TURBINE START UP TABLES

The following tables have been formulated to give a comparative reference


of the important turbine side activities against important parameters for
bringing up of a unit up to full load. The time at which HP and LP bypass
warm up pipes are cut in is used as a reference for further turbine side
activities. The HP and LP bypass are expected to be cut in after the boiler
has been fired and the corresponding parameters have been achieved.

1) ABSOLUTE COLD STARTUP (AFTER 250 HRS SHUT DOWN)

Time
(min)

Activity

Steam
Temperature (C)
SH

0
34
62
74
100
129
133
137
155
173
177
181
205
225
290
325

Cut In HP Bypass
warm up pipes
Cut in LP
Bypass( Raise firing)
Open ESV for
warming
Raise Speed Set
Point to 540 rpm
Speed= 540 rpm
Raise Speed Set
point to 3000 rpm
Speed= 3000 rpm
Synchronize
Cut in Ist Mill
Cut in IInd Mill
Cut in D/A from CRH
Cut in HP HEATERS
Cut in IIIrd Mill
Cut in IV Mill
Reach 100% turbine
flow
Reach 210 MW

RH

160-180

Steam
Flow
(tph)

Steam
Pressure
(ksc)
SH RH

20

Speed
(rpm)

Load
(MW)

220-230

250-310

30

12

265-275

310-350

70

24

270-280

320-350

70

30

320-330

350-375

70

30

540

360-365

370-385

70

30

540

370
370
380
415
425
440
460
480

380-390
380-395
405-415
425-430
430-440
435-440
460
480

70
110
150
220
235
365
520
640

30
30
35
48
55
64
100
147

4
4
4
10
11
12
18
25

3000
3000
3000
3000
3000
3000
3000
3000

08
24
45
56
65
108
150

515

515

640

149

34

3000

200

540

540

149

34

3000

210

NOTES:1. Aux Steam is available from external source.


2. Steam Temperature downstream of HP Bypass need not be regulated by spray
until the main steam temperature is above 300 deg. Then HP Bypass
downstream temperature may be regulated to 230 deg.
3. The D/A drawn from CRH is expected to be cut in after synchronization and at
least 20% loading is done. HP heaters may be cut in afterwards at 30% load.
4. SH spray need not be used for controlling SH temperature until the boiler flow is
160 T/H. SH and RH temperature may be regulated and allowed to rise along
the suggested curve at higher loads.

2) AFTER 160 HOURS SHUT DOWN

Time
(min)

Activity

Steam
Temperature (C)
SH

0
35
65
75
85
90
93
97
103
121
129
133
155
195
225
270

Cut In HP Bypass
warm up pipes
Cut in LP
Bypass( Raise
firing)
Open ESV for
warming
Raise Speed Set
Point to 540 rpm
Speed= 540 rpm
Raise Speed set
point to 3000 rpm
Speed =3000 rpm
Synchronize
Cut in Ist Mill
Cut in IInd Mill
Cut in D/A from
CRH
Cut in HP
HEATERS
Cut in IIIrd Mill
Cut in IV Mill
Reach 100%
turbine flow
Reach 210 MW

RH

140-165

Steam
Flow
(tph)

Steam
Pressure
(ksc)
SH RH

10

Speed
(rpm)

Load
(MW)

220-230

250-315

35

12

255-270

285-335

65

26

275-285

310-350

65

28

290-305

320-360

65

30

540

300-310

325-365

65

30

540

305-320
305-320
330-350
360-370

330-370
335-370
355-385
380-400

65
65
75
120

30
30
30
42

4
4
6
11

3000
3000
3000
3000

12
28
50

365-380

385-405

150

48

12

3000

55

380-395

400-415

165

52

14

3000

65

415-425
475

425-435
475

315
570

90
149

24
34

3000
3000

90
180

510

510

640

149

34

3000

205

540

540

640

149

34

3000

210

Notes:1. The metal temperature anticipated: HP Casing-140 deg, STV 50 deg and boiler
at ambient temp.
2. Aux Steam is expected to be available from external source.
3. Steam Temperature downstream of HP Bypass need not be regulated by spray
until the main steam temperature is 300 deg. afterwards, it may be regulated to
230 deg.
4. The D/A drawn from CRH is expected to be cut in after synchronization and at
least 20% loading is done. HP heaters may be cut in afterwards at 30% load.
5. SH spray need not be used for controlling SH temperature until the boiler flow is
at least 160 T/H. SH and RH temperature may be regulated and allowed to rise
along the suggested curve at higher loads.

3) AFTER 36 HOURS SHUT DOWN


Time
(min)

Activity

Steam
Temperature (C)
SH

Cut In HP and
LP Bypass

21
51

Cut in Ist Mill

56

Cut in D/A from


CRH

61
81
84
87
89
91
101
113
126
131
146
171

Open ESV for


warming
Roll Turbine to
540rpm
Speed =540 rpm
Raise speed set
point to 3000
rpm
Speed =3000
rpm
Synchronize
Cut in IInd Mill
Cut in HP
HEATERS
Cut in IIIrd Mill
Cut in IV Mill
Reach 100%
turbine flow
Reach 210 MW

RH

Steam
Flow
(tph)

Steam
Pressure(
ksc)
SH
RH

190-215

10

10

245-275

50

12

Speed
(rpm)

Load
(MW)

310-330

370-380

100

30

330-345

375-385

115

36

10

305-360

385-390

125

38

11

420

395

165

60

12

420

395

165

60

12

540

420

395

165

60

12

540

420

395

165

60

12

3000

420
420

395
405

165
170

60
60

12
13

3000
3000

16
44

440

425

250

82

18

3000

76

465
475

450
470

380
465

106
125

24
30

3000
3000

116
144

495

495

640

149

34

3000

180

540

540

640

149

34

3000

210

Notes:1. The metal temperature anticipated: HP Casing-350 deg and STV-210 deg
2. Aux Steam is expected to be available from external source.
3. D/A is to be kept pegged at 140 deg minimum before firing the unit
4. Only D/A steam is extracted from CRH until synchronization. HP heaters are
anticipated to be put into service after synchronization.
5. Steam Temperature downstream of HP Bypass need not be regulated until 90 tph
bypass flow is established. Afterwards, it may be regulated to 260 deg.
6. SH spray need not be used for controlling SH temperature until the boiler flow is
120 T/H.
7. RH temperature may be regulated by spray if required, after HP bypass closes..

4) AFTER 8 HOURS SHUT DOWN

Time
(min)

Activity

Steam
Temperature (C)
SH

0
4
12
18
28
30
34
36
38
40
47
57
64
72

Cut in HP & LP
Bypass
Raise Firing
Cut in Ist Mill
Cut in D/A & HP
HEATERS from
CRH, Cut in IInd
Mill
Open ESV for
warming
Raise Speed Set
Point to 540 rpm
Speed = 540 rpm
Raise Speed set
point to 3000 rpm
Speed = 3000 rpm
Synchronize
Cut in IIIrd Mill
Cut in IV Mill
Reach 100%
Turbine Flow
Load=210 MW

RH

375-410

Stea
m
Flow
(tph)

Steam
Pressure(
ksc)
SH
RH

50

66

12

Speed
(rpm)

Load
(MW)

385-415
425-440

400-425
425-455

60
95

70
80

12
12

450-460

450-470

160

84

12

490

465-475

235

92

12

500

475-480

245

98

12

505

490

255

100

12

540

510

495

255

100

12

540

515
520
530
535

500
500
520
530

255
255
325
500

100
100
108
128

12
12
14
26

3000
3000
3000
3000

16
100
164

535

535

640

149

32

3000

204

540

540

640

149

34

3000

210

Notes:1. The startup is 8 hours after a full parameter trip and boxing up.
2. The metal temperature anticipated: HP Casing-465 deg and STV-410 deg
3. Aux Steam is expected to be available from external source.
4. D/A is to be kept pegged at 140 deg minimum before firing the unit
5. Full vacuum must be available before firing.
6. Steam Temperature downstream of HP Bypass need not be regulated until 50 tph
bypass flow is established. Afterwards, it may be regulated to 300 deg.
7. SH spray need not be used for controlling SH temperature until the boiler flow is
160 T/H. SH and RH temperature may be regulated and allowed to rise along the
suggested curve at higher loads.