Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
2x 7.8
= 15.6 m
=
3.50 m
=
10.25 m
10.25 m
=
93.96 m
=
8.75 m
=
10.25 m
=
0.500 m
=
0.70 m
Y
300
97.378
300
96.460
720
0.79
Avg. G.L
94.606
93.106
0.6
93.456
1.127 m
92.606
3000
6A.01
720
2200
Earthwork in excavation for foundation for structures in all types of soil excluding rock :
Abutment
Pier
=
Total :
6A.02
65.9025
191.569336
x 1.1
43.935
x 1.1
157.301 m3
158 m3
210.73 m3
48.33
259.05 m3
0.000 m3
0.00 m3
Providing and laying in position coarse sand below foundation including compaction in layers :
Abutment
NIL
= NIL
m3
0.000 m3
Total :
6A.04
m3 x 1.1 =
=
157.301
6A.03
91.399 m3
1.996
6A.05
x 1.1 =
=
70.73 m3
71.00 m3
3.457 x 2 =
30o
6.914
7.730
3.457
3.457 x 1.5 =
5.186
6.914
a)- Quadrant =
36.73 x 0.3 x 0
b)- Back
3.457
0.000 m3
=
=
42.521 m3
Total =
42.521 m3
42.52 m3
43.00 m3
6A.09
Pier
84.50 m3
19.55
104.05 m3
Total =
6A.17
104.048 m3
105.00 m3
Structural cement concrete for Plain/ Reinforced Concrete in substructure, pier, piercap
abutment, abutmentcap, retaining wall , return wall, staircase, etc.
RCC M35 in abutment:-
Dirt Wall
5.246 m3
Abutment
44.339 m3
cantilever return =
1.36 m3
3 x 3.922 x 0.5 x 4
23.532 m3
10.754 m3
Pier Cap
11.100 m3
TOTAL
6A.18
96.335 m3
=
=
111.93 m3
=
6A.22
Foundation
Substructure
Superstructure
Approach slab
Railing kerb
105 x 85
97 x 135
112 x 120
21.525 x 80
4 x 50
kg.
kg.
kg.
kg.
kg.
=
=
=
=
=
TOTAL =
Say :
6A.28
T
T
T
T
T
T
T
3.390 m3
4.000 m3
=
=
Providing and laying over the top of deck slab 50mm thick asphaltic concrete:
(15.6 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 0.05 x 8.75
6A.26
8.925
13.095
13.440
1.722
0.2
37.382
38.00
Providing and laying in position controlled RCC M-30 in kerbs over bridge excluding cost of reinforcement
0.3 x 0.5 x 22.6
6A.25
112.00 m3
10.176 m3
Providing and laying a layer of 15 mm thick mastic asphalt over asphaltic concrete:
(15.6 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 8.75
6A.35
6A.36
Providing and fixing 150 dia PVC downtake and runner pipe :
6A.32
16.400 m2
203.525 m2
4 Nos.
5.6 m
m3
97.00 m3
6A.34
6A.30
30.75 Rm
6A.27
21.53 m3
Reinforced cement concrete M-30 grade concrete crash barrier including reinforcement :
(15.6 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 2.0
6A.07
& 6A.08
0.000 Rm
6A.29
46.520 Rm
Plain cement concrete M 15 leveling course below foundation of bridges, pile caps,
retaining walls, below approach slabs for bridges :
Below Abutment :
Below Pier :
Below approach :
Floor Protection :
=
=
=
=
12.751
3.969
7.175
187.24
Total :
6A.31
211.139 m3
x 1.1 =
=
211.139 m3
212.00 m3
15 x 2 x 2
60 Nos.
Total :
6A.06
m3
m3
m3
m3
60 Nos.
Providing and laying in position hand packed boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :
m3
= NIL
36.73 x 0.3 x 2
22.04 m3
Total :
22.04
m3 x 1.3 =
=
28.650 m3
29.00 m3
300
6A.37
Plain cement concrete in M20 grade in toe wall at the end of the stone pitching :
800
Length of toe wall required at each side
29.257 m
0.54 m2
62.41 m3
95.00 m3
300
1000
Bed Protection
= 29.7x14.01x0.15
6A.38
Providing 150mm thick coarse sand below boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :
m3
= NIL
36.73 x 0.6 x 2
=
Total :
11.02 m3
11.02
m3 x 1.3 =
=
14.325 m3
15.00 m3
BRIDGE No : 153/2
Total length of the bridge
3500
2x 5.35
= 10.7 m
=
3.50 m
=
10.25 m
10.25 m
=
86.734 m
=
8.75 m
=
10.25 m
=
0.500 m
=
0.45 m
Y
300
91.950
300
91.282
720
0.96
Avg. G.L
89.234
87.234
0.6
87.484
1.238 m
86.734
2750
6A.01
720
1750
Earthwork in excavation for foundation for structures in all types of soil excluding rock :
Abutment
Pier
315.735 m3
84.5875
Total :
6A.02
0 m3
x 1.1
=
0.00 m3
0.000 m3
0.00 m3
Providing and laying in position coarse sand below foundation including compaction in layers :
Abutment
NIL
m3
= NIL
Total :
6A.04
400.323 m3
401 m3
6A.03
m3 x 1.1 =
=
400.323
0.000 m3
2.310
6A.05
x 1.1 =
=
94.73 m3
95.00 m3
30o
4.001 x 2 =
8.002
8.947
4.001
4.001 x 1.5 =
6.002
8.002
a)- Quadrant =
49.203 x 0.3 x 0
b)- Back
4.001
0.000 m3
=
=
49.212 m3
Total =
49.212 m3
=
49.21 m3
50.00 m3
6A.09
Pier
68.73 m3
12.43
81.16 m3
Total =
6A.17
Structural cement concrete for Plain/ Reinforced Concrete in substructure, pier, piercap
abutment, abutmentcap, retaining wall , return wall, staircase, etc.
RCC M35 in abutment:-
Dirt Wall
3.71 m3
Abutment
56.06 m3
cantilever return =
1.76 m3
24.56 m3
15.72 m3
Pier Cap
11.10 m3
TOTAL
6A.18
112.91 m3
=
=
49.35375 m3
=
6A.22
Foundation
Substructure
Superstructure
Approach slab
Railing kerb
82 x 85
113 x 135
50 x 120
21.525 x 80
3 x 50
kg.
kg.
kg.
kg.
kg.
=
=
=
=
=
TOTAL =
Say :
6A.28
T
T
T
T
T
T
T
2.655 m3
3.000 m3
=
=
Providing and laying over the top of deck slab 50mm thick asphaltic concrete:
(10.7 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 0.05 x 8.75
6A.26
6.970
15.255
6.000
1.722
0.15
30.097
31.00
Providing and laying in position controlled RCC M-30 in kerbs over bridge excluding cost of reinforcement
0.3 x 0.5 x 17.7
6A.25
50.00 m3
8.033 m3
Providing and laying a layer of 15 mm thick mastic asphalt over asphaltic concrete:
(10.7 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 8.75
6A.35
6A.36
Providing and fixing 150 dia PVC downtake and runner pipe :
6A.32
16.400 m2
160.650 m2
4 Nos.
5.6 m
m3
113.00 m3
81.158 m3
82.00 m3
6A.34
6A.30
30.75 Rm
6A.27
21.53 m3
Reinforced cement concrete M-30 grade concrete crash barrier including reinforcement :
(10.7 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 2.0
6A.07
& 6A.08
0.000 Rm
6A.29
36.720 Rm
Plain cement concrete M 15 leveling course below foundation of bridges, pile caps,
retaining walls, below approach slabs for bridges :
Below Abutment :
Below Pier :
Below approach :
Floor Protection :
=
=
=
=
11.316
2.989
7.175
152.35
Total :
6A.31
173.827 m3
x 1.1 =
=
173.827 m3
174.00 m3
14 x 2 x 2
56 Nos.
Total :
6A.06
m3
m3
m3
m3
56 Nos.
Providing and laying in position hand packed boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :
m3
= NIL
49.203 x 0.3 x 2
29.52 m3
Total :
m3 x 1.3 =
=
29.52
38.378 m3
39.00 m3
750
6A.37
Plain cement concrete in M20 grade in toe wall at the end of the stone pitching & bed protection:
4100
Length of toe wall required at each side
42.497 m
3.75 m2
319.00 m3
Bed Protection
50.78 m3
369.78 m3
450
1500
6A.38
Providing 150mm thick coarse sand below boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :
m3
= NIL
49.203 x 0.3 x 2
=
Total :
14.76 m3
14.76
m3 x 1.3 =
=
19.189 m3
20.00 m3
BRIDGE No : 155/1
Total length of the bridge
3500
300
90.911
300
89.993
720
Avg. G.L
87.500
85.642
86.192
85.142
3550
6A.01
720
1900
Earthwork in excavation for foundation for structures in all types of soil excluding rock :
Abutment
Pier
114.589
38.2083
Total :
For 4 Lane Structure
6A.02
152.80
231.822402
97.97
Total
For 4 Lane Structure
6A.03
Providing and laying in position coarse sand below foundation including compaction in layers :
Abutment
NIL
= NIL
Total :
6A.04
0.000
6A.05
107.09 m3
For 4 Lane Structure
x 1.1 =
=
107.09
214.18
9.512
4.254
8.508
a)- Quadrant =
55.616 x 0.3 x 0
b)- Back
0.000
=
Total =
For 4 Lane Structure
6A.09
52.324
Pier
6A.17
52.324
Structural cement concrete for Plain/ Reinforced Concrete in substructure, pier, piercap
abutment, abutmentcap, retaining wall , return wall, staircase, etc.
RCC M35 in abutment:-
Dirt Wall
Abutment
cantilever return =
Pier Cap
6A.22
=
For 4 Lane Structure
114.8
Foundation
Substructure
Superstructure
Approach slab
Railing kerb
252.45725 x
254 x 135
230 x 120
21.525 x 80
8 x 50
kg.
kg.
kg.
kg.
kg.
=
=
=
=
=
TOTAL =
For 4 Lane Structure
6A.28
Providing and laying in position controlled RCC M-30 in kerbs over bridge excluding cost of reinforcement
0.3 x 0.5 x 23
=
=
Providing and laying over the top of deck slab 50mm thick asphaltic concrete:
(16 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 0.05 x 8.75
For 4 Lane Structure
6A.26
Providing and laying a layer of 15 mm thick mastic asphalt over asphaltic concrete:
(16 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 8.75
For 4 Lane Structure
6A.35
=
=
=
=
207.03
414.00
6A.36
6A.32
Providing and fixing 150 dia PVC downtake and runner pipe :
For 4 Lane Structure
Providing and fixing in position true to line and level :
a) tar paper bearings
0.42 x 10.25 x 4
For 4 Lane Structure
6A.34
=
=
16.400 m2
33.00 m2
6A.30
=
=
30.75 Rm
62.00 Rm
6A.27
=
=
21.53 m3
43.00 m3
Reinforced cement concrete M-30 grade concrete crash barrier including reinforcement :
(16 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 2.0
For 4 Lane Structure
6A.07
& 6A.08
=
=
=
=
=
=
Total :
13.264
4.459
7.175
205.54
230.441
For 4 Lane Structure
16 x 2 x 2
For 4 Lane Structure
6A.06
47.320
95.00
Plain cement concrete M 15 leveling course below foundation of bridges, pile caps,
retaining walls, below approach slabs for bridges :
Below Abutment :
Below Pier :
Below approach :
Floor Protection :
6A.31
0.000
6A.29
64 Nos.
128 Nos.
Providing and laying in position hand packed boulder pitching on slopes of embankment,
= NIL
55.616 x 0.3 x 2
33.37
Total :
For 4 Lane Structure
6A.37
Plain cement concrete in M20 grade in toe wall at the end of the stone pitching & bed protection:
Length of toe wall required at each side
Bed Protection
= 32x14.83x0.15
=
For 4 Lane Structure
6A.38
33.37
Providing 150mm thick coarse sand below boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :
= NIL
55.616 x 0.3 x 2
=
Total :
For 4 Lane Structure
16.68
16.68
o : 155/1
h of carriage way
h of footpath
th of superstructure
drant stone pitching (Y/N)
2x 8.00
= 16 m
=
3.50 m
=
10.25 m
10.25 m
=
86.72 m
=
8.75 m
=
10.25 m
=
0.500 m
=
0.70 m
Y
1.74
0.6
1.757 m
xcluding rock :
m3
34.2693
m3 x 1.1 =
=
152.797 m3
306 m3
x 1.1
255.004642 m3
x 1.1
107.767
362.77 m3
725.54 m3
=
=
ompaction in layers :
m3
m3
0.000 m3
0.00 m3
2.456
m3
m3
30o
4.254 x 2 =
4.254
8.508
4.254 x 1.5 =
6.381
m3
m3
m3
=
52.32 m3
104.65 m3
102.08 m3
24.14
Total =
126.23 m3
For 4 Lane Structure
e, pier, piercap
5.246 m3
56.103 m3
126.229 m3
252.46 m3
4.09233 m3
33.5049 m3
16.027 m3
11.100 m3
6 + 0.5)/2 x 0.82
TOTAL
126.074 m3
=
=
4 Lane Structure
m3
=
21.459
34.290
27.600
1.722
0.4
85.471
172.00
230.00 m3
T
T
T
T
T
T
T
10.35 m3
21.00 m3
m2
m2
4 Nos.
8 Nos.
m3
254.00 m3
5.6 m
11.2 m
Rm
reinforcement :
Rm
Rm
m3
m3
m3
m3
m3
4 Lane Structure
f embankment,
x 1.1 =
=
230.441 m3
462.00 m3
m3
m3
m3 x 1.3 =
=
43.380 m3
88.00 m3
300
48.00 m
1000
71.18 m3
163.61 m3
327 m3
m3
m3
m3 x 1.3 =
=
21.690 m3
44.00 m3
BRIDGE No : 164/1
Total length of the bridge
3500
300
88.530
300
87.612
720
Avg. G.L
85.055
83.555
83.805
83.055
3500
6A.01
720
2200
Earthwork in excavation for foundation for structures in all types of soil excluding rock :
Abutment
Total :
For 4 Lane Structure
6A.02
-23.612
-23.61
328.27977
Total
For 4 Lane Structure
6A.03
Providing and laying in position coarse sand below foundation including compaction in layers :
Abutment
NIL
= NIL
Total :
0.000
6A.04
6A.05
107.42 m3
For 4 Lane Structure
x 1.1 =
=
107.42
214.83
9.526
4.260
8.52
a)- Quadrant =
55.776 x 0.3 x 0
b)- Back
0.000
=
Total =
For 4 Lane Structure
6A.09
81.536
6A.17
81.536
Structural cement concrete for Plain/ Reinforced Concrete in substructure, pier, piercap
abutment, abutmentcap, retaining wall , return wall, staircase, etc.
RCC M35 in abutment:-
Dirt Wall
Abutment
cantilever return =
6A.22
=
60.4135
For 4 Lane Structure
Foundation
Substructure
Superstructure
Approach slab
Railing kerb
168.2025 x 8
196 x 135
122 x 120
21.525 x 80
6 x 50
kg.
kg.
kg.
kg.
kg.
=
=
=
=
=
TOTAL =
For 4 Lane Structure
6A.28
Providing and laying in position controlled RCC M-30 in kerbs over bridge excluding cost of reinforcement
0.3 x 0.5 x 15.42
For 4 Lane Structure
6A.25
=
=
Providing and laying over the top of deck slab 50mm thick asphaltic concrete:
(8.42 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 0.05 x 8.75
For 4 Lane Structure
6A.26
Providing and laying a layer of 15 mm thick mastic asphalt over asphaltic concrete:
(8.42 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 8.75
For 4 Lane Structure
6A.35
6A.36
6A.32
=
=
=
=
140.53
281.00
Providing and fixing 150 dia PVC downtake and runner pipe :
For 4 Lane Structure
=
=
8.200 m2
16.00 m2
6A.34
6A.30
=
=
20.50 Rm
41.00 Rm
6A.27
21.53 m3
43.00 m3
=
=
Reinforced cement concrete M-30 grade concrete crash barrier including reinforcement :
(8.42 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 2.0
For 4 Lane Structure
6A.07
& 6A.08
=
=
=
=
=
Total :
13.776
7.175
105.06
126.010
For 4 Lane Structure
16 x 2 x 2
For 4 Lane Structure
6A.06
32.120
64.00
Plain cement concrete M 15 leveling course below foundation of bridges, pile caps,
retaining walls, below approach slabs for bridges :
Below Abutment :
Below approach :
Floor Protection :
6A.31
0.000
6A.29
64 Nos.
128 Nos.
Providing and laying in position hand packed boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :
= NIL
55.776 x 0.3 x 2
=
Total :
For 4 Lane Structure
6A.37
33.47
33.47
Plain cement concrete in M20 grade in toe wall at the end of the stone pitching & bed protection:
Bed Protection
= 32x7.58x0.15
=
For 4 Lane Structure
6A.38
Providing 150mm thick coarse sand below boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :
= NIL
55.776 x 0.3 x 2
=
Total :
For 4 Lane Structure
16.73
16.73
o : 164/1
h of carriage way
h of footpath
th of superstructure
drant stone pitching (Y/N)
1x 8.42
= 8.42 m
=
3.50 m
=
10.25 m
10.25 m
=
85.21 m
=
8.75 m
=
10.25 m
=
0.500 m
=
0.70 m
Y
1.35
0.6
1.497 m
xcluding rock :
m3
-6.809925
m3 x 1.1 =
=
x 1.1
-23.612 m3
0 m3
361.107747 m3
=
=
361.11 m3
722.22 m3
0.000 m3
0.00 m3
ompaction in layers :
m3
m3
2.460
CHANGE 30 DEGREE INTO RADIANS
m
m3
30o
4.26 x 2 =
4.260
8.52
8.52
4.26 x 1.5 =
6.39
4.26
9.526
6.39
m
m3
m3
=
81.54 m3
163.07 m3
84.10 m3
Total =
For 4 Lane Structure
84.10 m3
=
e, pier, piercap
5.246 m3
56.191 m3
2.82002 m3
33.075 m3
84.101 m3
168.20 m3
TOTAL
97.332 m3
=
=
4 Lane Structure
m3
=
14.297
26.460
14.640
1.722
0.3
57.419
116.00
122.00 m3
T
T
T
T
T
T
T
7.03 m3
14.00 m3
m2
m2
2 Nos.
4 Nos.
2.8 m
5.6 m
m3
196.00 m3
Rm
reinforcement :
Rm
Rm
m3
m3
m3
m3
4 Lane Structure
x 1.1 =
=
126.010 m3
254.00 m3
f embankment,
m3
m3
m3 x 1.3 =
=
43.505 m3
88.00 m3
300
43.921 m
300
0.54 m2
1000
48.00 m3
36.38 m3
48.00 m3
96 m3
m3
m3
m3 x 1.3 =
=
21.753 m3
44.00 m3
EN APPLY TAN
BRIDGE No : 168/1
Total length of the bridge
3500
2x 7.4
= 14.8 m
=
=
300
93.384
300
100 thk PCC M15
92.516
720
500 thk. return wall
3.50
10.25
10.25
89.31
8.75
10.25
0.500
0.65
=
=
=
=
=
=
m
m
m
m
m
m
m
m
Y
1.97
m
Avg. G.L
89.358
87.810
0.6
88.160
1.914m
87.310
3700
6A.01
720
2200
Earthwork in excavation for foundation for structures in all types of soil excluding rock :
Abutment
Pier
7.520 m3
48.99
Total :
6A.02
m3 x 1.1 =
56.505 m3
57 m3
56.505
313.35
x 1.1
97.97
x 1.1
344.68 m3
107.77
=
6A.03
452.45 m3
Providing and laying in position coarse sand below foundation including compaction in layers :
Abutment
NIL
m3
= NIL
Total :
0.000 m3
0.000 m3
0.00 m3
=
6A.04
x 1.1 =
134.05 m3
135.00 m3
4.759
30o
6A.05
9.518
10.641
69.605 m2
4.759
4.759 x 1.5 =
7.139
9.518
a)- Quadrant =
69.605 x 0.3 x 0
b)- Back
Total =
0.000 m3
=
58.536 m3
58.536 m3
58.54 m3
=
59.00 m3
BRIDGE No : 168/1
6A.09
Pier
94.19 m3
24.14
Total =
118.33 m3
118.331 m3
=
6A.17
119.00 m3
Structural cement concrete for Plain/ Reinforced Concrete in substructure, pier, piercap
abutment, abutmentcap, retaining wall , return wall, staircase, etc.
RCC M35 in abutment:-
Dirt Wall
4.938 m3
Abutment
64.295 m3
cantilever return =
4.96 m3
38.6576 m3
18.115 m3
Pier Cap
11.100 m3
TOTAL
6A.18
142.061 m3
m3
143.00 m3
98.605 m3
=
6A.22
Foundation
Substructure
Superstructure
Approach slab
Railing kerb
119 x 85
143 x 135
99 x 120
21.525 x 80
4 x 50
kg.
kg.
kg.
kg.
kg.
=
=
=
=
=
TOTAL =
Say :
6A.28
T
T
T
T
T
T
T
3.270 m3
4.000 m3
Providing and laying over the top of deck slab 50mm thick asphaltic concrete:
(14.8 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 0.05 x 8.75
6A.26
10.115
19.305
11.880
1.722
0.2
43.222
44.00
Providing and laying in position controlled RCC M-30 in kerbs over bridge excluding cost of reinforcement
0.3 x 0.5 x 21.8
6A.25
99.00 m3
9.826 m3
Providing and laying a layer of 15 mm thick mastic asphalt over asphaltic concrete:
(14.8 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 8.75
6A.35
6A.36
Providing and fixing 150 dia PVC downtake and runner pipe :
6A.32
196.525 m2
4 Nos.
5.6 m
16.400 m2
BRIDGE No : 168/1
6A.34
6A.30
30.75 Rm
6A.27
6A.29
21.53 m3
Reinforced cement concrete M-30 grade concrete crash barrier including reinforcement :
(14.8 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 2.0
6A.07
& 6A.08
0.000 Rm
44.920 Rm
Plain cement concrete M 15 leveling course below foundation of bridges, pile caps,
retaining walls, below approach slabs for bridges :
Below Abutment :
Below Pier :
=
=
14.186 m3
4.459 m3
Below approach :
7.175 m3
Floor Protection :
30.8x14.83x0.45
197.06 m3
Total :
6A.31
x 1.1 =
222.880 m3
223.00 m3
16 x 3 x 2
96 Nos.
Total :
6A.06
222.880 m3
96 Nos.
Providing and laying in position hand packed boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :
= NIL
69.605 x 0.3 x 2
m3
41.76 m3
Total :
41.76 m3 x 1.3 =
54.292 m3
55.00 m3
300
6A.37
Plain cement concrete in M20 grade in toe wall at the end of the stone pitching :
800
Length of toe wall required at each side
36.415 m
0.54 m2
68.06 m3
108.00 m3
300
1000
Bed Protection
= 34.35x13.21x0.15
6A.38
Providing 150mm thick coarse sand below boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :
= NIL
69.605 x 0.6 x 2
=
Total :
m3
20.88 m3
20.88 m3 x 1.3 =
27.146 m3
28.00 m3
BRIDGE No : 183/2
Total length of the bridge
3500
300
88.118
300
87.200
720
Avg. G.L
85.613
84.113
0.6
84.463
83.613
2750
6A.01
720
2100
Earthwork in excavation for foundation for structures in all types of soil excluding rock :
Abutment
6.17 x 2 x 10.85 x 2
=
Total :
6A.02
267.778 m3
267.778
m3 x 1.1 =
=
=
6A.03
Providing and laying in position coarse sand below foundation including compaction in layers :
Abutment
=
Total :
37.946 m3
37.946 m3
=
6A.04
6A.05
60.2288 m3
x 1.1 =
=
60.23 m3
61.00 m3
3.19 x 2 =
7.133
3.190
6.38
a)- Quadrant =
31.275 x 0.3 x 4
b)- Back
37.529 m3
=
=
39.237 m3
Total =
76.766 m3
=
6A.09
=
Total =
6A.17
Structural cement concrete for Plain/ Reinforced Concrete in substructure, pier, piercap
abutment, abutmentcap, retaining wall , return wall, staircase, etc.
RCC M35 in abutment:-
Dirt Wall
Abutment
cantilever return =
TOTAL
6A.18
60.27 m3
=
6A.22
Foundation
Substructure
Superstructure
Approach slab
Railing kerb
80 x 85
67 x 135
61 x 120
21.525 x 80
3 x 50
kg.
kg.
kg.
kg.
kg.
=
=
=
=
=
TOTAL =
Say :
6A.28
Providing and laying in position controlled RCC M-30 in kerbs over bridge excluding cost of reinforcement
0.3 x 0.5 x 15.4
6A.25
=
=
2.310
3.000
Providing and laying over the top of deck slab 50mm thick asphaltic concrete:
(8.4 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 0.05 x 8.75
6A.26
6.800
9.045
7.320
1.722
0.15
25.037
26.00
7.018
Providing and laying a layer of 15 mm thick mastic asphalt over asphaltic concrete:
(8.4 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 8.75
140.350 m2
6A.35
6A.36
Providing and fixing 150 dia PVC downtake and runner pipe :
2.8
6A.32
6A.34
8.200 m2
6A.30
20.50 Rm
16.040 Rm
6A.27
6A.29
21.53 m3
Reinforced cement concrete M-30 grade concrete crash barrier including reinforcement :
(8.4 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 2.0
6A.07
& 6A.08
32.080 Rm
Plain cement concrete M 15 leveling course below foundation of bridges, pile caps,
retaining walls, below approach slabs for bridges :
Below foundation :
Below approach :
Floor Protection :
12.034 m3
7.175 m3
98.32 m3
=
=
=
Total :
6A.31
14 x 1 x 2
28 Nos.
Total :
6A.06
117.526 m3
28 Nos.
Providing and laying in position hand packed boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :
= NIL
31.275 x 0.6 x 4
75.06 m3
=
Total :
6A.37
75.06
m3 x 1.3 =
=
Plain cement concrete in M20 grade in toe wall at the end of the stone pitching :
Length of toe wall required at each side
38.038
0.54
=
=
70.44
112.00
Bed Protection
Volume of concrete required
6A.38
m3
= 35.55x13.21x0.15
Providing 150mm thick coarse sand below boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
= NIL
m3
Back :
0 x 0.6 x 2
=
Total :
9.38 m3
9.38
m3 x 1.3 =
=
1x 8.4
= 8.4
=
=
abutment foundation =
=
=
=
=
=
ne pitching (Y/N)
Y
3.50 m
10.25 m
10.25 m
m
8.75 m
10.25 m
0.500 m
0.70 m
0.74
1.092 m
cluding rock :
267.778 m3
268 m3
40 m3
42.00 m3
mpaction in layers :
37.946 m3
38.00 m3
1.842
30o
3.190
6.38
3.19 x 1.5 =
4.785
76.77 m3
77.00 m3
79.657875 m3
79.658 m3
79.658 m3
80.00 m3
pier, piercap
5.246 m3
40.398 m3
1.24870 m3
20.1025 m3
66.995 m3
=
m3
61.00 m3
T
T
T
T
T
T
T
excluding cost of reinforcement
m3
m3
m3
Nos.
m
67.00 m3
inforcement :
x 1.1 =
=
117.526 m3
118.00 m3
embankment,
97.577 m3
98.00 m3
300
800
m
300
m
1000
m
m3
3
12.197 m3
13.00 m3
BRIDGE No : 184/1
Total length of the bridge
3500
300
83.655
300
82.587
800
Avg. G.L
81.133
77.933
78.533
77.433
3850
6A.01
800
2450
Earthwork in excavation for foundation for structures in all types of soil excluding rock :
Abutment
Pier
618.233
197.152
Total :
6A.02
6A.03
815.385
Providing and laying in position coarse sand below foundation including compaction in layers :
Abutment
NIL
= NIL
Total :
0.000
6A.04
6A.05
128.36 m3
x 1.1 =
=
128.36
129.00
10.413
4.657
9.314
6A.09
a)- Quadrant =
66.654 x 0.3 x 0
b)- Back
0.000
=
57.281
Total =
57.281
Pier
6A.17
Structural cement concrete for Plain/ Reinforced Concrete in substructure, pier, piercap
abutment, abutmentcap, retaining wall , return wall, staircase, etc.
RCC M35 in abutment:-
Dirt Wall
Abutment
cantilever return =
6A.18
Pier
Pier Cap
6A.22
188.19
Foundation
Substructure
Superstructure
Approach slab
Railing kerb
157 x 85
146 x 135
189 x 120
21.525 x 80
5 x 50
kg.
kg.
kg.
kg.
kg.
=
=
=
=
=
TOTAL =
Say :
6A.28
Providing and laying in position controlled RCC M-30 in kerbs over bridge excluding cost of reinforcement
0.3 x 0.5 x 28.6
6A.25
=
=
Providing and laying over the top of deck slab 50mm thick asphaltic concrete:
(21.6 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 0.05 x 8.75
6A.26
Providing and laying a layer of 15 mm thick mastic asphalt over asphaltic concrete:
(21.6 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 8.75
6A.35
6A.36
Providing and fixing 150 dia PVC downtake and runner pipe :
6A.32
256.025
0.42 x 10.25 x 4
6A.34
6A.30
16.400 m2
30.75 Rm
6A.27
21.53 m3
Reinforced cement concrete M-30 grade concrete crash barrier including reinforcement :
(21.6 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 2.0
6A.07
& 6A.08
=
=
=
=
Total :
16 x 3 x 2
289.610
96 Nos.
Total :
96 Nos.
Providing and laying in position hand packed boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :
= NIL
66.654 x 0.3 x 2
=
Total :
6A.37
15.170
5.684
7.175
261.58
6A.06
58.520
Plain cement concrete M 15 leveling course below foundation of bridges, pile caps,
retaining walls, below approach slabs for bridges :
Below Abutment :
Below Pier :
Below approach :
Floor Protection :
6A.31
0.000
6A.29
39.99
39.99
Plain cement concrete in M20 grade in toe wall at the end of the stone pitching & bed protection:
Bed Protection
= 30.25x20.01x0.15
6A.38
Providing 150mm thick coarse sand below boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :
= NIL
66.654 x 0.3 x 2
=
Total :
20.00
20.00
o : 184/1
2x 10.8
= 21.6 m
=
3.50 m
=
10.25 m
10.25 m
=
0 m
=
8.75 m
=
10.25 m
=
0.500 m
=
0.85 m
Y
2.04
0.6
1.957 m
excluding rock :
m3
3564.578
m3 x 1.1 =
=
x 1.1
815.385 m3
816 m3
0 m3
=
0.00 m3
0.000 m3
0.00 m3
compaction in layers :
m3
m3
2.689
m3
m3
30o
4.657 x 2 =
4.657
9.314
4.657 x 1.5 =
6.986
m3
m3
m3
=
57.28 m3
58.00 m3
121.36 m3
=
Total =
34.82
156.18 m3
=
6.17 m3
66.49 m3
5.20 m3
156.176 m3
157.00 m3
39.44 m3
0.25 x 2.851)
16.93 m3
06 + 0.5)/2 x 0.82
11.10 m3
TOTAL
145.32 m3
=
=
m3
=
13.345
19.710
22.680
1.722
0.25
57.707
58.00
189.00 m3
T
T
T
T
T
T
T
12.801 m3
m2
4 Nos.
5.6 m
m3
146.00 m3
Rm
reinforcement :
Rm
m3
m3
m3
m3
m3
x 1.1 =
=
289.610 m3
290.00 m3
of embankment,
m3
m3
m3 x 1.3 =
=
51.990 m3
52.00 m3
750
46.104 m
450
3.75 m2
1500
346.00 m3
90.80 m3
486.65 m3
embankment,
m3
m3
m3 x 1.3 =
=
25.995 m3
26.00 m3
BRIDGE No : 186/1
Total length of the bridge
3500
300
76.989
300
76.421
720
Avg. G.L
74.224
72.724
72.974
72.224
2500
6A.01
720
1650
Earthwork in excavation for foundation for structures in all types of soil excluding rock :
Abutment
Pier
5.47 x 2 x 10.85 x 2
= 3.35 x 2.444 x 10.10 x 2
237.398
165.11
Total :
6A.03
402.513
0.00
Pier
6A.03
Providing and laying in position coarse sand below foundation including compaction in layers :
Abutment
3.79
NIL
= NIL
Total :
0.000
6A.04
6A.05
74.59 m3
x 1.1 =
=
74.59
75.00
7.938
3.550
7.1
a)- Quadrant =
38.732 x 0.3 x 0
b)- Back
0.000
=
Total =
6A.09
43.665
Pier
6A.17
43.665
Structural cement concrete for Plain/ Reinforced Concrete in substructure, pier, piercap
abutment, abutmentcap, retaining wall , return wall, staircase, etc.
RCC M35 in abutment:-
Dirt Wall
Abutment
cantilever return =
6A.18
Pier
Pier Cap
6A.22
47.355
Foundation
Substructure
Superstructure
Approach slab
Railing kerb
87 x 85
131 x 135
48 x 120
21.525 x 80
4 x 50
kg.
kg.
kg.
kg.
kg.
=
=
=
=
=
TOTAL =
Say :
6A.28
Providing and laying in position controlled RCC M-30 in kerbs over bridge excluding cost of reinforcement
0.3 x 0.5 x 20.2
6A.25
=
=
Providing and laying over the top of deck slab 50mm thick asphaltic concrete:
(13.2 + 0.02 x 4 + 0.3 x 2 + 3.5 x 2) x 0.05 x 8.75
6A.26
Providing and laying a layer of 15 mm thick mastic asphalt over asphaltic concrete:
(13.2 + 0.02 x 4 + 0.3 x 2 + 3.5 x 2) x 8.75
6A.35
6A.36
Providing and fixing 150 dia PVC downtake and runner pipe :
6A.32
182.700
24.600 m2
6A.30
41.00 Rm
6A.27
21.53 m3
Reinforced cement concrete M-30 grade concrete crash barrier including reinforcement :
(13.2 + 0.02 x 4 + 0.3 x 2 + 3.5 x 2) x 2.0
6A.07
& 6A.08
=
=
=
=
Total :
14 x 2 x 2
168.501
56 Nos.
Total :
56 Nos.
Providing and laying in position hand packed boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :
= NIL
38.732 x 0.3 x 2
=
Total :
6A.37
10.599
3.332
7.175
147.40
6A.06
41.760
Plain cement concrete M 15 leveling course below foundation of bridges, pile caps,
retaining walls, below approach slabs for bridges :
Below Abutment :
Below Pier :
Below approach :
Floor Protection :
6A.31
0.000
6A.29
23.24
23.24
Plain cement concrete in M20 grade in toe wall at the end of the stone pitching & bed protection:
Bed Protection
6A.38
Providing 150mm thick coarse sand below boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :
= NIL
38.732 x 0.3 x 2
=
Total :
11.62
11.62
86/1
of approach slab
of the abutment
of the abutment foundation
of carriage way
of superstructure
ant stone pitching (Y/N)
3x 4.4
= 13.2 m
=
3.50 m
=
10.25 m
10.25 m
=
72.224 m
=
8.75 m
=
10.25 m
=
0.500 m
=
0.35 m
Y
2.20
0.6
2.063 m
ing rock :
m3
87.87
m3 x 1.1 =
=
402.513 m3
403 m3
x 1.1
0.00 m3
x 1.1
4.17
=
4.17 m3
ction in layers :
m3
m3
0.000 m3
0.00 m3
2.050
m3
m3
30o
3.55 x 2 =
3.550
7.1
3.55 x 1.5 =
5.325
m3
m3
m3
=
43.67 m3
44.00 m3
64.24 m3
21.80
86.04 m3
Total =
3.09 m3
50.88 m3
5.85 m3
86.042 m3
87.00 m3
20.08 m3
28.48 m3
5)/2 x 0.82 x 2
22.20 m3
TOTAL
130.57 m3
=
=
m3
48.00 m3
7.395
17.685
5.760
1.722
0.2
32.762
33.00
T
T
T
T
T
T
T
9.135 m3
m2
6 Nos.
8.4 m
m3
131.00 m3
Rm
Rm
m3
m3
m3
m3
m3
x 1.1 =
=
168.501 m3
169.00 m3
m3
m3
m3 x 1.3 =
=
30.211 m3
31.00 m3
750
4100
40.017 m
450
3.75 m
1500
301.00 m3
49.13 m3
350.13 m3
m3
m3
m3 x 1.3 =
=
15.105 m3
16.00 m3
BRIDGE No : 186/3
Total length of the bridge
3500
300
76.571
300
75.603
720
Avg. G.L
72.731
70.780
71.380
70.280
3850
6A.01
720
2200
Earthwork in excavation for foundation for structures in all types of soil excluding rock :
Abutment
Pier
391.99
273.00
Total :
6A.03
6A.03
664.985
Providing and laying in position coarse sand below foundation including compaction in layers :
Abutment
NIL
= NIL
Total :
0.000
6A.04
6A.05
132.20 m3
x 1.1 =
=
132.20
133.00
10.568
4.726
9.452
6A.09
a)- Quadrant =
68.646 x 0.3 x 0
b)- Back
0.000
=
58.130
Total =
58.130
Pier
6A.17
Structural cement concrete for Plain/ Reinforced Concrete in substructure, pier, piercap
abutment, abutmentcap, retaining wall , return wall, staircase, etc.
RCC M35 in abutment:-
Dirt Wall
Abutment
cantilever return =
6A.18
Pier
Pier Cap
6A.22
200.64375
Foundation
Substructure
Superstructure
Approach slab
Railing kerb
166 x 85
172 x 135
201 x 120
21.525 x 80
5 x 50
kg.
kg.
kg.
kg.
kg.
=
=
=
=
=
TOTAL =
Say :
6A.28
Providing and laying in position controlled RCC M-30 in kerbs over bridge excluding cost of reinforcement
0.3 x 0.5 x 33.1
6A.25
=
=
Providing and laying over the top of deck slab 50mm thick asphaltic concrete:
(26.1 + 0.02 x 4 + 0.3 x 2 + 3.5 x 2) x 0.05 x 8.75
6A.26
Providing and laying a layer of 15 mm thick mastic asphalt over asphaltic concrete:
(26.1 + 0.02 x 4 + 0.3 x 2 + 3.5 x 2) x 8.75
6A.35
6A.36
Providing and fixing 150 dia PVC downtake and runner pipe :
6A.32
295.575
0.42 x 10.25 x 6
6A.34
6A.30
24.600 m2
41.00 Rm
6A.27
21.53 m3
Reinforced cement concrete M-30 grade concrete crash barrier including reinforcement :
(26.1 + 0.02 x 4 + 0.3 x 2 + 3.5 x 2) x 2.0
6A.07
& 6A.08
=
=
=
=
Total :
16 x 3 x 2
350.251
96 Nos.
Total :
96 Nos.
Providing and laying in position hand packed boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :
= NIL
68.646 x 0.3 x 2
=
Total :
6A.37
14.494
5.684
7.175
322.90
6A.06
67.560
Plain cement concrete M 15 leveling course below foundation of bridges, pile caps,
retaining walls, below approach slabs for bridges :
Below Abutment :
Below Pier :
Below approach :
Floor Protection :
6A.31
0.000
6A.29
41.19
41.19
Plain cement concrete in M20 grade in toe wall at the end of the stone pitching & bed protection:
Bed Protection
6A.38
Providing 150mm thick coarse sand below boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :
= NIL
68.646 x 0.3 x 2
=
Total :
20.59
20.59
86/3
of approach slab
of the abutment
of the abutment foundation
of carriage way
of superstructure
ant stone pitching (Y/N)
3x 8.7
= 26.1 m
=
3.50 m
=
10.25 m
10.25 m
=
0 m
=
8.75 m
=
10.25 m
=
0.500 m
=
0.75 m
Y
1.54
0.6
1.629 m
ing rock :
m3
3195.436
m3 x 1.1 =
=
x 1.1
664.985 m3
665 m3
0.00 m3
=
0.00 m3
0.000 m3
0.00 m3
ction in layers :
m3
m3
2.729
m3
m3
30o
4.726
4.726 x 2 = 9.452
4.726 x 1.5 =
7.089
m3
m3
m3
=
58.13 m3
59.00 m3
115.46 m3
=
Total =
49.63
165.08 m3
=
5.55 m3
62.33 m3
3.44 m3
165.082 m3
166.00 m3
39.97 m3
38.19 m3
5)/2 x 0.82 x 2
22.20 m3
TOTAL
171.69 m3
=
=
m3
=
14.110
23.220
24.120
1.722
0.25
63.422
64.00
201.00 m3
T
T
T
T
T
T
T
14.779 m3
m2
6 Nos.
8.4 m
m3
172.00 m3
Rm
Rm
m3
m3
m3
m3
m3
x 1.1 =
=
350.251 m3
351.00 m3
m3
m3
m3 x 1.3 =
=
53.544 m3
54.00 m3
750
46.483 m
450
3.75 m2
1500
349.00 m3
107.63 m3
506.87 m3
m3
m3
m3 x 1.3 =
=
26.772 m3
27.00 m3
BRIDGE No : 187/2
Total length of the bridge
3500
300
76.126
300
75.058
720
Avg. G.L
73.180
70.310
71.010
69.810
4000
6A.01
720
2500
Earthwork in excavation for foundation for structures in all types of soil excluding rock :
Abutment
=
Total :
For 4 Lane Structure
6A.02
627.738
627.74
0
Total
For 4 Lane Structure
6A.03
Providing and laying in position coarse sand below foundation including compaction in layers :
Abutment
NIL
= NIL
Total :
0.000
6A.04
6A.05
141.24 m3
For 4 Lane Structure
x 1.1 =
=
141.24
282.48
10.400
4.651
9.302
a)- Quadrant =
66.485 x 0.3 x 0
b)- Back
0.000
=
Total =
For 4 Lane Structure
6A.09
63.123
6A.17
63.123
Structural cement concrete for Plain/ Reinforced Concrete in substructure, pier, piercap
abutment, abutmentcap, retaining wall , return wall, staircase, etc.
RCC M35 in abutment:-
Dirt Wall
Abutment
cantilever return =
4 x 5.116 x 0.5 x 4
6A.22
=
103.8258
For 4 Lane Structure
Foundation
Substructure
Superstructure
Approach slab
Railing kerb
289.03836000kg.
232 x 135
kg.
208 x 120
kg.
23.751 x 80 kg.
6 x 50
kg.
=
=
=
=
=
TOTAL =
For 4 Lane Structure
6A.28
Providing and laying in position controlled RCC M-30 in kerbs over bridge excluding cost of reinforcement
0.3 x 0.5 x 17.8
For 4 Lane Structure
6A.25
=
=
Providing and laying over the top of deck slab 50mm thick asphaltic concrete:
(10.8 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 0.05 x 9.66
For 4 Lane Structure
6A.26
Providing and laying a layer of 15 mm thick mastic asphalt over asphaltic concrete:
(10.8 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 9.66
For 4 Lane Structure
6A.35
6A.36
6A.32
=
=
178.13
356.00
Providing and fixing 150 dia PVC downtake and runner pipe :
For 4 Lane Structure
6A.34
=
=
=
=
9.048 m2
18.00 m2
2 x 11.31
For 4 Lane Structure
6A.30
=
=
22.62 Rm
45.00 Rm
6A.27
=
=
23.75 m3
48.00 m3
Reinforced cement concrete M-30 grade concrete crash barrier including reinforcement :
(10.8 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 2.0
For 4 Lane Structure
6A.07
& 6A.08
=
=
=
=
=
Total :
17.010
7.917
158.26
183.183
For 4 Lane Structure
18 x 3 x 2
For 4 Lane Structure
6A.06
36.880
74.00
Plain cement concrete M 15 leveling course below foundation of bridges, pile caps,
retaining walls, below approach slabs for bridges :
Below Abutment :
Below approach :
Floor Protection :
6A.31
0.000
6A.29
108 Nos.
216 Nos.
Providing and laying in position hand packed boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :
= NIL
66.485 x 0.3 x 2
39.89
Total :
For 4 Lane Structure
6A.37
39.89
Plain cement concrete in M20 grade in toe wall at the end of the stone pitching & bed protection:
Length of toe wall required at each side
=
=
=
For 4 Lane Structure
6A.38
Providing 150mm thick coarse sand below boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :
= NIL
66.485 x 0.3 x 2
=
Total :
For 4 Lane Structure
19.95
19.95
o : 187/2
h of carriage way
h of footpath
th of superstructure
drant stone pitching (Y/N)
1x 10.80
= 10.8 m
=
3.50
=
11.31
11.31
=
70.78
=
9.66
=
11.31
=
0.500
=
0.85
Y
0.97
m
m
m
m
m
m
m
m
0.6
1.247 m
xcluding rock :
m3
105.444
m3 x 1.1 =
=
627.738 m3
1255 m3
0 m3
x 1.1
=
=
0.00 m3
0.00 m3
0.000 m3
0.00 m3
ompaction in layers :
m3
m3
2.685
m3
m3
30o
4.651 x 2 =
4.651
9.302
4.651 x 1.5 =
6.977
m3
m3
m3
=
63.12 m3
126.25 m3
144.52 m3
Total =
144.52 m3
For 4 Lane Structure
e, pier, piercap
6.806 m3
65.927 m3
1.79127 m3
40.928 m3
144.519 m3
289.04 m3
TOTAL
115.453 m3
=
=
4 Lane Structure
m3
=
24.568
31.320
24.960
1.900
0.3
83.048
168.00
208.00 m3
T
T
T
T
T
T
T
8.91 m3
18.00 m3
m2
m2
4 Nos.
8 Nos.
5.6 m
11.2 m
m3
232.00 m3
Rm
reinforcement :
Rm
Rm
m3
m3
m3
m3
4 Lane Structure
x 1.1 =
=
183.183 m3
368.00 m3
f embankment,
m3
m3
m3 x 1.3 =
=
51.858 m3
104.00 m3
300
0.54 m2
1000
53.00 m
52.75 m3
3
105.75 m3
212 m3
m3
m3
m3 x 1.3 =
=
25.929 m3
52.00 m3
BRIDGE No : 194/1
Total length of the bridge
3500
300
65.962
300
65.044
720
Avg. G.L
62.000
59.674
60.374
59.174
4000
6A.01
720
2500
Earthwork in excavation for foundation for structures in all types of soil excluding rock :
Abutment
Pier
251.147
159.94
Total :
6A.03
411.091
228.41
Pier
5.35 x 2 x 10.10 x 2
6A.03
Providing and laying in position coarse sand below foundation including compaction in layers :
Abutment
216.14
NIL
= NIL
Total :
0.000
6A.04
6A.05
155.33 m3
x 1.1 =
=
155.33
156.00
11.455
5.123
10.246
6A.09
a)- Quadrant =
80.66 x 0.3 x 0
b)- Back
0.000
=
185.965
Total =
185.965
Pier
6A.17
Structural cement concrete for Plain/ Reinforced Concrete in substructure, pier, piercap
abutment, abutmentcap, retaining wall , return wall, staircase, etc.
RCC M35 in abutment:-
Dirt Wall
Abutment
cantilever return =
4 x 5.588 x 0.5 x 4
6A.18
Pier
= ((7.25x3.745x0.75)+((22/7x0.75x0.75)/4x3.745))x2
Pier Cap
6A.22
180.81
Foundation
Substructure
Superstructure
Approach slab
Railing kerb
187 x 85
194 x 135
181 x 120
21.525 x 80
5 x 50
kg.
kg.
kg.
kg.
kg.
=
=
=
=
=
TOTAL =
Say :
6A.28
Providing and laying in position controlled RCC M-30 in kerbs over bridge excluding cost of reinforcement
0.3 x 0.5 x 32.2
6A.25
=
=
Providing and laying over the top of deck slab 50mm thick asphaltic concrete:
(25.2 + 0.02 x 4 + 0.3 x 2 + 3.5 x 2) x 0.05 x 8.75
6A.26
Providing and laying a layer of 15 mm thick mastic asphalt over asphaltic concrete:
(25.2 + 0.02 x 4 + 0.3 x 2 + 3.5 x 2) x 8.75
6A.35
6A.36
Providing and fixing 150 dia PVC downtake and runner pipe :
6A.32
287.700
24.600 m2
6A.30
41.00 Rm
6A.27
21.53 m3
Reinforced cement concrete M-30 grade concrete crash barrier including reinforcement :
(25.2 + 0.02 x 4 + 0.3 x 2 + 3.5 x 2) x 2.0
6A.07
& 6A.08
=
=
=
=
Total :
17 x 3 x 2
375.461
102 Nos.
Total :
102 Nos.
Providing and laying in position hand packed boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :
= NIL
80.66 x 0.3 x 2
=
Total :
6A.37
15.416
4.655
7.175
348.21
6A.06
65.760
Plain cement concrete M 15 leveling course below foundation of bridges, pile caps,
retaining walls, below approach slabs for bridges :
Below Abutment :
Below Pier :
Below approach :
Floor Protection :
6A.31
0.000
6A.29
48.40
48.40
Plain cement concrete in M20 grade in toe wall at the end of the stone pitching & bed protection:
Bed Protection
= 33.85x22.86x0.15
6A.38
Providing 150mm thick coarse sand below boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :
= NIL
80.66 x 0.3 x 2
=
Total :
24.20
24.20
94/1
of approach slab
of the abutment
of the abutment foundation
of carriage way
of superstructure
ant stone pitching (Y/N)
3x 8.4
= 25.2 m
=
3.50 m
=
10.25 m
10.25 m
=
60.52 m
=
8.75 m
=
10.25 m
=
0.500 m
=
0.70 m
Y
2.82
0.6
2.477 m
ing rock :
m3
65.0238
m3 x 1.1 =
=
411.091 m3
412 m3
x 1.1
251.25 m3
x 1.1
237.75
=
489.00 m3
ction in layers :
m3
m3
0.000 m3
0.00 m3
2.958
m3
m3
30o
5.123
5.123 x 2 = 10.246
5.123 x 1.5 =
7.685
m3
m3
m3
=
185.96 m3
186.00 m3
130.97 m3
55.95
186.92 m3
Total =
5.25 m3
68.93 m3
8.66 m3
186.925 m3
187.00 m3
44.70 m3
44.04 m3
5)/2 x 0.82 x 2
22.20 m3
TOTAL
193.78 m3
=
=
m3
181.00 m3
15.895
26.190
21.720
1.722
0.25
65.777
66.00
T
T
T
T
T
T
T
14.385 m3
m2
6 Nos.
8.4 m
m3
194.00 m3
Rm
Rm
m3
m3
m3
m3
m3
x 1.1 =
=
375.461 m3
376.00 m3
m3
m3
m3 x 1.3 =
=
62.915 m3
63.00 m3
300
800
48.666 m
300
0.54 m
1000
53.00 m3
116.07 m3
218.28 m3
m3
m3
m3 x 1.3 =
=
31.457 m3
32.00 m3
BRIDGE No : 202/1
Total length of the bridge
3500
300
42.976
300
42.083
720
Avg. G.L
40.000
36.500
37.100
36.000
4000
6A.01
720
2250
Earthwork in excavation for foundation for structures in all types of soil excluding rock :
Abutment
Pier
584.798
1139.28
Total :
6A.03
1724.078
72.28
Pier
6A.03
Providing and laying in position coarse sand below foundation including compaction in layers :
Abutment
118.77
NIL
= NIL
Total :
0.000
6A.04
6A.05
173.27 m3
x 1.1 =
=
173.27
174.00
12.099
5.411
10.822
a)- Quadrant =
89.984 x 0.3 x 0
b)- Back
0.000
=
Total =
6A.09
196.419
Pier
6A.17
196.419
Structural cement concrete for Plain/ Reinforced Concrete in substructure, pier, piercap
abutment, abutmentcap, retaining wall , return wall, staircase, etc.
RCC M35 in abutment:-
Dirt Wall
Abutment
cantilever return =
4 x 5.876 x 0.5 x 4
6A.18
Pier
Pier Cap
6A.22
314.803125
Foundation
Substructure
Superstructure
Approach slab
Railing kerb
247 x 85
339 x 135
315 x 120
21.525 x 80
9 x 50
kg.
kg.
kg.
kg.
kg.
=
=
=
=
=
TOTAL =
Say :
6A.28
Providing and laying in position controlled RCC M-30 in kerbs over bridge excluding cost of reinforcement
0.3 x 0.5 x 54.25
6A.25
=
=
Providing and laying over the top of deck slab 50mm thick asphaltic concrete:
(47.25 + 0.02 x 8 + 0.3 x 2 + 3.5 x 2) x 0.05 x 8.75
6A.26
Providing and laying a layer of 15 mm thick mastic asphalt over asphaltic concrete:
(47.25 + 0.02 x 8 + 0.3 x 2 + 3.5 x 2) x 8.75
6A.35
6A.36
Providing and fixing 150 dia PVC downtake and runner pipe :
6A.32
481.338
41.000 m2
6A.30
82.00 Rm
6A.27
21.53 m3
Reinforced cement concrete M-30 grade concrete crash barrier including reinforcement :
(47.25 + 0.02 x 8 + 0.3 x 2 + 3.5 x 2) x 2.0
6A.07
& 6A.08
=
=
=
=
Total :
17 x 3 x 2
596.79
102 Nos.
Total :
102 Nos.
Providing and laying in position hand packed boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :
= NIL
89.984 x 0.3 x 2
=
Total :
6A.37
14.904
4.214
7.175
570.50
6A.06
110.020
Plain cement concrete M 15 leveling course below foundation of bridges, pile caps,
retaining walls, below approach slabs for bridges :
Below Abutment :
Below Pier :
Below approach :
Floor Protection :
6A.31
0.000
6A.29
53.99
53.99
Plain cement concrete in M20 grade in toe wall at the end of the stone pitching & bed protection:
Bed Protection
= 41.91x30.25x0.15
6A.38
Providing 150mm thick coarse sand below boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :
= NIL
89.984 x 0.15 x 2
=
Total :
27.00
27.00
02/1
of approach slab
of the abutment
of the abutment foundation
of carriage way
of superstructure
ant stone pitching (Y/N)
7x 6.75
= 47.25m
=
3.50 m
=
10.25 m
10.25 m
=
36.44 m
=
8.75 m
=
10.25 m
=
0.500 m
=
0.65 m
Y
1.94
0.6
1.891 m
ing rock :
m3
156.4086
m3 x 1.1 =
=
x 1.1
1724.078 m3
1725 m3
79.51 m3
x 1.1
130.65
=
210.15 m3
ction in layers :
m3
m3
0.000 m3
0.00 m3
3.124
m3
m3
30o
5.411 x 2 =
5.411
10.822
5.411 x 1.5 =
8.117
m3
m3
m3
=
196.42 m3
197.00 m3
118.74 m3
127.40
246.14 m3
Total =
6.08 m3
73.55 m3
4.83 m3
246.137 m3
247.00 m3
47.01 m3
140.68 m3
5)/2 x 0.82 x 6
66.60 m3
TOTAL
338.74 m3
=
=
m3
339.00 m3
m3
315.00 m3
20.995
45.765
37.800
1.722
0.45
106.732
107.00
T
T
T
T
T
T
T
24.067 m3
m2
14 Nos.
19.6 m
Rm
Rm
m3
m3
m3
m3
m3
x 1.1 =
=
596.792 m3
597.00 m3
m3
m3
m3 x 1.3 =
=
70.188 m3
71.00 m3
750
4100
50.249 m
450
3.75 m
1500
377.00 m3
190.17 m3
567.17 m3
m3
m3
m3 x 1.3 =
=
35.094 m3
36.00 m3
BRIDGE No : 211/2
Total length of the bridge
3500
300
52.072
300
51.104
720
Avg. G.L
49.500
48.005
48.305
47.505
2850
6A.01
720
2250
Earthwork in excavation for foundation for structures in all types of soil excluding rock :
Abutment
6.42 x 0 x 10.85 x 2
Total :
For 4 Lane Structure
6A.02
0.000
0.00
277.93143
Total
For 4 Lane Structure
6A.03
Providing and laying in position coarse sand below foundation including compaction in layers :
Abutment
NIL
= NIL
Total :
0.000
6A.04
6A.05
64.51 m3
For 4 Lane Structure
x 1.1 =
=
64.51
129.02
7.383
3.302
6.604
a)- Quadrant =
33.507 x 0.3 x 0
b)- Back
0.000
=
110.353
Total =
110.353
For 4 Lane Structure
6A.09
6A.17
Structural cement concrete for Plain/ Reinforced Concrete in substructure, pier, piercap
abutment, abutmentcap, retaining wall , return wall, staircase, etc.
RCC M35 in abutment:-
Dirt Wall
Abutment
cantilever return =
6A.22
=
67.80375
For 4 Lane Structure
Foundation
Substructure
Superstructure
Approach slab
Railing kerb
159.531 x 85
140 x 135
136 x 120
21.525 x 80
6 x 50
kg.
kg.
kg.
kg.
kg.
=
=
=
=
=
TOTAL =
For 4 Lane Structure
6A.28
Providing and laying in position controlled RCC M-30 in kerbs over bridge excluding cost of reinforcement
0.3 x 0.5 x 15.82
For 4 Lane Structure
6A.25
=
=
Providing and laying over the top of deck slab 50mm thick asphaltic concrete:
(8.82 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 0.05 x 8.75
For 4 Lane Structure
6A.26
Providing and laying a layer of 15 mm thick mastic asphalt over asphaltic concrete:
(8.82 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 8.75
For 4 Lane Structure
6A.35
6A.36
6A.32
=
=
=
=
144.03
288.00
Providing and fixing 150 dia PVC downtake and runner pipe :
For 4 Lane Structure
12.300 m2
25.00 m2
6A.30
=
=
20.50 Rm
41.00 Rm
6A.27
=
=
21.53 m3
43.00 m3
Reinforced cement concrete M-30 grade concrete crash barrier including reinforcement :
(8.82 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 2.0
For 4 Lane Structure
6A.07
& 6A.08
=
=
=
=
=
=
Total :
12.546
4.459
7.175
114.91
139.092
For 4 Lane Structure
14 x 1 x 2
For 4 Lane Structure
6A.06
32.920
66.00
Plain cement concrete M 15 leveling course below foundation of bridges, pile caps,
retaining walls, below approach slabs for bridges :
Below Abutment :
Below Pier :
Below approach :
Floor Protection :
6A.31
0.000
6A.29
28 Nos.
56 Nos.
Providing and laying in position hand packed boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :
= NIL
33.507 x 0.3 x 2
=
Total :
For 4 Lane Structure
20.10
20.10
6A.37
Plain cement concrete in M20 grade in toe wall at the end of the stone pitching & bed protection:
Length of toe wall required at each side
=
=
=
For 4 Lane Structure
6A.38
Providing 150mm thick coarse sand below boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :
= NIL
33.507 x 0.3 x 2
=
Total :
For 4 Lane Structure
10.05
10.05
o : 211/2
h of carriage way
h of footpath
th of superstructure
drant stone pitching (Y/N)
1x 8.82
= 8.82 m
=
3.50 m
=
10.25 m
10.25 m
=
49.5 m
=
8.75 m
=
10.25 m
=
0.500 m
=
0.75 m
Y
0.63
0.5
0.922 m
xcluding rock :
m3
m3 x 1.1 =
=
x 1.1
0.000 m3
0 m3
305.724573 m3
=
=
305.72 m3
611.45 m3
0.000 m3
0.00 m3
ompaction in layers :
m3
m3
1.906
m3
m3
30o
3.302 x 2 =
3.302
6.604
3.302 x 1.5 =
4.953
m3
m3
m3
=
110.35 m3
220.71 m3
79.77 m3
Total =
For 4 Lane Structure
79.77 m3
=
e, pier, piercap
5.553 m3
41.313 m3
0.90013 m3
21.4719 m3
79.765 m3
159.53 m3
TOTAL
69.239 m3
=
=
4 Lane Structure
m3
136.00 m3
13.560
18.900
16.320
1.722
0.3
50.802
102.00
T
T
T
T
T
T
T
7.20 m3
14.00 m3
m2
m2
2 Nos.
4 Nos.
2.8 m
5.6 m
m3
140.00 m3
Rm
reinforcement :
Rm
Rm
m3
m3
m3
m3
m3
4 Lane Structure
x 1.1 =
=
139.092 m3
280.00 m3
f embankment,
m3
m3
m3 x 1.3 =
=
26.136 m3
54.00 m3
300
1000
42.00 m3
38.30 m3
80.30 m3
161 m3
m3
m3
m3 x 1.3 =
=
13.068 m3
28.00 m3
BRIDGE No : 211/3
Total length of the bridge
3500
300
52.493
300
51.525
720
Avg. G.L
49.718
47.718
48.018
47.218
3200
6A.01
720
2250
Earthwork in excavation for foundation for structures in all types of soil excluding rock :
Abutment
Total :
For 4 Lane Structure
6A.02
14.397
14.40
352.875418
Total
For 4 Lane Structure
6A.03
Providing and laying in position coarse sand below foundation including compaction in layers :
Abutment
NIL
= NIL
Total :
0.000
6A.04
6A.05
95.15 m3
For 4 Lane Structure
x 1.1 =
=
95.15
190.30
8.967
4.010
8.02
a)- Quadrant =
49.422 x 0.3 x 0
b)- Back
0.000
=
134.014
Total =
134.014
For 4 Lane Structure
6A.09
6A.17
Structural cement concrete for Plain/ Reinforced Concrete in substructure, pier, piercap
abutment, abutmentcap, retaining wall , return wall, staircase, etc.
RCC M35 in abutment:-
Dirt Wall
Abutment
cantilever return =
6A.22
=
67.80375
For 4 Lane Structure
Foundation
Substructure
Superstructure
Approach slab
Railing kerb
168.8585 x 8
174 x 135
136 x 120
21.525 x 80
6 x 50
kg.
kg.
kg.
kg.
kg.
=
=
=
=
=
TOTAL =
For 4 Lane Structure
6A.28
Providing and laying in position controlled RCC M-30 in kerbs over bridge excluding cost of reinforcement
0.3 x 0.5 x 15.82
For 4 Lane Structure
6A.25
=
=
Providing and laying over the top of deck slab 50mm thick asphaltic concrete:
(8.82 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 0.05 x 8.75
For 4 Lane Structure
6A.26
Providing and laying a layer of 15 mm thick mastic asphalt over asphaltic concrete:
(8.82 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 8.75
For 4 Lane Structure
6A.35
6A.36
6A.32
=
=
=
=
144.03
288.00
Providing and fixing 150 dia PVC downtake and runner pipe :
For 4 Lane Structure
12.300 m2
25.00 m2
6A.30
=
=
20.50 Rm
41.00 Rm
6A.27
=
=
21.53 m3
43.00 m3
Reinforced cement concrete M-30 grade concrete crash barrier including reinforcement :
(8.82 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 2.0
For 4 Lane Structure
6A.07
& 6A.08
=
=
=
=
=
=
Total :
13.264
4.459
7.175
114.91
24.898
For 4 Lane Structure
15 x 2 x 2
For 4 Lane Structure
6A.06
32.920
66.00
Plain cement concrete M 15 leveling course below foundation of bridges, pile caps,
retaining walls, below approach slabs for bridges :
Below Abutment :
Below Pier :
Below approach :
Floor Protection :
6A.31
0.000
6A.29
60 Nos.
120 Nos.
Providing and laying in position hand packed boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :
= NIL
49.422 x 0.3 x 2
=
Total :
For 4 Lane Structure
29.65
29.65
6A.37
Plain cement concrete in M20 grade in toe wall at the end of the stone pitching & bed protection:
Length of toe wall required at each side
=
=
=
For 4 Lane Structure
6A.38
Providing 150mm thick coarse sand below boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :
= NIL
49.422 x 0.3 x 2
=
Total :
For 4 Lane Structure
14.83
14.83
o : 211/3
h of carriage way
h of footpath
th of superstructure
drant stone pitching (Y/N)
1x 8.82
= 8.82 m
=
3.50 m
=
10.25 m
10.25 m
=
49.62 m
=
8.75 m
=
10.25 m
=
0.500 m
=
0.75 m
Y
0.60
0.5
0.897 m
xcluding rock :
m3
4.30563
m3 x 1.1 =
=
x 1.1
14.397 m3
29 m3
388.16296 m3
=
=
388.16 m3
776.33 m3
0.000 m3
0.00 m3
ompaction in layers :
m3
m3
2.315
m3
m3
30o
4.01 x 2 =
4.010
8.02
4.01 x 1.5 =
6.015
m3
m3
m3
=
134.01 m3
268.03 m3
84.43 m3
Total =
For 4 Lane Structure
84.43 m3
=
e, pier, piercap
5.553 m3
51.763 m3
0.83102 m3
28.64 m3
84.429 m3
168.86 m3
TOTAL
86.788 m3
=
=
4 Lane Structure
m3
136.00 m3
14.353
23.490
16.320
1.722
0.3
56.185
114.00
T
T
T
T
T
T
T
7.20 m3
14.00 m3
m2
m2
2 Nos.
4 Nos.
2.8 m
5.6 m
m3
174.00 m3
Rm
reinforcement :
Rm
Rm
m3
m3
m3
m3
m3
4 Lane Structure
x 1.1 =
=
24.898 m3
50.00 m3
f embankment,
m3
m3
m3 x 1.3 =
=
38.549 m3
78.00 m3
300
1000
46.00 m3
38.30 m3
84.30 m3
169 m3
m3
m3
m3 x 1.3 =
=
19.275 m3
40.00 m3