Nam Dinh PJT, Vietnam

BUILDING SIZE (Nam Dinh)

ACTIVITY DESCRIPTION
L

E/Height
Q'TY Story
F/Depth

175.0

41.0

12.8

175.0

41.0

17.2

F/Area

Total
F/Area

Structure

No. TECHNICAL BLDG

TURBINE BUILDING

1F

7,175

7,175

2F

7,175

7,175

Sub Total

14,350

22.0

40.0

4.3

BF

880

880

22.0

56.0

5.8

1F

1,232

1,232

22.0

64.0

5.8

2F

1,408

1,408

CENTRAL CONTROL BUILDING

STEEL

22.0

64.0

5.8

3F

1,408

1,408

22.0

64.0

5.0

4F

1,408

1,408

Sub Total

RC

6,336

WORKSHOP BUILDING

60.0

25.0

8.0

1,500

1,500

STEEL

STORE BUILDING & WAREHOUSE

66.0

15.0

8.4

990

990

STEEL

35.0

38.0

4.0

1F

1,330

1,330

7.0

38.0

4.0

2F

266

266

WATER TREATMENT BUILDING

Sub Total

13.0

15.0

4.0

13.0

15.0

4.0

SLUDGE TREATMENT BUIDLING

1
7.0

15.0

5.0

RC

1,596

1F

195

195

2F

195

195

3F

105

105

Sub Total

RC

495

FUEL OIL PUMP HOUSE

12.0

6.0

5.0

72

72

RC

SWITCHGEAR BUILDING FOR ESP & ASH HANDLING

35.0

18.0

5.0

630

630

RC

HYDROGEN GENERATION HOUSE

39.8

6.6

5.0

263

263

RC

330.0

69.5

30.0

22,935

45,870

44.0

16.5

3.0

BF

391

391

44.0

16.5

5.2

1F

509

509

2F

618

618

10 COAL YARD STORAGE SHED

11 COAL HANDLING CONTROL BUILDING

1
44.0

16.5

5.5

Sub Total
12 LIMESTONE STORAGE BUILDING

120.0

40.0

8.4

18.0

30.2

6.0

18.0

7.2

7.0

13 LIMESTONE MILL STATION

1
18.0

7.2

4.0

STEEL

RC

1,518

4,800

4,800

1F

544

544

2F

130

130

3F

130

130

Sub Total

STEEL

STEEL

803

14 COOLING WATER PUMP ELECTRICAL HOUSE

24.4

16.2

5.0

395

395

STEEL

15 FIRE FIGHTING PUMP HOUSE

14.0

9.0

5.0

126

126

STEEL

20.0

15.0

3.0

BF

183

183

20.0

15.0

4.3

1F

300

300

20.0

15.0

4.3

2F

300

300

20.0

15.0

4.3

3F

300

300

16 500 KV CONTROL BUILDING

Sub Total
17 CHLORINATION BUILDING

25.5

27.5

7.0

41.0

18.0

3.3

41.0

18.0

3.3

18 ADMINISTRATION BUILDING

1
41.0

18.0

3.3

1,083

701

701

1F

738

738

2F

738

738

3F

738

738

Sub Total

19 COMMON SERVICES BUILDING

37.8

23.3

3.3

37.8

23.3

3.3

RC

RC

RC

2,214

1F

690

690

2F

690

690

Sub Total

RC

1,380

20 CAR GARAGE HOUSE

60.0

13.0

5.2

780

780

STEEL

21 TRUCK GARAGE HOUSE

51.0

18.0

5.4

918

918

STEEL

22 BULLDOZER GARAGE HOUSE

40.0

10.0

5.0

400

400

STEEL

23 MOTORCYCLES & BIKE SHED

24.0

36.0

3.0

864

864

STEEL

24 MAIN GATE HOUSE

8.4

4.5

3.6

38

38

RC

25 SUB GATE HOUSE

6.0

4.5

3.6

27

135

RC

26 BERTH ELECTRICITY HOUSE

22.0

11.0

5.0

242

242

RC

27 HYDROGEN SHELTER

30.0

11.2

4.5

336

336

STEEL

14.0

7.0

4.0

1F

98

98

14.0

7.0

5.0

2F

98

98

28 COAL & ASH TREATMENT BUILDING

Sub Total
29 Auxiliary Boiler Control House
TOTAL

12.0

6.0

5.0

RC

196
72

72
89,102

RC

REMARK

SHEET NO. : 2 OF 15

DESCRIPTION OF BUILDING
PROJECT : Nam Dinh Project, Vietnam
SUBJECT : BUILDING & STRUCTURE WORK
NO .

ITEM

PRICE UNIT : USD

BRIEF SPECIFICATION

DESCRIPTION

UNIT

Q'TY

UNIT PRICE

TOTAL PRICE

EARTH WORK

EXCAVATION

- Refer to Technical Specification

M3

44,230

BACK FILL

- Refer to Civil Technical Specification


- Including necessary compaction test
- AASHTO T-180 Method D and DIN 4094 - Compaction in layers not exceeding 250mm thickness and 97% of max. dry density
- 97% Compaction
- Including stockpile of excavated & cutting material.
- Test shall be performed for each 500m3 of fill
-Selected fill
Ev2 not less than 1200 kg/cm2 = 120MN/m2
Ev2/Ev1 smaller than 2.2
(Ev1 - first loading process
Ev2 - second loading process)

M3

22,102

DISPOSAL

- Refer to Civil Technical Specification

M3

23,456

IMPORTED
SELLECTED SOIL

- Refer to Civil Technical Specification

M3

6,005

VAPOR BARRIER

- Below lean concrete


- THK. 0.1mm polyethylene film (2 Plies)

M2

27,381

- To be cut with slopes of a 1.00/1.50 (H/V) inclination


- Including compaction at excavated level
- Including safety precaution such as shuttering sheeting and bracing and stabilization of slopes
- Including protection measure to existing utilities which may be encountered during the work
- Including dewatering to ensure safe working environment, if required

During removal of surplus soil, if the unexpected waste material is found in the site, it will deal with as follows.
- After analyzing the composition of waste, it will be classified into general or specified waste.
- In case of general waste, it will be disposed to the municipally approved area outside the site.
- In case of specified waste, the local waste disposal company will handle them.
Ev2 not less than 1200 kg/cm2 = 120MN/m2
Ev2/Ev1 smaller than 2.2
(Ev1 - first loading process
Ev2 - second loading process)

SUB TOTAL
B

REINFORCED
CONC. WORK

CONCRETE WORK

1.1

LEAN CONCRETE

1.2

REMARKS

- F'c=7.0 N/mm2 (Grade 7)

- Including Dewatering for Foundation Work, if necessary.


- Including Marking, Leveling, Scaffolding, Admixture, Pouring, Vibrating, Smooth Con'c Finishing, Curing and Strength
Test as per Local Regulation.
- Including All Construction(including TG pedestal) & Other Joint Work.
- Including Block-Out for Equipment Foundation Anchor.
- Including Opening Work & Sleeve, if necessary.
- To keep Max. Temperature of Concrete : 30.
- Concreting in high embient temperatures shall apply with the ACI 305
REINF. CONCRETE - F'c=25.0 N/mm2 (Grade 25)
- Reinforced concrete with dense aggregate - ASTM C150 Type 1 "Standard specification for portland cement"
- Including Hydration Heat test, if necessary.
-The Sub Contractor shall be establish and maintain a field laboratory on the site

M3

1,620.003

M3

8,119

- Including Dewatering for Foundation Work, if necessary.


DESCRIPTION OF BUILDING
- Including Marking, Leveling, Scaffolding, Admixture, Pouring, Vibrating, Smooth Con'c Finishing, Curing and Strength
Test as per Local Regulation.
PROJECT : Nam Dinh Project, Vietnam
- Including All Construction(including TG pedestal) & Other Joint Work.
SUBJECT : BUILDING & STRUCTURE WORK
- Including Block-Out for Equipment Foundation Anchor.
- Including Opening Work & Sleeve, if necessary.
- To keep Max. Temperature of Concrete : 30.
NO .
ITEM
BRIEF SPECIFICATION
DESCRIPTION
- Concreting in high embient temperatures shall apply with
the ACI 305
- ASTM C150 Type 1 "Standard specification for portland cement"
Including
Hydration
Heat
test,
if
necessary.
1.3 REINF. CONCRETE - F'c=30.0 N/mm2 (Grade 30)
- Reinforced concrete with dense aggregate -The Sub Contractor shall be establish and maintain a field laboratory on the site
for structural elements including when in
contact with waste water and below
ground
level
- FOR TG FDN.

SHEET NO. : 3 OF 15

PRICE UNIT : USD


UNIT
M3

Q'TY
22,919

UNIT PRICE

TOTAL PRICE
-

REMARKS

SHEET NO. : 4 OF 15

DESCRIPTION OF BUILDING
PROJECT : Nam Dinh Project, Vietnam
SUBJECT : BUILDING & STRUCTURE WORK
NO .
2

ITEM

PRICE UNIT : USD

BRIEF SPECIFICATION

DESCRIPTION

UNIT

Q'TY

UNIT PRICE

RE-BAR WORK

2.1 REINFORCING
STEEL BAR

TOTAL PRICE
-

- ASTM A615, Grade 60 or Equivalent

- Including tying Wire with Mild Steel of Diameter Approx. 1.5mm.

TON

4,448

- Including Welding Work


- Including Bar Supports / Spacer.
- Including Bar Bending & Cutting Work.
3

FORM WORK

3.1 NORMAL FORM

- For Underground concrete.

- Including Shoring, Form Tie, Separator & All Accessories and Sealing of Form Tie Hole

M2

30,163

3.2 FAIR FACED FORM

- For above ground concrete (Including


equipment footing, opening, TG FDN.)

- Including Shoring, Form Ties, Separator & All Accessories and Sealing of Form Tie Holes.
- The surface are according to the finish of concrete surface in accordance with DIN 18 203 and 18 215
- Including chamfer at all exterior corners of reinforced concrete at least 25mm x25mm, at stair treads 10mm x 10mm

M2

43,308

- FLEXIBLE PVC
- W=150

-The waterstop shall combine the mechanical properties of PVC


- Including butt-welding fot joint

1,021

WATER STOP

SUB TOTAL
C
1

2
3

STEEL
STRUCTURE
WORK
STRUCTURAL
STEEL
(ERECTION only)

- ASTM A36
- ASTM A572 G50 (High strength steel)

- Shop Drawing Check and Erection Work of Structure Steel.


- Including Touch-Up Painting, Grinding, Scaffolding Work
- Including Support for Mono Rail I-Beam
- Including Testing as Per Specification.
- Including Construction Equipment.
- Including Structural Steel Erection Work Procedure.
- Insufficient or missing steel material is supplied by a local company.
- If there is some defect in the painting work due to the erection work, repaint after the erection work.

TON

6,165

ANCHOR BOLT
(ERECTION only)
NON-SHRINKAGE
GROUT

- ASTM A307

- For Steel Column Base.


- Including Foundation Anchor Sleeve & Anchor Frame.
- Including Form Work, Strength Test, Chipping, Cleaning etc.

TON

13.9

M3

DECK PLATE
(Installation only)

- THK.1.6mm Galvanized Steel.

M2

9,702

- For Steel Column Base.


- THK 50mm

- Including All Subsidiary Work such as Opening Arrangement, Sleeve, End Plate & Enclosure & Sealing for Concreting.
- Including Installation of Shear Connector.
- Including Erection and Touch-up Painting.
- Shop Drawing to be Prepared.

SUB TOTAL
D

MASONRY WORK

CEMENT
BRICK(0.5B)

RENDERED BRICK - THK. 100

- THK. 100, SAND LIME BRICK

- Including Mortar Filling.


- Including All Accessories of Masonry Work

M2

501

- Including Mortar Filling.


- Including All Accessories of Masonry Work

M2

7,366

REMARKS

SHEET NO. : 5 OF 15

DESCRIPTION OF BUILDING
PROJECT : Nam Dinh Project, Vietnam
SUBJECT : BUILDING & STRUCTURE WORK
NO .
3

ITEM
CONCRETE
HOLLOW
BLOCK(8")

PRICE UNIT : USD

BRIEF SPECIFICATION
- THK. 200

DESCRIPTION
- Including Conrete masonry block as per ASTM C90 TYPE 1 & ACI 530
- Including Scaffolding.
- Including Mortar Filling in hollow according to Drawing.

UNIT

Q'TY

UNIT PRICE

TOTAL PRICE

M2

9,710

7,366

990

- Including Anchor Strip/ Re-Bar, Re-Bar to be Welded to Steel.


- Including Solid Conc. Block for End Blocks or Mortar Filling.
- Including Mortar(Minimum 17.2Mpa) as per ASTM C270, Type M
- Including Damp Proof Course for Ext. Wall (DIN 18195)
- Including All Accessories of Masonry Work
4

MASONRY CAVITY - THK. 100 RENDERED BRICK


WALL SYSTEM
- THK. 10 AIR GAP
(FOR EXT.)
- THK. 50 THERMAL INSULATION
(Expended and water-resistant Mineral
wool)
- THK. 200 REINF CONCRETE BLOCK

M2

P.C LINTEL
(W:200 x H:200 )

-Including Reinforcing Bar


- F'c=25 N/mm2 (Grade 25)
SUB TOTAL

PLASTER WORK

CEMENT PLASTER - FOR EXT.WALL


- THK 20mm
- 2 COATS

CEMENT PLASTER - FOR INT.WALL


- THK 18mm
- 2 COATS

STEEL TROWEL
FINISH

- Including Scaffolding.
- Including Vert./ Horizontal Control Joint Work.
- Including Galv. Corner & Casing Bead & Plaster Stop & Lath Work.
- Including all accessories of Plaster Work.

-FOR CON'C FLOOR FINISH

M2

15,797

M2

26,667

M2

39,260

SUB TOTAL
F

PAINTING WORK

EMULSION PAINT

- FOR EXT.WALL
- 1 COAT PRIMER

EMULSION PAINT

- Including Scaffolding
- Including Surface Preparation

M2

15,511

-- 2FOR
COATS
OF EMULSION PAINT
INT.WALL
- 1 COAT PRIMER

M2

24,234

EMULSION PAINT

-- 2INT.CEILING
COATS OF EMULSION PAINT
- 1 COAT PRIMER

M2

8,010

EPOXY PAINT

1,894

EPOXY PAINT

- Oil Resistant Type.


- Including Scaffolding.
- Including Surface Preparation.

M2

2 COATS
OF EMULSION PAINT
-- FOR
SKIRT
- H=100
- FOR FLOOR

M2

15,213

EPOXY PAINT

- FOR FLOOR
- Minimum of 5 mm thick epoxy screed
with
a non-slip epoxy seal coat

- HVAC rooms

M2

1,092

REMARKS

SHEET NO. : 6 OF 15

DESCRIPTION OF BUILDING
PROJECT : Nam Dinh Project, Vietnam
SUBJECT : BUILDING & STRUCTURE WORK
NO .

ITEM

PRICE UNIT : USD

BRIEF SPECIFICATION

ACID RESISTANT
PAINT (FLOOR)

- FOR FLOOR
- 1 COAT PRIMER.

ACID RESISTANT
PAINT (WALL)

DESCRIPTION

UNIT

Q'TY

UNIT PRICE

TOTAL PRICE

M2

2 COATS
OF ACID RESISTANT PAINT.
-- FOR
WALL
- 1 COAT PRIMER.

M2

1,446

ACID RESISTANT
PAINT (CEILING)

-- 2FOR
COATS
OF ACID RESISTANT PAINT.
CEILING
- 1 COAT PRIMER.

M2

1,352

10

CHEMICAL
RESISTANT PAINT
(FLOOR)

-- 2FOR
COATS
OF ACID RESISTANT PAINT.
FLOOR
- 1 COAT PRIMER.

M2

1,319

11

CHEMICAL
RESISTANT PAINT
(WALL)

-- 2FOR
COATS
OF CHEMICAL RESISTANT
WALL
PAINT.
- 1 COAT PRIMER.

M2

918

12

CHEMICAL
RESISTANT PAINT
(CEILING)

- 2 COATS OF CHEMICAL RESISTANT


-PAINT.
FOR CEILING
- 1 COAT PRIMER.

M2

- 2 COATS OF CHEMICAL RESISTANT


FOR FLOOR
COLOR HARDENER -PAINT.
(FLOOR)

M2

23,256

13

- Including Scaffolding.
- Including Surface Preparation.

SUB TOTAL

WATER PROOFING
WORK

WATER PROOFING
MEMBRANE(VERTI -5 mm thickness
CAL)

- Including AL. Strip Flashing to cover the end of Waterproofing


- Including Bitumen Sealant at Groove to end Waterproofing Membrane.
- Including all Accessories for the work.

WATER PROOFING - Built-Up Roofing


MEMBRANE SHEET - Including Cold Worked Prime Coat
(HORIZONTAL)
& 4mm THK. Bituminous Membrane
- As Per Local Tender SPEC.

- Including AL. Strip Flashing to cover the end of Waterproofing


- Including Bitumen Sealant at Groove to end Waterproofing Membrane.
- Including all Accessories for the work.

1,069

M2

11,449

RIGID INSULATION - THK. 50


- Rigid Polystyrene Insulation Board
- Density : Above 64kg/m3

M2

9,996

PE FILM

- THK. 0.1 (2 Plies)

M2

9,996

PROTECTION
CONCRETE

- MIN. THK. 60mm


- Slope 1/150

M3

600

WELDED WIRE
MESH

- #8-150*150

M2

9,996

CEMENT LIQUID
WATER PROOF
PROTECTION
BITUMINOUS
COATING

- For Toilet, Shower Room


& Underground Wall
- FOR Underground MEMBERANE
- Two coats of bituminous coating

- Bidder to propose the detailed specification.

M2

2,347

- All concrete surfaces in contact with soil

M2
M2

12,518
24,772

8
9

SUB TOTAL

- For Roof Slab.


- Including All Materials.
- Including Expansion Joint & Caulking : @3.0m3.0m.

M2

REMARKS

SHEET NO. : 7 OF 15

DESCRIPTION OF BUILDING
PROJECT : Nam Dinh Project, Vietnam
SUBJECT : BUILDING & STRUCTURE WORK
NO .

ITEM

PRICE UNIT : USD

BRIEF SPECIFICATION

DESCRIPTION

UNIT

Q'TY

UNIT PRICE

TOTAL PRICE

STONE AND
TILING WORK

GLAZED VITRIFIED - For Floor / Non-Slip Type


CERAMIC TILE
- Ceramic Tile With Mortar

GLAZED CERAMIC - For Wall


TILE
- Bevel-Edged Glazed With Mortar

ACID & LYE


RESISTANT NONSLIP TILE

MARBLE COUNTER -THK.50 marble

- Battery room, waste treatment plant,


laboratory or any other rooms where
chemicals are handled.

- Including Adhesive & Mortar


- Including Joint Grouting.
- Including Scaffolding.
- Size of ceramic 330mmx330 mm
- Shop Drawing to be Prepared.
- Sealing strips shall be installed at all the corners and junctions.

M2

765

M2

1,940

- walls up to 1.20 m above floor level. Sealing strips shall be installed at all corners and junctions.
- Plaster and acid and lye resistant paint shall be applied above the tiles to the ceiling.

M2

1,668

M2

10

SUB TOTAL

INTERIOR WORK

SUSPENDED
CEILING W/
ACOUSTIC TILE

- Non-Combustible
- 1/2 Hour Fire Resistance

- Including AL. Tees Grid, Hanger, Edge Molding & Seismic Bracing.
- Including Scaffolding

M2

8,286

SUSPENDED
CEILING W/ PVC
STRIP

- FOR TOILETS, SHOWER ROOM


CEILING

- Including AL. Tees Grid, Hanger, Edge Molding & Seismic Bracing.
- Including Scaffolding.
- Shop Drawing to be Prepared.

M2

737

TOILET CUBICLE

- HEIGHT : 2100mm
- Aluminum Framed Hollow Wood Panel
w/Melamine Resin

- Including All Hardware and Accessories.


- Including Door (W 650mm).

M2

297

FALSE FLOOR

- Heavy duty PVC sheet


Control room, switchgear rooms, relay rooms etc.
- Basic grid of the supporting structure of a - The steel members of the supporting structure shall be galvanized.
false floor shall be 600 x 600 mm inimum - Anti-Static PVC Tile Steel Cementations Core Panel 34mm
- Finished With Factory Apploed Anti-Static 3mm PVC Sheet & Edge Trim
- Including Steps, Supporting Material and Accessories.
- Including Seismic Bracing, if necessary.
- Shop Drawing to be Prepared

M2

1,269

PVC TILE (FLOOR)

- Heavy duty rubber backed PVC tiles

M2

7,882

VINYL SKIRTING

- H=100

3,206

METAL STUD WALL -THK.12.5 mm Gypsum Board (2PLIES ) + -Includ'g metal stud framing, all hardware&accessoris
(THK. 150)
Metal Stud + THK.12.5 mm Gypsum
-Include'g jointing work
Board (2PLIES) or Equivalent Partition
System.

M2

166

PERFORATED
ACOUSTIC PANEL

M2

166

Instrumentation, computer, electrical, mechanical work rooms, Administration areas, offices, corridors, etc.

-Perforated Wooden Acoustic Panel for Wall and Ceiling It will be chosen by a beautiful, durable, and cost effective range of
perforated wooden acoustic panel for wall

REMARKS

SHEET NO. : 8 OF 15

DESCRIPTION OF BUILDING
PROJECT : Nam Dinh Project, Vietnam
SUBJECT : BUILDING & STRUCTURE WORK
NO .
9

ITEM

PRICE UNIT : USD

BRIEF SPECIFICATION

DESCRIPTION

STAGE

UNIT
M2

Q'TY
60

SUB TOTAL
J
1

UNIT PRICE

TOTAL PRICE
0

PANEL & ROOF


WORK
THERMAL
- EXT. : THK. 0.6mm, Galvanized Steel
INSULATED METAL Sheet
PANEL (ROOF, THK. w/Polyvinylidene
75mm)
Fluoride (PVDF) Coating
- INT. : THK. 0.6mm, Galvanized Steel
Sheet
THERMAL
w/Polyvinylidene Fluoride (PVDF)
INSULATED METAL Coating
PANEL (WALL, THK. - CORE : THK. 75mm Polyurethane Foam
50mm)
(Roof), THK. 50mm Polyurethane Foam
(Wall)

- Shop Drawing to be Prepared.


- Including Accessories
(Anchor, Plate, Top Capping & All Flashing 1.0mm Color Coated) & Sealant & Back Up & Joint Filling Material.
- Including Scaffolding.
- Including Wall & Roof Flashing Material & Installation Work.
- Including Door & Window Flashing Material & Installation Work.

M2

11,143

M2

8,010

THERMAL
- EXT. : THK. 0.6mm, Galvanized Steel
INSULATED (Mineral Sheet
wool) METAL
w/Polyvinylidene
PANEL (ROOF, THK. Fluoride (PVDF) Coating
75mm)
- INT. : THK. 0.6mm, Galvanized Steel
Sheet
w/Polyvinylidene Fluoride (PVDF)
THERMAL
Coating
INSULATED (Mineral
- CORE : THK. 75mm anti-rot, waterwool) METAL
resistant Mineral wool
PANEL (WALL, THK.
(Roof), THK. 50mm anti-rot, water50mm)
resistant Mineral wool
(Wall)
SINGLE SKIN
- THK. 0.6mm, Galvanized Steel Sheet
METAL
w/Polyvinylidene Fluoride (PVDF)
PANEL(ROOF)
Coating

- Shop Drawing to be Prepared.


- Including Accessories
(Anchor, Plate, Top Capping & All Flashing 1.0mm Color Coated) & Sealant & Back Up & Joint Filling Material.
- Including Scaffolding.
- Including Wall & Roof Flashing Material & Installation Work.
- Including Door & Window Flashing Material & Installation Work.
- Mineral Wool Shall be non-combustible material conforming to ASTM E 136

M2

5,513

M2

10,070

- Including Accessories
(Anchor, Plate, Top Capping & All Flashing 1.0 mm Color Coated) & Sealant & Back Up & Joint Filling Material.

M2

62,113

M2

34,941

SINGLE SKIN
METAL
PANEL(WALL)

GUTTER

- 250*200, PVDF Both Side


- THK 1.0mm GALV. Sheet
- Plate(W=1000mm) W/L - 40X40X5
@600 Support

- Including Gutter Hanger & Anchor & Sealant


- Including Fixing & Jointing
- Shop Drawing to be Prepared

1,480

ROOF DRAIN

- 100, CAST IRON

-Including Fixing & Jointing

EA

98

ROOF DRAIN

- 150, CAST IRON

EA

66

10

LEADER HEAD

- THK.1.0mm GALVANIZED STEEL


- 300*300*250

EA

99

11

DOWN SPOUT

- 100 / STEEL PIPE(GALV.)

1,551

12

DOWN SPOUT

- 150 /STEEL PIPE(GALV.)

1,242

13

SPLASH BLOCK

- 450 mm(L) x 300 mm (W) x 150 mm (H)

EA

241

- Including Down Spout Hanger and Anchor


- Including Coatings

REMARKS

SHEET NO. : 9 OF 15

DESCRIPTION OF BUILDING
PROJECT : Nam Dinh Project, Vietnam
SUBJECT : BUILDING & STRUCTURE WORK
NO .

ITEM

PRICE UNIT : USD

BRIEF SPECIFICATION

DESCRIPTION

UNIT

Q'TY

UNIT PRICE

SUB TOTAL
K

DOOR &
WINDOW WORK

DOOR WORK

1.1 NORMAL STEEL


DOOR
a) 1.01*2.135

- Single leaf doors

b)

2.20*2.135

- Double doors to rooms housing valves,


pumps and similar equipment

c)

2.20*2.50

- Double doors to rooms housing electrical


equipment:

TOTAL PRICE

All internal and exterior and safety doors shall be made of double steel sheet walls, insulated with glazing.
All doors and gates shall be installed such that rainwater penetration is avoided.
- All doors shall be fitted with approved locks.
- Including Painting Work
- Including Mortar Filling into Door Frame & Sealant around Door Frame /w Back Up Rod.
- Including middle Frame of Door shall installed removal type at Panel Room.
- Including All Frame & Hardwares.
- Including master key system for all doors at the site

EA

130

EA

82

EA

13

EA

EA

34

1.2 ROLLER SHUTTER


DOOR
a)

3.0*3.0

b)

5.0*4.0

c)

5.0*5.0

EA

d)

6.0*5.5

EA

EA

1.3 FIRE RESISTANT


STEEL DOOR
a) 1.01*2.135

The shutters shall be of double walled hollow sections of galvanized steel protected with coating.
Withstanding the maximum wind loads as specified in Design Criteria.
Hand crank with continuous chain reel shall be fitted to operate the door by hand in case of emergency.

- 2 Hours Fire Resistant Door


- Galvanized Double Skin 1.6mm Steel
Sheet

Fire rated doors shall be all in accordance with the more stringent of NFPA and local standards.
All doors and gates shall be installed such that rainwater penetration is avoided.
- Including All Frame & Hardwares.
- Including Painting Work
- Including Mortar Filling into Door Frame & Sealant around Door Frame /w Back Up Rod.

b)

2.20*2.135

EA

c)

2.20*2.50

EA

EA

EA

1.4 GLASS DOOR


a)

1.0*2.1

b)

2.0*2.1

- Including All Frame & Hardwares.

1.5 TIMBER DOOR


a)

1.0*2.1

EA

44

b)

2.0*2.1

EA

14

REMARKS

SHEET NO. : 10 OF 15

DESCRIPTION OF BUILDING
PROJECT : Nam Dinh Project, Vietnam
SUBJECT : BUILDING & STRUCTURE WORK
NO .
2

ITEM

PRICE UNIT : USD

BRIEF SPECIFICATION

WINDOW WORK

DESCRIPTION

UNIT

Q'TY

UNIT PRICE

TOTAL PRICE

Each window shall have side and bottom sash fitting and shall safely absorb an impact force of at least 7.5 kN.
The windows shall be resistant to pelting rain.

2.1 ALUMINUM
WINDOW(SLIDING
a) )0.6*0.6
- Anodized Heavy Duty AL. FRAME
- THK. 5mm GLASS + 6mm AIR +
THK. 5mm GLASS
b) 1.2*0.6
- Hermetically Sealed Glass Units

- Including All Hardwares


- Including Sealant Around Window Frame
- Including AL. Window Sill Flashing (EXT. Window Only)
- Including Insect Screen at Open Area Only

EA

10

EA

15

c)

3.0*1.0

EA

84

d)

1.8*0.9

EA

211

e)

2.0*1.2

EA

284

EA

2.2 ALUMINUM
WINDOW (FIX)
a) 4.5*1.0

- Anodized Heavy Duty AL. FRAME


- Hermetically Sealed Glass Units

- Including All Hardwares


- Including Sealant Around Window Frame

b)

5.4*1.0

EA

50

c)

1.0*9.2

EA

EA

52

M2

545

- TO RESISTANT PELTING RAIN

M2

All internal and exterior and safety doors shall be made of double steel sheet walls, insulated with glazing.
All doors and gates shall be installed such that rainwater penetration is avoided.
- All doors shall be fitted with approved locks.
- Including Painting Work
- Including Mortar Filling into Door Frame & Sealant around Door Frame /w Back Up Rod.
- Including middle Frame of Door shall installed removal type at Panel Room.
- Including All Frame & Hardwares.
- Including master key system for all doors at the site

M2

M2

2.3 ALUMINUM
LOUVER
2.4 CURTAIN WALL

- Supply by HVAC.

2.5 SUNSHADE
2.6 SOUND PROOF
DOOR
a) 1.01*2.135

- single door to conference room

b)

- Double doors to conference room

2.20*2.135

SUB TOTAL
L
1

MISC. METAL
WORK
MISC. STEEL
WORK

- Steel ASTM A-36 or equivalant


- Galvanized Steel
-SUPPLY AND INSTALLATION

All mild steel items for platforms, toe-plates, ladders, stanchions, handrails and chains shall be protected by hot dip galvanising
after
fabrication with a minimum thickness of 85 microns unless otherwise specified.
- For Steel Embedded Plate & Angle, Trench Cover, Steel Angle For Trench,
Fixing Angle for Block work, ETC.
- Including Touch-Up Painting Work at Site.

TON

412.66

REMARKS

SHEET NO. : 11 OF 15

DESCRIPTION OF BUILDING
PROJECT : Nam Dinh Project, Vietnam
SUBJECT : BUILDING & STRUCTURE WORK
NO .

ITEM

PRICE UNIT : USD

BRIEF SPECIFICATION

DESCRIPTION

UNIT

Q'TY

UNIT PRICE

TOTAL PRICE

CHK'D PLATE

- The minimum base thickness of 6 mm


with
a non-slip tread pattern
-SUPPLY AND INSTALLATION

Plated flooring shall be chequer plate having a minimum base thickness of 8 mm with a non-slip tread pattern, secured to the
supporting steelwork with countersunk screws, which shall be cadmium plated. For manoeuvring small-wheeled items e.g.
switchboard trucks, plain floor sheeting 8 mm minimum thickness shall be provided over specified areas.
- For Trench Cover, Platform, Non Slip Nosing, ETC.
- Including fixing by Countersunk Flat Head Bolt or Screw.
- Including Drain & Lifting Hole as per Approved Shop Drawing.
- Including Touch-Up Painting Work at Site.
- Shop Drawing to be Prepared.

M2

504.5

GALV. STEEL
GRATING

- Hot-dip galvanized steel


- Galvanized mild Steel
- Bearing Bar: Size 5x38mm @30mm
-SUPPLY AND INSTALLATION

- For Trench Cover, Platform, Stair Landing & Tread, ETC.


- Shop Drawing to be Prepared.

M2

5766

STEEL PIPE
HANDRAIL

- Grip 50, H=1200mm, Double Hand


Railing
- Post Spacing @ 1200mm, 25
-SUPPLY AND INSTALLATION

Dimensions:
- Handrail 48 mm dia.
- Knee rails (2 nos.) 42 mm dia.
- Toe plate 100/6 mm
- Stanchion 48 mm dia.
- Including Fixing and Accessories.
- Including Toe Plates (100x6mm).
- Knee Rail at 600mm.
- Weight 22 kg/ml
- Including Touch-Up Painting Work at Site.

435.2

TUBURAL STEEL
PIPE HANDRAIL

- Tubural steel handrail for stairway and


parapet
-SUPPLY AND INSTALLATION

796

SUS PIPE
HANDRAIL

357.4

EA

93

273

106.1

-SUPPLY AND INSTALLATION

GUARD
- Stainless Steel Pipe
POST(200, H=1200) - Grip 50, H=1200mm, Double Hand
Railing
- Post Spacing @ 1200mm, 25
-SUPPLY AND INSTALLATION

JOINT COVER

- =200, H=1200
W/ SAFETY PAINTING FIN.
-SUPPLY AND INSTALLATION

STEEL CAGE
LADDER ( W:450)

- Rung: round bars of 30 to 40 mm


diameter
- Rise: 250 mm
- Width: 400 mm
-SUPPLY AND INSTALLATION

- Including fixing by Countersunk Flat Head Bolt or Screw

- Including Fixing and Accessories.


- Knee Rail at 600mm.
- Weight 15 kg/ml

- Vertical fixed ladders for emergency use shall have equally spaced rungs between 230 and 260 mm apart with a width between
stringers not exceeding 400 mm.
- Safety cages shall be provided if the height of the ladder exceeds 2.0 m and the ladder design shall be in accordance with ASTM
standards or equivalent approved standards.
- Including Fixing and Accessories.
- Unit(M) means the Height of Ladder.

SUB TOTAL
L

MISC. WORK

EXPANSION JOINT

- THK. 12mm

- For Around Ground Slab.


- Including Oil Resistant Sealant W/ Joint Filler.

2,602

REMARKS

SHEET NO. : 12 OF 15

DESCRIPTION OF BUILDING
PROJECT : Nam Dinh Project, Vietnam
SUBJECT : BUILDING & STRUCTURE WORK
NO .

ITEM

PRICE UNIT : USD

BRIEF SPECIFICATION

ISOLATION JOINT

- THK. 50mm

PENENTRATION
SEAL WORKS

- For fire stop

DESCRIPTION
- For Around TG FDN.
- Including Oil Resistant Sealant W/ Joint Filler.

UNIT

Q'TY

UNIT PRICE

209

M3

SUB TOTAL
M

TOTAL PRICE
-

SANITARY
EQUIPMENT

TOILET ROLL
HOLDER

- Chromium-plated

EA

66

MIRROR

- Minimum 700 mm x 500 mm in size


- Moisture-resistant

EA

44

SOAP DISPENSER

- For liquid soap

EA

38

EA

38

EA

38

- EQUIPPED WITH OVERHEATING PROTECTION

HOR AIR
HAND DRYER

5
TOWEL HANGER

*NOTE :

SUB TOTAL

TO TAL

REMARKS

DESCRIPTION OF BUILDING
PROJECT : Nam Dinh Project, Vietnam
SUBJECT : BUILDING & STRUCTURE WORK
NO .

ITEM

PRICE UNIT : USD


BRIEF SPECIFICATION

DESCRIPTION

UNIT

UNIT
PRICE

Q'TY

TOTAL PRICE REMARKS

STEEL STRUCTURE
WORK
1

STRUCTURAL STEEL
(ROLL MEMBER)
(Fabrication and supply only)

- ASTM A36
- ASTM A572 G50 (High strength steel)
- Material supply and fabrication work only
- Including delivery work to the site

- Fabrication, Painting & Shop Drawing(3 Dimension) to be Prepared.

TON

6,495

TON

TON

14

- Including Accessories,
Purlins, Girths, Canopy, Handrail, Stair, Roof Monitor
- Including Gusset Plate and Base Plate

STRUCTURAL STEEL
(BUILT UP)
(Fabrication and supply only)

ANCHOR BOLT
(Fabrication and supply only)

- ASTM A307
- HOT DIP GALVANIZED
- Including delivery work to the site

DECK PLATE
(Fabrication and supply only)

-ASTM A653
-THK.1.6mm GALVANIZED STEEL
- Including delivery work to the site

-Including All Subsidiary Work such as Opening Arrangement, Sleeve, End Plate &
Enclosure & Sealing for Concreting
-Including -Including hot dip galvanized Shear
Connector
-Including Erection and Touch-up Painting.
-Shop Drawing to be Prepared

M3

9,702

PAINTING FOR
STRUCTURAL
STEEL(INDOOR STEEL)

SURFACE PREPARATION : SA 2.5

M2

141,697

PAINTING FOR
STRUCTURAL
STEEL(OUTDOOR STEEL)

SURFACE PREPARATION : SA 2.5

M2

1,634

- Caboline or Equivalent quality

- Surface preparation : Blasting according to SIS 055900


Grade : SA 2.5 (Steel pipe handrail : SP10)
- Prime coat
: Single or two pack inorganic ethyl zinc silicate or Sovent
based Metalic zinc rich epoxy with a vol.s solids content of min. 59 Vol. % zinc dust
by weight dry film minimum 80%
DFT : 75 microns(Interior and Exterior)
- Intermediate coat
: Epoxy High Solid
DFT : 80 microns(Interior), 160 microns(Exterior)
- Finish coat
: 2-comp. polyurethane
DFT : 50 microns(Exterior only)
--------------------------------------------------------------------------------------------------Total
DFT : 160microns(Interior)/290microns(Exterior)

FIRE PROOFING COATING


(2 HOUR)

- 2.0 hour fire resistant coating


- For Sub Steel Members
(For Girder & Beam)

- Including Touch-Up Painting, Grinding & Scaffolding Work.


- The thickness of material can be changed by the type of material according to the
site circumstances.

M2

32,587

HIGH TENSION BOLT


(Fabrication and supply only)

- ASTM 325 OR 490 with hot dip galvanized


- Including delivery work to the site

- Including All Paintings & Scaffolding Work.

EA

215,765

AUXILLIARY
STEEL MATERIAL
(Fabrication and supply only)

- Including delivery work to the site

- Including BRACING, RAFTER, GIRTH, PURLIN, BASE PLATE, RIB PLATE,


STUD BOLT, ETC.

169

- Caboline or Equivalent quality

SUB TOTAL

- Including Fabrication of Built-Up Beams with Plate, if necessary


- Including Testing as Per Specification.
- Including Shop Paintings & Scaffolding
- Including Paint supply for touch up work for the defect of the site erection work
- Including Erection Material
- For Steel Column Base.
- Including Foundation Anchor Sleeve & Anchor Frame.
- Supply Only ASTM A36.
- Packing List to be Prepared.

TON

BREAKDOWN OF BID PRICE


PROJECT : Nam Dinh Project, Vietnam
SUBJECT : BUILDING & STRUCTURE WORK

NO

ITEM

PRICE UNIT : USD

UNIT

UNIT
PRICE
(D+ID+P)
NAM DINH

A
1
2
3
4
5
B
1
1.1
1.2
1.3
2
2.1
3
3.1
3.2
4
C
1
2
3
4.1
4.2
5
6.1
6.2
7
8
9
10
11
D
1
2
3
4
5
E
1
2
3
F
1
2
3
4
5
6
7
8
9
10
11
12
13
G
1
2
3
4
5
6
7
8
9
H
1
2
3
4
I
1
2
3
4
5
6
7
8
9

EARTH WORK
EXCAVATION
BACK FILL
DISPOSAL
IMPORTED SELLECTED SOIL
VAPOR BARRIER
Sub Total
REINFORCED CONCRETE WORK
CONCRETE WORK
LEAN CONCRETE F'c = 7.0 N/mm2
REINF. CONCRETE F'c = 25.0 N/mm2
REINF. CONCRETE F'c = 30.0 N/mm2
RE-BAR WORK
HIGH STRENGTH REINFORCING BAR GRADE 60
FORM WORK
NORMAL FORM
FAIR FACED FORM
WATER STOP (PVC)
Sub Total
STEEL STRUCTURE WORK
STRUCTURAL STEEL (FABRICATION_ROLL MEMBER)
STRUCTURAL STEEL (FABRICATION__BUILT UP)
STRUCTURAL STEEL (INSTALLATION)
ANCHOR BOLT (FABRICATION)
ANCHOR BOLT (INSTALLATION)
NON-SHRINKAGE GROUT
DECK PLATE (FABRICATION)
DECK PLATE (INSTALLATION)
HIGH TENSION BOLT
STEEL AUXILLIARY MATERIAL
PAINTING FOR STRUCTURAL STEEL(INDOOR STEEL)
PAINTING FOR STRUCTURAL STEEL(OUTDOOR STEEL)
FIRE PROOFING COATING (2 HOUR)
Sub Total
MASONRY WORK
THK. 100 CEMENT BRICK (0.5B)
THK. 100 RENDERED BRICK
THK. 200 REINF CONC BLOCK (8")
MASONRY CAVITY WALL SYSTEM (FOR EXT.)
P.C LINTEL (W:200 x H:200 )
Sub Total
PLASTER WORK
CEMENT PLASTER (EXT. WALL)
CEMENT PLASTER (INT. WALL)
STEEL TROWEL FINISH
Sub Total
PAINTING WORK
EMULSION PAINT (EXT.WALL )
EMULSION PAINT (INT.WALL)
EMULSION PAINT (INT.CEILING )
EPOXY PAINT (SKIRT H=100 )
EPOXY PAINT (FLOOR)
EPOXY PAINT (THK5mm, FOR FLOOR)
ACID RESISTANT PAINT (FLOOR)
ACID RESISTANT PAINT (WALL)
ACID RESISTANT PAINT (CEILING)
CHEMICAL RESISTANT PAINT (FLOOR)
CHEMICAL RESISTANT PAINT (WALL)
CHEMICAL RESISTANT PAINT (CEILING)
COLOR HARDENER (FLOOR)
Sub Total
WATERPROOFING WORK
WATER PROOFING MEMBRANE (VERTICAL)
WATER PROOFING MEMBRANE SHEET (HORIZONTAL)
RIGID INSULATION
PE FILM
LIGHT WEIGHT CONCRETE
WELDED WIRE MESH
CEMENT LIQUID WATER PROOF
PROTECTION BOARD
BITUMINOUS COATING
Sub Total
STONE AND TILING WORK
UNGLAZED CERAMIC TILE(FLOOR)
GLAZED CERAMIC TILE(WALL)
ACID & LYE RESISTANT NON-SLIP TILE(FLOOR&WALL)
MARBLE COUNTER
Sub Total
INTERIOR WORK
SUSPENDED CEILING W/ ACOUSTIC TILE
SUSPENDED CEILING W/ PVC STRIP
TOILET CUBICLE
FALSE FLOOR
PVC TILE(FLOOR)
VINYL SKIRTING ( H:100)
METAL STUD WALL
PERFORATED ACOUSTIC PANEL
STAGE
Sub Total

02. CENTRAL CONTROL


01. TURBINE BUILDING
BUILDING

Q'ty

M3
M3
M3
M3
M2

17,608.2
6,209.6
10,864.6

M3
M3
M3

Price

Q'ty

Price

Q'ty

0
0
0
0
0
0

4,459.4
735.6
4,468.6

391.6
1,888.7
13,066.2

0
0
0

77.4
1,849.3
1,402.4

0
0
0

82.0

TON

2,125.5

390.2

M2
M2
M

13,396.6

0
0
0
0

2,960.7
13,911.4
124.0

TON
TON
TON
TON
TON
M3
M2
M2
EA
TON
M2
M2
M2

5,197.5

6,942.0

706.0

4,950.0
9.680
9.680
3.47
9,443
9,443
173,250
169
123,337.7
32,587.3

M2
M2
M2
M2
M

1,548.8

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0

60.0
257

0
0
0

52.19

36.20

0
0
0
0

343.2

0
0
0
0

256.0

0
0
0
0
0
0
0
0
0
0
0
0
0
0

132

0
0
0
0
0
0
0
0
0

96.2

0
0
0
0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0

4,312.5
7,298.0
4,953.5

0
0
0
0

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

484.2
484.2

0
0
0
0
0
0
0
0

4,312.5
7,550.7
3,479.2
398.9
2,063.0
460.0

0
0
0
0
0
0
0
0
0
0
0
0
0
0

M2
M2
M2
M2
M3
M2
M2
M2
M2

0
0
0
0
0

142.0

0
0
0
0
0
0
0
0
0
0

496
2,288.0
1,408.0
1,408.0
85.0
1,408.0
304.0
2,784.0
957.0

0
0
0
0
0
0
0
0
0
0

M2
M2
M2
M2

0
0
0
0
0

153.1
380.6
312.1

M2
M2
M2
M2
M2
M
M2
M2
M2

0
0
0
0
0
0
0
0
0
0

3,239.1
152.1
56.7
975.0
2,263.9
711.0

2,187.0
2,187.0
2,187.0
131.0
2,187.0
2,187.0
7,451.0

Q'ty

0
0
0

484.2
484.2
13,185.0

13,185.0

Price

386

104.4
2,896.4
1,952.8
2,896.4
261.2

252.7
257.6

Q'ty
304.0
242.0
73.0

0
0
0
0
0
0

803.0
626.0
213.0

Price

05. WATER
TREATMENT
BUILDING

0
0
0
0
0
0

M2
M2
M2

10,535.0

04. STORE
BUILDING &
WAREHOUSE

03. WORKSHOP
BUILDING

1,480.0

123
0.75
0.75
0.27

4,316
2,489.0

30.0
529.9

759.0
1,521.0

759.0
318.0

1,426.0

132.0

0
0
0
0
0
0
0
0
0
0

990.0

89.9
0.360
0.360
0.23

3,147
2,024.0

174.0
413.0
174.0

0
0
0
0
0
0

06. SLUDGE
TREATMENT
BUILDING

Price

782.0
620.0
194.7

Q'ty

Price

0
0
0
0
0
0

205.0
156.0
59.0

79.0
605.0
399

0
0
0

162.20

0
0
0
0

376.0
4,141.0

1,304.0

0
0
0
0

07. FUEL OIL PUMP


HOUSE

Q'ty

Price

0
0
0
0
0
0

139.0
109.0
35.6

14.2
255.0
84

0
0
0

53.00

0
0
0
0

123.9
1,933.0

0
0
0
0
0
0
0
0
0

195.0

0
0
0
0

0
0
0
0
0
0

30.4
228.0
1,170.0
228.0
98.0

0
0
0
0
0
0

57.2

Q'ty

Price

0
0
0
0
0
0

749.0
559.0
227.0

5.8
29.5
38

0
0
0

12.59

0
0
0
0

94.6
225.2

0
0
0
0
0
0
0
0
0

72.0

0
0
0
0

597.0

08. SWITCHGEAR
BUILDING FOR ESP
& ASH HANDLING

0
0
0
0
0
0

13.4

Q'ty
343.0
267.0
90.0

40.5
205.0
251

0
0
0

76.30

0
0
0
0

584.0
1,414.0

0
0
0
0
0
0
0
0
0

630.0

Q'ty

Price

11. COAL
HANDLING
CONTROL
BUILDING

Q'ty

7,925.3
5,521.4
2,645.9
5,515.2
1,934.0

0
0
0
0
0
0

1,723.0
483.0
1,488.0

13.0
88.0
43

0
0
0

104.0
2,036

0
0
0

15.70

358.00

0
0
0
0

225.0
584.0

0
0
0
0

4,923.4

0
0
0
0
0
0
0
0
0

220.0

0
0
0
0

0
0
0
0
0
0

10.0
423.0
119.0
423.0
34.6

0
0
0
0
0
0

435.0
36.0
435.0
30.0

12. LIMESTONE
STORAGE BUILDING

Price

0
0
0
0
0
0

Q'ty
0
0
0
0
0
0

1,780.0
1,353.0
512.0

23.8
568.0
447

0
0
0

162.90

0
0
0
0

1,135.0
4,054.0
121.0

536.0

Q'ty
0
0
0
0
0
0

313.0
236.0
93.0

260.9
192.0
1,586

0
0
0

188.90

0
0
0
0

537.4
960.0

0
0
0
0
0
0
0
0
0

483.4

0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

19.8
1,067.0
588.0
1,067.0
62.4

0
0
0
0
0
0

Price

0
0
0
0

4,800.0

451.8
0.600
0.600
0.35

15,813
7,073.0

14. COOLING
WATER PUMP
BUILDING

13. LIMESTONE
MILL STATION

Price

Q'ty
0
0
0
0
0
0

293.0
236.0
69.0

30.0
57.0
212

0
0
0

24.9

32.20

0
0
0
0

206.0

0
0
0
0
0
0
0
0
0

122.0

0
0
0
0
0
0
0
0
0

0
0
0
0

2,291.0

0
0
0
0
0
0

544.0

114.0
0.400
0.400
0.22
259.0
259
3,990

10.4
237.0

0
0
0

11.7

18.56

0
0
0
0

143.9

30.2

0
0
0
0
0
0
0
0
0

0
0
0
0

0
0
0
0

858.0
1,255.0
452.0

0
0
0
0

205.0
175.0
73.8

0
0
0
0

594.0
711.0
623.0

0
0
0
0

593.0
505.0
219.0

0
0
0
0

0
0
0
0

1,452.0
2,692.0
1,272.0

0
0
0
0

471.0
481.0
5,094.0

0
0
0
0

0
0
0
0
0
0
0
0

174.0
546.7

0
0
0
0
0
0
0
0

1,296.0
862.0
282.0

0
0
0
0
0
0
0
0
0
0
0
0
0
0

858.0
989.0
524.0

0
0
0
0
0
0
0
0

205.0
175.0
73.0
34.4
73.8

0
0
0
0
0
0
0
0

594.0
711.0
615.0
21.5

0
0
0
0
0
0
0
0

593.0
505.0
162.0

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

1,452.0
2,542.0
1,032.0

0
0
0
0
0
0
0
0

417.0
481.0

0
0
0
0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

363
1,036.5
646.0
646.0
39.0
646.0
735.0
1,399.0
638.0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

26.0
91.0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

481.0
26.0
9.0
189.0
308.0
350.0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

866.0

165.0

185.0

1,193.0
1,094.0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

1,330.0
1,330.0
1,330.0
79.8
1,330.0
76.0
1,330.0
593.8

0
0
0
0
0
0
0
0
0
0

452.0
265.0

195.0
195.0
195.0
11.7
195.0
195.0
171.0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

33.6

0
0
0
0
0

72.0
72.0
72.0
4.3
72.0
72.0
110.0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0

630.0
630.0
630.0
37.8
630.0
14.0
630.0
686.0

0
0
0
0
0
0
0
0
0
0

0
0

282.0

0
0
0
0
0

56.0
243.0

0
0
0
0
0

95.0
167.0

0
0
0
0
0

53.0
104.0
1,356.0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

6.0
24.0

0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

94.0
56.0
21.0

0
0
0
0
0
0
0
0
0
0

109.9
95.4

0
0
0
0
0
0
0
0
0
0

183.0
53.0
24.0
105.0
175.0
160.0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

8.2
6.0
2.4

0
0
0
0
0
0
0
0
0
0

109.0
34.0

72.0
70.4

219.0

590.0
122.0

263.0
263.0
263.0
15.8
263.0
263.0
286.0

58.0

5,540.0

777.0
143.0

0
0
0
0
0

320.0

5,094.0

1,456.0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

259.0

544.0

276.0

395.0

28.2
0.180
0.180
0.10

987
697.0

0
0
0
0
0
0

1,296.0
2,318.0
1,358.0

152.0

Q'ty

124

0
0
0
0

474.0

Price

144.0
113.0
37.0

174.0
546.7
976.0

474.0
802.0

15. FIRE FIGHTING 16. 500KV CONTROL 17. CHLORINATION


PUMP HOUSE
BUILDING
BUILDING

0
0
0
0
0
0

0
0
0
0

667.0

94.0
37.1

10. COAL STORAGE


SHED

Price

0
0
0
0
0
0

0
0
0
0

126.0

09. HYDROGEN
GENERATION
HOUSE

0
0
0
0
0
0
0
0
0
0
0
0

84.0
435.5

Q'ty

Price

0
0
0
0
0
0

870.0
284.0
703.0

65

0
0
0

10.50

0
0
0
0

117.0

11.5

0
0
0
0
0
0
0
0
0

0
0
0
0

126.0

10.8
0.090
0.090
0.06

378
273.0

0
0
0
0
0
0

435.5

Price

0
0
0
0
0
0
0
0
0
0
0
0

143.0

48.0
143.0

Q'ty
0
0
0
0
0
0

785.6
595.2
229.0

11.0
417.0
238

0
0
0

103.30

0
0
0
0

706.0
3,022.0
70.0

300.0

0
0
0
0

46.1
235.5
264

0
0
0

91.80

0
0
0
0

533.0
1,561.5

0
0
0
0
0
0
0
0
0

0
0
0
0
0
0

11.4
953.0
684.0
953.0
55.6

0
0
0
0
0
0

0
0
0
0

953.0
1,247.0
998.0

0
0
0
0

0
0
0
0
0
0
0
0

953.0
998.0
310.0
65.0
283.9
41.0

19. COMMON
SERVICES
BUILDING

Q'ty

Price

0
0
0
0
0
0

1,219.0
927.0
349.0

55.0
837.0
410

0
0
0

187.00

0
0
0
0

624.0
4,968.0

0
0
0
0
0
0
0
0
0

773.0

0
0
0
0

21. TRUCK GARAGE


20. CAR GARAGE HOUSE
HOUSE

Q'ty
0
0
0
0
0
0

334.0
269.0
77.0

56.0
439.0
373

0
0
0

56.0

132.00

0
0
0
0

724.0
3,132.0

0
0
0
0
0
0
0
0
0

709.0

0
0
0
0

0
0
0

59.0

244

33.50

0
0
0
0

309.7

40.4

0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0

1,019.0
1,453.0
698.0

0
0
0
0

852.1
3,025.4
2,005.0

0
0
0
0

802.0
1,423.0
1,167.0

0
0
0
0

0
0
0
0
0
0
0
0

787.0
1,019.0
635.0

0
0
0
0
0
0
0
0

852.0
3,025.0
217.0
42.2
69.0
36.5

0
0
0
0
0
0
0
0

802.0
1,423.0
78.0
15.2
15.2

0
0
0
0
0
0
0
0

0
0
0
0
0

636.0
522.0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

210
483.0
300.0
300.0
18.0
300.0
166.0
693.0
364.0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

45.0
130.0

0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

672.0
16.0
12.0

0
0
0
0
0
0
0
0
0
0

704.0
704.0
704.0
42.0
704.0
704.0
715.2

38.3

38.3
23.8

0
0
0
0
0
0
0
0
0
0

738.0
738.0
738.0
44.3
738.0
284.0
738.0
981.0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0

720.0
720.0
720.0
43.0
720.0
272.0
720.0
1,017.0

1,320

8.0

0
0
0
0
0
0

0
0
0
0
0

37.7
0.300
0.300
0.12

906.8

96.0
470.0
421.0
470.0
98.0

0
0
0
0
0

780.0

0
0
0
0

0
0
0
0
0
0

34.0

Q'ty
377.0
308.0
81.0

102.0
364.0
941.0
364.0
95.0

866.0

Price
0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0

14 of 15

704.0

0
0
0
0

721.0

Price

1,099.0
758.0
409.0

0
0
0
0
0

115.0

Q'ty
0
0
0
0
0
0

0
0
0
0
0

234.0

Price

18.
ADMINISTRATION
BUILDING

0
0
0
0
0
0
0
0
0
0

69.8
805.0

69.8

10.0

769.0

32.0

Price

22. BULLDOZER
GARAGE HOUSE

Q'ty
0
0
0
0
0
0

199.0
158.0
50.0

0
0
0

30.0

262

37.50

0
0
0
0

321.0

69.3

918.0

64.8
0.500
0.500
0.26

2,268

0
0
0
0

1,497.0

0
0
0
0
0
0

13.4

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

54.6

127.0
918.0

127.0

864.0

39.6

23. MOTOCYCLES &


24. MAIN GATE HOUSE
BIKE SHED

Price

Q'ty
0
0
0
0
0
0

314.0
261.0
64.0

0
0
0

5.0

131

18.90

0
0
0
0

201.0

0
0
0
0
0
0
0
0
0

244.5

0
0
0
0
0
0
0
0
0

0
0
0
0

1,108.0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

400.0

228.5
0.270
0.270
0.16

7,998

12.8
157.0

105.0
400.0

105.0

366.0

37.1

Price

Q'ty

Price

0
0
0
0
0
0

77.0
64.0
15.0

46

0
0
0

9.00

0
0
0
0

120.0

38.7

0
0
0
0
0
0
0
0
0

0
0
0
0

36.2
0.250
0.250
0.11

1,267

896.7

4.5
19.2
20

0
0
0

4.80

0
0
0
0

52.0
180.0

35.0

0
0
0
0

28. COAL & ASH


TREATMENT
BUILDING

Q'ty

Q'ty

Q'ty

Price

0
0
0
0
0
0

374.0
279.0
92.0

17.0
73.5
77

0
0
0

17.50

0
0
0
0

188.0
700.0

0
0
0
0
0
0
0
0
0

125.0

0
0
0
0

0
0
0
0
0
0

44,230.5
22,102.0
23,456.3
6,005.0
27,381.2
0.0

0
0
0
0
0
0

17.9
151.9
124

0
0
0

28.0
0.0
239

0
0
0

9.9
178.5
59

0
0
0

1,620.0
8,118.6
22,919.4

39.20

28.50

37.10

4,447.6

0
0
0
0

244.6
943.5

0
0
0
0

536.0
0.0
0.0

0
0
0
0

86.7
1,353.1

0
0
0
0

30,163.3
43,307.9
1,021.0
0.0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0

29.5
0.0
29.5
0.400
0.500

0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0

0
0
0
0

0
0
0
0

6,495.2
0.0
6,164.7
13.8
13.9
5.4
9,702.0
9,702.0
215,764.5
169.4
141,696.5
1,634.2
32,587.3
0.0

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0

500.6
7,366.3
9,710.4
7,366.3
990.1
0.0

0
0
0
0
0
0

0
0
0
0
0
0
0
0
0

242.0

0
0
0
0

0
0
0
0
0
0

0
0
0
0

0
0
0
0

95.0
74.0
33.0

0
0
0
0

400.0
235.0
115.0

0
0
0
0

376.0
307.0
245.0

0
0
0
0

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

95.0
74.0

0
0
0
0
0
0
0
0

400.0
235.0

0
0
0
0
0
0
0
0

376.0
307.0
245.0
64.4
245.0

0
0
0
0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0

195.0

0
0

211.3

0
0
0
0
0

136.0
303.0

0
0
0
0
0

14.0
36.0

0
0
0
0
0

18.0
51.0

0
0
0
0
0

15.0
51.0

0
0
0
0
0

0
0
0
0
0

5.0
27.0

0
0
0
0
0
0
0
0
0
0

1,929.0
118.0
96.0

0
0
0
0
0
0
0
0
0
0

1,151.0
136.0
71.0

0
0
0
0
0
0
0
0
0
0

36.0
14.0
5.0

0
0
0
0
0
0
0
0
0
0

36.0
18.0

0
0
0
0
0
0
0
0
0
0

17.0
17.0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

33.0
5.0

2.5

33.0
34.0

266.0
20.7

0
0
0
0
0

210.0
210.0
210.0
12.5
210.0
75.0
210.0
218.5

0
0
0
0
0

25.0
51.0

0
0
0
0
0
0
0
0
0
0

115.0
25.0

7.2

115.0
105.0

REMARKS
Price

143.5
109.2
41.3
131.0
220.4

43.0
240.0
55.0
240.0
55.0

0
0
0
0
0
0
0
0
0
0

Q'ty

0
0
0
0
0
0

0
0
0
0
0
0

58.0
58.0
58.0
3.5
58.0
15.0
58.0
64.0

TOTAL

Price

469.0
299.0
190.0
358.8
386.0

0
0
0
0

0
0
0
0
0

Price

0
0
0
0
0
0

9.0
57.0
22.0
57.0
14.0

335.0

17.0
15.8

27. HYDROGEN
SHELTER

0
0
0
0
0
0

0
0

36.0
23.0

26. BERTH
ELECTRICITY
HOUSE

0
0
0
0
0
0

299.0

36.0
31.0

Price

259.5
215.0
50.0

118.0
281.0

1,148.0
467.0

Q'ty
0
0
0
0
0
0

0
0
0
0
0

2,072.0
971.0
166
166
60

25. SUB GATE


HOUSE

0
0
0
0
0
0
0
0
0
0

242.0
242.0
242.0
14.5
242.0
242.0
289.0

1,033

737.5

0
0
0
0
0
0

0
0
0
0
0
0

58.9
349.1
58.9
47.6

0
0
0
0

655.1
727.1
316.3

0
0
0
0

15,796.9
26,667.2
39,259.9
0.0

0
0
0
0

0
0
0
0
0
0
0
0

655.1
596.6
285.2
37.1
85.1

0
0
0
0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

231.2
130.6

0
0
0
0
0

15,510.8
24,234.0
8,010.4
1,894.1
15,213.3
1,092.1
0.0
1,445.7
1,351.6
1,319.2
917.6
0.0
23,256.0
0.0

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

1,069.0
11,449.5
9,996.0
9,996.0
599.8
9,996.0
2,346.7
12,518.0
24,771.5
0.0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0

765.1
1,939.6
1,668.1
9.7
0.0

0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

8,285.5
737.5
297.1
1,269.0
7,882.2
3,206.4
166.0
166.0
60.0
0.0

0
0
0
0
0
0
0
0
0
0

378.0

378.0

390.0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

221.0
221.0
221.0
13.3
221.0
221.0
119.7

85.1

54.0
51.3

BREAKDOWN OF BID PRICE


PROJECT : Nam Dinh Project, Vietnam
SUBJECT : BUILDING & STRUCTURE WORK

NO

ITEM

PRICE UNIT : USD

UNIT

UNIT
PRICE
(D+ID+P)
NAM DINH

J
1
2
3
4
5
6
7
8
9
10
11
12
13
K
1
1.1
a)
b)
c)
1.2
a)
b)
c)
d)
1.3
a)
b)
c)
1.4
a)
b)
1.5
a)
b)
2
2.1
a)
b)
c)
d)
e)
2.2
a)
b)
c)
2.3
a)
b)
2.4
2.5
2.6
a)
b)
L
1
2
3
4
5
6
7
8
9
M
1
2
3
N
1
2
3
4
5

PANEL & ROOF WORK


THERMAL INSULATED METAL PANEL (ROOF)
THERMAL INSULATED METAL PANEL (WALL)
THERMAL INSULATED METAL PANEL (ROOF)
THERMAL INSULATED METAL PANEL (WALL)
SINGLE SKIN METAL PANEL(ROOF)
SINGLE SKIN METAL PANEL(WALL)
GUTTER(250*200)
ROOF DRAIN DIA.100
ROOF DRAIN DIA.150
LEADER HEAD (300*300*250)
DOWN SPOUT DIA.100
DOWN SPOUT DIA.150
SPLASH BLOCK, 450 mm(L) x 300 mm (W) x 150 mm (H)
Sub Total
DOOR & WINDOW WORK
DOOR WORK
NORMAL STEEL DOOR
1.01*2.135
2.20*2.135
2.20*2.50
ROLL UP STEEL DOOR
3.0*3.0
5.0*4.0
5.0*5.0
6.0*5.5
FIRE RESISTANT STEEL DOOR
1.01*2.135
2.20*2.135
2.20*2.50
GLASS DOOR
1.0*2.1
2.0*2.1
TIMBER DOOR
1.0*2.1
2.0*2.1
WINDOW WORK
ALUMINUM WINDOW (SLIDING)
0.6*0.6
1.2*0.6
3.0*1.0
1.8*0.9
2.0*1.2
ALUMINUM WINDOW (FIX)
4.5*1.0
5.4*1.0
1.0*9.2
ALUMINUM LOUVER
2.0*1.0
1.2*0.9
CURTAIN WALL
APPROVED SUNSHADE
SOUND PROOF DOOR
1.01*2.135
2.20*2.135
Sub Total
MISC. METAL WORK
MISC. STEEL WORK
CHK'D PLATE
GALV. STEEL GRATING
STEEL PIPE HANDRAIL
TUBURAL STEEL PIPE HANDRAIL
SUS PIPE HANDRAIL
GUARD POST(200, H=1200)
JOINT COVER
STEEL CAGE LADDER ( W:450)
Sub Total
MISC. WORK
EXPANSION JOINT, THK. 12 mm
ISOLATION JOINT, THK. 50 mm
PENENTRATION SEAL WORKS
Sub Total
SANITARY EZUIPMENT
TOILET ROLL HOLDER
MIRROR
SOAP DISPENSER
HOR AIR HAND DRYER
TOWEL HANGER
Sub Total

Total Cost

M2
M2
M2
M2
M2
M2
M
EA
EA
EA
M
M
EA

EA
EA
EA
EA
EA
EA
EA

02. CENTRAL CONTROL


01. TURBINE BUILDING
BUILDING

Q'ty

Price

5,513.0
10,070.0

350.0
58

1,154
38

6
10

2
1

Q'ty
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0

Price

Q'ty
0
0

12
12
232.0
10

8
31

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0

04. STORE
BUILDING &
WAREHOUSE

03. WORKSHOP
BUILDING

Price

1,620.0
1,342.0

120.0

84.0
10

7
5
3

Q'ty
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0

05. WATER
TREATMENT
BUILDING

Price

1,082.0
1,018.0

132.0

102.0
12

2
3

Q'ty

06. SLUDGE
TREATMENT
BUILDING

Price

Q'ty

07. FUEL OIL PUMP


HOUSE

Price

Q'ty

Price

08. SWITCHGEAR
BUILDING FOR ESP
& ASH HANDLING

Q'ty

Price

09. HYDROGEN
GENERATION
HOUSE

Q'ty

10. COAL STORAGE


SHED

Price

Q'ty

0
0

0
0

0
0

0
0

0
0

0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

8
8
63.0
8

0
0
0

16
2

0
0
0
0

5
5
55.0
5

0
0
0

8
2

0
0
0
0

0
0
0

2
2
10.0
2

0
0
0

8
8
40.0
8

1
5

0
0
0

4
4
17.0
4

5
3

60,845.2
34,819.2

Price

Q'ty

0
0
0
0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

EA
EA

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

EA
EA

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

EA
EA
EA
EA
EA

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0

0
0
0

0
0
0

0
0
0
0

0
0
0
0

0
0
0
0
0
0
0

EA
EA
M2
M2

36

EA
EA

TON
M2
M2
M
M
M
EA
M
M

254.0
500.0
5,725.0
336.0

M
M
M3

1,102.0
208.8
0.1

EA
EA
EA
EA
EA

6
273.0
14.4

0
0
0
0

200

0
0
0
0

0
0
0

0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0

172.8
108
2
8.2

0
0
0
0
0
0
0
0
0

10.0
5.0
5.0
5.0
5.0

10

12.3

0
0

0
0
0

10
8

0
0
0

0
0
0
0

0
0
0
0

0
0
0

0
0
0

0
0
0
0
0
0
0

8.9

0
0
162.0

0
0
0
0
0
0
0

46

1
11

4.5
41.0
146.0
34
2

0
0
0
0

0
0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0

126.0

0
0
0
0

4.0
2.0
2.0
2.0
2.0

0
0
0
0
0

4.0
2.0
2.0
2.0
2.0

0
0
0
0
0

0
0
0
0
0

0
0
0
0

0
0

0
0
0
0

11

0
0
0

3.0

170.0

0
0
0

0
0

0
0
0
0

22

0
0
0

56.0
48
4

0
0
56.0

6.0

0
0
0
0

0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

6.0

1.0
1.0
1.0
1.0
1.0

10.0

38.0

0
0
0
0
0
0
0
0
0
0

26

14

31.0
121.0
38

4.0

Price

5,040.0
2,059.0

240.0

136.0
16

0
0
0

0
0
0
0

0
0
0

15

13
9

0
0
0
0

0
0
0

0
0
0

0
0
0
0

0
0
0

15
66

9
9
89.0

0
0
0
0

0
0
0

0
0
0

Q'ty

0
0
0
0
0
0
0
0
0
0

0
0
0

36
94

Price
0
0

0
0
0

EA
EA
EA

12. LIMESTONE
STORAGE BUILDING

0
0

EA
EA

11. COAL
HANDLING
CONTROL
BUILDING

Q'ty
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0

Price

616.0
1,336.0

62.0

136.0
16

3
3

Q'ty
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0

15. FIRE FIGHTING 16. 500KV CONTROL 17. CHLORINATION


PUMP HOUSE
BUILDING
BUILDING

Price

442.0
397.0

51.4

20.4
4

2
1

Q'ty
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0

Price

159.0
243.0

29.2

20.4
4

Q'ty

Price

Q'ty

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0

4
4
51.6
4

18
5

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0
0
0
0
0
0
0
0

45.0

164.0

0
0
0
0
0
0
0

2.8

0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0

0
0
0
0

81.2

0
0
0
0

0
0
0
0

0
0
0
0

121.0

0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

2.0
2.0
2.0
2.0
2.0

0
0
0
0
0

0
0
0
0
0

11

34.6

1.0
1.0
1.0
1.0
1.0

0
0
0
0
0
0
0
0
0
0

1.0

0
0
0
0

46.0

0
0
0
0
0
0
0
0
0
0

33.6

3.0

0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

4.0
3.0
3.0
3.0
3.0

2
2
7.0
2

0
0

0
0

0
0

0
0

0
0

0
0

0
0

3.0
8.0

0
0

0
0

23
4

0
0

13
10

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

44.0
14.0

0
0
0
0
0

0
0
0
0
0

6
4
39

0
0
0
0
0

4
26
5
2

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

10.0
15.0
84.0
211.0
284.0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

8.0
50.0
1.0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

52.0
0.0
544.5
544.9

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

2.0
7.0
0.0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

2.500

0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

412.7
504.5
5,766.0
435.2
796.0
357.4
93.0
273.0
106.1
0.0

0
0
0
0
0
0
0
0
0
0

0
0
0
0

0
0
0
0

126.0
0.0
0.0

0
0
0
0

2,601.5
208.8
0.1
0.0

0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

66.0
44.0
38.0
38.0
38.0
0.0
0.0

0
0
0
0
0

14

0
0
0

0
0
0

0
0
0
0

0
0
0
0

0
0
0

0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0
0
0

0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0

467
129
2
7

118.0
53

3.0

0
0
0
0

78
96

0
0
0
0

0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0

0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

3.7

0
0
0
0

146.0

0
0
0
0

138.0

0
0
0
0

100.0

0
0
0
0

0
0
0
0

0
0
0
0
0

2.0
1.0
1.0
1.0
1.0

0
0
0
0
0

2.0
1.0
1.0
1.0
1.0

0
0
0
0
0

2.0
1.0
1.0
1.0
1.0

0
0
0
0
0

0
0
0
0
0

122.2
38

3.5

0
0
0
0
0

13.0
7.0
7.0
7.0
7.0

0
0
0

0
0
0
0

0
0
0

0
0
0
0
15.0
12.0
6.0
6.0
6.0

0
0
0

0
0
0
0

0
0
0
0
0

31

0
0
0
0
0
0
0

0
0
0
6.5

18

0
0

0
0
0
0
0
0
0

23.0

0
0

0
0
0
0
0
0
0

3.6

0
0
0

10

15

0
0
0

5.5

0
0
0
0

36

27.5

0
0
0
0
1.0
1.0
1.0
1.0
1.0

0
0
0
0
0

5.0
5.0
5.0
5.0
5.0

0
0
0

0
0

5
5
35.5

0
0
0
0
0
0
0
0
0
0

0
0

0
0
0
0
0

0
0
0

10

4
4
20.0

0
0
0
0
0
0
0
0
0
0

0
0

1
1

0
0
0

10
10
35.0

404.0
122.0
82.0
0
8
0
0.0
39
8

0
0
0

45

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0

0
0
0

0
0
0
0

0
0
0
0
0
0
0
0
0
0

11,143.0
8,010.0
5,513.0
10,070.0
62,113.2
34,941.2
1,480.1
98.0
66.0
99.0
1,551.4
1,241.5
241.0
0.0

3
3

0
0
0
0
0

0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0

0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0

0
0
0
0

0
0

0.0
0.0
0.0

0
0
0
0
0

0
0
0
0

0
0

0
0
0

0
0
0

6
2

0
0
0

130.0
82.0
13.0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

4.0
34.0
1.0
3.0

11

6.0

0
0
0
0

16

60.0
39
2

63.3

15 of 15

REMARKS
Price

0
0
0

0
0
0
0
0

0
0
0

0
0

Q'ty

0
0
0

0
0

0
0
0

0
0

TOTAL

Price

0
0
0

0
0

0
0
0

Q'ty

Price

0
0
0

0
0

Q'ty

Price

0
0
0

0
0
0

26.1

Q'ty

0
0
0

0
0
0
0

109.5

Price

0
0
0

15

0
0
0

864.0

Q'ty

0
0
0

0
0

0
0
0
0
0
0
0
0
0
0

Price

0
0
0

0
0

0
0
0

42.4

0
0

Q'ty

0
0
0

0
0

2
2

10

80.0

Price

0
0
0

0
0

0
0
0

59.0

0
0
0
0
0
0
0
0
0
0

400.0
431.0

Q'ty

28. COAL & ASH


TREATMENT
BUILDING

0
0
0

0
0

6
5

10

102.0

0
0

Price

27. HYDROGEN
SHELTER

0
0
0

1
1

0
0
0

51.0

0
0
0
0
0
0
0
0
0
0

918.0
702.0

Q'ty

26. BERTH
ELECTRICITY
HOUSE

0
0
0
0

0
0

10

7
8
74.0
49
8

122.0

0
0

Price

25. SUB GATE


HOUSE

0
0
0
0

0
0

19
11

10
10
93.0

866.0
482.0

Q'ty

23. MOTOCYCLES &


24. MAIN GATE HOUSE
BIKE SHED

0
0
0
0

0
0
0

6
6
42.0

Price

22. BULLDOZER
GARAGE HOUSE

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

Q'ty

0
0
0
0
0
0
0
0
0
0

0
0
0

29

Price
0
0

0
0
0

Q'ty
0
0

0
0
0
0

16

Price

21. TRUCK GARAGE


20. CAR GARAGE HOUSE
HOUSE

0
0

0
0
0
0

8
8

Q'ty

19. COMMON
SERVICES
BUILDING

0
0

0
0
0
0

Price

18.
ADMINISTRATION
BUILDING

0
0

0
0
0
0

0
0
0
0

14. COOLING
WATER PUMP
BUILDING

13. LIMESTONE
MILL STATION

0
0