How to search for items on stock? What are off-cuts and how are they important?
Practice nesting of plates for FC7/ FC8
When an NCP shape is sent to workshop, how is it sent to FC8? Why are excess
widths important?
What are different types of freight and what are their limitations?
How is production planned in workshop?
How is production time and cost controlled?
What can be improved in the current system?
WORKSHOP
Route of a drawing
Proposal Design Projects Procurement Workshop
Controlling production time:
Project compared to any past similar project and production time noted to get an
estimate.
Supervisors in workshop control time and quality.
Priority to manufacture is given according to deadline.
An excel sheet is opened containing the list of all employees. From there, those who
currently have been assigned some work and those not are sorted out.
A schedule of operation is then made on all received drawings, and proposal quotes
the time taken.
Controlling cost:
Production time determines cost of labour
In terms of material cost, the supplier whose delivery time is the shortest is the best
one.