Sei sulla pagina 1di 3

Revision

Indication

PROJECT SPECIFICATION

Note: The infor mation in this document is confidential and the pr oper ty of UOP LLC and must not be disclosed to other s or r epr oduced in any manner or used for any pur pose whatsoever without its wr itten per mission.

UOP LLC
25 East Algonquin Road
Des Plaines, Illinois 60017-5017 USA

TYPICAL EQUIPMENT LAYOUT

974901 999
REV

DATE

BY

APVD

10Jul13

AM

PG

08NOV13 SM

REV

DATE

SHEET

BY

APVD

PKG

Fixed-Bed Platforming Process Unit


974901
A typical equipment layout for this unit is shown on the following UOP Drawing:
974901-999-03-ga30001-Rev-00

1.

Typical Equipment Layout CCR Platforming Process Unit

General Requirements
1.1

The Typical Equipment Layout is based upon UOP Standard Specification 9-51, Plot Plan
Design Criteria for Process Units. The priority for documentation interpretation is:
a.

This Project Specification, including Section 3 Additional Requirements and


Section 4 Guidelines. Unless noted otherwise, each point in the Additional
Requirements section is mandatory and shall be incorporated into the final plot
plan.

b.

The suggested typical equipment arrangement shown on the UOP Typical


Equipment Layout Drawing.

c.

The plot plan guidelines described in UOP Standard Specification 9-51.

1.2

The UOP Typical Equipment Layout drawing is a non-project specific, generic,


arrangement of the major process equipment typically included in this process. It is NOT
intended to reflect the specific equipment used in, or the plot area available for, the subject
process unit for any project. The drawing provides a suggested equipment layout that
conforms to accepted good practice and incorporates the critical relationships between
major equipment that affect process performance, as described in the Additional
Requirements section of this specification.

1.3

There may be differences between the equipment required for this project and the
equipment shown on the UOP Typical Equipment Layout Drawing. The Contractor's plot
plan shall incorporate the specific requirements (e.g., free draining, equipment relative
locations) and equipment shown on the UOP Piping and Instrument Diagram and the UOP
Project Specifications. UOP Project Specification 112 - Equipment List, indicates the
specific equipment required for this project.

Other specifications
referenced in this
specification:
Form QUA-04-5

UOP Standard Specification: 9-51


UOP Standard Drawing:
UOP Project Specification: 974901-112
999-5

UOP Drawing: GA30001-Rev-00


999-301-1

Revision
Indication

PROJECT SPECIFICATION

Note: The infor mation in this document is confidential and the pr oper ty of UOP LLC and must not be disclosed to other s or r epr oduced in any manner or used for any pur pose whatsoever without its wr itten per mission.

UOP LLC
25 East Algonquin Road
Des Plaines, Illinois 60017-5017 USA

974901 999
REV

DATE

BY

APVD

10Jul13

AM

PG

REV

DATE

SHEET

BY

APVD

TYPICAL EQUIPMENT LAYOUT

2.

Review of Contractors Plot Plan


2.1

UOP will perform a single review of the Contractors proposed plot plan. One copy of the
Contractor's first complete plot plan may be sent to UOP at the following address:
UOP LLC
25 East Algonquin Road
Des Plaines, Illinois 60017-5017, USA
Attention: Project Document Review Coordination (Bin A15)

3.

2.2

The Contractor's plot plan shall be submitted in the English language, and early enough for
the Contractor to act upon UOP's comments without additional cost to the Owner. The plot
plan drawing must be of good quality, suitable for microfilming. Transmittal letters
accompanying the plot plan shall reference the UOP Project Number.

2.3

After receipt of the Contractor's plot plan, UOP will review the drawing(s) for process
related features. One copy, containing UOPs comments and marked "reviewed", will be
returned.

Additional Requirements
The following points are mandatory and shall be incorporated into the final plot plan.

4.

3.1

The Charge and Interheaters are a minimum distance from the reactors to minimize the
reactor circuit alloy piping requirements and compressor utilities.

3.2

The Combined Feed Exchanger should have a minimum pipe run into the Charge Heater.

3.3

The distance from the fired heaters to the Separator should be maximized for fire safety.
However, the linear (and equivalent) feet of the reactor circuit piping should be
minimized to minimize compressor utilities.

3.4

The Separator and Recontact Drums should be located close to Net Gas Compressors.

Guidelines
The following points are guidelines and are to be considered during development of the final plot
plan.
4.1

There should be access to the Reactor structures for catalyst loading using a crane.

4.2

The Debutanizer shall be located for best orientation relative to the reboiler fired heater
and the overhead air cooled condenser.

Form QUA-04-5

999-5

999-301-1

Revision
Indication

PROJECT SPECIFICATION

Note: The infor mation in this document is confidential and the pr oper ty of UOP LLC and must not be disclosed to other s or r epr oduced in any manner or used for any pur pose whatsoever without its wr itten per mission.

UOP LLC
25 East Algonquin Road
Des Plaines, Illinois 60017-5017 USA

974901 999
REV

DATE

BY

APVD

10Jul13

AM

PG

REV

DATE

SHEET

BY

APVD

TYPICAL EQUIPMENT LAYOUT

4.3

It may be desirable to locate the chloride injection facilities near the edge of the plot if a
dike will be required for containment of the organic chloride. Otherwise, the chloride and
condensate injection facilities are located near the Combined Feed Exchanger to minimize
the length of small diameter tubing. The requirements for the chloride storage drum are
determined by the contractor according to the local codes.

4.4

It may be desirable to locate the sulfide injection facilities near the edge of the plot if a
dike will be required for containment of the organic sulfide. Otherwise, the sulfide
injection facilities are located to minimize the length of small diameter tubing. The
requirements for the sulfide storage drum are determined by the contractor according to
local codes.

4.5

Similarly, it may be desirable to keep the caustic facilities near the edge of the plot area.