WORK PROGRAMME
Detailed Survey, Design, Cost Estimate, Preparation of Bid Documents & IEE of Road Projects
Initial Environmental Examination (IEE) Study, Detailed Engineering Survey and Design of
Bardibas Sindhuli Bazar Section of Banepa Sindhuli Bardibas Road ProjectTechnical
Proposal for
Preparation of Scoping Document, Terms of Reference and EIA Study Report of
Nepalthok Khurkot Section of Banepa Sindhuli - Bardibas Road Project
WORK PROGRAMME
WORK PROGRAMME AND STAFFING
CHAPTER
WORK PROGRAMME AND STAFFING
CHAPTER 5
WORK PROGRAMME AND STAFFING
5.1
GENERAL
This Section presents the Work Programme planning and scheduling in accordance with the
Methodology developed by the Consultant to fully attain the objectives of the ser15@
11
1111111111111&11
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-1
5.2
2bjbj22222222222222222222
2L22X22-
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-2
333333
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-3
44
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-4
555555
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-5
666666
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-6
777777
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-7
888888
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-8
9999999999999
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-9
10101010101041010101010104101010101010410108101010.5101010101051010101010
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-10
111111111111G1111111161111111111116111111111161111111111116111111111111611111
1111111|81111
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-11
1212:1212
121212,;1212T121212F1212121212F121212121212F121212121212F121212121212
F121212121212F121212121212F1212$121212eJ1212R1212L1212H121212G121212121
212121212121212121212121212121212
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-12
131313131313
;13131313131313131313131313131313131313131313t81313131313x81313131313;131313
131313;131313131313G1313131313131313131313131313
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-13
141414141414
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-14
1515151515156151515151515151515151515151561515
G15156151515>151515151515>151515151515>151515151515;1515151515
1515-
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-15
1616161616166161616161616
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-16
1717171717176171717171717F1717171717171717171717171717>17171717171717171717171
7171717171717171717171717171717171717171717171717171717171717171717171717171
717171717;171717171717F171717171717>1717t171717>171717171717?1717
:171717<C1717,171717
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-17
181818181818
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-18
19191919191919191919191919191919191919191919191919191919191919191919191919191919
19191919191919191919191919191919191919191919 C1919191919196191919191919619
19
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-19
202020XN4
20202020202020204202020202020P<2020|202020
hC20202020202020202020202020C20202020UG2020T202020G202020202020rC2020
.202020L202020202020<2020l 2020L2020202020 C2020202020202020202020202020
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-20
212121212121
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-21
222222222222
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-22
232323232323
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-23
242424242424
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-24
252525252525
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-25
26262626262626262626262626262626262626262626L2626262626262626262626262626
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-26
272727272727 C2727X272727;272727272727;272727272727>272727272727;272727272727
;2727272727272727272727272727272727272727272727272727272727272727272727272727
;272727272727;272727272727;272727272727G272727272727G272727272727
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-27
282828282828d28282&2828
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-28
292929292929292929298>2929X292929
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-29
3030303030303030303030302&30303030303030
3030303030303030303030303030303030303030303030303030303030303030303030303030303030303
03030303030303030303030303030303030303030303030303030303030303030303030303030303
03030303030303030303030303030303030303030303030303030303030303030303030303030303
03030303030303030303030303030303030303030303030303030303030303030303030303030303
03030303030303030303030303030303030303030303030303030303030303030303030303030303
03030303030303030303030303030303030303030303030303030303030303030303030303030303
03030303030303030303030303030303030303030303030303030303030303030303030303030303
03030303030303030303030303030303030303030303030303030303030303030303030303030303
03030303030303030303030303030303030303030303030303030303030303030303030303030303
03030303030303030303030303030303030303030303030303030303030303030303030303030303
03030303030303030303030303030303030303030303030303030303030303030303030303030303
03030303030303030303030303030303030303030303030303030303030303030303030303030303
03030303030303030303030303030303030303030303030303030303030303030303030303030303
03030303030303030303030303030303030303030303030303030303030303030303030303030303
03030303030303030303030303030303030303030303030303030303030303030303030303030303
03030303030303030303030303030303030303030303030303030303030303030303030303030303
03030303030303030303030303030303030303030303030303030303030303030303030303030303
03030303030303030303030303030303030303030303030303030303030303030303030303030303
03030303030303030303030303030303030303030303030303030303030303030303030303030303
0303030303030303030303030303030303030303030303030303030303030303030303030303030o
mpletion in consummate workmanlike manner. The Head Office will be in constant touch with the Study
Team. The Head office, its, advisors and support staffs will always be alert to the needs of Study Team
and will promptly respond with required information, supplies and other resources.
This Section presents the Work Programme planning and scheduling in accordance with the
Methodology developed by the Consultant to fully attain the objectives of the services. The Chapter
also presents the team of key personnel proposed by the Consultant, their involvement schedule and
the Curriculum Vitae.
5.3
PROJECT MANAGEMENT
The Consultant believes in strong management and administrative guidance in support of the Project.
In order to effectively address the present Study requirements, and their successful performance, the
Consultant has identified four major essential elements. They are:
-
A Study Management Element: which is responsible for overseeing of the contract, financial
monitoring, technical quality and the schedule;
Strong Study Team: the Study Team should possess strong leadership abilities and should be
capable of working in an integrated manner;
Linkage and Coordination: within the team, as well as with the Client.
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-30
5.4
ORGANIZATION
The Study Team has been formed and organized in such a way as to enable the Consultant to provide
the optimum combination of resources and experience to assure the successful completion of the
Study. Fig. 5.1 shows the Consultant's proposed Organization Structure. It shows a clear line of
command and working relation within the functional units of the Consultant's organization.
The main responsibility of the Consult ing Services to be provided will lie with the Team Leader of the
Study Team. He will be mobilizing all the resources available with the Firm so that the Study is carried
out smoothly. He will also identify, based upon the reports and feedback he will receive from the Study
Team Members, and decide about the type of backstopping support required at any time, and will
mobilize the same. He will develop appropriate linkage with the Client, Head Office and Consultant's
Study Personnel and brief them regularly as per the established lines of communication.
Back-up support from the Head Office will be made to the Consultants Study Team during the entire
period of services for carrying out their duties to a successful completion in consummate workmanlike
manner. The Head Office will be in constant touch with the Study Team. The Head office, its, advisors
and support staffs will always be alert to the needs of Study Team and will promptly respond with
required information, supplies and other resources.
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-31
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-32
5.5
WORK PROGRAMME
The itemized list of works and their sequence as suggested by the TOR is exhaustive and clear in
terms of the objectives and scope of works. The work plan is very tight and leaves little room for time
overruns necessitating close monitoring of activities and efficient and timely decision making. Based on
the TOR and comments made on Terms of Reference (Please see Chapter 3), the Consultant has
prepared the detail Work Programme, which is presented in Fig. 5.2 .
5.6
The Consultant has put a lot of efforts in understanding the nature, size, scope and the importance of
the proposed services. Similarly, a careful consideration has also been made while selecting the
proposed team members for the Study. The Consultant fully understands that despite the experience
and a sound establishment of the firms, the success of the Study will depend in large measure on the
composition of the Study Team. The team must represent a combination of inter-disciplinary skills,
including a high degree of technical expertise in a number of disciplines, and successful professional
experience in similar type of studies, with cross-cultural skills enabling them to work collaboratively and
aptly with Client's officials, other agencies and personnel related to the proposed Study.
The Consultant's proposed staffing will consists largely of the following types
a.
b.
The Consultant's Support Staff will be the Technical and Administrative support staff. There will also be
backstopping staff from its Head Office. The purpose is to provide additional expertise as well as
administrative support in case of specific needs. We, however, do not intend to impose much financial
burden onto the Client for the services of such backstopping input and the cost of their services will be
borne from the overhead of the Consultant. The proposed Manning Schedule and Responsibility
Matrix is shown in Fig. 5.3 and Fig. 5.4 respectively.
Team composition and task assignments are presented in following pages.
The estimated duration, and the probable timing of the assignment of each professional to be involved
in this Study are also shown in this Figure 5.3.
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-33
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-34
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-35
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-36
5.7
The Curriculum Vitae of each individual key staff proposed for this Study are presented in the following
pages. As will be evident from the curriculum vitae of the proposed team members, the central thrust is
made to assemble a team of professionals who have not only the required experiences in the
theoretical aspect but also an adequate experience of road bridge works execution, and full knowledge
of EIA roadbridge design and IEE procedure as per DORDoLIDAR standard and EPA and EPR of
HMGN as well as those of international bilateral and multilateral agencies. The key personnel to be
involved in this project isare shown in Table 5.1 and Table 5.2. The CV's of the professionals is also
attached in the following pages.
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-37
P. ShresthaMr. S. P.
AgrahariY. B. MallaDr. R. B.
Khadka
2.
14
J. JhaDr. P. C. Jha
U. R. Chaulagain
Hydrologist
P. P. Oli
Senior Surveyor
C. B. Bista
Socio-economist
H. J. B. Rana
3.
4.
5.
6.
7.
1.
2.
3.
4.
Mr. Y. P.
Saha
ARE /
Quality
Control
Engineer
C.
K.
AcharyaDr.
R. K. Raj
Regmi
Sociologist
/
AnthropologistS
enior Surveyor
C. B. BistaP.
D. Ulak
Geologist
Sociologist
/
Socio-economist
J. Jha
Hydrologist
C.
K.
Gyawali
SILTMAS
INA
SILTERM
C
ERMC
ERMC
Name
Position
TBN
Surveyor
TBN
Lab
Task
Assist Pavement Design / Material Engineer in carrying out field testing of pavement and borrow
areas
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-38
S
N
Name
Position
Technician
Task
TBN
CAD Expert
TBN
Office Support
Staff
Assist the study team in all office related works such as reports preparation, correspondence,
facilitation, logistics, office automation, secondary data collection etc.
TBN
Computer
Operator
Assist the study team in all field related investigation and surveys including field testing, sampling,
transport of samples, field data collection etc.
ERMC MASINA Joint VentureGEC ERMC MULTI in association with HIC(P.) Ltd.SILT / ERMC JV
V-39
5.1
GENERAL
............................................................................................................................................
111
5.2
PROJECT
MANAGEMENT
............................................................................................................................................
111
5.3
ORGANIZATION
............................................................................................................................................
111
5.4
WORK
PROGRAMME
............................................................................................................................................
333
5.5
STAFFING
AND
MANNING
SCHEDULE
............................................................................................................................................