CODIGO ACTIVIDAD

DESCRIPCION DE LA PARTIDA

LIMPIEZA DE TERRENO TOTAL

TRAZO Y REPLANTEO TOTAL

ELIMINACION MATERIAL EXCEDENTE TOTAL

EXCAVACION DE ZANJAS "A"

NIVELACION INTERIOR Y APISONADO "A"

CIMIENTOS CORRIDOS : CONCRETO F'C = 100 KG/CM2 + 30% DE P.G. "A"

SUBCIMIENTOS "A"

SOBRECIMIENTOS : CONCRETO F'C = 140 KG/CM2 "A"

SOBRECIMIENTOS : ENCOFRADO Y DESENCOFRADO "A"

10

FALSO PISO "A"

11

VIGA CIMENTACION : CONCRETO F'C = 210 KG/CM2 "A"

12

VIGA CIMENTACION : ACERO FY = 4200 KG/CM2 "A"

13

SOBRECIMIENTO ARMADO : CONCRETO F'C = 210 KG/CM2 "A"

14

SOBRECIMIENTO ARMADO : ENCOFRADO Y DESENCOFRADO "A"

15

SOBRECIMIENTO ARMADO : ACERO FY = 4200 KG/CM2 "A"

HOJA DE PROGRAMACION
METRADO Y CUADRILLA UNITARIA
UND.

CANT.

CAP

M2

145.53

0.1

M3

76.87

0.1

M3

59.13

0.1

M2

74.97

0.1

M3

57.83

0.1

M3

0.83

M3
M2

OPER

OFIC

PEON

MEZCL

VIBRAD

WINCHE

VOLQ

2
1

Ru

Tu

45

3.23

16

4.80

14.78

110

0.68

25

2.31

0.1

25

0.03

2.78

0.1

11

0.25

37.1

0.1

16

2.32

M2

120.19

0.1

120

1.00

M3

1.24

0.1

20

0.06

KG

21

0.1

250

0.08

M3

6.74

0.1

25

0.27

M2

64.87

0.1

10

6.49

KG

586

0.1

250

2.34

TIEMPOS
fm

dij

fm

dij
1

3.23

1.0

4.8

1.0

4.93

3.0

0.68

1.0

1.16

2.0

0.03

1.1

0.25

1.0

1.16

2.0

1.0

0.06

1.0

0.08

1.1

0.27

1.0

6.49

1.0

2.34

1.0

H
CODIGO ACTIVIDAD

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
38
39
40
41
42
43
44
45

46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93

94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141

142
143
144
145
146
147
148
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190

191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225

HOJA DE P
DESCRIPCION DE LA PARTIDA

MOVILIZACION DE EQUIPOS Y HERRAMIENTAS


CARTEL DE OBRA
CERCO PROVICIONAL DE ESTERAS
CASETA PARA OFICINAS
TRAZO DE NIVELES Y REPLANTEO
CORTE CON EQUIPO EN TERRENO NORMAL
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ELIMINCACION DE MATERIAL EXCEDENTE
LIMPIEZA MANUAL DE TERRENO
EXCAVACION DE ZANJA 1RA FILA DE CALZADURA "A"
EXCAVACION DE PIQUES NRO 1, 2, 3, 4 "A"
ENCOFRADO DE CALZADURAS "A"
COLOCACION DE CONCRETO EN CALZADURA "A"
DESENCOFRADO DE CALZADURA "A"
CURADO DE CONCRETO CALZADURA "A"
EXCAVACION DE PIQUES NRO 5, 6, 7, 8 "A"
ENCOFRADO DE CALZADURAS "A"
COLOCACION DE CONCRETO EN CALZADURA "A"
DESENCOFRADO DE CALZADURA "A"
CURADO DE CONCRETO CALZADURA "A"
EXCAVACION DE ZANJA 2DA FILA DE CALZADURA "A"
EXCAVACION DE PIQUES NRO 1, 2, 3, 4, 9 "A"
ENCOFRADO DE CALZADURAS "A"
COLOCACION DE CONCRETO EN CALZADURA "A"
DESENCOFRADO DE CALZADURA "A"
CURADO DE CONCRETO CALZADURA "A"
EXCAVACION DE PIQUES NRO 5, 6, 7, 8 "A"
ENCOFRADO DE CALZADURAS "A"
COLOCACION DE CONCRETO EN CALZADURA "A"
DESENCOFRADO DE CALZADURA "A"
CURADO DE CONCRETO CALZADURA "A"
EXCAVACION MASIVA A MAQUINA EN TERRENO NORMAL CON RETRO "A"
EXCAVACION PARA ZAPATAS "A"
COLOCACION DE CONCRETO SOLADOS "A"
EXCAVACION PARA CIMENTACION "A"
COLOCACION DE CONCRETO CIMIENTO CORRIDO "A"
COLOCACION DE ACERO ZAPATA E IZAJE DE COLUMNAS "A"
ENCOFRADO ZAPATA "A"
COLOCACION ACERO MURO REFORZADO "A"
COLOCACION CONCRETO ZAPATA "A"
DESENCOFRADO DE ZAPATA "A"
COLOCACION ACERO EN VIGA DE CIMENTACION "A"
ENCOFRADO DE VIGA DE CIMENTACION "A"
COLOCACION CONCRETO VIGA DE CIMENTACION "A"

DESENCOFRADO VIGA DE CIMENTACION "A"


ENCOFRADO DE SOBRECIMIENTOS "A"
COLOCACION DE CONCRETO SOBRECIMIENTOS "A"
DESENCOFRADO DE SOBRECIMIENTOS "A"
MURO PORTANTES LADRILLO KK EJES 2 Y 3 "A"
ENCOFRADO DE COLUMNAS DE CONFINAMIENTO "A"
COLOCACION DE CONCRETO EN COLUMNAS DE CONFINAMIENTO "A"
DESENCOFRADO DE COLUMNAS DE CONFINAMIENTO "A"
ENCOFRADO DE COLUMNAS "A"
COLOCACION DE CONCRETO EN COLUMNAS "A"
DESENCOFRADO COLUMNAS "A"
ENCOFRADO MURO REFORZADO "A"
COLOCACION DE CONCRETO MURO REFORZADO "A"
DESENCOFRADO DE MURO REFORZADOS "A"
ENCOFRADOS DE VIGAS
COLOCACION DE CONCRETO VIGAS
ENCOFRADO TECHO SECTOR "A"
COLOCACION DE LADRILLO DE TECHO "A"
COLOCACION DE ACERO TECHO "A"
INSTALACIONES ELECTRICAS Y SANITARIAS "A"
COLOCACION DE CONCRETO TECHO "A"
CURADO TECHO "A"
DESENCOFRADO TECHO "A"
COLOCACION ACERO COLUMNAS "C"
MURO PORTANTES LADRILLO KK EJES 2 Y 3 "C"
ENCOFRADO DE COLUMNAS DE CONFINAMIENTO "C"
COLOCACION DE CONCRETO COLUMNAS DE CONFINAMIENTO" C"
DESENCOFRADO DE COLUMNAS DE CONFINAMIENTO "C"
ENCOFRADO DE COLUMNAS "C"
COLOCACION DE CONCRETO COLUMNAS "C"
DESENCOFRADO DE COLUMNAS "C"
EXCAVACION MANUALEN TERRENO NORMAL ZAPATA "B"
COLOCACION CONCRETO SUBZAPATA "B"
COLOCACION ACERO ZAPATAS E IZAJE DE COLUMNAS "B"
ENCOFRADO ZAPATAS "B"
COLOCACION CONCRETO ZAPATA "B"
DESENCOFRADO ZAPATA "B"
EXCAVACION MANUAL EN TERRENO NORMAL CIMENTACION "B"
COLOCACION CONCRETO CIMIENTO CORRIDO "B"
EXCAVACION PARA VIGA DE CIMENTACION "B"
COLOCACION ACERO VIGA DE CIMENTACION "B"
ENCOFRADO DE VIGA DE CIMENTACION "B"
COLOCACION CONCRETO VIGA DE CIMENTACION "B"
DESENCOFRADO VIGA DE CIMENTACION "B"
ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS "B"
COLOCACION CONCRETO SOBRECIMIENTO "B"
DESENCOFRADO SOBRECIMIENTO "B"
MUROS PORTANTES LADRILLO KK EJE 4 "B"

ENCOFRADO DE COLUMNAS DE CONFINAMIENTO "B"


COLOCACION DE CONCRETO COLUMNAS DE CONFINAMIENTO "B"
DESENCOFRADO COLUMNAS DE CONFINAMIENTO "B"
ENCOFRADO DE COLUMNAS Y PLACAS "B"
COLOCACION CONCRETO COLUMNAS Y PLACAS "B"
DESENCOFRADO DE COLUMNAS Y PLACAS "B"
ENCOFRADO DE TECHO "B"
ENCOFRADO TECHO "C"
COLOCACION DE LADRILLO TECHO "B" Y "C"
COLCACION DE ACERO TECHO "B" Y "C"
INSTALACIONES ELECTRICAS Y SANITARIAS "B" Y "C"
ENCOFRADOS DE VIGAS "B" Y "C"
COLOCACION DE CONCRETO VIGAS "B" Y "C"
COLOCACION DE CONCRETO LOSA "B" Y "C"
COLOCACION ACERO COLUMNAS "D"
MURO PORTANTES LADRILLO KK EJES 2 Y 3 "D"
ENCOFRADO DE COLUMNAS DE CONFINAMIENTO "D"
COLOCACION DE CONCRETO COLUMNAS DE CONFINAMIENTO" D"
DESENCOFRADO DE COLUMNAS DE CONFINAMIENTO "D"
ENCOFRADO DE COLUMNAS Y PLACAS "D"
COLOCACION CONCRETO COLUMNAS Y PLACAS "D"
DESENCOFRADO DE COLUMNAS Y PLACAS "D"
ENCOFRADO TECHO "D"
COLOCACION DE LADRILLO TECHO "D"
COLCACION DE ACERO TECHO "D"
INSTALACIONES ELECTRICAS Y SANITARIAS "D"
ENCOFRADOS DE VIGAS "D"
COLOCACION DE CONCRETO VIGAS "D"
COLOCACION DE CONCRETO LOSA "D"
PARAPETO KK H=0.6 m "D"
COLOCACION DE ACERO EN COLUMNAS DE AZOTEA "D"
MURO KK AZOTEA "D"
ENCOFRADO DE COLUMNAS AZOTEA "D"
COLOCACION CONCRETO COLUMNAS AZOTEA "D"
ENCOFRADO TECHO ESCALERA AZOTEA
COLOCACION LADRILLO DE TECHO EN AZOTEA
COLOCACION ACERO TECHO DE AZOTEA
INSTALACIONES ELECTRICAS TECHO AZOTEA
COLOCACION CONCRETO TECHO DE AZOTEA
CURADO TECHO DE AZOTEA
ENCOFRADO DE ESCALERAS "A"
COLOCACION ACERO ESCALERAS "A"
COLOCACION CONCRETO ESCALERAS "A"
CURADO DE ESCALERAS "A"
DESENCOFRADO DE ESCALERAS "A"
ENCOFRADO DE ESCALERAS "C"
COLOCACION ACERO ESCALERAS "C"
COLOCACION CONCRETO ESCALERAS "C"

CURADO DE ESCALERAS "C"


DESENCOFRADO DE ESCALERAS "C"
ENCOFRADO DE ESCALERAS "D"
COLOCACION ACERO ESCALERAS "D"
COLOCACION CONCRETO ESCALERAS "D"
CURADO DE ESCALERAS "D"
DESENCOFRADO DE ESCALERAS "D"
TARRAJEO CIELO RASO MEZCLA 1:4 e=1.5 cm "A"
TARRAJEO EN INTERIORES ACABADO CON CEMENTO - ARENA "A"
TARRAJEO PRIMARIO RAYADO CON CEMENTO - ARENA "A"
VESTIDURA EN FONDO DE ESCALERA "A"
FORJADO Y REVESTIMIENTO DE GRADAS DE ESCALERA ACABAADO CEMENTO COLOREADO PULIDO "A"
DERRAME DE VANOS ANCHO APROX. 15 CM "A"
TRAZO Y REPLANTEO PRA LA INSTALACION DE TUBERIAS AGUA Y DESAGUE INTERIORES "A"
EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA 0.6m A=0.5m "A"
INSTALACION DE TUBERIAS DE AGUA Y DESAGUE "A"
RELLENO Y COMPACTACION DE ZANJA EN .t.n. hasta 0.6m A=0.5m "A"
EMPEDRADO 4" PARA FALSO PISO "A"
INSTALACION DE TUBERIAS ELECTRICAS POR EL PISO "A"
FALSO PISO e=4" (MEZCLA 1:10 C.H) "A"4
CAJA DE REGISTRO 12" x 24" TAPA DE CONCRETO "A"
ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MANUAL d<=30m "A"
PISO CERAMICO ANTIDESLIZANTE "A"
CONTRA ZOCALO DE CERAMICO ANTIDESLIZANTE h= 0.1m "A"
ENCHAPE CON MAYOLICA ANTIDESLIZANTE EN SS. HH. "A"
TARRAJEO EN CIELO RASO MEZCLA 1:4 e=1.5cm "B"
TARRAJEO EN INTERIORES ACABADO CON CEMENTO - ARENA "B"
TARRAJEO PRIMARIO RAYADO CON CEMENTO - ARENA "B"
TRAZO Y REPLANTEO PRA LA INSTALACION DE TUBERIAS AGUA Y DESAGUE INTERIORES "B"
EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA 0.6m A=0.5m "B"
INSTALACION DE TUBERIAS DE AGUA Y DESAGUE "B"
RELLENO Y COMPACTACION DE ZANJA EN .t.n. hasta 0.6m A=0.5m "B"
EMPEDRADO 4" PARA FALSO PISO "B"
INSTALACION DE TUBERIAS PARA INSTALACIONES ELECTRICAS "B"
FALSO PISO e=4" (MEZCLA 1:10 C.H) "B"
CAJA DE REGISTRO 12" x 24" TAPA DE CONCRETO "B"
ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MANUAL d<=30m "B"
PISO CERAMICO ANTIDESLIZANTE "B"
CONTRA ZOCALO DE CERAMICO ANTIDESLIZANTE h= 0.1m "B"
ENCHAPE CON MAYOLICA ANTIDESLIZANTE EN SS. HH. "B"
TARRAJEO EN CIELO RASO MEZCLA 1:4 e=1.5cm "C"
TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA "C"
TARRAJEO PRIMARIO RAYADO CON CEMENTO - ARENA "C"
VESTIDURA EN FONDO DE ESCALERA "C"
FORJADO Y REVESTIMIENTO DE GRADAS DE ESCALERA ACABAADO CEMENTO COLOREADO PULIDO "C"
INSTALACION DE TUBERIAS PARA INSTALACIONES ELECTRICAS "C"
CONTRAPISO E=4" (MEZCLA 1:10 C:H) "C"
PISO CERAMICO ANTIDESLIZANTE "C"

CONTRA ZOCALO DE CERAMICO ANTIDESLIZANTE h=0.10m "C"


ENCHAPE CON MAYOLICA ANTIDESLIZANTE EN SS.HH. "C"
TARRAJEO EN CIELO RASO MEZCLA 1:4 e=1.5cm "D"
TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA "D"
TARRAJEO PRIMARIO RAYADO CON CEMENTO - ARENA "D"
VESTIDURA EN FONDO DE ESCALERA "D"
FORJADO Y REVESTIMIENTO DE GRADAS DE ESCALERA ACABAADO CEMENTO COLOREADO PULIDO "D"
INSTALACION DE TUBERIAS PARA INSTALACIONES ELECTRICAS "D"
CONTRAPISO E=4" (MEZCLA 1:10 C:H) "D"
PISO CERAMICO ANTIDESLIZANTE "D"
CONTRA ZOCALO DE CERAMICO ANTIDESLIZANTE h=0.10m "D"
ENCHAPE CON MAYOLICA ANTIDESLIZANTE EN SS.HH. "D"
DERRAME DE VANOS ANCHO APROX. 15 CM "B"
DERRAME DE VANOS ANCHO APROX. 15 CM "C"
DERRAME DE VANOS ANCHO APROX. 15 CM "D"
TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA "AZOTEA"
DERRAME DE VANOS ANCHO APROX. 15cm "AZOTEA
COBERTURA CON LADRILLO PASTELERO ASENTADO C/MEZCLA C.A 1:5 "AZOTEA"
TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA
PINTURA LATEX EN INTERIORES Y CIELOS RASOS
VENTANAS METALICAS S/DISEO
MAMPARA METALICA VIDRIADA
PINTURA EN CARPINTERIA METALICA (2 MANOS ANTIC.+2 ESMALTE)
VIDRIO SEMIDOBLE PROVISION Y COLOCACION DE VENTANAS
DIVISIONES METALICAS EN SS HH s/DISEO / PUERTAS
PUERTAS METALICAS S/DISEO
PUERTA CONTRAPLACADA DE 45 mm TRIPLAY
CERRAJERIA
PINTURA EN CARPINTERIA DE MADERA AL BARNIZ
VIDRIO SEMIDOBLE PROVISION Y COLOCACION DE PUERTAS
PINTURA LATEX EN EXTERIORES
CLARABOYA METALICA C/CUBIERTA DE POLICARBONATO S/DISEO
COLOCACION DE APARATOS SANITARIOS (CORRRIENTES)
COLOCACION DE APARATOS SANITARIOS (PAPELERA, JABONERA, ETC)
TANQUE DE FIBRA DE VIDRIO S/PLANOS INCLUYE ACCESORIOS/INSTALACION

HOJA DE PROGRAMACION
METRADO Y CUADRILLA UNITARIA
UND.

CANT.

GBL

CAP

OPER

OFIC

PEON

UND

M2

210.1

M2

24

ML

926.4

0.1

M3

197.28

0.1

M3

164.72

0.1

M3

35.82

0.1

M2

926.4

M3

12.72

0.1

M3

2.5

0.1

M2

0.1

M3

2.5

10

5
2.5

0.1

M3

2.5

0.1

M2

0.1

10

M3

2.5

m2

m3

2.5

0.1

M3

12.72

0.1

M3

3.13

0.1

M2

6.25

0.1

M3

3.13

10

m2

6.25

m3

3.13

0.1

M3

2.5

0.1

M2

0.1

M3

2.5

10

m2

m3

2.5

0.1

M3

244.22

0.1

M3

45.8

0.1

M2

73.85

0.1

M3

15.26

0.1

M3

13.77

0.1

0.1

0.1

0.1

0.1

38.25

kg
M3

19.5

m2

38.25

kg

1
1

2
1

1
8

1
0.1

M2

10.5

0.1

M3

0.79

0.1

WINCHE

VOLQ

m3

M2

VIBRAD

m2

KG

MEZCL

M2

10.5

M2

8.52

0.1

M3

1.28

0.1

m2

8.52

M2

44.53

0.1

0.5

M2

9.36

0.1

M3

0.63

0.1

10

m2

9.36

M2

11.65

0.1

0.1

10

M3

6.13

m2

11.65

M2

266.28

0.1

M3

22.62

1.2

10

m2

266.28

M2

40.81

0.1

M3

4.39

0.1

M2

63.1

0.1

UND

460.7

0.1

0.1

kg
ml

67.5

M3

4.65

0.2

M3

4.65

0.1

m2

63.1

kg

10

12

0.1

M2

33.97

0.1

M3

1.96

0.1

10

m2

33.97

M2

93.67

0.1

0.1

10

M3

m2

93.67

M3

147.7

0.1

M3

60.85

0.1

0.1

89.3

0.1

M3

32.16

0.1

m2

89.3

M3

90.29

0.1

M3

67.71

0.1

kg

0.1

2
8

81.94

0.1

M3

1.24

0.1

M2

81.94

M2

61.98

0.1

0.1

0.5

0.1

M2

303.09

1
2

0.1

M2

0.5

M3

9.29

M2

61.98

0.1

M3

1
1

101.03

m2

M2

kg

M2

16.99

0.1

0.1

10

M3

0.98

m2

16.99

M2

187.34

0.1

M3

18.02

0.1

10

m2

187.34

M2

260.13

0.1

M2

79.87

0.1

UND

2890

0.1

0.1

kg

ml

348

M2

202.48

0.1

M3

25.32

0.1

10

M3

42.57

0.2

12

0.1

kg
M2

101.03

0.1

0.5

M2

33.97

0.1

0.1

10

M3

1.96

m2

33.97

M2

187.34

0.1

M3

18.02

0.1

10

m2

187.34

M2

79.87

0.1

UND

2890

0.1

0.1

kg

ml

344

M2

202.48

0.1

M3

25.32

0.1

10

M3

42.57

0.2

12

m2

49.56

0.1

0.5

KG

0.1

M2

18.9

0.1

M2

33.97

0.1

M3

1.96

0.1

M2

33.97

0.1

UND

2890

0.1

0.1

kg
ml

M3

42.57

0.2

m3

42.57

0.1

M2

14.85

0.1

0.1

KG
M3

2.21

0.1

M3

2.21

0.1

M2

14.85

M2

15.12

KG
M3

2.5

0.5

10

12
1

10
1

1
0.1

0.1

0.1

10

M3

2.5

M2

15.12

M2

14.88

0.1

1
1

0.1

0.1

2.41

0.1

M3

2.41

0.1

M2

14.88

M2

62

M2

35.35

M2

12.3

M2

6.03

0.1

M2

10

0.1

0.5

ml

3.6

0.1

0.33

KG
M3

1
1

M2

50

0.1

m3

50

0.1

ml

33

m2

50

m2

62.2

ml

46.5

m2

62.2

unid.

0.1

0.5

0.5
0.5

1
1

0.5

0.33
0.33

m3

50

0.1

m2

62.2

0.1

ml

72

m2

14.76

0.1

M2

282.2

0.5

M2

551.4

0.5

M2

38.55

0.5

M2

85

0.1

m3

85

0.1

ml

159.37

m2

85

3
1

1
0.1

0.5

1
0.1

10

286.2
ml

163.8

m2

286.2

unid.

11

m3

85

0.1

m2

286.2

0.1

ml

174

m2

35.08

M2

62

M2

35.35

0.5

M2

12.3

0.5

m2

6.03

0.1

0.5

ml

10

0.1

0.5

0.1

6
1
1

0.5

0.33

0.1

0.33

0.5

ml

54.63

m2

75

0.1

1
3

1
6

m2

62.2

0.1

0.5

ml

62.2

0.33

m2

24.84

M2

361.2

0.1

0.33

0.5

M2

643.46

0.5

M2

84.45

0.5

m2

6.03

0.1

0.5

ml

10

0.1

0.5

ml

306

m2

361.2

0.1

m2

361.2

0.1

0.5

ml

243

0.33

m2

101.34

0.1

0.33

ml

73.9

0.1

0.33

ml

3.6

0.1

0.33

ml

69.8

0.1

0.33

M2

61.05

ml

12.9

0.1

m2

371.2

0.2

m2

475.98

0.1

m2

1
6

0.5

0.33
1

0.5

2526

m2

90.3

m2

20.97

m2

180.6

ft2

971.63

m2

39.6

m2

8.58

m2

76.8

unid.

282

m2

153.6

0.5

ft2

161.4

m2

475.98

m2

61.45

unid.

40

0.2

unid.

43

0.1

unid.

0.5

TIEMPOS

METRA

TEODOL

Ru

Tu

fm

dij

CAP

OPER

OFIC

500

1.85

1.8

0.18

1.80

1.80

450

0.44

0.5

0.05

0.50

110

1.50

1.8

0.18

1.80

20

1.79

1.8

0.18

200

4.63

4.5

3.75

3.39

3.392

0.34

3.2

0.78

0.78125

0.08

12

0.42

0.4166666667

0.04

0.42

0.42

0.31

0.3125

0.31

0.31

0.31

50

0.10

0.1

30

0.08

0.0833333333

0.01

3.2

0.78

0.78125

0.08

12

0.42

0.4166666667

0.04

0.42

0.42

0.31

0.31

0.31

0.10

0.31

0.3125

50

0.10

0.1

30

0.08

0.0833333333

0.01

3.75

3.39

3.392

0.34

3.2

0.98

0.978125

0.10

12

0.52

0.5208333333

0.05

0.52

0.52

0.39

0.39125

0.39

0.39

0.39

50

0.13

0.125

0.10

0.13

30

0.10

0.1043333333

0.01

3.2

0.78

0.78125

0.08

12

0.42

0.4166666667

0.04

0.42

0.42

0.31

0.3125

0.31

0.31

0.31

50

0.10

0.1

30

0.08

0.0833333333

0.01

450

0.54

0.5427111111

0.05

3.25

14.09

2.8184615385

5.00

0.28

0.10

60

1.23

1.2308333333

1.00

0.12

3.75

4.07

2.0346666667

2.00

0.20

25

0.55

0.5508

1.00

250

0.00
3.1875

1.00

0.54

2.46

1.23

0.06

1.10

1.10

0.00

0.00

0.00

0.32

3.19

3.19

0.00

0.00

0.00

0.08

2.54

1.70

12

3.19

250

0.00

23

0.85

0.847826087

28

1.37

#DIV/0!

250

0.00

0.00

0.00

0.00

10

1.05

1.05

1.00

0.11

1.05

1.05

20

0.04

0.0395

1.00

0.00

0.08

0.08

1.00

#DIV/0!

35

0.30

#DIV/0!

#DIV/0!

16

0.53

0.5325

1.00

0.05

0.53

0.53

25

0.05

0.0512

1.00

0.01

0.10

0.10

28

0.30

#DIV/0!

4.95

2.4738888889

2.00

0.25

2.47

2.47

10

0.94

0.936

1.00

0.09

0.94

0.94

10

0.06

0.063

1.00

0.01

0.13

0.13

40

0.23

#DIV/0!

10

1.17

1.165

1.00

0.12

1.17

10

0.61

0.613

1.00

0.06

1.23

40

0.29

#DIV/0!

50

5.33

1.7752

3.00

0.18

1.78

1.78

10

2.26

1.131

2.00

1.36

2.26

2.26

50

5.33

#DIV/0!

10

4.08

2.0405

2.00

0.20

2.04

2.04

20

0.22

0.2195

1.00

0.02

0.44

0.44

15

4.21

2.1033333333

2.00

0.21

2.10

2.10

1600

0.29

0.2879375

1.00

0.03

0.29

0.29

250

0.00

2.00

0.00

0.00

0.00

20

3.38

0.84375

4.00

0.84

0.84

25

0.19

0.186

1.00

0.04

0.56

0.37

50

0.09

0.0132857143

7.00

0.00

36

1.75

#DIV/0!

250

0.00

11.23

5.6127777778

10

3.40

10

0.20

40

0.85

#DIV/0!

10

9.37

9.367

1.00

0.94

9.37

10

0.60

0.6

1.00

0.06

1.20

40

2.34

#DIV/0!

3.25

45.45

5.6807692308

8.00

0.57

23

2.65

1.322826087

2.00

0.13

2.65

2.65

250

0.00

0.00

0.00

0.00

12

7.44

2.4805555556

3.00

0.25

2.48

2.48

23

1.40

0.6991304348

2.00

0.07

2.10

1.40

28

3.19

#DIV/0!

3.75

24.08

4.8154666667

5.00

0.48

25

2.71

0.9028

3.00

0.09

3.75

0.00

#DIV/0!

250

0.00

10

8.19

2.7313333333

20

0.06

0.031

35

2.34

#DIV/0!

16

3.87

1.29125

3.00

0.13

1.29

25

0.37

0.1858

2.00

0.02

0.37

28

2.21

#DIV/0!

33.68

6.7353333333

#DIV/0!

#DIV/0!
1.17
1.23
#DIV/0!

#DIV/0!

#DIV/0!
0.00

0.00

0.00

2.00

0.56

5.61

5.61

3.397

1.00

0.34

3.40

3.40

0.196

1.00

0.02

0.39

0.39
#DIV/0!
9.37
1.20
#DIV/0!

#DIV/0!

1.81

1.81

0.00

0.00

0.00

3.00

0.27

2.73

2.73

2.00

0.00

0.06

0.06

#DIV/0!

#DIV/0!
1.29
0.37
#DIV/0!
5.00

0.67

6.74

6.74

10

1.70

1.699

1.00

0.17

1.70

0.00

0.00

1.70

10

0.10

40

0.42

#DIV/0!

10

18.73

4.6835

4.00

0.47

4.68

4.68

10

1.80

0.6006666667

3.00

0.06

1.20

1.20

40

4.68

#DIV/0!

15

17.34

4.3355

4.00

0.43

4.34

4.34

15

5.32

2.6623333333

2.00

0.27

2.66

2.66

1600

1.81

1.80625

1.00

0.18

1.81

1.81

0.00

0.00

0.00

0.00

0.00

0.00
#DIV/0!

#DIV/0!

250

0.00

20

17.40

10

20.25

5.062

4.00

0.51

5.06

5.06

20

1.27

1.266

1.00

0.13

2.53

2.53

25

1.70

1.7028

1.00

0.34

5.11

3.41

250

0.00

5.0

0.00

0.00

0.00

11.23

5.6127777778

2.0

0.56

5.61

5.61

10

3.40

3.397

1.0

0.34

3.40

3.40

10

0.20

0.098

2.0

0.01

0.20

0.20

40

0.85

0.84925

1.0

10

18.73

4.6835

4.0

0.47

4.68

4.68

10

1.80

0.901

2.0

0.09

1.80

1.80

40

4.68

4.6835

1.0

15

5.32

1.3311666667

4.0

0.13

1.33

1.33

1600

1.81

1.80625

1.0

0.18

1.81

1.81

250

0.00

2.0

0.00

0.00

0.00

20

17.20

17.2

1.0

17.20

17.20

10

20.25

5.062

4.0

0.51

5.06

5.06

20

1.27

1.266

1.0

0.13

2.53

2.53

25

1.70

1.7028

1.0

0.34

5.11

3.41

12

4.13

2.065

2.0

0.21

2.07

2.07

250

0.00

1.0

0.00

0.00

0.00

2.10

1.05

2.0

0.11

1.05

1.05

10

3.40

3.397

1.0

0.34

3.40

3.40

10

0.20

0.196

1.0

0.02

0.39

0.39

0.85

4.68

15

2.26

1.1323333333

2.0

0.11

1.13

1.13

1600

1.81

1.80625

1.0

0.18

1.81

1.81

250

0.00

1.0

0.00

0.00

0.00

25

0.20

0.2

1.0

0.20

0.20

25

1.70

1.7028

1.0

0.34

5.11

3.41

50

0.85

0.8514

1.0

0.09

1.86

0.928125

2.0

0.09

0.93

0.93

250

0.00

2.0

0.00

0.00

0.00

11

0.20

0.2009090909

1.0

0.02

0.60

0.40

30

0.07

0.0736666667

1.0

0.01

18

0.83

0.825

1.0

0.83

1.89

0.945

2.0

0.09

0.95

0.95

250

0.00

2.0

0.00

0.00

0.00

11

0.23

0.2272727273

1.0

0.02

0.68

0.45

30

0.08

0.0833333333

1.0

0.01

18

0.84

0.84

1.0

1.86

0.93

2.0

0.09

0.93

0.93

250

0.00

2.0

0.00

0.00

0.00

11

0.22

0.2190909091

1.0

0.02

0.66

0.44

30

0.08

0.0803333333

1.0

0.01

18

0.83

0.8266666667

1.0

10

6.20

2.0666666667

3.0

15

2.36

1.1783333333

2.0

18

0.68

0.6833333333

1.0

0.75

0.75375

1.0

0.08

0.75

2.00

2.0

0.10

0.50

18

0.20

0.2

1.0

0.02

0.20
0.50

0.84

0.83
2.07

100

0.50

0.5

1.0

0.05

3.25

15.38

15.384615385

1.0

1.54

20

1.65

1.65

1.0

110

0.45

0.4545454545

1.0

1.03
1.18

0.59

0.68

0.34

1.65
0.05

1.65

0.45

#DIV/0!

#DIV/0!

1.0

20

2.33

2.325

1.0

110

0.57

0.5654545455

1.0

0.25

0.25

1.0

8.33

8.3333333333

1.0

0.83

12.44

2.488

5.0

0.25

16

4.50

2.25

2.0

3.69

1.845

2.0

0.18

1.85

10

28.22

3.1355555556

9.0

3.14

1.57

15

36.76

3.0633333333

12.0

3.06

1.53

18

2.14

2.1416666667

1.0

2.14

1.07

100

0.85

0.85

1.0

0.09

3.25

26.15

26.153846154

1.0

2.62

20

7.97

7.9685

1.0

110

0.77

0.7727272727

1.0

#DIV/0!

#DIV/0!

1.0

0.06

2.33

2.33

1.70

0.57

0.25

2.49
2.25

0.85

7.97
0.08

20

8.19

8.19

1.0

110

2.60

1.3009090909

2.0

2.75

1.375

2.0

14.17

7.0833333333

2.0

0.71
0.57

0.13

7.97

0.77

8.19

8.19

3.90

1.30

1.38

57.24

5.724

10.0

16

10.88

5.4375

2.0

5.72

8.77

4.385

2.0

0.44

4.39

10

6.20

2.0666666667

3.0

2.07

1.03

15

2.36

1.1783333333

2.0

1.18

0.59

18

0.68

0.6833333333

1.0

0.68

0.34

0.75

0.75375

1.0

0.08

0.75

2.00

2.0

0.10

1.00

20

2.73

2.7315

1.0

80

0.94

0.9375

1.0

0.09

2.81

12.44

3.11

4.0

0.31

3.11

5.44

2.73

2.73

16

3.89

1.94375

2.0

1.94

6.21

2.07

3.0

0.21

2.07

10

36.12

4.515

8.0

4.52

2.26

15

42.90

4.7663703704

9.0

4.77

2.38

18

4.69

4.6916666667

1.0

4.69

2.35

0.75

0.75375

1.0

0.08

0.75

2.00

2.0

0.10

1.00

30

10.20

10.2

1.0

80

4.52

2.2575

2.0

0.23

6.77

0.60

6.02

10.20

72.24

6.02

12.0

16

15.19

5.0625

3.0

25.34

6.33375

4.0

0.63

6.33

18

4.11

2.0527777778

2.0

0.21

2.05

18

0.20

0.2

1.0

0.02

0.20

18

3.88

1.9388888889

2.0

0.19

1.94

15

4.07

1.3566666667

3.0

18

0.72

0.7166666667

1.0

0.07

30

12.37

3.0933333333

4.0

0.62

12

39.67

6.6108333333

6.0

0.66

25

101.04

10.104

10.0

10.10

2.5

36.12

5.16

7.0

5.16

5.06

1.36

3.09
6.61

#DIV/0!

#DIV/0!

6.02

2.0066666667

3.0

2.01

150

6.48

2.1591777778

3.0

2.16

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

2.5

30.72

4.3885714286

7.0

4.39

12

23.50

4.7

5.0

4.70

20

7.68

2.56

3.0

2.56

150

1.08

1.076

1.0

1.08

25

19.04

6.3464

3.0

6.35

#DIV/0!

#DIV/0!

10.00

2.5

4.0

0.50

5.00

5.38

2.6875

2.0

0.27

2.69

#DIV/0!

#DIV/0!

0.68

0.72

30

10.20

5.16

4.39

2.69

METRADO Y CUADRILLA UNITARIA


PEON

7.20
1.00
1.80
7.20
4.50
3.39
0.78

3.13
0.20
0.08
0.78

3.13
0.20
0.08
3.39
0.98

3.91
0.25
0.10
0.78

3.13
0.20
0.08
1.09
2.82
7.39
2.03
4.41

6.78
#DIV/0!

0.32

MEZCL

VIBRAD

WINCHE

VOLQ

TEODOL

#DIV/0!

0.41
#DIV/0!
1.24

0.63
#DIV/0!

6.13
#DIV/0!

11.31
#DIV/0!

2.20

2.30

2.23
0.01
#DIV/0!

2.81

1.96
#DIV/0!

6.00
#DIV/0!
5.68
10.58

5.59
#DIV/0!
4.82
7.22
#DIV/0!

0.25
#DIV/0!

1.49
#DIV/0!
3.37

0.00
#DIV/0!

6.01
#DIV/0!

14.45

12.66
20.43

2.81

0.98
1.70

9.01
9.37

14.45

12.66
20.43
1.03

0.53

1.96

14.45

20.43
0.85

2.01
0.07
1.65

2.27

0.08
1.68

2.19
0.08
1.65

0.38

0.07
1.50
15.38

0.45

3.39
0.25
8.33
1.24
0.74
0.61

2.55
26.15

0.77

7.81
1.38
7.08
2.86
1.79
1.45

0.38
0.50

5.63
1.56

0.64
0.68

0.38
0.50

13.55
3.01
1.67
2.09
0.68
0.07
0.64

0.24
3.09
3.31
10.10

1.00

2.56

6.35

2.50
1.34

CODIGO
ACTIVIDAD

DESCRIPCION DE LA PARTIDA

METRADO Y CUADRILLA UNITARIA


UND.

MOVILIZACION Y DESMOVILIZACION DE EQUIPO LIVIANO EN AREQUIPA

CERCO DE MALLA ARPILLERA

3
4

CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 x 2.40M (BANER ARTISTICO)

5
6

DEMOLICION DE ESTRUCTURA DE MATERIAL NOBLE Y CONCRETO SIMPLE


LIMPIEZA DE TERRENO MANUAL

M2
M2

TRAZO, NIVELACIN Y REPLANTEO

M2

8
9

EXCAVACION DE ZANJAS EN TERRENO NORMAL MANUAL (ZAPATAS)


EXCAVACION DE ZANJAS EN TERRENO NORMAL MANUAL (VIGAS DE CIMENTACION)

M3
M3

10
11

CONCRETO SIMPLE PARA SOLADO F'C=140 KG/CM2 E=0.20M

HABILITACION ACERO DE REFUERZO FY=4200 KG/CM2 PARA ZAPATAS

M2
KG

12

ACERO DE REFUERZO FY=4200 KG/CM2 PARA ZAPATAS

13
14

HABILITACION ACERO DE REFUERZO FY=4200 KG/CM2 COLUMNAS Y PLACAS

15
16

EXCAVACION DE ZANJAS EN TERRENO NORMAL MANUAL (CIMIENTOS CORRIDOS)


CONCRETO PARA ZAPATAS F'C=210 KG/CM2

M3
M3

17

HABILITACION ACERO DE REFUERZO FY=4200 KG/CM2 VIGAS DE CIMENTACION

KG

18
19

ACERO DE REFUERZO FY=4200 KG/CM2 VIGAS DE CIMENTACION

20
21

ENCOFRADO DE VIGAS DE CIMENTACION

22

CANT.

VJE

ML

100
1

UND
M2

OPER

OFIC

206
117.5

0.1
0.1

5.11
65.5

0.1
0.1

1095.31

0.1

KG

1095.31

KG
KG

2232.8
2232.8

0.1
0.1

1
1

1
1

32.95
32.75

0.1
0.1
0.1

789.39

0.1

KG
M2

789.39
21.7

0.1

1
1

CONCRETO PARA VIGAS DE CIMENTACION F'C=210 KG/CM2

M2
M3

21.7
7.91

0.1
0.1

1
2

DESENCOFRADO DE VIGAS DE CIMENTACION

M2

21.7

0.1

23
24

ACERO DE REFUERZO FY=4200 KG/CM2 PARA TENSORES

KG
PTO

178.88
7

0.1

0.1

25
26
27

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA

M3
M2
M2

16.58
122.41

0.1

2
1

122.41

0.1

M
M2
M2
M3
M3
M2
M2
M3
KG
KG
M2
M2
KG
UND
M2
M2
UND
KG
KG
PTO
PTO
M3
KG
KG
PTO
DIA

30

0.1

28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
27
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69

ACERO DE REFUERZO FY=4200 KG/CM2 COLUMNAS Y PLACAS(PRIMER NIEL)

HABILITACION MADERA ENCOFRADO DE VIGAS DE CIMENTACION

INSTALACION DE SALIDAS DE TOMACORRIENTES EN COLUMNAS


HABILITACION PARA ENCOFRADO COLUMNAS PRIMER NIVEL
ENCOFRADO DE COLUMNAS PRIMER NIVEL
MONTANTES, TUBERIA PVC SAL 2" Y 4" DE DESAGUE, VENTILACION, TUBERIA PVC SAP 1/2" Y 3/4" PARA AGUA Y TUBERIA
PVC SEL 20MM Y 25MM INST. ELECTRICAS
HABILITACION MADERA ENCOFRADO PLACAS
ENCOFRADO DE PLACAS PRIMER NIVEL
CONCRETO PARA COLUMNAS PRIMER NIVEL F'C=210 KG/CM2
CONCRETO PARA PLACAS PRIMER NIVEL F'C=210 KG/CM2
DESENCOFRADO DE COLUMNAS PRIMER NIVEL
DESENCOFRADO DE PLACAS PRIMER NIVEL
RELLENO COMPACTADO CON MATERIAL PROPIO, COMPACTADORA 4HP
HABILITACION ACERO DE REFUERZO FY=4200 KG/CM2 PARA VIGAS (1ER TECHO)
ACERO DE REFUERZO FY=4200 KG/CM2 PARA VIGAS (1ER TECHO)
HABILITACION MADERA ENCOFRADO VIGAS
ENCOFRADO DE VIGAS (1ER TECHO)
COLOCACION ACERO PARA TENSORES 2DO NIVEL
COLOCACION ANCLAJES PUENTE METALICO
HABILITACION MADERA ENCOFRADO LOSA MACIZA Y ALIGERADA
ENCOFRADO DE LOSAS ALIGERADAS Y MACIZA (1ER TECHO)

COLOCACION LADRILLO DE ARCILLA PARA TECHO 20X30X30 CM (1ER TECHO)


HAB. ACERO DE REFUERZO PARA LOSAS ALIGERADAS Y MACIZA (1ER TECHO)
ACERO DE REFUERZO FY=4200 KG/CM2 PARA LOSAS ALIGERADAS Y MACIZA (1ER TECHO)
LOSA, TUBERIA PVC SAL 2" Y 4" DE DESAGUE Y TUBERIA PVC SEL 20MM Y 25MM INST. ELECTRICAS
SALIDAS CENTROS DE LUZ PRIMER NIVEL
CONCRETO PARA LOSAS ALIGERADAS Y MACIZA F'C=210 KG/CM2 (1ER TECHO)

HABILITACION ACERO DE REFUERZO COLUMNAS Y PLACAS (2DO NIVEL)


ACERO DE REFUERZO FY=4200 KG/CM2 COLUMNAS Y PLACAS (2DO NIVEL)
INSTALACION DE SALIDAS DE TOMACORRIENTES EN COLUMNAS
CURADO LOSAS ALIGERADAS Y MACIZA (1ER TECHO)
MONTANTES, TUBERIA PVC SAL 2" Y 4" DE DESAGUE, VENTILACION, TUBERIA PVC SAP 1/2" Y 3/4" PARA AGUA Y TUBERIA PVC SEL 20MM Y
25MM INST. ELECTRICAS (2DO NIVEL)

ENCOFRADO DE COLUMNAS SEGUNDO NIVEL


ENCOFRADO DE PLACAS SEGUNDO NIVEL
CONCRETO PARA COLUMNAS SEGUNDO NIVEL F'C=210 KG/CM2
CONCRETO PARA PLACAS SEGUNDO NIVEL F'C=210 KG/CM2
DESENCOFRADO DE COLUMNAS SEGUNDO NIVEL
DESENCOFRADO DE PLACAS SEGUNDO NIVEL
DESENCOFRADO LOSA PRIMER TECHO
HABILITACION ACERO DE REFUERZO FY=4200 KG/CM2 PARA VIGAS (2DOTECHO)
ACERO DE REFUERZO FY=4200 KG/CM2 PARA VIGAS (2DO TECHO)
ENCOFRADO DE VIGAS (2DO TECHO)
ENCOFRADO DE LOSAS ALIGERADAS Y MACIZA (2DO TECHO)

COLOCACION LADRILLO DE ARCILLA PARA TECHO 20X30X30 CM (2DO TECHO)


HAB. ACERO DE REFUERZO PARA LOSAS ALIGERADAS Y MACIZA (2DO TECHO)
ACERO DE REFUERZO FY=4200 KG/CM2 PARA LOSAS ALIGERADAS Y MACIZA (2DO TECHO)
LOSA, TUBERIA PVC SAL 2" Y 4" DE DESAGUE Y TUBERIA PVC SEL 20MM Y 25MM INST. ELECTRICAS
SALIDAS CENTROS DE LUZ SEGUNDO NIVEL

M
M2
M2
M3
M3
M2
M2
M2
KG
KG
M2
M2
UND
KG
KG
PTO
PTO

206

73.44
73.44
11.34
8.71
122.41
73.44
62.42
1716.05
1716.05
163.43
163.43
322.22
1
167.9
167.9
1346
1089.75
1089.75
30
30
33.33

MEZCL

TIEMPOS
VIBRAD

WINCHE

VOLQ

TEODOL

fm

dij

fm

dij

CAP

OPER

0.25

2.00

1.00

1.00

45

2.22

2.22

2.20

1.11

4.44

0.5
6

2.00
5.00

2.00
2.50

1
2

2.00
2.50

1
2

2.00
2.50

2.00
5.00

3
1

6
50

4.68
4.12

1.56
2.06

3
2

1.60
2.10

3
2

0.16

0.41

0.40

0.04

5.16
0.68

7
2

5.20
0.70

7
2

0.52
0.07

60
250

1.09
4.38

0.55
4.38

2
1

0.50
4.40

2
1

250

4.38

2.19

2.20

250
250

8.93
8.93

8.93
2.23

1
4

8.90
2.20

3.75
23

8.79
1.42

8.79
0.71

1
2

250

3.16

3.16

1
1

250
26.2

3.16
0.83

3.16
0.83

1
2

10
20

2.17
0.40

2.17
0.40

10

2.17

250
4

1
8

2.00

0.41

0.75
8

1
1

0.1

0.1
0.1

1
1

1
1

0.1
0.1

1
1

0.2
0.1
0.1

3
1
1

7
14

0.1

15

0.1

122.41
73.44
11.34
8.71
122.41
73.44
167.9
1716.05
1716.05
163.43
167.9
1346
1089.75
1089.75
35
35

0.1
0.1
0.1
0.1
0.1
0.1

1
1
2
2
1
1

0.1
0.1
0.1
0.1

1
1
1
1

1
1
2
2
1
1
1
1
1
1
1

0.1

0.1
0.1

1
1

1
1

0.1
0.1

1
1

10
10

1
1

1
1

1
1

1
1
1
1
1
1
1
1
1

0.75
0.75
2
1
1

PEON

1
2

36.15
1.36

2
1

OFIC

500

0.1

0.1
0.1

Tu

3.25
3.75

1
1
2
2
1
1

0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1

RECURSOS ASIGNADOS

Ru

1
1

1
1
2
2
1
1
1
1
1
1
1
1
1
1
1

2232.8
2232.8

PEON

2
0.5
1
0.1
0.1

OFICINAS, ALMACENES Y CASETA DE GUARDIANIA

30
28.06

CAP

12

0.75
1
1

10
10

0.75
0.75

1
1

1
1

1
1

4.68
2.06
0.41

0.41

0.05
0.44

1.09
4.38

1.09
4.38

0.22

2.19

2.19

1
4

0.89
0.22

8.93
2.23

8.93
2.23

8.80
0.70

1
2

0.88
0.07

2.14

1.42

3.20

0.32

3.16

3.16

1
1

3.20
0.80

1
1

0.32

3.16
0.83

3.16
0.83

1
1

2.20
0.40

1
1

0.22
0.04

2.17
0.79

2.17
0.79

2.17

2.20

0.22

2.17

2.17

0.72
1.75

0.72
1.75

1
1

0.70
1.80

1
1

0.07
0.18

0.72
1.75

0.72

25
26.2
10

0.66
4.67
12.24

0.66
4.67
6.12

1
1
2

0.70
4.70
6.10

1
1
2

0.07

1.33
4.67
6.12

1.33
4.67
6.12

10

3.00
2.80
7.34
1.13
0.87
12.24
7.34
0.57
6.86
6.86
6.24
10.90
1.29
1.00
6.41
11.19
0.84
3.63
3.63
7.50
7.50
1.33
8.93
8.93
1.75
14.00

3.00
2.80
3.67
0.57
0.87
1.36
1.05
0.28
6.86
3.43
6.24
5.45
1.29
1.00
6.41
3.73
0.84
3.63
1.82
7.50
7.50
1.33
8.93
8.93
1.75
0.93

1
1
2
2
1
9
7
2
1
2
1
2
1
1
1
3

3.00
2.80
3.70
0.60
0.90
1.40
1.00
0.30
6.90
3.40
6.20
5.40
1.30
1.00
6.40
3.70
0.80
3.60
1.80
7.50
7.50
1.30
8.90
8.90
1.80
0.90

1
1
2
2
1
9
7
2
1
2
1
2
1
1
1
3
1
1
2
1
1
1
1
1
1
15

0.30

26.2
10
10
10
10
10
110
250
250
26.2
15
250
1
26.2
15
1600
300
300
4
4
25
250
250
4
1

0.37
0.08
0.36
0.18
0.75
0.75
0.27
0.89
0.89
0.18

3.00
2.80
3.67
1.13
1.74
1.36
1.05
0.28
6.86
3.43
6.24
5.45
1.29
1.00
6.41
3.73
0.84
3.63
1.82
7.50
7.50
4.00
8.93
8.93
1.75

10
10
10
10
10
10
10
36
250
250
15
15
1600
250
250
4
4

1.50
12.24
7.34
1.13
0.87
12.24
7.34
4.66
6.86
6.86
10.90
11.19
0.84
4.36
4.36
8.75
8.75

1.50
6.12
2.45
0.57
0.87
1.36
1.05
4.66
6.86
3.43
5.45
5.60
0.84
4.36
2.18
8.75
8.75

1.50
6.10
2.40
0.60
0.90
1.40
1.00
4.70
6.90
3.40
5.40
5.60
0.80
4.40
2.20
8.80
8.80

1
2
3
2
1
9
7
1
1
2
2
2
1
1
2
1
1

0.15
0.61
0.24
0.06
0.09
0.14
0.10

1.50
6.12
2.45
1.13
1.74
1.36
1.05

0.69
0.34
0.54
0.56
0.08
0.44
0.22
0.88
0.88

6.86
3.43
5.45
5.60
0.84
4.36
2.18
8.75
8.75

1
1
2
1
1
1
1
1
1
15
1
2
3
2
1
9
7
1
1
2
2
2

1
1
2
1
1

0.61

0.37
0.06
0.09
0.14
0.10
0.03
0.69
0.34
0.54
0.13

1.24
5.16
0.68
4.37

8.79
5.70

3.16

1.31
5.31

3.00
2.80
3.67
1.13
1.74
1.36
1.05

5.67
8.71

0.28
6.86
3.43
6.24
5.45
1.29
1.00
6.41
3.73
0.84
3.63
1.82

2.67
8.93
8.93

6.73

5.63
5.63
16.00

1.31
0.93
1.50
6.12
2.45
1.13
1.74
1.36
1.05
4.66
6.86
3.43
5.45
5.60
0.84
4.36
2.18

5.67
8.71

4.66

6.73

6.56
6.56

0.75

70

SALIDAS DE TOMACORRIENTE, SALIDAS DE AGUA Y REDES COLECTORAS DESAGUE EN S/C

PTO

12

0.1

71
72

ENCOFRADO DE SOBRECIMIENTOS

M2
M3

11.14
0.85

0.1
0.1

1
2

1
2

73
74

DESENCOFRADO DE SOBRECIMIENTOS

11.14

0.1

MUROS DE LADRILLO K.K. ARC. DE SOGA MEZCLA 1:4 e=1.5 CM I NIVEL

M2
M2

48.39

0.1

0.5

75

ENCOFRADO DE TENSORES (PRIMER NIVEL)

M2

76
77

CONCRETO TENSORES (PRIMER NIVEL)

M3
M2

25.36
1.25

0.1
0.1

1
2

1
2

10

78
79
80

HABILITACION ACERO PARA LOSAS(SEGUNDO TECHO)

25.36
1018.09

0.1
0.1

1
1

1
1

CONCRETO PARA LOSAS ALIGERADAS Y MACIZA F'C=210 KG/CM2 (TECHO 2)

1018.1
173.425
17.03

0.1
0.1
0.1

1
1
2

81
82
83
84

ACERO DE REFUERZO FY=4200 KG/CM2 PARA JARDINERAS Y PLACA 3(TERCER NIVEL)

509.69
509.69

0.1
0.1

1
1

1
1

ENCOFRADO DE JARDINERAS Y PLACA 3 (TERCER NIVEL)

KG
M2

92.35

0.1

85

CONCRETO JARDINERAS Y PLACA 3 F'C=210 KG/CM2(TERCER NIVEL)

M3

86
87

DESENCOFRADO DE JARDINERAS Y PLACA 3 (TERCER NIVEL)

M2
M3

11.25
92.35

0.1
0.1

2
1

2
1

88
89

ACERO DE REFUERZO FY=4200 KG/CM2 PARA VIGAS SOLERAS(PRIMER NIVEL)

0.1
0.1

PICADO DE MUROS PARA SALIDAS DE INTERRUPTORES

KG
PTO

17.03
115.2
6

0.1

90

ENCOFRADO DE VIGAS SOLERAS (PRIMER NIVEL)

M2

91
92

CONCRETO VIGAS SOLERAS PRIMER NIVEL F'C=210 KG/CM2 (PRIMER NIVEL)

20.8
0.45

0.1
0.1

1
2

1
2

1
1

COLOCACION Y ANCLAJE DE TUBOS ESTRUCTURALES TERCER NIVEL

20.8
2

0.1

93
94
95

ACERO DE REFUERZO FY=4200 KG/CM2 PARA LOSA MACIZA(TERCER TECHO)

96
97

CONCRETO PARA LOSA MACIZA(TERCER TECHO) F'C=210 KG/CM2

98
99

ACERO DE REFUERZO FY=4200 KG/CM2 PARA JARDINERAS (PRIMER NIVEL)

100
101
102
103

CONCRETO JARDINERAS F'C=210 KG/CM2(PRIMER NIVEL)

104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126

SALIDAS PARA INSTALACIONES ELECTRICAS Y SANITARIAS MUROS II NIVEL

127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142

CONCRETO CICLOPEO PARA SOBRECIMIENTO 1:8 + 25% PM

DESENCOFRADO DE TENSORES (PRIMER NIVEL)


ACERO DE REFUERZO FY=4200 KG/CM2 PARA LOSAS ALIGERADA Y MACIZA
LOSA, TUBERIA PVC SAL 2" Y 4" DE DESAGUE Y TUBERIA PVC SEL 20MM Y 25MM INST. ELECTRICAS 2DO TECHO
HABILITACION ACERO DE REFUERZO PARA JARDINERAS Y PLACA 3(TERCER NIVEL)

CURADO LOSA TECHO 2

DESENCOFRADO DE VIGAS SOLERAS (PRIMER NIVEL)


ENCONFRADO METALICO LOSA MACIZA (TERCER NIVEL)

CURADO LOSA TECHO 3


ENCOFRADO DE JARDINERAS (PRIMER NIVEL)
DESENCOFRADO DE JARDINERAS (PRIMER NIVEL)
DESENCOFRADO LOSA MACIZA Y ALIGERADA TECHO 2
MUROS DE LADRILLO K.K. ARC. DE SOGA MEZCLA 1:4 e=1.5 CM II NIVEL
ACERO DE REFUERZO FY=4200 KG/CM2 PARA TENSORES (SEGUNDO NIVEL)
ENCOFRADO DE TENSORES (SEGUNDO NIVEL)
CONCRETO TENSORES (SEGUNDO NIVEL)
DESENCOFRADO DE TENSORES (SEGUNDO NIVEL)
DESENCONFRADO METALICO LOSA MACIZA (TERCER NIVEL)
TARRAJEO CIELORASO Y VIGAS CON MEZCLA C:A 1:5 E=1.50 CM. PRIMER NIVEL
TARRAJEO COLUMNAS CON MEZCLA C:A 1:5 E=1.50 CM. PRIMER NIVEL
TARRAJEO MUROS INTERIORES CON MEZCLA C:A 1:5 E=1.50 CM. PRIMER NIVEL
TARRAJEO DEL TIPO RAYADO PARA JARDINERAS C/MORTERO 1:5 1ER NIVEL
TARRAJEO MUROS EXTERIORES CON MEZCLA C:A 1:5 E=1.50 CM. PRIMER NIVEL
VESTIDURA DE DERRAMES E=1.5 CM (PRIMER NIVEL)
TARRAJEO PLACA 3 CON MEZCLA C:A 1:5 E=1.50 CM. TERCER NIVEL
TARRAJEO DEL TIPO RAYADO PARA JARDINERAS 3 NIVEL C/MORTERO 1:5
TARRAJEO CIELO RASO TERCER NIVEL CON MEZCLA C:A 1:5 E=1.50 CM.
ACERO DE REFUERZO FY=4200 KG/CM2 PARA VIGAS SOLERAS(SEGUNDO NIVEL)
ENCOFRADO DE VIGAS SOLERAS (SEGUNDO NIVEL)
CONCRETO VIGAS SOLERAS SEGUNDO NIVEL F'C=210 KG/CM2 (SEGUNDO NIVEL)
DESENCOFRADO DE VIGAS SOLERAS (SEGUNDO NIVEL)
TARRAJEO CIELORASO Y VIGAS CON MEZCLA C:A 1:5 E=1.50 CM. SEGUNDO NIVEL
TARRAJEO COLUMNAS CON MEZCLA C:A 1:5 E=1.50 CM. SEGUNDO NIVEL
TARRAJEO MUROS INTERIORES CON MEZCLA C:A 1:5 E=1.50 CM. SEGUNDO NIVEL
TARRAJEO MUROS EXTERIORES CON MEZCLA C:A 1:5 E=1.50 CM. SEGUNDO NIVEL
REDES DE DISTRIBUCION DE AGUA REDE DE DERIVACION DE DESAGUE Y CANALIZACION Y TUBERIAS DE
INSTALACIONES ELECTRICAS (PRIMER PISO)
CONCRETO EN FALSO PISO BAOS E=4" DE 1:6 CEM-HOR
CURADO FALSO PISO BAOS
CONCRETO EN FALSO PISO PATIO E=4" DE 1:6 CEM-HOR
CURADO FALSO PISO PATIO
PISO DE LOSETA CERAMICA BAOS 30 x 30 CM COLOR GRIS
ZOCALO DE PORCELANATO PULIDO BAOS SUPER WHITE 60 x 60 CM COLOR MARFIL
CAJA DE REGISTRO
PISO DE PIEDRA LAJA COLOR BLANCO- PIEDRA TALAMOYA CON AMARRE IRREGULAR PARA PATIO
CONTRAPISO DE E=48 MM AZOTEA
CURADO CONTRAPISO AZOTEA
PISO CERAMICO RUSTICO ESTRUCTURADO 45 x 45 CM COLOR PINTA GRIS AZOTEA
CONTRAPISO II NIVEL DE E=48 MM
CURADO CONTRAPISO II NIVEL
PISO DE LOSETA CERAMICA BAOS30 x 30 CM COLOR GRIS 2DO NIVEL
PISO PORCELANATO PULIDO COMEDOR 60 x 60 CM COLOR BLANCO ANTIDESLIZANTE

KG
KG
M
M3
KG

M3
M2
UND
M2
KG
M3
M3
KG
M2

10.03

1
1
2

1
2

1.75
122.49

0.1
0.1

31.49

0.1

M3
M2
M2
M2

3.91
31.49
167.9
96.78

0.1
0.1
0.1
0.1

2
1
1
1

2
1
1
1

PTO
KG
M2
M3
M2
M2
M2
M2
M2
M2
M2
M
M2
M2
M2
KG
M2
M3
M2
M2
M2
M2
M2

28

0.1

357.76
50.72
2.5
50.72
10.03
167.91
129.41
54.35
32.24
35.34
39.83
51.76
64.48
30.58
230.4
41.16
0.9
41.16
167.91
129.41
54.35
35.34

0.1
0.1
0.1
0.1

1
1
2
1

0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1

1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1

M
M2
M3
M2
M3
M2
M2
UND
M2
M2
M3
M2
M2
M3
M2
M2

28

0.1

21.72
21.72
65.15
65.15
31.92
28.49
1
451.52
62.2
2.41
62.2
93.28
93.28
31.92
182.55

0.1
0.1
0.1
0.1
0.1

1
3
1
1

10

10

1
1
2
1

3.00

3.00

3.00

0.30

3.00

0.70
0.03

0.70
0.03

1
1

0.70
0.00

1
1

0.07
0.00

0.70
0.07

0.70
0.07

2.25
0.27

16
9

0.70
5.38

0.70
1.08

1
5

0.70
1.10

1
5

0.07
0.11

0.70
1.08

0.70
1.08

0.54

10

2.54

2.54

2.50

0.25

2.54

2.54

10
10

0.13
2.54

0.13
0.85

1
3

0.10
0.80

1
3

0.01
0.08

0.25
0.85

0.25
0.85

250
250
4

4.07
4.07
43.36

4.07
2.04
43.36

1
2
1

4.10
2.00
43.40

1
2
1

0.41
0.20
4.34

4.07
2.04
43.36

4.07
2.04

10
250

1.70
2.04

1.70
2.04

1
1

1.70
2.00

1
1

0.17
0.20

3.41
2.04

3.41
2.04

300
10

1.70
9.24

0.85
4.62

2
2

0.80
4.60

2
2

0.08
0.46

0.85
4.62

0.85
4.62

1.13

0.56

0.60

0.06

1.13

1.13

10
50

9.24
0.34

1.54
0.02

6
15

1.50
0.00

6
15

0.15
0.00

1.54

1.54

300
4

0.38
1.50

0.38
1.50

1
1

0.40
1.50

1
1

0.04
0.15

0.38
1.50

0.38

10

2.08

2.08

2.10

0.21

2.08

2.08

10
10

0.05
2.08

0.05
0.69

1
3

0.00
0.70

1
3

0.00
0.07

0.09
0.69

0.09
0.69

1
36

2.00
0.28

2.00
0.14

1
2

2.00
0.10

1
2

300

0.47

0.47

0.50

0.05

0.47

0.47

10

1
2
10
1

2.00
0.14

0.18
0.04

0.18
0.00

1
14

0.20
0.00

1
14

0.02
0.00

0.35

0.35

0.41
3.15

0.41
3.15

1
1

0.40
3.10

1
1

0.04
0.31

0.41
3.15

0.41
3.15

10
10
18
9

0.39
3.15
9.33
10.75

0.39
1.05
4.66
2.69

1
3
2
4

0.40
1.00
4.70
2.70

1
3
2
4

0.04
0.10
0.47
0.27

0.78
1.05
4.66
2.69

0.78
1.05
4.66
2.69

7.00
1.19
5.07
0.25
5.07
0.28
16.79
12.94
5.44
3.22
3.53
3.98
5.18
6.45
3.06
0.77
4.12
0.09
4.12
16.79
12.94
5.44
3.53

7.00
1.19
5.07
0.25
1.69
0.28
4.20
2.16
2.72
3.22
1.77
3.98
2.59
3.22
3.06
0.77
4.12
0.09
2.06
4.20
2.16
2.72
0.88

1
1
1
1
3
1
4
6
2
1
2
1
2
2
1
1
1
1
2
4
6
2
4

7.00
1.20
5.10
0.30
1.70
0.30
4.20
2.20
2.70
3.20
1.80
4.00
2.60
3.20
3.10
0.80
4.10
0.10
2.10
4.20
2.20
2.70
0.90

1
1
1
1
3
1
4
6
2
1
2
1
2
2
1
1
1
1
2
4
6
2
4

0.70
0.12
0.51
0.03
0.17

7.00
1.19
5.07
0.50
1.69

0.5
0.5
0.5
0.5

4
300
10
10
10
36
10
10
10
10
10
10
10
10
10
300
10
10
10
10
10
10
10

0.42
0.22
0.27
0.32
0.18
0.40
0.26
0.32
0.31
0.08
0.41
0.01
0.21
0.42
0.22
0.27
0.09

4.20
2.16
2.72
3.22
1.77
3.98
2.59
3.22
3.06
0.77
4.12
0.18
2.06
4.20
2.16
2.72
0.88

1
6
1
6
1
0.5
0.33
1
0.5
6
1
0.5
6
1
0.5
0.5

4
110
30
110
30
6
16
4
12
110
30
6
110
30
6
6

7.00
0.20
0.72
0.59
2.17
5.32
1.78
0.25
37.63
0.57
0.08
10.37
0.85
3.11
5.32
30.43

7.00
0.20
0.72
0.59
2.17
5.32
0.89
0.13
4.70
0.57
0.04
2.07
0.85
1.55
5.32
6.09

1
1
1
1
1
1
2
2
8
1
2
5
1
2
1
5

7.00
0.20
0.70
0.60
2.20
5.30
0.90
0.10
4.70
0.60
0.00
2.10
0.80
1.60
5.30
6.10

1
1
1
1
1
1
2
2
8
1
2
5
1
2
1
5

0.70
0.02
0.07
0.06
0.22
0.53

7.00
0.59

0.20

1.78

0.59

5.32
0.89
0.13
4.70
1.70

0.57

2.07
2.54

0.85

1
0.5

10

2
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5

10

0.47
0.06
0.00
0.21
0.08
0.16
0.53
0.61

5.63

1.50

10
50

17.03

0.02

300
10
10

1.25

43.36

10

1
1
1
2
1
1

4
16
25

1
1

0.1
0.1

0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1

1
2

142.32
1.75

1
1
1
1
3

5.32
6.09

0.45
2.00
0.28
1.75
0.00

3.91
4.66
1.34
7.00

1.19
5.07
0.50
1.69
0.28

0.77
4.12
0.18
2.06

2.50
0.56
2.10
1.08
1.36
1.61
0.88
1.99
1.29
1.61
1.53

0.90
2.10
1.08
1.36
0.44
7.00
1.18
0.72
3.55
2.17
2.66
0.29
0.13
2.35
3.39
0.04
1.04
5.09
1.55
2.66
3.04

143

ZOCALO DE PORCELANATO PULIDO BAOS SUPER WHITE 60 x 60 CM COLOR MARFIL

M2

28.49

0.33

16

1.78

0.89

0.90

0.89

0.29

144
145

ZOCALO DE PORCELANATO PULIDO COMEDOR SUPER WHITE 60 x 60 CM COLOR MARFIL

M2
M3

56.99
220

1
1

0.33
1

16
45

3.56
4.89

1.78
1.63

2
3

1.80
1.60

2
3

1.78
1.63

0.59
1.63

146
147

BASE DE IMPRIMACION PARA MUROS INTERIORES

420.15

BASE DE IMPRIMACION PARA COLUMNAS Y PLACAS

M4
M5

220

1
1

45
45

9.34
4.89

3.11
0.81

3
6

3.10
0.80

3
6

3.11
0.81

3.11
0.81

148

BASE DE IMPRIMACION PARA JARDINERAS

M6

45

3.33

1.67

1.70

1.67

1.67

BASE DE IMPRIMACION PARA EXTERIORES

M2
M2

1
1

149
150

150
329.48

7.32
1.67

1.83
0.83

4
2

1.80
0.80

4
2

1.83
0.83

1.83
0.83

PINTADO DE MUROS INTERIORES PINTURA LATEX VINILICO 02 MANOS


PINTADO DE COLUMNAS Y PLACAS C/LATEX VINILICO 02 MANOS

M2
M2

1
1

45
45

151
152

75.11
108.07

1
1

258.81

1
1

45
45

2.40
5.75

0.80
0.96

3
6

0.80
1.00

3
6

0.80
0.96

0.80
0.96

153

PINTADO DE VIGAS C/LATEX VINILICO 02 MANOS

M2

5.27

0.75

0.80

0.75

0.75

M2
M2

1
1

45

PINTADO DE MUROS EXTERIORES C/LATEX VINILICO 02 MANOS

236.97
70.67

154
155

45
45

1.57
3.33

0.39
1.67

4
2

0.40
1.70

4
2

0.39
1.67

0.39
1.67

MURO CORTINA C/CRISTAL EXTERIOR CURVEX REFLEJ. SILVER DARK BLUE 8 MM L=20M

0.1

1
1

1
1

156
157

150
1

0.5

0.1

0.5

10
10

0.10
0.10

0.05
0.05

2
2

0.10
0.10

2
2

158

CONDUCTORES Y CABLES ELECTRICOS

50

10.12

5.06

5.10

5.06

159
160

COLOCACION DE PUERTA CONTRAPLACADA MADERA TORNILLO CON MDF 6 MM

1
1

4.00
12.00

4.00
12.00

1
1

4.00
12.00

1
1

4.00
12.00

4.00
12.00

161
162

CABLE TW N N 10 AWG -N 12 AWG - 14 AWG - CONEXIONES ELECTRICAS

80
80

11.31
0.67

11.31
0.67

1
1

11.30
0.70

1
1

11.31
0.67

11.31
0.67

163

80

0.28

0.28

0.30

0.28

0.28

164
165

CABLE CONDUCTOR DE COBRE 1 x 2.5 mm2 . 1 x 4.0 mm2

166
167

MAMP. BATIENTE 5.32x2.95M CRISTAL TEMP. 10MM FRENO HIDRAULICO

168

BASE DE IMPRIMACION PARA CIELO RASO Y VIGAS

PINTADO DE CIELO RASOS PINTURA LATEX VINILICO 02 MANOS

PINTADO DE JARDINERAS C/LATEX VINILICO 02 MANOS


MURO CORTINA INTERIOR C/CRISTAL CURVEX REFLEJ. SILVER DARK BLUE 8 MM L=16M

UND
UND
ML

0.01
0.01

0.05
0.05

0.03
0.03
5.06

UND
PZA

506
4
12

1
1
1

1
1

CABLE PARA SEAL DE TV

M
M

904.7
53.5

1
1

1
1

CABLE PARA TELEFONO

22.7

M
UND

37.8
1

1
1

1
1

3
2

80
1

0.47
1.00

0.47
1.00

1
1

0.50
1.00

1
1

0.47
1.00

0.47
1.00

1.42
2.00

P3 MAMPARA DE 1.80x2.20M DOS HOJAS CORRED. CRIST. TEMP. INCOLORO 8MM

UND
UND

1
1

1
1

1
1

2
2

1
1

1.00
1.00

1.00
1.00

1
1

1.00
1.00

1
1

1.00
1.00

1.00
1.00

2.00
2.00

VENTANA PIVOT VERTICAL 60x60CM VIDRIO TEMPLADO INCOLORO 6MM

UND

5.00

5.00

5.00

5.00

5.00

169
170

P4 MAMPARA DE 1.20X2.20M IZQ. C/SOBRE LUZ CRIST. TEMP. INCOLORO 8MM

UND
UND

1
1

1
1

1
1

1
1

1.00
1.00

1.00
1.00

1
1

1.00
1.00

1
1

1.00
1.00

1.00
1.00

171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189

MAMPARA BATIENTE CRIST. TEMP. INCOL. 10MM FRENO HIDRAUL.

UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
M2
UND
UND
UND

2
1
145
2
6
6
54
1
1
42
64
1
1
4
8
206
1
1
1

1
1
2
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1

1
1
30
1
1
1
20
1
1
20
20
1
1
1
1
100
1
1
1

2.00
1.00
4.83
2.00
6.00
6.00
2.70
1.00
1.00
2.10
3.20
1.00
1.00
4.00
8.00
2.06
1.00
1.00
1.00

2.00
1.00
4.83
2.00
3.00
3.00
1.35
0.50
0.50
1.05
3.20
1.00
1.00
4.00
8.00
0.69
1.00
1.00
1.00

1
1
1
1
2
2
2
2
2
2
1
1
1
1
1
3
1
1
1

2.00
1.00
4.80
2.00
3.00
3.00
1.40
0.50
0.50
1.10
3.20
1.00
1.00
4.00
8.00
0.70
1.00
1.00
1.00

1
1
1
1
2
2
2
2
2
2
1
1
1
1
1
3
1
1
1

2.00
1.00
9.67
2.00
3.00
3.00
1.35
0.50
0.50
1.05
3.20
1.00
1.00
4.00
8.00

2.00
1.00
4.83

BISAGRA ALUMINIZADA CAPUCHINA DE 3 1/2" Y CERRADURA PARA PUERTA DE MADERA

MAMPARA FIJA DE 5.38x2.90M CRISTAL TEMPLADO INCOLORO 10MM

P6 MAMPARA DE 1.25X2.20M CORREDIZA CRIST. TEMP. INCOLORO 8MM ARENADO


MAMPARA FIJA DE 3.85x2.90M CRISTAL TEMPLADO INCOLORO 10MM
INSTALACION DE LUMINARIAS INTERNAS
INSTALACION TABLERO GENERAL TG TABLERO DE DISTRIBUCION STD-1
SUMINISTRO DE INODOROS NOVARA Y URINARIOS CADET
SUMINISTRO DE LAVATORIOS CERALUX Y LAV. MANCORA
SUMINISTRO DE ACCESORIOS DE DESAGUE
SUM. ESCURRIDERO DE PLATOS DOBLE GRIFERIA
SUMINISTRO LAVATORIO DE COCINA 53 X 97 CM INC. ACCESORIOS
SUMINISTRO DE ACCESORIOS SANITARIOS
INSTALACION DE TOMACORRIENTES, INTERRUPTORES Y TAPAS PARA CAJAS DE PASO
POZO DE PUESTA A TIERRA
DUCTO DE VENTILACION PARA CAMPANA EXTRACTORA DE COCINA
SISTEMA DE REFLECTORES DE PISO
FAROL DOBLE PARA LA AZOTEA
LIMPIEZA DE OBRA
COLOCACION DE ESCALERA METALICA PRIMER NIVEL
COLOCACION DE ESCALERA METALICA SEGUNDO NIVEL
COLOCACION DE PUENTE METALICO

1
1
1

1
1

2
3
1
1
1
2
1
1
2
2
1
1
1
1
1
1
1
1

1.00
1.00
1.00

1.35

1.05
3.20

33.93

4.00
14.50
2.00
3.00
3.00
2.70
0.50
0.50
2.10
6.40
1.00
1.00
4.00
8.00
0.69
1.00
1.00
1.00

RECURSOS ASIGNADOS
MEZCL

VIBRAD

WINCHE

VOLQ

TEODOL

0.41

0.71

0.71

0.40

0.40

0.66

0.57
0.87

0.57
0.87

0.57
0.87

1.33

2.67

1.33

0.57
0.87

0.57
0.87

0.57
0.87

0.03

0.13

0.13

0.13

1.70

1.70

1.70

0.56

0.56

0.56

0.05

0.05

0.05

0.18

0.18

0.18

0.39

0.39

0.39

0.25

0.25

0.25

0.09

0.09

0.09

CODIGO
ACTIVIDAD

UND.

Movilizacion de Equipos y Herramientas

Cerco Provisional de Esteras

Cartel de Obra

4
5

Caseta para Oficinas

6
7

Trazo de Niveles

8
9
10
11
12

Excavacion Zanja 1 Fila de Calzadura "A" I

13

MATERIAL1 CEMENTO

METRADO

DESCRIPCION DE LA PARTIDA

RU

FM

GBL

1.00

1.00

ML

210.1

45

2.33

105.03

UND

0.5

1.00

0.50

24
3

6
6

1.33
0.50

8.00
3.00

Corte con Equipo en Terreno Normal

M2
M3

397.95
197.28

500
450

0.80
0.44

398.00
197.10

Relleno y Compactado con Material Propio c/equipo

M3

164.72

110

1.50

164.67

Eliminacion de Material Excedente

M3
M2

35.82
397.95

20
50

1.79
2.65

35.82
132.65

M3
M3

12.72
2.5

3.75
3.2

3.39
0.78

12.72
2.50

M2

12

0.42

5.00

M3
M3

2.5
2.5

8
30

0.31
0.03

2.50
0.84

2.5
5

3.2
12

0.78
0.42

2.50
5.00

Limpieza de Terreno Manual


Excavacion de Piques N 1, 2, 3 4 "A" I
Encofrado y Desencofrado de Calzadura 1,2,3,4 "A" I

14
15

Colocacion de Concreto Muros de Calzadura 1, 2, 3, 4 "A" I

16
17

Excavacion de Piques N 5, 6, 7, 8 "A" II


Encofrado y Desencofrado de CalzaduraN 5, 6, 7, 8 "A" II

M3
M2

18

Colocacion de Concreto Muros de Calzadura N 5, 6, 7, 8 "A" II

M3

2.5

0.31

2.50

19
20

Curado de Concreto Calzadura N 5, 6, 7, 8 "A" II

m3
M3

2.5
12.72

30
3.75

0.03
3.39

0.84
12.72

21
22

Excavacion de Piques N 1, 2, 3, 4, 9"A" III


Encofrado y Desencofrado de Calzadura N 1, 2, 3, 4, 9"A" III

M3
M2

3.13
6.25

3.2
12

0.98
0.52

3.13
6.25

23

Colocacion de Concreto Muros de Calzadura N 1, 2, 3, 4, 9"A" III

M3

3.13

0.39

3.13

24
25

Curado de Concreto Calzadura N 1, 2, 3, 4, 9 "A" III

m3
M3

2.5
2.5

30
3.2

0.03
0.78

0.84
2.50

26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70

Encofrado y Desencofrado de CalzaduraN 5, 6, 7, 8 "A" IV

5
2.5
2.5
305.28
244.22
45.8
45.8
73.85
2625.97
1596.57
38.25
1029.4
19.5
133.14
133.14
11.31
11.31
15.26
15.26
13.77
205.1
205.1
10.5
0.79
8.52
1.28
15
44.53
9.36
0.63
11.65
6.13
5
79.87
729
729
14
460.7
4.65
4.65
1137.59
1137.59
30
101.03
16.99

12
8
30
450
250
3.25
6
60
300
300
12
300
23
50
50
10
10
3.75
6
25
300
300
10
20
16
25
10
9
10
10
10
10
7
15
300
300
4
1600
25
50
300
300
10
9
10

0.42
0.31
0.03
0.68
0.98
4.70
3.82
1.23
2.19
2.66
3.19
1.14
0.85
2.66
2.66
1.13
1.13
4.07
2.54
0.55
0.68
0.68
1.05
0.04
0.53
0.05
1.50
2.47
0.94
0.06
1.17
0.61
0.71
5.33
1.22
2.43
3.50
0.29
0.19
0.01
1.90
1.90
3.00
5.61
1.70

5.00
2.50
0.84
305.10
244.25
15.27
22.90
73.86
656.40
798.30
38.26
343.20
19.50
133.15
133.15
11.31
11.31
15.26
15.26
13.78
205.20
205.20
10.50
0.80
8.53
1.28
15.00
22.27
9.36
0.63
11.65
6.13
5.00
79.88
364.50
729.00
14.00
460.80
4.65
0.65
568.80
568.80
30.00
50.52
16.99

Curado de Concreto Calzadura N 1, 2, 3, 4, "A" I

Excavacion Zanja 2 Fila de Calzadura "A" III

Excavacion de Piques N 5, 6, 7, 8 "A" IV

M2
M3
M3
Curado de Concreto
Nen
5, 6,
7, 8 "A"
IV
Excavacion
MasivaCalzadura
a Maquina
Terreno
Normal
c/retro Sotano "A"
M3
Acarreo de Material Excavado de Sotano c/equipo "A"
M3
Excavacion Manual en Terreno Normal para Zapatas "A"
M3
Acarreo de Material de Excavacion de Zapatas "A"
M3
Concreto en Solados e=4" "A"
M2
KG
Habilitacion de Acero para Zapatas , Muro Reforzado y Columnas "A"
Colocacion de Acero en Zapatas e Izaje de Columnas "A"
KG
M2
Encofrado y Desencofrado de Zapatas "A"
KG
Colocacion de Acero en Muro Reforzado "A"
M3
Concreto en Zapatas "A"
M2
Encofrado y Desencofrado de Muro Reforzado "A" 50% 1/2
M2
Encofrado y Desencofrado de Muro Reforzado "A" 50 % 2/2
M3
Concreto en Muro Reforzado "A" 50 % 1/2
M3
Concreto en Muro Reforzado "A" 50 % 2/2
M3
Excavacion Manual en Terreno Normal para Cimentacion "A"
M3
Acarreo de material de excavacion de Cimiento corrido "A"
M3
Concreto para Cimiento Corrido 1:10 +30%PG "A"
KG
Habilitacion de Acero para Vigas de Cimentacion "A"
Colocacion de Acero en Viga de Cimentacion "A"
KG
M2
Encofrado y Desencofrado de Viga de Cimentacion "A"
M3
Concreto en Viga de Cimentacion "A"
M2
Encofrado y Desencofrado de Sobrecimiento "A"
M3
Concreto en Sobrecimientos f'c=140 Kg/cm2 "A"
Montantes, Tuberia PVC SAL 2" y 4" de Desague, Ventilacion, Tuberia PVC SAP 1/2" y 3/4" para Agua y Tuberia PVC SEL 20mm y
PTO
25mm Inst. Electricas "A"
M2
Muro Portante Soga "A"
M2
Encofrado y Desencofrado de Columnas de confinamiento "A"
M3
Concreto Columnas de Confinamiento "A"
M2
Encofrado y Desencofrado de Columnas "A"
M3
Concreto Columnas "A"
M3
Relleno y Compactado de Piso de Sotano con Material Propio "A"
M2
Encofrado de Losa y Vigas "A"
KG
Habilitacion de Acero para Vigas y Losas "A"
KG
Colocacion de Acero en Vigas y Losas "A"
PTO
Losa, Tuberia PVC SAL 2" y 4" de Desague y Tuberia PVC SEL 20mm y 25mm Inst. Electricas"A"
UND
Colocacion Ladrillo en Losa "A"
M3
Concreto Losa y Vigas "A"
M3
Curado de Losa "A"
KG
Habililacion de Acero Columnas "C"
KG
Colocacion de Acero en Columnas "C"
Montante,Tuberia PVC SAL 2" y 4" de Desague, Ventilacion, Tuberia PVC SAP 1/2" y 3/4" para Agua y Tuberia PVC SEL 20mm y 25mm PTO
M2
Muro Portante soga ejes 2, 3 "C"
M2
Encofrado y Desencofrado de Columnas de confinamiento "C"
Colocacion de Concreto Muros de Calzadura N 5, 6, 7, 8 "A" IV

ACERO
P.U.

APORTE
BLS/--

M2
M2

SS.HH. Y Vestuarios Provicionales

MATERIAL2

PRODUCCION DIARIA

CANT.

CONSUMO
DIARIO

APORTE

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
2.9

7.3

0.0
0.0
0.0
2.9

7.3

0.0
0.0
0.0
0.0
2.9

9.1

0.0
0.0
0.0
2.9

7.3

0.0
0.0
0.0
0.0
0.0
0.27

19.9

0.0
0.0
0.0
0.0
9.73

189.8

9.73
9.73

110.0
110.0

1.07
1.07
1.07

0.0
0.0

0.0
0.0
2.9

39.9

0.0
0.0
0.0
9.73

1.07
1.07

7.8

0.0
3.7

4.7

0.0
0.218

4.9

0.0
9.73

6.1

0.0
9.73

59.6

0.0
0.0
0.0
0.0
0.0
0.0
9.73

45.2

0.0
0.0
0.0
0.0
0.218

1.07
1.07

11.0

0.0

1.07
1.07

CONSUMO
DIARIO

PRESUPUESTO

71

Concreto Columnas de Confinamiento "C"

M3

1.96

10

0.20

1.96

9.73

72
73

Encofrado y Desencofrado de Columnas "C"

M2
M3

15.02
6

10
10

1.50
0.60

15.02
6.00

9.73

74
75

Encofrado de Losas y Vigas "C"


Excavacion Manual en Terreno Normal para Zapatas "B"

M2
M3

79.87
147.7

15
3.25

5.33
5.68

79.88
18.46

76

Excavacion manual en Terreno Normal para Cimentacion "B"

M3

89.3

3.75

4.76

17.86

77
78

Acarreo de Material de excavacion de Zapatas "B"

M3
M3

55
55.8

6
6

3.06
3.10

18.34
18.60

79
80

Concreto en Subzapatas "B"


Habilitacion de Acero para Zapatas y Columnas "B"

M3
KG

60.85
4250.23

23
300

2.65
2.02

60.86
607.20

81

Colocacion de Acero en Zapatas e Izaje de Columnas "B"

KG

4250.23

300

3.54

1062.60

82
83

Encofrado y desencofrado de Zapatas "B"

M2
M3

89.3
32.16

12
23

2.48
0.70

29.77
16.08

84
85

Concreto Simple en Cimiento corrido"B"

86

Concreto Columnas "C"

Acarreo de material de excavacion de Cimiento Corrido "B"

Concreto en Zapatas "B"


Excavacion para viga de cimentacion "B"
Habilitacion de Acero para Vigas de Cimentacion "B"

0.0

2.9

9.73

156.4

2.9

98.2

M3
M3

67.71
1.24

25
3.75

1.35
0.33

33.85
1.24

KG

1162.21

300

1.94

581.10

KG
M2

1162.21
81.94

300
10

0.97
2.05

290.70
20.49

1.24
61.98

20
16

0.06
3.87

1.24
61.98

9.73

0.0
0.0
0.0
0.0

89
90

Concreto en Vigas de Cimentacion "B"


Encofrado y Desencofrado de Sobreciemientos "B"

M3
M2

91

Concreto en sobrecimientos f'c=140 Kg/cm2 "B"

M3

9.29

25

0.37

9.30

3.7

92
93

Montante,Tuberia PVC SAL 2" y 4" de Desague, Ventilacion, Tuberia PVC SAP 1/2" y 3/4" para Agua y Tuberia PVC SEL 20mm y 25m
Muro Portante Soga "B"

PTO
M2

47
303.09

10
9

4.70
6.74

47.00
60.62

0.218

94
95

Encofrado y Desencofrado de Columnas de confinamiento "B"


Concreto Columnas de Confinamiento "B"

M2
M3

33.97
0.98

10
10

1.70
0.10

16.99
0.98

9.73

96

Encofrado y Desencofrado de Columnas "B"

M2

187.34

10

4.68

46.84

97
98

Concreto Columnas "B"

M3
M3

18.02
15

10
7

0.90
2.14

9.01
15.00

99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143

Encofrado de Losa y Vigas "B"

M2
KG
KG
KG
UND
UND
PTO
M3
M3
M2
KG
KG
KG
PTO
M2
M2
M3
M2
M3
M3
M3
M2
M2
KG
KG
KG
PTO
UND
UND
M3
M3
M2
KG
KG
M2
M2
M3
M2
KG
KG
UND
PTO
M3
M3
m2

306.03
5273.48
2636.74
2636.74
1445
1445
70
25.32
25.32
79.87
3084.2
1542.1
1542.1
77
303.09
33.97
1.96
93.67
93.67
9.01
9.01
192.96
192.96
4711.82
2355.91
2355.91
28
1445
1445
42.57
42.57
79.87
263.04
263.04
18.9
33.97
1.96
33.97
259.31
259.31
64.6
2
1.02
1.02
49.56

15
300
300
300
1600
1600
4
25
50
36
300
300
300
10
9
10
10
10
10
10
10
15
15
300
300
300
4
1600
1600
25
50
36
300
300
9
10
10
15
300
300
1600
4
25
50
9

3.40
1.95
2.93
2.93
0.45
0.45
17.50
1.01
0.07
1.11
1.71
2.57
2.57
7.70
6.74
1.70
0.20
4.68
4.68
0.90
0.90
4.29
4.29
1.96
2.62
2.62
7.00
0.45
0.45
1.70
0.12
1.11
0.88
0.88
1.05
3.40
0.20
2.27
0.86
0.86
0.04
0.50
0.04
0.00
1.84

51.00
585.90
879.00
879.00
723.20
723.20
70.00
25.33
3.60
39.92
513.90
771.00
771.00
77.00
60.62
16.99
1.96
46.84
46.84
9.01
9.01
64.32
64.32
588.90
785.40
785.40
28.00
723.20
723.20
42.58
6.10
39.92
263.10
263.10
9.45
33.97
1.96
33.98
259.20
259.20
64.00
2.00
1.03
0.15
16.52

Habililacion de Acero para Vigas y Losas "B" y "C"


Colocacion de acero en Vigas y Losas "B" y "C" 50% 1/2
Colocacion de acero en Vigas y Losas "B" y "C" 50 % 2/2
Colocacion Ladrillo en Losa "B"y "C" 50 % 1/2
Colocacion Ladrillo en Losa "B"y "C" 50% 2/2
Losa,Tuberia PVC SAL 2" y 4" de Desague y Tuberia PVC SEL 20mm y 25mm Inst. Electricas"B" y "C"
Concreto Losa y Vigas "B" y "C"
Curado de Losa "B" y "C"
Desencofrado de Losa "B" y "C"
Habilitacion de Acero Columnas "D"
Colocacion de Acero Columnas "D" 50% 1/2
Colocacion de Acero Columnas "D" 50% 2/2
Montante,Tuberia PVC SAL 2" y 4" de Desague, Ventilacion, Tuberia PVC SAP 1/2" y 3/4" para Agua y Tuberia PVC SEL 20mm y 25m
Muro Portante Soga "D"
Encofrado y Desencofrado de Columnas de Confinamiento "D"
Concreto Columnas de Confinamiento "D"
Encofrado y Desencofrado de Columnas "D" 50% 1/2
Encofrado y Desencofrado de Columnas "D" 50% 2/2
Concreto Columnas "D"50% 1/2
Concreto Columnas "D" 50% 2/2
Encofrado de Losa y Vigas "D" 50% 1/2
Encofrado de Losa y Vigas "D" 50% 2/2
Habilitacion de Acero para Vigas y Losas "D"
Colocacion de Acero en Vigas y Losas "D" 50% 1/2
Colocacion de Acero en Vigas y Losas "D" 50% 2/2
Losa, Tuberia PVC SAL 3" para Evacuacion de Aguas Pluviales y Tuberia PVC SEL 20mm y 25mm Inst. Electricas "D"
Colocacion Ladrillo en Losa "D" 50% 1/2
Colocacion Ladrillo en Losa "D" 50% 2/2
Concreto Losa y Vigas "D"
Curado de Losa "D"
Desencofrado de Losa "D"
Habilitacion de Acero en Columnas de Azotea "D"
Colocacion de Acero en Columnas de Azotea "D"
Muro de Soga Azotea "D"
Encofrado y Desencofrado de Columnas Azotea "D"
Concreto Columnas de Azotea "D"
Encofrado de Losa y Vigas sobre Escalera en Azotea "D"
Habilitacion de Acero para Vigas y Losas en Azotea "D"
Colocacion de Acero en Vigas y Losas en Azotea "D"
Colocacion Ladrillo en Losa en Azotea "D"
Losa,Tuberia PVC SEL 20mm y 25mm Inst. Electricas Azotea "D"
Concreto Losa y Vigas en Azotea"D"
Curado Losa de Azotea "D"
Muro kk Parapeto h=0.60m Azotea "D"

176.5

0.0
0.0
0.0

Colocacion de Acero en Vigas de Cimentacion "B"

Relleno y Compactado de Piso con material propio "B"

58.4

0.0
0.0
0.0
0.0
0.0

87
88

Encofrado y Desencofrado de Vigas de Cimentacion "B"

19.1

1.07
1.07

1.07
1.07

12.1

0.0
34.4

0.0
13.2

0.0
9.5

0.0
9.73

87.7

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
9.73

246.4

0.0
0.0
0.0
0.0
0.0
0.0
0.218

1.07
1.07
1.07

1.07
1.07
1.07

13.2

0.0
9.73

19.1

0.0
0.0
9.73
9.73

87.7
87.7

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
9.73

414.3

0.0
0.0
0.0
0.0
0.218

1.07
1.07
1.07

1.07
1.07

2.1

0.0
9.73

19.1

0.0
0.0
0.0
0.0
0.0
9.73

10.0

0.0
0.218

3.6

1.07
1.07

0.0
0.0
0.0
0.0

144

Habilitacion de Acero en Escaleras "A"

KG

123.3

300

0.41

123.30

145
146

Excavacion de Cimiento para escalera "A"

M3
M2

1.28
14.85

3.75
8

0.34
0.93

1.28
7.42

147
148

Colocacion Acero en Escaleras "A"


Concreto en Escaleras "A"

KG
M3

123.23
2.21

300
11

0.41
0.20

123.30
2.21

149

Curado de escaleras"A"

M3

2.21

30

0.01

0.33

150
151

Desencofrado de escaleras "A"

M2
M2

14.85
6.03

18
8

0.83
0.75

14.85
6.03

152
153

Forjado y revestimiento de Gradas de escalera acabado cemento coloreado pulido "A"

ML
KG

10
124.53

5
300

1.00
0.42

5.00
124.50

154

Encofrado de Escaleras "C"

M2

15.12

0.95

7.56

155
156

Colocacion Acero en Escaleras "C"

KG
M3

124.53
2.5

300
11

0.42
0.23

124.50
2.50

157
158

Curado de escaleras"C"
Desencofrado de escaleras "C"

M3
M2

2.5
15.12

30
18

0.01
0.84

0.36
15.12

159

Vestidura en fondo de Escaleras "C"

M2

6.03

0.75

6.03

160
161

Forjado y revestimiento de Gradas de escalera acabado cemento coloreado pulido "C"

ML
KG

10
124.53

5
300

1.00
0.42

5.00
124.50

162
163

Encofrado de Escaleras "D"


Colocacion Acero en Escaleras "D"

M2
KG

14.85
124.53

8
300

0.93
0.42

7.42
124.50

164

Concreto en escaleras "D"

M3

2.41

11

0.22

2.41

165
166

Curado de escaleras"D"

M3
M2

2.41
14.88

30
18

0.01
0.83

0.33
14.89

167
168

Vestidura en fondo de Escaleras "D"

M2
ML

6.03
10

8
5

0.75
1.00

6.03
5.00

0.154

0.8

169

Tarrajeo en cielo raso mezcla 1:4 e=1.5 cm "A"

M2

62

10

3.10

31.00

0.257

8.0

170
171

Pared, Tuberia PVC SAP 1/2" y 3/4" para Agua y Tuberia PVC SEL 20mm y 25mm Inst. Electricas "A"

PTO
M2

30
12.3

10
18

1.50
0.68

12.29

0.117

1.4

172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216

Tarrajeo en interiores acabado con cemento-arena "A"

M2
ML
ML
ML
PTO
ML
M3
PTO
PTO
UND
M2
M2
ML
M2
UND
UND
UND
UND
M2
M2
M2
M2
PTO
M2
M2
ML
ML
ML
PTO
ML
M3
PTO
PTO
UND
M2
M2
ML
M2
UND
UND
UND
UND
UND
M2
M2

35.35
3.6
20
20
6
20
21
6
4
1
62.2
62.2
72
14.76
2
2
2
4
219.17
109.585
109.585
282.2
47
38.55
551.4
73.9
50
50
20
50
35
25
18
11
286.2
286.2
174
35.08
7
6
5
1
13
833.6
416.8

15
18
100
3.25
10
110
20
10
10
4
110
6
16
5
4
3
4
4
1000000
45
45
10
10
18
15
18
100
3.25
10
110
20
10
10
4
110
6
16
5
4
3
4
8
4
1000000
45

1.18
0.20
0.20
6.15
0.60
0.18
1.05
0.60
0.40
0.25
0.57
3.46
2.25
1.48
0.50
0.67
0.50
1.00
0.00
2.44
2.44
4.03
1.57
1.07
5.25
2.05
0.50
15.39
2.00
0.46
1.75
2.50
1.80
1.38
1.30
7.95
1.81
1.40
0.88
1.00
0.63
0.13
1.08
0.00
2.32

17.67
3.60
20.00
20.00
6.00
20.02
21.00
6.00
4.00
1.00
62.15
20.74
36.00
7.38
2.00
2.00
2.00
4.00
0.00
109.58
109.58
40.31

0.117
0.016

2.1
0.1

0.257

10.4

19.28
78.77
36.95
50.00
50.00
20.00
50.05
35.00
25.00
18.00
5.50
143.11
47.70
29.01
7.02
3.50
3.00
2.50
1.00
4.33
0.00
104.22

0.117
0.117
0.016

2.3
9.2
0.6

Encofrado de Escaleras "A"

Vestidura en fondo de Escaleras "A"


Habilitacion de Acero en Escaleras "C"

Concreto en escaleras "C"

Habilitacion de acero en Escaleras "D"

Desencofrado de escaleras "D"


Forjado y revestimiento de Gradas de escalera acabado cemento coloreado pulido "D"

Tarrajeo primario rayado con cemento-arena "A"


Derrame de vanos ancho aproximado 15 cm. "A"
Trazo y replanteo para la instalacin de tuberas agua y desague interiores "A"
Excavacin de zanjas en terreno normal hasta 0.60m. A=0.50m. "A"
Tuberia PVC SAL 2" y 4" de Desague "A"
Relleno de zanjas en t.n. Hasta 0.60m A=0.50m. y compactacin. "A"
Eliminacin de material excedente carguo manual d<=30 m. "A"
Tuberia PVC SAP 1/2" y 3/4" para Agua "A"
Tuberia PVC SEL 20mm y 25mm Inst. Electricas "A"
Caja de registro 12" x 24" tapa de concreto "A"
Falso piso E=4" (mezcla 1:10 C:H) "A"
Piso cermico antideslizante "A"
Contra zcalo de ceramico antideslizante h=0.10 m. "A"
Enchape con maylica antideslizante en SS.HH. "A"
Sumidero de bronce 2 "A"
Vlvula de compuerta de bronce de unin roscada de 1/2" y 3/4" "A"
Registro roscado de bronce 4" "A"
Colocacion de Aparatos Sanitarios (Corrientes) "A"
Secado de Tarrajeo "A"
Pintura ltex en interiores y cielos rasos, considera 2 manos de imprimacion "A" 50% 1/2
Pintura ltex en interiores y cielos rasos, considera 2 manos de imprimacion "A" 50% 2/2
Tarrajeo en cielo raso mezcla 1:4 e=1.5 cm "B"
Pared, Tuberia PVC SAP 1/2" y 3/4" para Agua y Tuberia PVC SEL 20mm y 25mm Inst. Electricas "B"
Tarrajeo primario rayado con cemento-arena "B"
Tarrajeo en interiores acabado con cemento-arena "B"
Derrame de vanos ancho aproximado 15 cm. "B"
Trazo y replanteo para la instalacin de tuberas agua y desague interiores "B"
Excavacin de zanjas en terreno normal hasta 0.60m. A=0.50m. "B"
Tuberia PVC SAL 2" y 4" de Desague "B"
Relleno y compactacin de zanjas en t.n. Hasta 0.60m. A=0.50m. "B"
Eliminacin de material excedente carguo manual d<=30 m. "B"
Tuberia PVC SAP 1/2" y 3/4" para Agua "B"
Tuberia PVC SEL 20mm y 25mm Inst. Electricas "B"
Caja de registro 12" x 24" tapa de concreto "B"
Falso piso E=4" (mezcla 1:10 C:H) "B"
Piso cermico antideslizante "B"
Contra zcalo de ceramico antideslizante h=0.10 m. "B"
Enchape con maylica antideslizante en SS.HH. "B"
Sumidero de bronce 2" "B"
Vlvula de compuerta de bronce de unin roscada de 1/2" y 3/4" "B"
Registro roscado de bronce 4" "B"
Colocacion de aparatos sanitarios (Papelera, jabonera, etc) "B"
Colocacion de Aparatos Sanitarios (Corrientes) "B"
Secado de Tarrajeo "B"
Pintura ltex en interiores y cielos rasos, considera 2 manos de imprimacion "B" 50 % 1/2

9.73

1.07

1.07

21.5

0.0
0.0
0.0
0.154

0.8

0.0
0.0
0.0
9.73

1.07
1.07

24.3

0.0
0.0
0.0
0.154

0.8

0.0
0.0
0.0
9.73

23.4

0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.18
0.15
0.187
0.15

11.2
3.1
6.7
1.1

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.18
0.15
0.187
0.15

25.8
7.2
5.4
1.1

0.0
0.0
0.0
0.0
0.0
0.0
0.0

1.07
1.07

0.0

217

Pintura ltex en interiores y cielos rasos, considera 2 manos de imprimacion "B" 50 % 2/2

M2

416.8

45

2.32

104.22

218
219

Tarrajeo en cielo raso mezcla 1:4 e=1.5 cm "C"

M2
PTO

62
77

10
10

3.10
1.93

31.00

0.257

8.0

220
221

Tarrajeo en interiores acabado con cemento-arena "C"


Tarrajeo primario rayado con cemento-arena "C"

M2
M2

35.35
12.3

15
18

1.18
0.68

17.67
12.29

0.117
0.117

2.1
1.4

222

Derrame de vanos ancho aproximado 15 cm. "C"

ML

3.6

18

0.20

3.60

0.016

223
224

Tuberia PVC SAP 1/2" y 3/4" para Agua "C"

PTO
PTO

5
5

10
10

0.50
0.50

5.00
5.00

225
226

Contrapiso E=4" (mezcla 1:10 C:H) "C"

M2
M2

75
62.2

80
6

0.94
3.46

75.04
20.74

0.455
0.15

227

Contra zcalo de ceramico antideslizante h=0.10 m. "C"

228
229

Enchape con maylica antideslizante en SS.HH. "C"

230
231

Vlvula de compuerta de bronce de unin roscada de 1/2" y 3/4" "C"

232

Pared, Tuberia PVC SAP 1/2" y 3/4" para Agua y Tuberia PVC SEL 20mm y 25mm Inst. Electricas "C"

Tuberia PVC SEL 20mm y 25 mm Inst. Electricas "C"


Piso cermico antideslizante "C"

0.1

0.0
0.0
34.1
3.1

ML

62.2

16

1.94

31.10

0.187

M2
UND

24.84
2

5
4

1.66
0.50

8.28
2.00

0.15

Registro roscado de bronce 4" "C"

UND
UND

2
2

3
4

0.67
0.50

2.00
2.00

Colocacion de aparatos sanitarios (Papelera, jabonera, etc) "C"

UND

0.13

1.00

233
234

Colocacion de Aparatos Sanitarios (Corrientes) "C"

UND
M2

4
97.35

4
1000000

1.00
0.00

4.00
0.00

235
236

Pintura ltex en interiores y cielos rasos, considera 2 manos de imprimacion "C" 50 % 1/2

M2
M2

109.585
109.585

45
45

2.44
2.44

109.58
109.58

237

Tarrajeo en cielo raso mezcla 1:4 e=1.5 cm "D"

M2

361.2

10

4.01

40.13

0.257

10.3

238
239

Pared, Tuberia PVC SAP 1/2" y 3/4" para Agua y Tuberia PVC SEL 20mm y 25mm Inst. Electricas "D"

PTO
M2

15
643.46

10
15

0.30
5.36

80.43

0.117

9.4

240
241

Tarrajeo primario rayado con cemento-arena "D"


Derrame de vanos ancho aproximado 15 cm. "D"

M2
ML

84.45
69.8

18
18

2.35
1.94

42.23
34.90

0.117
0.016

242

Tuberia PVC SAP 1/2" y 3/4" para Agua "D"

PTO

46

10

4.60

46.00

243
244

Tuberia PVC SEL 20mm y 25 mm Inst. Electricas "D"

PTO
M2

28
361.2

10
80

2.80
2.26

28.00
180.64

245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289

Piso cermico antideslizante "D"

M2
ML
M2
UND
UND
UND
UND
UND
M2
M2
M2
M2
ML
PTO
M2
M2
M2
M2
UND
M2
M2
M2
UND
ML
ML
ML
M2
M2
M2
M2
FT2
M2
FT2
FT2
M2
UND
ML
UND
PTO
PTO
PT
PTO
ML
ML
PT

361.2
243
95.6
17
7
11
10
18
1004.66
502.33
502.33
61.05
12.9
2
371.2
475.98
475.98
475.98
1
76.8
39.6
8.58
282
18.5
85
85
45.15
45.15
20.97
153.6
161.4
180.6
485.815
485.815
61.45
4
506
1
18
71
8
70
25
75
61

6
16
5
4
3
4
8
4
100000
45
45
15
18
10
35
12
100000
35
1
2.5
10
10
15
4
100
8
2.5
2.5
10
20
150
30
150
150
30
2
50
1
10
10
4
10
30
30
10

7.53
1.90
2.39
1.42
1.17
1.38
0.63
1.13
0.00
2.23
2.23
1.02
0.72
0.20
3.54
5.67
0.00
2.72
1.00
5.12
0.99
0.86
3.76
1.54
0.85
3.54
3.01
3.01
1.05
2.56
1.08
2.01
1.08
1.08
1.02
1.00
2.02
1.00
1.80
2.37
2.00
2.33
0.83
0.83
1.53

45.15
30.37
11.95
5.67
3.50
5.50
5.00
4.50
200.00
100.49
100.49
15.27
12.91
2.00
123.73
67.99
100.00
95.20
1.00
12.80
9.90
8.58
56.40
6.17
85.00
28.34
7.53
7.53
10.49
51.20
161.40
60.21
162.00
162.00
30.72
2.00
101.20
1.00
18.00
23.67
8.00
23.33
24.99
24.99
15.25

Sumidero de bronce 2" "C"

Secado de Tarrajeo "C"


Pintura ltex en interiores y cielos rasos, considera 2 manos de imprimacion "C" 50 % 2/2

Tarrajeo en interiores acabado con cemento-arena "D"

Contrapiso E=4" (mezcla 1:10 C:H) "D"


Contra zcalo de ceramico antideslizante h=0.10 m. "D"
Enchape con maylica antideslizante en SS.HH. "D"
Sumidero de bronce 2" "D"
Vlvula de compuerta de bronce de unin roscada de 1/2" y 3/4" "D"
Registro roscado de bronce 4" "D"
Colocacion de aparatos sanitarios (Papelera, jabonera, etc) "D"
Colocacion de Aparatos Sanitarios (Corrientes) "D"
Secado de Tarrajeo "D"
Pintura ltex en interiores y cielos rasos, considera 2 manos de imprimacion "D" 50 % 1/2
Pintura ltex en interiores y cielos rasos, considera 2 manos de imprimacion "D" 50 % 2/2
Tarrajeo en interiores acabado con cemento-arena "Azotea"
Derrame de vanos ancho aproximado 15 cm. "Azotea"
Tuberia PVC SAP 1" para Agua "Azotea"
Cobertura con ladrillo pastelero asentado c/mezcla c:a 1:5 "Azotea"
Tarrajeo en exteriores acabado con cemento-arena
Secado de Tarrajeo Exterior
Pintura Latex exteriores
Tanque de fibra de vidrio s/planos incluye accesorios/instalacin
Puerta contra placada de 45 mm triplay
Divisiones metlicas en SSHH s/diseo /puertas
Puertas metlicas s/diseo
Cerrajeria
Barandas metlicas segn diseo
Juntas de Construccion en Muros e=1"
Tapajuntas metlicas de 2"
Ventanas metlicas s/diseo 50% 1/2
Ventanas metlicas s/diseo 50% 2/2
Mampara metlica vidriada
Pintura en carpintera de madera al barniz
Vidrio semidoble provisin y colocacin en puertas
Pintura en carpintera metlica (2 manos antic.+2 esmalte)
Vidrio semidoble provisin y colocacin en ventanas 50% 1/2
Vidrio semidoble provisin y colocacin en ventanas 50% 2/2
Claraboya metlica c/cubierta de policarbonato s/diseo
Tableros electricos y tablero general
Cables elctricos NYY 2x2.5 mm2 y 2x4 mm2
Pozo de tierra
Salida para antenas, telefono, timbre
Salida centro de luz c/interruptor simple y doble doble
Artefacto tipo spot light cromado
Salida para tomacorriente doble c/lnea a tierra y simple
Alimentador al pozo de tierra 1x10mm2 cobre desnudo
Alimentadores a tableros
Artefactos tipo Fluorescentes

5.8
1.2

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

4.9
0.6

0.0
0.0
0.455

82.2

0.15
0.187
0.15

6.8
5.7
1.8

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.117
0.016

1.8
0.2

0.0
0.22
0.117

27.2
8.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.022

1.9

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

290

Limpieza final de obra

M2

926.4

200

4.63

926.40

0.0

Potrebbero piacerti anche