: 14.05

AMARKANTAK UNIT 5:

TG PG test and Boiler PG test were completed.


NALCO UNIT 10 :

Unit reached full load.


KUTTIYADI UNIT 1 :

72 hours full load trial operation


KUTTIYADI UNIT 2 :

72 hours

full

load trial operation

was completed.
was completed.

MUDDANUR UNIT - 5 :

Steam blowing was completed.

KOTHAGUDAM UNIT - 11 :

Boiler was lighted up.


TECHNICAL SERVICES / PSSR

OCTOBER 2010

TS TIDINGS

INSIDE

1. STATUS OF PROJECTS COMMISSIONED / TO BE COMMISSIONED DURING


2009 - 2011.
2. SERVICE RENDERED TO OTHER REGIONS/SAS/PROJECTS AFTER CONTRACT
CLOSING/ CUSTOMER TRAINING.
3. APPRECIATION FROM CUSTOMER FOR SERVICES RENDERED.
4. FEED BACK ON EQUIPMENTS FROM SITES.
5. LET US KNOW - GENERATOR PROTECTION FUNCTIONS

Feed backs and suggestions from all departments of BHEL for improvement of TS
TIDINGS are welcome and may please be addressed to ADDL. GENERAL MANAGER
(TSX)/BHEL-PSSR/CHENNAI

TECHNICAL SERVICES / PSSR

OCTOBER 2010

TS TIDINGS

STATUS OF PROJECTS COMMISSIONED / TO BE COMMISSIONED DURING


2009 2011 :
AMARKANTAK UNIT 5 :

Unit was
synchronized
preparations.

on 05.10.2010 after overhaul and PG test

TG PG test (100% and 80% load) , auxiliary power consumption test and Boiler
PG test were completed successfully and MOM signed on 30.10.2010.

NALCO - UNIT 9 :

Unit is running at

80 100 MW as per the requirement of customer.

NALCO UNIT 10 :

After servicing the thrust bearing,

trial run of CEP 2 was completed.

Unit was synchronized on 03.10.2010 and loaded to 60 MW.

Calibration

Unit reached full load for the first time on 06.10.2010.

Unit was stopped on 09.10.2010 due to HPCV-2 drain line leakage and was
attended and cleared for unit start up.

Unit was restarted

Unit was stopped on 31.10.2010 due to Boiler economizer tube leakage.

of Feeder - A was carried out.

on 24.10.10 as per customer requirement.

NALCO DAMANJODI UNIT 5 :

Calibration of hot air damper and cold air damper for mill AB was completed.

Soot blower lines hydro test was completed.

AC-JOP suction line modification was carried out as per revised scheme. ACJOP alignment of new pump and pump trial were completed.

TECHNICAL SERVICES / PSSR

OCTOBER 2010

TS TIDINGS

4 hours trial
run of Mill CD lube oil motors and
drive lube oil motors were
completed.

ESP : Charging of ACP and controller panels was completed. ESP A pass
CERM, EERM & GDRM trial
run was completed. Dummy
load test of all
field controller panels was carried out in ESP A pass. OCC and SCC tests
for five rectiformers were completed.

BFP A lube oil flushing was declared completed.

Feeder C trial run and

Mill CD motor trial run was carried out.

Mill - AB & CD inert steam line hydro test was completed.

Mill AB lube oil flushing was declared

Large video screen system erection and commissioning


control room.

BFP B motor trial run was completed and released for alignment and coupling.

Trial run of DC scanner air fan, Mill CD auxiliary


drive to main reducer was completed.

Seal air fan - B damper was commissioned.

tracking was

trial run of mill auxiliary

carried out.

completed.
was

completed at unit

drive motor and

auxiliary

KRL KOCHI :

GT was
running around 17MW with around 40 TPH HRSG steam flow.
tripped on 11.10.2010, as PLC both processors got hanged.

TIE-3 Transformer OLTC was commissioned.

During restarting flow divider was found jammed. After attending to the flow
divider problem, GT was restarted on 14.10.2010.

Process incomer -1 hipot test

ACTP 1 feeder was charged.

Presently GT is

running

was completed

It

and charged.

at 15 MW with 34 TPH HRSG steam flow.

TECHNICAL SERVICES / PSSR

OCTOBER 2010

TS TIDINGS

RAICHUR UNIT 8 :

Unit which was


under shut
problem was synchronized
two mills.

down since
21.09.2010
due to
ID fan
on 10.10.2010 and loaded to
80 MW with

ID fan A

HP heaters were charged and level control were put on auto.

Auto synchronizer was commissioned.

Mill E and feeder - E were taken into service on 24.10.2010.

Unit was stopped on

was taken into service

on 14.10.2010.

30.10.2010 due to bottom ash evacuation problem.

RAYALASEEMA TPP - UNIT 5 :

Second stage steam blowing was completed with total 25 blows.

Trial run

BFP- 5B lube oil flushing was completed.

Steam blowing of soot blower line was completed.

Seal oil system AC motor trial run was completed.

Mill seal air


carried out.

8 hours trial run

HFO pump house temperature


commissioned from remote.

BFP B recirculation valve

8 hours

PA FAN-5B 8hrs trial run was completed

Reheater hydro test was done.

CW pump A & B motor

Fibre optic cable from CW pump house to control room was laid and all the
CW pump house parameters were checked from control room.

of mill motors - C, E and F was

fan motor

and

completed.

DC scanner air

fan motor

trial

run

was

control valve and pressure control valve

were

of FD fan A motor was completed.

was commissioned from remote.

trial run of BFP -5B

& CEP motors - A , B & C was completed.

8 hours trial run was

completed.

TECHNICAL SERVICES / PSSR

OCTOBER 2010

TS TIDINGS

AC-JOP was commissioned.

CW pump butter fly valve was commissioned.

FD fan 5A one hour trial run was carried out.

4 hours trial run of seal air fan -5B

8 hours trial run

Mill motor - 5D was taken trial run for

PA fan -5A lube oil flushing was declared completed.

GD test

of

was completed.

PA fan -5A motor was completed.


8 hours.

of ESP A pass was completed.

KUTTIYADI UNIT 1 :

After completing the


04.10.2010.

balancing

72 hours
full
11.10.2010.

Unit is in service as per the requirement of customer.

load trial

work,

operation

unit
was

was synchronized

completed

successfully

on
on

KUTTIYADI UNIT 2:

Nozzle 1 & 3

erection work was completed.

Deflector feed back mechanism setting for

72 hours
full load
30.10.2010

trial

operation

all corners was completed.


was

completed

successfully on

VIJAYAWADA UNIT 7:

Unit was synchronized on 03.10.10 after erection of PG test flow nozzle and
attending to EHTC problem.

Unit was shut down on 05.10.2010


transformer
bushing failure and after
resynchronized on 20.10.2010.

Unit is presently running around

to attend to
replacing the

GT - Y phase
same, unit was

450 500 MW.

TECHNICAL SERVICES / PSSR

OCTOBER 2010

TS TIDINGS

KAKATIYA UNIT 1 :

Unit was under shut down since 07.10.2010 due to PA fan A NDE
bearing failure Unit was synchronized on 13.10.2010 and loaded to 200
MW.

Mill D scrapper

Unit tripped twice on 21.10.2010 due


to (1) generator
differential fault
on R phase and (2) opening of GCB.
Unit
was resynchronized on
22.10.2010 and loaded to 200 MW.

PA fan A: Trial run after new rotor assembly was completed.

Presently unit is running

LRSBs pressure setting is in progress.

replacement work was completed.

440 450 MW.

KOTHAGUDAM 500 MW, UNIT 1 :

Boiler final hydro


Boiler Inspector.

test

was

completed on

02.10.10

in the presence of

ID fan B was run for one hour

ID fan B and FD fan B were run and

LDO pump A was run and fuel was charged upto all four corners.

All the CC pumps were

SG-DMCW pumps A & B were run after attending to the seal leakage and
jamming problem.

DMCW lines flushing in CC pump cooling water suction side was carried out.

CC pump emergency cooling water

Boiler expansion constraints cutting work is in progress.

CC pumps A & B was run

Boiler was lighted up for the first time on 31.10.10

on 13.10.2010.
draught system was established.

erected.

circuit flushing was carried out.

TECHNICAL SERVICES / PSSR

OCTOBER 2010

TS TIDINGS

SIMHADRI STAGE II, 2 X 500 MW, UNIT 3 :

SAPH 3A Soot blower motor

4 hours

Stage 1 to stage 2
completed.

Booster pump motor A


completed.

ID fan 3 A 8 hours motor trial run through channel 2 was completed.

ID fan 3A motor - channel

MDBFP C motor 8 hours trial run was completed.

SG-ECW B 8 hrs. motor trial run was completed.

SAPH-3A fire fighting line flushing was completed.

Local commissioning of SH drain MOVs was completed.

Pre-Boiler system Detergent flushing completed.

LT-APRDS
& B for

trial run was completed.

interconnection line steam blowing was


CC pump motor 4 hours trial run

was

1 & 2 parallel operation was completed.

NEYVELI TS II EXP CFBC, 2 X 250 MW, UNIT 1:

SAT & UAT were charged for the first time and power extended to boards.

ESP B pass GD rapping motors trial run was completed.

DMCW 1A & 1B motor trial run 8 hours completed.

SA fan - 1B motor and IA compressor motor cable hi-pot test was carried
out.

IA compressor 1 & 2 motor trial run - 8 hrs. was completed.

SA fan motor 1A & 1B motor trial run - 8 hrs. was completed.

PA fan A cable hi-pot test was carried out.

DMCW system 4 nos. actuator were commissioned.

PA fan A 8 hours motor trial run and


were completed.

Detergent flushing motors trial run for 4 hours was carried out.

HVAC motor 4 hours trial run

TECHNICAL SERVICES / PSSR

OCTOBER 2010

TS TIDINGS

SERVICES RENDERED TO CUSTOMER /SAS/MUs:


Shri. P Muthu, AGM/Kakatiya site and Shri. R Ganeshram, Engineer, TSX, Chennai
were deputed to Neyveli for attending to high shaft vibration problem of unit number
7 of TS II.

CUSTOMER TRAINING & TECHNICAL PAPER PRESENTED:

--- NIL ---

APPRECIATION FROM CUSTOMER FOR SERVICES RENDERED :


--- NIL ---

TECHNICAL SERVICES / PSSR

OCTOBER 2010

10

TS TIDINGS

FEED BACK NO.1

PROJECT: NEYVELI LIGNITE CORPORATION, TS II, UNIT NO. 7, 210 MW KWU


DESIGN
PROBLEM: HIGH HP SHAFT VIBRATION PROBLEM
HISTORY OF PROBLEM:
NLC-TS-II-U#7 HP,IP turbine overhaul was carried out in August 2008 by BHELSAS-Secunderabad. During the overhaul, HP rotor was replaced due to excess
interstage and gland seal clearance and bearings 1 & 2 were replaced due to Babbitt
damage and pitting. After the overhaul, the vibration value at HP (front) shaft was
found to have increased to 180 microns compared to prior level of 110 microns.
Trim balancing was carried out by M/s.BHEL specialist twice at LP rotor and HP
rotor. After second trim balancing, the vibration levels were slightly found reduced,
but in due course the vibration levels increased with HP front shaft vibration level
maintaining at about 175 microns and showing rising trend further.
During Aug 2009, Journal bearing No.1 was replaced with a spare bearing with
minimum design clearances as per suggestion of M/s. BHEL-SAS. There was slight
reduction of HP shaft vibrations from 175 microns to 160 microns. However, turbine
vibrations particularly at HP front shaft increased in due course.
RECTIFICATION WORKS CARRIED OUT:
Rectification works to contain high vibrations in U#7 were entrusted to BHEL-SAS in
Aug/Sep 2010.The significant defects noticed and rectification works carried out are
given below in brief.

Shifting of total turbine rotor along with combined thrust and journal bearing in
axial direction towards Generator by 1 mm when compared to previous assembly
position ( 2008).

Heavy pitting and impression were found in axial key contact areas of thrust
cum journal bearing no.2 and the pedestal along with slight pitting on the
spherical piece/spherical support (right side).

TECHNICAL SERVICES / PSSR

OCTOBER 2010

11

TS TIDINGS

The thrust cum journal bearing No.2 along with its support was replaced by new
one purchased from M/s .BHEL/Hardwar.

Axial key pitting marks in the pedestal were removed by grinding and matching
was ensured.

Turbine cold rolling was done on 18.09.2010. The load could not be raised beyond
115 MW due to very high value of vibration at bearing No.2 pedestal.
On 19.09.2010, the turbine was hand tripped as the pedestal vibration at bearing
no.2 reached the trip value of 45 microns. Again turbine rolling was done and the load
was raised gradually up to about 190 MW. The pedestal vibrations were found to be
higher compared to prior levels of the above rectification works.
Machine vibrations are changing and sometimes allowing to synchronize and load.
Sometimes even synchronization was not possible. It is attributed to self aligning
problem as the bearing No.2 is of self aligning type.
Unit got tripped on some other protection on 20.09.2010. Again while the unit was
brought back into service, the vibration values at HP front and HP rear shaft went
beyond trip level( more than 200 microns) and hence the unit was hand tripped.
REINSPECTION WORKS CARRIED OUT:
Further to forced shut down, inspection and rectification works were carried out by
BHEL-SAS from 01.10.2010 to 09.10.2010 . The major defects noticed are given
below in brief.
OBSERVATIONS ON DISMANTLING:

HPF swing check of 0.27 mm observed.

HP/IP alignment L-R 0.0525 mm, T-B 0.0175 mm.

Bearing No.2 level was checked using master level at P/P and found to have a slope
of 0.85 mm/meter (High at turbine side i.e., front).

When bottom half was removed and inspected, it was observed that the contact
between torus and support was only on the right side with slight pitting.

TECHNICAL SERVICES / PSSR

OCTOBER 2010

12

TS TIDINGS

The support was removed form location and checked .The measurement reveal slope
as follows
L-R slope at front 0.16 mm over 700 length
L-R slope at rear 0.24 mm over 700 length
No significant slope in front-rear

Support seating surface inside the pedestal was checked and the measurement
levels slope as follows.
Front to rear slope of 0.20 to 0.24 mm over 280 mm width
No significant slope in L-R

RECTIFICATIONS:

The above slopes (Left-Right and front-rear) were corrected by machining


/grinding and matching was ensured.

Bearings 1 & 2 Torus to support matching was done to improve and ensure proper
self aligning of the bearings as the existing contact was limited.

Pedestal 1&2 loading packers were removed, eased and put back.

After completion of above works, Machine was put on barring gear on


10.10.2010 @ 05:14 Hrs. Unit was steam rolled to 3000 rpm on 10.10.2010 @
11:40 Hrs. Load was gradually raised and full load reached at 10:21 Hrs on
11.10.2010.Performance of the machine was satisfactory and the vibration levels are
as follows.

TECHNICAL SERVICES / PSSR

OCTOBER 2010

13

TS TIDINGS

BrgNo

Shell vibrations
(microns)

Shaft vibrations

16

127

21.5

88

50

16

65

5(V/H)

14/8.5

6(V/H)

11/6

(microns)

Vibration specialist BHEL-PSSR and BHEL- Hardwar/Engg analyzed the case.


They concluded that the vibration problem is due to improper self aligning of bearing
No.2
CONCLUSION:
During the assembly of bearings 1 & 2 self aligning of bearings is to be
ensured. If it does not exists, it shall be achieved by matching and ensuring proper
contact between bearing spherical seat and support. Also, pedestals 1 & 2 are to be
ensured for free movement by easing to achieve unrestricted casing expansions.

Prepared by :
V.Naga Raju,
Jr.Executive(Engg)
Staff No : 2767554
BHEL-PSSR-SAS
Secunderabad.

TECHNICAL SERVICES / PSSR

14

OCTOBER 2010

TS TIDINGS

FEEDBACK NO. 2
PROJECT : KOTHAGUDAM UNIT 11 (500MW)
PROBLEM : JAMMING AND SEAL LEAKAGE OF SGDMCW PUMP

Problem Detail:
Two Nos. SG DMCW Pumps were supplied by M/s FlowMore Ltd at KTPS Unit XI .
Pump B was first commissioned on 02/10/2010 after completion of flushing with
ACW water and subsequently with DMCW water. High vibration and noise was heard
during first trial run. After 4hrs, when pump was stopped, it got jammed.
Pump casing was opened. Pebbles, welding slag and rust were found in the casing
and NDE side wear ring was found jammed on to the impeller. It was cleaned by light
emery polishing, and pump was reassembled. During the reassembly, the DE / NDE
end seal face covers were found having pin holes at parting plane through which,
water was leaking profusely upon charging. Hence for attending the same, pump had
to be opened 4 times and finally silicone sealant was applied to arrest the leak.
Suction line and discharge lines flushing with DM water was thoroughly done and
pump was reassembled after realignment. During running of pump, high vibration was
observed along with heavy NDE seal leak. Pump was hand tripped and got jammed.
Again upon opening of the pump casing, NDE wear ring was found struck up in impeller
and rubbing/ scoring marks were observed on the impeller wear ring area. Polishing
was carried out on wear ring,.
In spite of repeated efforts by suppliers technicians, the seal leaks, and NDE
wearing jamming in pump B could not be resolved .
On 08/10/2010, a senior pump service engineer was deputed by M/s. Flow more
to assist in rectification of SG DMCW pump. Pump B which was jammed, was opened
in his presence and found that seal got worn out by 0.4mm (slightly) due to dislocation
of spring retention pin (Refer seal drawing),caused by jamming.
Seal was reassembled and pump was run. After 4hrs of trial run, pump was
hard to rotate on coasting down. Entry of foreign materials in the pump casing such
as rust, pebbles etc. were suspected for the problem by M/s FlowMore.

TECHNICAL SERVICES / PSSR

15

OCTOBER 2010

TS TIDINGS

Hence a suction strainer from ACW system was borrowed from customer and
was introduced in common suction header of SG DMCW with one isolation valve.
Thorough flushing of lines was again carried out.
After clearance from piping on 12/10/10, Pump-B was run for 20 min. After
stopping, again it got jammed. Minor buffing on NDE wear ring saw it run for 72hrs
continuously. But upon stopping it again got jammed.
Resolution:
Pump B was opened and the wearing ring to top casing blue contact was
checked. It was found that there is no contact of top half casing with the wearing
ring due to higher 2.5mm parting plane gasket thickness put at shop. Hence during
servicing the wearing ring was getting jammed. It was corrected by introduction of
1mm parting plane gasket. The wearing ring was also found to be oval and hence both
NDE and DE wearing rings ovality were removed. After box up of pump B it was
rotating freely after trial run for 2hrs. No further correction was necessary.

SGDMCW Seal Drawing

TECHNICAL SERVICES / PSSR

16

OCTOBER 2010

TS TIDINGS

TECHNICAL SERVICES / PSSR

17

OCTOBER 2010

TS TIDINGS

Conclusion:
In the absence of site specific O&M manuals / drawings site had to waste
precious erection and commissioning time in attending trivial problems probably caused
by poor assembly / testing of these pumps at works.
However, introduction of suitable suction strainers can be made as permanent
feature in closed CW systems were foreign material entry is inevitable during initial
commissioning. Higher size DMCW piping is being TIG welded as per plan. However
TIG welding of piping less than 200NB also needs to be introduced in place of arc
welding in the quality plan for erection.

TECHNICAL SERVICES / PSSR

OCTOBER 2010

18

TS TIDINGS

GENERATOR PROTECTION FUNCTIONS


Introduction
Protection against internal and external faults and immediate isolation of
the network are extremely important for even small sized generators and
transformers. The prompt isolation against the faults will save the equipment from
further damage and also saves the human life. This article provides an overview of
the basic protection concepts applied for large generators with respect to numerical
protection relays.
The figure 1 shows the typical protection scheme for a medium sized
generator. The figure also points out the Current and Voltage measuring regions for
each protection. Each protection is discussed briefly in this article.

TECHNICAL SERVICES / PSSR

19

OCTOBER 2010

TS TIDINGS

Figure 1:Typical protection Scheme For a 100 MW Generator along with Gen Transformer and Unit
Transformer

Phase Distance Protection (21)


The machine impedance protection is used as a selective time graded protection
to provide shortest possible tripping times for short-circuits in the synchronous
machine, on the terminal leads as well as in the lower voltage winding of the unit
transformer. It thus provides a fast back-up protection to the generator and
transformer differential relays

TECHNICAL SERVICES / PSSR

20

OCTOBER 2010

TS TIDINGS

The phase distance function (21) is designed for system phase fault backup
protection and is implemented as a two-zone mho characteristic. Three separate
distance elements are used to detect AB, BC, and CA fault types. The diameter,
offset, system impedance angle (relay characteristic angle), and definite time delay
need to be selected for each zone for coordination with the system relaying in the
specific application.
Typically the first zone of protection is set to an impedance value enough in
excess of the first external protective section (typically the unit transformer) to
assure operation for faults within that protective zone. (See Figure 2, Phase Distance
(21) Coverage.)
A negative or positive offset can be specified to offset the mho circle from the
origin. This offset is usually set at zero. (See Figure 3, Phase Distance (21) Function
Applied For System Backup.) The impedance angle should be set as closely as possible
to the actual impedance angle of the zone being protected. The time delays are set
to coordinate with the primary protection of those overreached zones and, when
applicable, with the breaker failure schemes associated with those protective zones.
The Phase distance Second stage zone settings can be set for the second
external section of protection on the system (typically transmission Zone 1 distance
relays) plus adequate overreach.

Figure 2: Phase Distance coverage

TECHNICAL SERVICES / PSSR

OCTOBER 2010

21

TS TIDINGS

Figure 3: Phase Distance (21) Function Applied for System Backup

Volts/Hz (24)
The overexcitation protection is used to detect impermissible overexcitation
conditions which can endanger generators and transformers. The overexcitation
protection must pick up when the induction admissible for the protected object (e.g.
power station unit transformer) is exceeded. The transformer is endangered, for
example, if the power station block is disconnected from the system from full-load,
and if the voltage regulator either does not operate or does not operate sufficiently
fast to control the associated voltage rise. Similarly, decrease in frequency (speed),
e.g. in island systems, can endanger the transformer because of increased induction.
An increase in induction above the rated values leads very quickly to saturation
of the iron core and to large eddy current losses.
The overexcitation protection feature servers to measure the voltage/frequency
ratio which is proportional to the B induction and puts it in relation to the BN nominal
induction. In this context, both voltage and frequency are related to nominal values of
the object to be protected (generator, transformer).

TECHNICAL SERVICES / PSSR

22

OCTOBER 2010

TS TIDINGS

The overexcitation protection feature includes two staged characteristics and


one thermal characteristic for an approximate modeling of the heating which the
overexcitation may cause to the object to be protected.
The thermal characteristic is prespecified by 8 value pairs concerning the U/f
overexcitation (related to nominal values) and the t trip time. In most cases, the
specified characteristic related to standard transformers provides for sufficient
protection. If this characteristic does not correspond to the actual thermal behavior
of the object to be protected, each desired characteristic can be implemented by
entering customer-specific trip times for the specified U/f overexcitation values.
Intermediate values are determined by a linear interpolation within the device. The
figure below shows the tyypical tripping time characteristics for the over excitation
protection.

Figure 4: Tripping Time Characteristic of the Overexcitation Protection

Definite-Time Overcurrent Protection with undervoltage seal in(50/51)


The overcurrent protection is used as backup protection for the short-circuit
protection of the protected object. It also provides backup protection for downstream
network faults which are not promptly disconnected and thus may endanger the
protected object.

TECHNICAL SERVICES / PSSR

OCTOBER 2010

23

TS TIDINGS

Each phase current is compared individually with the overcurrent


common
setting value. Currents above these value are recorded and signalled individually. As
soon as the corresponding time delay has elapsed, a trip signal is transmitted.
The overcurrent stage has an undervoltage stage. This stage maintains the
pick-up signal for a settable seal-in time if the value falls below a settable threshold
of the positive-sequence component of the voltages after an overcurrent pickup even
if the current falls again below the overcurrent pick-up value. But if the voltage
recovers before the seal in time has elapsed, the function will not be activated.
The function can also be implemented without undervoltage detection keeping
that option disabled

Inverse-Time Overcurrent Protection (51V)


The voltage dependent overcurrent function is used for system backup
protection and can trip the generator circuit breaker, if a fault has not been cleared
by other protection after a certain period of time. The voltage dependent function
can be either voltage controlled or voltage restrained.
In generators where the excitation voltage is derived from the machine
terminals, the short-circuit current subsides quickly in the event of close-up faults
(i.e. in the generator or unit transformer range) due to the absence of excitation
voltage the current decreases within a few seconds to a value below the pick-up value
of the overcurrent time protection. In order to avoid a drop out of the pickup, the
positive sequence component is monitored additionally. This component can influence
the overcurrent detection according to two different methods.
It is similar to Definite time overcurrent protection but has two modes of
operation.

Voltage controlled:

When voltage controlled, the timing characteristic is changed from a load to a


fault characteristic when the voltage drops below a set level. It is mainly used for
generators connected directly to the busbar.

Voltage restraint:

TECHNICAL SERVICES / PSSR

OCTOBER 2010

24

TS TIDINGS

When voltage restrained, the current pick-up level is proportionally lowered as


the voltage falls below a set value, producing a continuous variation of timing
characteristics. This is applicable to generators connected to the busbar, each via a
step-up transformer.

Figure 5: Voltage dependent overcurrent functions

Thermal Overload Protection (49)


The thermal overload protection feature of the 7UM61 is designed to prevent
overloads from damaging the protected equipment. The device is capable of projecting
excessive operating temperatures for the protected equipment in accordance with a
thermal model, based on the following differential equation:

Actual operating temperature expressed in per cent of the


operating temperature corresponding to the maximum
permissible operating current.
Coolant temperature or ambient temperature as a difference to
the 40 C reference temperature.
Thermal time constant for the heating of the equipment being
Protected
Operating current expressed in per cent of the maximum
permissible operating current

TECHNICAL SERVICES / PSSR

25

OCTOBER 2010

TS TIDINGS

The thermal overload protection feature models a heat image of the


equipment being protected. Both the previous history of an overload and the heat loss
to the environment are taken into account.
The thermal overload protection calculates the operating temperature of the
protected equipment in per cent of the maximum allowable operating temperature.
When the calculated operating temperature reaches a settable percentage of the
maximum allowable operating temperature, a warning message is issued to allow time
for the load reduction measures to take place. If the second temperature threshold,
i.e. end temperature = trip temperature, is reached, the protected equipment is
disconnected from the network.
The temperature rise is calculated from the highest of the three phase
currents. Since the calculation is based on the r.m.s. values of the currents, it also
considers harmonics which contribute to a temperature rise of the stator winding.

Unbalanced Load (Negative Sequence) Protection (46)


Negative phase sequence function is for the detection of sustained unbalanced
load conditions. Under such circumstances double frequency eddy currents are induced
in the rotor of a generator and can cause rapid overheating. The function has a
thermal replica curve which simulates the effects of pre-fault heating due to low
levels of standing negative phase sequence current I2. When the I2 value is well above
threshold, the thermal replica approximates to a t = K/I22 characteristic, where K is
the generators per-unit current thermal capacity constant in seconds.
The tripping characteristic is shown in Figure 6. When high values of K are
selected and the negative phase sequence currents measured are near to the
threshold, the operating time may be too slow. In this case, a maximum time setting
tMAX is available to provide a safe trip time. When I2 is high, the operating time
may become too fast and cause loss of discrimination with other power system
protection under fault conditions. To reduce this risk, the inverse characteristic is
provided with an adjustable minimum operating time setting tMIN.

TECHNICAL SERVICES / PSSR

26

OCTOBER 2010

TS TIDINGS

The machine manufacturers indicate the permissible unbalanced load by means


of the following formula.

where tperm =maximum permissible application time of the negative-sequence


current I2.
K =Asymmetry factor (machine constant)
I2/IN =Unbal. load (ratio neg. phase-sequ. I2 nom. cur. IN)

Figure 6: Negative phase sequence tripping characteristic

Differential Protection (87G)


The generator differential function is for the protection of phase to phase or
three-phase stator windings faults which normally involve high fault currents, so that
fast fault clearance is required. This function works on a per phase basis and has a
dual slope bias characteristic as shown in figure 7. The lower slope provides sensitivity
for internal faults, whereas the higher slope provides stability under through fault
conditions, especially if the generator CTs saturate as discussed below.

TECHNICAL SERVICES / PSSR

27

OCTOBER 2010

TS TIDINGS

Figure 7: Generator differential bias characteristic


Differential protection systems operate according to the principle of current
comparison (Kirchhoffs current law). They utilize the fact that in a healthy protected
object the current leaving the object is the same as that which entered it (current
Ip, dotted in Figure.
Any measured current difference is a certain indication of a fault somewhere
within the protected zone. The secondary windings of current transformers CT1 and
CT2, which have the same transformation ratio, may be so connected that a closed
circuit is formed. If now a measuring element M is connected at the electrical balance
point, it reveals the current difference. Under healthy conditions (e.g. on-load
operation) no current flows in the measuring element. In the event of a fault in the
protected object, the summation current Ip1+Ip2 flows on the primary side. The
currents on the secondary side, I1 and I2 flow through the measuring element M. as
a summation current I1+I2 (see Figure)

Figure 8: Basic Principle of Differential Protection (Single-Phase


Representation)
TECHNICAL SERVICES / PSSR

28

OCTOBER 2010

TS TIDINGS

(Ipx = primary current, Ix = secondary current)


When an external fault causes a heavy current to flow through the protected
zone, differences in the magnetic characteristics of the current transformers CT1
and CT2 under conditions of saturation may cause a significant current to flow
through the element M. If the magnitude of this current lies above the response
threshold, the element would issue a trip signal. To prevent the protection from such
erroneous operation, a stabilizing current is brought in.
The stabilizing quantity is derived from the arithmetical sum of the absolute
values of |I1| + |I2|. The following definitions apply:
The differential current
Idiff = |I1 + I2|
and the stabilization or restraining current
Istab = |I1| + |I2|
Idiff is derived from the fundamental frequency current and produces the
tripping effect quantity, Istab counteracts this effect.
Note: if CT ratios are different it has to be matched to the common value,
ie to generator full load current and the corresponding multiplier has to be fed to the
function. For the transformer cases, Vector group matching has also to be carried
out. If CT polarities are found to be reversed, it has to be changed without affecting
the Relay measurement circuit. Relay will usually carried out the measurements from
the Generator neutral side CTs. In that case phase side CT polarities have to be
reversed after ensuring the polarities of Neutral side CTs.

Underexcitation (Loss-of-Field) Protection (40)


Severe loss of excitation caused by field failure can cause a high value of
reactive current to be drawn from the power system which can endanger the
generator. The field failure protection provided by this relay is a single phase
impedance measuring element with an offset mho characteristic. An integrating timing
arrangement, identical to that for the power functions, is also available in many
relays. This allows the relay to trip within the pre-determined time delay even though
the impedance measurement may temporarily fall outside the mho characteristic, eg.
under poleslipping conditions.

TECHNICAL SERVICES / PSSR

29

OCTOBER 2010

TS TIDINGS

For generators that are paralleled to a power system, the preferred method is
to monitor for loss of field at the generator terminals. When a generator loses
excitation power, it appears to the system as an inductive load, and the machine
begins to absorb a large amount of VARs. Loss of field may be detected by monitoring
for VAR flow or apparent impedance at the generator terminals. The power diagram
(P-Q plane) of Fig. 9 shows the characteristic with a representative setting, a
representative generator thermal capability curve, and an example of the trajectory
following a loss of excitation. The first quadrant of the diagram applies for lagging
power factor operation (generator supplies VARs). The trajectory starts at point A
and moves into the leading power factor zone (4th quadrant) and can readily exceed
the thermal capability of the unit. A trip delay of about 0.2-0.3 seconds is
recommended to prevent unwanted operation due to other transient conditions. A
second high speed trip zone might be included for severe underexcitation conditions.

Figure 9: FOR LOSS OF FIELD THE POWER TRAJECTORY MOVES FROM POINT A INTO THE
FOURTH QUADRANT.

TECHNICAL SERVICES / PSSR

OCTOBER 2010

30

TS TIDINGS

When impedance relaying is used to sense loss of excitation, the trip zone
typically is marked by a mho circle centered about the X axis, offset from the R axis
by X'd/2. Two zones sometimes are used: a high speed zone and a time delayed zone.

Figure 10:

LOSS OF EXCITATION USING IMPEDANCE RELAY.

With complete loss of excitation, the unit will eventually operate as an induction
generator with a positive slip. Because the unit is running above synchronous speed,
excessive currents can flow in the rotor, resulting in overheating of elements not
designed for such conditions. This heating cannot be detected by thermal relay 49,
which is used to detect stator overloads.
Rotor thermal capability can also be exceeded for a partial reduction in
excitation due to an operator error or regulator malfunction. If a unit is initially
generating reactive power and then draws reactive power upon loss of excitation, the
reactive swings can significantly depress the voltage. In addition, the voltage will
oscillate and adversely impact sensitive loads. If the unit is large compared to the
external reactive sources, system instability can result.

Reverse Power Protection (32R)


Reverse power protection is used to protect a turbo-generator unit in case of
failure of energy to the prime mover. In this case the synchronous generator runs as
a motor and drives the turbine, taking the required motoring energy from the
network. This condition leads to overheating of the turbine blades and must be
interrupted within a short time by tripping the network circuit-breaker. For the
generator, there is the additional risk that in case of a malfunctioning residual steam
pass (defective stop valves) after the switching off of the circuit breakers, the
turbine-generator-unit is speeded up, thus reaching an overspeed. For this reason,
the system isolation should only be performed after the detection of active power
input into the machine.
TECHNICAL SERVICES / PSSR

31

OCTOBER 2010

TS TIDINGS

Forward Active Power Supervision (32F)


Forward Active Power Supervision monitors whether the active power falls
below one set threshold, and whether a separate second set threshold is exceeded.
Each of these functions can initiate different control functions. When, for example,
with generators operating in parallel, the active power output of one machine becomes
so small that other generators could take over this power, and then it is often
appropriate to shut down the lightly loaded machine. The criterion in this case is that
the forward power supplied into the network falls below a certain value.

Out-of-Step Protection (78)


In extensive high-voltage networks, short-circuits which are not disconnected
quickly enough, or disconnection of coupling links which may result in an increasing of
the coupling reactance, may lead to system swings. These consist of power swings
which endanger the stability of the power transmission. Stability problems result in
particular from active power swings which can lead to pole-slipping and thus to
overloading of the synchronous machines.
The out-of-step protection detects these power swings by the well-proven
impedance measurement. The trajectory of the complex impedance vector is
evaluated. The impedance is calculated from the positive sequence components of the
voltages and currents. Trip decision is made dependent of the rate of change of the
impedance vector and on the location of the electrical centre of the power swing.
The pickup area is restricted to the shaded area in Figure 11, Out-of-Step
Relay Characteristics defined by the inner region of the MHO circle, the region to
the right of the blinder A and the region to the left of blinder B. For operation of
the blinder scheme, the operating point (positive sequence impedance) must originate
outside either blinder A or B, and swing through the pickup area for a time greater
than or equal to the time delay setting and progress to the opposite blinder from
where the swing had originated. When this scenario happens, the tripping circuit is
complete.

TECHNICAL SERVICES / PSSR

OCTOBER 2010

32

TS TIDINGS

Figure 11: Out-of-Step Relay Characteristics

Under-voltage Protection (27)


Under voltage protection detects and reports abnormally low voltage conditions,
some of which could be related to system stability problems (voltage collapse, etc.)
Two-pole short circuits or earth faults cause an asymmetrical voltage collapse.
Compared with three mono-phase measuring systems, the detection of the positive
phase-sequence system is not influenced by these procedures and is advantageous
especially with regard to the judgement of stability problems.

Overvoltage Protection (59)


Overvoltage protection serves to protect the electrical machine, and the
associated electrical plant connected to it, from the effects of impermissible voltage
increases. Overvoltages can be caused by incorrect manual operation of the excitation
system, faulty operation of the automatic voltage regulator, (full) load shedding of a
generator, separation of the generator from the system or during island operation.

Frequency Protection(81)
The frequency protection function detects abnormally high and low frequencies
in the system. If the frequency lies outside the allowable range, appropriate actions
are initiated, such as separating a generator from the system.
TECHNICAL SERVICES / PSSR

33

OCTOBER 2010

TS TIDINGS

A decrease in system frequency occurs when the system experiences an increase


in the real power demand, or when a malfunction occurs with a generator governor or
automatic generation control (AGC) system. The frequency decrease protection is also
used for generators which (for a certain time) function on an island network. This is
due to the fact that the reverse power protection cannot operate in case of a drive
power failure. The generator can be disconnected from the power system by means of
the frequency decrease protection.
An increase in system frequency occurs when large blocks of load are removed
from the system, or again when a malfunction occurs with a generator governor or
AGC system. This means a risk of self-excitation for generators feeding long lines
under no load conditions.

90%Stator Earth Fault Protection (59N,64G)


The stator earth fault protection detects earth faults in the stator windings of
threephase machines. The machine can be operated in busbar connection (directly
connected to the network) or in unit connection (via unit transformer). The criterion
for the occurrence of an earth fault is mainly the occurrence of a neutral
displacement voltage. This principle results in a protected zone of 90%to 95%of the
stator winding. Beyond that the setting value cannot be lowered as it may lead to
false trippings. So only 90-95% of the winding only could be protected using the
function.
The displacement voltage UE can be measured either at the machine starpoint
via voltage transformers or neutral earthing transformers (Figure 12) or via the e-n
winding (broken delta winding) of a voltage transformer set or the measurement
winding of a line connected earthing transformer (Figure 13).

Figure 12: Unit Connected Generator with Neutral Earthing Transformer

TECHNICAL SERVICES / PSSR

34

OCTOBER 2010

TS TIDINGS

Figure 13: Unit Connected Generator with Earthing Transformer

100%Stator Earth Fault Protection with 3rd Harmonics(27/59TN)


As described in the previous section, the measuring procedure based on the
fundamental wave of the displacement voltage serves to protect maximally 90 % to 95
% of the stator winding. A non-line-frequent voltage must be used to implement a
100 % protection range.
The 3rd harmonic is created in each machine in a more or less significant way.
It is provoked by the shape of the poles. If an earth fault occurs in the generator
stator winding, the division ratio of the parasitic capacitances changes, as one of the
capacitances was short-circuited by the earth fault. During this procedure, the 3rd
harmonic measured in the starpoint decreases, whereas the 3rd harmonic measured at
the generator terminals increases (see figure 12). The 3rd harmonic forms a zero
phase-sequence system and can thus also be determined by means of the voltage
transformer switched in star/delta or by calculating the zero phase-sequence system
from the phase-earth-voltages.

TECHNICAL SERVICES / PSSR

35

OCTOBER 2010

TS TIDINGS

Figure 14: Profile of the 3rd Harmonic along the Stator Winding

Moreover, the level of the 3rd harmonic depends on the operating point of the
generator, i.e. a function of the P active power and the Q reactive power. For this
reason, the working area of the stator earth fault protection is restricted in order to
enhance security.

100% Stator Earth Fault Protection with 20 Hz Voltage Injection (64G)


The 100-% stator earth fault protection detects earth faults in the stator
windings of generators which are connected with the network via a unit transformer.
This protection function, which works with an injected 20 Hz voltage, is independent
of the system frequency displacement voltage appearing in earth faults, and detects
earth faults in all windings including the machine starpoint. The measuring principle
used is not influenced at all by the generator operating mode and allows to perform
measurements even with the generator standing still. The two measuring principles
used measurement of the displacement voltage and evaluation of the measured
quantities at an injected 20 Hz voltage allow to implement reliable protection
concepts that complement one another. If an earth fault in the generator starpoint or
close to the starpoint is not detected, the generator is running with an earthing. A
subsequent fault (e.g. a second earth fault) causes a single-pole short-circuit that
may have an extremely high fault current because the generator zero impedance is
very small.
Figure 15 shows the basic protection principle. An external low-frequency
alternating voltage source (20 Hz) injects into the generator starpoint a voltage of
max. 1 % of the rated generator voltage. If an earth fault occurs in the generator

TECHNICAL SERVICES / PSSR

36

OCTOBER 2010

TS TIDINGS

starpoint, the 20 Hz voltage drives a current through the fault resistance. From the
driving voltage and the fault current, the protective relay determines the fault
resistance. The protection principle described here also detects earth faults at the
generator terminals, including connected components such as voltage transformers.

Figure 15: Basic Principle of Voltage Injection into the Generator Starpoint

Rotor Earth Fault Protection (64R)


Rotor earth fault protection is used to detect earth faults in the excitation
circuit of the synchronous machines. One earth fault in the rotor winding does not
cause immediate damage; however, if a second earth fault occurs, then this
represents a winding short-circuit of the excitation circuit. Magnetic unbalances can
occur resulting in extreme mechanical forces which can lead to the destruction of the
machine.
The rotor earth fault protection in the Siemens 7UM62 relay is mentioned as an
example. It uses an external auxiliary voltage of approximately 36 to 45 V AC, which
can be taken from the voltage transformers via a coupling unit. This voltage is
symmetrically coupled to the excitation circuit via the capacitors of the coupling unit
and simultaneously connected to the measurement input of the relay. The capacitors
CK of the coupling unit are protected by series resistors R series. The auxiliary AC
voltage drives a small charging current through the coupling unit, brush resistance and
capacitance to earth of the excitation circuit. This current IRE amounts to only a few
mA during normal operation and is measured by the device

TECHNICAL SERVICES / PSSR

37

OCTOBER 2010

TS TIDINGS

Figure16 : Determination of the Rotor Earth Resistance RE

The rotor earth fault calculation calculates the complex earth impedance from
the auxiliary AC voltage URE and the current IRE. The earth resistance RE of the
excitation circuit is then calculated from the earth impedance. The device also
considers the coupling capacitance of the coupling unit CK, the series (e.g. brush)
resistance Rseries and the capacitance to the earth excitation circuit CE. This
method ensures that even relatively high-ohmic earth faults (up to 30 k under ideal
conditions) can be detected. In order to eliminate the influence of harmonics - such
as occur in static excitation equipment (thyristors or rotating rectifiers) - the
measured quantities are filtered prior to their evaluation

Breaker Failure Protection (50BF)


The breaker failure protection can be assigned to the current inputs of side 1
or side 2 during the configuration of the protective functions The breaker failure
protection function monitors the reaction of a circuit breaker to a trip signal. In
machine protections, it is typically referred to the mains breaker. To determine if
the circuit breaker has properly opened in response to a trip signal, one of the
following methods is used to ascertain the status of the circuit breaker:

TECHNICAL SERVICES / PSSR

38

OCTOBER 2010

TS TIDINGS

Checking whether the current in all three phases drops below a set threshold
following a trip command,
Evaluating the position of a circuit breaker auxiliary contact for protective
functions, with which the current criterion is perhaps not expressive, e.g.
frequency protection, voltage protection, rotor earth fault protection.
If the circuit breaker has not opened after a programmable time delay (breaker
failure), a higher-level circuit breaker can be initiated for the disconnection

Inadvertent Energization (50/27)


The inadvertent energizing protection serves to limit damages by accidental
connection of the standing or already started, but not yet synchronized generator by
a fast actuation of the mains breaker. A connection to a standing machine
corresponds to the connection to an inductivity. Due to the nominal voltage impressed
by the power system, the generator starts with a high slip as asynchronous machine.
In this context, impermissibly high currents are induced inside the rotor which may
finally destroy it.
The inadvertent energizing protection only intervenes if measured quantities do
not yet exist in the valid frequency working area (operational condition 0 in case of
the standing machine) or if an undervoltage below the nominal frequency is present
(machine already started, but not yet synchronized). The inadvertent energizing
protection is blocked by a voltage criterion on exceeding a minimum voltage, in order
to avoid that it picks up during normal operation. This blocking is delayed to avoid
that the protection is blocked immediately by the time of an unwanted connection.
Another pickup delay is necessary to avoid an unwanted operation in case of highcurrent faults with a heavy voltage dip. A dropout time delay allows for a measuring
limited in time.

TECHNICAL SERVICES / PSSR

OCTOBER 2010

39

TS TIDINGS

UNITS WHICH HAVE ACHIEVED 100% OA


THERMAL
500 MW
RAMAGUNDAM UNITS 4 & 7
TALCHER UNIT 4, 5 & 6
SIMHADRI UNIT 2
210 MW
MUDDANUR UNITS 1 & 3
RAICHUR UNIT 1 & 4
METTUR UNIT 4
TUTICORIN UNIT 1 & 4
NORTH CHENNAI UNIT 2 & 3
UNITS WHICH HAVE ACHIEVED PLF MORE THAN 100%
500 MW
RAMAGUNDAM UNIT - 7
SIMHADRI UNIT - 2
UNITS WHICH HAVE ACHIEVED PLF BETWEEN 90 & 100%
THERMAL
500 MW
RAMAGUNDAM UNITS 4
TALCHER UNITS 2,4,5 & 6
SIMHADRI UNIT 1
SIPAT UNIT - 4
250 MW
KOTHAGUDAM UNIT 9
210 MW
VIJAYAWADA UNITS 1,2,3,4 & 5
MUDDANUR UNIT 1 & 3
RAICHUR UNIT - 4
METTUR UNIT 4
NORTH CHENNAI UNIT - 3
TECHNICAL SERVICES / PSSR

OCTOBER 2010

40

TS TIDINGS

PERFORMANCE OF BHEL THERMAL SETS IN SR (210 MW AND ABOVE)


FOR THE PERIOD FROM 01/04/2010 TO 31/10/2010 COMPARED WITH THE
CORRESPONDING PERIOD IN THE PREVIOUS YEAR.
( PLF IN PERCENTAGE )

STATION
North Chennai
Neyveli
Raichur
Tuticorin
Ramagundam
Muddanur
Kothagudam
Vijayawada
VTPS - 7
Mettur
Talcher
Simhadri
Sipat
120.00

2009 - 10
87.09
85.42
77.38
78.30
89.07
82.11
93.08
90.69
91.52
85.28
92.97
91.65
PLF

2010 - 11
76.14
84.18
55.45
78.44
92.55
80.36
66.15
73.59
65.39
79.67
84.69
92.90
97.08
2009 - 10

2010 - 11

PLF PERCENTAGE

100.00
80.00
60.00
40.00
20.00

N
or
th

S
ip
at

Ch
en
na
i
N
ey
ve
li
Ra
ic
hu
r
T
ut
ic
Ra
or
in
m
ag
un
da
m
M
ud
da
nu
Ko
r
th
ag
ud
am
Vi
ja
ya
w
ad
a
VT
PS
7
M
et
tu
r
T
al
ch
er
S
im
ha
dr
i

0.00

UNIT

TECHNICAL SERVICES / PSSR

Potrebbero piacerti anche