DNV SOFTWARE
Palace House, 3 Cathedral Street, London SE19DE, UK
http://www.dnv.com/software
Copyright Det Norske Veritas. All Rights Reserved.
No reproduction or broadcast of this material is permitted without the express written consent of DNV.
Contact software.support@dnv.com for more information.
Minor enhancements..................................................................................... 24
Workarounds and Bug Fixes........................................................................ 25
Known Issues, Alerts and Workarounds for v6.7 ....................................................................... 25
Bug Fixes for v6.7....................................................................................................................... 27
Discharge ............................................................................................................................... 27
Dispersion .............................................................................................................................. 27
GUI ........................................................................................................................................ 27
Graphs:
o
Report: component probit/lethality versus distance and mixture lethality versus distance
These new additional results are available for the Vessel/Pipe Source, User-defined Source and the
Warehouse Fire Model scenarios. These enhancements are further detailed below for the specific
case of the warehouse scenario.
Extension to the model for instances when there is not enough material present for the
specified fire duration,
Enabling user specified reaction rate for non-PGS15 fire extinction systems.
The sections below describe these modifications and enhancements in further detail.
In Phast v6.7 the model has been enhanced to reset the fire duration time to the actual duration it takes
for all materials to be burnt and the model will now run successfully.
15:47:39 ----- Calculating Model
Deelen, dag:Deelen - D 9.0m/s...
Doors
Open-
900
m2/1800
for
Weather
15:47:39 ---Info: WHFIRE 2001: Specified fire duration is larger than time
1031.11 s at which all warehouse materials are burned. So fire duration is
reset to the time 1031.11 s at which all warehouse materials are burned
The message displayed will only be seen if display information messages and display warning
messages are selected in the Miscellaneous tab from the Options>Preferences>General Preferences
menu.
The v6.7 plot displays the Warehouse Reference mixture footprint in addition to the NO2 & HCl
lethality
Please note that in the above screen shot the formatting of the plots has been adjusted from the default
(right-click on legend and choose Properties) to help distinguish between overlapping lines.
10
11
PGS15 logic for allowing ADR Class 3 liquids has now been fully implemented. This logic is as
follows:
The screen below shows that for Fire-fighting system 2.1b, the not stored & Stored in other
packaging are now the only available options, as expected from the details above.
12
In Phast v6.7, users now have availability of the user-defined reaction rate when PGS-15 Fire-fighting
systems are not selected.
13
Users need to select either Stored in Other Packaging or Stored in Synthetic Packaging in order for
the Reaction rate calculation field to be enabled. Then, the user defined calculation can be selected
and the desired value may be entered, as can be seen below.
14
In v6.7, the release duration is set so all liquid will eventually evaporate from the building
for both instantaneous and continuous releases. This corrects an inconsistency previously
present where liquid would not always evaporate for instantaneous releases.
For continuous releases the release duration from a building can never be less than one air
change.
The release duration can never be more than the maximum release duration as set in the
parameters (currently 1800 seconds).
For indoor releases, the vapor fraction multiplication factor remains in use (current default value of 3)
and the material remaining is presumed to be trapped as liquid in the building. This multiplication
factor determines the fraction of vapor that can be released from the building and can be modified in
the Discharge parameters group.
In addition to dispersion calculations, the in-building model also carries out explosion calculations,
(which are not included in the risk calculations). Previous to v6.7, the venting parameter of the indoor
confined explosion model was a constant. The venting parameter is now a variable based on the
laminar burning velocity. Please note this correlation is only applicable for low-strength enclosures
which cannot withhold an overpressure higher than 0.1 bar (National Fire Protection Association NFPA 68) for laminar burning velocity not higher than 0.6m/s. Currently, there is no implementation
for high-strength enclosures; this is listed as a potential enhancement for a future version.
For further information on the in-building release model theory, please refer to the technical
documentation which is available with the Phast installation
15
16
10000
1000
Cardiff_Cyclo-Hexane
Cardiff_Water
Cardiff_Gasoline
Cardiff_Butane
Cardiff_Propane
INERIS_Butane
VKI - R134-A
STEP - Propane
HSL - Propane
INERIS - Butane
Ecole de Mines - Water
+30%-deviation
-30%-deviation
100
10
10
100
1000
10000
A modified CCPS droplet correlation has been developed and implemented in Phast v6.7 as the default
choice for continuous releases. This modified CCPS correlation chooses the mechanical break-up
droplet size for sub-cooled releases and the flashing droplet size for superheated releases, instead of
choosing the minimum size as in the original CCPS correlation. Better predictions compared to
experiments are obtained with the modified CCPS droplet correlation, as shown in the figure below.
17
10000
1000
Cardiff_Cyclo-Hexane
Cardiff_Water
Cardiff_Gasoline
Cardiff_Butane
Cardiff_Propane
INERIS_Butane
VKI - R134-A
STEP - Propane
HSL - Propane
INERIS - Butane
Ecole de Mines - Water
+30%-deviation
-30%-deviation
100
10
10
100
1000
10000
Please note the modified CCPS droplet correlation is intended to be used in conjunction with the
Unified Dispersion Model (UDM) Version 2, which is the new default UDM model in Phast v6.7.
Additionally, it was also shown that the modified CCPS droplet correlation resulted in the most
accurate UDM predictions of rainout.
For further details, see the document Dropsize_theory_validation.pdf included as part of the Phast
technical documentation.
The inclusion of CO2 as a Hazardous Substance in the Seveso Directive has been described in a HSE
paper available from the HSE's web site (http://www.hse.gov.uk/seveso/co2-hazardous-substance.pdf).
This paper states that the Phast CO2 model currently has the greatest potential to accurately model
the release of CO2.
For further information on the modelling, see also the files Thrm_theory.pdf and Xprp_Theory.pdf
included as part of the technical documentation on the release DVD.
18
Component
Nitrogen (N2)
-65.7
5.2
The above values for carbon dioxide are derived from values recommended by the HSE for SLOT (1%
probability of death), SLOD (50% probability of death) and N. The HSE SLOT DTL and SLOD DTL
values for carbon dioxide are 1.5 x 1040 and 1.5 x 1041 respectively (units ppm for concentration c and
minutes for time t), where the dangerous toxic load DTL is defined by
DTL =
N
c dt
Please note that the above values are not used by default, since both nitrogen and carbon dioxide are
flagged as inert materials. The materials Flammable/Toxic physical property setting needs to be set
to Toxic to enable toxicity calculations (and associated risk).
Previously, if using dangerous toxic load values greater than 3.4 x 1038 you receive an error during
toxic effect calculations. The SLOT DTL and SLOD DTL values for Carbon Dioxide are 1.5 x 1040
and 1.5 x 1041 respectively. The dangerous toxic load model currently uses single precision floating
point values which have a maximum definable positive value of 3.4 x 1038. Over time all of the DNV
Software models are being updated to use double precision floating point numerical values but at this
time the dangerous toxic load calculation is awaiting update. It is worth noting that this problem tends
to exist for materials which are not strictly classified as toxic but are considered harmful at relatively
large concentrations and exposure times based on their asphyxiation potential. Please note that when
calculating toxic load using these toxic coefficients changes should be made to the model inputs as
follow:
1. Change the Toxic parameters > Toxic Tab > Probit Calculation Method to 'Use Probit'
2. For SLOT use 1% lethality, for SLOD 50%
Pools on Water
The table below lists the material properties used in Phast for pools on water. These are all nonDIPPR physical properties. The last two properties in the table concern ammonia only, and for this
case the properties are obtained from Raj and Reid as described in the PVAP theory manual. For the
remaining first four properties a thorough literature search has been done and new values have been
19
implemented in Phast v6.7. For further details on the actual values please refer to the
Property_Database_Property_List.pdf document provided with the software.
Property
Dissolution in water
Dissolution in water
2
Boiling on water
vapour-plume centre-line
(always unaffected by bund)
bund
If the release location is indeed at the centre of the bund, the formulation in previous versions of Phast
may have given too conservative results; particularly for the cases of a large bund, rainout locations at
or near the bund wall and formation of a large pool filling the entire bund.
Phast v6.7 provides a modified less conservative method, which applies the assumption that the
release point is at the centre of the bund both for the rainout criterion and the subsequent pool fire
calculations.
vapour-plume centre-line
(always unaffected by bund)
bund
If rainout occurs outside the bund, this enhancement will have no effect.
If the droplets hit the bund wall, rainout is assumed to occur inside the bund and the resulting
pool is assumed to have spread back, in the upwind direction
If rainout occurs within the bund, without hitting the wall, it is assumed that the pool will
spread without bund effects until the downwind radius of the pool reaches the downwind
radius of the bund and then spread back upwind, ultimately with the pool constrained by the
bund centered at the release point.
20
The previous versions of Phast assumed the pool centre to be equal to the rainout location. This
simplistic latter assumption has been maintained in Phast v6.7 for the purpose of the pool evaporation
calculations and the pool vapour added back to the UDM cloud.
However the early and late pool fires will apply the new, more correct location of the pool fire, with
the downwind edge of the pool fires moved to the downwind bund wall (but reduction of radiation due
to shielding by the bund wall is not considered).
21
This will then bring up the wizard where you can select the type of CAD connection to be used and the
file to be used.
Once the file is selected the wizard will create the CSD file and will include all layers available. As
you can see below the location of the CSD file is displayed
22
Once the Finish button is pressed, the tree will show the new connection created.
23
24
Minor enhancements
Specification of breach location larger than the total pipe length will produce a fatal error, resulting
in a red bordered Vessel/Pipe Source and no consequence results in v6.7 whereas the previous
behavior was to automatically relocate the break location to the end of the pipe. This change applies to
both long pipeline models: the vapor phase long pipeline scenarios and 2-phase long pipeline
scenarios.
In calculation of ambient temperature, now dry air specific heat instead of wet air is used in the
code in line with UDM theory (Appendix A.3 in UDM theory manual). Particularly in cases which
experience large elevation changes this may have some effect. This has less effect if UDM version 2
(default) is in use for dispersion calculations
The default value for the parameter for maximum step size for instantaneous releases has been
reduced from 1000s to 100s. This will affect results for instantaneous releases for step sizes larger
than 100 seconds. This will also result in more smooth results in the far-field both for dispersion and
subsequent hazardous effects particularly toxic results.
Modified pool fire maximum burn rate mixing rule - incorrect mixing rule is applied in case a
mixture contains both components with defined maximum burn rate and undefined maximum burn
rate. In Phast v6.7 a mixtures maximum burn rate is now set to undefined when any of the
components are undefined. An undefined mixing rate as input to the pool fire model POLF, means
that POLF will calculate the burn rate itself.
Corrected density calculations for jet fires. The saturated vapour density at atmospheric pressure is
required for two-phase jet fire calculation. For some materials, particularly mixtures, liquid density
could previously be erroneously returned as vapour density by the property calculation if the saturation
temperature at atmospheric pressure is very low and this would subsequently lead to under-predictions
of jet fire radiation. This is prevented now by using ideal gas density if no valid vapour density is
found by the property calculation for a 2-phase discharge. If this occurs, the JFSH warning 1050 is
given. Thus if this warning is given in Phast v6.7, increased hazards may occur for the jet fire
compared to v6.6.
Warehouse fires, with warehouse material including Br and F. The modelled combustion product
released to the atmosphere consist of HCl, HBr and HF. Prior to v6.7, HBr and HF were classed
together with HCl to conserve mass in line with previous CPR-15 regulations. To obtain more accurate
toxicity calculations it is however more appropriate to conserve number of moles instead of mass.
Thus in Phast v6.7, HBr and HF are classed together with HCl such as to conserve moles in line in
more recent PGS-15 regulations. In case Br and/or F are present in the stored warehouse material, this
will affect the mass fraction of HCl per unit mass of active warehouse material, the mass fraction of
HCl in the modelled released combustion product (HCl, NO2, SO2 mixture), and the mass release rate
of HCl/NO2/SO2 mixture.
25
Feature Description
Alert/Workaround
SI10384: when a file created in versions previous to This can be remedied by saving the PSU file in
v6.7 is opened and the map is viewed there may be a v6.7, closing the file and then reopening the file.
GIS error on the message log and the map may be
invisible
SI10311: when exporting a report, the save as dialog The workaround is to click the save button and
does not show a field to enter a name in Vista
then rename the saved file to the desired name
SI10150: When using external connections, the data If you get this message in the log window, please
complete check does not spot if an External check the locations for the external connections
Connection has moved from its original location. This and modify accordingly
means that you can have an External Connection with
Feature Classes showing as complete in the node tree,
but not displaying in the GIS views. On opening a map
or risk contour plot you get the following message in
the log window:
"GIS Error: Unable to connect to the
database.
Please
verify
that
your
warehouse-connection
parameters
are
correct and try again."
SI10536: Import of certain AutoCAD files results in The example.dwg import was created using the
undesirable display of vectors zig zagging the object.
new CAD import wizard (see page 20). This
method imports all layers. To workaround the
An example of such a drawing is:
problem, use the manual CAD import method and
exclude the problematic layer when defining
feature classes. Alternatively, remove the layer in
AutoCAD.
26
Feature Description
Alert/Workaround
27
Discharge
10044
Premature termination for time-varying vapour line ruptures In earlier versions there were cases
of premature termination of time-varying line rupture cases. In v6.7 this has now been largely
addressed for cases where the storage state is pure vapour. For cases that did not depressurize fully,
the release duration, expelled mass and hence risk may increase in v6.7. However, results are not
expected to change for cases which previously depressurized successfully.
J415
Discharge from vessels and short pipes (leak, line rupture, relief valve scenarios) DISC warning
1005 converted to DISC error 32. The error is now provided in case entropy is not conserved for
property calculations associated with choked orifice flow. This appears to be mostly caused by
picking up incorrect vapour density instead of liquid density and vice versa. This is now an error
because previous results were shown to be physically incorrect by a large margin. To model cases
which show this error it will be necessary to adjust inputs and/or use the user-defined source model.
Dispersion
2110
UDM instantaneous dispersion taking excessively large downwind steps Very large steps taken
by instantaneous dispersion model results in discontinuities in the toxic and concentration results.
This has been resolved in reducing the default maximum step size for instantaneous dispersion
calculations from 1000 seconds to 100 seconds.
10365
Droplet trajectories for pressurised instantaneous releases These were incorrectly calculated,
resulting in rainout too far downwind. This would result in clouds leaving the pool behind too soon.
GUI
8812
9128
9343
28
9838
10225
Flammable Mass in the v6.6 fireball report is not the mass actually used in the model
For v6.7, in the Fireball report there are now two fields: Potential Fireball Mass (total mass in vessel),
and Actual Flammable Mass (mass used for fire-ball calculations, three times vapour fraction (if <
100%).
10227
10235
10290
The flammable lethality zone on the Map tab in graphs is incorrectly calculated.
Changing the lethality on the jetfire reporting levels grid had no effect on the jetfire lethality Effect
zone on the map.
10379
The Pool fire report included the radiative fraction for general fires even if not used
Now the correct radiative fraction is reported (as output by the pool fire calculations) for all types of
fires (general, luminous, smoky fires). This only affects the pool fire report and does not otherwise
affect the results.
10440
Save as with results not working properly with psc format with memory saving on
The supplementary results files we not being written the results folder as required by the minimise
memory option.
10469
10513
Save as overwrites existing file on Vista and Windows 7 with file extensions on
It was easy to think you were saving to a new file and instead the existing file was being overwritten
so your original data was lost. The problem only occurred on Windows Vista and version 7 when the
user had activated the display of file extensions (non-default).
29
Technical Reference
The Technical Reference subfolder contains *.PDF documents which give details of several aspects
of the modelling. These details include verification and validation of the models.
In Phast v6.7 this documentation in installed and is accessible from the Help menu in the program.
30
System Requirements
Operating
system
Internet
Browser
IE 5.0x. This does not have to be set as your default browser, but you
must have at least this version installed in order to run the program.
Display
800x600 resolution
Screen
depth
CPU
32 or 64 bit multi-core CPU from Intel or ADM like Intel Core2 Duo
Media
Pointing device
MS Mouse or compatible
Disk Space
Spreadsheet
.
CPU Speed
Recommended
Memory
(minimum)
Phast
2.8+GHz
3GB
(2GB)
These values are based on the user experiencing acceptable performance. Depending on your needs
you may consider to select a more powerful machine.
The indicated required disk space is very dependent on the existing system. Our values are based on a
clean operating system with no additional software.
Temporary folders
The program uses hard disk space to write temporary, or scratch files which are subsequently
deleted once the run has completed or in some cases when the program has been closed down. By
default the program uses the subfolder C:\DNVUser\Temp to write temporary files during the
calculation of results, and also to write temporary files that are used during the reporting of results.
For large Study Folders, these temporary files can require a lot of hard disk space. Phast will crash if
there is insufficient hard disk space for it to create the temporary files, so you should save your Study
Folder before running calculations or viewing results, and avoid running Phast if the free space on
your hard disk is low
31
Phast uses a third party product called Seagate Crystal Reports to produce text reports. Crystal
Reports always uses the temporary folder set up by your operating system for its own scratch file
space, and by default this is generally the C:\Temp folder.
You should always save your Study Folder before you run any calculations. This will ensure
that you do not lose any changes that you have made to the input data in the unlikely event
that a condition emerges in the calculations that means that the program must be terminated.
It is unwise to give the same name to more than one Model in a given Study Folder, Phast will
allow you to do this, but you will find it difficult to distinguish between the results for the
Models in Reports and Graphs, and it is not good practice.
You should use only letters, numbers and underscores (_) in the names of Study Folder files,
and should not use special characters such as commas or quotation marks.
32
Memory Management
Phast can use a lot of memory (RAM) when running very large studies/study folders, and also when
viewing large combinations of text reports and graphs. You should follow these simple rules to avoid
problems with memory:
Close all out-of-date Reports and Graphs if you are no longer using them. You can always
reopen the Report or Graph for the Model if you need to view it again; if the name of the
Model is displayed in blue in the Study Tree, then that Model has results that are available for
viewing.
Use the option in the Results tab of the General Preferences to save results to files instead of
storing them in memory. Reports and Graphs will take longer to generate if you choose this
option, but it will reduce the memory requirements considerably.
For very large studies (for example those containing more than 100 models and 3 associated
weathers) ensure before you run that you have sufficient hard disk space for temporary file
storage and also for runtime memory requirements.
Runtime memory is memory which will be used by Phast for storing results as it performs its
calculations; it is a combination of fixed RAM plus virtual (hard disk substitute) memory. You can
adjust the total available memory size using the System option in the Control Panel. Consult your IT
professional before altering any of these settings.
During calculations for a very large study, you may see an "out of memory" message (or similar)
appear on the screen. If this occurs it is important you stop the calculations immediately and save your
work. If you do not stop the calculations, Phast may crash, and you will lose any changes you made to
your Study Folder since the last time you saved your work.
The process of generating Graphs can sometimes require a large amount of memory (especially
graphics memory). Models which involve the rainout and evaporation of a flammable material can
produce a particularly large number of data points that need to be plotted, with large demands on the
Graphing function. If you use the data culling option (on the Graphs tab section of the Preferences
dialog, which is under the Options menu), then the Graphing function will ignore unnecessary data
points (i.e. data points which do not describe significant changes in the behavior), and will therefore
save memory and time. See the online Help for more details of data culling.
It has not been explicitly mentioned that the application is single-thread software and increasing cores
or CPUs will not improve calculation. However, multi-cores would benefit the overall user experience
as the OS, Outlook, or other applications can use the other system capacities. In this case, the
bottleneck may be the RAM or disk read/write speed (local or remote).