Sei sulla pagina 1di 2

Check List of Items/Information to be Obtained from a New Regional Entity by the RLDC

Sr. Item
No.

Available /
Not Available /
Value

Remark

Name of the New Regional Entity:


Name of the Region / Concerned RLDC:
1
A
B
C
2
A
B
C
D
E
3
A
B
C
D
E
F
G
4
A
B
C
5
A
6
A
B
7
A
B
C
D
E

Metering Details
Main Meters (feeder wise, with nos.)
Standby Meter (feeder wise, with nos.)
Check Meter (feeder wise, with nos.)
Generation
Total Installed Capacity (MW)
No. of Units
Capacity of each unit (MW)
FGMO / RGMO capability as per IEGC.
Collected unit wise details
Date of Commercial Operation (unit wise)
Transmission Connectivity
Voltage Level (kV)
No. of Circuits
Node of Connectivity to the Grid
(in case of more than one node, add rows)
Date of the charging of lines / connection to the Grid
(node wise)
Map / Diagram showing connectivity to the Grid
Details of Reactive Compensation
Details of Transformers Number, MVA rating,
Voltage Ratio, vector of each transformer bank
Protection
Details of Protective Relays obtained
Whether Protection Settings have been supplied to the
RLDC for Protection Coordination
Any Special Protections Schemes used
Station Details
Single Line / Bus Diagram identifying all equipment
Telemetry
Type of Data Gateway (Remote Terminal Unit/
Substation Automation System Gateway)
Data Communication connectivity followed (As per
interface requirement and other guideline
made available by the respective RLDC)
Communication
Details of the communication media, interface and
capacity being targeted for connection for Data
Communication Main Channel
Details of the communication media, interface and
capacity being targeted for connection for Data
Communication Standby Channel
Voice Communication Main
Voice Communication Standby
Integration of Station Data in the SCADA of the

Check List for a New Regional Entity

Page 1

F
G
8
A
B
C
D
9
A
B
C
D

10
A
B
C
D
11
A
B
C
12
A
13
A
14
A
B

Concerned RLDC
Integration of Station Data in the SCADA of NLDC
Details of any dedicated communication (Voice /
Data) that the Station has with another Control Area
and the neighboring station
Manning of the Control Room
Contact details (Telephone, FAX)
Contact person
Escalation Matrix starting from Control Room Shift
In-charge to Senior Level
Details of the Shift Operation
Modification of various applications to include the New Regional Entity at the Concerned RLDC
Scheduling
Metering
Accounting (UI/RE)
Reporting Systems
Has the new entity been informed about the
information submission requirements to the RLDCs
along with periodicity?
Bank Account Details of the new Regional Entity
Bank Account No.
Bank Name & Branch
Bank Address
RLDC bank account details been intimated to the new
entity
Agreement Details
Quantum for which LTA has been sought (MW)
Long Term Agreement (MW) for which PPA exists
Medium Term Agreement (MW) for which PPA exists
Simulation Studies
Incorporation in the assessment of Transfer Capability
Undertakings to be obtained
Undertaking obtained from new entity that it is not
going to breach any PPA to sell in short term
Intimation to Concerned RPC about addition of a New Regional Entity
Intimation sent
Inclusion in the REA

Note:
In order to avoid disputes later on, to begin with once a new Regional Entity is created, they would be
allowed to operate first with any Long Term / Medium Term contracts and Bilateral Contracts. After the
first set of accounts have been issued by the RPC and all payments settled by the concerned RLDC,
permission / NOC may issued for trading through the Power Exchange(s). Such NOCs issued must
essentially contain
1. The total quantum of trade that can be done through the Power Exchange(s)
2. The period of validity of the NOC.
3. NOC must state that in case the new Regional Entity trades in more than one Power Exchange, then
the total quantum of trade would not exceed the quantum specified/permitted by the RLDC in the
NOC.

Check List for a New Regional Entity

Page 2

Potrebbero piacerti anche