SUBCONTRACTOR'S PRE-QUALIFICATION FORM

1 of 16

General Pre-Qualification Questionnaire


Category Applied For as per SUBCO-FRM-02

A) Subcontractors Name

____________________________
____________________________

B) Business Address (Head Office):

C) Telephone No. (with area code):


D) Cell No.:

E) Fax No.:

F) E-Mail:

G) Web Address:

H) NTN

I) STN

Note: Any change in mailing address and contact numbers will be intimated within 3 days to Descon Engineering L

J) Names and Contact Numbers of Proprietors / Directors:


1

K) Person(s) to be contacted (mention Cell Number as well):


1

L) Type of Concern (Please tick box):


a.
Sole proprietor

c.

Partnership

b.

d.

Public Ltd

Private

M) Date of Company Registration/Commercial License No:


N) Factory Address and Telephone Nos. (If applicable):

For Descon Use Only


Prequalification No.

____________________________

Date of Prequalification

____________________________

This document is the Intellectual Property of Descon Engineering Limited. Any unauthorized use,

SUBCONTRACTOR'S PRE-QUALIFICATION FORM


2 of 16

Date of Renewal:

____________________________

This document is the Intellectual Property of Descon Engineering Limited. Any unauthorized use,

SUBCONTRACTOR'S PRE-QUALIFICATION FORM


3 of 16

Nature of the Business (Please tick box)

1.1

CIVIL

General Civil Works


Investigation Works
Earthwork
Concrete Work
Pre-stressed, Post-tensioned Concrete
Dewatering
Piling Works
Water Supply and Sanitation
Roads
ELECTRICAL & INSTRUMENTATION
Cable Laying & Termination
Electrical Equipment Installation
Field Test Calibration
Instrument Calibration & Testing
Earthing & Lighting Protection System
Building Electrification Work
ENGINEERING SERVICES
Basic Engineering
Detailed Engineering
Consultancy Services

1.1.01
1.1.02
1.1.03
1.1.04
1.1.05
1.1.06
1.1.07
1.1.08
1.1.09

1.2
1.2.01
1.2.02
1.2.03
1.2.04
1.2.05
1.2.06

1.3
1.3.01
1.3.02
1.3.03

1.4

1.1.10
1.1.11
1.1.12
1.1.13
1.1.14
1.1.15
1.1.16

1.2.07
1.2.08
1.2.09
1.2.10
1.2.11

Bridges
Slip Forming
Water Proofing
Surface Protection/Fire Pr
False Ceiling
Boring / Drilling
Termite Proofing
Any Other - Civil- Please

Fiber Optic Cable Termin


Dehydration of Transform
Switchgear Testing/Trans
Cathodic Protection
Fire Alarm System
Any Other - E&I- Please

1.3.04

Architectural Services
Any Other - ES - Please s

1.4a.06

Tank & Vessels Fabricatio


Metal Forming
Metal Forging
Any Other - Manufacturin

MECHANICAL
a) Fabrication and Manufacturing Work

Boiler
Heat Exchangers
Fired Heater /Furnaces
Duct/Stack Fabrication
Steel Structure/Grating Fabrication

1.4a.01
1.4a.02
1.4a.03
1.4a.04
1.4a.05

1.4a.07
1.4a.08

b) Erection & Installation Works


1.4b.01
1.4b.02
1.4b.03
1.4b.04
1.4b.05
1.4b.06
1.4b.07
1.4b.08
1.4b.09
1.4b.10

Boiler Erection
Equipment Installation (Stationary)
Equipment Installation (Rotary)
Heat Exchanger Re-tubing
Duct/Stack Erection
Steel Structure/Grating Erection
Scaffolding Work
Tank & Vessel Erection
Valve Refurbishment
Hydrojetting

1.4b.11
1.4b.12
1.4b.13
1.4b.14
1.4b.15
1.4b.16
1.4b.17
1.4b.18

HVAC Work
Pickling & Passivation
Insulation Work
Refractory Work
Dismantling Work
Rigging/Heavy Lifting
Fire Fighting Systems
Catalyst Handling
Any Other - Erection- Ple

c) Inspection Service
1.4c.01
1.4c.02

NDT/NDE Services
IMTE Calibration & Testing

Any Other - Inspection- P

d) Piping (Fabrication & Erection)


1.4d.01
1.4d.02
1.4d.03

Piping Fabrication Work


Piping Erection Work
Piping Welding Work

1.4d.05
1.4d.06
1.4d.07

Pipe support Erection


RTRP/GRP Jointing
Cross Country Pipeline W

This document is the Intellectual Property of Descon Engineering Limited. Any unauthorized use,

SUBCONTRACTOR'S PRE-QUALIFICATION FORM


4 of 16
1.4d.04

Pipe Support Fabrication

1.4d.10

Any Other - Piping - Plea

This document is the Intellectual Property of Descon Engineering Limited. Any unauthorized use,

SUBCONTRACTOR'S PRE-QUALIFICATION FORM


5 of 16
e) Surface Protection
Surface Preparation
1.4e.01
Painting
1.4e.02
Coating & Wrapping
1.4e.03
Internal Lining
1.4e.04
Galvanizing
1.4e.05
f) Stress Relieving Services
Post Weld Heat Treatment (PWHT)
1.4f.01
Annealing
1.4f.02
1.5 RENTAL EQUIPMENT
Handling Equipment
1.5.01
Earth Moving Equipment
1.5.02
Power Generator
1.5.03
1.6
1.6.01
1.6.02

1.7
1.7.01
1.7.02
1.7.03

1.8

1.9.02
1.9.03
1.9.04
1.9.05

3.
4.

Litigation history against any Customer if any?


Details and reasons of litigation

1.9.07

Networking Services/Tele
Horticulture Services
Fumigation Services
Training and Certification
Software License
Advertisement / Exhibitio
Any Other - Please Specif

1.9.10
1.9.11
1.9.12

Skilled
Semi-Skilled

Factory

Detail of Works / Jobs In Hand


Work/Job Description

Janitorial Staff
Any Other - Manpower- P

Heavy Transportation
Any Other - Logistics- Ple

1.9.09

Manpower Qualification (Optional):


Graduates
Engineers
Diploma Holders
Number of staff employed:
Office

Workshop Machinery
Any Other - Maintenance

1.8.04

1.9.08

Land/Building Leasing

Sr. No.

5.

1.5.05

OTHERS
Insurance Services
Camp and Catering Services
Photo copying Services
Courier Services
Disposal Services

1.9.06

2.

Vehicles
Welding Equipment
Any Other - Rental Equip

1.5.04

Custom Clearance
Freight Forwarder
Light Transportation

1.8.02
1.8.03

1.9.01

Any Other - Stress Reliev

REPAIR AND MAINTENANCE


Vehicles
1.6.03
Construction Machinery
MANPOWER SUPPLY
Supervisory Staff
1.7.04
Skilled / Semi Skilled Staff
Security Staff
FORWARDING, LOADING / UNLOADING, TRANSPORTATION, etc

1.8.01

1.9

Chromium Plating
Nickel Plating
FBE Coating
Any Other -Surface Prote

1.4e.06
1.4e.07
1.4e.08

(Filled "Annexure-C" to be provided as per below

Location

Client

Contract Value

Yes

This document is the Intellectual Property of Descon Engineering Limited. Any unauthorized use,

SUBCONTRACTOR'S PRE-QUALIFICATION FORM


6 of 16

6.

Status of Companys Certification in:


ISO 9001

ISO 14001

Note: Companies not possessing above certification shall follow Descons QHSE Policy and Procedures.

This document is the Intellectual Property of Descon Engineering Limited. Any unauthorized use,

SUBCONTRACTOR'S PRE-QUALIFICATION FORM


7 of 16

7.

Company's Health, Safety & Environment (HSE) and QA/QC Systems details:
HSE Organization Chart.
List of HSE experienced key personnel.
Do you have written procedure for emergency handling?
Please give the injuries frequency rates of last three years.
Quality Control Procedure

a
b
c
d
e
8.
a
b
c
d
e

Please submit the following along with this PQ Form:


List of Major Equipment
List / CV of Key Personnel with Past Experience (SUBCO-FRM-02)
List of Works already completed (SUBCO-FRM-03)
List of Clients / Companies with which your company is already prequalified /registered
Renewed Registration with Pakistan Engineering Council / Registration Certificate
from appropriate Authority
Valid Commercial License attached for:

9.

Please provide a copy of your company profile (Optional):

10

Bank Details:

Pakistan
Abu Dhabi
KSA
Qatar

Account Title:

Bank A/C No.:

Bank Name:

Branch Name:

Branch Address:
Bank Code/IBAN
d. Branch
No.: Code/Swift Code:

BIC/Swift Code:
DECLARATION

I, ___________________________ of ________________________ (company) hereby solemnly affirm that


mentioned above is true to the best of my knowledge and if any information is found incorrect or incomplete ou
form will be liable for disqualification.
Name of Person completing this form:

Sig

Signature
FOR DESCON USE ONLY

Recommended by: I/C QA/QC BA

Signature:

Recommended by: Subcontracting Engineer


/ Specialist BA
Signature:

Name:

Name:

Date:

Date:

This document is the Intellectual Property of Descon Engineering Limited. Any unauthorized use,

SUBCONTRACTOR'S PRE-QUALIFICATION FORM


8 of 16

Reviewed by: I/C Subcontracting BA

Signature:

Approved by: I/C Subcontracting Corporate

Signature:

Name:

Name:

Date:

Date:

This document is the Intellectual Property of Descon Engineering Limited. Any unauthorized use,

Doc No: SUBCO/FRM-01


Rev:
00
Date:
Aug 18, 2014
Page:

9 of 16

con Engineering Limited, in writing.

e.
f.

LLC
WLL

This document is the Intellectual Property of Descon Engineering Limited. Any unauthorized use,

Doc No: SUBCO/FRM-01


Rev:
00
Date:
Aug 18, 2014
Page:

10 of 16

This document is the Intellectual Property of Descon Engineering Limited. Any unauthorized use,

Doc No: SUBCO/FRM-01


Rev:
00
Date:
Aug 18, 2014
Page:

11 of 16

Protection/Fire Proofing

Drilling
Proofing
er - Civil- Please specify

tic Cable Termination/Splicing


ion of Transformer Oil
ar Testing/Transformer Testing
Protection
m System
er - E&I- Please specify

ural Services
er - ES - Please specify

Vessels Fabrication

er - Manufacturing-Please specify

& Passivation
n Work
y Work
ing Work
Heavy Lifting
ting Systems
Handling
er - Erection- Please specify

er - Inspection- Please specify

port Erection
RP Jointing
untry Pipeline Work
This document is the Intellectual Property of Descon Engineering Limited. Any unauthorized use,

Doc No: SUBCO/FRM-01


Rev:
00
Date:
Aug 18, 2014
Page:

12 of 16

er - Piping - Please specify

This document is the Intellectual Property of Descon Engineering Limited. Any unauthorized use,

Doc No: SUBCO/FRM-01


Rev:
00
Date:
Aug 18, 2014
Page:

13 of 16

m Plating

er -Surface Protection-Please specify

er - Stress Relieving -Please specify

Equipment
er - Rental Equipment-Please Specify

p Machinery
er - Maintenance- Please Specify

Staff
er - Manpower- Please Specify

ansportation
er - Logistics- Please Specify

ng Services/Telecommunication
ure Services
on Services
and Certification
License
ement / Exhibition
er - Please Specify

vided as per below details)

Contract
Duration

Yes

Date of
Commence
ment

No

This document is the Intellectual Property of Descon Engineering Limited. Any unauthorized use,

Doc No: SUBCO/FRM-01


Rev:
00
Date:
Aug 18, 2014
Page:

14 of 16

OHSAS 18001

This document is the Intellectual Property of Descon Engineering Limited. Any unauthorized use,

Doc No: SUBCO/FRM-01


Rev:
00
Date:
Aug 18, 2014
Page:

15 of 16

ified /registered.
Certificate
YES

NO

Enclosed

Not Enclosed

mnly affirm that the information


r incomplete our prequalification

Date

ecialist BA

This document is the Intellectual Property of Descon Engineering Limited. Any unauthorized use,

Doc No: SUBCO/FRM-01


Rev:
00
Date:
Aug 18, 2014
Page:

16 of 16