Project: Proposed Two(2) Storey Residential Bldg.

Location:
Subject: Bill of Materials and Cost Estimates
Item No.
1

Description
EARTHWORKS
Excavation
Backfill
Gravel Bed

cu.m.
cu.m.
cu.m.

CONCRETING WORKS
Cement (40 kgs Portland Cement)
Washed Gravel
Washed Sand

bags
cu.m
cu.m

MASONRY WORKS
6" CHB
4" CHB
Cement (40 kgs Portand Cement)
Fine Sand

pcs
pcs
bags
cu.m

DRY WALL WORKS


5mm thk. Fiber Cement Board
Metals Studs

shts
ln.m.
le

REINFORCING STEEL BAR


Grade 40
10-mm Def. Bars x 6m
12-mm Def. Bars x 6m

le
le

Grade 60
8-mm Def. Bars x 6m
10-mm Def. Bars x 6m
12-mm Def. Bars x 6m
16-mm Def. Bars x 6m
20-mm Def. Bars x 6m

le
le
le
le
le

ROOF FRAMING

12mm dia. Round Bar Cross Bracing


10mm dia. Round Bar Sag Rod

le
le
le
le
le

ROOFING MATERIALS
Ga. 26 Prepainted Metal Roofing
Ga. 26 GI Corr. Sheet
Ga. 26 GI Plain Sheet

pcs
pcs
pcs

SCAFFOLDINGS
2"x3"x12' coconut lumber
2"x2"x12' coconut lumber
5mm thk. Ordinary/Marine Plywood

bd.ft
bd.ft
shts

100mm x 50mm x 2.0mm C Steel Purlins x 6m.


100mm x 50mm x 1.5mm C Steel Purlins x 6m.
75mm x 50mm x 1.5mm C Steel Purlins x 6m.

Unit

DOORS & WINDOWS


Doors
0.90m. X 2.25m. Solid Panel Door on Metal
Jamb with Complete Accessories
0.80m. X 2.10m. HDF Panel Door on Metal
Jamb with Complete Accessories
0.60m. X 2.10m. PVC Flush Door on Metal
Jamb with Complete Accessories
Windows
1.40m. X 2.00m. Analok Fin Aluminum
Framed Fixed & Sliding Window w/ Transom
& 6mm thk. Clear Floats Glass
1.40m. X 1.00m. Analok Fin Aluminum
Framed Fixed & Sliding Window w/ Transom

sets
sets
sets

sets

Qty.

Material

Unit Cost
Labor

Total

Total Amount

& 6mm thk. Clear Floats Glass


2.25m. X 1.50m. Analok Fin Aluminum
Framed Fixed & Sliding Window w/ Transom
& 6mm thk. Clear Floats Glass
0.60m. X 0.60m. Analok Fin Aluminum
Framed Fixed & Sliding Window w/ Transom
& 6mm thk. Clear Floats Glass
10

11

12

13

sets

sets

sets

TILE WORKS
0.60m. X 0.60m. Glazed Floor Tile
0.20m. X 0.20m. Unglazed Floor Tile
Tile Trim
Cement (40 kgs Portand Cement)
Tile Grout
Fine Sand

pcs
pcs
ln.m.
bags
kgs.
cu.m.

PAINTING WORKS
Acrytex Cast
Gloss Latex
Politaff
Enamil Paint
Paint Thinner
Tinting Color
Roller Brush
Paint Brush
Sand Paper

gal.
gal.
gal.
gal.
gal.
pints
pcs
pcs
doz

Plumbing Fixtures
Water Closet
Lavatory
Kitchen Sink
Floor Drain 6"
Shower Head
Faucet

set
set
set
set
set
set

Consumables
(welding rod, bolts, nails, etc.)

lump sum

Sub-Total>>>>>>>>>>>>>>>>>>>>>>>

Contingecy Fund

Over-all Total>>>>>>>>>>>>>>>>>>>>

Prepared by:

Conformed:

Estimator

Project Owner

TABLE OF CONTENTS
Item
1.0 Acknowledgement
2.0 Bill of Quantity and Materials
3.0 Computations
3.1 Earthworks
3.11 Excavation
3.12 Backfill
3.13 Gravel Bed
3.14 Summary
3.2 Concreting Works
3.21 Footing
3.22 Wall Footing/Footing Tie Beam
3.23 Column
3.24 Beam
3.25 Roof Beam
3.26 Slab
3.27 Stairs
3.28 Summary
3.3 Masonry works
3.31 Ground Floor
3.32 Second Floor
3.33 Summary
3.4 Dry Wall Works
3.41 Wall partition
3.42 Summary
3.5 Reinforcing Steel Bar
3.51 Footing
3.52 Wall Footing/Footing Tie Beam
3.53 Wall
3.54 Column
3.55 Beam
3.56 Roof Beam
3.57 Slab
3.58 Stairs
3.59 Summary
3.6 Roof Framing
3.61 Frames
3.62 Summary
3.7 Roofing Materials
3.71 GI sheets
3.72 Summary
3.8 Scaffoldings
3.81 Estimate
3.82 Summary
3.9 Doors and Windows
3.10 Tile works
3.11 Painting Works
3.12 Plumbing Fixtures