Sei sulla pagina 1di 4

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - JUNE 2008)

REV 3

SAUDI ARAMCO TEST REPORT

SATR NUMBER

SATR-X-3201

DC Cable Holiday Testing


PROJECT TITLE

WBS / BI / JO NUMBER

EQUIPMENT ID NUMBER(S)

EQUIPMENT DESCRIPTION

LAYOUT DRAWING NUMBER

REV. NO.

SCHEDULED TEST DATE & TIME

ACTUAL TEST DATE & TIME

CONTRACTOR / SUBCONTRACTOR

SYSTEM ID.

PURCHASE ORDER NUMBER

CONTRACTOR INSPECTION LEVEL

REFERENCE

TEST PROCEDURE AND CHECKLIST

A1

Conduct a visual and touch inspection of the impressed current anode


cable insulation immediately adjacent to the head of the anode. Anode
leads with noticeable "necking", or an obvious reduction in diameter of
the insulation, shall not be used.

SAES-X-400
Sec. 6.2.1.2

A2

Inspect all cables and lead wires for burial for insulation damage
immediately prior to installation. Inspect with a pulse type holiday
detector set at 18,000 volts DC.

SAES-X-400
Sec. 6.2.1.2

A3

Check the holiday detector before using according to the manufacturer's


instructions.

SAES-X-600
Sec. 5.4.3

A4

Conduct the inspection with a certified and calibrated pulse type holiday
detector set at 18,000 volts DC. The calibration date shall not exceed 6
months.

SAES-X-400
Sec. 6.2.1.2

A5

Do not use anodes with cables that fail the dielectric test.

SAES-X-400
Sec. 6.2.1.2

A6

Repair of the insulation for buried positive cable by any method is


prohibited.

SAES-X-400
Sec. 6.4.3

A7

CHECK-OUT INSTRUCTIONS
a) Make sure that the detector is turned OFF.
b) Select the specific voltage required by the CP manufacturer.
c) Attach electrode to the voltage probe assembly and apply to the cable
to be inspected. The electrode should always make intimate contact with
the surface under inspection.
Ref: Ref: Instrument Instruction Manual

SAES-X-400
Sec. 6.4.3

A8

OPERATING METHODS
a) The cable to be inspected must be grounded from the bare cable to
earth at some point along the cable. If individual joints of the cable are to
be inspected that are not electrically connected, each joint must be
grounded. Ref: Instrument Instruction Manual

SAES-X-400
Sec. 6.4.3

A9

c) Occasional checks of the detector operation should be made,


particularly if no holidays are being found.
Ref: Instrument Instruction Manual

SAES-X-400
Sec. 6.4.3

A10

b) Voltage Output Checks


In case of LOW output voltage:
a. Check position of voltage selector switches.
b. Check battery (is it fully charged?).
c. Check for "parted conductor in voltage probe and/or ground trail.

SAES-X-400
Sec. 6.4.3

A11

Inspect positive cables for insulation damage immediately prior to the


burial of the cables.

SAES-X-600
Sec. 5.4.3

Page 1 of 4

MH's SPENT

TRAVEL TIME

SAUDI ARAMCO USE ONLY

SAUDI ARAMCO INSPECTION LEVEL

TEST PROCEDURE ACCEPTANCE CRITERIA

PLANT NO.

EC / PMCC / MCC NO.


QUANTITY INSP.

SAUDI ARAMCO ACTIVITY NUMBER

A.

CP-

EQPT CODE

SAUDI ARAMCO TIP NUMBER

ITEM
No.

30-Jun-08
DATE APPROVED
QR NUMBER

WORK PERMIT REQUIRED?

PASS

FAIL

N/A

RE-TEST DATE

A12

Make sure that all cable area was covered by the Holiday Detector.

Page 2 of 4

SAES-X-600
Sec. 5.4.3

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - JUNE 2008)

REV 3

SAUDI ARAMCO TEST REPORT

SATR NUMBER

SATR-X-3201

DC Cable Holiday Testing


PROJECT TITLE

WBS / BI / JO NUMBER

ITEM
No.

TEST RESULTS ACCEPTANCE CRITERIA

REFERENCE

CPCONTRACTOR / SUBCONTRACTOR

PASS

FAIL

N/A

RE-TEST DATE

REFERENCE

PASS

FAIL

N/A

RE-TEST DATE

REFERENCE

PASS

FAIL

N/A

RE-TEST DATE

A13

If a holiday is detected, the entire anode/cable assembly shall be


replaced.

SAES-X-400
Sec. 6.4.3

A14

Negative cables and bond cables to be used for buried service need to
be only checked visually for obvious insulation defects.

SAES-X-400
Sec. 6.4.5

B.

30-Jun-08
DATE APPROVED
QR NUMBER

TEST EQUIPMENT AND MATERIALS CRITERIA

C. TEST RESULTS
ITEM
No.

C.TEST RESULTS ACCEPTANCE CRITERIA

Cable
No.

Tested Cable description and label

CERTIFYING COMPANY:
C. TEST RESULTS

D. CONCLUSIONS
ITEM
No.

TEST RESULTS ACCEPTANCE CRITERIA

D1

No Holidays were detected.

D2

Test results are acceptable and in accordance with Saudi Aramco


Engineering Standards and contractual requirements.

N/A

REMARKS:

REFERENCE DOCUMENTS:
1. Schedule Q -- Quality Requirements (Pro Forma Contract), February 2008
2. Schedule G -- Material, Tools and Equipment (Pro Forma MP-IK-LS Contract), March 2006

Page 3 of 4

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - JUNE 2008)

REV 3

SAUDI ARAMCO TEST REPORT

SATR NUMBER

SATR-X-3201

DC Cable Holiday Testing


PROJECT TITLE

WBS / BI / JO NUMBER

ITEM
No.

30-Jun-08
DATE APPROVED
QR NUMBER

TEST RESULTS ACCEPTANCE CRITERIA

REFERENCE

CPCONTRACTOR / SUBCONTRACTOR

PASS

FAIL

N/A

RE-TEST DATE

3. SAES-X-400 Cathodic Protection of Buried Pipelines 22 October, 2007


4. SAES-X-600 Cathodic Protection of Plant Facilities 25 June, 2007

Contractor / Third-Party

Saudi Aramco

Technician Performing Test*


Name, Title, Department,
Company, Initials and
Date:

PMT Representative

Test Performed Successfully and Results are Acceptable:


Name, Initials and Date:

QC Inspector
Name, Initials and Date:

T&I Witnessed

QC Record Reviewed

Work Verified

T&I Witnessed

QC Record Reviewed

Work Verified

T&I Witnessed

QC Record Reviewed

Work Verified

PID Representative
Witnessed Test

Work / Rework May Proceed

QC Supervisor

Name, Initials and Date:

Proponent and Others


Quality Record Approved:

Name, Sign and Date:

Name, Organization,
Initials and Date:

*Person Responsible for Implementation of Test and Analysis of Results

Y = YES

Page 4 of 4

N = NO F = FAILED