, AWS A5.01, ASME
II Part C

I/O

684-04 Series Drawing


Vendor Internal Inspection
ASME VIII Div.1, API 560, ASME Reports, Material Traceability
B31.3
Reports, Material Map

I/O

ASME VIII Div.1, ASME B31.3,


API 560, ASME IX
Approved Welding Book

684-262-129
ASME VIII Div.1, ASME B31.3,
684-262-194
API 560, ASME IX
Welder Performance Qualifciations (WPQ)- Welder
ID

Vendor Internal Visual Inspection Procedure

Verifying Document

ASME VIII Div.1, ASME B31.3,


API 560

Vendor Internal Inspection


Reports, Weld History Reports

Vendor Internal Inspection


Reports, Weld History Reports

Vendor Internal Inspection


Reports, Weld History Reports,
Visual Inspection Reports

WHRU INSPECTION & TEST PLAN


CHAPTER A- Coilwork Fabrication
Controlling Document/Procedure

Vendor Internal Visual Inspection Procedure

Acceptance Criteria

ASME VIII Div.1, ASME B31.3,


API 560

Verifying Document

BIH

I/O

Vendor Internal Inspection


Reports, Weld History Reports,
Visual Inspection Reports

684-262-201

ASME VIII Div.1, ASME B31.3,


API 560

684-262-145

ASME VIII Div.1, API 560, ASME PWHT Reports & Charts
B31.3

684-262-141
684-262-143

VENDOR

Weld History Reports, Repair


Reports

WHRU INSPECTION & TEST PLAN


CHAPTER A- Coilwork Fabrication
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER A- Coilwork Fabrication
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER A- Coilwork Fabrication
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

AP

AP

AP

AP

AP

AP

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

I/O

I/O

I/O

I/O

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

I/O

I/O

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

Boustead
Activity ref no

5021004000

B1

5021004002

B1.1

Activity Description

Documents Preparation & Submission


Welding Data
a) WPS/PQR
b) Weld Plan (Preliminary)
c) List of Welder
d) Weld Repair Procedure
e) Consumables Handling Proc
Note:- Item (a) & (b) to be compile and submit as a book.

5021004004

B1.2

5021004006

B1.3

5021004008
5021004010

B2
B3

5021004012

B4

NDT Procedure
a)Dye Penetrant Inspection (DPI)
b)Magnetic Particle Inspection (MPI)
c) Ultrasonic Testing (UT)
d) Radiography Testing (RT)
e) Positive Material Identification (PMI)
Others Quality Control Procedure
a) Quality Control Dossier Index
b) Surface Treatment Procedure
c) Pickling and Passivation Procedure
d) Refractory Installation Procedure including storage and
preservation instructions
e) Packing/Protecting Procedure
f) Shipping/Packing List
Pre Inspection Meeting (PIM)
Quality Management Audit-if any
Materials Inspection, Identification,Traceability and
Certification incl. Weld Consumables

Boustead
Activity ref no

Activity Description

Raw Material i.e. Plate, Pipe, Forgings, Fittings, Castings, Fasteners,


Finned Tube etc
a) Material test Certificates
-Reviewof souce material's
-Chemical and Mechanical properties including metallurgical
-Type of Certificate
- Verify supplementary test if any

5021004014

B4.1
b) Physical Verification of Receive Materials
-Check on material traceability, dimensions, marking
and surface finishes.
- Check on qty receive
- Flange Face protection
- Material Segregation (Alloy & Non-Alloy)

5021004016

Welding Consumables i.e. Flux, Wire, Rod, Electrode etc..


a) Consumables test Certificates
-Reviewof souce material's
-Chemical and Mechanical properties including metallurgical
-Type of Certificate
- Verify supplementary test if any

5021004018
B4.2

b) Physical Verification of Receive Consumables


- Check Storage in good condition
- Check Oven, quiver in good condition
- Issuance of consumables

5021004020
5021004022
5021004024

B5
B5.1

Fabrication
WHRU Convection and Transiton Sections

Boustead
Activity ref no

5021004026

B5.1.1

Activity Description

Marking, Cutting, Forming, Bending & etc..


- Check dimension
- Check surface damage/imperfections
- Identification transfer of cut materials
- Check stub/nozzle opening

Boustead
Activity ref no

5021004028

B5.1.2

5021004032
B5.1.3

5021004036

Joint preparation & Fit-Up Configuration


- Check edge preparation & Fit-Up configuration (i.e.bevel angle,
root opening, root face, root gap)
- Check correct material been fit-up
- Check tack welding (i.e.filler, welder, preheat etc..)
- Dimensional check before weld (i.e. alignment, length, ovality,
straightness etc..)
a) Welding Operation
-Check preheat & preheat maintainance
- Check interpass temperature & cleanliness
- Check electrical parameters
- Check welding machine calibration
- Check Correct Consumables (i.e.filler, shield & purge gas, grinding
disc)
- Check Welder Qualifications

5021004030

5021004034

Activity Description

b) Internal Root Penetration


-Check root penetration, root concavity, burn throughs, shrinkage
and undercut.
c) Completed Weld
-Check weld surface is regular, weld cap and height of excess weld
metal, concavity.
-Check weld width is consistent and weld prep. completely filled, or
leg length is correct and throat thickness right.
-Check toes of weld for fusion.
-Check that spatter/arc well remove
-Check surrounded weld area free from mechanical damage.

d) Weld Repair-if any

Boustead
Activity ref no

5021004038

A5.1.4

Activity Description

NDT- RT/UT [subject to geometry]


-10% of full penetration butt welds in each frame or structure.
-100% of full penetration butt welds in primary members including
splice joints.
-100% of full penetration lifting lugs welds (including pad eyes)
-One radiograph of each junction and one intermediate shot of all
longitudinal welds.

NDT- MPI/LPI
-10% of full penetration butt welds in each frame or structure.
-10% of all fillet welds in major/primary joints.
-100% of full penetration butt welds in primary members including
splice joints.
-100% of full penetration lifting lugs welds (including pad eyes)
-100% of weld rat holes corner joints.

5021004040

B5.1.5

5021004042

B5.1.6

Positive material identification (PMI)


-10% on Stainless Steel Stud

5021004044

B5.1.7

Final Visual & Dimensional


-100% Visual of completed sections
-100% Dimensional Check on completed sections

5021004046

B5.2

WHRU Hopper Ducting Including


Support Steel Work

Boustead
Activity ref no

5021004048

B5.2.1

Activity Description

Marking, Cutting, Forming, Bending & etc..


- Check dimension
- Check surface damage/imperfections
- Identification transfer of cut materials
- Check stub/nozzle opening

Boustead
Activity ref no

5021004050

B5.2.2

5021004054
B5.2.3

5021004058

Joint preparation & Fit-Up Configuration


- Check edge preparation & Fit-Up configuration (i.e.bevel angle,
root opening, root face, root gap)
- Check correct material been fit-up
- Check tack welding (i.e.filler, welder, preheat etc..)
- Dimensional check before weld (i.e. alignment, length, ovality,
straightness etc..)
a) Welding Operation
-Check preheat & preheat maintainance
- Check interpass temperature & cleanliness
- Check electrical parameters
- Check welding machine calibration
- Check Correct Consumables (i.e.filler, shield & purge gas, grinding
disc)
- Check Welder Qualifications

5021004052

5021004056

Activity Description

b) Internal Root Penetration


-Check root penetration, root concavity, burn throughs, shrinkage
and undercut.
c) Completed Weld
-Check weld surface is regular, weld cap and height of excess weld
metal, concavity.
-Check weld width is consistent and weld prep. completely filled, or
leg length is correct and throat thickness right.
-Check toes of weld for fusion.
-Check that spatter/arc well remove
-Check surrounded weld area free from mechanical damage.

d) Weld Repair-if any

Boustead
Activity ref no

5021004060

B5.2.4

Activity Description

NDT- RT/UT [subject to geometry]


-10% of full penetration butt welds in each frame or structure.
-100% of full penetration butt welds in primary members including
splice joints.
-100% of full penetration lifting lugs welds (including pad eyes)
-One radiograph of each junction and one intermediate shot of all
longitudinal welds.

NDT- MPI/LPI
-10% of full penetration butt welds in each frame or structure.
-10% of all fillet welds in major/primary joints.
-100% of full penetration butt welds in primary members including
splice joints.
-100% of full penetration lifting lugs welds (including pad eyes)
-100% of weld rat holes corner joints.

5021004062

B5.2.5

5021004064

B5.2.6

Positive material identification (PMI)


-10% on Stainless Steel Stud

5021004066

B5.2.7

Final Visual & Dimensional


-100% Visual of completed sections
-100% Dimensional Check on completed sections

5021004068

B5.3

5021004070

B5.3.1

WHRU Platforms Structure Steel , Handrails and Ladders


Marking, Cutting, Forming, Bending & etc..
- Check dimension
- Check surface damage/imperfections
- Identification transfer of cut materials

Boustead
Activity ref no

5021004072

B5.3.2

Joint preparation & Fit-Up Configuration


- Check edge preparation & Fit-Up configuration (i.e.bevel angle,
root opening, root face, root gap)
- Check correct material been fit-up
- Check tack welding (i.e.filler, welder, preheat etc..)
- Dimensional check before weld (i.e. alignment, length, ovality,
straightness etc..)
a) Welding Operation
-Check preheat & preheat maintainance
- Check interpass temperature & cleanliness
- Check electrical parameters
- Check welding machine calibration
- Check Correct Consumables (i.e.filler, shield & purge gas, grinding
disc)
- Check Welder Qualifications

5021004074

B5.3.3

5021004076

5021004078
5021004080

Activity Description

B5.3.4

b) Completed Weld
-Check weld surface is regular, weld cap and height of excess weld
metal, concavity.
-Check weld width is consistent and weld prep. completely filled, or
leg length is correct and throat thickness right.
-Check toes of weld for fusion.
-Check that spatter/arc well remove
-Check surrounded weld area free from mechanical damage.

d) Weld Repair-if any


Final Visual & Dimensional
-100% Visual of completed sections
-100% Dimensional Check on completed sections

Boustead
Activity ref no

Activity Description

5021004082

B6

5021004084

B6.1

WHRU Trial Assembly


-All bolt holes are free from sharp edges or burrs no flame cutting
acceptable for bolt holes
-The bolts being used for trial assembly are the correct size
(diameter/length) and same size as the final erection bolts
-Match marks are applied either hard stamped (or welded) and are
deep enough that they will not be obscured during blasting /
painting
-In all locations that there are NO bolt/nut clashes with the structure
and sufficient clearance for tightening
-flange faces are square/flat and are mating
-key overall dimensions (e.g. height, length, width, diameter,
straightness, levelness, squareness corner to corner/diagonal).

5021004086
5021004088
5021004090
5021004092
5021004094
5021004096
5021004098
5021004100

B7

B7.1

5021004102

B7.3

B7.2

Surface Treatments & Galvanizing


Painting and Protective Coatings
a) Surface Preparations
b) 1st Coat- Primer
c) 2nd Coat-Intermediate
d) 3rd Coat- Final Coat
e) Coating Test
Pickling & Passivations
Galvanizing- For Platformsshandrails,ladders,stairs etc..

Boustead
Activity ref no

5021004104

B8

5021004106

Activity Description

Refractory Installation (Ceramic Fibre Blanket)


Raw Material i.e. anchors, stud, washer, nut, CFB, Bitumastic
a) Material test Certificates
-Reviewof source material's
-Certificate of Conformity
- MSDS

B8.1
b) Physical Verification of Receive Materials
-Check on material traceability, dimensions, marking
and surface finishes.
- Check on qty receive
- Material Storage

5021004108

5021004110
5021004112
5021004114
5021004116
5021004118
5021004120
5021004122

B8.2

B8.3

5021004124

B8.4

Positive Material Identification (PMI)


i) 10% on each type of anchors/studs.
Stud Installation
a) Surface preparation
b) Stud installation/fit-up/layout
c) Stud welding
d) 5% Hammer test of Stud (One pound hammer)
Internal Insulation
a) Surface preparation
- All internal surface cleaned by power tool or
power tool accordance with SSPC SP7
- Anticorrosive Bitumastic (0.4mm)

Boustead
Activity ref no

5021004126
B8.4

Activity Description

b) Ceramic Fiber Installation


- Surface preparation prior to installation
- Stud check prior to lining
- Check installation Correct Thickness
- Check Fiber Blakets Match Tightly Adjacent Ones
- Check Hot Face Layer Follows (Gas Flow) at
Over lap joint
c) Insulation Lining/Cladding Plate Installation
- Surface preparation prior to installation
- Check of insulation cladding plate (Gas Flow) at
Over lap joint
- Check of tack weld nut to stud/washer
- Check lining cleanliness
- Check gap is acceptable (i.e..around the corner, mating flange,
edge to batten channel)
- Check batten channel installation (straightness, free from bent

5021004128

5021004130
5021004132

B9
B10

5021004134

B10.1

5021004136
5021004138
5021004140

B11
B12
B13

Load Test of Spreader/Lifting Beam


Final Inspection & Cleanliness
- Check of Cleanliness and Dryness
- Check of Paint, Rust Prevention and Galvanizing
- Check of Protection of Flange face
- Check of Marking for Construction
- Check of Name Plate installation/location
- Check of Quantity
- Check Instruments/Electrcial/Earthing Connection
Packing/Shipping
Punch List/NCR Closing
Quality Dossier

Boustead
Activity ref no

5021004142
5021004144

B13.1
B14

Activity Description

Manufacturer Record Book


Inspection Release Note

WHRU INSPECTION & TEST PLAN


CHAPTER B- Steelwork Fabrication c/w Refractory Insulation
Controlling Document/Procedure

684-262-128

Acceptance Criteria

Verifying Document

VENDOR

BIH

684-262C spec, AWS D1.1,


Approved Welding Data
AWS D1.6, ASME IX, BS EN ISO
15614

WHRU INSPECTION & TEST PLAN


CHAPTER B- Steelwork Fabrication c/w Refractory Insulation
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER B- Steelwork Fabrication c/w Refractory Insulation
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER B- Steelwork Fabrication c/w Refractory Insulation
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER B- Steelwork Fabrication c/w Refractory Insulation
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER B- Steelwork Fabrication c/w Refractory Insulation
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER B- Steelwork Fabrication c/w Refractory Insulation
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER B- Steelwork Fabrication c/w Refractory Insulation
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER B- Steelwork Fabrication c/w Refractory Insulation
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER B- Steelwork Fabrication c/w Refractory Insulation
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER B- Steelwork Fabrication c/w Refractory Insulation
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER B- Steelwork Fabrication c/w Refractory Insulation
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER B- Steelwork Fabrication c/w Refractory Insulation
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

AP

AP

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

Boustead
Activity ref no

5021006000

C1

5021006002

C1.1

Activity Description

Documents Preparation & Submission


Welding Data
a) WPS/PQR
b) Weld Plan (Preliminary)
c) List of Welder
d) Weld Repair Procedure
e) Consumables Handling Proc
Note:- Item (a) & (b) to be compile and submit as a book.

5021006004

C1.2

5021006006

C1.3

5021006008
5021006010

C2
C3

5021006012

C4

NDT Procedure
a)Dye Penetrant Inspection (DPI)
b)Magnetic Particle Inspection (MPI)
c) Ultrasonic Testing (UT)
d) Radiography Testing (RT)
e) Positive Material Identification (PMI)
Others Quality Control Procedure
a) Quality Control Dossier Index
b) Surface Treatment Procedure
c) Pickling and Passivation Procedure
d) Pressure Test Procedure
e) Packing/Protecting Procedure
f) FAT Test Procedure
Pre Inspection Meeting (PIM)
Quality Management Audit-if any
Materials Inspection, Identification,Traceability and
Certification incl. Weld Consumables

Boustead
Activity ref no

Activity Description

Raw Material i.e. Plate, Pipe, Forgings, Fittings, Castings, Fasteners,


Finned Tube etc
a) Material test Certificates
-Reviewof souce material's
-Chemical and Mechanical properties including metallurgical
-Type of Certificate
- Verify supplementary test if any

5021006014

C4.1
b) Physical Verification of Receive Materials
-Check on material traceability, dimensions, marking
and surface finishes.
- Check on qty receive
- Check Machining area protection (shaft)
- Material Segregation (Alloy & Non-Alloy)

5021006016

Welding Consumables i.e. Flux, Wire, Rod, Electrode etc..


a) Consumables test Certificates
-Reviewof souce material's
-Chemical and Mechanical properties including metallurgical
-Type of Certificate
- Verify supplementary test if any

5021006018
C4.2

5021006020

b) Physical Verification of Receive Consumables


- Check Storage in good condition
- Check Oven, quiver in good condition
- Issuance of consumables

Boustead
Activity ref no

5021006022

C4.3

Activity Description

Electrical & Instrumentations i.e..valve, filter, tubing, cable, JB &


etc
a) Material test Certificates
-Reviewof souce material's
-Material Test Certificate/Certifcate of Conformity
-Hazardous area test certifcates
-IP test certificates
-Calibration & Test Certificates

Boustead
Activity ref no

b) Physical Verification of Receive Materials


-Check on material traceability, dimensions, marking
and surface finishes.
- Check on qty receive
- Check tagging plate
- Check name plate marking

5021006024

5021006026

C5

5021006028

C5.1

5021006030

Activity Description

C5.2

Fabrication (Damper Frames & Blades)


Marking, Cutting, Forming, Bending & etc..
- Check dimension
- Check surface damage/imperfections
- Identification transfer of cut materials
- Check stub/nozzle opening
Joint preparation & Fit-Up Configuration
- Check edge preparation & Fit-Up configuration (i.e.bevel angle,
root opening, root face, root gap)
- Check correct material been fit-up
- Check tack welding (i.e.filler, welder, preheat etc..)
- Dimensional check before weld (i.e. alignment, length, ovality,
straightness etc..)
a) Welding Operation
-Check preheat & preheat maintainance
- Check interpass temperature & cleanliness
- Check electrical parameters
- Check welding machine calibration
- Check Correct Consumables (i.e.filler, shield & purge gas, grinding
disc)
- Check Welder Qualifications

5021006032

C5.3

Boustead
Activity ref no

C5.3

5021006034

5021006036

5021006038

C5.4

Activity Description

b) Completed Weld
-Check weld surface is regular, weld cap and height of excess weld
metal, concavity.
-Check weld width is consistent and weld prep. completely filled, or
leg length is correct and throat thickness right.
-Check toes of weld for fusion.
-Check that spatter/arc well remove
-Check surrounded weld area free from mechanical damage.

d) Weld Repair-if any


NDT- RT/UT [subject to geometry]
-10% of full penetration butt welds in each frame or structure.
-100% of full penetration butt welds in primary members including
splice joints.
-100% of full penetration lifting lugs welds (including pad eyes)
-One radiograph of each junction and one intermediate shot of all
longitudinal welds.

Boustead
Activity ref no

5021006040

C5.5

5021006042

C5.6

Activity Description

NDT- MPI/LPI
-10% of full penetration butt welds in each frame or structure.
-10% of all fillet welds in major/primary joints.
-100% of full penetration butt welds in primary members including
splice joints.
-100% of full penetration lifting lugs welds (including pad eyes)
-100% of weld rat holes corner joints.

Positive material identification (PMI)


-10% on Stainless Steel Stud

Boustead
Activity ref no

5021006044

C5.7

5021006046

C8

5021006048

Activity Description

Final Visual & Dimensional


-100% Visual of completed sections
-100% Dimensional Check on completed sections
Refractory Installation (Ceramic Fibre Blanket)
Raw Material i.e. anchors, stud, washer, nut, CFB, Bitumastic
a) Material test Certificates
-Reviewof source material's
-Certificate of Conformity
- MSDS

C8.1
b) Physical Verification of Receive Materials
-Check on material traceability, dimensions, marking
and surface finishes.
- Check on qty receive
- Material Storage

5021006050

5021006052
5021006054
5021006056
5021006058
5021006060
5021006062
5021006064
5021006066

C8.2

C8.3

C8.4
C8.4.1

Positive Material Identification (PMI)


i) 10% on each type of anchors/studs.
Stud Installation
a) Surface preparation
b) Stud installation/fit-up/layout
c) Stud welding
d) 5% Hammer test of Stud (One pound hammer)
Insulation
Surface preparation
- All internal surface cleaned by power tool or
power tool accordance with SSPC SP7
- Anticorrosive Bitumastic (0.4mm)

Boustead
Activity ref no

5021006068

C8.4.2

5021006070

C8.4.3

5021006072
5021006074
5021006076
5021006078
5021006080
5021006082
5021006084
5021006086
5021006088
5021006090

C9

C9.1

C9.2
C10
C11

Activity Description

Ceramic Fiber Installation


- Surface preparation prior to installation
- Stud check prior to lining
- Check installation Correct Thickness
- Check Fiber Blakets Match Tightly Adjacent Ones
- Check Hot Face Layer Follows (Gas Flow) at
Over lap joint
Insulation Lining/Cladding Plate Installation
- Surface preparation prior to installation
- Check of insulation cladding plate (Gas Flow) at
Over lap joint
- Check of tack weld nut to stud/washer
- Check lining cleanliness
- Check gap is acceptable
Surface Treatments
Painting and Protective Coatings
a) Surface Preparations
b) 1st Coat- Primer
c) 2nd Coat-Intermediate
d) 3rd Coat- Final Coat
e) Coating Test
Pickling & Passivations
Pressure Test- Air Tank
Assembly

Boustead
Activity ref no

5021006092

C11.1

Activity Description

Mechanical Completion
-Check assembly has correct tagging and identification
- Check all welds visual & dimensional inspection have been
completed and accepted.
- Check that welding and NDT has been performed and
NDT reports properly reviewed and endorsed by qualified NDT
Interpretation personnel.
- Check all hydrostatic done (air reservoir).
- Check air reservoir nameplate & information carve correct.
- Check material certification is complete cover with index &
traceability (if require).
- Check all mechanical item installed according to approved
drawing (i.e..blade,lever & linkage,housing & bearing,)

Boustead
Activity ref no

5021006094

C11.2

Activity Description

Instruments Completion
- Check all items have been supplied and installed correctly.
- Check tagging and location of equipment for accessibility for
operation and maintenance.
- Check appearance, paintwork, dimensions and fixing points
against final agreed drawings.
- Check routing and segregation of all cabling.
- Check that all wiring, cables and cores are correctly terminated
and that cable / terminal markers and nameplates correspond to
the documentation.
- Check that calibration certificates, material certificates and
hazardous area certification for all applicable instrumentation
equipment are available.
- Check that hydrostatic pressure test certificates / certification for
all applicable instrumentation equipment, including impulse lines
available.
- Check that instrument cable been performed insulation &
continuity test.
- Check that loop test been performed for each instruments
installed back to JB.

Boustead
Activity ref no

5021006096

C11.3

5021006098
5021006100
5021006102

C12
C12.1
C12.2

5021006104

C12.3

Activity Description

Electrical Completion
- Check located in such a manner as to enable ease of maintenance
& adequate access for cabling and routing.
- Check space on cable tray or racking for cables
- Check external cable connections shall be located on perimeter of
packaged skid (unless a direct connection to equipment within the
package is more convenient for installation and for maintenance).
- Check adequate space shall be left between gland plates and
terminal strips to ensure termination of each cable is practicable
once all other cables have been terminated.
- Check protection shall be provided for cables, electrical
equipment, devices, and conduits when installed in areas subject to
physical damage or vibration.
- Check equipment installed in a neat manner. Trays, channels and
cables routed horizontally and vertically, parallel to one another or
at right angles to equipment line.
- Check working space around equipment shall as a minimum, be in
accordance with specification. Sufficient aisle space shall be
provided to allow for the removal of equipment.
- Check control panels or local controls shall be constructed and
sited to prevent physical damage or inadvertent operation.
- Check Motors mounted.

Factory Acceptance Test (FAT)


Seal Air Fan Motor- Routine Test
Seal Air Fan Mechanical Run/Balancing Test
Operational Test/Functional Test of Damper and
actuator (check clearances in closed position)

Boustead
Activity ref no

5021006106

C13

5021006108

C13.1

5021006110
5021006112
5021006114
5021006116
5021006118
5021006120
5021006122

C14
C15
C16
C16.1
C16.2
C16.3
C17

Activity Description

Final Inspection & Cleanliness


- Check of Cleanliness and Dryness
- Check of Paint, Rust Prevention and Galvanizing
- Check of Protection of Flange face
- Check of Marking for Construction
- Check of Name Plate installation/location
- Check of Quantity
- Check Instruments/Electrcial/Earthing Connection
Packing/Shipping
Punch List/NCR Closing
Quality Dossier
Manufacturer Record Book
ATEX Techincal Dossier/File
Air Tank ASME Data Reports
Inspection Release Note

WHRU INSPECTION & TEST PLAN


CHAPTER C- Damper
Controlling Document/Procedure

684-341-128

Acceptance Criteria

Verifying Document

VENDOR

BIH

684-341C spec, AWS D1.1,


Approved Welding Data
AWS D1.6, ASME IX, BS EN ISO
15614

WHRU INSPECTION & TEST PLAN


CHAPTER C- Damper
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER C- Damper
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER C- Damper
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER C- Damper
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER C- Damper
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER C- Damper
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER C- Damper
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER C- Damper
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER C- Damper
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER C- Damper
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER C- Damper
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

AP

AP

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

Boustead
Activity ref no

5021008000

D1

5021008002

D1.1

Activity Description

Documents Preparation & Submission


Welding Data
a) WPS/PQR
b) Weld Plan (Preliminary)
c) List of Welder
d) Weld Repair Procedure
e) Consumables Handling Proc
Note:- Item (a) & (b) to be compile and submit as a book.

5021008004

D1.2

5021008006

D1.3

5021008008
5021008010

D2
D3

5021008012

D4

NDT Procedure
a)Dye Penetrant Inspection (DPI)
b)Magnetic Particle Inspection (MPI)
c) Ultrasonic Testing (UT)
d) Radiography Testing (RT)
e) Positive Material Identification (PMI)
Others Quality Control Procedure
a) Quality Control Dossier Index
b) Surface Treatment Procedure
c) Pickling and Passivation Procedure
d) Refractory Installation Procedure including storage and
preservation instructions
e) Packing/Protecting Procedure
f) Shipping/Packing List
Pre Inspection Meeting (PIM)
Quality Management Audit-if any
Materials Inspection, Identification,Traceability and
Certification incl. Weld Consumables

Boustead
Activity ref no

Activity Description

Raw Material i.e. Plate, Pipe, Forgings, Fittings, Castings, Fasteners,


Finned Tube etc
a) Material test Certificates
-Reviewof souce material's
-Chemical and Mechanical properties including metallurgical
-Type of Certificate
- Verify supplementary test if any

5021008014

D4.1
b) Physical Verification of Receive Materials
-Check on material traceability, dimensions, marking
and surface finishes.
- Check on qty receive
- Flange Face protection
- Material Segregation (Alloy & Non-Alloy)

5021008016

5021008018
D4.2

b) Physical Verification of Receive Consumables


- Check Storage in good condition
- Check Oven, quiver in good condition
- Issuance of consumables

5021008020
5021008022

Welding Consumables i.e. Flux, Wire, Rod, Electrode etc..


a) Consumables test Certificates
-Reviewof souce material's
-Chemical and Mechanical properties including metallurgical
-Type of Certificate
- Verify supplementary test if any

D5

Fabrication

Boustead
Activity ref no

5021008024

D5.1

Activity Description

Marking, Cutting, Forming, Bending & etc..


- Check dimension
- Check surface damage/imperfections
- Identification transfer of cut materials

Boustead
Activity ref no

5021008026

D5.2

5021008030
D5.3

5021008034

Joint preparation & Fit-Up Configuration


- Check edge preparation & Fit-Up configuration (i.e.bevel angle,
root opening, root face, root gap)
- Check correct material been fit-up
- Check tack welding (i.e.filler, welder, preheat etc..)
- Dimensional check before weld (i.e. alignment, length, ovality,
straightness etc..)
a) Welding Operation
-Check preheat & preheat maintainance
- Check interpass temperature & cleanliness
- Check electrical parameters
- Check welding machine calibration
- Check Correct Consumables (i.e.filler, shield & purge gas, grinding
disc)
- Check Welder Qualifications

5021008028

5021008032

Activity Description

b) Root Penetration
-Check root penetration, root concavity, burn throughs, shrinkage
and undercut.
c) Completed Weld
-Check weld surface is regular, weld cap and height of excess weld
metal, concavity.
-Check weld width is consistent and weld prep. completely filled, or
leg length is correct and throat thickness right.
-Check toes of weld for fusion.
-Check that spatter/arc well remove
-Check surrounded weld area free from mechanical damage.

d) Weld Repair-if any

Boustead
Activity ref no

5021008036

D6

5021008038

D6.1

5021008040

D6.2

5021008042

D7

5021008044

D7.1

5021008046
5021008048
5021008050

D7
D7.1
D8

5021008052

D8.1

Activity Description

Non Destructive Testing (NDT)


NDT- RT/UT [subject to geometry]
-10% of full penetration butt welds in each frame or structure.
-100% of full penetration butt welds in primary members including
splice joints.
-100% of full penetration lifting lugs welds (including pad eyes)

NDT- MPI/LPI
-10% of full penetration butt welds in each frame or structure.
-10% of all fillet welds in major/primary joints.
-100% of full penetration butt welds in primary members including
splice joints.
-100% of full penetration lifting lugs welds (including pad eyes)
-100% of weld rat holes corner joints.

Final Visual & Dimensional


Final Visual & Dimensional
-100% Visual of completed sections
-100% Dimensional Check on completed sections
Surface Treatments & Galvanizing
Pickling & Passivations
Acoustic Lining
Installation of acoustic infil and fitting
of liner plates.

Boustead
Activity ref no

5021008054

D9

5021008056

D9.1

5021008058
5021008060
5021008062
5021008064
5021008066

D10
D11
D12
D12.1
D13

Activity Description

Final Inspection & Cleanliness


- Check of Cleanliness and Dryness
- Check of Paint, Rust Prevention and Galvanizing
- Check of Protection of Flange face
- Check of Marking for Construction
- Check of Name Plate installation/location
- Check of Quantity
Packing/Shipping
Punch List/NCR Closing
Quality Dossier
Manufacturer Record Book
Inspection Release Note

WHRU INSPECTION & TEST PLAN


CHAPTER D- Silencer
Controlling Document/Procedure

684-567-128

Acceptance Criteria

Verifying Document

VENDOR

BIH

684-262C spec, AWS D1.1,


Approved Welding Data
AWS D1.6, ASME IX, BS EN ISO
15614

WHRU INSPECTION & TEST PLAN


CHAPTER D- Silencer
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER D- Silencer
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER D- Silencer
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER D- Silencer
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER D- Silencer
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

Boustead
Activity ref no

5021010000

E1

5021010002

E1.1

Activity Description

Documents Preparation & Submission


Welding Data
a) WPS/PQR
b) Weld Plan (Preliminary)
c) List of Welder
d) Weld Repair Procedure
e) Consumables Handling Proc
Note:- Item (a) & (b) to be compile and submit as a book.

5021010004

E1.2

5021010006

E1.3

5021010008
5021010010

E2
E3

5021010012

E4

NDT Procedure
a)Dye Penetrant Inspection (DPI)
b)Magnetic Particle Inspection (MPI)
c) Ultrasonic Testing (UT)
d) Radiography Testing (RT)
e) Positive Material Identification (PMI)
Others Quality Control Procedure
a) Quality Control Dossier Index
b) Surface Treatment Procedure
c) Pickling and Passivation Procedure
d) Refractory Installation Procedure including storage and
preservation instructions
e) Packing/Protecting Procedure
f) Shipping/Packing List
Pre Inspection Meeting (PIM)
Quality Management Audit-if any
Materials Inspection, Identification,Traceability and
Certification incl. Weld Consumables

Boustead
Activity ref no

Activity Description

Raw Material i.e. Plate, Pipe, Forgings, Fittings, Castings, Fasteners,


Finned Tube etc
a) Material test Certificates
-Reviewof souce material's
-Chemical and Mechanical properties including metallurgical
-Type of Certificate
- Verify supplementary test if any

5021010014

E4..1
b) Physical Verification of Receive Materials
-Check on material traceability, dimensions, marking
and surface finishes.
- Check on qty receive
- Flange Face protection
- Material Segregation (Alloy & Non-Alloy)

5021010016

Welding Consumables i.e. Flux, Wire, Rod, Electrode etc..


a) Consumables test Certificates
-Reviewof souce material's
-Chemical and Mechanical properties including metallurgical
-Type of Certificate
- Verify supplementary test if any

5021010018
E4.2

b) Physical Verification of Receive Consumables


- Check Storage in good condition
- Check Oven, quiver in good condition
- Issuance of consumables

5021010020
5021010022

E5

Fabrication

Boustead
Activity ref no

5021010024

E5.1

Activity Description

Marking, Cutting, Forming, Bending & etc..


- Check dimension
- Check surface damage/imperfections
- Identification transfer of cut materials

Boustead
Activity ref no

5021010026

E5.2

5021010030
E5.3

5021010034

Joint preparation & Fit-Up Configuration


- Check edge preparation & Fit-Up configuration (i.e.bevel angle,
root opening, root face, root gap)
- Check correct material been fit-up
- Check tack welding (i.e.filler, welder, preheat etc..)
- Dimensional check before weld (i.e. alignment, length, ovality,
straightness etc..)
a) Welding Operation
-Check preheat & preheat maintainance
- Check interpass temperature & cleanliness
- Check electrical parameters
- Check welding machine calibration
- Check Correct Consumables (i.e.filler, shield & purge gas, grinding
disc)
- Check Welder Qualifications

5021010028

5021010032

Activity Description

b) Root Penetration
-Check root penetration, root concavity, burn throughs, shrinkage
and undercut.
c) Completed Weld
-Check weld surface is regular, weld cap and height of excess weld
metal, concavity.
-Check weld width is consistent and weld prep. completely filled, or
leg length is correct and throat thickness right.
-Check toes of weld for fusion.
-Check that spatter/arc well remove
-Check surrounded weld area free from mechanical damage.

d) Weld Repair-if any

Boustead
Activity ref no

Activity Description

Final Visual & Dimensional


Final Visual & Dimensional
-100% Visual of completed sections
-100% Dimensional Check on completed sections

5021010036

E6

5021010038

E6.1

5021010040

E7

5021010042

E7.1

Non Destructive Testing (NDT)- Pre Load


NDT- RT/UT [subject to geometry]
-100% of full penetration lifting lugs welds (including pad eyes)

5021010044

E7.2

NDT- MPI/LPI
-100% of full penetration lifting lugs welds (including pad eyes)

5021010046
5021010048
5021010050
5021010052

E8
E8.1
E8.2
E9

5021010054

E9.1

Load Test
Lifting/Spreader Beam
Drop Links
Non Destructive Testing (NDT)- Post Load
NDT- RT/UT [subject to geometry]
-100% of full penetration lifting lugs welds (including pad eyes)

5021010056

E9.2

NDT- MPI/LPI
-100% of full penetration lifting lugs welds (including pad eyes)

5021010058
5021010060
5021010062
5021010064
5021010066
5021010068
5021010070

E10

E10.1

Surface Treatments & Galvanizing


Painting and Protective Coatings
a) Surface Preparations
b) 1st Coat- Primer
c) 2nd Coat-Intermediate
d) 3rd Coat- Final Coat
e) Coating Test

Boustead
Activity ref no

5021010072
5021010074

E11
E12

5021010076

E12.1

5021010078
5021010080
5021010082
5021010084
5021010086

E13
E14
E15
E15.1
E16

Activity Description

Assembly, Identification & Marking


Final Inspection & Cleanliness
- Check of Cleanliness and Dryness
- Check of Paint, Rust Prevention and Galvanizing
- Check of Protection of Flange face
- Check of Marking for Construction
- Check of Name Plate installation/location
- Check of Quantity
Packing/Shipping
Punch List/NCR Closing
Quality Dossier
Manufacturer Record Book
Inspection Release Note

WHRU INSPECTION & TEST PLAN


CHAPTER E- Lifting Beam
Controlling Document/Procedure

704-294-128

Acceptance Criteria

Verifying Document

VENDOR

BIH

704-294C spec, AWS D1.1,


Approved Welding Data
AWS D1.6, ASME IX, BS EN ISO
15614

WHRU INSPECTION & TEST PLAN


CHAPTER E- Lifting Beam
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER E- Lifting Beam
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER E- Lifting Beam
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER E- Lifting Beam
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER E- Lifting Beam
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

Boustead
Activity ref no

5021012000

F1

5021012002

F1.2

5021012004

F2

5021012006

F2.1

Documents Preparation & Submission


Project & Engineering Procedure
a) Quality Control Dossier Index
b) General Arrangements
c) Instrument Data Sheet
d) Instrumentations Hook Up Detail
e) Instrument Index
f) Instrument Cable Schedule
g) Panel/Junction Box Layout
h) Wiring/Schematic Diagram
i) Utilities Schedule
Materials Inspection, Identification,Traceability and
Certification.
Electrical & Instrumentations i.e..valve, filter, tubing, cable, JB &
etc
a) Material test Certificates
-Reviewof souce material's
-Material Test Certificate/Certifcate of Conformity
-Hazardous area test certifcates
-IP test certificates
-Calibration & Test Certificates
b) Physical Verification of Materials
-Check on material traceability, dimensions, marking
and surface finishes.
- Check on qty receive
- Check tagging plate
- Check name plate marking

5021012008

5021012010
5021012012

Activity Description

F3
F3.1

Inspection & Test


Manual Valves

Boustead
Activity ref no

5021012014
5021012016
5021012018
5021012020
5021012022

F3.1.1
F3.1.2
F3.1.3
F3.1.4
F3.1.5

5021012024

F3.2

5021012026
5021012028
5021012030
5021012032
5021012034

F3.2.1
F3.2.2
F3.2.3
F3.2.4
F4

5021012036

F4.1

5021012038
5021012040
5021012042
5021012044

F4.2
F5
F6
F7

Activity Description

NDT- 100% DPI on Internal Valves


PMI - 10% DPI on Internal Valves
Body Hydrostatic Test
Seat/Seal Hydrostatic & Pneumatic Leak Test
Functional Check
Instrumentations (i.e..thermowell/thermoelements/cable/control
panel etc)
Hydrostatic test - Thermowells
Insulation and continuity test - Cable
Functional test
Calibration check
Final Inspection & Cleanliness
- Check of Cleanliness and Dryness
- Check of Paint, Rust Prevention and Galvanizing
- Check of Protection of Flange face
- Check of Marking for Construction
- Check of Name Plate installation/location
- Check of Quantity
Three Way Check Completeness
Packing/Shipping
Punch List/NCR Closing
Inspection Release Note

WHRU INSPECTION & TEST PLAN


CHAPTER F- Instrumentations including Valve
Controlling Document/Procedure

704-403-169

Acceptance Criteria

704-403C Spec

Verifying Document

VENDOR

BIH

Approved Documents

WHRU INSPECTION & TEST PLAN


CHAPTER F- Instrumentations including Valve
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

Boustead
Activity ref no

5021014000

G1

5021014002

G1.1

Activity Description

Documents Preparation & Submission


Welding Data
a) WPS/PQR
Note:- Item (a) & (b) to be compile and submit as a book.

5021014004

G1.2

5021014006

G2

5021014008

G3

Manufacturing & Test Procedure


a)Dye Penetrant Inspection (DPI)
b) Radiography Testing (RT)
c) Positive Material Identification (PMI)
d) Quality Control Dossier Index
Quality Management Audit-if any
Materials Inspection, Identification,Traceability and
Certification.
Raw Material i.e. Plate & Pipe
a) Material test Certificates
-Reviewof souce material's
-Chemical and Mechanical properties including metallurgical
-Type of Certificate
- Verify supplementary test if any

5021014010
G3.1

b) Physical Verification of Receive Materials


-Check on material traceability, dimensions, marking
and surface finishes.
- Check on qty receive
- Material Segregation (Alloy & Non-Alloy)

5021014012

5021014014

G3.2

5021014016

G4

Positive Material Identification (PMI)


-100% on Pressure Part Components
Fabrication

Boustead
Activity ref no

5021014018

G4.1

5021014020

G4.2

5021014022

G4.3

Activity Description

Marking & Cutting


- Check dimension
- Check surface damage/imperfections
Verification finning test piece - First production only
a) Fin welding Operation
- Check correct material been joined.
- Check electrical parameters.
- Check welding machine calibration.
- Dimensional check before weld (i.e. alignment, length, ovality,
straightness etc..)
- Check operator Qualifications.
b) Completed Finning Operation
-Check weld width is consistent.
-Check toes of weld for fusion.
-Check surrounded weld area free from mechanical damage.

5021014024

5021014026
5021014028

G4.4

5021014030
5021014032

G5
G6

5021014034

G6.1

c) Finning Repair-if any


Finning production test - if any
- Check the degree of fin-to-tube welding
Final Visual & Dimensional Inspection
Final Inspection & Cleanliness
- Check of Cleanliness
- Check Protection of End Preparations
- Check Protection of Material from C.S. Banding or Packing Material
- Check Rust Protection of Finned Tube
- Check of item marking
- Check of Quantity

Boustead
Activity ref no

5021014036
5021014038
5021014040
5021014042
5021014044

G7
G8
G9
G9.1
G10

Activity Description

Packing/Shipping
Punch List/NCR Closing
Quality Dossier
Manufacturer Record Book
Inspection Release Note

WHRU INSPECTION & TEST PLAN


CHAPTER G- Tube Finning Fabrication
Controlling Document/Procedure

704-240-129

Acceptance Criteria

Verifying Document

684-262C spec, AWS D1.1,


Approved Welding Data
AWS D1.6, ASME IX, BS EN ISO
15614

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER G- Tube Finning Fabrication
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

WHRU INSPECTION & TEST PLAN


CHAPTER G- Tube Finning Fabrication
Controlling Document/Procedure

Acceptance Criteria

Verifying Document

VENDOR

BIH

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

AP

AP

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

DOC NO:
SHEET:

704-ETD-001/CA
X

Authorised Party
O&G

CU

TP

EU

of XX

Remarks

Rev
0

1. Document No. and Rev.


Each inspection and test plan shall be uniquely identified. The ITP number and revision s
2. Date
This shall be the date of issue of the ITP in the numeric format dd/mm/yyyy.
3. Page
This shall show the quantity of pages in the numeric format xx of yy.
4. Location
This shall contain the general location on the worksite that the ITP relates to.

5. Item No
This shall be a sequential number within each ITP starting at 1. This number shall not be
duplicated within the ITP. There shall not be any sub-numbering of items.

6. Activity
A description of each activity shall be included. The activities shall be sequential and sh
be in order of the activity that is undertaken on a step by step basis. This provides the fi
inspector and craft supervisor with the instructions necessary to plan, coordinate, and
perform the inspection of the Work. Where necessary, main activities may make referen
or cross refer to other ITPs. The frequency of inspection of verification shall be identified
e.g. 100%, 50%, 10%, daily, weekly, first of batch, at delivery etc. The activity stage sha
be detailed to reflect the project specifications, drawings, and contract requirements.

7. Reference Document
The reference document shall be the specific document that controls the activity being
performed. This may be the drawing, datasheet, project specification or standard,
national/international code or standard, PIUL or Subcontractor procedure or working
practice/method. Each activity shall be allocated a reference document. No entry shall b
left blank.

8. Acceptance Criteria
For each activity there shall be an acceptance criteria for the activity performed. This m
be a tolerance, a reading, a value, or an outcome. The requirement/ acceptance criteria
the governing document that is used to ensure that the Work is fabricated/installed/test
correctly. The governing document shall be a procedure, project specification, data shee
and/or drawing. It may be that the governing document is more than one of these. All
appropriate governing documents shall be referenced. Project specifications identified a
governing documents shall indicate the paragraph where the acceptance criteria are fou
The acceptance criteria for each activity shall be included.

9. Verifying Document
The verifying document is the record that is used to document the activity. This may tak
the form of a quality control sign-off sheet or Inspection form. For each activity the resul

shall be defined with a verifying document. For items where there is a reading or
measurement of any sort taken, this shall be recorded. The appropriate quality
control/inspection form shall be referenced as the verifying document. Where other test
are undertaken to prove the result of an activity, these shall also be similarly recorded a
the appropriate quality control/ inspection form shall be referenced as the verifying
document. For activities involving other results, then the verifying document shall be th
appropriate record generated as a consequence of the activity.

No activity shall result in the verifying document being the ITP. Each activity shall have i
own unique verifying document, be it a quality control/inspection form, receipt, issue
request or an as-built documentation etc.

number and revision shall be identified.

mm/yyyy.

relates to.

s number shall not be

be sequential and shall


is. This provides the field
an, coordinate, and
ies may make reference
ion shall be identified
The activity stage shall
ract requirements.

ols the activity being


on or standard,
cedure or working
ment. No entry shall be

ity performed. This may


t/ acceptance criteria are
bricated/installed/tested
ecification, data sheet
an one of these. All
cifications identified as
ptance criteria are found.

activity. This may take


each activity the result

is a reading or
riate quality
ent. Where other tests
e similarly recorded and
d as the verifying
document shall be the

h activity shall have its


orm, receipt, issue

Potrebbero piacerti anche