ITEM 5.1
ITEM 5.2
EARTH EXCAVATION
ITEM 5.3
ROCK EXCAVATION
ITEM 5.4
HAULING OF MATERIALS
ITEM 5.5
5.5.1
BACKFILLING
GENERAL
5.5.1.1
DESCRIPTION
This item shall consist of furnishing all materials, equipment and labor for
backfilling to install or construct the penstock and other accessories as
shown on the Plans and referred to in these specifications.
Backfill Term used to describe the material used in the fill zones of
excavation. Backfill shall consist of earth removed from excavation or sand
backfill approved by the Engineer. Debris or large rocks shall not be used as
backfill material.
Compaction The process whereby the density of a soil mass is increased by
mechanical, usually dynamic means. This typically involves tamping, rolling,
or vibration, or a combination of these processes. This will result in
relocation of soil particles and the expulsion of air from the soil mass, but
usually without significantly altering the amount of water in the soil.
5.5.2
MATERIAL REQUIREMENTS
5.5.3
EXECUTION
5.5.3.1
The Contractor shall not place any backfill material until the Engineer has
inspected and accepted the placement of the bedding. The Contractor must
not place the overlay material until the concrete has obtained its initial set.
Backfill must not be placed within twenty four (24) hours of placing
concrete. Backfill shall be excavated granular material free of, debris,
organic matter, and rocks larger than four (4) inches across their greatest
dimension.
All compaction shall be by hand operated, plate type, vibratory, or other
suitable hand tampers in areas not accessible to larger rollers or
compactors. Extreme care shall be taken to avoid damage to conduits, pipes,
and any appurtenances.
The backfill material shall be placed and compacted in layers not exceeding
two hundred (200) millimeters loose thickness, and shall be moisture
conditioned as required to facilitate adequate compaction.
The Contractor is responsible for monitoring and rectifying any subsidence
that occurs as a consequence of the Works. The Contractor shall pay any
damage caused as a consequent of subsidence.
5.5.4
MEASUREMENT/BASIS OF PAYMENT
The volume that is to be backfilled to be paid for will be the volume of fill
acceptably cleared in conformity with the plans or as directed by the Engineer.
The accepted quantities, measured as prescribed above shall be paid for at the
contract unit price for each of the particular pay items listed and included in the
Bill of Quantities. The payment shall constitute full compensation for the
removal and disposal of cleared and grubbed materials including all labor,
equipment tools and incidentals.
ITEM 5.6
ITEM 5.7
FORM/DEFORM WORKS
ITEM 5.8
ITEM 5.9
5.9.1
5.9.1.1
DESCRIPTION
This item shall cover all related Specifications for the supply, fabrication and
installation of steel pipes.
5.9.2
CONTRACTORS SCOPE
The Contractor shall supply, install, test and commission fully operational low
pressure steel pipes. Methodology shall be submitted to the Engineer as
instructed as well as the material specification of the pipe taking into account
the requirements specified herein.
Plans are in accordance with the provisions of these Specifications or as
instructed by the Engineer.
5.9.3
MATERIAL REQUIREMENT
Joints shall be fabricated accurately for close fit. Weld exposed joints
continuously unless otherwise indicated or approved. Dress exposed welds
flush and smooth. All welds shall be according to the applicable provisions as
stated herein.
e. Procedure for Installation of Embedded Items
Temporarily brace and secure items which are to be built into concrete.
Isolate non ferrous metal surfaces to be permanently fastened in contact
with ferrous metal surfaces, concrete, or masonry by coating non ferrous
metal surfaces with bituminous mastic, prior to installation
Fit and set fabricated metal work accurately in location, alignment, and
elevation. Securely fastened in place.
5.9.4
MEASUREMENT/BASIS OF PAYMENT
ITEM 5.10
5.10.1
5.10.1.1
DESCRIPTION
This item shall consists steel structures of any structural shape as shown
on the Plans approved by the Engineer. The structure will rest on pedestal
with a given height as required on site.
5.10.2
CONTRACTORS SCOPE
The Contractor shall be responsible for the accurate location of all steel works
including items used to attach materials to other parts of the work.
The Contractor shall see to it that any or all items of work which, are to be built
into the work of other trades are installed at the proper time.
The Contractor shall notify the Engineer if the steel work shall be fabricated in a
shop other than the site, so that arrangements can be made together with the
Engineer in the inspection of the delivered materials and in the fabrication of the
steel work.
5.10.3
SUBMITTALS
5.10.4
MATERIAL REQUIREMENTS
DELIVERY
5.10.5
EXECUTION
5.10.5.1
WELDING TECHNIQUE
BOLTS
a. Tighten all bolts to a bolt tension not less than the proof load given in
the applicable ASTM specifications for the type of bolt used.
PAINTING
5.10.5.4.2
NONDESTRUCTIVE TESTING
IDENTIFICATION
ERECTION
5.10.5.6.1
GENERAL
BRACING
The frame of the steel structure shall be carried up true and plumb
and temporary bracing shall be introduced wherever necessary to
take care of all loads to which the structure maybe subjected,
including equipment and the operation of the same. Such bracing
shall be left in place as long as may be required for safety. Wherever
of piles of materials, erection equipment or other loads are varied
during erection, proper provisions shall be made to take care of
stresses resulting from such loads. As erection progresses, the work
shall be securely bolted, or welded, to take care of all dead load, wind
and erection stresses.
5.10.5.6.3
ALIGNMENT
FIELD WELDING
WORKMANSHIP
MEASUREMENT/BASIS OF PAYMENT
This item will be paid as indicated in the contract which is per accomplishment
or can be converted into a lump sum basis.
The accepted quantities, measured as prescribed above shall be paid for at the
contract unit price for each of the particular pay items listed and included in
the Bill of Quantities. The payment shall constitute full compensation for the
fabrication, installation and supply of materials including all labor, equipment
tools and incidentals necessary to complete the work prescribed in this item.
ITEM 5.11
5.11.1
5.11.1.1
DESCRIPTION
EXECUTION
The material shall be made of A36 steel and an approved kind of
sealer for the joints either a rubberized or compact cork material.
Bolts shall conform on the Drawings in terms of size and materials.
The bolts shall be made of required tensile strength steel.
5.11.3
MEASUREMENT/BASIS OF PAYMENT
Payment will be made as a lump sum basis or as per quantity
installed.
The installed item will be tested to assure that there is no leak and
shall be paid for at the Contract unit price for the expansion joint
pay item that is included in the Bill of Quantity, which price and
payment shall be for full compensation for furnishing all labor,
equipment, tools and incidentals necessary to complete the Work
prescribed in this item.