REV 3
SATR NUMBER
SATR-X-3201
WBS / BI / JO NUMBER
EQUIPMENT ID NUMBER(S)
EQUIPMENT DESCRIPTION
REV. NO.
CONTRACTOR / SUBCONTRACTOR
SYSTEM ID.
REFERENCE
A1
SAES-X-400
Sec. 6.2.1.2
A2
Inspect all cables and lead wires for burial for insulation damage
immediately prior to installation. Inspect with a pulse type holiday
detector set at 18,000 volts DC.
SAES-X-400
Sec. 6.2.1.2
A3
SAES-X-600
Sec. 5.4.3
A4
Conduct the inspection with a certified and calibrated pulse type holiday
detector set at 18,000 volts DC. The calibration date shall not exceed 6
months.
SAES-X-400
Sec. 6.2.1.2
A5
Do not use anodes with cables that fail the dielectric test.
SAES-X-400
Sec. 6.2.1.2
A6
SAES-X-400
Sec. 6.4.3
A7
CHECK-OUT INSTRUCTIONS
a) Make sure that the detector is turned OFF.
b) Select the specific voltage required by the CP manufacturer.
c) Attach electrode to the voltage probe assembly and apply to the cable
to be inspected. The electrode should always make intimate contact with
the surface under inspection.
Ref: Ref: Instrument Instruction Manual
SAES-X-400
Sec. 6.4.3
A8
OPERATING METHODS
a) The cable to be inspected must be grounded from the bare cable to
earth at some point along the cable. If individual joints of the cable are to
be inspected that are not electrically connected, each joint must be
grounded. Ref: Instrument Instruction Manual
SAES-X-400
Sec. 6.4.3
A9
SAES-X-400
Sec. 6.4.3
A10
SAES-X-400
Sec. 6.4.3
A11
SAES-X-600
Sec. 5.4.3
Page 1 of 4
MH's SPENT
TRAVEL TIME
PLANT NO.
A.
CP-
EQPT CODE
ITEM
No.
30-Jun-08
DATE APPROVED
QR NUMBER
PASS
FAIL
N/A
RE-TEST DATE
A12
Make sure that all cable area was covered by the Holiday Detector.
Page 2 of 4
SAES-X-600
Sec. 5.4.3
REV 3
SATR NUMBER
SATR-X-3201
WBS / BI / JO NUMBER
ITEM
No.
REFERENCE
CPCONTRACTOR / SUBCONTRACTOR
PASS
FAIL
N/A
RE-TEST DATE
REFERENCE
PASS
FAIL
N/A
RE-TEST DATE
REFERENCE
PASS
FAIL
N/A
RE-TEST DATE
A13
SAES-X-400
Sec. 6.4.3
A14
Negative cables and bond cables to be used for buried service need to
be only checked visually for obvious insulation defects.
SAES-X-400
Sec. 6.4.5
B.
30-Jun-08
DATE APPROVED
QR NUMBER
C. TEST RESULTS
ITEM
No.
Cable
No.
CERTIFYING COMPANY:
C. TEST RESULTS
D. CONCLUSIONS
ITEM
No.
D1
D2
N/A
REMARKS:
REFERENCE DOCUMENTS:
1. Schedule Q -- Quality Requirements (Pro Forma Contract), February 2008
2. Schedule G -- Material, Tools and Equipment (Pro Forma MP-IK-LS Contract), March 2006
Page 3 of 4
REV 3
SATR NUMBER
SATR-X-3201
WBS / BI / JO NUMBER
ITEM
No.
30-Jun-08
DATE APPROVED
QR NUMBER
REFERENCE
CPCONTRACTOR / SUBCONTRACTOR
PASS
FAIL
N/A
RE-TEST DATE
Contractor / Third-Party
Saudi Aramco
PMT Representative
QC Inspector
Name, Initials and Date:
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
PID Representative
Witnessed Test
QC Supervisor
Name, Organization,
Initials and Date:
Y = YES
Page 4 of 4
N = NO F = FAILED