Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Hold open current vacant positions total tax% tax $ utility $ utility $
City Engineer 105,660.00 36,981.00 142,641.00 30% 42,792.30 70% 99,848.70
Deputy Police Chief 110,952.00 38,833.20 149,785.20 100% 149,785.20 0% -
HR Administrator 87,336.00 30,567.60 117,903.60 80% 94,322.88 20% 23,580.72
PW Director 112,296.00 39,303.60 151,599.60 70% 106,119.72 30% 45,479.88
Water Resources Program Mgr 83,352.00 29,173.20 112,525.20 10% 11,252.52 90% 101,272.68
projected savings 674,454.60 404,272.62 270,181.98
IT proposed savings in GG
Replace phone line service provider 12,000.00
SUMMARY
total tax supported cuts 981,697.62
total utility supported labor 270,181.98
$ 1,251,879.60
***note $800,000-$1,000,000 from 2010 sale of property to go into a one time emergency fund for 2010 and 2011
CITY OF BAINBRIDGE ISLAND 2010 PROPOSED BUDGET AMENDMENTS
ALL DEPARTMENTS SUMMARY- ALL FUNDS
Interfund Transfers - -
To Other Funds and Sub-Funds 5,289,100 - 5,289,100
OTHER USES 5,289,100 - 5,289,100
MEMORANDUM
TO: City Manager, Lee Walton
Deputy City Manager, Stan McNutt
1. The Administration has targeted approximately $40,000 to come from a call for voluntary
20% work schedule reductions. The Administration has not yet approached the union about
this matter, however, it is a tool that has been used successfully in the past to meet budget
constraints. In this case, employees who volunteer for the program would be expected to take
a 20% reduction in work hours for the remainder of the year, but would be able to keep their
full employee benefits without penalties. We expect that the targeted dollar amount could be
fully met with the cooperation of 4 to 5 employees. During the preparation of the 2011-12
budget, the Administration will determine whether or not these measures are required to be
sustained beyond the current year.
Interfund Transfers - - -
To Other Funds and Sub-Funds 181,540 - 181,540
OTHER USES 181,540 - 181,540
MEMORANDUM
TO: City Manager, Lee Walton
Deputy City Manager, Stan McNutt
1. The savings of $49,859 for BITV is a reduction from budgeting the franchise fee portion at
100% of revenues instead of the required 90%.
2. The savings of $12,000 is the result from replacing the phone service provider in December.
3. The current contract with BIFD is in the amount of $200,000. The proposed reduction of
$100,000 would affect the Commercial Building Fire Safety Inspection program and would
reduce the inspections proportionate to the funded FTE of the Fire Prevention Technician and
total number of identified occupancies.
4. The Knotweed Eradication program is in the third year of implementation and the
elimination of funding will likely reverse some of the progress that has been made toward the
eradication of this noxious plant from the Island.
Professional Services - - -
Communication - - -
Travel 1,200 - 1,200
Training - - -
Advertising 2,000 - 2,000
Operating
p g Leases - - -
Repair & Maintenance 578 - 578
All other Miscellaneous 1,025 - 1,025
Contingency - - -
SERVICES & CHARGES 4,803 - 4,803
Capital Equipment - - -
OTHER EXPENDITURES - - -
Salaries 744,471 -
HR Administrator1 (87,336) 657,135
Benefits 257,391 -
HR Administrator1 (30,567) 226,824
SALARIES & BENEFITS 1,001,862 (117,903) 883,959
Intergovernmental Services - - -
INTERGOVERNMENTAL & INTERFUND - - -
Capital Equipment - - -
Capital Projects - - -
Debt Service - - -
OTHER EXPENDITURES - - -
MEMORANDUM
TO: City Manager, Lee Walton
Deputy City Manager, Stan McNutt
1. Holding the vacant HR Administrator position open in 2010 will have impacts on several
components of the Executive Department and the City’s 2010 work plan. The resources of this
position will not be available for the negotiation of the union contract and will also not be
available for the assistance in the recruitment of a permanent City Manager. Keeping this
position open will also impact the workload on the Finance Department Budget Manager and
the Executive Department Administrative Secretary as they will be responsible for the duties
of this position.
Human Resources
Outline and implement use of MUNIS for all HRIS activities: position
control, leave tracking, job classification, training. 1
Re-form citywide Safety Committee. 1
Complete a current Accident Prevention Plan. 1
Schedule citywide and management training sessions. 1
Update HR web page to reflect organizational culture and to increase use
as a recruitment tool. 2
Explore possibility of implementing annual accountability agreements
between City Manager and Department Directors based upon
performance expectations and annual work plans. 2
Legal
Oversee representation of City in McNabb lawsuit relating to remaining
claims in quiet title/boundary line dispute.
Oversee representation of City in Samson (Blakely Harbor) trial for
damages relating to shoreline nmoratorium.
Oversee representation of City in Kane LUPA appeal.
Oversee representation of City in Hammer lawsuit.
Oversee representation of City in Sneller appeal of attorneys' fees and
complaint.
Oversee representation of City in Bainbridge Ratepayers Alliance appeal.
Provide legal advice and real estate closing assistance in connection with
potential sale of City's interest in Islander Mobile Home.
Provide assistance with code revisions.
Provide legal advice in connection with all city contracts, resolutions and
ordinances.
Prepare resolution and/or ordinance providing City Manager with limited
settlement authority
Provide legal advise and recommended revisions regarding the
Council/Manager governance manual
Provide legal advice in connection with Open Water Marina.
Performance Manager
Develop semi-annual reporting on the status of meeting department and
division Performance Measures as described in the Level of
Service/Performance Measure sections of the 2009-2010 Proposed
Budget, and provide leadership in developing realistic and measurable
Performance Measures.
Assist the City Manager and Executive staff in special project analysis
that focus on efficiency improvements, cost reductions, cost/benefit
analysis, revenue additions, and organization and staffing.
Provide the leadership in the sale of surplus properties to meet cash flow
objectives for 2010.
Develop workflow and process maps for all major operations in the City,
and initiate and provide the leadership in the performance improvement
of key processes within each department or combination of departments.
2010 Executive Department Work Plan with Proposed Budget Reductions
Provide leadership in continuing development of Integrated Capital
Project database to include development of budget change and debt
service database modules, integration of 12-month tax-supported and
utilities cash flow models, and integration of an improved method for
managing capital project estimates and schedule.
Develop a litigation database to manage and report on status and success
of litigation and special projects, and to integrate database and Legal
division work plan.
Provide leadership in developing technical skills of staff in their ability to
develop, modify and maintain sophisticated data and information
management models.
Communications
Work with Council, City Manager, staff and consultants to Initiate, Identify stakeholders, develop
design and implement plans for meaningful public participation using messages, select and implement
tools identified and adopted in the Governance Coordination Manual. appropriate outreach tools,
(Ex: SMP Update, Sr. Center Improvements, Comp Plan Update, organize, publicize and manage
HDDP/Government Way project, Ground Water Model, etc.) Public Forums and presentations,
etc. 1
Support City Manager/Deputy and City Council in successfully "Whole Team" involvement in and
implementing use of the flexible Public Process, as described in knowledge of crucial issues and
G
Governance R
Review
i manual, l to
t advise
d i on design
d i off effective
ff ti public
bli processes as they
th develop
d l results lt in
i
processes for public issues of high interest/high impact. As per manual, well-designed processes and avoids
include representatives of Council, City Manager, expert staff and "Not Ready for Prime Time"
citizens as appropriate. roadbumps.
2
As PIO, communicate with 200 neighborhoods already organized Bainbridge Island residents have
through Map Your Neighborhood. Promote new MYN access to the information they need
involvement and emergency preparedness by organizing events to prepare themselves, their
(National Night Out, Bainbridge Prepares), developing materials families, and their homes as safe as
and conducting outreach. possible in an emergency.
3
As PIO, report when needed to City and County Emergency Operations See above
Centers; participate in Kitsap County Public Information Officer
trainings. 4
Improve the City's ability to communicate through the internet by seeking City Council, stakeholder groups
Council, public and staff input, facilitating improvements to the City's and the public are well informed
web site and supporting exploration of new tools like SeeClickFix, about significant projects and
OneBainbridge, etc. policy changes and have
appropriate opportunities for
involvement. 5
With Deputy City Manager, Planning Department Director, Council, staff See above
and citizens, evaluate and improve the city's noticing and public
involvement processes for land use activities. 6
2010 Executive Department Work Plan with Proposed Budget Reductions
With Building Dept., improve "user friendly" quality of existing Better customer understanding and
permitting materials and develop new ones that make it clear why we more accessible materials reduce
require permits, how the process works, and what to expect. customer frustration and
complaints. 7
Manage 18 Community Services contracts -- 11 LTAC and 7 tax- Support Council and
supported. Support Council in development of LTAC Manual. Administration in appropriate use
of public funds which result in
measurable benefits to the
Bainbridge Island community. 8
CITY OF BAINBRIDGE ISLAND 2010 PROPOSED BUDGET AMENDMENTS
FINANCE & ADMINISTRATIVE SERVICES
DEPARTMENT SUMMARY- ALL FUNDS
Intergovernmental Services - - -
Intergovernmental Taxes & Assessments - - -
Interfund-Taxes & Assessments - - -
INTERGOVERNMENTAL & INTERFUND - - -
Capital Equipment - - -
Capital Projects - - -
Debt Service - - -
Other Non-Operating Expenditures - - -
OTHER EXPENDITURES - - -
Interfund Transfers - - -
To Other Funds and Sub-Funds 5,107,560 - 5,107,560
OTHER USES 5,107,560 - 5,107,560
MEMORANDUM
TO: City Manager, Lee Walton
Deputy City Manager, Stan McNutt
1. The elimination of $5,500 allotted in 2010 for Budget Development- Printing and Graphic
Design will mean that the entire budget document will be produced in house with a basic
presentation and minimal graphics and photographs. Less hard copies and disks will be
produced and on-line viewing of the budget will be encouraged.
g
Debt Service Management and Data Base K. Shaw,, E. Bobergg Courts 3
2009 Annual Financial and Accountability Audit E. Konkel, J. Longfield, K. Shaw, E. 1
Boberg Courts, O. San Juan, K. Jahraus,
support staff
Monthly Financial Statements, Revenue Management, General Ledger E. Konkel, J. Longfield, K. Shaw, E. 1
Maintenance, Investments Boberg Courts, O. San Juan, K. Jahraus
Monthly Cash Flow Analysis and maintenance and upgrades of data E. Konkel, J. Longfield, K. Shaw, E. 1
base Boberg Courts, O. San Juan
Close MUNIS monthly and produce monthly Statements J. Longfield, O. San Juan 1
Monthly Bank Reconciliations O. San Juan 1
Human Resources Administration J. Longfield 1
Grant processing, tracking, reconciling K. Shaw 2
LID billing-terminate outside billing and bring in house D. Lee 1
Business License renewals & updates implement streamlined fee-one D. Lee 1
charge for all licenses
Accounts receivable invoices-create, mail and track, unclaimed property D. Lee
SSWM asses fees, monitor and update based on County and GIS data D. Lee 1
Provide Escrow Companies with total assessments due at close of sale D. Lee, C. Shipman 2
of property
Fixed Asset- establish and track current fixed assets. Explore adding E. Boberg Courts, D. Lee 3
fixed assets to MUNIS data base
Utility Billing-create, monitor and maintain accounts C. Shipman 1
Utility Billing-support water resource and conservation agency C. Shipman
Records retention and managment, off-site storage maintenance, Public K. Jahraus 1
Records requests
2010 Finance Department Work Plan with Proposed Budget Reductions
Payroll & Benefits-issue employee checks, maintain benefits, annual L. Steinberg 1
employee statements
Support and Assist Utility Advisory Committee E. Konkel, K. Jahraus 2
Maintain IGWG model E. Konkel, O. San Juan 3
Research and further implement electronic payment and receipting E. Konkel, J. Longfield, C. Shipman 2
capabilites
CITY OF BAINBRIDGE ISLAND 2010 PROPOSED BUDGET AMENDMENTS
INFORMATION TECHNOLOGY
DEPARTMENT SUMMARY- ALL FUNDS
Professional Services - - -
Community Services - - -
Communication - - -
Travel 450 - 450
Training 2,500 - 2,500
Advertising - - -
Operating Leases 25,000 - 25,000
Insurance - - -
Utilities - - -
Repair & Maintenance 145,000 - 145,000
All other Miscellaneous - - -
SERVICES & CHARGES 172,950 - 172,950
Intergovernmental Services - - -
Intergovernmental Taxes & Assessments - - -
Interfund-Taxes & Assessments - - -
INTERGOVERNMENTAL & INTERFUND - - -
Capital Equipment - - -
Capital Projects 5,000 - 5,000
Debt Service - - -
Other Non-Operating Expenditures - - -
Interfund Transfers - - -
To Other Funds and Sub-Funds - - -
OTHER USES - - -
Technical Support
Maintain multi-site functional and secure data network 1
Maintain platform standardization - desktop, server, and network 1
Provide database administration across multiple platforms 1
Manage servers - OS, version, security, and software patches 1
Manage data integrity via stewardship and backup 1
Manage communications systems (phone, voicemail, email, website) 1
Maintain user administration - network and application specific 1
Manage anti-virus software and SPAM email flow 1
Daily Projects and Tasks - Ongoing
Manage presentation and video-conferencing systems 1
Infrastructure and Network
Manage technical and functional issues related to City website 1
Applications and Hardware
Maintain hardware inventory - purchase, install, and license Communications and Website 1
Maintain software inventory - purchase, install, and license Help Desk Technical Support 1
Manage peripheral equipment - monitors, keyboards, printers, etc. 1
Manage hardware/software support and maintenance 1
Evaluate and integrate software products - new and upgrades 1
Manage operating system and productivity software patches 1
Attend technical training and provide staff training at all levels 1
Administration of spyware & malware - prevention and outbreaks 1
Provide technical support - software, hardware, and process 1
2010 Information Technology Department Work Plan by Function
FUNCTION NOTES & COMMENTS PRIORITY
Systems Administration
Provide City-wide software systems administration 1
Administer configuration control of software systems 1
Evaluate potential new systems and interfaces 1
Maintain module data consistency across integrated system(s) 1
Administer user security level permissions by function/module 1
Update fee structure changes across multiple systems 1
Maintain data integrity and consistency Daily Projects and Tasks - Ongoing 1
Develop process and policy with focus on efficiency/productivity MUNIS and Tidemark (Systems) 1
Provide staff training and provide support assistance by module 1
Development or updates of customized Crystal Reports 1
Perform data conversion and integration 1
Cross-system data interface development 1
Represent city at regional users groups & other local agencies 1
GIS/Mapping
Ensure city GIS product is incorporated into daily workflow 1
Manage data layers within City GIS system - currently 81 1
Respond to internal, public, and external agency mapping requests 1
Generate and provide map-related data, products, and services 1
Integrate cross-platform mapping product outputs 1
Maintain aerial imagery data sets and accessibility 1
Maintain data integrity and consistency across data sources 1
Daily Projects and Tasks - Ongoing
Develop and maintain GIS based data layer software viewer 1
Reduce redundancy of re-creating files and duplicative work 1
Work with other agencies to develop and integrate data layers 1
Development of GIS system database/server infrastructure 1
Attend technical training and provide training to staff 1
Represent city at local and regional users groups 1
* Demonstrates strategic planning process for major technology-related projects and impact of recent spending reductions *
* Total FTE staff count performing all work: 1999 = 7, 2003 = 6 (centralized IT), 2009 = 5 (budgetary layoff) *
Information Technology - Strategic Initiatives Work Planning
Year Planned Item Current Status
2009 yes Desktop computer replacement - 30 (Actual = 4) Defer - Cost
yes Implement GIS basic data set for public access via website Defer - Resources
yes Replace anti-virus software - city wide managed product Complete
no Budget, cashflow, spending plan, IT fund allocation model Complete
no staff reduction, workload prioritize, adapt service levels Complete
no replace phone service vendor - cost savings Complete
no wireless microphone system for chambers Defer - Cost
no Community video area on city website to host BITV B-news blurbs Defer - Resources
no MUNIS: GoDocs (electronic distribution of routine forms and advices) In progress
no WAC 434-662: Preservation of public records - 2010 unfunded mandate In progress
no NPDES permit - integrate into MUNIS, water resources weather station In progress
2010 no Desktop computer replacement - 30 Defer - Cost
no Upgrade MS Exchange email - replace server, OS, & software version Defer - Cost
no Replace primary data server - SAN or NAS technology Defer - Cost
yes Implement GIS basic data set for public access via website In progress
no wireless microphone system for chambers In progress
no Methodology to link digital audio to meeting notes on website In progress
no Citizen request web based software product In progress
no SeeClickFix - web (2.0) based citizen interaction tool In progress
no Google Fiber for Communities RFI
2011 yes Desktop computer replacement - 30 (target 40 to recover)
yes Replace phone and voice mail systems with IP based (installed yr 1998)
yes Replace Tidemark server or evaluate replacement (installed year 2000)
yes Replace MUNIS server (installed year 2004)
2012 yes Desktop computer replacement - 30 (target 40 to recover)
yes Unified communications - hardware & software (need IP phone system)
yes Replace web server & evaluate website redesign (installed year 2005)
2013 yes Replace GIS server (installed year 2008)
* Demonstrates strategic planning process for major technology-related projects and impact of recent spending reductions *
* Total FTE staff count performing all work: 1999 = 7, 2003 = 6 (centralized IT), 2009 = 5 (budgetary layoff) *
Information Technology Department
The Information Technology (IT) Department provides three primary services: technical
support, systems administration and GIS/mapping maintenance. All IT related functions
support the primary department goal of systems integration, interdepartmental functionality,
and data and process consistency at a city-wide level. IT reports directly to the City Manager,
and functions as a service department to all city staff, the community, the City Council, and all
local and regional government agencies.
The department’s focus is to maintain a functional and secure data network, provide database
administration, serve as a technical support resource, provide communications systems
administration, maintain consistent hardware and software purchasing, installation and
licensing, and improve overall systems-related work flow processes. The department is also
responsible for city-wide systems administration, configuration control of existing systems and
evaluation of potential new systems, interfaces, and technologies. Additionally, the
department ensures that the city’s GIS product is incorporated into daily workflow, as well as
responding to citizen and customer requests for map related data, products and services.
Maintenance of the city website is a collaborative effort with IT responsibility focusing on the
technical and functional issues, and working closely with all other city departments to manage
the content.
Program Staffing:
Director Total FTE: 1.00
Technical Support
Program Staffing:
Senior Information Technician Total FTE: 2.00
Systems Administration
Program Staffing:
Systems Administrator Total FTE: 1.00
GIS/Mapping
Program Staffing:
Engineering Technician 2 – GIS/Mapping Total FTE: 1.00
CITY OF BAINBRIDGE ISLAND 2010 PROPOSED BUDGET AMENDMENTS
MUNICIPAL COURT
DEPARTMENT SUMMARY- ALL FUNDS
Capital Equipment - - -
Capital Projects - - -
OTHER EXPENDITURES - - -
Salaries 1,511,718 -
4-month Shoreline Planner Deferrel1 (17,500) 1,494,218
Benefits 519,060 -
4-month Shoreline Planner Deferrel1 (6,125) 512,935
SALARIES & BENEFITS 2,030,778 (23,625) 2,007,153
Intergovernmental Services - - -
Intergovernmental Taxes & Assessments - - -
Interfund-Taxes & Assessments - - -
INTERGOVERNMENTAL & INTERFUND - - -
Capital Equipment - - -
Capital Projects 2,242,351 - 2,242,351
Debt Service - - -
Other Non-Operating Expenditures - - -
Interfund Transfers - - -
To Other Funds and Sub-Funds - - -
OTHER USES - - -
MEMORANDUM
TO: City Manager Lee Walton
Deputy City Manager Stan McNutt
3. 2030 Consultant Services: These consultant services are intended to support the 2030
update to the Comprehensive Plan, and are allocated as follows: $10,000 to use the USGS
model to run water needs scenarios for several land use alternatives; $17,500 to examine
alternative sewage treatment systems for land use alternatives, including the Neighborhood
Service Centers; $25,000 for a consultant to assist with environmental analysis of land use
alternatives; $23,000 for transportation modeling for land use alternatives. The proposed
reductions would postpone funding for the environmental consultant and traffic modeling,
requiring that the timeline for the update be extended. Given that the state is considering
extending the deadlines, this deferral is acceptable.
2030 Update to Comprehensive Plan: Required by GMA, considers Timeline has requirement of completion by 2
how the City can accommodate projected population growth through the end of 2011. State legislature is
the year 2030. 2009 Council directed that update include “green considering extending deadlines. If deadline
infrastructure planning.” is not extended, and if Shoreline Planner is
not hired, the scope must be significantly
reduced.
Critical Areas Ordinance Review and Update: This review is The current review will be limited in 2
required by the BIMC. scope to geohazardous issues due to
staffing limitations
Amend Historic Preservation Ordinance to strengthen incentive Project has experienced significant 3
program. delays due to staffing constraints.
2010 Planning Department Work Plan with Proposed Budget Reductions
Tree Retention & Preservation Ordinance: Reorganization & Ready to go to Planning Commission, 3
consolidation of regulations into one chapter. however, needs to be a lower priority
due to staffing constraints and legal
issues.
Current Planning/Code Compliance
Process submitted land use applications, including required site visits 1
and inspections.
Implement improvements to the permit review process, in This was identified in 2009 as one of the 2
coordination with Public Works department's highest priorities; however
signficant staff reductions in Public
Works and Planning has required some
deferment.
Develop clearer submittal requirements and improved forms reflecting This was also identified in 2009 as one 2
those requirements. of the department's highest priorities.
Some of the work will be achieved
through the Code Update process,
however, improving forms and some
other improvements have been deferred
due to other priorities.
Review tracking and online systems for code enforcement that may 2
provide public with better access to complaint status and related
information about staff involvement.
Conduct code enforcement investigations and actions in response to 1
complaints.
Building
Process submitted building applications, including building code and 1
engineering review and inspections.
Adopt 2009 International Building Codes Effective July 1, 2010, all cities must 1
adopt the new International Building
Codes (building, mechanical, energy,
plumbing, etc.) This will include
required training and certification for
building staff.
CITY OF BAINBRIDGE ISLAND 2010 PROPOSED BUDGET AMENDMENTS
PUBLIC SAFETY
DEPARTMENT SUMMARY- ALL FUNDS
Salaries 2,196,913
Deputy Police Chief1 (110,952) 2,085,961
Benefits 738,236
Deputy Police Chief1 (38,833) 699,403
Capital Equipment - - -
Capital Projects - - -
Debt Service - - -
Other Non-Operating Expenditures - - -
OTHER EXPENDITURES - - -
Interfund Transfers - - -
To Other Funds and Sub-Funds - - -
OTHER USES - - -
MEMORANDUM
TO: City Manager, Lee Walton
Deputy City Manager, Stan McNutt
With no Deputy Police Chief position the Chief of Police is tasked with both the
administration of the Department and the day-to-day operations of the organization. The
Chief is required to attend numerous meetings within the City and County. These meetings
take away from the Chief’s ability to observe, monitor and direct day-to-day operations. The
Chief currently attends between twenty-five (25) to forty (40) meetings monthly. These
meetings range from Director’s meetings to school/parent meetings to meetings with law
enforcement managers. On top of this is the responsibility of emergency preparedness
manager for the Island. Eighteen months ago there were three people doing the work and
carrying the responsibilities that one person is carrying today.
Investigation of complaints are handled by lieutenants who are also members of the same
Guild as officers. This places Guild members investigating Guild members, which has caused
conflict in the past. The Deputy Chief position is an exempt position and not a member of the
Guild.
Salaries 3,507,696
1
PW Director (112,296)
2
City Engineer (105,660)
3
Water Resources Manager (83,352) 3,206,388
Benefits 1,386,615
1
PW Director (39,304)
City Engineer2 (36,981)
3
Water Resources Manager (29,173) 1,281,157
SALARIES & BENEFITS 4,894,311 (406,766) 4,487,545
Interfund Transfers - - -
To Other Funds and Sub-Funds - - -
OTHER USES - - -
MEMORANDUM
TO: City Manager, Lee Walton
Deputy City Manager, Stan McNutt
1. Public Works Director – Position will remain unfilled in 2010. Current Public Works Deputy
Director of Operations and Maintenance Newkirk will continue serving in capacity of Interim
Public Works Director through 2010. Direct savings of both salary and benefits.
2. City Engineer – Position will remain unfilled in 2010. Current Deputy Director of Planning
Wierzbicki will continue serving in capacity of Acting City Engineer through 2010. Direct
savings of both salary and benefits.
3. Water Resources Manager – Position will remain unfilled in 2010. Direct savings of both
salary and benefits.
4. Gravel Road Grading – The 2010 Gravel Road Grading contract will not be let in 2010.
Public Works Operations & Maintenance personnel will perform this work in-house; provided
that, there is no additional lay off of public works personnel required to support this activity.
5. City Hall Landscaping – City Hall landscaping services will not be contracted out as
proposed. Public Works Operations & Maintenance personnel will perform this work in-
house; provided that, there is no additional lay off of public works personnel required to
support this activity.