Sei sulla pagina 1di 6

CEILING SYSTEMS

Between us, ideas become reality

Armstrong Ceiling
Suspension Systems

n
sio
en ems
p

t
s
su sys

prelude 24

ex

po

sy
ed

ste

ARMSTRONG SUSPENSION SYSTEMS

- exposed suspension system 24 mm (nominal)


24 mm XL PRELUDE
Item Nr.
Component
Dimensions

length height

(mm) (mm)
BP 73 40 42
Main Runner
BP 73 42 52 P 1200 mm cross tee
BP 312022
600 mm cross tee

3600
1200
600

43
35
30

System load
carrying capacity
kg/m2

23.78

24 mm XL MIDRANGE

Cross Tee 24 TL
Universal Main Runner 24
Peakform with Superlock clip
Cross Tee 24 XL
Peakform

Item Nr.
Component
Dimensions

length height

(mm) (mm)

System load
carrying capacity

BP 73 42 52 P
Main Runner
BP 31 30 61
1200 mm cross tee
BP 31 20 61
600 mm cross tee

10.37
10.37

3600
1200
600

35
27
27

kg/m2

24 mm XL RETAIL

suprafine 15

Item Nr.
Component
Dimensions

length height

(mm) (mm)

System load
carrying capacity

BP 73 42 101
BP 71 30 62
BP 71 20 11

7.05
7.05

Main Runner
1200 mm cross tee
600 mm cross tee

3600
1200
600

32
27
25

kg/m2

- exposed suspension system 15 mm (nominal)


15 mm SUPRAFINE PEAKFORM
Item Nr.
Component
Dimensions

length height

(mm) (mm)

System load
carrying capacity

BP 75 40 42
BP 75 30 42
BP 75 20 42

23.71
23.71

Main Runner
1200 mm cross tee
600 mm cross tee

3600
1200
600

43
43
43

kg/m2

15 mm SUPRAFINE MIDRANGE

Universal Main Runner 15


Peakform with Superlock clip

select 15

Item Nr.
Component
Dimensions

length height

(mm) (mm)
Cross Tee 15 TL

BP 73 42 101
Cross Tee 15 XL BP 71 30 62
Peakform
BP 71 20 11

Main Runner
1200 mm cross tee
600 mm cross tee

3000
1200
600

32
27
25

System load
carrying capacity
kg/m2

7.57
7.57

- exposed suspension system 15 mm (nominal)


15 mm SELECT
Item Nr.
Component
Dimensions

length height

(mm) (mm)

System load
carrying capacity

BP 70 42 102 Bl
Main Runner
BP 70 30 102 Bl 1200 mm cross tee
BP 70 20 102 Bl 600 mm cross tee

10.12
10.12

3000
1200
600

32
32
32

kg/m2

n
sio
en ems
p

t
s
su sys

d
se s
m
po
ex yste
s

ARMSTRONG SUSPENSION SYSTEMS

silhouette xl 15 mm (nominal) designer grid

Silhouette with 6 mm reveal is available either in Armstrong Global White or Global White with black reveal (BI).
SILHOUETTE HIGH END (6mm black reveal)
Item Nr.
Component
Dimensions

length height

(mm) (mm)

System load
carrying capacity

BP 80 40 82Bl
Main Runner
BP 80 30 82Bl 1200 mm cross tee
BP 80 20 82Bl 600 mm cross tee

15.68
15.68

3600
1200
600

45
45
45

kg/m2

SILHOUETTE HIGH END (6mm white reveal)

Silhouette Main Runner,


Global White

Silhouette Main Runner


with Black reveal

Item Nr.
Component
Dimensions

length height

(mm) (mm)

System load
carrying capacity

BP 80 40 82
BP 80 30 82
BP 80 20 82

15.68
15.68

Main Runner
1200 mm cross tee
600 mm cross tee

3600
1200
600

38
38
38

kg/m2

SILHOUETTE MID-RANGE (6mm black reveal)


Item Nr.
Component
Dimensions

length height

(mm) (mm)

System load
carrying capacity

BP 80 42 32Bl
Main Runner
BP 80 30 32Bl 1200 mm cross tee
BP 80 20 32Bl 600 mm cross tee

11.25
11.25

3000
1200
600

38
38
38

kg/m2

SILHOUETTE MID-RANGE (6mm white reveal)


Item Nr.
Component
Dimensions

length height

(mm) (mm)

System load
carrying capacity

BP 80 42 32
BP 80 30 32
BP 80 20 32

11.25
11.25

Main Runner
1200 mm cross tee
600 mm cross tee

3000
1200
600

38
38
38

interlude xl 15 mm (nominal)

15 mm INTERLUDE
Item Nr.
Component
Dimensions

length height

(mm) (mm)

Interlude Main Runner

Interlude Cross Tee

Main Runner
1200 mm cross tee
600 mm cross tee

3600
1200
600

44
44
44

kg/m2

n
sio
en ms
s p y s t e
u
s
s

n
sio rs
en
s p a n g e
u
s
h

ie
ic
or
ism ss
se acce

ARMSTRONG SUSPENSION SYSTEMS

suspension hangers

26 mm

25 mm
26 mm

BPGM 6065 Anchor Fastener


Used to secure the ceiling
suspension hanger wire
to the structural soffit/deck

BP 7891 6bd10 12 Gauge Soft Hanger


Wire ( 2.68mm, L 1800mm)
Used to hang suspended ceilings
from structural deck

BPGM2626 - Vertical Hanger


Connects Anchor Fastener and
steel wire.

BPGM2010 Hook Clip


Connects 2.68 mm hanger wire
to the main runner;
recommended for renovation & fast
track applications; provides easy
adjustment of ceiling height

seismic accessories

BERC2 2 Beam End


Retaining Clip Joins main
beam or cross tee to wall
molding and web of grid with
no visible pop rivets
BERC2

Seismic Joint Clip CT Offers a


faster, easier and better seismic
solution for Seismic Category D,
E and F installations. Armstrong
offers the only State
University of New
York, University
of Buffalo-tested
approach to
creating seismic
separation joints in
IBC Category D, E
and F installations.
SJCG

Seismic Joint Clip MB Allows the


ceiling to be divided at a splice on main
beam to accommodate the IBC mandate for
ceiling areas greater than
2500 sf to have seismic
separation joints. ES4
expansion sleeve is used
to cover 3/4 gap.
SJMR15

ARMSTRONG SUSPENSION SYSTEMS

BERC

ARMSTRONG SUSPENSION SYSTEMS

Its simple to install with these easy steps:


How to install the Seismic
Separation Joint Clip.
Step One: Install suspension system
completely, in a conventional manner.
Step Two: Decide upon which run(s)
of Main Runners to create the seismic
separation. NOTE: the Seismic Joint
Clip allows for cross-tees to move
along the axis of the cross-tees.
NOTE: Divide 2500 SF by the length
of the run of mains in feet. The result
will be the maximum spacing, in feet,
for the separation joint. Round this
result down to the nearest 4'
increment when mains are installed 4'
on center.
Step Three: Attach two adjacent
sides of each section of the divided
ceiling to the structure. Where these
sections touch the wall the
attachment may be by riveting to the
wall molding or by means of the
BERC2 clip with a tight screw.
Sections that do not touch walls on
two adjacent sides must be braced to
structure.

Steps 1-3

Step 4

Step 6

Step 5

Step 7

Step Four: Cut XL through the end


details of cross-tees inserted into
Main Runner designated for the
Seismic Separation. NOTE: This
should be done one intersection at a
time or the grid system will fall apart.
Step Five: Assemble the two sides of
Joint clip into one unit.
Step Six: Snap completed assembly
over the bulb of the Main Runner at
the intersection of the cross-tees.
Step Seven: Insert a 1/4" long #10
screw through slot in clip, into the
upper XL clip stake hole. Use vertical
stamp mark below the horizontal slot
to properly position the screw within
the clip. Install one screw from each
side of the assembled clip to hold the
proper shape. Do not allow screw
threads to strip out the stake hole.

Complete

Armstrong World Industries (India) Pvt. Ltd.,


Regd. Office: B2, G-01, Marathon Innova, Near Peninsula Corporate Park, Off Ganpatrao Kadam Marg, Lower Parel,
Mumbai 400 013, India. Tel: 022-3048 0800, Fax: 022-30460439/24913604. E-mail: helpdesk@armstrongindia.com
Central Warehouse Bhiwandi: Tel: 02522-2441441, Fax: 02522-244050. Ahmedabad: Cell: +91-9376133127.
Bengaluru: 080-26576367, Fax: 080-25733416. Bhopal: Cell:+91-93296 82944. Chandigarh: Tel: 0172-2621081.
Chennai: Tel: 044-4217 5303/3297 4323, Telefax: 044-28291213. Hyderabad: Tel: 040-32009868, Cell: +91-93930
43137, Fax : 040-23358486. Jaipur: Cell: +91-9352569512. Kochi:- +91-9388939252. Kolkata: Cell: +91-9339073133.
Lucknow: Tel:0522-2626097/3232986, Telefax: 0522-2201143. New Delhi: Tel: 011-25893262/78, Fax: 011-25893287.
Pune: Tel: 020-32502404.

Potrebbero piacerti anche