BRIDGE No : 151/1

Total length of the bridge


3500

2x 7.8
= 15.6 m
=
3.50 m
=
10.25 m
10.25 m
=
93.96 m
=
8.75 m
=
10.25 m
=
0.500 m
=
0.70 m
Y

300

97.378

Length of approach slab


Width of the abutment
=
Width of the abutment foundation =
Level of Rock
Width of carriage way
Total deck width
Width of footpath
Depth of superstructure
Quadrant stone pitching (Y/N)

300

96.460

100 thk PCC M15

720

500 thk. return wall

0.79

Avg. G.L
94.606
93.106

0.6

93.456
1.127 m

92.606
3000

6A.01

720

2200

Earthwork in excavation for foundation for structures in all types of soil excluding rock :
Abutment

Pier

6.52 x 0.646 x 10.85 x 2


= 4.35 x 1.5 x 10.10

=
Total :

6A.02

65.9025

191.569336

x 1.1

43.935

x 1.1

4.35 x 1.0 x 10.10

157.301 m3
158 m3

210.73 m3

48.33
259.05 m3

0.000 m3
0.00 m3

Providing and laying in position coarse sand below foundation including compaction in layers :
Abutment

NIL

= NIL

m3
0.000 m3

Total :

6A.04

m3 x 1.1 =
=

157.301

Ditto as item 6A.01 above but in soft disintegrated rock :


6.52 x 1.354 x 10.85 x 2

6A.03

91.399 m3

Back filling behind abutments, wing walls, return walls :

1.996

0.5 x 1.996 x 3.457 x 10.25 x 2


= 70.72676 m3

6A.05

x 1.1 =
=

70.73 m3
71.00 m3

Filter media behind abutment, retaining wall and return wall :


Area =
=

6.05 x 7.73 x pi() /4


36.730 m2

3.457 x 2 =

30o

6.914

7.730
3.457

3.457 x 1.5 =
5.186

6.914
a)- Quadrant =

36.73 x 0.3 x 0

b)- Back

2 x 0.6 x 10.25 x 3.457

3.457

0.000 m3

=
=

42.521 m3

Total =

42.521 m3

42.52 m3

43.00 m3

6A.09

Structural cement concrete for Plain/ Reinforced Concrete in open foundation :


RCC M35 :Abutment

Pier

((0.72+5.92) x 0.5 x 0.35 + 5.92 x 0.5) x 10.25 x 2


= ((0.75+3.75)/2 x 0.45) x (9.5 + 8.0)/2 + (3.75 x 0.3 x 9.5)

84.50 m3

19.55
104.05 m3

Total =

6A.17

104.048 m3
105.00 m3

Structural cement concrete for Plain/ Reinforced Concrete in substructure, pier, piercap
abutment, abutmentcap, retaining wall , return wall, staircase, etc.
RCC M35 in abutment:-

Dirt Wall

0.853 x 10.25 x 0.3 x 2

5.246 m3

Abutment

0.5 x (0.72 + 0.72) x 3.004 x 10.25 x 2

44.339 m3

cantilever return =

(0.6+1.13)/2 x 0.4 x 3.5 x 4

1.36 m3

full return wall

3 x 3.922 x 0.5 x 4

23.532 m3

RCC M35 in pier:Pier

= (7.25 x 2.653 x 0.75) + (22/7 x 0.75 x 0.75 x 0.25 x 2.653)

10.754 m3

Pier Cap

= ((8.0+10.25)/2 x 0.75 x 0.82) + ((10.25 x (0.806 + 0.5)/2 x 0.82

11.100 m3

TOTAL

6A.18

96.335 m3
=
=

Structural cement concrete for Reinforced Concrete in superstructure :


RCC M35 Solid Slab :7.8 x 2 x 0.7 x 10.25

111.93 m3

=
6A.22

Providing & fixing in position HYSD reinforcement bars


a)b)c)d)e)-

Foundation
Substructure
Superstructure
Approach slab
Railing kerb

105 x 85
97 x 135
112 x 120
21.525 x 80
4 x 50

kg.
kg.
kg.
kg.
kg.

=
=
=
=
=
TOTAL =
Say :

6A.28

T
T
T
T
T
T
T

3.390 m3
4.000 m3

=
=

Providing and laying over the top of deck slab 50mm thick asphaltic concrete:
(15.6 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 0.05 x 8.75

6A.26

8.925
13.095
13.440
1.722
0.2
37.382
38.00

Providing and laying in position controlled RCC M-30 in kerbs over bridge excluding cost of reinforcement
0.3 x 0.5 x 22.6

6A.25

112.00 m3

10.176 m3

Providing and laying a layer of 15 mm thick mastic asphalt over asphaltic concrete:
(15.6 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 8.75

6A.35

Drainage spouts complete as per MOST drawing No. SD/205 :

6A.36

Providing and fixing 150 dia PVC downtake and runner pipe :

6A.32

Providing and fixing in position true to line and level :


a) tar paper bearings
0.42 x 10.25 x 4

16.400 m2

203.525 m2
4 Nos.
5.6 m

m3
97.00 m3

6A.34

Providing & laying Buried type Expansion joint :.


3 x 10.25

6A.30

30.75 Rm

Reinforced cement concrete railing with M 30 grade concrete:


(15.6 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 1.0

6A.27

21.53 m3

Reinforced cement concrete M-30 grade concrete crash barrier including reinforcement :
(15.6 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 2.0

6A.07
& 6A.08

0.000 Rm

Structural concrete grade M 30 in Reinforced Cement Concrete in approach slabs


excluding reinforcement :
10.25 x 3.5 x 0.3 x 2

6A.29

46.520 Rm

Plain cement concrete M 15 leveling course below foundation of bridges, pile caps,
retaining walls, below approach slabs for bridges :
Below Abutment :
Below Pier :
Below approach :
Floor Protection :

6.22 x 10.55 x 0.1 x 2


4.05 x 9.8 x 0.1
10.25 x 3.5 x 0.1 x 2
29.7x14.01x0.45

=
=
=
=

12.751
3.969
7.175
187.24

Total :

6A.31

211.139 m3

x 1.1 =
=

211.139 m3
212.00 m3

Providing weep holes in retaining wall, abutment and retaining/return walls :


Abutment

15 x 2 x 2

60 Nos.

Total :
6A.06

m3
m3
m3
m3

60 Nos.

Providing and laying in position hand packed boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :

m3

= NIL
36.73 x 0.3 x 2

22.04 m3

Total :

22.04

m3 x 1.3 =
=

28.650 m3
29.00 m3
300

6A.37

Plain cement concrete in M20 grade in toe wall at the end of the stone pitching :
800
Length of toe wall required at each side

29.257 m

Area of toe wall section

0.54 m2

62.41 m3

95.00 m3

300
1000
Bed Protection

= 29.7x14.01x0.15

Volume of concrete required

6A.38

Providing 150mm thick coarse sand below boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :

m3

= NIL
36.73 x 0.6 x 2

=
Total :

11.02 m3
11.02

m3 x 1.3 =
=

14.325 m3
15.00 m3

BRIDGE No : 153/2
Total length of the bridge
3500

2x 5.35
= 10.7 m
=
3.50 m
=
10.25 m
10.25 m
=
86.734 m
=
8.75 m
=
10.25 m
=
0.500 m
=
0.45 m
Y

300

91.950

Length of approach slab


Width of the abutment
Width of the abutment foundation
Level of Rock
Width of carriage way
Total deck width
Width of footpath
Depth of superstructure
Quadrant stone pitching (Y/N)

300

91.282

100 thk PCC M15

720

500 thk. return wall

0.96

Avg. G.L
89.234
87.234

0.6

87.484
1.238 m

86.734
2750

6A.01

720

1750

Earthwork in excavation for foundation for structures in all types of soil excluding rock :
Abutment

Pier

5.82 x 2.5 x 10.85 x 2


= 3.35 x 2.5 x 10.10

315.735 m3

84.5875

Total :

6A.02

0 m3

x 1.1
=

0.00 m3

0.000 m3
0.00 m3

Providing and laying in position coarse sand below foundation including compaction in layers :
Abutment

NIL

m3

= NIL
Total :

6A.04

400.323 m3
401 m3

Ditto as item 6A.01 above but in soft disintegrated rock :


5.82 x 0 x 10.85 x 2

6A.03

m3 x 1.1 =
=

400.323

0.000 m3

Back filling behind abutments, wing walls, return walls :

2.310

0.5 x 2.31 x 4.001 x 10.25 x 2


= 94.7336775 m3

6A.05

x 1.1 =
=

94.73 m3
95.00 m3

Filter media behind abutment, retaining wall and return wall :


Area =
=

7.002 x 8.947 x pi() /4


49.203 m2

30o

4.001 x 2 =

8.002

8.947
4.001

4.001 x 1.5 =
6.002

8.002
a)- Quadrant =

49.203 x 0.3 x 0

b)- Back

2 x 0.6 x 10.25 x 4.001

4.001

0.000 m3

=
=

49.212 m3

Total =

49.212 m3
=

49.21 m3
50.00 m3

6A.09

Structural cement concrete for Plain/ Reinforced Concrete in open foundation :


RCC M35 :Abutment

Pier

((0.72+5.22) x 0.5 x 0.25 + 5.22 x 0.5) x 10.25 x 2


= ((0.75+2.75)/2 x 0.3) x (9.5 + 8.0)/2 + (2.75 x 0.3 x 9.5)

68.73 m3

12.43
81.16 m3

Total =

6A.17

Structural cement concrete for Plain/ Reinforced Concrete in substructure, pier, piercap
abutment, abutmentcap, retaining wall , return wall, staircase, etc.
RCC M35 in abutment:-

Dirt Wall

0.603 x 10.25 x 0.3 x 2

3.71 m3

Abutment

0.5 x (0.72 + 0.72) x 3.798 x 10.25 x 2

56.06 m3

cantilever return =

(0.6+1.24)/2 x 0.4 x 3.5 x 4

1.76 m3

full return wall

2.75 x 4.466 x 0.5 x 4

24.56 m3

RCC M35 in pier:Pier

= (7.25 x 2.851 x 0.75) + (22/7 x 0.75 x 0.75 x 0.25 x 2.851)

15.72 m3

Pier Cap

= ((8.0+10.25)/2 x 0.75 x 0.82) + ((10.25 x (0.806 + 0.5)/2 x 0.82

11.10 m3

TOTAL

6A.18

112.91 m3
=
=

Structural cement concrete for Reinforced Concrete in superstructure :


RCC M35 Solid Slab :5.35 x 2 x 0.45 x 10.25

49.35375 m3

=
6A.22

Providing & fixing in position HYSD reinforcement bars


a)b)c)d)e)-

Foundation
Substructure
Superstructure
Approach slab
Railing kerb

82 x 85
113 x 135
50 x 120
21.525 x 80
3 x 50

kg.
kg.
kg.
kg.
kg.

=
=
=
=
=
TOTAL =
Say :

6A.28

T
T
T
T
T
T
T

2.655 m3
3.000 m3

=
=

Providing and laying over the top of deck slab 50mm thick asphaltic concrete:
(10.7 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 0.05 x 8.75

6A.26

6.970
15.255
6.000
1.722
0.15
30.097
31.00

Providing and laying in position controlled RCC M-30 in kerbs over bridge excluding cost of reinforcement
0.3 x 0.5 x 17.7

6A.25

50.00 m3

8.033 m3

Providing and laying a layer of 15 mm thick mastic asphalt over asphaltic concrete:
(10.7 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 8.75

6A.35

Drainage spouts complete as per MOST drawing No. SD/205 :

6A.36

Providing and fixing 150 dia PVC downtake and runner pipe :

6A.32

Providing and fixing in position true to line and level :


a) tar paper bearings
0.42 x 10.25 x 4

16.400 m2

160.650 m2
4 Nos.
5.6 m

m3
113.00 m3

81.158 m3
82.00 m3

6A.34

Providing & laying Buried type Expansion joint :.


3 x 10.25

6A.30

30.75 Rm

Reinforced cement concrete railing with M 30 grade concrete:


(10.7 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 1.0

6A.27

21.53 m3

Reinforced cement concrete M-30 grade concrete crash barrier including reinforcement :
(10.7 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 2.0

6A.07
& 6A.08

0.000 Rm

Structural concrete grade M 30 in Reinforced Cement Concrete in approach slabs


excluding reinforcement :
10.25 x 3.5 x 0.3 x 2

6A.29

36.720 Rm

Plain cement concrete M 15 leveling course below foundation of bridges, pile caps,
retaining walls, below approach slabs for bridges :
Below Abutment :
Below Pier :
Below approach :
Floor Protection :

5.52 x 10.55 x 0.1 x 2


3.05 x 9.8 x 0.1
10.25 x 3.5 x 0.1 x 2
34.025 x 9.95 x 0.45

=
=
=
=

11.316
2.989
7.175
152.35

Total :

6A.31

173.827 m3

x 1.1 =
=

173.827 m3
174.00 m3

Providing weep holes in retaining wall, abutment and retaining/return walls :


Abutment

14 x 2 x 2

56 Nos.

Total :
6A.06

m3
m3
m3
m3

56 Nos.

Providing and laying in position hand packed boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :

m3

= NIL
49.203 x 0.3 x 2

29.52 m3

Total :

m3 x 1.3 =
=

29.52

38.378 m3
39.00 m3
750

6A.37

Plain cement concrete in M20 grade in toe wall at the end of the stone pitching & bed protection:
4100
Length of toe wall required at each side

42.497 m

Area of toe wall section

3.75 m2

Volume of concrete required for Toe Wall

319.00 m3

Bed Protection

50.78 m3

369.78 m3

450
1500

= 34.025 x 9.95 x 0.15

Total Volume of Concrete

6A.38

Providing 150mm thick coarse sand below boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :

m3

= NIL
49.203 x 0.3 x 2

=
Total :

14.76 m3
14.76

m3 x 1.3 =
=

19.189 m3
20.00 m3

BRIDGE No : 155/1
Total length of the bridge
3500

300

90.911

Length of approach slab


Width of the abutment
Width of the abutment foundation
Level of Rock
Width of carriage way
Total deck width
Width of footpath
Depth of superstructure
Quadrant stone pitching (Y/N)

300

89.993

100 thk PCC M15

720

500 thk. return wall

Avg. G.L
87.500
85.642

86.192
85.142
3550

6A.01

720

1900

Earthwork in excavation for foundation for structures in all types of soil excluding rock :
Abutment

Pier

6.77 x 0.78 x 10.85 x 2


= 4.85 x 0.78 x 10.10

114.589

38.2083

Total :
For 4 Lane Structure
6A.02

152.80

Ditto as item 6A.01 above but in soft disintegrated rock :


6.77 x 1.578 x 10.85 x 2

4.85 x 2.0 x 10.10

231.822402
97.97
Total
For 4 Lane Structure

6A.03

Providing and laying in position coarse sand below foundation including compaction in layers :
Abutment

NIL

= NIL

Total :

6A.04

0.000

Back filling behind abutments, wing walls, return walls :


0.5 x 2.456 x 4.254 x 10.25 x 2
Total

6A.05

107.09 m3
For 4 Lane Structure

x 1.1 =
=

107.09
214.18

Filter media behind abutment, retaining wall and return wall :


Area =
=

7.4445 x 9.512 x pi() /4


55.616 m2

9.512
4.254

8.508
a)- Quadrant =

55.616 x 0.3 x 0

b)- Back

2 x 0.6 x 10.25 x 4.254

0.000
=

Total =
For 4 Lane Structure
6A.09

52.324

Structural cement concrete for Plain/ Reinforced Concrete in open foundation :


RCC M35 :Abutment

Pier

6A.17

52.324

((0.72+6.17) x 0.5 x 0.55 + 6.17 x 0.5) x 10.25 x 2


= ((0.75+4.25)/2 x 0.55) x (9.5 + 8.0)/2 + (4.25 x 0.3 x 9.5)

Structural cement concrete for Plain/ Reinforced Concrete in substructure, pier, piercap
abutment, abutmentcap, retaining wall , return wall, staircase, etc.
RCC M35 in abutment:-

Dirt Wall

0.853 x 10.25 x 0.3 x 2

Abutment

0.5 x (0.72 + 0.72) x 3.801 x 10.25 x 2

cantilever return =

(0.6+1.76)/2 x 0.4 x 3.5 x 4

full return wall

3.55 x 4.719 x 0.5 x 4

RCC M35 in pier:Pier

= (7.25 x 3.326 x 0.75) + (22/7 x 0.75 x 0.75 x 0.25 x 3.326)

Pier Cap

= ((8.0+10.25)/2 x 0.75 x 0.82) + ((10.25 x (0.806 + 0.5)/2 x 0.82

For 4 Lane Structure


6A.18

Structural cement concrete for Reinforced Concrete in superstructure :


RCC M35 Solid Slab :8 x 2 x 0.7 x 10.25

6A.22

=
For 4 Lane Structure

114.8

Providing & fixing in position HYSD reinforcement bars


a)b)c)d)e)-

Foundation
Substructure
Superstructure
Approach slab
Railing kerb

252.45725 x
254 x 135
230 x 120
21.525 x 80
8 x 50

kg.
kg.
kg.
kg.
kg.

=
=
=
=
=

TOTAL =
For 4 Lane Structure
6A.28

Providing and laying in position controlled RCC M-30 in kerbs over bridge excluding cost of reinforcement
0.3 x 0.5 x 23

=
=

For 4 Lane Structure


6A.25

Providing and laying over the top of deck slab 50mm thick asphaltic concrete:
(16 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 0.05 x 8.75
For 4 Lane Structure

6A.26

Providing and laying a layer of 15 mm thick mastic asphalt over asphaltic concrete:
(16 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 8.75
For 4 Lane Structure

6A.35

=
=

Drainage spouts complete as per MOST drawing No. SD/205 :


For 4 Lane Structure

=
=

207.03
414.00

6A.36

6A.32

Providing and fixing 150 dia PVC downtake and runner pipe :
For 4 Lane Structure
Providing and fixing in position true to line and level :
a) tar paper bearings
0.42 x 10.25 x 4
For 4 Lane Structure

6A.34

=
=

16.400 m2
33.00 m2

Providing & laying Buried type Expansion joint :.


3 x 10.25
For 4 Lane Structure

6A.30

=
=

30.75 Rm
62.00 Rm

Reinforced cement concrete railing with M 30 grade concrete:


(16 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 1.0

6A.27

=
=

21.53 m3
43.00 m3

Reinforced cement concrete M-30 grade concrete crash barrier including reinforcement :
(16 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 2.0
For 4 Lane Structure

6A.07
& 6A.08

=
=

6.47 x 10.55 x 0.1 x 2


4.55 x 9.8 x 0.1
10.25 x 3.5 x 0.1 x 2
30.8x14.83x0.45

=
=
=
=

Total :

13.264
4.459
7.175
205.54

230.441
For 4 Lane Structure

Providing weep holes in retaining wall, abutment and retaining/return walls :


Abutment

16 x 2 x 2
For 4 Lane Structure

6A.06

47.320
95.00

Plain cement concrete M 15 leveling course below foundation of bridges, pile caps,
retaining walls, below approach slabs for bridges :
Below Abutment :
Below Pier :
Below approach :
Floor Protection :

6A.31

0.000

Structural concrete grade M 30 in Reinforced Cement Concrete in approach slabs


excluding reinforcement :
10.25 x 3.5 x 0.3 x 2
For 4 Lane Structure

6A.29

64 Nos.
128 Nos.

Providing and laying in position hand packed boulder pitching on slopes of embankment,

in front of abutments and in launching apron:


Front :
Back :

= NIL
55.616 x 0.3 x 2

33.37

Total :
For 4 Lane Structure
6A.37

Plain cement concrete in M20 grade in toe wall at the end of the stone pitching & bed protection:
Length of toe wall required at each side

Area of toe wall section

Volume of concrete required for Toe Wall

Bed Protection

= 32x14.83x0.15

Total Volume of Concrete

=
For 4 Lane Structure

6A.38

33.37

Providing 150mm thick coarse sand below boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :

= NIL
55.616 x 0.3 x 2

=
Total :
For 4 Lane Structure

16.68
16.68

o : 155/1

l length of the bridge

gth of approach slab


h of the abutment
h of the abutment foundation

h of carriage way

h of footpath
th of superstructure
drant stone pitching (Y/N)

2x 8.00
= 16 m
=
3.50 m
=
10.25 m
10.25 m
=
86.72 m
=
8.75 m
=
10.25 m
=
0.500 m
=
0.70 m
Y
1.74

0.6

1.757 m

xcluding rock :
m3

34.2693

m3 x 1.1 =
=

152.797 m3
306 m3

x 1.1

255.004642 m3

x 1.1

107.767
362.77 m3
725.54 m3

=
=

ompaction in layers :
m3

m3

0.000 m3
0.00 m3

2.456

m3
m3

30o

4.254 x 2 =

4.254

8.508

4.254 x 1.5 =
6.381

m3
m3
m3
=

52.32 m3
104.65 m3

102.08 m3

24.14

Total =
126.23 m3
For 4 Lane Structure

e, pier, piercap

5.246 m3

56.103 m3

126.229 m3
252.46 m3

4.09233 m3

33.5049 m3

16.027 m3
11.100 m3

6 + 0.5)/2 x 0.82

TOTAL

126.074 m3
=
=

4 Lane Structure

m3
=

21.459
34.290
27.600
1.722
0.4
85.471
172.00

230.00 m3

T
T
T
T
T
T
T

e excluding cost of reinforcement


3.45 m3
8.00 m3

10.35 m3
21.00 m3

m2
m2
4 Nos.
8 Nos.

m3
254.00 m3

5.6 m
11.2 m

Rm

reinforcement :
Rm
Rm

m3
m3
m3
m3

m3
4 Lane Structure

f embankment,

x 1.1 =
=

230.441 m3
462.00 m3

m3
m3
m3 x 1.3 =
=

43.380 m3
88.00 m3
300

hing & bed protection:


800
43.888 m
300
0.54 m

48.00 m

1000

71.18 m3
163.61 m3
327 m3

m3
m3
m3 x 1.3 =
=

21.690 m3
44.00 m3

BRIDGE No : 164/1
Total length of the bridge
3500

300

88.530

Length of approach slab


Width of the abutment
Width of the abutment foundation
Level of Rock
Width of carriage way
Total deck width
Width of footpath
Depth of superstructure
Quadrant stone pitching (Y/N)

300

87.612

100 thk PCC M15

720

500 thk. return wall

Avg. G.L
85.055
83.555

83.805
83.055
3500

6A.01

720

2200

Earthwork in excavation for foundation for structures in all types of soil excluding rock :
Abutment

7.02 x -0.155 x 10.85 x 2

Total :
For 4 Lane Structure
6A.02

-23.612

-23.61

Ditto as item 6A.01 above but in soft disintegrated rock :


7.02 x 2.155 x 10.85 x 2

328.27977
Total
For 4 Lane Structure

6A.03

Providing and laying in position coarse sand below foundation including compaction in layers :
Abutment

NIL

= NIL
Total :

0.000

6A.04

Back filling behind abutments, wing walls, return walls :


0.5 x 2.46 x 4.26 x 10.25 x 2
Total

6A.05

107.42 m3
For 4 Lane Structure

x 1.1 =
=

107.42
214.83

Filter media behind abutment, retaining wall and return wall :


Area =
=

7.455 x 9.526 x pi() /4


55.776 m2

9.526
4.260

8.52
a)- Quadrant =

55.776 x 0.3 x 0

b)- Back

2 x 0.6 x 10.25 x 4.26

0.000
=

Total =
For 4 Lane Structure
6A.09

81.536

Structural cement concrete for Plain/ Reinforced Concrete in open foundation :


RCC M35 :Abutment

6A.17

81.536

((0.72+6.42) x 0.5 x 0.25 + 6.42 x 0.5) x 10.25 x 2

Structural cement concrete for Plain/ Reinforced Concrete in substructure, pier, piercap
abutment, abutmentcap, retaining wall , return wall, staircase, etc.
RCC M35 in abutment:-

Dirt Wall

0.853 x 10.25 x 0.3 x 2

Abutment

0.5 x (0.72 + 0.72) x 3.807 x 10.25 x 2

cantilever return =

(0.6+1.5)/2 x 0.4 x 3.5 x 4

full return wall

3.5 x 4.725 x 0.5 x 4

For 4 Lane Structure


6A.18

Structural cement concrete for Reinforced Concrete in superstructure :


RCC M35 Solid Slab :8.42 x 1 x 0.7 x 10.25

6A.22

=
60.4135
For 4 Lane Structure

Providing & fixing in position HYSD reinforcement bars


a)b)c)d)e)-

Foundation
Substructure
Superstructure
Approach slab
Railing kerb

168.2025 x 8
196 x 135
122 x 120
21.525 x 80
6 x 50

kg.
kg.
kg.
kg.
kg.

=
=
=
=
=

TOTAL =
For 4 Lane Structure
6A.28

Providing and laying in position controlled RCC M-30 in kerbs over bridge excluding cost of reinforcement
0.3 x 0.5 x 15.42
For 4 Lane Structure

6A.25

=
=

Providing and laying over the top of deck slab 50mm thick asphaltic concrete:
(8.42 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 0.05 x 8.75
For 4 Lane Structure

6A.26

Providing and laying a layer of 15 mm thick mastic asphalt over asphaltic concrete:
(8.42 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 8.75
For 4 Lane Structure

6A.35

6A.36

6A.32

=
=

=
=

140.53
281.00

Drainage spouts complete as per MOST drawing No. SD/205 :


For 4 Lane Structure

Providing and fixing 150 dia PVC downtake and runner pipe :
For 4 Lane Structure

Providing and fixing in position true to line and level :


a) tar paper bearings
0.42 x 10.25 x 2
For 4 Lane Structure

=
=

8.200 m2
16.00 m2

6A.34

Providing & laying Buried type Expansion joint :.


2 x 10.25
For 4 Lane Structure

6A.30

=
=

20.50 Rm
41.00 Rm

Reinforced cement concrete railing with M 30 grade concrete:


(8.42 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 1.0

6A.27

21.53 m3
43.00 m3

=
=

Reinforced cement concrete M-30 grade concrete crash barrier including reinforcement :
(8.42 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 2.0
For 4 Lane Structure

6A.07
& 6A.08

=
=

6.72 x 10.55 x 0.1 x 2


10.25 x 3.5 x 0.1 x 2
30.8x14.83x0.45

=
=
=
Total :

13.776
7.175
105.06
126.010
For 4 Lane Structure

Providing weep holes in retaining wall, abutment and retaining/return walls :


Abutment

16 x 2 x 2
For 4 Lane Structure

6A.06

32.120
64.00

Plain cement concrete M 15 leveling course below foundation of bridges, pile caps,
retaining walls, below approach slabs for bridges :
Below Abutment :
Below approach :
Floor Protection :

6A.31

0.000

Structural concrete grade M 30 in Reinforced Cement Concrete in approach slabs


excluding reinforcement :
10.25 x 3.5 x 0.3 x 2
For 4 Lane Structure

6A.29

64 Nos.
128 Nos.

Providing and laying in position hand packed boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :

= NIL
55.776 x 0.3 x 2

=
Total :
For 4 Lane Structure

6A.37

33.47
33.47

Plain cement concrete in M20 grade in toe wall at the end of the stone pitching & bed protection:

Length of toe wall required at each side

Area of toe wall section

Volume of concrete required for Toe Wall

Bed Protection

= 32x7.58x0.15

Total Volume of Concrete

=
For 4 Lane Structure

6A.38

Providing 150mm thick coarse sand below boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :

= NIL
55.776 x 0.3 x 2

=
Total :
For 4 Lane Structure

16.73
16.73

o : 164/1

l length of the bridge

gth of approach slab


h of the abutment
h of the abutment foundation

h of carriage way

h of footpath
th of superstructure
drant stone pitching (Y/N)

1x 8.42
= 8.42 m
=
3.50 m
=
10.25 m
10.25 m
=
85.21 m
=
8.75 m
=
10.25 m
=
0.500 m
=
0.70 m
Y
1.35

0.6

1.497 m

xcluding rock :
m3

-6.809925

m3 x 1.1 =
=

x 1.1

-23.612 m3
0 m3

361.107747 m3
=
=

361.11 m3
722.22 m3

0.000 m3
0.00 m3

ompaction in layers :
m3
m3

2.460
CHANGE 30 DEGREE INTO RADIANS
m
m3

THEN APPLY TAN

30o

4.26 x 2 =

4.260

8.52
8.52
4.26 x 1.5 =
6.39

4.26
9.526

6.39
m

m3
m3
=

81.54 m3
163.07 m3

84.10 m3

Total =
For 4 Lane Structure

84.10 m3
=

e, pier, piercap

5.246 m3

56.191 m3

2.82002 m3

33.075 m3

84.101 m3
168.20 m3

TOTAL

97.332 m3
=
=

4 Lane Structure

m3
=

14.297
26.460
14.640
1.722
0.3
57.419
116.00

122.00 m3

T
T
T
T
T
T
T

e excluding cost of reinforcement


2.31 m3
6.00 m3

7.03 m3
14.00 m3

m2
m2
2 Nos.
4 Nos.
2.8 m
5.6 m

m3
196.00 m3

Rm

reinforcement :
Rm
Rm

m3
m3
m3

m3
4 Lane Structure

x 1.1 =
=

126.010 m3
254.00 m3

f embankment,

m3
m3
m3 x 1.3 =
=

43.505 m3
88.00 m3
300

hing & bed protection:


800

43.921 m
300
0.54 m2
1000
48.00 m3
36.38 m3
48.00 m3
96 m3

m3
m3
m3 x 1.3 =
=

21.753 m3
44.00 m3

EN APPLY TAN

BRIDGE No : 168/1
Total length of the bridge
3500

2x 7.4
= 14.8 m
=
=

300
93.384

Length of approach slab


Width of the abutment
Width of the abutment foundation
Level of Rock
Width of carriage way
Total deck width
Width of footpath
Depth of superstructure
Quadrant stone pitching (Y/N)

300
100 thk PCC M15

92.516

720
500 thk. return wall

3.50
10.25
10.25
89.31
8.75
10.25
0.500
0.65

=
=
=
=
=
=

m
m
m
m
m
m
m
m

Y
1.97
m

Avg. G.L
89.358
87.810

0.6

88.160
1.914m
87.310
3700

6A.01

720

2200

Earthwork in excavation for foundation for structures in all types of soil excluding rock :
Abutment

7.22 x 0.048 x 10.85 x 2

Pier

= 4.85 x 1.0 x 10.10

7.520 m3

48.99

Total :

6A.02

m3 x 1.1 =

56.505 m3

57 m3

Ditto as item 6A.01 above but in soft disintegrated rock :

Abutment 7.22 x 2 x 10.85 x 2


Pier

56.505

4.85 x 2.0 x 10.10

313.35

x 1.1

97.97

x 1.1

344.68 m3
107.77
=

6A.03

452.45 m3

Providing and laying in position coarse sand below foundation including compaction in layers :
Abutment

NIL

m3

= NIL
Total :

0.000 m3

0.000 m3
0.00 m3

=
6A.04

Back filling behind abutments, wing walls, return walls :


2.748
0.5 x 2.748 x 4.759 x 10.25 x 2
= 134.0468 m3

x 1.1 =

134.05 m3

135.00 m3

4.759
30o

6A.05

Filter media behind abutment, retaining wall and return wall :


4.759 x 2 =
Area =

8.3285 x 10.641 x pi() /4


=

9.518

10.641

69.605 m2

4.759

4.759 x 1.5 =
7.139

9.518
a)- Quadrant =

69.605 x 0.3 x 0

b)- Back

2 x 0.6 x 10.25 x 4.759

Total =

0.000 m3
=

58.536 m3
58.536 m3

58.54 m3
=

59.00 m3

BRIDGE No : 168/1
6A.09

Structural cement concrete for Plain/ Reinforced Concrete in open foundation :


RCC M35 :Abutment

((0.72+6.62) x 0.5 x 0.35 + 6.62 x 0.5) x 10.25 x 2

Pier

= ((0.75+4.25)/2 x 0.55) x (9.5 + 8.0)/2 + (4.25 x 0.3 x 9.5

94.19 m3

24.14

Total =

118.33 m3

118.331 m3
=

6A.17

119.00 m3

Structural cement concrete for Plain/ Reinforced Concrete in substructure, pier, piercap
abutment, abutmentcap, retaining wall , return wall, staircase, etc.
RCC M35 in abutment:-

Dirt Wall

0.803 x 10.25 x 0.3 x 2

4.938 m3

Abutment

0.5 x (0.72 + 0.72) x 4.356 x 10.25 x 2

64.295 m3

cantilever return =

(0.6+1.91)/2 x 0.4 x 3.5 x 4

4.96 m3

full return wall

3.7 x 5.224 x 0.5 x 4

38.6576 m3

RCC M35 in pier:Pier

= (7.25 x 3.259 x 0.75) + (22/7 x 0.75 x 0.75 x 0.25 x 3.259)

18.115 m3

Pier Cap

= ((8.0+10.25)/2 x 0.75 x 0.82) + ((10.25 x (0.806 + 0.5)/2 x 0.82

11.100 m3

TOTAL

6A.18

142.061 m3

m3

143.00 m3

Structural cement concrete for Reinforced Concrete in superstructure :


RCC M35 Solid Slab :7.4 x 2 x 0.65 x 10.25

98.605 m3
=

6A.22

Providing & fixing in position HYSD reinforcement bars


a)b)c)d)e)-

Foundation
Substructure
Superstructure
Approach slab
Railing kerb

119 x 85
143 x 135
99 x 120
21.525 x 80
4 x 50

kg.
kg.
kg.
kg.
kg.

=
=
=
=
=
TOTAL =
Say :

6A.28

T
T
T
T
T
T
T

3.270 m3

4.000 m3

Providing and laying over the top of deck slab 50mm thick asphaltic concrete:
(14.8 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 0.05 x 8.75

6A.26

10.115
19.305
11.880
1.722
0.2
43.222
44.00

Providing and laying in position controlled RCC M-30 in kerbs over bridge excluding cost of reinforcement
0.3 x 0.5 x 21.8

6A.25

99.00 m3

9.826 m3

Providing and laying a layer of 15 mm thick mastic asphalt over asphaltic concrete:
(14.8 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 8.75

6A.35

Drainage spouts complete as per MOST drawing No. SD/205 :

6A.36

Providing and fixing 150 dia PVC downtake and runner pipe :

6A.32

Providing and fixing in position true to line and level :


a) tar paper bearings
0.42 x 10.25 x 4

196.525 m2
4 Nos.
5.6 m

16.400 m2

BRIDGE No : 168/1
6A.34

Providing & laying Buried type Expansion joint :.


3 x 10.25

6A.30

30.75 Rm

Reinforced cement concrete railing with M 30 grade concrete:


(14.8 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 1.0

6A.27

Structural concrete grade M 30 in Reinforced Cement Concrete in approach slabs


excluding reinforcement :
10.25 x 3.5 x 0.3 x 2

6A.29

21.53 m3

Reinforced cement concrete M-30 grade concrete crash barrier including reinforcement :
(14.8 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 2.0

6A.07
& 6A.08

0.000 Rm

44.920 Rm

Plain cement concrete M 15 leveling course below foundation of bridges, pile caps,
retaining walls, below approach slabs for bridges :
Below Abutment :
Below Pier :

6.92 x 10.55 x 0.1 x 2


4.55 x 9.8 x 0.1

=
=

14.186 m3
4.459 m3

Below approach :

10.25 x 3.5 x 0.1 x 2

7.175 m3

Floor Protection :

30.8x14.83x0.45

197.06 m3

Total :

6A.31

x 1.1 =

222.880 m3

223.00 m3

Providing weep holes in retaining wall, abutment and retaining/return walls :


Abutment

16 x 3 x 2

96 Nos.

Total :
6A.06

222.880 m3

96 Nos.

Providing and laying in position hand packed boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :

= NIL
69.605 x 0.3 x 2

m3
41.76 m3

Total :

41.76 m3 x 1.3 =

54.292 m3

55.00 m3
300

6A.37

Plain cement concrete in M20 grade in toe wall at the end of the stone pitching :
800
Length of toe wall required at each side

36.415 m

Area of toe wall section

0.54 m2

68.06 m3

108.00 m3

300
1000
Bed Protection

= 34.35x13.21x0.15

Volume of concrete required

6A.38

Providing 150mm thick coarse sand below boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :

= NIL
69.605 x 0.6 x 2

=
Total :

m3
20.88 m3
20.88 m3 x 1.3 =

27.146 m3

28.00 m3

BRIDGE No : 183/2
Total length of the bridge
3500

300

88.118

Length of approach slab


Width of the abutment
Width of the abutment foundation
Level of Rock
Width of carriage way
Total deck width
Width of footpath
Depth of superstructure
Quadrant stone pitching (Y/N)

300

87.200

100 thk PCC M15

720

500 thk. return wall

Avg. G.L
85.613
84.113

0.6

84.463
83.613
2750

6A.01

720

2100

Earthwork in excavation for foundation for structures in all types of soil excluding rock :
Abutment

6.17 x 2 x 10.85 x 2

=
Total :

6A.02

267.778 m3
267.778

m3 x 1.1 =
=

Ditto as item 6A.01 above but in soft disintegrated rock :

=
6A.03

Providing and laying in position coarse sand below foundation including compaction in layers :
Abutment

6.17 x 0.3 x 10.25 x 2

=
Total :

37.946 m3
37.946 m3
=

6A.04

Back filling behind abutments, wing walls, return walls :

0.5 x 1.842 x 3.19 x 10.25 x 2


=

6A.05

60.2288 m3

x 1.1 =
=

60.23 m3
61.00 m3

Filter media behind abutment, retaining wall and return wall :


Area = 5.5825 x 7.133 x pi() /4
=
31.275 m2

3.19 x 2 =

7.133
3.190

6.38
a)- Quadrant =

31.275 x 0.3 x 4

b)- Back

2 x 0.6 x 10.25 x 3.19

37.529 m3

=
=

39.237 m3

Total =

76.766 m3
=

6A.09

Structural cement concrete for Plain/ Reinforced Concrete in open foundation :


RCC M35 :Abutment

((0.72+5.57) x 0.5 x 0.35 + 5.57 x 0.5) x 10.25 x

=
Total =

6A.17

Structural cement concrete for Plain/ Reinforced Concrete in substructure, pier, piercap
abutment, abutmentcap, retaining wall , return wall, staircase, etc.
RCC M35 in abutment:-

Dirt Wall

0.853 x 10.25 x 0.3 x 2

Abutment

0.5 x (0.72 + 0.72) x 2.737 x 10.25 x 2

cantilever return =

(0.6+1.09)/2 x 0.4 x 3.5 x 4

full return wall

2.75 x 3.655 x 0.5 x 4

TOTAL

6A.18

Structural cement concrete for Reinforced Concrete in superstructure :


RCC M35 Solid Slab :8.4 x 1 x 0.7 x 10.25

60.27 m3
=

6A.22

Providing & fixing in position HYSD reinforcement bars


a)b)c)d)e)-

Foundation
Substructure
Superstructure
Approach slab
Railing kerb

80 x 85
67 x 135
61 x 120
21.525 x 80
3 x 50

kg.
kg.
kg.
kg.
kg.

=
=
=
=
=
TOTAL =
Say :

6A.28

Providing and laying in position controlled RCC M-30 in kerbs over bridge excluding cost of reinforcement
0.3 x 0.5 x 15.4

6A.25

=
=

2.310
3.000

Providing and laying over the top of deck slab 50mm thick asphaltic concrete:
(8.4 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 0.05 x 8.75

6A.26

6.800
9.045
7.320
1.722
0.15
25.037
26.00

7.018

Providing and laying a layer of 15 mm thick mastic asphalt over asphaltic concrete:
(8.4 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 8.75

140.350 m2

6A.35

Drainage spouts complete as per MOST drawing No. SD/205 :

6A.36

Providing and fixing 150 dia PVC downtake and runner pipe :

2.8

6A.32

Providing and fixing in position true to line and level :


a) tar paper bearings
0.4 x 10.25 x 2

6A.34

8.200 m2

Providing & laying Buried type Expansion joint :.


2 x 10.25

6A.30

20.50 Rm

Reinforced cement concrete railing with M 30 grade concrete:


(8.4 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 1.0

16.040 Rm

6A.27

Structural concrete grade M 30 in Reinforced Cement Concrete in approach slabs


excluding reinforcement :
10.25 x 3.5 x 0.3 x 2

6A.29

21.53 m3

Reinforced cement concrete M-30 grade concrete crash barrier including reinforcement :
(8.4 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 2.0

6A.07
& 6A.08

32.080 Rm

Plain cement concrete M 15 leveling course below foundation of bridges, pile caps,
retaining walls, below approach slabs for bridges :
Below foundation :
Below approach :
Floor Protection :

5.87 x 10.55 x 0.1 x 2


10.25 x 3.5 x 0.1 x 2
28.9x7.56x0.45

12.034 m3
7.175 m3
98.32 m3

=
=
=
Total :

6A.31

Providing weep holes in retaining wall, abutment and retaining/return walls :


Abutment

14 x 1 x 2

28 Nos.

Total :
6A.06

117.526 m3

28 Nos.

Providing and laying in position hand packed boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :

= NIL
31.275 x 0.6 x 4

75.06 m3

=
Total :

6A.37

75.06

m3 x 1.3 =
=

Plain cement concrete in M20 grade in toe wall at the end of the stone pitching :
Length of toe wall required at each side

38.038

Area of toe wall section

0.54

=
=

70.44
112.00

Bed Protection
Volume of concrete required

6A.38

m3

= 35.55x13.21x0.15

Providing 150mm thick coarse sand below boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :

= NIL

m3

Back :

0 x 0.6 x 2

=
Total :

9.38 m3
9.38

m3 x 1.3 =
=

1x 8.4
= 8.4
=
=
abutment foundation =
=
=
=
=
=
ne pitching (Y/N)
Y

3.50 m
10.25 m
10.25 m
m
8.75 m
10.25 m
0.500 m
0.70 m

0.74

1.092 m

cluding rock :

267.778 m3
268 m3

40 m3
42.00 m3

mpaction in layers :

37.946 m3
38.00 m3

1.842

30o

3.190

6.38

3.19 x 1.5 =
4.785

76.77 m3
77.00 m3

79.657875 m3
79.658 m3

79.658 m3
80.00 m3

pier, piercap

5.246 m3
40.398 m3
1.24870 m3
20.1025 m3
66.995 m3
=

m3

61.00 m3

T
T
T
T
T
T
T
excluding cost of reinforcement
m3
m3

m3

Nos.
m

67.00 m3

inforcement :

x 1.1 =
=

117.526 m3
118.00 m3

embankment,

97.577 m3
98.00 m3
300
800
m
300
m

1000
m
m3
3

12.197 m3
13.00 m3

BRIDGE No : 184/1
Total length of the bridge
3500

300

83.655

Length of approach slab


Width of the abutment
Width of the abutment foundation
Level of Rock
Width of carriage way
Total deck width
Width of footpath
Depth of superstructure
Quadrant stone pitching (Y/N)

300

82.587

100 thk PCC M15

800

500 thk. return wall

Avg. G.L
81.133
77.933

78.533
77.433
3850

6A.01

800

2450

Earthwork in excavation for foundation for structures in all types of soil excluding rock :
Abutment

Pier

7.7 x 3.7 x 10.85 x 2


= 6.1 x 3.2 x 10.10

618.233

197.152

Total :

6A.02

Ditto as item 6A.01 above but in soft disintegrated rock :


7.7 x 0 x 10.85 x 2

6A.03

815.385

Providing and laying in position coarse sand below foundation including compaction in layers :
Abutment

NIL

= NIL
Total :

0.000

6A.04

Back filling behind abutments, wing walls, return walls :


0.5 x 2.689 x 4.657 x 10.25 x 2
=

6A.05

128.36 m3

x 1.1 =
=

128.36
129.00

Filter media behind abutment, retaining wall and return wall :


Area =
=

8.15 x 10.413 x pi() /4


66.654 m2

10.413
4.657

9.314

6A.09

a)- Quadrant =

66.654 x 0.3 x 0

b)- Back

2 x 0.6 x 10.25 x 4.657

0.000
=

57.281

Total =

57.281

Structural cement concrete for Plain/ Reinforced Concrete in open foundation :


RCC M35 :Abutment

Pier

6A.17

((0.8+7.1) x 0.5 x 0.6 + 7.1 x 0.5) x 10.25 x 2


= ((0.75+5.5)/2 x 0.7) x (9.5 + 8.0)/2 + (5.5 x 0.3 x 9.5)

Structural cement concrete for Plain/ Reinforced Concrete in substructure, pier, piercap
abutment, abutmentcap, retaining wall , return wall, staircase, etc.
RCC M35 in abutment:-

Dirt Wall

1.003 x 10.25 x 0.3 x 2

Abutment

0.5 x (0.8 + 0.8) x 4.054 x 10.25 x 2

cantilever return =

(0.6+1.96)/2 x 0.4 x 3.5 x 4

full return wall

3.85 x 5.122 x 0.5 x 4

RCC M35 in pier:-

6A.18

Pier

= (7.25 x 2.851 x 0.75) + (22/7 x 0.75 x 0.75 x 0.25 x 2.851)

Pier Cap

= ((8.0+10.25)/2 x 0.75 x 0.82) + ((10.25 x (0.806 + 0.5)/2 x 0.82

Structural cement concrete for Reinforced Concrete in superstructure :


RCC M35 Solid Slab :10.8 x 2 x 0.85 x 10.25

6A.22

188.19

Providing & fixing in position HYSD reinforcement bars


a)b)c)d)e)-

Foundation
Substructure
Superstructure
Approach slab
Railing kerb

157 x 85
146 x 135
189 x 120
21.525 x 80
5 x 50

kg.
kg.
kg.
kg.
kg.

=
=
=
=
=
TOTAL =
Say :

6A.28

Providing and laying in position controlled RCC M-30 in kerbs over bridge excluding cost of reinforcement
0.3 x 0.5 x 28.6

6A.25

=
=

Providing and laying over the top of deck slab 50mm thick asphaltic concrete:
(21.6 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 0.05 x 8.75

6A.26

Providing and laying a layer of 15 mm thick mastic asphalt over asphaltic concrete:
(21.6 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 8.75

6A.35

Drainage spouts complete as per MOST drawing No. SD/205 :

6A.36

Providing and fixing 150 dia PVC downtake and runner pipe :

6A.32

Providing and fixing in position true to line and level :


a) tar paper bearings

256.025

0.42 x 10.25 x 4
6A.34

Providing & laying Buried type Expansion joint :.


3 x 10.25

6A.30

16.400 m2

30.75 Rm

Reinforced cement concrete railing with M 30 grade concrete:


(21.6 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 1.0

6A.27

21.53 m3

Reinforced cement concrete M-30 grade concrete crash barrier including reinforcement :
(21.6 + 0.02 x 3 + 0.3 x 2 + 3.5 x 2) x 2.0

6A.07
& 6A.08

7.4 x 10.55 x 0.1 x 2


5.8 x 9.8 x 0.1
10.25 x 3.5 x 0.1 x 2
34.025 x 20.85 x 0.45

=
=
=
=
Total :

16 x 3 x 2

289.610

96 Nos.

Total :

96 Nos.

Providing and laying in position hand packed boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :

= NIL
66.654 x 0.3 x 2

=
Total :

6A.37

15.170
5.684
7.175
261.58

Providing weep holes in retaining wall, abutment and retaining/return walls :


Abutment

6A.06

58.520

Plain cement concrete M 15 leveling course below foundation of bridges, pile caps,
retaining walls, below approach slabs for bridges :
Below Abutment :
Below Pier :
Below approach :
Floor Protection :

6A.31

0.000

Structural concrete grade M 30 in Reinforced Cement Concrete in approach slabs


excluding reinforcement :
10.25 x 3.5 x 0.3 x 2

6A.29

39.99
39.99

Plain cement concrete in M20 grade in toe wall at the end of the stone pitching & bed protection:

Length of toe wall required at each side

Area of toe wall section

Volume of concrete required for Toe Wall

Bed Protection

= 30.25x20.01x0.15

Total Volume of Concrete

6A.38

Providing 150mm thick coarse sand below boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :

= NIL
66.654 x 0.3 x 2

=
Total :

20.00
20.00

o : 184/1

al length of the bridge

ngth of approach slab


dth of the abutment
dth of the abutment foundation

dth of carriage way


al deck width
dth of footpath
pth of superstructure
adrant stone pitching (Y/N)

2x 10.8
= 21.6 m
=
3.50 m
=
10.25 m
10.25 m
=
0 m
=
8.75 m
=
10.25 m
=
0.500 m
=
0.85 m
Y
2.04

0.6

1.957 m

excluding rock :
m3

3564.578

m3 x 1.1 =
=

x 1.1

815.385 m3
816 m3

0 m3
=

0.00 m3

0.000 m3
0.00 m3

compaction in layers :
m3
m3

2.689

m3
m3

30o

4.657 x 2 =

4.657

9.314

4.657 x 1.5 =
6.986

m3
m3
m3
=

57.28 m3
58.00 m3

121.36 m3

=
Total =

34.82
156.18 m3
=

re, pier, piercap

6.17 m3

66.49 m3

5.20 m3

156.176 m3
157.00 m3

39.44 m3

0.25 x 2.851)

16.93 m3

06 + 0.5)/2 x 0.82

11.10 m3

TOTAL

145.32 m3
=
=

m3
=

13.345
19.710
22.680
1.722
0.25
57.707
58.00

189.00 m3

T
T
T
T
T
T
T

ge excluding cost of reinforcement


4.290 m3
5.000 m3

12.801 m3

m2
4 Nos.
5.6 m

m3
146.00 m3

Rm

reinforcement :
Rm

m3
m3
m3
m3
m3

x 1.1 =
=

289.610 m3
290.00 m3

of embankment,

m3
m3
m3 x 1.3 =
=

51.990 m3
52.00 m3
750

ching & bed protection:


4100

46.104 m
450
3.75 m2
1500
346.00 m3
90.80 m3
486.65 m3

embankment,

m3
m3
m3 x 1.3 =
=

25.995 m3
26.00 m3

BRIDGE No : 186/1
Total length of the bridge
3500

300

76.989

Length of approach slab


Width of the abutment
Width of the abutment foundation
Level of Rock
Width of carriage way
Total deck width
Width of footpath
Depth of superstructure
Quadrant stone pitching (Y/N)

300

76.421

100 thk PCC M15

720

500 thk. return wall

Avg. G.L
74.224
72.724

72.974
72.224
2500

6A.01

720

1650

Earthwork in excavation for foundation for structures in all types of soil excluding rock :
Abutment

Pier

5.47 x 2 x 10.85 x 2
= 3.35 x 2.444 x 10.10 x 2

237.398

165.11

Total :

6A.03

402.513

Ditto as item 6A.01 above but in hard rock :

Abutment 5.47 x 0 x 10.85 x 2

0.00

Pier

3.35 x 0.056 x 10.10 x 2

6A.03

Providing and laying in position coarse sand below foundation including compaction in layers :
Abutment

3.79

NIL

= NIL
Total :

0.000

6A.04

Back filling behind abutments, wing walls, return walls :


0.5 x 2.05 x 3.55 x 10.25 x 2
=

6A.05

74.59 m3

x 1.1 =
=

74.59
75.00

Filter media behind abutment, retaining wall and return wall :


Area =

6.2125 x 7.938 x pi() /4


=
38.732 m2

7.938
3.550

7.1
a)- Quadrant =

38.732 x 0.3 x 0

b)- Back

2 x 0.6 x 10.25 x 3.55

0.000
=

Total =

6A.09

43.665

Structural cement concrete for Plain/ Reinforced Concrete in open foundation :


RCC M35 :Abutment

Pier

6A.17

43.665

((0.72+4.87) x 0.5 x 0.25 + 4.87 x 0.5) x 10.25 x 2


= (((0.75+2.75)/2 x 0.2) x (9.5 + 8.0)/2 + (2.75 x 0.3 x 9.5)) x 2

Structural cement concrete for Plain/ Reinforced Concrete in substructure, pier, piercap
abutment, abutmentcap, retaining wall , return wall, staircase, etc.
RCC M35 in abutment:-

Dirt Wall

0.503 x 10.25 x 0.3 x 2

Abutment

0.5 x (0.72 + 0.72) x 3.447 x 10.25 x 2

cantilever return =

(0.6+2.06)/2 x 0.4 x 3.5 x 4

full return wall

2.5 x 4.015 x 0.5 x 4

RCC M35 in pier:-

6A.18

Pier

= (7.25 x 3.1 x 0.75) + (22/7 x 0.75 x 0.75 x 0.25 x 3.1) x 2

Pier Cap

= ((8.0+10.25)/2 x 0.75 x 0.82) + ((10.25 x (0.806 + 0.5)/2 x 0.82 x 2

Structural cement concrete for Reinforced Concrete in superstructure :


RCC M35 Solid Slab :4.4 x 3 x 0.35 x 10.25

6A.22

47.355

Providing & fixing in position HYSD reinforcement bars


a)b)c)d)e)-

Foundation
Substructure
Superstructure
Approach slab
Railing kerb

87 x 85
131 x 135
48 x 120
21.525 x 80
4 x 50

kg.
kg.
kg.
kg.
kg.

=
=
=
=
=
TOTAL =
Say :

6A.28

Providing and laying in position controlled RCC M-30 in kerbs over bridge excluding cost of reinforcement
0.3 x 0.5 x 20.2

6A.25

=
=

Providing and laying over the top of deck slab 50mm thick asphaltic concrete:
(13.2 + 0.02 x 4 + 0.3 x 2 + 3.5 x 2) x 0.05 x 8.75

6A.26

Providing and laying a layer of 15 mm thick mastic asphalt over asphaltic concrete:
(13.2 + 0.02 x 4 + 0.3 x 2 + 3.5 x 2) x 8.75

6A.35

Drainage spouts complete as per MOST drawing No. SD/205 :

6A.36

Providing and fixing 150 dia PVC downtake and runner pipe :

6A.32

Providing and fixing in position true to line and level :

182.700

a) tar paper bearings


0.42 x 10.25 x 6
6A.34

24.600 m2

Providing & laying Buried type Expansion joint :.


4 x 10.25

6A.30

41.00 Rm

Reinforced cement concrete railing with M 30 grade concrete:


(13.2 + 0.02 x 4 + 0.3 x 2 + 3.5 x 2) x 1.0

6A.27

21.53 m3

Reinforced cement concrete M-30 grade concrete crash barrier including reinforcement :
(13.2 + 0.02 x 4 + 0.3 x 2 + 3.5 x 2) x 2.0

6A.07
& 6A.08

5.17 x 10.55 x 0.1 x 2


3.4 x 9.8 x 0.1
10.25 x 3.5 x 0.1 x 2
30.05 x 10.90 x 0.45

=
=
=
=
Total :

14 x 2 x 2

168.501

56 Nos.

Total :

56 Nos.

Providing and laying in position hand packed boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :

= NIL
38.732 x 0.3 x 2

=
Total :

6A.37

10.599
3.332
7.175
147.40

Providing weep holes in retaining wall, abutment and retaining/return walls :


Abutment

6A.06

41.760

Plain cement concrete M 15 leveling course below foundation of bridges, pile caps,
retaining walls, below approach slabs for bridges :
Below Abutment :
Below Pier :
Below approach :
Floor Protection :

6A.31

0.000

Structural concrete grade M 30 in Reinforced Cement Concrete in approach slabs


excluding reinforcement :
10.25 x 3.5 x 0.3 x 2

6A.29

23.24
23.24

Plain cement concrete in M20 grade in toe wall at the end of the stone pitching & bed protection:

Length of toe wall required at each side

Area of toe wall section

Volume of concrete required for Toe Wall

Bed Protection

= 30.05 x 10.90 x 0.15

Total Volume of Concrete

6A.38

Providing 150mm thick coarse sand below boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :

= NIL
38.732 x 0.3 x 2

=
Total :

11.62
11.62

86/1

ngth of the bridge

of approach slab
of the abutment
of the abutment foundation

of carriage way

of superstructure
ant stone pitching (Y/N)

3x 4.4
= 13.2 m
=
3.50 m
=
10.25 m
10.25 m
=
72.224 m
=
8.75 m
=
10.25 m
=
0.500 m
=
0.35 m
Y
2.20

0.6

2.063 m

ing rock :
m3

87.87

m3 x 1.1 =
=

402.513 m3
403 m3

x 1.1

0.00 m3

x 1.1

4.17
=

4.17 m3

ction in layers :
m3
m3

0.000 m3

0.00 m3

2.050

m3
m3

30o

3.55 x 2 =

3.550

7.1

3.55 x 1.5 =
5.325

m3
m3
m3
=

43.67 m3
44.00 m3

64.24 m3

21.80
86.04 m3

Total =

3.09 m3

50.88 m3

5.85 m3

86.042 m3
87.00 m3

20.08 m3

28.48 m3

5)/2 x 0.82 x 2

22.20 m3

TOTAL

130.57 m3
=
=

m3
48.00 m3

7.395
17.685
5.760
1.722
0.2
32.762
33.00

T
T
T
T
T
T
T

uding cost of reinforcement


3.030 m3
4.000 m3

9.135 m3

m2
6 Nos.
8.4 m

m3
131.00 m3

Rm

Rm

m3
m3
m3
m3
m3

x 1.1 =
=

168.501 m3
169.00 m3

m3
m3
m3 x 1.3 =
=

& bed protection:

30.211 m3
31.00 m3
750

4100
40.017 m
450
3.75 m

1500
301.00 m3
49.13 m3
350.13 m3

m3
m3
m3 x 1.3 =
=

15.105 m3
16.00 m3

BRIDGE No : 186/3
Total length of the bridge
3500

300

76.571

Length of approach slab


Width of the abutment
Width of the abutment foundation
Level of Rock
Width of carriage way
Total deck width
Width of footpath
Depth of superstructure
Quadrant stone pitching (Y/N)

300

75.603

100 thk PCC M15

720

500 thk. return wall

Avg. G.L
72.731
70.780

71.380
70.280
3850

6A.01

720

2200

Earthwork in excavation for foundation for structures in all types of soil excluding rock :
Abutment

Pier

7.37 x 2.451 x 10.85 x 2

391.99

= 5.20 x 2.599 x 10.10 x 2

273.00

Total :

6A.03

Ditto as item 6A.01 above but in hard rock :

Abutment 7.37 x 0 x 10.85 x 2

6A.03

664.985

Providing and laying in position coarse sand below foundation including compaction in layers :
Abutment

NIL

= NIL
Total :

0.000

6A.04

Back filling behind abutments, wing walls, return walls :


0.5 x 2.729 x 4.726 x 10.25 x 2
=

6A.05

132.20 m3

x 1.1 =
=

132.20
133.00

Filter media behind abutment, retaining wall and return wall :


Area =
=

8.2705 x 10.568 x pi() /4


68.646 m2

10.568
4.726

9.452

6A.09

a)- Quadrant =

68.646 x 0.3 x 0

b)- Back

2 x 0.6 x 10.25 x 4.726

0.000
=

58.130

Total =

58.130

Structural cement concrete for Plain/ Reinforced Concrete in open foundation :


RCC M35 :Abutment

Pier

6A.17

((0.72+6.77) x 0.5 x 0.6 + 6.77 x 0.5) x 10.25 x 2


= ((0.75+4.60)/2 x 0.5) x (9.5 + 8.0)/2 + (4.60 x 0.3 x 9.5)) x 2

Structural cement concrete for Plain/ Reinforced Concrete in substructure, pier, piercap
abutment, abutmentcap, retaining wall , return wall, staircase, etc.
RCC M35 in abutment:-

Dirt Wall

0.903 x 10.25 x 0.3 x 2

Abutment

0.5 x (0.72 + 0.72) x 4.223 x 10.25 x 2

cantilever return =

(0.6+1.63)/2 x 0.4 x 3.5 x 4

full return wall

3.85 x 5.191 x 0.5 x 4

RCC M35 in pier:-

6A.18

Pier

= (7.25 x 3.475 x 0.75) + (22/7 x 0.75 x 0.75 x 0.25 x 3.475) x 2

Pier Cap

= ((8.0+10.25)/2 x 0.75 x 0.82) + ((10.25 x (0.806 + 0.5)/2 x 0.82 x 2

Structural cement concrete for Reinforced Concrete in superstructure :


RCC M35 Solid Slab :8.7 x 3 x 0.75 x 10.25

6A.22

200.64375

Providing & fixing in position HYSD reinforcement bars


a)b)c)d)e)-

Foundation
Substructure
Superstructure
Approach slab
Railing kerb

166 x 85
172 x 135
201 x 120
21.525 x 80
5 x 50

kg.
kg.
kg.
kg.
kg.

=
=
=
=
=
TOTAL =
Say :

6A.28

Providing and laying in position controlled RCC M-30 in kerbs over bridge excluding cost of reinforcement
0.3 x 0.5 x 33.1

6A.25

=
=

Providing and laying over the top of deck slab 50mm thick asphaltic concrete:
(26.1 + 0.02 x 4 + 0.3 x 2 + 3.5 x 2) x 0.05 x 8.75

6A.26

Providing and laying a layer of 15 mm thick mastic asphalt over asphaltic concrete:
(26.1 + 0.02 x 4 + 0.3 x 2 + 3.5 x 2) x 8.75

6A.35

Drainage spouts complete as per MOST drawing No. SD/205 :

6A.36

Providing and fixing 150 dia PVC downtake and runner pipe :

6A.32

Providing and fixing in position true to line and level :


a) tar paper bearings

295.575

0.42 x 10.25 x 6
6A.34

Providing & laying Buried type Expansion joint :.


4 x 10.25

6A.30

24.600 m2

41.00 Rm

Reinforced cement concrete railing with M 30 grade concrete:


(26.1 + 0.02 x 4 + 0.3 x 2 + 3.5 x 2) x 1.0

6A.27

21.53 m3

Reinforced cement concrete M-30 grade concrete crash barrier including reinforcement :
(26.1 + 0.02 x 4 + 0.3 x 2 + 3.5 x 2) x 2.0

6A.07
& 6A.08

7.07 x 10.55 x 0.1 x 2


5.8 x 9.8 x 0.1
10.25 x 3.5 x 0.1 x 2
30.20 x 23.76 x 0.45

=
=
=
=
Total :

16 x 3 x 2

350.251

96 Nos.

Total :

96 Nos.

Providing and laying in position hand packed boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :

= NIL
68.646 x 0.3 x 2

=
Total :

6A.37

14.494
5.684
7.175
322.90

Providing weep holes in retaining wall, abutment and retaining/return walls :


Abutment

6A.06

67.560

Plain cement concrete M 15 leveling course below foundation of bridges, pile caps,
retaining walls, below approach slabs for bridges :
Below Abutment :
Below Pier :
Below approach :
Floor Protection :

6A.31

0.000

Structural concrete grade M 30 in Reinforced Cement Concrete in approach slabs


excluding reinforcement :
10.25 x 3.5 x 0.3 x 2

6A.29

41.19
41.19

Plain cement concrete in M20 grade in toe wall at the end of the stone pitching & bed protection:

Length of toe wall required at each side

Area of toe wall section

Volume of concrete required for Toe Wall

Bed Protection

= 30.20 x 23.76 x 0.15

Total Volume of Concrete

6A.38

Providing 150mm thick coarse sand below boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :

= NIL
68.646 x 0.3 x 2

=
Total :

20.59
20.59

86/3

ngth of the bridge

of approach slab
of the abutment
of the abutment foundation

of carriage way

of superstructure
ant stone pitching (Y/N)

3x 8.7
= 26.1 m
=
3.50 m
=
10.25 m
10.25 m
=
0 m
=
8.75 m
=
10.25 m
=
0.500 m
=
0.75 m
Y
1.54

0.6

1.629 m

ing rock :
m3

3195.436

m3 x 1.1 =
=

x 1.1

664.985 m3
665 m3

0.00 m3
=

0.00 m3

0.000 m3
0.00 m3

ction in layers :
m3
m3

2.729

m3
m3

30o

4.726

4.726 x 2 = 9.452

4.726 x 1.5 =
7.089

m3
m3
m3
=

58.13 m3
59.00 m3

115.46 m3

=
Total =

49.63
165.08 m3
=

5.55 m3

62.33 m3

3.44 m3

165.082 m3
166.00 m3

39.97 m3

38.19 m3

5)/2 x 0.82 x 2

22.20 m3

TOTAL

171.69 m3
=
=

m3
=

14.110
23.220
24.120
1.722
0.25
63.422
64.00

201.00 m3

T
T
T
T
T
T
T

uding cost of reinforcement


4.965 m3
5.000 m3

14.779 m3

m2
6 Nos.
8.4 m

m3
172.00 m3

Rm

Rm

m3
m3
m3
m3
m3

x 1.1 =
=

350.251 m3
351.00 m3

m3
m3
m3 x 1.3 =
=

53.544 m3
54.00 m3
750

& bed protection:


4100

46.483 m
450
3.75 m2
1500
349.00 m3
107.63 m3
506.87 m3

m3
m3
m3 x 1.3 =
=

26.772 m3
27.00 m3

BRIDGE No : 187/2
Total length of the bridge
3500

300

76.126

Length of approach slab


Width of the abutment
Width of the abutment foundation
Level of Rock
Width of carriage way
Total deck width
Width of footpath
Depth of superstructure
Quadrant stone pitching (Y/N)

300

75.058

100 thk PCC M15

720

500 thk. return wall

Avg. G.L
73.180
70.310

71.010
69.810
4000

6A.01

720

2500

Earthwork in excavation for foundation for structures in all types of soil excluding rock :
Abutment

7.82 x 3.37 x 11.91 x 2

=
Total :
For 4 Lane Structure

6A.02

627.738
627.74

Ditto as item 6A.01 above but in soft disintegrated rock :


7.82 x 0 x 11.91 x 2

0
Total
For 4 Lane Structure

6A.03

Providing and laying in position coarse sand below foundation including compaction in layers :
Abutment

NIL

= NIL
Total :

0.000

6A.04

Back filling behind abutments, wing walls, return walls :


0.5 x 2.685 x 4.651 x 11.31 x 2
Total

6A.05

141.24 m3
For 4 Lane Structure

x 1.1 =
=

141.24
282.48

Filter media behind abutment, retaining wall and return wall :


Area =
=

8.1395 x 10.4 x pi() /4


66.485 m2

10.400
4.651

9.302
a)- Quadrant =

66.485 x 0.3 x 0

b)- Back

2 x 0.6 x 11.31 x 4.651

0.000
=

Total =
For 4 Lane Structure
6A.09

63.123

Structural cement concrete for Plain/ Reinforced Concrete in open foundation :


RCC M35 :Abutment

6A.17

63.123

((0.72+7.22) x 0.5 x 0.7 + 7.22 x 0.5) x 11.31 x 2

Structural cement concrete for Plain/ Reinforced Concrete in substructure, pier, piercap
abutment, abutmentcap, retaining wall , return wall, staircase, etc.
RCC M35 in abutment:-

Dirt Wall

1.003 x 11.31 x 0.3 x 2

Abutment

0.5 x (0.72 + 0.72) x 4.048 x 11.31 x 2

cantilever return =

(0.6+1.25)/2 x 0.4 x 3.5 x 4

full return wall

4 x 5.116 x 0.5 x 4

For 4 Lane Structure


6A.18

Structural cement concrete for Reinforced Concrete in superstructure :


RCC M35 Solid Slab :10.8 x 1 x 0.85 x 11.31

6A.22

=
103.8258
For 4 Lane Structure

Providing & fixing in position HYSD reinforcement bars


a)b)c)d)e)-

Foundation
Substructure
Superstructure
Approach slab
Railing kerb

289.03836000kg.
232 x 135
kg.
208 x 120
kg.
23.751 x 80 kg.
6 x 50
kg.

=
=
=
=
=

TOTAL =
For 4 Lane Structure
6A.28

Providing and laying in position controlled RCC M-30 in kerbs over bridge excluding cost of reinforcement
0.3 x 0.5 x 17.8
For 4 Lane Structure

6A.25

=
=

Providing and laying over the top of deck slab 50mm thick asphaltic concrete:
(10.8 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 0.05 x 9.66
For 4 Lane Structure

6A.26

Providing and laying a layer of 15 mm thick mastic asphalt over asphaltic concrete:
(10.8 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 9.66
For 4 Lane Structure

6A.35

6A.36

6A.32

=
=

178.13
356.00

Drainage spouts complete as per MOST drawing No. SD/205 :


For 4 Lane Structure

Providing and fixing 150 dia PVC downtake and runner pipe :
For 4 Lane Structure

Providing and fixing in position true to line and level :


a) tar paper bearings
0.42 x 11.31 x 2
For 4 Lane Structure

6A.34

=
=

Providing & laying Buried type Expansion joint :.

=
=

9.048 m2
18.00 m2

2 x 11.31
For 4 Lane Structure
6A.30

=
=

22.62 Rm
45.00 Rm

Reinforced cement concrete railing with M 30 grade concrete:


(10.8 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 1.0

6A.27

=
=

23.75 m3
48.00 m3

Reinforced cement concrete M-30 grade concrete crash barrier including reinforcement :
(10.8 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 2.0
For 4 Lane Structure

6A.07
& 6A.08

=
=

7.52 x 11.61 x 0.1 x 2


11.31 x 3.5 x 0.1 x 2
32x10.99x0.45

=
=
=
Total :

17.010
7.917
158.26
183.183
For 4 Lane Structure

Providing weep holes in retaining wall, abutment and retaining/return walls :


Abutment

18 x 3 x 2
For 4 Lane Structure

6A.06

36.880
74.00

Plain cement concrete M 15 leveling course below foundation of bridges, pile caps,
retaining walls, below approach slabs for bridges :
Below Abutment :
Below approach :
Floor Protection :

6A.31

0.000

Structural concrete grade M 30 in Reinforced Cement Concrete in approach slabs


excluding reinforcement :
11.31 x 3.5 x 0.3 x 2
For 4 Lane Structure

6A.29

108 Nos.
216 Nos.

Providing and laying in position hand packed boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :

= NIL
66.485 x 0.3 x 2

39.89

Total :
For 4 Lane Structure
6A.37

39.89

Plain cement concrete in M20 grade in toe wall at the end of the stone pitching & bed protection:
Length of toe wall required at each side

Area of toe wall section

Volume of concrete required for Toe Wall


Bed Protection
= 32x10.99x0.15

=
=

Total Volume of Concrete

=
For 4 Lane Structure

6A.38

Providing 150mm thick coarse sand below boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :

= NIL
66.485 x 0.3 x 2

=
Total :
For 4 Lane Structure

19.95
19.95

o : 187/2

l length of the bridge

gth of approach slab


h of the abutment
h of the abutment foundation

h of carriage way

h of footpath
th of superstructure
drant stone pitching (Y/N)

1x 10.80
= 10.8 m
=
3.50
=
11.31
11.31
=
70.78
=
9.66
=
11.31
=
0.500
=
0.85
Y
0.97

m
m
m
m
m
m
m
m

0.6

1.247 m

xcluding rock :
m3

105.444
m3 x 1.1 =
=

627.738 m3
1255 m3

0 m3

x 1.1
=
=

0.00 m3
0.00 m3

0.000 m3
0.00 m3

ompaction in layers :
m3
m3

2.685

m3
m3

30o

4.651 x 2 =

4.651

9.302

4.651 x 1.5 =
6.977

m3
m3
m3
=

63.12 m3
126.25 m3

144.52 m3

Total =
144.52 m3
For 4 Lane Structure

e, pier, piercap

6.806 m3

65.927 m3

1.79127 m3

40.928 m3

144.519 m3
289.04 m3

TOTAL

115.453 m3
=
=

4 Lane Structure

m3
=

24.568
31.320
24.960
1.900
0.3
83.048
168.00

208.00 m3

T
T
T
T
T
T
T

e excluding cost of reinforcement


2.67 m3
6.00 m3

8.91 m3
18.00 m3

m2
m2
4 Nos.
8 Nos.
5.6 m
11.2 m

m3
232.00 m3

Rm

reinforcement :
Rm
Rm

m3
m3
m3

m3
4 Lane Structure

x 1.1 =
=

183.183 m3
368.00 m3

f embankment,

m3
m3
m3 x 1.3 =
=

51.858 m3
104.00 m3
300

hing & bed protection:


800
48.191 m
300

0.54 m2
1000
53.00 m
52.75 m3
3

105.75 m3
212 m3

m3
m3
m3 x 1.3 =
=

25.929 m3
52.00 m3

BRIDGE No : 194/1
Total length of the bridge
3500

300

65.962

Length of approach slab


Width of the abutment
Width of the abutment foundation
Level of Rock
Width of carriage way
Total deck width
Width of footpath
Depth of superstructure
Quadrant stone pitching (Y/N)

300

65.044

100 thk PCC M15

720

500 thk. return wall

Avg. G.L
62.000
59.674

60.374
59.174
4000

6A.01

720

2500

Earthwork in excavation for foundation for structures in all types of soil excluding rock :
Abutment

Pier

7.82 x 1.48 x 10.85 x 2

251.147

= 5.35 x 1.48 x 10.10 x 2

159.94

Total :

6A.03

411.091

Ditto as item 6A.01 above but in soft rock :

Abutment 7.82 x 1.346 x 10.85 x 2

228.41

Pier

5.35 x 2 x 10.10 x 2

6A.03

Providing and laying in position coarse sand below foundation including compaction in layers :
Abutment

216.14

NIL

= NIL
Total :

0.000

6A.04

Back filling behind abutments, wing walls, return walls :


0.5 x 2.958 x 5.123 x 10.25 x 2
=

6A.05

155.33 m3

x 1.1 =
=

155.33
156.00

Filter media behind abutment, retaining wall and return wall :


Area =

8.9655 x 11.455 x pi() /4


=
80.660 m2

11.455
5.123

10.246

6A.09

a)- Quadrant =

80.66 x 0.3 x 0

b)- Back

2 x 0.6 x 10.25 x 5.123

0.000
=

185.965

Total =

185.965

Structural cement concrete for Plain/ Reinforced Concrete in open foundation :


RCC M35 :Abutment

Pier

6A.17

((0.72+7.22) x 0.5 x 0.7 + 7.22 x 0.5) x 10.25 x 2


= ((0.75+4.75)/2 x 0.6) x (9.5 + 8.0)/2 + (4.75 x 0.3 x 9.5)) x 2

Structural cement concrete for Plain/ Reinforced Concrete in substructure, pier, piercap
abutment, abutmentcap, retaining wall , return wall, staircase, etc.
RCC M35 in abutment:-

Dirt Wall

0.853 x 10.25 x 0.3 x 2

Abutment

0.5 x (0.72 + 0.72) x 4.67 x 10.25 x 2

cantilever return =

(0.6+2.48)/2 x 0.4 x 3.5 x 4

full return wall

4 x 5.588 x 0.5 x 4

RCC M35 in pier:-

6A.18

Pier

= ((7.25x3.745x0.75)+((22/7x0.75x0.75)/4x3.745))x2

Pier Cap

= ((8.0+10.25)/2 x 0.75 x 0.82) + ((10.25 x (0.806 + 0.5)/2 x 0.82 x 2

Structural cement concrete for Reinforced Concrete in superstructure :


RCC M35 Solid Slab :8.4 x 3 x 0.7 x 10.25

6A.22

180.81

Providing & fixing in position HYSD reinforcement bars


a)b)c)d)e)-

Foundation
Substructure
Superstructure
Approach slab
Railing kerb

187 x 85
194 x 135
181 x 120
21.525 x 80
5 x 50

kg.
kg.
kg.
kg.
kg.

=
=
=
=
=
TOTAL =
Say :

6A.28

Providing and laying in position controlled RCC M-30 in kerbs over bridge excluding cost of reinforcement
0.3 x 0.5 x 32.2

6A.25

=
=

Providing and laying over the top of deck slab 50mm thick asphaltic concrete:
(25.2 + 0.02 x 4 + 0.3 x 2 + 3.5 x 2) x 0.05 x 8.75

6A.26

Providing and laying a layer of 15 mm thick mastic asphalt over asphaltic concrete:
(25.2 + 0.02 x 4 + 0.3 x 2 + 3.5 x 2) x 8.75

6A.35

Drainage spouts complete as per MOST drawing No. SD/205 :

6A.36

Providing and fixing 150 dia PVC downtake and runner pipe :

6A.32

Providing and fixing in position true to line and level :

287.700

a) tar paper bearings


0.42 x 10.25 x 6
6A.34

24.600 m2

Providing & laying Buried type Expansion joint :.


4 x 10.25

6A.30

41.00 Rm

Reinforced cement concrete railing with M 30 grade concrete:


(25.2 + 0.02 x 4 + 0.3 x 2 + 3.5 x 2) x 1.0

6A.27

21.53 m3

Reinforced cement concrete M-30 grade concrete crash barrier including reinforcement :
(25.2 + 0.02 x 4 + 0.3 x 2 + 3.5 x 2) x 2.0

6A.07
& 6A.08

7.52 x 10.55 x 0.1 x 2


4.75 x 9.8 x 0.1
10.25 x 3.5 x 0.1 x 2
33.85x22.86x0.45

=
=
=
=
Total :

17 x 3 x 2

375.461

102 Nos.

Total :

102 Nos.

Providing and laying in position hand packed boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :

= NIL
80.66 x 0.3 x 2

=
Total :

6A.37

15.416
4.655
7.175
348.21

Providing weep holes in retaining wall, abutment and retaining/return walls :


Abutment

6A.06

65.760

Plain cement concrete M 15 leveling course below foundation of bridges, pile caps,
retaining walls, below approach slabs for bridges :
Below Abutment :
Below Pier :
Below approach :
Floor Protection :

6A.31

0.000

Structural concrete grade M 30 in Reinforced Cement Concrete in approach slabs


excluding reinforcement :
10.25 x 3.5 x 0.3 x 2

6A.29

48.40
48.40

Plain cement concrete in M20 grade in toe wall at the end of the stone pitching & bed protection:

Length of toe wall required at each side

Area of toe wall section

Volume of concrete required for Toe Wall

Bed Protection

= 33.85x22.86x0.15

Total Volume of Concrete

6A.38

Providing 150mm thick coarse sand below boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :

= NIL
80.66 x 0.3 x 2

=
Total :

24.20
24.20

94/1

ngth of the bridge

of approach slab
of the abutment
of the abutment foundation

of carriage way

of superstructure
ant stone pitching (Y/N)

3x 8.4
= 25.2 m
=
3.50 m
=
10.25 m
10.25 m
=
60.52 m
=
8.75 m
=
10.25 m
=
0.500 m
=
0.70 m
Y
2.82

0.6

2.477 m

ing rock :
m3

65.0238

m3 x 1.1 =
=

411.091 m3
412 m3

x 1.1

251.25 m3

x 1.1

237.75
=

489.00 m3

ction in layers :
m3
m3

0.000 m3

0.00 m3

2.958

m3
m3

30o

5.123

5.123 x 2 = 10.246

5.123 x 1.5 =
7.685

m3
m3
m3
=

185.96 m3
186.00 m3

130.97 m3

55.95
186.92 m3

Total =

5.25 m3

68.93 m3

8.66 m3

186.925 m3
187.00 m3

44.70 m3

44.04 m3

5)/2 x 0.82 x 2

22.20 m3

TOTAL

193.78 m3
=
=

m3
181.00 m3

15.895
26.190
21.720
1.722
0.25
65.777
66.00

T
T
T
T
T
T
T

uding cost of reinforcement


4.830 m3
5.000 m3

14.385 m3

m2
6 Nos.
8.4 m

m3
194.00 m3

Rm

Rm

m3
m3
m3
m3
m3

x 1.1 =
=

375.461 m3
376.00 m3

m3
m3
m3 x 1.3 =
=

& bed protection:

62.915 m3
63.00 m3
300

800
48.666 m
300
0.54 m

1000
53.00 m3
116.07 m3
218.28 m3

m3
m3
m3 x 1.3 =
=

31.457 m3
32.00 m3

BRIDGE No : 202/1
Total length of the bridge
3500

300

42.976

Length of approach slab


Width of the abutment
Width of the abutment foundation
Level of Rock
Width of carriage way
Total deck width
Width of footpath
Depth of superstructure
Quadrant stone pitching (Y/N)

300

42.083

100 thk PCC M15

720

500 thk. return wall

Avg. G.L
40.000
36.500

37.100
36.000
4000

6A.01

720

2250

Earthwork in excavation for foundation for structures in all types of soil excluding rock :
Abutment

Pier

7.57 x 3.56 x 10.85 x 2


= 4.7 x 4 x 10.10 x 6

584.798

1139.28

Total :

6A.03

1724.078

Ditto as item 6A.01 above but in soft rock :

Abutment 7.57 x 0.44 x 10.85 x 2

72.28

Pier

4.70 x 0.417 x 10.10 x 6

6A.03

Providing and laying in position coarse sand below foundation including compaction in layers :
Abutment

118.77

NIL

= NIL
Total :

0.000

6A.04

Back filling behind abutments, wing walls, return walls :


0.5 x 3.124 x 5.411 x 10.25 x 2
=

6A.05

173.27 m3

x 1.1 =
=

173.27
174.00

Filter media behind abutment, retaining wall and return wall :


Area =

9.4695 x 12.099 x pi() /4


=
89.984 m2

12.099
5.411

10.822
a)- Quadrant =

89.984 x 0.3 x 0

b)- Back

2 x 0.6 x 10.25 x 5.411

0.000
=

Total =

6A.09

196.419

Structural cement concrete for Plain/ Reinforced Concrete in open foundation :


RCC M35 :Abutment

Pier

6A.17

196.419

((0.72+6.97) x 0.5 x 0.6 + 6.97 x 0.5) x 10.25 x 2


= ((0.75+4.10)/2 x 0.45) x (9.5 + 8.0)/2 + (4.10 x 0.3 x 9.5)) x 6

Structural cement concrete for Plain/ Reinforced Concrete in substructure, pier, piercap
abutment, abutmentcap, retaining wall , return wall, staircase, etc.
RCC M35 in abutment:-

Dirt Wall

0.828 x 10.25 x 0.3 x 2

Abutment

0.5 x (0.72 + 0.72) x 4.983 x 10.25 x 2

cantilever return =

(0.6+1.89)/2 x 0.4 x 3.5 x 4

full return wall

4 x 5.876 x 0.5 x 4

RCC M35 in pier:-

6A.18

Pier

= (7.25 x 3.988 x 0.75) + (22/7 x 0.75 x 0.75 x 0.25 x 3.988) x 6

Pier Cap

= ((8.0+10.25)/2 x 0.75 x 0.82) + ((10.25 x (0.806 + 0.5)/2 x 0.82 x 6

Structural cement concrete for Reinforced Concrete in superstructure :


RCC M35 Solid Slab :6.75 x 7 x 0.65 x 10.25

6A.22

314.803125

Providing & fixing in position HYSD reinforcement bars


a)b)c)d)e)-

Foundation
Substructure
Superstructure
Approach slab
Railing kerb

247 x 85
339 x 135
315 x 120
21.525 x 80
9 x 50

kg.
kg.
kg.
kg.
kg.

=
=
=
=
=
TOTAL =
Say :

6A.28

Providing and laying in position controlled RCC M-30 in kerbs over bridge excluding cost of reinforcement
0.3 x 0.5 x 54.25

6A.25

=
=

Providing and laying over the top of deck slab 50mm thick asphaltic concrete:
(47.25 + 0.02 x 8 + 0.3 x 2 + 3.5 x 2) x 0.05 x 8.75

6A.26

Providing and laying a layer of 15 mm thick mastic asphalt over asphaltic concrete:
(47.25 + 0.02 x 8 + 0.3 x 2 + 3.5 x 2) x 8.75

6A.35

Drainage spouts complete as per MOST drawing No. SD/205 :

6A.36

Providing and fixing 150 dia PVC downtake and runner pipe :

6A.32

Providing and fixing in position true to line and level :

481.338

a) tar paper bearings


0.42 x 10.25 x 10
6A.34

41.000 m2

Providing & laying Buried type Expansion joint :.


8 x 10.25

6A.30

82.00 Rm

Reinforced cement concrete railing with M 30 grade concrete:


(47.25 + 0.02 x 8 + 0.3 x 2 + 3.5 x 2) x 1.0

6A.27

21.53 m3

Reinforced cement concrete M-30 grade concrete crash barrier including reinforcement :
(47.25 + 0.02 x 8 + 0.3 x 2 + 3.5 x 2) x 2.0

6A.07
& 6A.08

7.27 x 10.55 x 0.1 x 2


4.3 x 9.8 x 0.1
10.25 x 3.5 x 0.1 x 2
41.91x30.25x0.45

=
=
=
=
Total :

17 x 3 x 2

596.79

102 Nos.

Total :

102 Nos.

Providing and laying in position hand packed boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :

= NIL
89.984 x 0.3 x 2

=
Total :

6A.37

14.904
4.214
7.175
570.50

Providing weep holes in retaining wall, abutment and retaining/return walls :


Abutment

6A.06

110.020

Plain cement concrete M 15 leveling course below foundation of bridges, pile caps,
retaining walls, below approach slabs for bridges :
Below Abutment :
Below Pier :
Below approach :
Floor Protection :

6A.31

0.000

Structural concrete grade M 30 in Reinforced Cement Concrete in approach slabs


excluding reinforcement :
10.25 x 3.5 x 0.3 x 2

6A.29

53.99
53.99

Plain cement concrete in M20 grade in toe wall at the end of the stone pitching & bed protection:

Length of toe wall required at each side

Area of toe wall section

Volume of concrete required for Toe Wall

Bed Protection

= 41.91x30.25x0.15

Total Volume of Concrete

6A.38

Providing 150mm thick coarse sand below boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :

= NIL
89.984 x 0.15 x 2

=
Total :

27.00
27.00

02/1

ngth of the bridge

of approach slab
of the abutment
of the abutment foundation

of carriage way

of superstructure
ant stone pitching (Y/N)

7x 6.75
= 47.25m
=
3.50 m
=
10.25 m
10.25 m
=
36.44 m
=
8.75 m
=
10.25 m
=
0.500 m
=
0.65 m
Y
1.94

0.6

1.891 m

ing rock :
m3

156.4086

m3 x 1.1 =
=

x 1.1

1724.078 m3
1725 m3

79.51 m3

x 1.1

130.65
=

210.15 m3

ction in layers :
m3
m3

0.000 m3

0.00 m3

3.124

m3
m3

30o

5.411 x 2 =

5.411

10.822

5.411 x 1.5 =
8.117

m3
m3
m3
=

196.42 m3
197.00 m3

118.74 m3

127.40
246.14 m3

Total =

6.08 m3

73.55 m3

4.83 m3

246.137 m3
247.00 m3

47.01 m3

140.68 m3

5)/2 x 0.82 x 6

66.60 m3

TOTAL

338.74 m3
=
=

m3
339.00 m3

m3
315.00 m3

20.995
45.765
37.800
1.722
0.45
106.732
107.00

T
T
T
T
T
T
T

uding cost of reinforcement


8.138 m3
9.000 m3

24.067 m3

m2
14 Nos.
19.6 m

Rm

Rm

m3
m3
m3
m3
m3

x 1.1 =
=

596.792 m3
597.00 m3

m3
m3
m3 x 1.3 =
=

& bed protection:

70.188 m3
71.00 m3
750

4100
50.249 m
450
3.75 m

1500
377.00 m3
190.17 m3
567.17 m3

m3
m3
m3 x 1.3 =
=

35.094 m3
36.00 m3

BRIDGE No : 211/2
Total length of the bridge
3500

300

52.072

Length of approach slab


Width of the abutment
Width of the abutment foundation
Level of Rock
Width of carriage way
Total deck width
Width of footpath
Depth of superstructure
Quadrant stone pitching (Y/N)

300

51.104

100 thk PCC M15

720

500 thk. return wall

Avg. G.L
49.500
48.005

48.305
47.505
2850

6A.01

720

2250

Earthwork in excavation for foundation for structures in all types of soil excluding rock :
Abutment

6.42 x 0 x 10.85 x 2

Total :
For 4 Lane Structure
6A.02

0.000

0.00

Ditto as item 6A.01 above but in soft disintegrated rock :


6.42 x 1.995 x 10.85 x 2

277.93143
Total
For 4 Lane Structure

6A.03

Providing and laying in position coarse sand below foundation including compaction in layers :
Abutment

NIL

= NIL
Total :

0.000

6A.04

Back filling behind abutments, wing walls, return walls :


0.5 x 1.906 x 3.302 x 10.25 x 2
Total

6A.05

64.51 m3
For 4 Lane Structure

x 1.1 =
=

64.51
129.02

Filter media behind abutment, retaining wall and return wall :


Area =
=

5.7785 x 7.383 x pi() /4


33.507 m2

7.383
3.302

6.604
a)- Quadrant =

33.507 x 0.3 x 0

b)- Back

2 x 0.6 x 10.25 x 3.302

0.000
=

110.353

Total =
110.353
For 4 Lane Structure
6A.09

Structural cement concrete for Plain/ Reinforced Concrete in open foundation :


RCC M35 :Abutment

6A.17

((0.72+5.82) x 0.5 x 0.3 + 5.82 x 0.5) x 10.25 x 2

Structural cement concrete for Plain/ Reinforced Concrete in substructure, pier, piercap
abutment, abutmentcap, retaining wall , return wall, staircase, etc.
RCC M35 in abutment:-

Dirt Wall

0.903 x 10.25 x 0.3 x 2

Abutment

0.5 x (0.72 + 0.72) x 2.799 x 10.25 x 2

cantilever return =

(0.5+0.92)/2 x 0.4 x 3.5 x 4

full return wall

2.85 x 3.767 x 0.5 x 4

For 4 Lane Structure


6A.18

Structural cement concrete for Reinforced Concrete in superstructure :


RCC M35 Solid Slab :8.82 x 1 x 0.75 x 10.25

6A.22

=
67.80375
For 4 Lane Structure

Providing & fixing in position HYSD reinforcement bars


a)b)c)d)e)-

Foundation
Substructure
Superstructure
Approach slab
Railing kerb

159.531 x 85
140 x 135
136 x 120
21.525 x 80
6 x 50

kg.
kg.
kg.
kg.
kg.

=
=
=
=
=

TOTAL =
For 4 Lane Structure
6A.28

Providing and laying in position controlled RCC M-30 in kerbs over bridge excluding cost of reinforcement
0.3 x 0.5 x 15.82
For 4 Lane Structure

6A.25

=
=

Providing and laying over the top of deck slab 50mm thick asphaltic concrete:
(8.82 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 0.05 x 8.75
For 4 Lane Structure

6A.26

Providing and laying a layer of 15 mm thick mastic asphalt over asphaltic concrete:
(8.82 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 8.75
For 4 Lane Structure

6A.35

6A.36

6A.32

=
=

=
=

144.03
288.00

Drainage spouts complete as per MOST drawing No. SD/205 :


For 4 Lane Structure

Providing and fixing 150 dia PVC downtake and runner pipe :
For 4 Lane Structure

Providing and fixing in position true to line and level :


a) tar paper bearings
0.42 x 10.25 x 3

12.300 m2

For 4 Lane Structure


6A.34

25.00 m2

Providing & laying Buried type Expansion joint :.


2 x 10.25
For 4 Lane Structure

6A.30

=
=

20.50 Rm
41.00 Rm

Reinforced cement concrete railing with M 30 grade concrete:


(8.82 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 1.0

6A.27

=
=

21.53 m3
43.00 m3

Reinforced cement concrete M-30 grade concrete crash barrier including reinforcement :
(8.82 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 2.0
For 4 Lane Structure

6A.07
& 6A.08

=
=

6.12 x 10.55 x 0.1 x 2


4.55 x 9.8 x 0.1
10.25 x 3.5 x 0.1 x 2
32x7.98x0.45

=
=
=
=
Total :

12.546
4.459
7.175
114.91
139.092
For 4 Lane Structure

Providing weep holes in retaining wall, abutment and retaining/return walls :


Abutment

14 x 1 x 2
For 4 Lane Structure

6A.06

32.920
66.00

Plain cement concrete M 15 leveling course below foundation of bridges, pile caps,
retaining walls, below approach slabs for bridges :
Below Abutment :
Below Pier :
Below approach :
Floor Protection :

6A.31

0.000

Structural concrete grade M 30 in Reinforced Cement Concrete in approach slabs


excluding reinforcement :
10.25 x 3.5 x 0.3 x 2
For 4 Lane Structure

6A.29

28 Nos.
56 Nos.

Providing and laying in position hand packed boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :

= NIL
33.507 x 0.3 x 2

=
Total :
For 4 Lane Structure

20.10
20.10

6A.37

Plain cement concrete in M20 grade in toe wall at the end of the stone pitching & bed protection:
Length of toe wall required at each side

Area of toe wall section

Volume of concrete required for Toe Wall


Bed Protection
= 32x7.98x0.15

=
=

Total Volume of Concrete

=
For 4 Lane Structure

6A.38

Providing 150mm thick coarse sand below boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :

= NIL
33.507 x 0.3 x 2

=
Total :
For 4 Lane Structure

10.05
10.05

o : 211/2

l length of the bridge

gth of approach slab


h of the abutment
h of the abutment foundation

h of carriage way

h of footpath
th of superstructure
drant stone pitching (Y/N)

1x 8.82
= 8.82 m
=
3.50 m
=
10.25 m
10.25 m
=
49.5 m
=
8.75 m
=
10.25 m
=
0.500 m
=
0.75 m
Y
0.63

0.5

0.922 m

xcluding rock :
m3

m3 x 1.1 =
=

x 1.1

0.000 m3
0 m3

305.724573 m3
=
=

305.72 m3
611.45 m3

0.000 m3
0.00 m3

ompaction in layers :
m3
m3

1.906

m3
m3

30o

3.302 x 2 =

3.302

6.604

3.302 x 1.5 =
4.953

m3
m3
m3
=

110.35 m3
220.71 m3

79.77 m3

Total =
For 4 Lane Structure

79.77 m3
=

e, pier, piercap

5.553 m3

41.313 m3

0.90013 m3

21.4719 m3

79.765 m3
159.53 m3

TOTAL

69.239 m3
=
=

4 Lane Structure

m3
136.00 m3

13.560
18.900
16.320
1.722
0.3
50.802
102.00

T
T
T
T
T
T
T

e excluding cost of reinforcement


2.37 m3
6.00 m3

7.20 m3
14.00 m3

m2
m2
2 Nos.
4 Nos.
2.8 m
5.6 m

m3
140.00 m3

Rm

reinforcement :
Rm
Rm

m3
m3
m3
m3

m3
4 Lane Structure

x 1.1 =
=

139.092 m3
280.00 m3

f embankment,

m3
m3
m3 x 1.3 =
=

26.136 m3
54.00 m3
300

hing & bed protection:


800
38.654 m
300
0.54 m

1000
42.00 m3
38.30 m3
80.30 m3
161 m3

m3
m3
m3 x 1.3 =
=

13.068 m3
28.00 m3

BRIDGE No : 211/3
Total length of the bridge
3500

300

52.493

Length of approach slab


Width of the abutment
Width of the abutment foundation
Level of Rock
Width of carriage way
Total deck width
Width of footpath
Depth of superstructure
Quadrant stone pitching (Y/N)

300

51.525

100 thk PCC M15

720

500 thk. return wall

Avg. G.L
49.718
47.718

48.018
47.218
3200

6A.01

720

2250

Earthwork in excavation for foundation for structures in all types of soil excluding rock :
Abutment

6.77 x 0.098 x 10.85 x 2

Total :
For 4 Lane Structure
6A.02

14.397

14.40

Ditto as item 6A.01 above but in soft disintegrated rock :


6.77 x 2.402 x 10.85 x 2

352.875418
Total
For 4 Lane Structure

6A.03

Providing and laying in position coarse sand below foundation including compaction in layers :
Abutment

NIL

= NIL
Total :

0.000

6A.04

Back filling behind abutments, wing walls, return walls :


0.5 x 2.315 x 4.01 x 10.25 x 2
Total

6A.05

95.15 m3
For 4 Lane Structure

x 1.1 =
=

95.15
190.30

Filter media behind abutment, retaining wall and return wall :


Area =
=

7.0175 x 8.967 x pi() /4


49.422 m2

8.967
4.010

8.02
a)- Quadrant =

49.422 x 0.3 x 0

b)- Back

2 x 0.6 x 10.25 x 4.01

0.000
=

134.014

Total =
134.014
For 4 Lane Structure
6A.09

Structural cement concrete for Plain/ Reinforced Concrete in open foundation :


RCC M35 :Abutment

6A.17

((0.72+6.17) x 0.5 x 0.3 + 6.17 x 0.5) x 10.25 x 2

Structural cement concrete for Plain/ Reinforced Concrete in substructure, pier, piercap
abutment, abutmentcap, retaining wall , return wall, staircase, etc.
RCC M35 in abutment:-

Dirt Wall

0.903 x 10.25 x 0.3 x 2

Abutment

0.5 x (0.72 + 0.72) x 3.507 x 10.25 x 2

cantilever return =

(0.5+0.9)/2 x 0.4 x 3.5 x 4

full return wall

3.2 x 4.475 x 0.5 x 4

For 4 Lane Structure


6A.18

Structural cement concrete for Reinforced Concrete in superstructure :


RCC M35 Solid Slab :8.82 x 1 x 0.75 x 10.25

6A.22

=
67.80375
For 4 Lane Structure

Providing & fixing in position HYSD reinforcement bars


a)b)c)d)e)-

Foundation
Substructure
Superstructure
Approach slab
Railing kerb

168.8585 x 8
174 x 135
136 x 120
21.525 x 80
6 x 50

kg.
kg.
kg.
kg.
kg.

=
=
=
=
=

TOTAL =
For 4 Lane Structure
6A.28

Providing and laying in position controlled RCC M-30 in kerbs over bridge excluding cost of reinforcement
0.3 x 0.5 x 15.82
For 4 Lane Structure

6A.25

=
=

Providing and laying over the top of deck slab 50mm thick asphaltic concrete:
(8.82 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 0.05 x 8.75
For 4 Lane Structure

6A.26

Providing and laying a layer of 15 mm thick mastic asphalt over asphaltic concrete:
(8.82 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 8.75
For 4 Lane Structure

6A.35

6A.36

6A.32

=
=

=
=

144.03
288.00

Drainage spouts complete as per MOST drawing No. SD/205 :


For 4 Lane Structure

Providing and fixing 150 dia PVC downtake and runner pipe :
For 4 Lane Structure

Providing and fixing in position true to line and level :


a) tar paper bearings
0.42 x 10.25 x 3

12.300 m2

For 4 Lane Structure


6A.34

25.00 m2

Providing & laying Buried type Expansion joint :.


2 x 10.25
For 4 Lane Structure

6A.30

=
=

20.50 Rm
41.00 Rm

Reinforced cement concrete railing with M 30 grade concrete:


(8.82 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 1.0

6A.27

=
=

21.53 m3
43.00 m3

Reinforced cement concrete M-30 grade concrete crash barrier including reinforcement :
(8.82 + 0.02 x 2 + 0.3 x 2 + 3.5 x 2) x 2.0
For 4 Lane Structure

6A.07
& 6A.08

=
=

6.47 x 10.55 x 0.1 x 2


4.55 x 9.8 x 0.1
10.25 x 3.5 x 0.1 x 2
32x7.98x0.45

=
=
=
=
Total :

13.264
4.459
7.175
114.91
24.898
For 4 Lane Structure

Providing weep holes in retaining wall, abutment and retaining/return walls :


Abutment

15 x 2 x 2
For 4 Lane Structure

6A.06

32.920
66.00

Plain cement concrete M 15 leveling course below foundation of bridges, pile caps,
retaining walls, below approach slabs for bridges :
Below Abutment :
Below Pier :
Below approach :
Floor Protection :

6A.31

0.000

Structural concrete grade M 30 in Reinforced Cement Concrete in approach slabs


excluding reinforcement :
10.25 x 3.5 x 0.3 x 2
For 4 Lane Structure

6A.29

60 Nos.
120 Nos.

Providing and laying in position hand packed boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :

= NIL
49.422 x 0.3 x 2

=
Total :
For 4 Lane Structure

29.65
29.65

6A.37

Plain cement concrete in M20 grade in toe wall at the end of the stone pitching & bed protection:
Length of toe wall required at each side

Area of toe wall section

Volume of concrete required for Toe Wall


Bed Protection
= 32x7.98x0.15

=
=

Total Volume of Concrete

=
For 4 Lane Structure

6A.38

Providing 150mm thick coarse sand below boulder pitching on slopes of embankment,
in front of abutments and in launching apron:
Front :
Back :

= NIL
49.422 x 0.3 x 2

=
Total :
For 4 Lane Structure

14.83
14.83

o : 211/3

l length of the bridge

gth of approach slab


h of the abutment
h of the abutment foundation

h of carriage way

h of footpath
th of superstructure
drant stone pitching (Y/N)

1x 8.82
= 8.82 m
=
3.50 m
=
10.25 m
10.25 m
=
49.62 m
=
8.75 m
=
10.25 m
=
0.500 m
=
0.75 m
Y
0.60

0.5

0.897 m

xcluding rock :
m3

4.30563

m3 x 1.1 =
=

x 1.1

14.397 m3
29 m3

388.16296 m3
=
=

388.16 m3
776.33 m3

0.000 m3
0.00 m3

ompaction in layers :
m3
m3

2.315

m3
m3

30o

4.01 x 2 =

4.010

8.02

4.01 x 1.5 =
6.015

m3
m3
m3
=

134.01 m3
268.03 m3

84.43 m3

Total =
For 4 Lane Structure

84.43 m3
=

e, pier, piercap

5.553 m3

51.763 m3

0.83102 m3

28.64 m3

84.429 m3
168.86 m3

TOTAL

86.788 m3
=
=

4 Lane Structure

m3
136.00 m3

14.353
23.490
16.320
1.722
0.3
56.185
114.00

T
T
T
T
T
T
T

e excluding cost of reinforcement


2.37 m3
6.00 m3

7.20 m3
14.00 m3

m2
m2
2 Nos.
4 Nos.
2.8 m
5.6 m

m3
174.00 m3

Rm

reinforcement :
Rm
Rm

m3
m3
m3
m3

m3
4 Lane Structure

x 1.1 =
=

24.898 m3
50.00 m3

f embankment,

m3
m3
m3 x 1.3 =
=

38.549 m3
78.00 m3
300

hing & bed protection:


800
42.546 m
300
0.54 m

1000
46.00 m3
38.30 m3
84.30 m3
169 m3

m3
m3
m3 x 1.3 =
=

19.275 m3
40.00 m3