Sei sulla pagina 1di 24

UNOPS

UNITED NATIONS OFFICE FOR PROJECT SERVICES

BILL OF QUANTITIES

Ai Khanem Border Crossing Point Facilities


Takhar, Afghanistan

Customs and Police Office Buildings

NOTICE TO ALL BIDDERS - COMPLETE PROJECT PRICE:


1. All bidders MUST examine the complete project documents. These
documents include the Drawings, BOQ, Schedules and Specifications.
Any discrepancies between these documents are to be brought to the
immediate attention of UNOPS Engineer.
2. Quotation given by the contractor on this BOQ are to cover any and all
additional materials, labor or associated costs to complete the works as
documented on the complete project documents.
3. Eventual claims for extra works are covered by project general
documentation of contract.

Currency:

US Dollars

Project No:
Project Title:
Location:

810
Ai Khanem Border Crossing Point Facilities
Takhar, Afghanistan

Tender No:
Tender Title:
Original Issue:

04
Customs and Police Office Buildings
February 25, 2010

Ai Khanem Border Crossing Point Facilities


Takhar, Afghanistan
Customs Office Building

UNOPS
Vertical Structures Unit

DETAILS OF COMPONENT
Currency:

US Dollars

Project No:
Project Title:
Location:

810
Ai Khanem Border Crossing Point Facilities
Takhar, Afghanistan

Tender No:
04
Component: Customs Office Building
Original Issue: February 25, 2010

Pos.
1. General

Description of Work/Items

1.1 Preliminaries

1
2

Unit

Quantity

Unit Cost

Total Cost

1.1 Occupied Areas, 1.1 Existing


Services Schedule and 1.1 Items
to be supplied schedules

Pre-construction work, mobilisation activities


including paper/ documentation tasks.
Post construction works and clean up.

1.2 General Requirements


1

Project Schedules Ref.

LS

1.00

LS

1.00

LS

1.00

1.2 Inspection notification


schedule and 1.2 Warranty
schedules

Testing and Operation/Maintenance Manuals.

Subtotal General

2. Site

2.3 Earthwork
1

Excavation (any soil type) for foundation.


This item includes all excavations, disposal and
temporary support or shoring if needed. See
drawing and schedule for details.

Ground improvement under foundations.


This includes supplying of filling materials and
compacting the layers according to schedule
and drawings.
Soil backfilling on RCC math foundation up to
ground level. This includes supplying of needed
materials. See drawings and schedules for
levels/dimensions and details.
Gravel compaction, Class 2, at any places
under the PCC/RCC shown inside the building
or at sidewalk/ramp. This includes supplying of
needed materials. See drawing and project
schedules for dimensions and details.

2.1 Identified hazardous materials


and 2.3 Earthwork schedules

CU.M

246.00

CU.M

110.00

CU.M

190.00

CU.M

75.00

Subtotal Site

3. Structure

3.1 Concrete-General

3.1 Non reinforced concrete, 3.1


Reinforced concrete and 3.2
Concrete- Integral Finishes
schedules

NOTE: Cost for concrete items in this section


includes reinforcement, steel anchorage embedded
in concrete, shuttering, concrete, concrete curing
and all to the complete job.

1
2
3

PCC lean concrete (10 Mpa) under the RCC


foundations.
RCC (20 Mpa) foundations, rectangular and
trapezoidal foundation beams.
PCC, 40mm thick, lean concrete (10 Mpa) at
the floor over the gravel compaction.

3/24

CU.M

13.00

CU.M

140.00

CU.M

19.00

Currency:

US Dollars

Project No:
Project Title:
Location:

810
Ai Khanem Border Crossing Point Facilities
Takhar, Afghanistan

Tender No:
04
Component: Customs Office Building
Original Issue: February 25, 2010

Description of Work/Items

Pos.
4

3.3 Pre-cast RC Concrete


1

Unit Cost

Total Cost

CU.M

47.00

CU.M

82.00

CU.M

86.00

CU.M

15.00

Lin M

29.00

CU.M

60.00

SQ.M

680.00

CU.M

60.00

Lin M

560.00

No

6.00

No

4.00

No

2.00

3.5 Brickwork construction


schedule

3.9 Light Timberwork schedule,


6.6 Interior painting and 6.6
Exterior painting schedules

Roof timber structure on the trusses. The cost


includes 30mm thick wooden planks as shown
on the drawing. This also cover all auxiliary and
needed materials and supplying and installation
of members including painting to make the
surface ready for folded metal sheet roofing
according to the drawing, schedule and
specifications.

3.10 Concrete Unit Masonry


1

Quantity

3.3 Precast Concrete Prototypes


Schedule

Second Class Brick masonry with mortar. This


includes all brick walls/ brick masonry in the
entire building. The cost includes steel bars
shown in the walls and their connection to the
perimeter RCC elements.

3.9 Light Timberwork

Unit

Precast RCC (20 Mpa) exterior window sill for


all windows as per drawings. This includes all
work need for complete installation.

3.5 Brickwork
1

Project Schedules Ref.

PCC concrete, 100mm thick, (20 Mpa) at the


floor over the water-proofing layer. This item
includes the stairs steps at the entrances and
the ramps.
RCC Columns, includes all columns (from -1.65
to +3.55) and supporting columns/ring beams
for trusses on the roof.
RCC (20 Mpa) slabs and beams. The items
covers all slabs, beams and RCC floor for the
bank.
RCC Pavement (20 Mpa), for 1000mm-wide
side walks. This includes entrances and ramps.
The cost includes expansion joint on side walk
surface as shown and as well as the broom
finish to the side walk/ ramp surfaces.

3.10 Concrete Unit Masonry

CMU masonry with mortar. This item covers all


CMU works shown on the drawings for the
building. The cost includes all needed
materials, steel bars, anchors etc and works.

3.11 Structural Steel

3.11 Structural Steel Schedules

NOTE: Cost for steel related items in this section


includes supplying materials and installation to the
complete condition for all members, gussets,
fasteners, connections, welding and other
accessories and works needed to complete the job.
The cost also includes painting according to the
schedules and specifications for steel member
painting, which is at least on coat of anti-rust
followed by 2 other coats of oil-based painting for all
surfaces and sides of the steel members.

2
3
4

Steel support, purlin, at the metal sheet roof as


(C-shape 140x65mm + L-shape 50x50mm).
See drawing for details.
Steel truss (TRUSS 1) at the roof. See drawing
for details.
Steel truss (TRUSS 2) at the roof. See drawing
for details.
Steel truss (TRUSS 3) at the roof. See drawing
for details.

4/24

Currency:

US Dollars

Project No:
Project Title:
Location:

810
Ai Khanem Border Crossing Point Facilities
Takhar, Afghanistan

Tender No:
04
Component: Customs Office Building
Original Issue: February 25, 2010

Description of Work/Items

Pos.
5
6
7
8
9
10
11
12
13

Project Schedules Ref.

Steel truss (TRUSS 4) at the roof. See drawing


for details.
Steel truss (TRUSS 5) at the roof. See drawing
for details.
Steel truss (TRUSS 6) at the roof. See drawing
for details.
Steel truss (TRUSS 7) at the roof. See drawing
for details.
Steel truss (TRUSS 8) at the roof. See drawing
for details.
Steel truss (TRUSS 9) at the roof. See drawing
for details.
Steel truss (TRUSS 10) at the roof. See
drawing for details.
Steel truss (TRUSS 11) at the roof. See
drawing for details.
Steel frame fixed ladder inside the toilet as the
access way to the roof. The work and the cost
includes construction of fixed later to the wall
and the opening pane, its hardware and other
accessories to complete the installation as per
drawing and schedule. This also includes
painting according to the schedules and
specifications for steel surfaces painting.

Unit

Quantity

Unit Cost

Total Cost

No

8.00

No

2.00

No

2.00

No

8.00

No

2.00

No

4.00

No

4.00

No

1.00

LS

1.00

Subtotal Structure

4. Enclosure

4.1 Waterproofing
1

Bitumen water-proofing coat. This is a 3-5mm


thick hot bitumen painting coats on dried PCC
surface. The item applies on 40mm PCC at the
floor beneath the 20 Mpa, 100mm thick PCC
layer. This cost includes supplying and applying
the coats with all needed accessories and work
to do the job as per manufacturer's data and to
the full satisfaction of UNOPS engineer.

Single layer bitumen membrane at the floor and


walls of toilets/kitchen. This includes
preparation of base layers shown on the
drawings. Refer to schedule/drawing for details.

4.2 Roofing
1

Standing seam metal roofing (using GI sheet


gauge 24). This includes all accessories
required for installation of roof on the prepared
timber plank (see item 3.9.1 for the cost of
timber plank on roof). The cost also includes all
flashings, capping etc needed on the metal roof.

Metallic gutter around the roof (using GI sheet


gauge 20). The cost includes all accessories
required for complete installation of gutter such
as supplying, fixing and others as per drawing
and schedules.

Down pipes, PVC pipe class-B. This includes


all accessories required for complete installation
such as supplying, fixing and others as per
drawing and schedules.

4.1 Waterproofing system


schedule

SQ.M

470.00

SQ.M

55.00

SQ.M

680.00

Lin M

116.00

Lin M

45.00

4.2 Roofing materials, and 4.2


Gutter and Down pipe Schedules

5/24

Currency:

US Dollars

Project No:
Project Title:
Location:

810
Ai Khanem Border Crossing Point Facilities
Takhar, Afghanistan

Tender No:
04
Component: Customs Office Building
Original Issue: February 25, 2010

Description of Work/Items

Pos.

4.3 Windows and Window Hardware

Project Schedules Ref.

Unit

Quantity

Unit Cost

Total Cost

SQ.M

63.00

SQ.M

76.00

SQ.M

6.00

SQ.M

2.00

No

5.00

SQ.M

640.00

SQ.M

310.00

4.3 Window, 4.3 Window


Hardware, 4.5 Annealed Glasses,
and 4.6 Glassblock work
schedules

NOTE: Prior to work, samples must be approved by


UNOPS Engineer.

Wooden frame windows. The work includes


making, transportation, installation, hardware,
glazing, glass-block work around window,
insect screen, 3 coats of oil-based painting, and
other accessories required for complete
installation as per drawings and schedule.

4.4 Doors and Door Hardware

4.4 Joinery doors 4.4 PVC doors,


4.4 Steel doors and 4.5 Annealed
Glasses schedules

NOTE: Prior to work, samples must be approved by


UNOPS Engineer.

Wooden frame doors. The work includes


making, transportation, installation, hardware,
glazing, and other accessories required for
complete installation as per drawings and
schedule.
PVC frame doors. The work includes making,
transportation, installation, hardware, glazing,
and other accessories required for complete
installation as per drawings and schedule.
Steel frame doors. The work includes making,
transportation, installation, hardware, glazing, 1
coat of anti-rust followed by 2 other coats of oilbased painting, and other accessories required
for complete installation as per drawings and
schedule.

4.5 Glazing
1

Mirrors (40x60cm) at toilets. This includes


complete installation.

4.7 Insulation and Vapour Barriers


1

4.5 Mirrors schedules

4.7 Insulation Schedules

Glasswool thermal insulation on RCC roof,


beneath roof structure. See drawings and
schedules for details.

4.8 Exterior Insulation and Finish System

4.8 EFIS Schedules

NOTE: Prior to work, samples must be approved by


UNOPS Engineer.

External wall insulation system, STOTHERM


CLASSIC, (expanded polystyrene foam and
organically bound render) "or equivalent ". See
drawing and schedule for location and detail.
The cost includes one preparation layer of
cement render and all other process required for
a complete job as per product's manufacturer
data and UNOPS engineer satisfaction.

Subtotal enclosure

5. Interior

5.4 Suspended Ceiling

5.4 Suspended Ceiling Schedule

6/24

Currency:

US Dollars

Project No:
Project Title:
Location:

810
Ai Khanem Border Crossing Point Facilities
Takhar, Afghanistan

Tender No:
04
Component: Customs Office Building
Original Issue: February 25, 2010

Description of Work/Items

Pos.
1

5.5 Joinery
1

Wooden frame, MDF finish, wall mounted


cabinet at the kitchen. See drawings for details.
The cost includes making, installation, framing,
hardware, finish, 3 coats oil-based painting and
all to the complete job.

Wooden frame, MDF finish, floor mounted


cupboard at the kitchen. See drawings for
details. The cost includes making, installation,
framing, finish, hardware, stone table top,
splash back, 3 coats oil-based painting and all
to the complete job.

5.6 Metalwork
1

2
3

Unit

Quantity

Unit Cost

Total Cost

SQ M

152.00

SQ M

4.00

LS

1.00

LS

1.00

Lin M

70.00

No

3.00

LS

1.00

No

4.00

No

4.00

5.5 Joinery fixtures schedule

5.6 Metal Fixtures Schedule

Metallic plaster beads for outer corners at the


corridors only, including edge of walls. This
includes any needed work for complete
installation. See schedules and drawings for
details.
Toilet roll holders. This also includes installation.
Grab rail for handicap toilet. One complete set.
This includes supplying and complete
installation.
Soap dishes. This also includes installation.

5.8 Fire Extinguishers and Blankets


1

Project Schedules Ref.

Lasani wooden board, 16mmm, fixed ceiling for


all soffits around the building. The cost includes
all framing, fixing, oil based painting and
needed work for a complete job to the full
satisfaction of Engineer.
Gypsum board, 16mmm, reflected ceiling for
the side entrances of the building. The cost
includes all framing, fixing, and needed work for
complete job.

5.8 Fire Extinguishers Schedule

Extinguishers, wall mounted, powder-type (9kg).

Subtotal Interior

6. Finish

6.1 Plastering

6.1 Plastering Schedule

NOTE: Prior to work, samples must be approved by


UNOPS Engineer.
Internal surfaces

Cement render medium CRM followed by


cement render fine CRF on all internal surfaces
of walls/ ceilings/ beams/ columns/ reveals. See
schedule for detail.
External surfaces

SQ.M

1,100.00

SQ.M

40.00

Gypsum board, decorative finish, at both main


entrances foreheads. The cost includes
supplying, making, installation and all to the
complete condition as per Engineer's approval.

6.2 Cementitious Toppings

6.2 Cementitious Toppings


Schedule

NOTE: Prior to work, samples must be approved by


UNOPS Engineer.

7/24

Currency:

US Dollars

Project No:
Project Title:
Location:

810
Ai Khanem Border Crossing Point Facilities
Takhar, Afghanistan

Tender No:
04
Component: Customs Office Building
Original Issue: February 25, 2010

Description of Work/Items

Pos.
1

Project Schedules Ref.

In situ colored chips, colored mortar terrazzo,


including marble trims for joints, for all floors as
shown on the drawing. See schedule for details.
The cost also includes stainless steel nosing at
the outer edges of the stair steps at the
entrances.

6.3 Tiling

Unit

Quantity

Unit Cost

Total Cost

SQ.M

510.00

SQ.M

70.00

SQ.M

35.00

Lin M

450.00

SQ.M

1,100.00

6.3 Wall tiling and 6.3 Floor tiling


schedules

NOTE: Prior to work, samples must be approved by


UNOPS Engineer.

2
3

Ceramic wall tiles for toilets, kitchen, around the


drinking water fountain and any place shown.
The cost includes bed preparation, bedding and
grout.
Ceramic floor tiles for toilets including bed
preparation, bedding and grout.
Marble skirting for all rooms and halls where did
not receive ceramic tiles. The cost includes
bedding and grout.

6.6 Painting

6.6 Interior/Exterior painting


schedule

NOTE: Prior to work, samples must be approved by


UNOPS Engineer.
Internal surfaces

Flat water based: Interior, on all surfaces that


receive cement plaster. The cost includes wall
putty (gypsum filling) layer before painting and
all needed preparation of the surfaces for
painting. See schedule for detail on this paint
system

Subtotal Finishes

8. Water Services

8.1 Water Services

8.1 Water services samples, 8.1


Water system piping, 8.1 Sanitary
fixtures, 8.1 Water heater
schedules and 8.1 Water
Services Testing schedules

NOTE: The cost for all pipes exposed to


weather includes glass wool thermal insulation
cover. The cost given for all GI and PVC pipes
with diameter less than 60mm includes all
required fittings, accessories and work for
complete system installation.
Water supply piping

1
2
3
4
5
6
7
8

GI water supply pipe D=32mm, including


fittings and installation.
GI water supply pipe D=25mm, including
fittings and installation.
GI water supply pipe D=20mm, including
fittings and installation.
GI water supply pipe D=15mm, including
fittings and installation.
Water supply bronze Valve D=32mm, including
fittings and installation.
Water supply bronze Valve D=20mm, including
fittings and installation.
Damp proof Insulation rubber tape for all GI
Piping.
Water supply inspection manhole less than
1200mm deep. This includes excavation and
any needed work to make the manhole as per
drawings and schedule.

Lin M

30.00

Lin M

22.00

Lin M

25.00

Lin M

50.00

No

2.00

No

1.00

150.00

3.00

Lin M

No

8/24

Currency:

US Dollars

Project No:
Project Title:
Location:

810
Ai Khanem Border Crossing Point Facilities
Takhar, Afghanistan

Tender No:
04
Component: Customs Office Building
Original Issue: February 25, 2010

Description of Work/Items

Pos.

Project Schedules Ref.

Unit

Quantity

Unit Cost

Total Cost

Lin M

34.00

Lin M

50.00

Lin M

15.00

Lin M

10.00

No

4.00

No

8.00

No

1.00

No

3.00

No

2.00

No

4.00

No

6.00

No

1.00

No

2.00

No

1.00

No

1.00

No

2.00

No

1.00

No

2.00

Sanitation Piping

10
11

12

13
14
15

16
17
18

19
20
21
22
23
24
25
26

PVC pipe D=100mm, including supply and


installation. This also includes supply and
installation of PVC pipe from GI sheet
downpipes to the open channel collector at the
side walks.
PVC pipe D=50mm, including fittings and
installation.
Ventilation PVC pipes D=100mm (from toilets
to roof). This also includes supplying and
installation of PVC screen at the pipe inlets
inside the toilets. See drawing and schedule for
details.
Ventilation PVC pipes D=50mm (from toilets to
roof). This also includes supplying and
installation of PVC screen at the pipe inlets
inside the toilets. See drawing and schedule for
details.
PVC Elbow D=100x100,45, including supply
and installation.
PVC Tee D=100x100, 45, including supply and
installation.
Sanitation Grease Trap less than 1200mm
deep. This includes excavation and any needed
work to make the manhole according to the
drawings and schedules.
Sanitary and other fixtures
Western toilet, including supply, installation and
accessories.
Water fountain , including supply, installation
and accessories.
Ceramic sink at toilets and labs, including mixer
and all accessories, supplying and installation.
Floor trap D=50mm, including supply and
installation.
Stainless steel sink, including supply and
installation.
Ventilation cap D=100mm, including supply
and installation.
Ventilation cap D=50mm, including supply and
installation.
Service Sink, including supply and installation.
Electrical water boiler with capacity of 50 Liter,
including supply and installation.
Electrical water boiler with capacity of 30 Liter,
including supply and installation.
Sewer Manholes More than 1200mm deep.
This includes excavation and any needed work
to make the manhole according to the drawings
and schedules.

Subtotal Water Services

9. Electrical Services

9.1 Electrical Services

9.1 Electrical systems, 9.1


Electrical supply mains, 9.1
Electrical switchboard design, 9.1
Main 380VAC Distribution
System, 9.1 Panel Construction,
9.1 Power accessories, 9.1
Lighting control and fittings, 9.1
Fire Detection Equipment
Schedule Schedules and the
Attachments

9/24

Currency:

US Dollars

Project No:
Project Title:
Location:

810
Ai Khanem Border Crossing Point Facilities
Takhar, Afghanistan

Tender No:
04
Component: Customs Office Building
Original Issue: February 25, 2010

Description of Work/Items

Pos.

Project Schedules Ref.

Unit

Quantity

Unit Cost

Total Cost

Note: for all items below the cost includes


complete/installations with all needed
accessories and works.
Switchboard and sub boards

Sub distribution panel, 750x500x250 mm,


powder coated, weatherproof, outdoor mounted
metal. With Digital Measurement equipments.

2
3

Main circuit breaker, MCCB, 3x160Amps, TypeC.


Circuit breaker, MCB, 1x32Amps, Type-C

Circuit breaker, MCB, 1x20Amps, Type-C

No.

1.00

No.

1.00

No.

16.00

No.

38.00

Lin M

600.00

Lin M

1,500.00

No

42.00

No

35.00

No

21.00

No

7.00

No

25.00

No

2.00

No

98.00

Distribution wiring

3 (1X6mm2) wires pulled in 24mm PVC


Conduit, assorted colors as per phase
requirement RST/UVW, white color for neutral
and green color for grounding.
3 (1X4mm2) wires pulled in 24mm PVC
Conduit, assorted colors as per phase
requirement RST/UVW, white color for neutral
and green color for grounding.
Fittings/Fixtures

Single pole/double pole or two way light switch.

13

32W circular surface ceiling mount, IP54


fluorescent light fixture.
60W circular Pendant ceiling mount, IP54
fluorescent light fixture with all accessories.
60W Circular Surface ceiling mount, IP54
fluorescent light fixture with all accessories.
2x36W pendant ceiling mounted fluorescent
light fixture, IP-44.with all accessories.
1x36W pendant ceiling mounted fluorescent
light fixture, IP-56. with all accessories.
16 Amp Duplex power receptacle.

14

16 Amp single water proof power receptacle.

No

9.00

15

25 Amp single water proof power receptacle for


electrical water heater and kitchen.
AC/Split Units and Exhaust fans

No

9.00

12000 BTU AC/ Split unit 220 V, 50 HZ


Samsung made in Italy with all accessories.
Roof mounted exhaust fans .

No

15.00

No

3.00

25 Amp single electrical non-fuse disconnecting


switch for AC/ Split unit.
Emergency evacuation lighting

No

15.00

2x10 watt IP-65 wall mounted Emergency Light


Fixture.
1X10W surface mounted IP-40 Exit light.

No

7.00

No

4.00

LS

1.00

No

4.00

No

4.00

No

22.00

9
10
11
12

16
17
18

19
20

Fire alarm system (including all associated


cabling, wiring, mounting, etc)

23

Addressable fire alarm panel, with all


accessories, to the complete and functioning
job.
Fire alarm push button, double action type, UL
Listed
Fire alarm

24

Photoelectric type smoke detectors, UL Listed

21

22

Electrical Grounding and Lightning


Protection.

10/24

Currency:

US Dollars

Project No:
Project Title:
Location:

810
Ai Khanem Border Crossing Point Facilities
Takhar, Afghanistan

Tender No:
04
Component: Customs Office Building
Original Issue: February 25, 2010

Description of Work/Items

Pos.
25

Lightening protection as mentioned in lightening


protection drawing with air terminal, electrodes,
tape, connectors, clamp and grounding cable

26

Grounding system as mentioned in grounding


drawing with electrodes, tape, connectors,
clamp and grounding cable
Labeling

27

Project Schedules Ref.

Unit

Quantity

Unit Cost

Total Cost

Set

1.00

Set

1.00

LS

1.00

Proper and correct all circuits numbering, cable


circuit drawings, cable and switchboard labeling
to the full satisfaction of UNOPS engineer.

Subtotal Electrical Services

11/24

UNOPS
Vertical Structures Unit

SUMMARY OF COMPONENT
Currency:

US Dollars

Project No:
Project Title:
Location:

810
Ai Khanem Border Crossing Point Facilities
Takhar, Afghanistan

Tender No:
Component:
Original Issue:

04
Customs Office Building
February 25, 2010

Work Type
Total for General

0.00

Total for Site

0.00

Total for Structure

0.00

Total for Enclosure

0.00

Total for Interior

0.00

Total for Finish

0.00

Total for Water Supply Services

0.00

Total for Electrical Services

0.00

Total for Customs Office Building

0.00

Ai Khanem Border Crossing Point Facilities


Takhar, Afghanistan
Police Office Building

UNOPS
Vertical Structures Unit

DETAILS OF COMPONENT
Currency:

US Dollars

Project No:
Project Title:
Location:

810
Ai Khanem Border Crossing Point Facilities
Takhar, Afghanistan

Tender No:
04
Component: Police Office Building
Original Issue: February 25, 2010

Pos.
1. General

Description of Work/Items

1.1 Preliminaries
1

Pre-construction work, mobilisation activities


including paper/ documentation tasks.

Post construction works and clean up.

1.2 General Requirements


1

Unit

Quantity

Unit Cost

Total Cost

1.1 Occupied Areas, 1.1 Existing


Services Schedule and 1.1 Items to be
supplied schedules

LS

1.00

LS

1.00

LS

1.00

1.2 Inspection notification schedule and


1.2 Warranty schedules

Testing and Operation/Maintenance Manuals.

Subtotal General

2. Site

2.3 Earthwork
1

Excavation (any soil type) for foundation.


This item includes all excavations, disposal
and temporary support or shoring if needed.
See drawing and schedule for details.

Ground improvement under foundations.


This includes supplying of filling materials and
compacting the layers according to schedule
and drawings.
Soil backfilling on RCC math foundation up
to ground level. This includes supplying of
needed materials. See drawings and
schedules for levels/dimensions and details.

2.1 Identified hazardous materials and


2.3 Earthwork schedules

CU.M

190.00

CU.M

85.00

CU.M

147.00

CU.M

60.00

Gravel compaction, Class 2, at any places


under the PCC/RCC shown inside the building
or at sidewalk/ramp. This includes supplying
of needed materials. See drawing and project
schedules for dimensions and details.

Subtotal Site

3. Structure

3.1 Concrete-General

3.1 Non reinforced concrete, 3.1


Reinforced concrete and 3.2 ConcreteIntegral Finishes schedules

NOTE: Cost for concrete items in this section


includes reinforcement, steel anchorage embedded
in concrete, shuttering, concrete, concrete curing
and all to the complete job.

1
2
3

PCC lean concrete (10 Mpa) under the RCC


foundations.
RCC (20 Mpa) foundations, rectangular and
trapezoidal foundation beams.
PCC, 40mm thick, lean concrete (10 Mpa) at
the floor over the gravel compaction.

14/24

CU.M

10.00

CU.M

108.00

CU.M

15.00

Currency:

US Dollars

Project No:
Project Title:
Location:

810
Ai Khanem Border Crossing Point Facilities
Takhar, Afghanistan

Tender No:
04
Component: Police Office Building
Original Issue: February 25, 2010

Description of Work/Items

Pos.
4

PCC concrete, 100mm thick, (20 Mpa) at the


floor over the water-proofing layer. This item
includes the stairs steps at the entrances and
the ramps.
RCC Columns, includes all columns (from 1.65 to +3.55) and supporting columns/ring
beams for trusses on the roof.
RCC (20 Mpa) slabs and beams. The items
covers all slabs, beams and RCC floor for the
bank.
RCC Pavement (20 Mpa), for 1000mm-wide
side walks. This includes entrances and
ramps. The cost includes expansion joint on
side walk surface as shown and as well as the
broom finish to the side walk/ ramp surfaces.

3.3 Pre-cast RC Concrete


1

Quantity

Unit Cost

Total Cost

CU.M

36.00

CU.M

66.00

CU.M

66.00

CU.M

12.00

Lin M

23.00

CU.M

46.00

LS

1.00

LS

1.00

495.00

3.3 Precast Concrete Prototypes


Schedule

Precast RCC (20 Mpa) exterior window sill for


all windows as per drawings. This includes all
work need for complete installation.

3.5 Brickwork
1

Unit

3.5 Brickwork construction schedule

Second Class Brick masonry with mortar. This


includes all brick walls/ brick masonry in the
entire building. The cost includes steel bars
shown in the walls and their connection to the
perimeter RCC elements.

3.7 Light Steelwork

3.7 Light Steelwork, 6.6 Interior painting


and 6.6 Exterior painting schedules

NOTE: The following steel items include


painting according to the schedules and
specifications for steel member painting for
complete installation. See drawing for details.

Steel frame cabinet for First-Aid-Kits at the


hall of Police Office Building. The item and its
cost include making, transportation,
installation, hardware, finishes and all other
accessories and work required for a complete
cabinet to the full satisfaction of the Engineer.

Steel frame cabinets for Weapon Storages at


the hall of Police Office Building. The item and
its cost include making, transportation,
installation, hardware, finishes and all other
accessories and work required for a complete
cabinet to the full satisfaction of the Engineer.

3.9 Light Timberwork

3.9 Light Timberwork schedule, 6.6


Interior painting and 6.6 Exterior
painting schedules

Roof timber structure on the trusses. The cost


includes 30mm thick wooden planks as
shown on the drawing. This also cover all
auxiliary and needed materials and supplying
and installation of members including painting
to make the surface ready for folded metal
sheet roofing according to the drawing,
schedule and specifications.
SQ.M

3.10 Concrete Unit Masonry

3.10 Concrete Unit Masonry

15/24

Currency:

US Dollars

Project No:
Project Title:
Location:

810
Ai Khanem Border Crossing Point Facilities
Takhar, Afghanistan

Tender No:
04
Component: Police Office Building
Original Issue: February 25, 2010

Description of Work/Items

Pos.
1

3.11 Structural Steel

3.11 Structural Steel Schedules

NOTE: Cost for steel related items in this section


includes supplying materials and installation to the
complete condition for all members, gussets,
fasteners, connections, welding and other
accessories and works needed to complete the
job. The cost also includes painting according to
the schedules and specifications for steel member
painting, which is at least on coat of anti-rust
followed by 2 other coats of oil-based painting for
all surfaces and sides of the steel members.

3.7 Light Steelwork Schedule

2
3
4
5
6
7
8
9
10
11
12
13

Unit

Quantity

Unit Cost

Total Cost

CU.M

46.00

Lin M

440.00

No

3.00

No

4.00

No

2.00

No

8.00

No

2.00

No

2.00

No

8.00

No

2.00

No

4.00

No

4.00

No

1.00

LS

1.00

CMU masonry with mortar. This item covers


all CMU works shown on the drawings for the
building. The cost includes all needed
materials, steel bars, anchors etc and works.

Steel support, purlin, at the metal sheet roof


as (C-shape 140x65mm + L-shape
50x50mm). See drawing for details.
Steel truss (TRUSS 1) at the roof. See
drawing for details.
Steel truss (TRUSS 2) at the roof. See
drawing for details.
Steel truss (TRUSS 3) at the roof. See
drawing for details.
Steel truss (TRUSS 4) at the roof. See
drawing for details.
Steel truss (TRUSS 5) at the roof. See
drawing for details.
Steel truss (TRUSS 6) at the roof. See
drawing for details.
Steel truss (TRUSS 7) at the roof. See
drawing for details.
Steel truss (TRUSS 8) at the roof. See
drawing for details.
Steel truss (TRUSS 9) at the roof. See
drawing for details.
Steel truss (TRUSS 10) at the roof. See
drawing for details.
Steel truss (TRUSS 11) at the roof. See
drawing for details.
Steel frame fixed ladder inside the toilet as the
access way to the roof. The work and the cost
includes construction of fixed later to the wall
and the opening pane, its hardware and other
accessories to complete the installation as per
drawing and schedule. This also includes
painting according to the schedules and
specifications for steel surfaces painting.

Subtotal Structure

4. Enclosure

4.1 Waterproofing
1

4.1 Waterproofing system schedule

Bitumen water-proofing coat. This is a 3-5mm


thick hot bitumen painting coats on dried PCC
surface. The item applies on 40mm PCC at
the floor beneath the 20 Mpa, 100mm thick
PCC layer. This cost includes supplying and
applying the coats with all needed accessories
and work to do the job as per manufacturer's
data and to the full satisfaction of UNOPS
engineer.

SQ.M

16/24

360.00

Currency:

US Dollars

Project No:
Project Title:
Location:

810
Ai Khanem Border Crossing Point Facilities
Takhar, Afghanistan

Tender No:
04
Component: Police Office Building
Original Issue: February 25, 2010

Description of Work/Items

Pos.
2

Single layer bitumen membrane at the floor


and walls of toilets/kitchen. This includes
preparation of base layers shown on the
drawings. Refer to schedule/drawing for
details.

4.2 Roofing
1

Unit

Quantity

Unit Cost

Total Cost

SQ.M

55.00

SQ.M

495.00

Lin M

98.00

Lin M

38.00

SQ.M

50.00

SQ.M

60.00

SQ.M

6.00

SQ.M

2.00

No

5.00

495.00

4.2 Roofing materials, and 4.2 Gutter


and Down pipe Schedules

Standing seam metal roofing (using GI sheet


gauge 24). This includes all accessories
required for installation of roof on the prepared
timber plank (see item 3.9.1 for the cost of
timber plank on roof). The cost also includes
all flashings, capping etc needed on the metal
roof.
Metallic gutter around the roof (using GI sheet
gauge 20). The cost includes all accessories
required for complete installation of gutter
such as supplying, fixing and others as per
drawing and schedules.
Down pipes, PVC pipe class-B. This includes
all accessories required for complete
installation such as supplying, fixing and
others as per drawing and schedules.

4.3 Windows and Window Hardware

4.3 Window, 4.3 Window Hardware, 4.5


Annealed Glasses, and 4.6 Glassblock
work schedules

NOTE: Prior to work, samples must be approved by


UNOPS Engineer.

Wooden frame windows. The work includes


making, transportation, installation, hardware,
glazing, glass-block work around window,
insect screen, 3 coats of oil-based painting,
and other accessories required for complete
installation as per drawings and schedule.

4.4 Doors and Door Hardware

4.4 Joinery doors 4.4 PVC doors, 4.4


Steel doors and 4.5 Annealed Glasses
schedules

NOTE: Prior to work, samples must be approved by


UNOPS Engineer.

Wooden frame doors. The work includes


making, transportation, installation, hardware,
glazing, and other accessories required for
complete installation as per drawings and
schedule.
PVC frame doors. The work includes making,
transportation, installation, hardware, glazing,
and other accessories required for complete
installation as per drawings and schedule.
Steel frame doors. The work includes making,
transportation, installation, hardware, glazing,
1 coat of anti-rust followed by 2 other coats of
oil-based painting, and other accessories
required for complete installation as per
drawings and schedule.

4.5 Glazing
1

Mirrors (40x60cm) at toilets. This includes


complete installation.

4.7 Insulation and Vapour Barriers


1

4.5 Mirrors schedules

4.7 Insulation Schedules

Glasswool thermal insulation on RCC roof,


beneath roof structure. See drawings and
schedules for details.

SQ.M

17/24

Currency:

US Dollars

Project No:
Project Title:
Location:

810
Ai Khanem Border Crossing Point Facilities
Takhar, Afghanistan

Tender No:
04
Component: Police Office Building
Original Issue: February 25, 2010

Description of Work/Items

Pos.

4.8 Exterior Insulation and Finish System

Unit

Quantity

SQ.M

250.00

Unit Cost

Total Cost

4.8 EFIS Schedules

NOTE: Prior to work, samples must be approved by


UNOPS Engineer.

External wall insulation system,


STOTHERM CLASSIC, (expanded
polystyrene foam and organically bound
render) "or equivalent ". See drawing and
schedule for location and detail. The cost
includes one preparation layer of cement
render and all other process required for a
complete job as per product's manufacturer
data and UNOPS engineer satisfaction.

Subtotal enclosure

5. Interior

5.4 Suspended Ceiling


1

Lasani wooden board, 16mmm, fixed ceiling


for all soffits around the building. The cost
includes all framing, fixing, oil based painting
and needed work for a complete job to the full
satisfaction of Engineer.

Gypsum board, 16mmm, reflected ceiling for


the side entrances of the building. The cost
includes all framing, fixing, and needed work
for complete job.

5.5 Joinery
1

Wooden frame, MDF finish, wall mounted


cabinet at the kitchen. See drawings for
details. The cost includes making, installation,
framing, hardware, finish, 3 coats oil-based
painting and all to the complete job.

Wooden frame, MDF finish, floor mounted


cupboard at the kitchen. See drawings for
details. The cost includes making, installation,
framing, finish, hardware, stone table top,
splash back, 3 coats oil-based painting and all
to the complete job.

5.6 Metalwork
1

2
3

117.00

SQ M

4.00

LS

1.00

LS

1.00

Lin M

54.00

No

3.00

LS

1.00

No

4.00

No

4.00

5.6 Metal Fixtures Schedule

5.8 Fire Extinguishers Schedule

Extinguishers, wall mounted, powder-type


(9kg).

Subtotal Interior

6. Finish

6.1 Plastering

SQ M

5.5 Joinery fixtures schedule

Metallic plaster beads for outer corners at the


corridors only, including edge of walls. This
includes any needed work for complete
installation. See schedules and drawings for
details.
Toilet roll holders. This also includes
installation.
Grab rail for handicap toilet. One complete
set. This includes supplying and complete
installation.
Soap dishes. This also includes installation.

5.8 Fire Extinguishers and Blankets


1

5.4 Suspended Ceiling Schedule

6.1 Plastering Schedule

NOTE: Prior to work, samples must be approved by


UNOPS Engineer.

18/24

Currency:

US Dollars

Project No:
Project Title:
Location:

810
Ai Khanem Border Crossing Point Facilities
Takhar, Afghanistan

Tender No:
04
Component: Police Office Building
Original Issue: February 25, 2010

Description of Work/Items

Pos.

Unit

Quantity

Unit Cost

Total Cost

SQ.M

880.00

SQ.M

40.00

SQ.M

390.00

SQ.M

70.00

SQ.M

35.00

Lin M

360.00

SQ.M

880.00

Internal surfaces

Cement render medium CRM followed by


cement render fine CRF on all internal
surfaces of walls/ ceilings/ beams/ columns/
reveals. See schedule for detail.
External surfaces
Gypsum board, decorative finish, at both main
entrances foreheads. The cost includes
supplying, making, installation and all to the
complete condition as per Engineer's approval.

6.2 Cementitious Toppings

6.2 Cementitious Toppings Schedule

NOTE: Prior to work, samples must be approved by


UNOPS Engineer.

In situ colored chips, colored mortar terrazzo,


including marble trims for joints, for all floors
as shown on the drawing. See schedule for
details. The cost also includes stainless steel
nosing at the outer edges of the stair steps at
the entrances.

6.3 Tiling

6.3 Wall tiling and 6.3 Floor tiling


schedules

NOTE: Prior to work, samples must be approved by


UNOPS Engineer.

2
3

Ceramic wall tiles for toilets, kitchen, around


the drinking water fountain and any place
shown. The cost includes bed preparation,
bedding and grout.
Ceramic floor tiles for toilets including bed
preparation, bedding and grout.
Marble skirting for all rooms and halls where
did not receive ceramic tiles. The cost
includes bedding and grout.

6.6 Painting

6.6 Interior/Exterior painting schedule

NOTE: Prior to work, samples must be approved by


UNOPS Engineer.
Internal surfaces

Flat water based: Interior, on all surfaces that


receive cement plaster. The cost includes wall
putty (gypsum filling) layer before painting and
all needed preparation of the surfaces for
painting. See schedule for detail on this paint
system

Subtotal Finishes

8. Water Services

8.1 Water Services

8.1 Water services samples, 8.1 Water


system piping, 8.1 Sanitary fixtures, 8.1
Water heater schedules and 8.1 Water
Services Testing schedules

NOTE: The cost for all pipes exposed to


weather includes glass wool thermal insulation
cover. The cost given for all GI and PVC pipes
with diameter less than 60mm includes all
required fittings, accessories and work for
complete system installation.
Water supply piping

GI water supply pipe D=32mm, including


fittings and installation.

Lin M

19/24

30.00

Currency:

US Dollars

Project No:
Project Title:
Location:

810
Ai Khanem Border Crossing Point Facilities
Takhar, Afghanistan

Tender No:
04
Component: Police Office Building
Original Issue: February 25, 2010

Description of Work/Items

Pos.
2
3
4
5
6
7
8

10
11

12

13
14
15

16
17
18

19
20
21
22
23
24
25

GI water supply pipe D=25mm, including


fittings and installation.
GI water supply pipe D=20mm, including
fittings and installation.
GI water supply pipe D=15mm, including
fittings and installation.
Water supply bronze Valve D=32mm,
including fittings and installation.
Water supply bronze Valve D=20mm,
including fittings and installation.
Damp proof Insulation rubber tape for all GI
Piping.
Water supply inspection manhole less than
1200mm deep. This includes excavation and
any needed work to make the manhole as per
drawings and schedule.
Sanitation Piping

Unit

Quantity

Lin M

22.00

Lin M

59.00

Lin M

78.00

No

2.00

No

2.00

200.00

No

4.00

Lin M

50.00

Lin M

45.00

Lin M

23.00

Lin M

8.00

No

10.00

No

15.00

No

1.00

No

5.00

No

2.00

No

6.00

No

7.00

No

1.00

No

3.00

No

1.00

No

1.00

No

2.00

No

2.00

Lin M

PVC pipe D=100mm, including supply and


installation. This also includes supply and
installation of PVC pipe from GI sheet
downpipes to the open channel collector at the
side walks.
PVC pipe D=50mm, including fittings and
installation.
Ventilation PVC pipes D=100mm (from toilets
to roof). This also includes supplying and
installation of PVC screen at the pipe inlets
inside the toilets. See drawing and schedule
for details.
Ventilation PVC pipes D=50mm (from toilets
to roof). This also includes supplying and
installation of PVC screen at the pipe inlets
inside the toilets. See drawing and schedule
for details.
PVC Elbow D=100x100,45, including supply
and installation.
PVC Tee D=100x100, 45, including supply
and installation.
Sanitation Grease Trap less than 1200mm
deep. This includes excavation and any
needed work to make the manhole according
to the drawings and schedules.
Sanitary and other fixtures
Western toilet, including supply, installation
and accessories.
Water fountain , including supply, installation
and accessories.
Ceramic sink at toilets and labs, including
mixer and all accessories, supplying and
installation.
Floor trap D=50mm, including supply and
installation.
Stainless steel sink, including supply and
installation.
Ventilation cap D=100mm, including supply
and installation.
Ventilation cap D=50mm, including supply
and installation.
Service Sink, including supply and installation.
Electrical water boiler with capacity of 50
Liter, including supply and installation.
Electrical water boiler with capacity of 30
Liter, including supply and installation.

20/24

Unit Cost

Total Cost

Currency:

US Dollars

Project No:
Project Title:
Location:

810
Ai Khanem Border Crossing Point Facilities
Takhar, Afghanistan

Tender No:
04
Component: Police Office Building
Original Issue: February 25, 2010

Description of Work/Items

Pos.
26

Unit

Sewer Manholes More than 1200mm deep.


This includes excavation and any needed work
to make the manhole according to the
drawings and schedules.

No

Quantity

3.00

Subtotal Water Services

Unit Cost

Total Cost

9. Electrical Services

9.1 Electrical Services

9.1 Electrical systems, 9.1 Electrical


supply mains, 9.1 Electrical switchboard
design, 9.1 Main 380VAC Distribution
System, 9.1 Panel Construction, 9.1
Power accessories, 9.1 Lighting control
and fittings, 9.1 Fire Detection
Equipment Schedule Schedules and the
Attachments

Note: for all items below the cost includes


complete/installations with all needed
accessories and works.
Switchboard and sub boards

Sub distribution panel, 750x500x250 mm,


powder coated, weatherproof, outdoor
mounted metal. With Digital Measurement
equipments.
Main circuit breaker, MCCB, 3x160Amps,
Type-C.
Circuit breaker, MCB, 1x32Amps, Type-C

Circuit breaker, MCB, 1x20Amps, Type-C

No.

1.00

No.

1.00

No.

12.00

No.

30.00

Lin M

400.00

Lin M

900.00

No

38.00

No

26.00

No

16.00

No

2.00

No

16.00

No

3.00

No

54.00

No

16.00

No

12.00

No

8.00

Distribution wiring

7
8
9
10
11

3 (1X6mm2) wires pulled in 24mm PVC


Conduit, assorted colors as per phase
requirement RST/UVW, white color for neutral
and green color for grounding.
3 (1X4mm2) wires pulled in 24mm PVC
Conduit, assorted colors as per phase
requirement RST/UVW, white color for neutral
and green color for grounding.
Fittings/Fixtures
Single pole/double pole or two way light
switch.
32W circular surface ceiling mount, IP54
fluorescent light fixture.
60W circular Pendant ceiling mount, IP54
fluorescent light fixture with all accessories.
60W Circular Surface ceiling mount, IP54
fluorescent light fixture with all accessories.
2x36W pendant ceiling mounted fluorescent
light fixture, IP-44.with all accessories.

12

1x36W pendant ceiling mounted fluorescent


light fixture, IP-56. with all accessories.

13

16 Amp Duplex power receptacle.

14

16 Amp single water proof power receptacle.

15

25 Amp single water proof power receptacle


for electrical water heater and kitchen.
AC/Split Units and Exhaust fans

16

12000 BTU AC/ Split unit 220 V, 50 HZ


Samsung made in Italy with all accessories.

21/24

Currency:

US Dollars

Project No:
Project Title:
Location:

810
Ai Khanem Border Crossing Point Facilities
Takhar, Afghanistan

Tender No:
04
Component: Police Office Building
Original Issue: February 25, 2010

Description of Work/Items

Pos.

Unit

Quantity

Unit Cost

Total Cost

17

Roof mounted exhaust fans .

No

5.00

18

25 Amp single electrical non-fuse


disconnecting switch for AC/ Split unit.
Emergency evacuation lighting

No

8.00

2x10 watt IP-65 wall mounted Emergency


Light Fixture.
1X10W surface mounted IP-40 Exit light.

No

5.00

No

4.00

LS

1.00

No

4.00

No

4.00

No

16.00

Set

1.00

Set

1.00

LS

1.00

19
20

Fire alarm system (including all associated


cabling, wiring, mounting, etc)

23

Addressable fire alarm panel, with all


accessories, to the complete and functioning
job.
Fire alarm push button, double action type, UL
Listed
Fire alarm

24

Photoelectric type smoke detectors, UL Listed

21

22

25

26

27

Electrical Grounding and Lightning


Protection.
Lightening protection as mentioned in
lightening protection drawing with air terminal,
electrodes, tape, connectors, clamp and
grounding cable
Grounding system as mentioned in grounding
drawing with electrodes, tape, connectors,
clamp and grounding cable
Labeling
Proper and correct all circuits numbering,
cable circuit drawings, cable and switchboard
labeling to the full satisfaction of UNOPS
engineer.

Subtotal Electrical Services

22/24

UNOPS
Vertical Structures Unit

SUMMARY OF COMPONENT
Currency:

US Dollars

Project No:
Project Title:
Location:

810
Ai Khanem Border Crossing Point Facilities
Takhar, Afghanistan

Tender No:
Component:
Original Issue:

04
Police Office Building
February 25, 2010

Work Type
Total for General

0.00

Total for Site

0.00

Total for Structure

0.00

Total for Enclosure

0.00

Total for Interior

0.00

Total for Finish

0.00

Total for Water Supply Services

0.00

Total for Electrical Services

0.00

Total for Police Office Building

0.00

UNOPS
Vertical Structures Unit

SUMMARY BILL OF QUANTITIES


Currency:

US Dollars

Project No:
Project Title:
Location:

810
Ai Khanem Border Crossing Point Facilities
Takhar, Afghanistan

Tender No:
Tender Title:
Original Issue:

04
Customs and Police Office Buildings
February 25, 2010

CONTRACT COMPONENTS
Total for Customs Office Building
Total for Police Office Building

BOQ Value for whole tender in words:


Zero

Agreed on behalf of Contractor


Name

UNOPS
Name

Position

Position

Signature

Signature

Address and
Mobile Number

Potrebbero piacerti anche