Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
2011
Market
value:
USD
68.4
billion
2017
Market
value:
USD
160
billion
India Advantage
L&T CONSTRUCTION
Hospitals
Pharmaceutical
Diagnostics
Medical
Equipment
Medical
Insurance
L&T CONSTRUCTION
L&T CONSTRUCTION
HOSPITALS:
Government Hospital
4475 nos.
Charitable Trusts Hospitals 335 nos.
Private / Corporate Hospitals 10289 nos.
375987 Beds
19677 Beds
228155 Beds
15099 nos.
623819 Beds
TOTAL
USA
UK
GERMANY
FRANCE
ITALY
CANADA
CHINA
SWEDEN
JAPAN
- 3:1000
- 3:1000
- 8.3:1000
- 6.6:1000
- 3.5:1000
- 3.2:1000
- 3.8:1000
- 2.7:1000
- 13.7:1000
USA
- 2.42/1000
UK
- 2.77/1000
GERMANY - 3.69/1000
FRANCE - 3.38/1000
ITALY
- 3.8/1000
CANADA - 2.07/1000
CHINA
-1.46/1000
SWEDEN - 3.8/1000
JAPAN
- 2.14/1000
STRONG ECONOMY:
$4.99 Trillion dollar economy.
4th largest economy in the world.
56.9% of GDP from service sector.
25.8% of GDP from industry sector.
STRONG ENABLERS:
Economy expected to grow at around 6% + annually.
Young employable human resources.
A market of 1,236,344,631(JULY 2014 EST.) Population.
OVERVIEW:
Indian healthcare market expected to touch USD 160 billion crores by 2017.
Annual growth rate of 15% for the next 15 years.
Sector
Central Govt.
Private
State Govt.
TOTAL
% of total
28.64%
32.53%
38.83%
100.00%
Actual power supply position in terms of peak demand met during the year
2011-12 in India
Peak demand in MW
1,36,006
L&T CONSTRUCTION
Peak met in MW
1,16,191
Surplus / Deficit
in MW
in %
-13,815
-10.6
B&F EDRC - CHENNAI
Given the backdrop of the power scenario, the way out to resolve the crisis is to reduce the demand to match with
the available supply.
As there remain a lot of social issues in bringing down the existing demand, the fresh demand that is being added
into the system should be managed.
Rational use requires that we obtain maximum efficiency from the energy consumption and from the facilities
required for the generation and distribution of such energy.
L&T CONSTRUCTION
It has put onus on the companies developing the countrys infrastructure to bring down
the carbon footprint of the new immovable assets coming up in the country.
L&T CONSTRUCTION
L&T CONSTRUCTION
DG SET -1
DG SET -2
Transformer -1
SECTION - 1
vi.
vii.
viii.
ix.
x.
xi.
xii.
LIGHTING
SMALL POWER
AHU PUMPS
VENTILATION FANS
MONOBLOC, SOLAR HOT WATER
SYSTEM,DRINKING WATER COOLER ,OWC
STP,WTP & RO PLANT
SWIMMING POOL TREATMENT UNIT
SEWAGE PUMPS
SERVICE BUILDING LOADS LIGHTING &
SMALL POWER
KITCHEN LOADS
CHILLERS
FACILITIES LIGHTING
Transformer -2
B/C
L&T CONSTRUCTION
GRID SUPPLY
B/C
SECTION - 2
i.
ii.
iii.
iv.
v.
vi.
LIFTS
PRIMARY PUMP , SECONDARY PUMP, CONDENSER
PUMP & COOLING TOWER LOADS
HYDROPNEUMATIC & BOREWELL PUMPS
FIRE PROTECTION SYSTEM
EXTERNAL LIGHTING
CHILLERS
CBS
EMERGENCY LIGHTING
CBS - CENTRAL BATTERY SYSTEM
ELV - EXTRA LOW VOLTAGE
UPS - UNINTERRUPTABLE POWER SUPLLY
DG SET -4
B/C
GRID SUPPLY
i.
ii.
iii.
iv.
v.
DG SET -3
SECTION - 3
ELECTROMEDICAL
EQUIPMENTS
UPS
i.
ii.
DG SET -1
DG SET -2
Transformer -1
SECTION - 1
vi.
vii.
viii.
ix.
x.
xi.
xii.
LIGHTING
SMALL POWER
AHU PUMPS
VENTILATION FANS
MONOBLOC, SOLAR HOT WATER
SYSTEM,DRINKING WATER COOLER ,OWC
STP,WTP & RO PLANT
SWIMMING POOL TREATMENT UNIT
SEWAGE PUMPS
SERVICE BUILDING LOADS LIGHTING &
SMALL POWER
KITCHEN LOADS
CHILLERS
FACILITIES LIGHTING
L&T CONSTRUCTION
DG SET -4
B/C
GRID
SUPPLY
i.
ii.
iii.
iv.
v.
DG SET -3
GRID
SUPPLY
Transformer -2
B/C
B/C
SECTION - 2
i.
ii.
iii.
iv.
v.
vi.
LIFTS
PRIMARY PUMP , SECONDARY PUMP,
CONDENSER PUMP & COOLING TOWER LOADS
HYDROPNEUMATIC & BOREWELL PUMPS
FIRE PROTECTION SYSTEM
EXTERNAL LIGHTING
CHILLERS
CBS
EMERGENCY
LIGHTING
(90 MINUTES)
SECTION - 3
ELECTROMEDICAL
EQUIPMENTS
UPS
i.
ii.
L&T CONSTRUCTION
Lighting system
Elevators
Electro-medical and its allied systems
Exploring same materials for multi use
and using of new materials are greatly
reduced.
Building Management Systems (BMS)
ELV systems
CONCEPT:
Sustainable Lighting Solutions for a Healing Environment in patient
rooms
SPECIAL CONSIDERATIONS:
L&T CONSTRUCTION
L&T CONSTRUCTION
L&T CONSTRUCTION
Passenger lifts.
Bed lifts.
Service lifts.
Dumb waiters
L&T CONSTRUCTION
Solar geyser
Power requirement
has been brought
down to 4% from the
total power
requirement against
10%.
Water &
landscape pumps
ro plant
L&T CONSTRUCTION
L&T CONSTRUCTION
The degree to which harmonics is determined by the susceptibility of the load (or power source) to them. The
most susceptible type of equipment is that whose design or constitution assumes (nearly) perfect sinusoidal
fundamental input.
CASE STUDY
At Transformer Incomer Feeder,
Voltage variation
Observed 230 volts to 236 volts which is normal as per
the standards variation.
L&T CONSTRUCTION
Current variation
Observed1147amps to a max. of 1485 amps, Neutral
current 1068 amps to 1550 amps & led to system
unstable.
B&F EDRC - CHENNAI
Power Factor
L&T CONSTRUCTION
Voltage variation
Observed 234 volts to 238 volts which is normal as per
the standards variation.
L&T CONSTRUCTION
Current variation
The phase current is about 40 amps in all the three
phases and the neutral current is about 230 amps which
is not advisable as it leads to unstable of the power
system.
Voltage variation
Observed 234 volts to 238 volts which is normal as per
the standards variation.
L&T CONSTRUCTION
Current variation
The phase current is about 40 amps in all the three
phases and the neutral current is about 230 amps which
is not advisable as it leads to unstable of the power
system.
Power Factor
L&T CONSTRUCTION
L&T CONSTRUCTION
Monitor consumption
Save money
Control usage
L&T CONSTRUCTION
Lower emissions
L&T CONSTRUCTION
Reduction in maintenance
staff
B&F EDRC - CHENNAI
CCTV Monitoring
PA
Control
ler
ACS
Workstat
ion
IBMS
Workstat
ion
Printer
IBM
S
Serve
r
LOC: HOSPITAL
COMMAND CENTER
10/100/1000 Mbps
LAN
Cameras
(Typ.)
BACnet
Fire
Alarm
Control
Panel
Amplifier
Remote
Call
Station
CCTV
Storage
LON
Modbus
ACCESS
Controller
(Typ.)
Building Manager
BMS architecture
Optimized man power, Control usage, Improved comfort.
Flexibility in information availability via web link/Internet/Intranet.
The health care buildings are designed by integrating other ELV systems like Nurse call system,
Hospital Management System, CCTV, Public Address system, CATV system, Data/LAN network
system, Telephone and EPABX system to make the operation & facilities much more user friendly and
for operational excellence.
L&T CONSTRUCTION
General
Purpose
Controller DDC (Typ.)
AHUs
Chillers
Field
devices
L&T CONSTRUCTION
Unitary
Controller Integrator
(Typ.)
Third Party
Integration
1. Lift
2. VFD
3. CPM
BTU
Meter,
Water
Meter
Fans
PHE Pumps
Fire Pumps
IP Master DDC
Integrators
Felid Equipments
BMS Workstation
L&T CONSTRUCTION
PCMS System has been designed for the Control and Monitoring of all main electrical panels(HT Panel,LT panel, Main
distribution panels.)exclusively;
Dedicated system for Electrical systems control & monitoring apart from BMS
Electrical Panels
DG
Lighting control
UPS
The system will have dedicated monitor for Control & Monitoring.
This system will integrate with IBMS software for Critical alarm monitoring through IBMS Screen.
L&T CONSTRUCTION
BMS
Safety systems
Security systems
L&T CONSTRUCTION
TOUCH POTENTIAL
STEP POTENTIAL
To be continued
L&T CONSTRUCTION
DETAIL 1-1
L&T CONSTRUCTION
L&T CONSTRUCTION
DETAIL-2
L&T CONSTRUCTION
Continuity
maintained
by welding
of
reinforceme
nt rods
L&T CONSTRUCTION
Reinforcement steel is used for forming Grid/Mat as per the Calculation in order to meet the required Step and
Touch Potential.
L&T CONSTRUCTION
Interconnecting strips
are being joined using
DC welding to make
Grid formation
Earth rod of 3 mtrs being
driven at the junctions/
interconnecting strips
L&T CONSTRUCTION
STEP-1
STEP-3
16mm non
reinforcing
rods used for
linking
STEP-2
STEP-4
Identified
Pile rod for
Structural
Earthing
The length of
welding seam min
100mm (for single
side welding) and
min 55mm
(Double side
welding).
STEP-5
Link from
pile rods to
column.
STEP-6
Link
between
two
column
rods
Linking of column and pile rods
using 16mm reinforcing rods and
make welding at that points
L&T CONSTRUCTION
Tangible benefits:
To be continued.
L&T CONSTRUCTION
Intangible benefits:
L&T CONSTRUCTION
To BMS
Fire Alarm
panel for partial
Zone
L&T CONSTRUCTION
In a Nut shell, Re-arrangement of these loads by altering the loading factors is demonstrated.
L&T CONSTRUCTION
L&T CONSTRUCTION
L&T CONSTRUCTION
L&T CONSTRUCTION