CRONOGRAMA VALORIZADO DE OBRA

OBRA: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA INTEGRAL DE AGUA POTABLE Y SANEAMIENTO EN EL CENTRO POBLADO DE MARINTARI, DISTRITO DE SANTA ROSA, PROVINCIA LA MAR - AYACUCHO.
junio
SANEAMIENTO MARINTARI
INICIO
CAPTACION
OBRAS PRELIMINARES Y TRABAJOS PROVISIONALES
Trazo y replanteo inicial para captacin
Replanteo final de la obra para captacin
Cartel de identificacin de la obra de 3,60 m x 2,40 m
Desbroce de vegetacin (malezas)
DEMOLICION DE ESTRUCTURAS
Demolicin de captacin
MOVIMIENTOS DE TIERRAS
Excavaciones de estructuras t-normal a pulso
Refine, nivelacin y compactacin en terreno normal a pulso
Eliminacin de desmonte en terreno normal a pulso
OBRAS DE CONCRETO SIMPLE
Concreto 1:10 para solados cemento - hormign
OBRAS DE CONCRETO ARMADO
Concreto f'c 210 kg/cm2 para muros
Acero estruc. trabajado p/muro
Encofrado (incl. habilitacin de madera) para muros
REVOQUES, ENLUCIDOS Y MOLDURAS
Tarrajeo con impermeabilizante de losa de fondo y muros interiores
Tarrajeo exterior con mortero 1:5x1,5 cm
FILTROS
Filtros de grava 1 "
TAPAS METALICAS
Tapa metlica 0.60x0.40cm e=1/8 " incl. elemento de seguridad y coloacin
Tapa metlica 0.95x0.75cm e=1/8 " incl. elemento de seguridad y coloacin
ACCESORIOS HIDRAULICOS
Canastilla de PVC 4 "
Niple de fo. gdo. 4 " x 0.50 m con brida rompe agua
Unin universal de fierro galvanizado 4 "
Unin de PVC presin-rosca 4 "
Niple de acero SCH-40 4 " x 0.40m
Codo de acero de 90 tipo campana (CC) DN 100
Unin de PVC roscado 4 "
Vlvula cpta. CC, ho.ductil cierre elst. vstago acero inoxidable DN 100
Niple de fo. gdo. 4 " x 4 "
Tubera de PVC-U SAL pesada 4 "
Codo PVC SAP de 90 x 4 "
PINTURA
Pintado de muro exterior con teknomate o supermate (similar)
CERCO PERIMETRICO
Trazo y replanteo inicial para cerco perimetrico
Replanteo final de la obra, para cerco permetrico
Excavaciones en terreno normal a pulso hasta 1,00 m profundidad
Retiro + acomodo desmonte en zona aledaa terreno normal
Concreto f'c 175 kg/cm2 para cimientos de cerco
Encofrado (incl. habilitacin de madera) para cimientos
Eucalipto rolliso 4 " x 2.40 m
Alambre de pas N 14 galvanizado
Instalacin de cerco de alambre de pas con postes de eucalipto
ANDENERIA
Andeneria para estabilizacin de terreno en captacin
LINEA DE CONDUCCION
TRABAJOS PRELIMINARES
Trazo y replanteo inicial del proyecto, para lneas-redes con estacin total
Replanteo final de la obra, para lneas redes con estacin total
Limpieza y desbroce
MOVIMIENTOS DE TIERRAS
Excav. zanja (pulso) p/tub. t-normal 63 - 90 hasta 1,25 m prof.
Excav. zanja (pulso) p/tub. t-normal 110 - 160 hasta 1,25 m prof.
Excavacin zanja (s/exp) p/tub. t-rocoso 63 - 90 hasta 1,25 m prof.
Refine y nivel de zanja t-normal p/ tub. 63 - 90 para toda profund.
Refine y nivel de zanja t-normal p/ tub. 110 - 160 para toda profund.
Refine y nivel de zanja terr-rocoso p/ tub. 63 - 90 para toda profund.
Relleno comp.zanja(pul) p/tub t-normal 63 - 90 hasta 1,25 m prof.
Relleno comp.zanja(pul) p/tub t-normal 110 - 160 hasta 1,25 m prof.
Relleno comp.zanja(pulso)p/tub t-rocoso 63 - 90 hasta 1,00 m prof.
Elimin. desmonte(p+v) t-normal p/tub. 63 - 90 para toda prof.
Elimin. desmonte(p+v) t-normal p/tub. 110 - 160 para toda prof.
Elimin. desmonte(puls+v) t-rocoso p/tub 63 - 90 hasta 1,00 m

julio

S/. 113.45

agosto

septiembre

octubre

noviembre

diciembre

enero

febrero

S/. 28.36
S/. 131.05

S/. 1,518.70
S/. 361.53
S/. 610.94

marzo

abril

Total

S/. 141.81
S/. 131.05
S/. 1,518.70
S/. 361.53
S/. 610.94

S/. 1,257.20
S/. 66.60
S/. 1,957.96

S/. 1,257.20
S/. 66.60
S/. 1,957.96

S/. 501.68

S/. 501.68

S/. 2,316.19
S/. 2,624.78
S/. 1,066.46

S/. 2,316.19
S/. 2,624.78
S/. 1,066.46

S/. 732.89
S/. 307.35

S/. 732.89
S/. 307.35

S/. 1,112.50

S/. 1,112.50
S/. 316.42
S/. 446.42

S/. 316.42
S/. 446.42

S/. 200.00
S/. 250.00
S/. 277.00
S/. 14.00
S/. 350.00
S/. 318.50
S/. 25.70
S/. 450.00
S/. 110.00
S/. 113.64
S/. 28.50

S/. 200.00
S/. 250.00
S/. 277.00
S/. 14.00
S/. 350.00
S/. 318.50
S/. 25.70
S/. 450.00
S/. 110.00
S/. 113.64
S/. 28.50
S/. 66.94

S/. 27.72

S/. 66.94

S/. 15.57
S/. 25.95
S/. 305.47
S/. 62.18
S/. 168.00
S/. 100.80
S/. 603.40

S/. 27.72
S/. 6.44
S/. 15.57
S/. 25.95
S/. 305.47
S/. 62.18
S/. 168.00
S/. 100.80
S/. 603.40

S/. 3,717.80

S/. 3,717.80

S/. 6.44

S/. 5,188.03
S/. 2,151.17
S/. 50,601.15
S/. 65,072.20

S/. 6,071.08

S/. 108,732.41

S/. 29,387.44
S/. 22,870.00
S/. 14,679.00
S/. 2,741.78
S/. 2,150.00
S/. 523.60
S/. 72,488.28
S/. 33,920.00

S/. 58,716.00

S/. 2,094.40

S/. 37,345.00
S/. 62,874.05

S/. 28,394.73
S/. 32,600.00
S/. 6,165.60

S/. 24,662.40

Pgina 1

S/. 5,188.03
S/. 2,151.17
S/. 50,601.15
S/. 94,459.64
S/. 22,870.00
S/. 73,395.00
S/. 8,812.86
S/. 2,150.00
S/. 2,618.00
S/. 181,220.69
S/. 33,920.00
S/. 37,345.00
S/. 91,268.78
S/. 32,600.00
S/. 30,828.00

CRONOGRAMA VALORIZADO DE OBRA


OBRA: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA INTEGRAL DE AGUA POTABLE Y SANEAMIENTO EN EL CENTRO POBLADO DE MARINTARI, DISTRITO DE SANTA ROSA, PROVINCIA LA MAR - AYACUCHO.
junio
SUMINISTRO E INSTALACION DE TUBERA Y ACCESORIOS
Suministro e instalacin de tubera PVC UF NTP ISO 1452 PN10 90mm
Suministro e instalacin de tubera PVC UF NTP ISO 1452 PN10 110mm
Suministro e instalacin de tubera de fo. galvanizado C-40 4 "
PRUEBAS
Prueba hidrulica de tubera agua potable (incl. desinfeccin) 90 - 110mm
Pruebas de compactacin de suelos (proctor modificado y de control de compactacin - densidad de campo)
Prueba de calidad del concreto (prueba a la compresin)
Estructuras para cruces de quebradas
Cmara tipo CRP6
ALMACENAMIENTO
CONSTRUCCION DE RESERVORIO RP-1 V=70m3 INCL. CASETA Y CERCO
TRABAJOS PRELIMINARES
Trazo y replanteo inicial del proyecto, p/reservorio
Replanteo final de la obra
Transporte a zona s/acceso:materiales, equipos, desmonte
MOVIMIENTOS DE TIERRAS
Excavaciones-cortes en terreno normal a pulso
Excavaciones en terreno normal a pulso
Refine, nivelacin y compactacin en terreno normal a pulso
Eliminacin de desmonte en terreno normal a pulso
OBRAS DE CONCRETO
Concreto f'c 100 kg/cm2 para solados y/o sub bases (Cemento P-I)
Encofrado (incl. habilitacin de madera) para solados
Encofrado (incl. habilitacin de madera) para losas de fondo-piso
Encofrado (incl. habilitacin de madera) para muro cilndrico de cuba
Encofrado (incl. habilitacin de madera) para vigas circulares
Encofrado (incl. habilitacin de madera) para cpula esfrica
Acero estruc. trabajado p/zapata armada (costo prom. incl. desperdicios)
Acero estruc. trabajado p/losa de fondo-piso (costo prom. incl. desperdicios)
Acero estruc. trabajado p/muro reforzado (costo prom. incl. desperdicios)
Acero estruc. trabajado para vigas (costo prom. incl. desperdicios)
Acero estruc. trabajado p/cpula esfrica (costo prom. incl. desperdicios)
Concreto f'c 210 kg/cm2 para zapatas (Cemento P-I)
Concreto f'c 210 kg/cm2 para losas de fondo-piso (Cemento P-I)
Concreto f'c 210 kg/cm2 para muros
Concreto f'c 210 kg/cm2 para vigas (Cemento P-I)
Concreto f'c 210 kg/cm2 para cpula esfrica (Cemento P-I)
Concreto f'c 140 kg/cm2 + 25% P.G. para falsas zapatas (Cemento P-I)
Prueba de calidad del concreto (prueba a la compresin)
Aditivo desmoldeador para encofrados tipo caravista
REVOQUES, ENLUCIDOS Y MOLDURAS
Tarrajeo con impermeabilizante de losa de fondo
Tarrajeo con impermeabilizante de muros en reservorio apoyado
Tarrajeo con impermeabilizante de cielo raso en reservorio apoyado
CARPINTERIA METALICA
Escalera de tubo fo. galv. con parantes de 1 1/2 " por peldaos de 3/4 "
Marco y tapa de plancha LAC 1/4 " con mecanismo de seguridad de 1,04 x 1,04 m segn diseo
Ventilacin con tubera de acero segn diseo 4 "
Soporte metlico tipo abrazadera para tubera 3 "
VARIOS
Limpieza y desinfeccin de reservorios apoyados
Evacuacin del agua de prueba con empleo de la lnea de salida
Prueba hidrulica con empleo de la lnea de ingreso (captacin)
Vereda de concreto f'c 175 kg/cm2 e=10cm pasta 1:2 (P-I), c/empleo de mezcladora
Caja rebose-limpia terreno normal incl. eliminacin desmonte a pulso
Excav. zanja (pulso) p/tub. terr-normal 110 - 160 hasta 1,00 m prof.
Refine y nivel de zanja terr-normal para tub. 110 - 160 para toda profund.
Relleno comp.zanja(pulso) p/tub t-normal 110 - 160 hasta 1,25 m prof.
Tubera PVC-U UF NTP ISO 4435 SN 4 DN 110 incl. anillo + 2% desperdicios
Instalacin de tubera de PVC p/desage DN 110 incluye prueba hidrulica
Buzonete en terreno normal a pulso hasta 1,00 m profundidad
Junta de dilatacin con relleno asfltico
Mortero 1:3 + impermeabilizante para juntas de construccin muros-concreto
Provisin y colocado de junta water stop de neoprene e=15 cm (6 " )
Provisin y colocado de tecnoport de 1 "
Pintado exterior c/teknomate o similar de reservorio apoyado incl. mensaje
Aplicacin de 1ra capa de Xypex concentrado p/impermeabilizacin exterior de estructura hid.(3 x 1 agua)
Aplicacin de 2da capa de Xxypex concentrado p/impermeabilizacin interior de estructura hid.(5 x 2 agua)
CONSTRUCCION DE CASETA DE VLVULAS RP-1 V=70m3
MOVIMIENTOS DE TIERRAS
Excavaciones en terreno normal a pulso

julio

agosto
S/. 47,379.46

septiembre

S/. 41,457.03
S/. 12,611.11

S/. 10,088.89
S/. 8,787.90

octubre

noviembre

diciembre

enero

febrero

S/. 5,437.71

S/. 20,505.10

S/. 48,539.20

S/. 46,973.42
S/. 24,284.31

S/. 145.43

S/. 1,156.30
S/. 864.22
S/. 1,821.15

S/. 1,593.50
S/. 2,965.20
S/. 192.74
S/. 107.73

S/. 1,156.30
S/. 864.22
S/. 3,414.65
S/. 2,965.20
S/. 192.74
S/. 107.73
S/. 2,621.18

S/. 2,621.18
S/. 1,329.49
S/. 70.73
S/. 423.70
S/. 6,150.46
S/. 1,147.00
S/. 825.48
S/. 3,209.41
S/. 1,491.12
S/. 6,406.89
S/. 1,181.70
S/. 878.63
S/. 3,299.32
S/. 1,215.04
S/. 5,731.96

Total

S/. 16,844.50
S/. 10,524.60
S/. 254.50
S/. 117,433.55
S/. 37,360.48

S/. 1,403.28
S/. 109.07
S/. 21,920.93
S/. 13,076.17

abril

S/. 88,836.49
S/. 22,700.00
S/. 29,293.00

S/. 16,844.50
S/. 3,683.61

marzo

S/. 1,329.49
S/. 70.73
S/. 423.70
S/. 6,150.46
S/. 1,147.00
S/. 1,926.12
S/. 3,209.41
S/. 1,491.12
S/. 6,406.89
S/. 1,181.70
S/. 2,050.14
S/. 3,299.32
S/. 1,215.04
S/. 5,731.96
S/. 683.88
S/. 1,062.02
S/. 743.69
S/. 407.20
S/. 982.03

S/. 1,100.64

S/. 1,171.51

S/. 683.88
S/. 1,062.02
S/. 743.69
S/. 407.20
S/. 982.03

S/. 1,194.95

S/. 1,149.62
S/. 2,968.43
S/. 796.63

S/. 1,149.62
S/. 2,968.43
S/. 1,991.58

S/. 644.91
S/. 373.65
S/. 149.06
S/. 46.64

S/. 644.91
S/. 373.65
S/. 149.06
S/. 46.64
S/. 92.41
S/. 56.52

S/. 2,396.92
S/. 2,015.25

S/. 92.41
S/. 56.52
S/. 214.78
S/. 911.76
S/. 3,340.96
S/. 733.00
S/. 57.00
S/. 919.00
S/. 675.50
S/. 126.50
S/. 3,034.23
S/. 185.58
S/. 465.61
S/. 796.75
S/. 45.90
S/. 476.53
S/. 2,396.92
S/. 2,015.25

S/. 225.38

S/. 225.38

S/. 214.78
S/. 911.76
S/. 3,340.96
S/. 733.00
S/. 57.00
S/. 919.00
S/. 675.50
S/. 126.50
S/. 3,034.23
S/. 185.58
S/. 465.61
S/. 796.75
S/. 45.90
S/. 476.53

Pgina 2

CRONOGRAMA VALORIZADO DE OBRA


OBRA: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA INTEGRAL DE AGUA POTABLE Y SANEAMIENTO EN EL CENTRO POBLADO DE MARINTARI, DISTRITO DE SANTA ROSA, PROVINCIA LA MAR - AYACUCHO.
junio
Refine, nivelacin y compactacin en terreno normal a pulso
Eliminacin de desmonte en terreno normal a pulso
OBRAS DE CONCRETO
Encofrado (incl. habilitacin de madera) para sobrecimientos
Encofrado (incl. habilitacin de madera) para gradas y/o piso simple
Encofrado (incl. habilitacin de madera) para anclajes y/o dados
Encofrado (incl. habilitacin de madera) para columnas
Encofrado (incl. habilitacin de madera) para vigas rectas y dinteles
Encofrado (incl. habilitacin de madera) para losas macizas
Acero estruc. trabajado p/anclaje
Acero estruc. trabajado para columnas
Acero estruc. trabajado para vigas
Acero estruc. trabajado p/losas macizas
Concreto 1:10 + 30% piedra grande para cimiento
Concreto 1:8 + 25% P.M. p/sobrecimientos
Concreto f'c 175 kg/cm2 para gradas
Concreto f'c 210 kg/cm2 para anclajes y/o dados
Concreto f'c 210 kg/cm2 para columnas
Concreto f'c 210 kg/cm2 para vigas
Concreto f'c 210 kg/cm2 para losas macizas
Prueba de calidad del concreto (prueba a la compresin)
MUROS, REVOQUES, ENLUCIDOS, MOLDURAS Y CIELO RASO
Muros de ladrillo king kong de arcilla de cabeza con mortero 1:4 x 1,5 cm
Tarrajeo interior con mortero 1:5x1,5 cm (incluye columnas empotradas)
Tarrajeo exterior con mortero 1:5x1,5 cm (incluye columnas empotradas)
Tarrajeo de superficie vigas peraltadas independientes (en interiores)
Revestimiento de gradas con mortero de 1:4 x 2 cm + pulido 1:2 x 1 cm
Vestidura de derrames en puerta, ventana y vano
Cielo rasos incluye vigas empotradas con mortero de 1:4 x 1,5 cm
PISOS Y SARDINELES
Contrapiso de 48 mm c/mortero 1:5 x 38mm en base 1:2 x 10 mm acabado
Falso piso de concreto 1:8 de espesor 4 " (Cemento PI)
Vereda de concreto f'c 175 kg/cm2 e=10cm pasta 1:2 (P-I), c/empleo de mezcladora
CARPINTERIA METALICA Y HERRERIA
Cerradura para exterior, c/llaves inter. y exterior de 2 golpes
Escalera de tubo fo. galv. con parantes de 1 1/2 " por peldaos de 3/4 "
Puerta metlica LAC 1/8 " con marco de 2 " x 2 " x 1/4 " y refuerzos
Ventana fierro barras Co. 3/4 " @ 0,19 y marco platina de 2 " x 1/4 "
Marco y tapa de plancha LAC 0,7x0,7 m con mecanismo de seguridad s/diseo
PINTURA
Pintado de ventanas metlicas (2manos anticorrosiva + 2esmalte)
Pintado de puertas metlicas LAC (2manos anticorrosiva + 2esmalte)
Pintado de muro exterior con teknomate o supermate (similar)
Pintado de muro interior con teknomate o supermate (similar)
Pintado de cielo raso con teknomate o supermate (similar)
VARIOS
Candado, incluyendo aldabas
Cubierta ladrillo pastelero asentado de barro 3 cm + fragua c/mortero 1:5
Provisin y colocado de tecnoport de 1 "
INSTALACIONES HIDRULICAS
Suministro e instalacin de accesorios en reservorio y caseta
CERCO PERIMETRICO
Trazo y replanteo inicial para cerco perimetrico
Replanteo final de la obra, para cerco permetrico
Excavaciones en terreno normal a pulso hasta 1,00 m profundidad
Retiro + acomodo desmonte en zona aledaa terreno normal
Concreto f'c 175 kg/cm2 para cimientos de cerco
Encofrado (incl. habilitacin de madera) para cimientos
Eucalipto rolliso 4 " x 2.40 m
Alambre de pas N 14 galvanizado
Instalacin de cerco de alambre de pas con postes de eucalipto
MEJORAMIENTO DE RESERVORIO EXISTENTE
TRABAJOS PRELIMINARES
Retiro de tarrajeo interior y exterior en reservorio existente
Eliminacin desmonte por demoliciones
REVOQUES Y ENLUCIDOS
Tarrajeo con impermeabilizante de losa de fondo
Tarrajeo con impermeabilizante de muros en reservorio apoyado
Tarrajeo con impermeabilizante de cielo raso en reservorio apoyado
Tarrajeo interior con mortero 1:5x1,5 cm (incluye columnas empotradas)
Tarrajeo exterior con mortero 1:5x1,5 cm (incluye columnas empotradas)
CARPINTERIA METALICA

julio

agosto

septiembre
S/. 38.81
S/. 140.29

octubre

noviembre

diciembre

enero

febrero

S/. 481.87
S/. 26.44
S/. 60.30

S/. 258.10
S/. 1,432.22
S/. 1,779.35
S/. 1,889.36
S/. 1,503.00
S/. 258.27
S/. 169.94
S/. 44.03
S/. 853.91
S/. 536.01
S/. 1,603.42
S/. 87.26

S/. 1,596.30

S/. 429.94
S/. 1,284.96
S/. 710.40

Total
S/. 38.81
S/. 140.29

S/. 441.96
S/. 777.18
S/. 107.81
S/. 84.44
S/. 238.26
S/. 740.87

S/. 1,596.30
S/. 441.96
S/. 777.18
S/. 107.81
S/. 84.44
S/. 238.26
S/. 740.87

S/. 464.02
S/. 470.80
S/. 690.49

S/. 464.02
S/. 470.80
S/. 690.49

S/. 39.50
S/. 322.46
S/. 963.72
S/. 532.80
S/. 309.31

S/. 39.50
S/. 752.40
S/. 2,248.68
S/. 1,243.20
S/. 309.31
S/. 62.11
S/. 41.96
S/. 184.84
S/. 151.96
S/. 188.02

S/. 62.11
S/. 41.96
S/. 184.84
S/. 151.96
S/. 188.02

S/. 39.00
S/. 787.30

S/. 39.00
S/. 787.30
S/. 16.58

S/. 10,316.98

S/. 10,316.98

S/. 16.58

S/. 39.60

S/. 144.00
S/. 862.00

S/. 39.60
S/. 9.20
S/. 17.79
S/. 29.66
S/. 345.67
S/. 71.06
S/. 192.00
S/. 144.00
S/. 862.00

S/. 56.11

S/. 828.10
S/. 84.16

S/. 9.20
S/. 17.79
S/. 29.66
S/. 345.67
S/. 71.06
S/. 192.00

S/. 828.10
S/. 28.05

S/. 433.77
S/. 1,268.87
S/. 630.38
S/. 13.69
S/. 1,384.71

Pgina 3

abril

S/. 481.87
S/. 26.44
S/. 60.30
S/. 433.88
S/. 801.30
S/. 1,108.55
S/. 258.10
S/. 1,432.22
S/. 1,779.35
S/. 1,889.36
S/. 1,503.00
S/. 258.27
S/. 169.94
S/. 44.03
S/. 853.91
S/. 536.01
S/. 1,603.42
S/. 305.40

S/. 433.88
S/. 801.30
S/. 1,108.55

S/. 218.14

marzo

S/. 433.77
S/. 1,268.87
S/. 630.38
S/. 13.69
S/. 1,384.71

CRONOGRAMA VALORIZADO DE OBRA


OBRA: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA INTEGRAL DE AGUA POTABLE Y SANEAMIENTO EN EL CENTRO POBLADO DE MARINTARI, DISTRITO DE SANTA ROSA, PROVINCIA LA MAR - AYACUCHO.
junio
Escalera de tubo fo. galv. con parantes de 1 1/2 " por peldaos de 3/4 "
Marco y tapa de plancha LAC 0,8x0,8 m con mecanismo de seguridad s/diseo
Marco y tapa de plancha LAC 1/4 " con mecanismo de seguridad de 0.50 x 0.40m segn diseo
Ventilacin con tubera de acero segn diseo 4 "
VARIOS
Pintado exterior c/teknomate o similar de reservorio apoyado incl. mensaje
Limpieza y desinfeccin de reservorios apoyados
Evacuacin del agua de prueba con empleo de la lnea de salida
Prueba hidrulica con empleo de la lnea de ingreso (captacin)
Vereda de concreto f'c 175 kg/cm2 e=10cm pasta 1:2 (P-I), c/empleo de mezcladora
INSTALACIONES HIDRULICAS
Suministro e instalacin de accesorios hidrulicos en reservorio y caseta
CERCO PERIMETRICO
Trazo y replanteo inicial para cerco perimetrico
Replanteo final de la obra, para cerco permetrico
Excavaciones en terreno normal a pulso hasta 1,00 m profundidad
Retiro + acomodo desmonte en zona aledaa terreno normal
Concreto f'c 175 kg/cm2 para cimientos de cerco
Encofrado (incl. habilitacin de madera) para cimientos
Eucalipto rolliso 4 " x 2.40 m
Alambre de pas N 14 galvanizado
Instalacin de cerco de alambre de pas con postes de eucalipto
LINEA DE ADUCCION Y RED DE DISTRIBUCION
TRABAJOS PRELIMINARES
Cerco de malla HDP de 1 m altura para lmite de seguridad de obra
Cartel de identificacin de la obra de 3,60 m x 2,40 m
Tranquera tipo caballete de 2,40 x 1,20m p/sealiz-protec.(prov. durante obra)
Letrero metlico 0,60 x 0,60 m s/poste p/desvo trnsito (prov. durante obra)
Puente de madera para pase peatonal sobre zanja s/d (prov. durante obra)
Puente de madera para pase vehicular sobre zanja s/d (prov. durante obra)
Trazo y replanteo inicial del proyecto, para lneas-redes con estacin total
Replanteo final de la obra, para lneas redes con estacin total
MOVIMIENTOS DE TIERRAS
Excavac. zanja (mq.) p/tub. terr-normal 1 1/2 "
Excavac. zanja (mq.) p/tub. terr-normal 63 - 90 mm
Excavac. zanja (mq.) p/tub. terr-normal 110 - 160mm
Refine y nivel de zanja terr-normal para tub. 1 1/2 "
Refine y nivel de zanja terr-normal para tub. 63 - 90 mm
Refine y nivel de zanja terr-normal para tub. 110 - 160 mm
Relleno comp.zanja(pulso) p/tub t-normal 1 1/2 "
Relleno comp.zanja(pulso) p/tub t-normal 63 - 90mm
Relleno comp.zanja(pulso) p/tub t-normal 110mm
Elimin. desmonte(carg+v) t-normal p/tub. 1 1/2 "
Elimin. desmonte(carg+v) t-normal p/tub. 63 - 90mm
Elimin. desmonte(carg+v) t-normal p/tub. 110mm
SUMINISTRO E INSTALACION DE TUBERA Y ACCESORIOS
Suministro e instalacin de tubera PVC SP PN 10 1 1/2 "
Suministro e instalacin de tubera PVC UF NTP ISO 1452 PN10 63mm
Suministro e instalacin de tubera PVC UF NTP ISO 1452 PN10 90mm
Suministro e instalacin de tubera PVC UF NTP ISO 1452 PN10 110mm
Suministro e instalacin de Vlvula de control
Suministro e in stalacin de Vlvula de purga
PRUEBAS
Prueba hidrulica de tubera agua potable (incl. desinfeccin) 1 1/2 " - 110mm
Pruebas de compactacin de suelos (proctor modificado y de control de compactacin - densidad de campo)
Prueba de calidad del concreto (prueba a la compresin)
CONEXIONES DOMICILIARIAS DE AGUA POTABLE
Trazo y replanteo inicial para conexin domiciliaria
Replanteo final de la obra para conexin domiciliaria
Excav. zanja (pulso) p/tub. terr-normal 1/2 " - 1 1/2 " hasta 1,00 m prof.
Refine y nivel de zanja terr-normal para tub. 1/2 " - 1 1/2 " para toda profund.
Relleno comp.zanja(pulso) p/tub t-normal 1/2 " - 1 1/2 " hasta 1,00 prof.
Elimin. desmonte(puls+v) t-normal p/tub. 1/2 " - 1 1/2 " para toda prof.
Tubera de PVC-U SP PN 10 1/2 " incl. elemento unin + 2% desperdicios
Instalacin de tubera PVC p/agua potab. 1/2 " - 3/4 " incluye prueba hidrulica
Abrazadera de termoplstico 1 1/2 " x 1/2 "
Abrazadera de termoplstico 63 x 1/2 "
Curva de PVC-U simple presin de 90 1/2 "
Codo de PVC-U simple presin de 45 1/2 "
Unin presin-rosca de PVC-U DN 15 - 20
Suministro de elementos de toma para conexion de agua 1/2 "
Sumin. elementos de control sin medidor p/conex.agua 1/2 " c/vlv.resina termoplst.c/niple telesc.salida auxiliar

julio

agosto

septiembre

octubre

noviembre

diciembre

enero

febrero

S/. 429.94
S/. 309.31
S/. 243.65
S/. 74.53
S/. 397.21

abril

Total
S/. 429.94
S/. 309.31
S/. 243.65
S/. 74.53
S/. 397.21
S/. 61.21
S/. 17.10
S/. 145.38
S/. 1,046.20

S/. 61.21
S/. 17.10
S/. 145.38
S/. 1,046.20
S/. 9,984.61

S/. 9,984.61

S/. 31.68

S/. 31.68
S/. 7.36
S/. 15.57
S/. 25.95
S/. 305.47
S/. 62.18
S/. 168.00
S/. 115.20
S/. 689.60

S/. 7.36
S/. 15.57
S/. 25.95
S/. 305.47
S/. 62.18
S/. 168.00
S/. 115.20
S/. 689.60

S/. 506.23

marzo

S/. 491.70

S/. 2,177.53

S/. 43.08
S/. 30.64
S/. 30.72
S/. 367.61
S/. 2,839.60

S/. 43.08
S/. 30.64
S/. 30.72
S/. 367.61

S/. 1,545.35

S/. 1,685.60
S/. 1,935.40
S/. 378.73

S/. 7,464.80
S/. 8,571.05
S/. 1,677.24
S/. 2,504.80
S/. 3,065.98
S/. 562.98
S/. 13,336.20
S/. 14,555.96
S/. 2,763.43
S/. 2,790.00
S/. 2,923.50
S/. 599.90

S/. 1,685.60
S/. 1,935.40
S/. 378.73
S/. 1,131.20
S/. 1,384.63
S/. 254.25
S/. 8,173.80
S/. 8,921.40
S/. 1,693.72
S/. 1,710.00
S/. 1,791.83
S/. 367.68

S/. 10,836.00
S/. 12,441.85
S/. 2,434.70
S/. 3,636.00
S/. 4,450.61
S/. 817.23
S/. 21,510.00
S/. 23,477.36
S/. 4,457.15
S/. 4,500.00
S/. 4,715.33
S/. 967.58

S/. 13,793.76
S/. 10,045.66
S/. 4,141.75
S/. 3,403.92
S/. 4,472.99

S/. 8,454.24
S/. 6,157.01
S/. 2,538.49
S/. 2,086.28
S/. 16,997.36
S/. 1,015.89

S/. 22,248.00
S/. 16,202.67
S/. 6,680.24
S/. 5,490.20
S/. 21,470.35
S/. 1,015.89

S/. 1,012.47

S/. 1,177.41

S/. 3,576.80

S/. 1,841.11
S/. 2,192.24

S/. 7,364.42

S/. 9,205.53
S/. 5,769.04
S/. 254.50

S/. 254.50
S/. 160.70

S/. 528.00
S/. 1,036.60
S/. 4,110.11
S/. 335.28
S/. 4,713.61
S/. 1,439.72
S/. 2,567.83
S/. 579.83
S/. 333.33
S/. 292.78
S/. 67.06
S/. 78.89
S/. 78.89
S/. 568.79
S/. 2,578.09

Pgina 4

S/. 14,385.39
S/. 1,173.47
S/. 16,497.64
S/. 5,039.03
S/. 8,987.42
S/. 2,029.42
S/. 1,166.67
S/. 1,024.72
S/. 234.69
S/. 276.11
S/. 276.11
S/. 1,990.76
S/. 9,023.31

S/. 4,214.58
S/. 1,518.70
S/. 86.16
S/. 61.28
S/. 61.44
S/. 735.22
S/. 2,839.60
S/. 1,177.41

S/. 688.70
S/. 1,036.60
S/. 18,495.50
S/. 1,508.75
S/. 21,211.25
S/. 6,478.75
S/. 11,555.25
S/. 2,609.25
S/. 1,500.00
S/. 1,317.50
S/. 301.75
S/. 355.00
S/. 355.00
S/. 2,559.55
S/. 11,601.40

CRONOGRAMA VALORIZADO DE OBRA


OBRA: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA INTEGRAL DE AGUA POTABLE Y SANEAMIENTO EN EL CENTRO POBLADO DE MARINTARI, DISTRITO DE SANTA ROSA, PROVINCIA LA MAR - AYACUCHO.
junio
Instalacin de abrazaderas p/conexin en tubera 1/2 " - 90
Instalacin de accesorios de P.V.C UF-SP 1/2 " - 1 1/2 "
Instalacin elementos de toma p/conexin agua 1/2 " - 1 "
Instalacin elementos de control para conexin agua 1/2 " - 1 "
Suministro de caja de concreto marco y tapa acero galv. con seguro para medidor 1/2 "
Construccin de losa de concreto f'c 175 kg/cm2 de 1 x 1 x 0,10 m
Instalacin de caja y tapa para medidor 1/2 " - 3/4 "
Pruebas de compactacin de suelos (proctor modificado y de control de compactacin - densidad de campo)
Prueba de calidad del concreto (prueba a la compresin)
Prueba hidrulica de tubera agua para potable (incl. desinfeccin) 1/2 " - 1 1/2 "
REDES DE ALCANTARILLADO
TRABAJOS PRELIMINARES
Cerco de malla HDP de 1 m altura para lmite de seguridad de obra
Cartel de identificacin de la obra de 3,60 m x 2,40 m
Tranquera tipo caballete de 2,40 x 1,20m p/sealiz-protec.(prov. durante obra)
Letrero metlico 0,60 x 0,60 m s/poste p/desvo trnsito (prov. durante obra)
Puente de madera para pase peatonal sobre zanja s/d (prov. durante obra)
Puente de madera para pase vehicular sobre zanja s/d (prov. durante obra)
Trazo y replanteo inicial del proyecto, para lneas-redes con estacin total
Replanteo final de la obra, para lneas redes con estacin total
Limpieza y desbroce
MOVIMIENTOS DE TIERRAS
Excavac. zanja (mq.) p/tub. terr-normal DN 110 - 160 hasta 1,50 m prof.
Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 hasta 1,50 m prof.
Refine y nivel de zanja terr-normal para tub. DN 110 - 160 para toda profund.
Refine y nivel de zanja terr-normal para tub. DN 200 - 250 para toda profund.
Relleno comp.zanja(pulso) p/tub t-normal DN 110 - 160 hasta 1,50 m prof.
Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 hasta 1,50 m prof.
Elimin. desmonte(carg+v) t-normal p/tub. DN 110 - 160 para toda prof.
Elimin. desmonte(carg+v) t-normal p/tub. DN 200 - 250 para toda prof.
SUMINISTRO E INSTALACION DE TUBERA
Suministro e instalacin de tubera PVC UF NTP ISO 4435 SN2 160
Suministro e instalacin de tubera PVC UF NTP ISO 4435 SN2 DN 200
PRUEBA HIDRAULICA
Prueba hidrulica de tubera p/desague 160 - 200mm
Prueba hidrulica de tubera existentes p/desague 200
BUZONES Y BUZONETAS
Buzn I t. normal a pulso hasta 1,50 m profundidad (encofrado interior)
Buzn I t. normal a pulso hasta 2,00 m profundidad (encofrado interior)
Buzn I t. normal a pulso hasta 2,50 m profundidad (encofrado interior)
Buzn I t. normal a pulso hasta 3,00 m profundidad (encofrado interior)
Buzn I t. normal a pulso hasta 3,50 m profundidad (encofrado interior)
Buzn I t. normal a pulso hasta 5,00 m profundidad (encofrado interior)
Buzonete en terreno normal a pulso hasta 1,50 m profundidad
Reconstruccin de buzn I t-normal, a pulso
EMPALMES Y PRUEBAS
Empalmes de tuberas DN 200 a 250 buzn existente en servicio
Pruebas de compactacin de suelos (proctor modificado y de control de compactacin - densidad de campo)
Prueba de calidad del concreto (prueba a la compresin)
CONEXIONES DOMICILIARIAS DE ALCANTARILLADO
Trazo y replanteo inicial para conexin domiciliaria
Replanteo final de la obra para conexin domiciliaria
Excav. zanja (pulso) p/tub. terr-normal 110 - 160 hasta 1,25 m prof.
Refine y nivel de zanja terr-normal para tub. 110 - 160 para toda profund.
Relleno comp.zanja(pulso) p/tub t-normal 110 - 160 hasta 1,25 m prof.
Elimin. desmonte(puls+v) t-normal p/tub. 110 - 160 para toda prof.
Tubera PVC-U UF NTP ISO 4435 serie 25 DN 160 incl. anillo + 2% desperdicios
Instalacin de tubera de PVC p/desage DN 160 incluye prueba hidrulica
Suministro de elemento de empotramiento de tubera de PVC-U DN 150
Instalacin de elemento de empotramiento de tubera PVC-U DN 150 a 200
Suministro de caja de concreto simple y tapa concreto armado de 0,30 m x 0,60 m
Instalacin de caja y tapa de registro de 0,30 m x 0,60 m en terreno normal
Prueba de compactacin de suelos (procto modif densidad campo)
Prueba de calidad del concreto (prueba a la compresin)
Prueba hidrulica de tubera p/desague DN 150
CONEXIONES DOMICILIARIAS CON SISTEMA INDIVIDUAL DE TRATAMIENTO
Trazo y replanteo inicial para conexin domiciliaria
Replanteo final de la obra para conexin domiciliaria
Excavaciones de estructuras t-normal a pulso
Refine, nivelacin y compactacin en terreno normal a pulso
Relleno con material propio
Concreto f'c 175 kg/cm2

julio

agosto

septiembre

octubre
S/. 362.10
S/. 364.47
S/. 343.96
S/. 343.96
S/. 15,004.67
S/. 5,054.41
S/. 3,659.66
S/. 744.95

noviembre
S/. 1,267.35
S/. 1,275.63
S/. 1,203.84
S/. 1,203.84
S/. 52,516.33
S/. 17,690.44
S/. 12,808.79
S/. 2,607.33
S/. 509.00

diciembre

enero

S/. 546.70

S/. 363.44

S/. 1,609.54

S/. 43.08
S/. 30.64
S/. 30.72
S/. 367.61
S/. 1,803.53

S/. 43.08
S/. 30.64
S/. 30.72
S/. 367.61

febrero

marzo

abril

S/. 1,796.30

S/. 363.44

S/. 1,518.70

S/. 673.04

S/. 74.78

S/. 23,213.06

Total
S/. 1,629.45
S/. 1,640.10
S/. 1,547.80
S/. 1,547.80
S/. 67,521.00
S/. 22,744.85
S/. 16,468.45
S/. 3,352.28
S/. 509.00
S/. 2,343.00

S/. 2,336.42
S/. 1,518.70
S/. 86.16
S/. 61.28
S/. 61.44
S/. 735.22
S/. 1,803.53
S/. 747.82
S/. 23,213.06

S/. 1,910.20
S/. 1,301.20
S/. 165.43
S/. 199.96
S/. 4,143.11
S/. 2,842.94
S/. 577.69
S/. 624.66

S/. 8,459.47
S/. 5,762.47
S/. 732.63
S/. 885.55
S/. 18,348.07
S/. 12,590.15
S/. 2,558.36
S/. 2,766.37

S/. 1,910.20
S/. 1,301.20
S/. 165.43
S/. 199.96
S/. 7,102.48
S/. 4,873.61
S/. 990.33
S/. 1,070.85

S/. 12,279.87
S/. 8,364.87
S/. 1,063.49
S/. 1,285.47
S/. 29,593.66
S/. 20,306.70
S/. 4,126.38
S/. 4,461.88

S/. 7,715.81
S/. 6,956.65

S/. 34,170.02
S/. 30,808.02

S/. 7,715.81
S/. 6,956.65

S/. 49,601.64
S/. 44,721.32

S/. 6,179.19
S/. 2,180.16

S/. 6,179.19
S/. 2,180.16

S/. 32,328.83

S/. 31,285.96
S/. 12,202.05
S/. 10,796.28
S/. 21,877.17
S/. 9,250.56
S/. 5,834.17
S/. 7,234.32
S/. 24,842.62

S/. 63,614.79
S/. 12,202.05
S/. 10,796.28
S/. 21,877.17
S/. 9,250.56
S/. 5,834.17
S/. 7,234.32
S/. 24,842.62

S/. 2,271.75
S/. 144.22

S/. 879.39
S/. 254.50

S/. 4,988.17
S/. 512.98

S/. 312.34

S/. 4,988.17
S/. 3,664.12
S/. 509.00

S/. 110.28

S/. 356.96
S/. 906.66
S/. 14,402.91
S/. 804.08
S/. 12,964.03
S/. 5,007.87
S/. 22,330.85
S/. 2,341.71
S/. 3,198.69
S/. 7,090.36
S/. 36,236.50
S/. 16,037.52
S/. 6,634.99
S/. 50.90

S/. 13,776.69
S/. 769.12
S/. 12,400.37
S/. 4,790.13
S/. 21,359.95
S/. 2,239.89
S/. 3,059.61
S/. 6,782.09
S/. 34,661.00
S/. 15,340.23
S/. 6,346.51
S/. 169.67

S/. 33.93
S/. 3,629.40

S/. 19.40
S/. 29.20
S/. 359.20
S/. 33.30
S/. 69.70
S/. 980.77

Pgina 5

S/. 100.74

S/. 669.30
S/. 1,007.40
S/. 28,179.60
S/. 1,573.20
S/. 25,364.40
S/. 9,798.00
S/. 43,690.80
S/. 4,581.60
S/. 6,258.30
S/. 13,872.45
S/. 70,897.50
S/. 31,377.75
S/. 12,981.50
S/. 254.50
S/. 3,629.40
S/. 19.40
S/. 29.20
S/. 359.20
S/. 33.30
S/. 69.70
S/. 980.77

CRONOGRAMA VALORIZADO DE OBRA


OBRA: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA INTEGRAL DE AGUA POTABLE Y SANEAMIENTO EN EL CENTRO POBLADO DE MARINTARI, DISTRITO DE SANTA ROSA, PROVINCIA LA MAR - AYACUCHO.
junio
Tarrajeo acabado y pulido en conexiones
Suministro y accesorios para conexin domiciliarias desague
EMISOR
Trazo y replanteo inicial del proyecto, para lneas-redes con estacin total
Replanteo final de la obra, para lneas redes con estacin total
Limpieza y desbroce
Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 hasta 1,50 m prof.
Refine y nivel de zanja terr-normal para tub. DN 200 - 250 para toda profund.
Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 hasta 1,50 m prof.
Elimin. desmonte(carg+v) t-normal p/tub. DN 200 - 250 para toda prof.
Tubera PVC-U UF NTP ISO 4435 SN 2 DN 200 incl. anillo + 2% desperdicios
Instalacin de tubera de PVC p/desage DN 200 incluye prueba hidrulica
Prueba hidrulica de tubera existentes p/desague 200
Buzn I t. normal a pulso hasta 1,50 m profundidad (encofrado interior)
Buzn I t. normal a pulso hasta 2,00 m profundidad (encofrado interior)
Buzn I t. normal a pulso hasta 2,50 m profundidad (encofrado interior)
Buzn I t. normal a pulso hasta 3,00 m profundidad (encofrado interior)
Buzn I t. normal a pulso hasta 3,50 m profundidad (encofrado interior)
Pruebas de compactacin de suelos (proctor modificado y de control de compactacin - densidad de campo)
Prueba de calidad del concreto (prueba a la compresin)
LAGUNAS DE ESTABILIZACION
Construccin provisional para almacn, depsito del campamento (rea=12,96 m2)
Construccin provisional para guardiana (rea=2,88 m2)
Movilizacin y Desmovilizacin de maquinaria y herramientas para la obra
Limpieza y desbroce
Trazo y replanteo inicial en Planta de Tratamiento
Replanteo colocacin de puntos y plantillas
Habilitacin de va de acceso a laguna de estabilizacin
Excavacin masiva a maquina
Excavaciones masiva para conformacin de terraplenes y taludes
Refine de talud y fondo de laguna de estabilizacin
Provisin y colocado de geomembrana de HDPE e=1.00mm en fondo de laguna
Provisin y colocado de geomembrana de HDPE e=1.00mm en paredes interiores de laguna
Relleno con material propio
Eliminacin de desmonte en terreno normal con maquinaria
CAMARA DE REJAS, MEDIDOR DE CAUDAL Y DESARENADOR
Trazo y replanteo
Excavaciones en terreno normal a pulso
Refine, nivelacin y compactacin en terreno normal a pulso
Eliminacin de desmonte en terreno normal a pulso
Concreto 1:8 para solados y/o sub bases (Cemento P-I)
Concreto f'c 210 kg/cm2 para muros reforzados (Cemento P-I)
Encofrado (incl. habilitacin de madera) para muros rectos
Acero estruc. trabajado p/muro reforzado (costo prom. incl. desperdicios)
Tarrajeo con impermeabilizante de muros
Tarrajeo exterior con mortero 1:5x1,5 cm
Rejilla metlica de 1/4 " x 1 " espaciamiento de 1 " de 0.40 x 1.00m
Provisin y colocado de compuerta de PVC tipo tarjeta de 0.66x0.63m e=25mm
Provisin y colocado de compuerta de PVC tipo tarjeta de 0.66x0.80m e=25mm
ESTRUCTURA PARA DISTRIBUCION DE CAUDALES
Trazo y replanteo
Excavaciones en terreno normal a pulso
Concreto f'c 210 kg/cm2 para muros reforzados (Cemento P-I)
Encofrado (incl. habilitacin de madera) para muros rectos
Acero estruc. trabajado p/muro reforzado (costo prom. incl. desperdicios)
Provisin y colocado de compuerta de PVC tipo tarjeta de 0.56x0.43m e=25mm
Tarrajeo con impermeabilizante de muros
Tarrajeo exterior con mortero 1:5x1,5 cm
ESTRUCTURA DE ENTRADA Y SALIDA
Trazo y replanteo
Excavaciones en terreno normal a pulso
Refine, nivelacin y compactacin en terreno normal a pulso
Cama de apoyo de e=10cm
Suministro e instalacin de tubera PVC UF NTP ISO 4435 SN2 DN 200, ingreso y salida
Relleno compactado con material de prstamo seleccionado (incl. provisin)
Prueba hidrulica de tubera existentes p/desague 200
Vlvula cpta. CC, fo.fdo. cierre elst. vstago acero inoxidable DN 200
Concreto f'c 210 kg/cm2 para estructura de salida
Encofrado (incl. habilitacin de madera) para estructura de salida
Acero estruc. trabajado p/estructura de salida
Tarrajeo con impermeabilizante de muros
Tarrajeo exterior con mortero 1:5x1,5 cm (incluye columnas empotradas)

julio

agosto

septiembre

octubre

noviembre

diciembre

enero

febrero

marzo

abril

S/. 236.88
S/. 909.50
S/. 1,013.05

S/. 407.20

S/. 1,013.05
S/. 420.05
S/. 13,021.84
S/. 13,931.26
S/. 1,818.84
S/. 32,422.80
S/. 6,313.22
S/. 58,268.78
S/. 5,008.40
S/. 3,795.84
S/. 22,572.99
S/. 4,880.82
S/. 8,097.21
S/. 15,626.55
S/. 9,250.56
S/. 2,026.96
S/. 407.20

S/. 94,550.00
S/. 94,550.00
S/. 2,032.80
S/. 3,708.90

S/. 407.94
S/. 193.78
S/. 2,872.89
S/. 23,688.00
S/. 3,816.00
S/. 22,662.84
S/. 5,735.00
S/. 72,792.00
S/. 6,360.00
S/. 113,967.68
S/. 94,550.00
S/. 94,550.00
S/. 2,032.80
S/. 7,058.88

S/. 420.05
S/. 13,021.84
S/. 8,010.47
S/. 1,045.83
S/. 18,643.11
S/. 3,630.10
S/. 33,504.55
S/. 2,879.83

S/. 1,554.00

S/. 326.35

S/. 5,920.79
S/. 773.01
S/. 13,779.69
S/. 2,683.12
S/. 24,764.23
S/. 2,128.57
S/. 3,795.84
S/. 22,572.99
S/. 4,880.82
S/. 8,097.21
S/. 15,626.55
S/. 9,250.56
S/. 472.96

S/. 81.59
S/. 193.78
S/. 2,872.89
S/. 23,688.00
S/. 3,816.00
S/. 22,662.84

S/. 5,735.00
S/. 22,006.88

S/. 50,785.12
S/. 6,360.00
S/. 113,967.68

S/. 3,349.98
S/. 151.41
S/. 593.04
S/. 25.88
S/. 1,701.50
S/. 591.44
S/. 3,567.75
S/. 2,916.69
S/. 4,129.13
S/. 1,184.53

S/. 107.29
S/. 137.29

S/. 151.41
S/. 593.04
S/. 25.88
S/. 1,701.50
S/. 591.44
S/. 3,567.75
S/. 2,916.69
S/. 4,129.13
S/. 1,579.37
S/. 942.42
S/. 624.74
S/. 214.58
S/. 274.58

S/. 394.84
S/. 942.42
S/. 624.74
S/. 107.29
S/. 137.29

S/. 45.06
S/. 96.58
S/. 647.79
S/. 619.87
S/. 768.93
S/. 174.58
S/. 346.17
S/. 34.15

S/. 45.06
S/. 96.58
S/. 647.79
S/. 619.87
S/. 768.93
S/. 174.58
S/. 346.17
S/. 34.15
S/. 3,443.50
S/. 5,228.07
S/. 283.96
S/. 2,652.80
S/. 7,681.60
S/. 15,310.40

Pgina 6

Total
S/. 236.88
S/. 909.50

S/. 3,979.20
S/. 11,522.40
S/. 22,965.60
S/. 1,152.00
S/. 3,200.00
S/. 1,683.27
S/. 2,238.11
S/. 3,193.49
S/. 1,249.99
S/. 123.10

S/. 3,443.50
S/. 5,228.07
S/. 283.96
S/. 6,632.00
S/. 19,204.00
S/. 38,276.00
S/. 1,152.00
S/. 3,200.00
S/. 1,683.27
S/. 2,238.11
S/. 3,193.49
S/. 1,249.99
S/. 123.10

CRONOGRAMA VALORIZADO DE OBRA


OBRA: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA INTEGRAL DE AGUA POTABLE Y SANEAMIENTO EN EL CENTRO POBLADO DE MARINTARI, DISTRITO DE SANTA ROSA, PROVINCIA LA MAR - AYACUCHO.
junio
ESTRUCTURA PARA REUNION DE CAUDALES
Trazo y replanteo
Excavaciones en terreno normal a pulso
Acarreo de material excedente hasta D prom = 30 m
Concreto f'c 210 kg/cm2 para muros
Encofrado (incl. habilitacin de madera) para reunin de caudales
Acero estruc. trabajado p/reunin de caudales
Tarrajeo con impermeabilizante de muros
Tarrajeo exterior con mortero 1:5x1,5 cm
ESTRUCTURA PARA DEMASIAS
Trazo y replanteo
Excavaciones en terreno normal a pulso
Acarreo de material excedente hasta D prom = 30 m
Concreto f'c 210 kg/cm2 para muros
Encofrado (incl. habilitacin de madera) para reunin de caudales
Acero estruc. trabajado p/reunin de caudales
Tarrajeo con impermeabilizante de muros
Tarrajeo exterior con mortero 1:5x1,5 cm
CERCO DE PROTECCION
Excavaciones en terreno normal a pulso hasta 1,00 m profundidad
Retiro + acomodo desmonte en zona aledaa terreno normal
Concreto f'c 175 kg/cm2 para cimientos de cerco
Eucalipto rolliso 4 " x 2.40 m
Alambre de pas N 14 galvanizado
Instalacin de cerco de alambre de pas con postes de eucalipto
PLAN DE MANEJO AMBIENTAL
Reforestacin de taludes (suministro de rboles)
Conformacin de comits de mantenimiento
Eventos de capacitacin (charla a trabajadores)
Eventos de capacitacin para operacin y mantenimiento
Restauraciones (limpieza del rea de trabajo)
Riesgos de salud (implementacin de botiqun)
FLETES
Flete terrestre para planta de tratamiento
Flete rural para planta de tratamiento
SISTEMA DE DRENAJE
Trazo y replanteo inicial del proyecto
Excavaciones en terreno normal con cargador retroexcavador 0,75-1,60 yd3
Entibado de zanjas
Suministro e instalacin de tubera PVC UF NTP ISO 4435 SN 4 DN 200 con orificios
Suministro e instalacin de tubera PVC UF NTP ISO 4435 SN 4 DN 200
Suministro e instalacin de tubera PVC UF NTP ISO 4435 SN 4 DN 160
Provisin y colocacin de material de prstamo piedra grava de 1 1/2 " - 2 1/2 "
Provisin y colocacin de material de prstamo piedra grava de 2 1/2 " - 3 1/2 "
Relleno con material propio y compactacin
Acarreo de material excedente hasta D prom = 30 m
Codo PVC SAL P de 90 x 200mm
Codo PVC SAL P de 45 x 200mm
Codo PVC SAL P de 90 x 160mm
Tee PVC SAP de 200mm
Tee PVC SAP de 160mm
Reduccin de PVC 200 a 160mm
Instalacin de accesorios de P.V.C UF-SP DN 200 - 250
Concreto f'c 140 kg/cm2 para anclajes de accesorios DN 200 - 250
Provisin y colocado de registro de bronce 6 "
Provisin y colocado de sumidero de bronce 6 "
Pantalla de geomembrana HDPE espesor 1.00 mm
SISTEMA DE TRATAMIENTO PARA CONEXIONES INDIVIDUALES
Sistema de desage con tratamiento individual
CASETA PARA PERSONAL DE JASS
Trazo y replanteo inicial del proyecto
Replanteo final de la obra
Excavaciones en terreno normal a pulso
Concreto 1:10 + 30% piedra grande para cimiento corrido (Cemento P-I)
Encofrado (incl. habilitacin de madera) para sobrecimientos
Piso de 2 " concreto f'c 140 kg/cm2 de 4 cm + pulido con mortero 1:2 x 1 cm
Concreto f'c 175 kg/cm2 para cimientos reforzados (Cemento P-I)
Encofrado (incl. habilitacin de madera) para cimientos reforzados
Acero estruc. trabajado p/cimiento ref. (costo prom. incl. desperdicios)
Concreto f'c 210 kg/cm2 para columnas (Cemento P-I)
Encofrado (incl. habilitacin de madera) para columnas
Acero estruc. trabajado para columnas (costo prom. incl. desperdicios)

julio

agosto

septiembre

octubre

noviembre

diciembre

enero

febrero

marzo

abril

S/. 16.22
S/. 48.86
S/. 51.85
S/. 572.93
S/. 514.21
S/. 662.75
S/. 287.01
S/. 28.37

S/. 12.18
S/. 24.00
S/. 27.56
S/. 293.81
S/. 252.64
S/. 274.27
S/. 154.83
S/. 71.60

S/. 12.18
S/. 24.00
S/. 27.56
S/. 293.81
S/. 252.64
S/. 274.27
S/. 154.83
S/. 71.60
S/. 284.66
S/. 268.56
S/. 4,630.35
S/. 1,728.00
S/. 259.80
S/. 9,331.15

S/. 333.33

S/. 250.00
S/. 2,166.67

S/. 857.14

S/. 642.86

S/. 100,000.00

S/. 20,000.00
S/. 21,666.67

S/. 284.66
S/. 268.56
S/. 4,630.35
S/. 1,728.00
S/. 259.80
S/. 9,331.15

S/. 5,363.33

S/. 2,681.67

S/. 32,766.67

S/. 16,383.33

S/. 1,250.00
S/. 3,333.33

S/. 16,666.67

S/. 40,480.61
S/. 3,069.00
S/. 9,088.27
S/. 5,808.87
S/. 1,334.40
S/. 918.32
S/. 9,055.31
S/. 9,055.31
S/. 1,580.76
S/. 2,615.22
S/. 65.80
S/. 264.00
S/. 127.50
S/. 322.50
S/. 49.50
S/. 370.00
S/. 221.12
S/. 1,731.68
S/. 500.32
S/. 182.30
S/. 8,865.53

S/. 28,700.00

S/. 28,700.00

S/. 8.14
S/. 12.52
S/. 60.43
S/. 343.77
S/. 131.76
S/. 187.60
S/. 104.50
S/. 199.48
S/. 413.05
S/. 161.95
S/. 300.00
S/. 666.49

S/. 8,045.00
S/. 1,500.00
S/. 2,500.00
S/. 20,000.00
S/. 49,150.00
S/. 1,500.00
S/. 120,000.00
S/. 25,000.00

S/. 3,333.33
S/. 40,480.61
S/. 3,069.00
S/. 9,088.27
S/. 5,808.87
S/. 1,334.40
S/. 918.32
S/. 9,055.31
S/. 9,055.31
S/. 1,580.76
S/. 2,615.22
S/. 65.80
S/. 264.00
S/. 127.50
S/. 322.50
S/. 49.50
S/. 370.00
S/. 221.12
S/. 1,731.68
S/. 500.32
S/. 182.30
S/. 8,865.53

Pgina 7

Total

S/. 16.22
S/. 48.86
S/. 51.85
S/. 572.93
S/. 514.21
S/. 662.75
S/. 287.01
S/. 28.37

S/. 8.14
S/. 12.52
S/. 60.43
S/. 343.77
S/. 131.76
S/. 187.60
S/. 104.50
S/. 199.48
S/. 413.05
S/. 161.95
S/. 300.00
S/. 666.49

CRONOGRAMA VALORIZADO DE OBRA


OBRA: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA INTEGRAL DE AGUA POTABLE Y SANEAMIENTO EN EL CENTRO POBLADO DE MARINTARI, DISTRITO DE SANTA ROSA, PROVINCIA LA MAR - AYACUCHO.
junio
Concreto f'c 210 kg/cm2 para losas macizas (Cemento P-I)
Muros de ladrillo king kong de arcilla de soga con mortero 1:4 x 1,5 cm
Contrazcalo de cemento pulido + ocre con mortero 1:5 de 2 cm x 0,20 m
Tarrajeo exterior con mortero 1:5x1,5 cm (incluye columnas empotradas)
Tarrajeo interior con mortero 1:5x1,5 cm (incluye columnas empotradas)
Suministro y colocacin de accesorios para caseta personal JASS
Puerta metlica segn diseo
Prueba de calidad del concreto (prueba a la compresin)
Pruebas de compactacin de suelos (proctor modificado y de control de compactacin - densidad de campo)
FLETE PARA LA OBRA
Flete terrestre para obra
Flete rural a pie de obra
MITIGACION DE IMPACTO AMBIENTAL
Mitigacin e Impacto Ambiental
EDUCACION SANITARIA
Capacitacin de la JASS
Capacitacin en hbitos de higiene con dramatizaciones teatrales
FIN
Total

julio

agosto

septiembre

octubre

noviembre
S/. 207.94
S/. 712.51

diciembre

enero

febrero

marzo

abril

S/. 779.60

Total
S/. 207.94
S/. 712.51
S/. 70.74
S/. 470.11
S/. 553.40
S/. 3,800.00
S/. 1,200.00
S/. 1,527.00
S/. 779.60

S/. 4,814.81

S/. 35,000.06
S/. 25,999.99

S/. 70.74
S/. 470.11
S/. 553.40
S/. 3,800.00
S/. 1,200.00
S/. 1,527.00

S/. 4,057.98
S/. 1,444.44

S/. 7,862.33
S/. 4,975.31

S/. 7,862.33
S/. 4,975.31

S/. 7,608.71
S/. 4,814.81

S/. 7,608.71
S/. 4,975.31

S/. 11,049.50

S/. 67,379.90

S/. 333,176.99

S/. 406,116.44

S/. 431,367.91

Pgina 8

S/. 710,907.28

S/. 727,965.56

S/. 431,529.90

S/. 11,049.50

S/. 212,833.71

S/. 10,336.63

S/. 3,564.36

S/. 35,999.99

S/. 16,666.67
S/. 26,666.67

S/. 8,333.33
S/. 13,333.33

S/. 25,000.00
S/. 40,000.00

S/. 112,125.40

S/. 44,904.11

S/. 3,478,307.20