MW Standard Operation Procedure for Axis Swap

AMBER Project

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

MW Standard Operation Procedure for Axis Swap Project


Revision Declaration

This document is prepared and explained by the Site Business Dept of Global Technical Service Dept.
Specifications or documents related to this document:
Related international specifications or document consistency:
Specifications or documents that are replaced or expire:
Correlation of specifications and documents:

Version
V1.0

Prepared by
Zhou Shengwei

Reviewed by
Chew Weng Soon

Issue Date: 2011-09-05

Approved by

Revision Record
Initial release

Effective Date: 2011-09-05

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 2

Typical Installation Scenarios for OptiX RTN


The IDU of OptiX RTN is installed on the Huawei rack
The DDF/DCDB/Rack/Mounting Pole are installed on site
The height of tower is about 50m .
Protection:1+1 HSB
The configuration of 2 sites between this link is same
The distance of 2 sites between this link is 4.3km

Pole
Antenna
ODU and Coupler

Rack GND
IDU DC Power

DCDB

ACDB

IF cable

DC power cabinet

Ground bar
DDF
IDU
PGND

Battary

Page 3

MW Standard Operation Procedure for Axis Swap Project


1.1.1

1.2.1

Preparation
10:00
Operator

10:10
BC

1.3.1

Assemble Pole
10:10
Operator

10:25
BC

1.5.1

Per-work on tower
10:25
Operator

1.6.1
Lift & install Antenna
and Grond ODU
11:15
11:40
Operator
(AD)BC

Lift & install pole

10:50
BC

10:50
Operator

11:15
(AD)BC

Start

1.1.2

1.2.2

1.3.2

1.4

1.5.2

1.6.2

1.7

Check Materials

Assemble Antenna

Install coupler

Install ODU

Install Rack

Install DCDB

Install IDU and DDF

10:00
Operator

10:10

10:10

10:30

10:30

10:40

10:40

10:50

10:50

11:15

11:15

11:35

11:35

11:45

AD

Operator

AD

Operator

Operator

Operator

AD

Operator

AD

Operator

AD

40

10
1.3.3
Assemble IF
terminal (outdoor)
10:30
11:45
Operator
A

1.8.1

1.9.1

1.14

Lift & Route IF


cable
11:40
11:55
Operator
(A)BC

Waterproof ODU&
Bind IF cable
11:55
12:30
Operator
B

Align Antenna at site


A
16:20
17:50
Operator
BD

1.14

1.9.2

1.11

1.12

1.13

1.15.1

When BE finish
installation at site B
then go to site A for
aligning antenna

Grounding and
waterproof of IF
cable
11:55
12:45

Power on
equipment

Single site
configuration

Install Microwave
at site B

Check installation and


take photograph

Operator

BD

1.8.2

Install E1/LANcable
and Patching
11:45
12:10
Operator
A

Operator

12:45

12:55

12:55

13:10

13:10

16:20

17:50

18:00

1.16

Operator

Operator

Operator

ABCD

Operator

BD
C

Swap MW Link
1:00
1:10
Operator
A

1.9.3

1.14
Align Antenna at site
B
16:20
17:50
Operator
AC

Make cable labels


12:10
Operator

12:45
A

1.8.3

1.9.4

Route IF
cable(indoor)
11:45
12:10
Operator
D

Install power cable


12:10
Operator

12:20
D

1.15.2
Perform test/ATP
17:50
Operator

18:00
A

1.10
Clear Sites
12:20
Operator

End

12:30
D

A, B, C and D from the site implementation team will finish the new site within Eight hours.
Don't consider the distance between two sites
A
B are experienced on MW installation
5

Page 4

MW Standard Operation Procedure for Axis Swap Project

Flathead screwdriver

Cross screwdriver

Diagonal pliers

Paper knife

Antistatic gloves

Marking pen

File

Wire cutter

Solid wrench

Adjustable wrench

Punchdown tool

Crimping pliers

Allen wrench

Ladder

Multimeter

Compass

Lifting hook

Lifting rope

Percussion drill

Cleaner

Torque wrench

Socket wrench

Telescope

Safety harness

Safty helmet

Camera

Claw hammer

Crimping

Scissors

Page 5

Installation Materials

IDU subrack

SL61EMS6

SL61SU2

SL61PXC

SL61PH1A

ODU

Hybrid coupler

Naked crimping terminal

IF Cable Label

Power Cable Label

Orderwire Phone

Crossover Network Cable

Coaxial Cable

External Power Cable

Protection Ground Cable

IF Jumper Cable

Type-N Connector

Lightning Arrester

Grounding Clip

PVC tape

16mm Grounding Cable

Captive nuts

LAN cable

Panel Nuts

Signal Cable Label

Waterproof tape

Cable tie

Alarm cable

OT terminal

Antenna

Page 6

MW Standard Operation Procedure for Axis Swap Project


Site Pack Documents:
1. Work Permit
2. AMBER 110614001-Q -F003-TSSR (Approved)
3. AMBER 110614001-Q -F002-Site Design
4. Equipment Delivery Note (DN)
5. AMBER110614001-Q-F074-Site Damage Condition Report
6. AMBER110614001-Q-F075-Site Diary
7. AMBER110614001-H-F001-Toolbox Talk Report
8. AMBER110614001-H-F008-Job Safety Analysis
9. AMBER110614001-Q-F100-MS Site Handover Checklist
10. AMBER110614001-Q-F101-ATP Microwave
11. AMBER110614001-Q-F102-Swap Leader Checklist
12. AMBER110614001-Q-F103-Site Quality Audit Checklist
Site Pack Reference Documents:
13. AMBER110614001-Q-P050-MOP for Swap BTS and MW
14. AMBER110614002-Q-G011-Quick Installation Guide-RTN950 ODU
15. AMBER110614002-Q-G009-Quick Installation Guide-RTN950 IDU
16. AMBER110614001-Q-P007-SOP for Microwave Swap
HSE Manager/Officer Documents:
1. AMBER110614001-H-F002-Contractor HSE Management System Checklist
2. AMBER110614001-H-F003-Contractor HSE Communication Log
3. AMBER110614001-H-F004-Contractor HSE Program
4. AMBER110614001-H-F005-Contractor HSE Inspection Checklist
5. AMBER110614001-H-F006-Accident and Incident Report

SN
1.1.1 A

Task Description

Operator

Duration

BC

10 minutes

Preparation

Procedure - Site Pack Documents and Site Access

Implement and maintain effective risk management procedures and strategies to


ensure all required safety procedures are adhered to.

Site access/Login procedures should be followed on entering a facility.


Refer Access Procedure Draft v1.

The Site Pack must be available and all forms filled in on entering the site and
updated on departure to reflect any work done on site.

Upon arrival at site, promptly conduct a site inspection for any damage/vandalism. In
the case of any damage or vandalism, please contact the NOC and local field
operations (MS) team. Record it in the AMBER110614001-Q-F074-Site Condition
Damage Report V1.0.

Refer to AMBER110614001-Q-F103-Site Quality Audit Checklist for pending tasks.


Note

If site condition is different from the site survey report, contact Huawei interface for
further action.

Take Site condition photos to report any issues upon arrival at site. Refer to Procedure
no. 4.

Make sure that the building site access, work permit and application to work has been
approved.

Make sure all Site Pack documents and PPE is avaliable and practised.
Tools

Camera

Level Bar

Marker pen

Measuring tape

6
Materials

Axis Work Permit

Site Keys

1.1.1 Preparation

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Building Site Access Approval

Page 7

MW Standard Operation Procedure for Axis Swap Project

SN
1.1.1 B

Task Description

Operator

Duration

BC

10 minutes

Preparation

Additional Site Installation Materials:

Procedure - Additional Installation Materials

Indoor
19" Rack wall support L-bracket 2 PCS
Coach Screw sized (M12mm x 40-50mm) 4PCS
Outdoor
Anaconda 1 inch with metal protector 10m
Black Cable Ties 6 Inch 2 Packs
Black cable ties L300 x 4.8mm 2 Packs
"Waterproof adhesive Rubber tape (Brand 3M, or Polymoth)" 6 PCS
Isolation tape black (Brand 3M) 4 PCS
ABPDB inlet (1 inch) 1 PCS

Install the outdoor site lightings. Carefully read all the installation manual of the
equipment & make sure the installation of all the equipment according to the design
specified in TSSR.

Check the installation position of BTS Rack according to design floor plan. Verify
location and measurements.

Verify TSSR and site solution including site ID, site name, site configuration, power,
transmission and RF Feeder & Antenna system, etc.

Take pictures of the site.


Note

If site condition is different from the site survey report, contact Huawei interface for
further action.

Any thing not according to plan or design or any such issues that includes unplanned
Live network interruption should be notified straight away to Huawei interface.

Ensure that the site lightings are sufficient to conduct the work safely.

4
Tools
1

Camera

Level Bar

Marker pen

Measuring tape

6
Materials

Coach Screw
Wall mounted bracket

1
3

AMBER110614001-Q-P050MOP for Swap BTS and MW


AMBER110614002-Q-G009Quick Installation GuideRTN950 IDU

1.1.1 Preparation

Huawei Confidential
Confidential
Copyright Huawei Technologies Co., Ltd. All rights
rights reserved.
reserved.

Technical Site Survey Report (TSSR)

AMBER110614002-Q-G011-Quick Installation
Guide-RTN950 ODU

Page 8

MW Standard Operation Procedure for Axis Swap Project


1

SN
1.1.1 C

Task Description

Operator

Duration

BC

10 minutes

Preparation
Procedure

2-

Check the design documents ;


A. Antenna installation manual(In packed box) ;

B. OptiX RTN radio transmisssion system-IDU&ODU quick installation guide ;


3

Make the labels according to the templates provided by Huawei ;

Check installation condition(place of antenna\cable\IDU, power,cable rack,earth


bar,hole,indoor entironment ;

Tools (see tools card in this guide) .

2-

Design document
3

Note

Do not handle the uncoated metal surface of parts and components with sweatsoaked or dirty gloves.

Move unpacked equipment and packing materials and keep them indoors.
Tools
Paper knife

AMBER110614002-Q-G009Quick Installation GuideRTN950 IDU

Materials

Label

1.1.1 Preparation

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

AMBER110614002-Q-G011-Quick Installation
Guide-RTN950 ODU

Page 9

MW Standard Operation Procedure for Axis Swap Project

SN
1.1.2A

Task Description

Operator

Duration

AD

5 minutes

Check Materials
Procedure

1
2
3
4

MR

Check the total number of materials in the packing case according to the attached
Site Packing list and Delivery Note (DN).
Check whether the cases have the same number and types of items as are
mentioned in the packing list.
Sign off the proof of delivery and DN. Submit the copy of the DN with Site Pack to
Huawei.
Additional installation materials is sufficient and brought to site. Refer to attached
photos.
Keep the rectifier cabinet pallet base for the temporary installation of the cabinets.
Note

Material for Indoor Installation


DDF
IF board

Ensure that the parts and components do not collide with objects like doors, walls, or
trolleys during transportation, moving, or installation.

Do not touch the uncoated metal surface of any of the equipment parts and
components with sweat-soaked or dirty gloves.

Unpacked equipments and packing materials should be kept indoors.

If found any discrepencies inform Huawei Site Engineer.

Tributary

Tools

IDU
1

Paper knife

Camera

Flat-head screwdriver

Hammer

6
Materials

E1

1.1.2 Check Materials

Power

Ground

IDU accessory
packet

Delivery Note

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 10

SN

MW Standard Operation Procedure for Axis Swap Project

1.1.2B

Task Description

Operator

Duration

AD

5 minutes

Check Materials
Procedure

Goods for Outdoor Installation

Check whether the goods, including the antenna, ODU, ODU accessory box, and IF
cable, are consistent with the MR;

Check whether the diameter and frequency band of the antenna, the frequency band
of the ODU are consistent with the design document.

ODU accessory case


4

ODU

Note

Check the frequency band


of the ODU

IF cable

1
2

Antenna

Ensure that the parts and components do not collide with objects like doors, walls, or
trolleys during transportation, moving, or installation.
Do not touch the uncoated metal surface of parts and components with sweat-soaked
or dirty gloves.

Move unpacked equipment and packing materials and keep them indoors.

If found any discrepencies inform huawei engineer


Tools

Paper knife

Camera

Flat-head screwdriver

Hammer

6
Materials

Check the diameter and


frequency band of the
antenna

1.1.2 Check Materials

Delivery Note

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 11

MW Standard Operation Procedure for Axis Swap Project


1-

SN
1.2.1

Task Description

Operator

Duration

BC

15 minutes

Assemble Pole
Procedure

11

Install the first U-bolts of T-bracket at one end of pole and fasten it ;

Install the second U-bolts of T-bracket at the other both end of pole and fasten it.

3
4
5
1-

2-

Note
1

Make sure that all bolts and nuts of the pole are tight and secure.

2
3
4

Tools
2-

2-

Wrench

Solid wrench

Adjustable wrench

6
Materials

1.2.1 Assemble Pole

Microwave pole

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 12

SN

MW Standard Operation Procedure for Axis Swap Project

1.2.2A

Task Description

Duration

AD

5 minutes

Assemble Antennaunpacking the equipment


Procedure

1-

1-A

Operator

Insert the flathead screwdriver into the the hole of the tongue on the cover of the
wooden case, and then straighten the tongue ;

Remove the cover after all tongues on the cover are straightened;

Take out the antenna and the accessories.

1-C

Note

21
2
3
4

Tools
3-A

3-

Flathead screwdriver

Adjustable wrench

3
6

Materials
1

1.2.2 Assemble Antenna

Antenna

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 13

SN

MW Standard Operation Procedure for Axis Swap Project


2

Bolt B

4-B

5-

5-C

6-

10 minutes

Determine where to install the antenna according to the azimuth and the design
height of the antenna, then remove bolt A on the antenna, and loosen bolt B ;

Loosen the bolt on the stand of the antenna;

Adjust the elevation adjustment bolt on the stand to the middle position;

5-

AD

Bolt A

Duration

Procedure

Bolt B

Operator

Assemble the Antenna

Bolt A

4-

1.2.2B

Task Description

Fasten the hanging bracket to bolt B. Pass bolt A through the stand and insert bolt A
in the installation hole on the antenna. Then, tighten the two bolts ;
Remove the bolts on the level adjustment screw, and then install the level adjustment
screw on the stand;
Remove the nuts of the level adjustment screw, and then fix the stand base to the
level adjustment screw;
Apply anti-seize grease to the level adjustment screw and the retaining bolts of the
antenna;
Install the retaining bolts and clamps of the antenna on the stand base.

Note

6B

7-A

1
7B

Engineers should select a proper installation manner for left installation or right
installation based on antenna receiving direction, mounting pipe and relevant position
of surrounding object.

Tools
1
8-

8-B

8-

Allen wrench

Solid wrench

3
6

Materials

1.2.2 Assemble Antenna

Antenna

Anti-seize grease

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Hanging bracket

Page 14

SN

MW Standard Operation Procedure for Axis Swap Project

1.2.2C

Task Description

Operator

Duration

AD

5 minutes

Modify the Antenna


Polarization Mode
Procedure

1-

1-

The default polarization mode of the antenna is the vertical polarization. If the radio
link is designed with the horizontal polarization, the polarization mode needs to be
modified as follows.

Loosen the four bolts that fix the feed boom ;

Rotate the feed boom 90 degrees smoothly, and point the polarization indicator to the
letter H . In this manner, the antenna is in the horizontal polarization mode;

Tighten the four bolts that fix the feed boom.

V Vertical

Note
1
3-

3-

H Horizontal

90
90

Vaseline can't be lay on the surface or inner part of the feeder.

3
4

Tools
1
4-

4-

Cross screwdriver

Adjustable wrench

3
6

Materials
1

1.2.2 Assemble Antenna

Antenna

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 15

SN.

MW Standard Operation Procedure for Axis Swap Project

1.3.1

Task Description

Operator

Duration

BC

25 minutes

Pre-work on tower

Procedure
1-A

Before you lift and install the antenna, determine the height and azimuth of
the antenna according to the design document by compass;
The operators should carry the following materials and tools on the tower: the
pulley, lifting rope, anti-fall clamp, ground cable of the IF cable, PVC tape,
waterproof tape, bundling tape, wrench, socket-head wrench, diagonal pliers,
flathead screwdriver, and paper knife;
Fix the pulley on tower above the antenna which will be mounted,thread
hanging rope through the pulley to ground.

4
5

Note
1
1-

Must carefully check the pretended antenna installation place on tower as


suggested in TSSR.

Tools
1

Compass

2 Hanging rope

3 Pulley

Safety belt

5 Tools bag

Materials
1

Design document

1.3.1 Per-work on the tower

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

2
4

Page 16

MW Standard Operation Procedure for Axis Swap Project


1-

SN

Task Description

Operator

Duration

1.3.2A

Install coupler

2 minutes

Procedure

11

Remove the dust protection cover, by default the polarization of the coupler is
vertical, the arrow is pointing to "V";

Check the polarization from document, the default polarization mode of the antenna
is the vertical polarization then go to SN 1.3.2C . If the radio link is designed with the
horizontal polarization, the polarization mode needs to be modified SN1.3.2B .

4
5
6

Note
1

Coupler polarization should be same as the design document.

2
23

Tools
1

Adjustable wrench

Cross screwdriver

3
6

Material
1

1.3.2 Install coupler(1+1)

Coupler

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 17

SN

MW Standard Operation Procedure for Axis Swap Project


1-

2-

1-

3-

1.3.2B

Task Description

Duration

5 minutes

Modify the polarization of


coupler
Procedure

2-

3-

Operator

Loosen the screws by hex key wrench and remove the polarization part;

Remove the vertical polarization converter from the polarization part;

Replace the vertical polarization converter with the horizontal polarizer and connect to
the polarization part;

Confirm the interface of the polarization part is the same as coupler, then insert the
polarization part into the antenna interface of the coupler;

Confirm the arrow on the polarization part points to "H",and fix the two screws on the
polarization part by hex key wrench.

Note
1
4-

4-

The waveguide direction of horizontal polarizer must be the same as the polarization part.

5
2
3

Tools
1
4-

4-

Allen wrench

6
Material

1
H - Horizontal
H - Horizontal

1.3.2 Install coupler(1+1)

Coupler

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 18

MW Standard Operation Procedure for Axis Swap Project


1

2-

Task Description

Operator

Duration

1.3.2C

Install coupler

3 minutes

Procedure

2-

2-

SN

Remove the two lifting rings of the antenna;

Remove the protective cap of the feed boom, and then apply an appropriate ainstallof
vaseline to the gasket of the feed boom;

Remove the protective cap of the feed boom of coupler;

Apply anti-seize grease to the retaining bolts of the coupler;

Confirm that the coupler is consistent with the antenna in the polarization mode;

Close the four latches cornerwise and tighten the four screws on the coupler;, fasten
4 bolts with inner hexagonal tool;

Install the removed lifting rings on the antenna .


Note

6-

6-

Coupler's polarization should be as the feeder's polarization.

Vaseline can't be lay on the surface or inner part of the feeder.

Storage polarization component well.

Tools

6
Material

Coupler

Vaseline

1.3.2 Install coupler(1+1)

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Antenna

Page 19

SN

MW Standard Operation Procedure for Axis Swap Project

1.3.3A

Task Description

Operator

Duration

15 minutes(Total)

Assemble IF cable
(Outdoor)
Procedure

Sheath

1-

Shieldin Insulating Inner


layer
conductor
g
layer
1-B

Nut

Clam
p

Sleeve

Body
2

1-

Place the nut to the IF cable, and then strip the sheath off the IF cable ;

Place the clamp to the end of the IF cable;

Fold back the shielding layer to the clamp. Then, place the sleeve between the
shielding layer and the insulating layer;

Reserve the shielding layer of 4 mm and cut off the redundant part ;

Strip the insulating layer off, and obtain the inner conductor of 4.5 mm. Then, file the
head of inner conductor to the arc shape;

Fit the IF cable in the body of connector, and tighten the body and nut with the
wrenches(S=16mm);

7
15.5mm
3

4-A

Note
4-

4-

1
2
3
4mm
4

5-

5-B

5-

5-

Tools

4.5mm

5-

6-A

6-

Paper knife

Diagonal pliers

File

Brush

Materials

61

1.3.3 Assemble IF terminal

Solid Wrench

IF cable

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

IF cable connector (N-JRG8-1 Connector)

Page 20

MW Standard Operation Procedure


for Axis Swap Project
.

SN

Task Description

Operator

Duration

1.3.3B

Test the IF Cable Connector

15 minutes(Total)

Procedure

1
1

Set the multimeter to the continuity test mode.

Connect one needle of the multimeter to the external conductor of the IF cable
connector. Connect the other needle to the core of the IF cable connector.

If no buzz is generated, the IF cable is normal.

If the buzz is generated, the IF cable is short-circuited. The IF cable connector should
be made again.

5
6
7

Notes
1

2
3
4

Tools
1
3

Multimeter

Materials

1.3.3 Assemble IF terminal

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 21

MW Standard Operation Procedure for Axis Swap Project

SN

Task Description

Operator

Duration

1.3.3C

Assemble IF terminal
(outdoor)

15 minutes(Total)

Procedure
1

2-A

2-

Mark the IF cable by color tape to identify which connected to main ODU;

Mark the IF cable with waterproof label(yellow) to identify which connected to main
ODU ;

Protect the IF terminal to avoid the damage during hanging .

4
5
6

3-

Note

3-B
1
2
3
4

Tools
1

Cutter

6
Materials

PVC tape

Outdoor label

1.3.3 Assemble IF terminal

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Cable tie (black)

Page 22

SN

MW Standard Operation Procedure for Axis Swap Project


1-A

1-B

3-A

1.4A

Task Description

Duration

5 minutes

Install ODU
Procedure

1-C

3-

Operator

Remove the protective cap of the feed boom, and then apply an appropriate ainstallof
vaseline to the gasket of the feed boom;

Main ODU should be mounted on THIS SIDE UP MAINside;

installODU on coupler as polarization decided.Close the 4 latches cornerwise ;

Install stand-by ODU on the other side of coupler with same method above .

5
Note
1

Main ODU should be mounted onTHIS SIDE UP MAINside.

The IF interface on ODU must face to the opposite from hoisting ring.

3
3-C

4-A

Tools

41

6
Material

ODU

1.4 Install ODU

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

2
4

Page 23

SN

MW Standard Operation Procedure for Axis Swap Project


1-

1-B

1.4B

Task Description

Duration

5 minutes

Install ODU
Procedure

1-C

Operator

Remove the nut of the grounding bolt on the ODU;

Place the ring terminal of the ODU ground cable around the grounding bolt ;

Tighten the nut.

4
2-

2-B

2-C

5
6
Note
1

Fasten the grounding kits tightly.

2
3-

3-B

3-C

Tools
1

Wrench

6
Material

ODU

1.4 Install ODU

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Grounding kits

Page 24

MW Standard Operation Procedure for Axis Swap


Project
1

SN
1.5.1

Task Description

Operator

Duration

(AD)BC

25 minutes

Lift & Install pole

Procedure

2
1

Bind hanging rope on the upper T-bracket and bind towing rope on another T-bracket ;
BCD hang the pole up and A control the pole not touch tower with towing rope simultaneous;

CD hold the pole at the position antenna will be mounted with calling:"up/down" to the people on
ground ;

Clamp the upper and lower T-bracket to the tower,fasten the bolts on T-bracket;

Confirm the pole verticality with adjustment of the lower T-bracket.

5
Note
3

installthe pole at right position on the tower as the azimuth, high of the design document.

Confirm the pole verticality.

Tools
1

Hanging rope

Towing rope

Level

Safety belt

Spanner

Material
1

1.5.1 Lift & Install pole

pole

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 25

MW Standard Operation Procedure for Axis Swap Project

SN
1.5.2A

Task Description

Operator

Duration

AD

8 minutes

Install 19"Rack
Procedure

Mark the location of the 19" Rack according to the equipment layout, identify the
installation reference point and mark it for the 19" Rack installation;

Use a percussion drill with bit 16 to drill holes at the anchor points,clear the dust
inside and around the holes ;

Hammer the expansion bolt until it tube completely enters the hole.

5
Note
1

Clear the dust inside and around the holes. If the inter-hole spacing is too wide or too
narrow, locate and drill holes again;

2
Tools
1

Percussion drill

Marking pen

Claw hammer

Wrench

6
Materials

Expansion nut

1.5.2 Install 19'Rack

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

2
4

Page 26

MW Standard Operation Procedure for Axis Swap Project


1-

SN
1.5.2B

Task Description

Operator

Duration

AD

6 minutes

Install 19"Rack
Procedure

1-

Install the base to the frame of rack, then tighten the four bolts;

Place the rack on the hole that had been drilled , tighten the bolts to ensure that
Rack and base is installed together;

Wire bindings can be assembled to the front or the back of Rack frame according to
wire outlet.

4
2-

2-

5
Note
1

Insulated plate

When the wire is up-route, let the two wire bindings empty position on the top of Rack
, when the wire is dowen-route, let the two wire bindings empty at the bottom of
Rack.

2
Tools

3-A

3-

Screwdriver

Level bar

3
6

Materials
1

19"Rack

1.5.2 Install 19'Rack

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Insulated plate

Page 27

MW Standard Operation Procedure for Axis Swap Project

SN
1.5.2C

Task Description

Operator

Duration

AD

6 minutes

Install 19'Rack
Procedure

Assemble OT terminals to one end of the PGND cable , for details, see SN 1.5.2D.

Link the OT terminal to the grounding screw on the 19"rack ;

Lay PGND cable from 19" rack to grounding bar along cable ladder ;

Assemble OT terminal to the other end of PGND cable, then link it to the grounding
bar .

5
Note
1

Keep the cross-section of the conductor level with the end face of the OT terminal

2
3
4
Tools
1

Cross screwdriver

Crimping plier

2
5

3
6

Materials
1

1.5.2 Install 19'Rack

OT terminal

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Power cable with yellow green 16mm2

Page 28

MW Standard Operation Procedure for Axis Swap Project

SN
1.5.2D

Task Description

Operator

Duration

AD

5 minutes

Install 19'Rack
Procedure

1-

1-

1-B

Strip a certain length of the insulation layer off the ground cable ;

Insert the exposed conductor into the core end terminal. Ensure that the conductor is
level with the endface of the core end terminal;

Press the endface to the conductor by using the crimping pliers.

4
5
1-

2-A

2-

Note
1

When making the core end or ring terminal, you should level the exposed conductor
with the endface of the terminal and press the endface to the conductor with the
crimping pliers.

6 MM

3
3-

3-B

Tools
1

Crimping plier

OT Terminal

2
5

3
6

Materials
1

1.5.2 Install 19'Rack

OT terminal

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Power cable with yellow green

Page 29

MW Standard Operation Procedure for Axis Swap Project

SN

Task Description

Operator

Duration

1.6.1A

Lift and Install the Antenna

(AD)BC

25 minutes

Procedure
1

Before you lift and install the antenna, determine the pole and azimuth of the antenna
according to the design document ;

Install the anti-fall clamp on the pole. For details , see working procedure 1.6.1B.

Bind the lifting rope and pulling rope to the lifting ring and stand of the antenna ;

Two installation operators on the ground lift the antenna to the tower;

Install the two clamps of the stand around the pole and fix the clamps on the stand.
Then, fix the antenna according to the azimuth specified in the design document .For
details, see working procedure 1.6.1C.

Remove the rubber plugs of the two air holes on the bottom of the antenna;

Perform the grounding for the ODU. For details, see working procedure 1.6.1D.
Note

7-A

When lifting the antenna, you must use the pulling rope to prevent the antenna from
hitting the tower. In this manner, the equipment can be protected from damage.

When fixing the antenna, you cannot remove the lifting rope from the antenna.
Instead, you should keep the lifting rope bound on the tower tightly till the antenna is
fixed to the pole. In this manner, the antenna can be protected from falling down.

7-B

Tools
1

Lifting hook

Solid wrench

Lifting rope

Allen wrench

6
Materials

1.6.1 Lift & Install Antenna

Antenna

Anti-fall clamp

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

ODU

Page 30

SN

MW Standard Operation Procedure for Axis Swap Project

1.6.1B

Task Description

Operator

Duration

5 minutes

Install the Anti-fall Clamp


Procedure

1-

1-

Loosen one bolt on the anti-fall clamp;

Place the anti-fall clamp around the pole;

Tighten the bolt to fix the anti-fall clamp to the pole.

4
5
Note
1-

2-

2-

1
2
3
4
Tools
3-

3-

3-C

Allen wrench

6
Materials

1.6.1 Lift & Install Antenna

Anti-fall clamp

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 31

SN

MW Standard Operation Procedure for Axis Swap Project

1.6.1C

Task Description

Operator

Duration

10 minutes

Fix the Hanging Bracket


Procedure

Install the down clamps of the hanging bracket around the pole, then tighten the nuts
to fix the antenna to the pole;

Install the up clamps of the hanging bracket around the pole, then tighten the nuts to
fix the antenna to the pole.

3
4
Hanging Bracket Right Installation

Hanging Bracket Left Installation

5
Note

1-

1-b

2-

Fasten the antenna tightly.

When installing the antenna, ensure that the hanging bracket is close to the anti-fall
clamp .

3
4
Tools
2-b

2-C

2-D

Solid wrench

6
Materials

1.6.1 Lift & Install Antenna

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 32

SN

MW Standard Operation Procedure for Axis Swap Project

Task Description

1.6.1D

Operator

Duration

5 minutes

Perform the Grounding for


the ODU
Procedure

1-

1-

Determine a proper grounding point on the tower. Then, remove anti-rustic paint or
rust at the grounding point;

Fix the fixing clip of the ground cable to the grounding point ;

Bind the ground cable to the tower and cut off the redundant bundling tape .

2-

4
5
Note
2-

2-

3-

The position of grounding point should be lower than the antenna.

2
3
4
Tools
3-

3-C

3-D

Solid wrench

Diagonal pliers

2
5

3
6

Materials
1

1.6.1 Lift & Install Antenna

Ground cable of the ODU

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Bundling tape

Page 33

SN

Task Description

Operator

Duration

1.6.2A

Install DCDB

AD

8 minutes

MW Standard Operation Procedure for Axis Swap Project


1-

Procedure

1-

4U

2-

According the design document, fix the four captive nuts to the installbar on the rack
column;

Install the DCDB in the correct position of 19" Rack, tighten the four screws on the
panel to secure the DCDB on the rack ;

Remove the four panel of DCDB,and remove the panel;

Connect the -48 power cable(blue cable) to the first air breaker, and the grounding
cable(black cable) to the place above the air breaker .

5
6

2-

Note
1

The power cable must be 16mm .

2
3
Tools
3

Grounding

Cross screwdriver

Crimping plier

2
4

OT terminal

6
Materials

-48V cable

DCDB

Captive nuts

1.6.2 Install DCDB

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Power cable

Page 34

SN

Task Description

Operator

Duration

1.6.2B

Install DCDB

AD

6 minutes

MW Standard Operation Procedure for Axis Swap Project

Procedure
1

Route the power cable (blue cable and black cable) to the DC power cabinet along
cable ladder.

Install power cable(from DCDB) in the proper air breaker at the DC power cabinet.

3
4
5
6
Note
Grounding
cable of DCDB

The power must connect to the 63A air breaker in the DC power cabinet.

2
-48v cable
of DCDB

3
Tools
1

Cross screwdriver

Crimping plier

2
5

OT terminal

6
Materials

1.6.2 Install DCDB

DCDB

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Power cable

Page 35

SN

Task Description

Operator

Duration

1.6.2C

Install DCDB

AD

6 minutes

MW Standard Operation Procedure for Axis Swap Project

Procedure
1

Connect the grounding cable in the DCDB.

Route the grounding cable from DCDB to indoor grounding bar along the cable
ladder.

Determine the length of the grounding cable based on the grounding position
,terminal the grounding cable with OT terminal. Then, properly fasten the grounding
cable to the grounding bar.

Grounding
cable of

5
6
Note
1
2
3
Tools
1

Cross screwdriver

Crimping plier

2
5

OT terminal

6
Materials

1.6.2 Install DCDB

DCDB

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

PGND cable

Page 36

SN

MW Standard Operation Procedure for Axis Swap Project

1.7A

Task Description

Operator

Duration

AD

4 minutes

Install the IDU


Procedure

1-

3-

1-B

3-B

Obtain the IDU and ground cable;

Remove the two screws at the grounding point on the left of the IDU;

Use the removed screws to fix the ground cable to the grounding point of the IDU;

Fix the four captive nuts to the installbar on the rack column, according to the deigned
location of the IDU;

Hold the IDU with both hands and push the IDU into the rack. Then, tighten the four
panel screws in a diagonal sequence. In this manner, the IDU is fixed to the rack;

Assemble OT terminals to one end of the PGND cable,Link the OT terminal to the
grounding screw on the 19"rack.

Note

2U

When installing the IDUon a Huawei open rack, you should fix two captive nuts with a
space of four holes on the installbar.

Tighten the four front panel screws in a diagonal sequence.

There must be a space of two holes above and below the IDU chasssis for heat
disspation.

4
5-

5-A

Tools
1

Cross screwdriver

Flathead screwdriver

3
6

Materials
1

IDU 620

Ground cable

Four M6 captive nuts

Four M6 panel screws

1.7 Install IDU and DDF

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 37

SN

MW Standard Operation Procedure for Axis Swap Project

1.7B

Task Description

Operator

Duration

AD

2 minutes

Install IDU Boards


Procedure

1-

1-B

Take out the tributary board from the package;

Press the ejector levers with both hands. Then, insert the board smoothly along the
board track till the board cannot move forward;

Push the board to ensure that the board is caught tightly;

Press the ejector levers inward forcibly;

Tighten the two screws on the front panel ;

Install the IF board in the same manner .


Note

When installing the tributary board and IF board, you should wear antistatic gloves.

2
3
4
6-

6-B

6-

Cross screwdriver

Antistatic gloves

2
5

3
6

Materials
1

1.7 Install IDU and DDF

Boards on the RTN

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 38

SN

MW Standard Operation Procedure for Axis Swap Project

Task Description

1.7C

Operator

Duration

AD

4 minutes

Install the DDF


Procedure

2-A

Take out the DDF from the package ;

Remove the captive nuts and panel screws on the DDF;

Fix the four captive nuts to the installbar on the rack column, according to the deigned
location of the DDF;

Tighten the four panel screws. In this manner, the DDF is fixed to the rack .

2-

5
Note
4-A

1U

4-

When installing the DDF on a Huawei open rack, you should fix two captive nuts with a
space of one hole on the installbar.

Tighten the four front panel screws in a diagonal sequence.

3
4
Tools

4-C

Flathead screwdriver

Cross screwdriver

3
6

Materials
1

120-ohm DDF

Four M6 panel screws

1.7 Install IDU and DDF

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Four M6 captive nuts

Page 39

SN

MW Standard Operation Procedure for Axis Swap Project

1.8.1

Task Description
Lift and Route IF Cable

Operator

Duration

(A)BC

15 minutes

Procedure
2-

3-

3-

2-

Put the hanging rope along the cable ladder down to the ground;

Bind the IF cable to the lifting rope on the ground, then pull up the lifting rope with the IF cable ;

Reserve the IF cable of extra three to five meters at the ODU. Coil the extra cable into a circle of more than 0.6
meter in diameter, and fix the cable to the tower ;

Fix the IF cable to the cable ladder along the route of the IF cable. Pass the IF cable through the feeder window
into the room;

Make the coiled cable a waterproof curve in front of the feeder window, and fix the cable to the cable ladder .

6
Note
0.6M

When binding the IF cable to the lifting rope, you can not bind the connector with the rope. Otherwise, the connect
might be damaged in the lifting process.

2
3
5

4
Tools
1

Lifting rope

Solid wrench

2
5

Diagonal pliers

6
Materials

IF cable

1.8.1 Lift & Route IF cable

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Bundling tape

Page 40

SN

MW Standard Operation Procedure for Axis Swap Project

1.8.2A

Task Description

Operator

Duration

15 minutes

Route and Install 120-Ohm


E1 Cables
Procedure

1-

1-

Connect the E1 cables to the E1 interface on the tributary board. Then, tighten the
screws to fix the cables ;

Route the E1 cables from the equipment side to the DDF, and tighten it to the Rack by
cable tie;

Cut the E1 cables to a proper length and mark the cables for the transmit and receive
directions (such as Tx/Rx) ;

Bond the E1 cables. For details on how to bond the 120-ohm E1 cables , see working
procedure 1.8.2B.

5
Note
1-

1
2
3
4
4-

Tools

4-

Cross screwdriver

Marking pen

Paper knife

Diagonal pliers

Punchdown tool

Materials
1

120-ohm E1 cable

Cable tie(white)

1.8.2 Install E1 or FE cable

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

PVC insulation tape

Page 41

SN

MW Standard Operation Procedure for Axis Swap Project

1.8.2B

Task Description

Operator

Duration

10 minutes

Bond 120-Ohm E1 Cables


Procedure

3-

3-

Remove the DDF module of the DDF ;

Pass the E1 cable through the hole on the backplane of the DDF ;

Strip the sheath, shielding layer, and protection layer off the E1 cable. Apply the PVC
tape on the cable for protection;

Pass the core wires of the E1 cable through the hole of the DDF module;

Insert the core wires to the connection holes of the DDF module according to the wire
sequence table of the E1 cable ). For details, see working procedure 1.8.2C.

3-D

Note
1
2
3-

5-

3
4
Tools

5-

5-D

Diagonal pliers

Paper knife

Marking pen

Punchdown tool

6
Materials

120-ohm E1 cable

Bundling tape

1.8.2 Install E1 or FE cable

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

PVC insulation tape

Page 42

SN

MW Standard Operation Procedure for Axis Swap Project


Pin
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

16
17
18
19
20
21
22
23
24
49
50
51
52
53
54
55

56

W
Remarks Tape Color
Pin
Color of the
Relationship
core
White
25
Blue
Twisted pair
R0
26
White
27
Green
Twisted pair
R1
28
White
29
Grey
Twisted pair
R2
30
Red
31
Orange Twisted pair
R3
32
Blue
Red
33
Brown
Twisted pair
R4
34
Black
35
Blue
Twisted pair
R5
36
Black
37
Green
Twisted pair
R6
38
Black
39
Grey
Twisted pair
R7
40
White
41
Blue
Twiste d pair
R8
42
White
43
Green
Twisted pair
R9
44
White
45
Grey
Twisted pair
R10
46
Red
47
Orange Twisted pair
R11
48
Orange
Red
73
Brown
Twisted pair
R12
74
Black
75
Blue
Twisted pair
R13
76
Black
77
Green
Twisted pair
R14
78
Black
79
Grey
Twisted pair
R15
80

1.8.2 Install E1 or FE cable

W
Remarks Tape Color
Color of the
Relationship
core
White
Orange Twisted pair
T0
White
Brown
Twisted pair
T1
Red
Blue
Twisted pair
T2
Red
Green
Twisted pair
T3
Blue
Red
Grey
Twisted pair
T4
Black
Orange Twisted pair
T5
Black
Brown
Twisted pair
T6
Yellow
Blue
Twiste d pair
T7
White
Orange Twiste d pair
T8
White
Brown
Twiste d pair
T9
Red
Blue
Twiste d pair
T10
Red
Green
Twiste d pair
T11
Orange
Red
Grey
Twiste d pair
T12
Black
Orange Twiste d pair
T13
Black
Brown
Twiste d pair
T14
Yellow
Blue
Twiste d pair
T15

1.8.2C

Task Description

Operator

Duration

120-ohm E1 cable
Connections
Procedure

Connect the E1 cables according to the MUX plan.

2
3
4
5

Note
1
2
3
4

Tools
1

Punchdown tool

Materials
1

E1 cable

LAN cable

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

DDF

Page 43

MW Standard Operation Procedure for Axis Swap Project

SN
1.8.3A

Task Description

Operator

Duration

15 minutes

Route the IF Cable(indoor)


Procedure

Lay the IF cable from the feeder window to the position connected to IF jumper along
the cable labber;
Cut off the IF cable of an appropriate length to make the IF cable connector
according to (Assemble IF terminal (oitdoor)), after make the IF terminal test it as
follow 1.8.3B;

3
4
5
2

6
Note
1
2
3
Tools
1

Paper knife

File

Diagonal pliers

Solid Wrench

6
Materials

1.8.3 Route the IF cable

IF cable

Cable tie(White)

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

IF cable connector (N-JRG8-1 Connector)

Page 44

MW Standard Operation Procedure for Axis Swap Project

SN
1.8.3B

Task Description

Operator

Duration

5minutes

Route the IF Cable(indoor)


Procedure

ODU Side

IDU Side
The test value of
resistance should be
infinitude.

Set the multimeter to R/. Connect one needle of the multimeter to the external
conductor of the IF cable connector. Connect the other needle to the core of the IF
cable connector

In the short circuit, the test value of resistance should be infinitude.

In the open circuit , the test value of resistance should be very small.

4
5
6

Open circuit.

Note

ODU Side

IDU Side
The test value of
resistance should
be very small.

1
2
3
4
Tools
1

Short circuit

Multimeter

6
Materials

1.8.3 Route the IF cable

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 45

MW Standard Operation Procedure for Axis Swap Project


1-

1-

SN
1.8.3C

Task Description

Operator

Duration

5 minutes

Route the IF Cable(indoor)


Procedure

2-

Mark the IF cable with color tape at the two ends of IF cable to devide which
connecting the IF cable from main ODU;

Connect the IF cable to the IF interface on the IF board, and then fix the connector;

Route the IF jumper from the equipment side to a proper location on the cable ladder,
Interconnect the IF jumper with the IF cable properly .

4
2-

2-C

2-D

5
Note
1

In case of 1+1 HSB/SD,IF cable from slot 5/6 must be connected with IF cable of
main ODU, IF cable from slot 7/8 must be connected with IF cable of stand-by ODU

2
3
4
Tools
1

Wrench

6
Materials

1.8.3 Route the IF cable

IF jumper cable

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 46

SN

MW Standard Operation Procedure for Axis Swap Project

1.9.1A

Task Description

Operator

Duration

15 minutes

Perform the Waterproof


Treatment of the IF Cable
Connector
Procedure

1-

1-

Connect the connector of IF cable to the IF interface on the ODU. Then, tighten the
connector gently with a wrench;

Wrap the connector with one layer of PVC tape 35 cm below the connector and
toward the direction of the ODU ;

Wrap the connector with three layers of waterproof tape 35 cm below the connector.
The wrapping directions of the three layers are from down to up, from up to down,
and from down to up respectively;

Wrap the connector with three layers of PVC tape 35 cm below the connector. The
wrapping directions of the three layers are from down to up, from up to down, and
from down to up respectively ;

Wrap the PVC tape on both ends tightly with cable tie. Then, cut off the redundant
bundling tape.

3-

3-

Note

When wrapping the connector with the waterproof tape and PVC tape, you should
stretch the tape to 3/4 of its original width. In addition, the upper layer should cover
about 1/2 of the lower layer.

The redundant of cable tie must be 5-10mm.

3
5-

Tools
5-

5-C

Paper knife

Diagonal pliers

2
5

3
6

Materials
1

Waterproof tape

Cable tie

1.9.1 Waterproof ODU

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

PVC tape

Page 47

MW Standard Operation Procedure for Axis Swap Project

SN
1.9.1B

Task Description

Operator

Duration

30 minutes

Bind IF Cable
Procedure

Bind IF cable to the cable ladder every 1m with cable ties.

Cut off extra part of cable ties.

3
4
5
6
Note
1

The redundant of cable tie must be 5-10mm.

2
3
4
Tools
1

Diagonal pliers

3
Materials

IF cable

1.9.1 Waterproof ODU

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Cable tie

Page 48

SN

MW Standard Operation Procedure for Axis Swap Project

1.9.2A

Task Description

Operator

Duration

50minutes(Total)

Grounding Point of the IF


Cable
Procedure

Determine where the grounding clip is installed on the IF cable

2
3
4
5
Note
1
2
3
4
Grounding
Point SN.

Position of the Grounding Clip

The place about 1 m away from the IF


interface of the ODU

The grounding point provided by the tower (if the tower


provides no grounding point, fix the foot of the ground
cable onto the tower)

The place about 1 m away from the cable


entry (when the outdoor wiring frame is
longer than 20 meters)

The outdoor grounding bar (if there is no grounding bar


but the outdoor wiring frame is well grounded, fix the foot
of the ground cable onto the wiring frame)

The middle point of the cable (when the


cable on tower is longer than 60 meters)

The grounding point provided by the tower (if the tower


provides no grounding point, fix the foot of the ground
cable onto the tower)

1.9.2 Grounding IF cable

Tools

Connecting Point for the Ground Cable


1

Cross screwdriver

Paper knife

Wire cutter

6
Materials

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 49

SN

MW Standard Operation Procedure for Axis Swap Project


1-

1-

1.9.2B

Task Description

Operator

Duration

50 minutes(Total)

Perform the Grounding of


the IF Cable
Procedure

1-

Determine where the grounding clip is installed on the IF cable. Strip the sheath off
the IF cable according to the length of the grounding clip;

Fit the grounding clip where the sheath is stripped off on the IF cable, and then
tighten the screws.

3
4
1-

2-

2-

5
6
Note

38mm

The angle between the ground cable connected to the grounding clip and the IF
cable canSNt exceed 15 degrees. Route the ground cable along the route of the IF
cable.
Strip the sheath off the IF cable according to the length of the grounding clip.

Don't strip any shielding layer of the IF cable.

2-

4
Tools
1

Paper knife

Cross screwdriver

3
6

Materials
1

1.9.2 Grounding IF cable

Ground cable of the IF cable

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 50

SN

MW Standard Operation Procedure for Axis Swap Project


1

6-

Duration

50 minutes(Total)

Procedure

Operator

Perform the Grounding of


the IF Cable

1.9.2C

Task Description

Wrap one layer of PVC tape 35 cm up and below the clip point;

Wrap the connector with three layers of waterproof tape 35 cm up and below the clip point.
The wrapping directions of the three layers are from down to up, from up to down, and from
down to up respectively;

Wrap the connector with three layers of PVC tape 35 cm below the clip point. The wrapping
directions of the three layers are from down to up, from up to down, and from down to up
respectively ;

Wrap the PVC tape on both ends tightly with cable tie. Then, cut off the redundant cable tie;

Scratching patinting at seleced point on tower;

Fix another end of grounding clamp to seleced point on tower after scratching patinting and
bind the grounding cable to the tower.

The angle between the ground cable connected to the grounding clip and the IF cable can't
exceed 15 degrees. Route the ground cable along the route of the IF cable.

Strip the sheath off the IF cable according to the length of the grounding clip.

Don't strip any shielding layer of the IF cable.

Note

6-

6-C

Tools

Down

Materials
1

PVC tape

Cable tie (black)

1.9.2 Grounding IF cable

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Waterproof tape

Page 51

SN

MW Standard Operation Procedure for Axis Swap Project


1-A

1.9.3A

Task Description

Operator

Duration

35minutes

Affix Labels
Procedure

1-

Affix the labels to the cables according to the standards of the customer.

2
3
4
5
1-C

Note

1-

Generally, affix the label 2 cm away from the connector. To avoid bending the cable
or making the installation of other cables inconvenient, you can affix the label to other
places.

No handwritten labels are allowed.

3
4
Tools
1-E

1-

Marking pen

6
Materials

1.9.3 Make Cable Labels

Label paper

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 52

SN

Task Description

Operator

Duration

35 minutes

MW Standard Operation Procedure for Axis Swap Project


1.9.3B

Affix the L-Shape Label


Procedure

Write on the label according to the standards of the customer.

Determine where to affix the label.

Affix the label to the cable.

3-A

5
Note

3-

Generally, affix the label 2 cm away from the connector. To avoid bending the cable
or making the installation of other cables inconvenient, you can affix the label to other
places.

2
3
4
Tools
1

Marking pen

Paper knife

2
5

3
6

Materials
1

1.9.3 Make Cable Labels

Label paper

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 53

SN

Task Description

1.9.4

Route and Install Power


Cables of the IDU

MW Standard Operation Procedure for Axis Swap Project

Operator

Duration

10 minutes

Procedure
1-A

1-B

1-D

1-E

1-C

Connect the power cables to the power interface on the PXC board. Then, tighten the
screws to fix the power cable ;

Route the power cables from the equipment side to the DCDB ;

Cut the power cables to a proper length. Then, make the core end terminal (of the blue
cable) and the ring terminal (of the black cable);

Remove the bolt of the working ground busbar. Put the ring terminal of the black cable
around the bolt, and then tighten the bolt ;

Confirm that the capacity of the air breaker is equal to or greater than 15 A. Loosen
the bolt that fixes the power cable on the air breaker, insert the core end terminal
vertically into the jack of the terminal block, and then tighten the bolt.
Note

1
2

When connecting the power cable and ground cable to the DCDB, you should insulate
the tools with insulation tape to avoid short circuit.
After the power cables are installed, pull the power cables to ensure that they are
fixed.

3
3

GND Power Cable

4
Tools
1

Cross screwdriver

Solid wrench

Crimping pliers

Paper knife

Wire cutters

Diagonal pliers

Materials

-48V Power Cable


1

Power cable

One ring terminal and one core end terminal

Bundling tape

PVC insulation tape

1.9.4 Install power cable

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 54

MW Standard Operation Procedure for Axis Swap Project

SN

Task Description

Operator

Duration

1. 10

Clear sites

15 minutes

Procedure
1

Collect the tools and excessive cables on site

Clear up the equipment room and the outdoors.

3
4
5
Note
1

No packing boxes or boards are placed at random on the installation field.

No cable ties or other sundries are left on the floor or in the cabinets.
Tools

6
Materials

1.10 Clear sites

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page55

SN

MW Standard Operation Procedure for Axis Swap Project

1.11A

Task Description
Power On the Equipment

Operator

Duration

10 minutes(Total)

Procedure
2

Before powering on the equipment, check the input voltage.Connect negative needle of the multimeter to air
breaker, connect positive needle of the multimeter to grounding point. Make sure that the input voltage is within
the range allowed by the equipment ;

Turn on the air breaker of the power supply ;

Turn on the system power switch of the PXC board on the IDU, and then the ODU power switch on the IF board.
For details, see work procedure 1.11.2B

5
Note
1

3-A

3-B

2
3

If the standard voltage of the input power is 48 V, the tested value of the voltage should range from 38.4 V to 57.6 V.
If the standard voltage of the input power is 60 V, the tested value of the voltage should range from 48 V to 72
V.
The startup time of the equipment is about 3 to 5 minutes.

4
Tools
1
4

Multimeter

6
Materials

1.11 Power-on Equip

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page56

SN

MW Standard Operation Procedure for Axis Swap Project

1.11B

Task Description
Operate the Toggle Switch of the
Equipment

Operator

Duration

10 minutes(Total)

Procedure
1-

Pull out the toggle switch;

Move the toggle switch to the left (I) or to the right (O);

Release the toggle switch.

1-

On

Off

4
5
Note
1

If you move the toggle switch to the left (I), the equipment the powered on. If you move the toggle switch to the
right (O), the equipment is powered off.

2
3
2

On

Off

Tools
1

6
Materials

1.11 Power-on Equip

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page57

MW Standard Operation Procedure for Axis Swap Project

SN

Task Description

Operator

Duration

1.12A

Configure the Data-Log in to


the Web LCT

15 minutes

Procedure
1
2
3

Log in to the Web LCT as shown in the figure. In this case, the
V2R6C03B01cSPC002 version is considered as an example.
Use a network cable to connect the network port of the computer to the EHT port on
the SCC board of the OptiX RTN 600.
Modify the IP address and the subnet mask of the computer. Ensure that the IP
address is in the network section of 129.9.0.0, and the subnet mask is 255.255.0.0.
The IP address of 129.9.0.12 can be considered as an example.
Double-click the icon of Web LCT to display the home page of the Web LCT. On the
home page, enter the default user admin and password T2000. Then, click Login to
display the NE list.

5
Note
1
2
3
4
Tools
1

laptop

6
Materials

1.12 Config Data

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All
All rights
rights reserved.
reserved.

Page 58

SN

MW Standard Operation Procedure for Axis Swap Project

1.12B

Task Description

Operator

Duration

15 minutes

Configure the Data-Search


For the Equipment
Procedure

Click NE Search to display the Search NE window.

Click End Search to search for NEs.

Click Add NE to add the NEs that are searched out to the NE list.

Close the Seach NE window.

5
Note
1
2
3
4
Tools
1

6
Materials

1.12 Config Data

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 59

SN

MW Standard Operation Procedure for Axis Swap Project

1.12C

Task Description

Operator

Duration

15 minutes

Configure the Data-Log In


To the NE
Procedure

Select the NE that you need to log in to, and then click NE Login to display the NE
Login window.

Enter the default user lct and password password. Then, click OK.

Double-click the NE in the NE list or click NE Explorer to display the NE Explorer


window.

4
5
Note
1
2
3
4
Tools
1

6
Materials

1.12 Config Data

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 60

SN

MW Standard Operation Procedure for Axis Swap Project

1.12D

Task Description

Operator

Duration

15 minutes

Configure the Data-Modify


the Name and ID of the NE
Procedure

Choose Configuration > NE Attribute in the Function Tree. Then, the NE Attribute
page is displayed.

Modify the NE name according to the design document, and then click Apply.

Click Modify NE ID. Modify the NE ID according to the design document, and then
click Apply.

4
5
Note
1

After the NE ID is modified, the system is reset. Then, you should search for and log
in to the NE again.

2
3
4
Tools
1

6
Materials

1.12 Config Data

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 61

SN

MW Standard Operation Procedure for Axis Swap Project

1.12E

Task Description

Operator

Duration

15 minutes

Configure the Data-Add


Logical Boards
Procedure

On the Slot Layout page, click Add Logical Boards to add all the logical boards.

2
3
4
5
Note
1
2
3
4
Tools
1

6
Materials

1.12 Config Data

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 62

SN

MW Standard Operation Procedure for Axis Swap Project

1.12F

Task Description

Operator

Duration

15 minutes

Configure the DataConfigure IF and RF


Parameters
Procedure

Choose Configuration > Link Configuration in the Function Tree. Then, the Link
Configuration page is displayed.

Choose IF/ODU Configuration. Click the IF board or ODU to be configured.

Set the IF work mode according to the design document, and click Apply.

Set the Tx Frequency, T/R Spacing, and Tx Power according to the design
document, and click Apply.

5
Note
1

If two IF boards form a 1+1 protection group, you only need to configure the working
IF board and the ODU. That is, there is no need to configure the protection IF board.

2
3
4
Tools
1

6
Materials

1.12 Config Data

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 63

MW Standard Operation Procedure for Axis Swap Project

SN

Task Description

Operator

Duration

1.12G

Configure the DataConfigure Cross-Connections

15 minutes

Procedure
1
2

Choose Configuration > Cross-Connection Configuration in the Function Tree.


Then, the Cross-Connection Configuration page is displayed.
Click New, and configure cross-connections according to the design document.
Then, click OK.

3
4
5
Note
1

If two IF boards form a 1+1 protection group, you only need to configure the working
IF board and the ODU. That is, there is no need to configure the protection IF board.

2
3
4
Tools
1

6
Materials

1.12 Config Data

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 64

SN

MW Standard Operation Procedure for Axis Swap Project

1.12H

Task Description

Operator

Duration

15 minutes

Configure the DataConfigure the System Clock


Procedure

1
2

Choose Configuration > Clock > Clock Source Priority. Then, the System Clock
Source Priority List is displayed.
Modify the clock source priority list according to the design document, and then click
Apply.

3
4
5
Note
1
2
3
4
Tools
1

6
Materials

1.12 Config Data

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All
All rights
rights reserved.
reserved.

Page 65

SN

MW Standard Operation Procedure for Axis Swap Project

1.12I

Task Description

Operator

Duration

15 minutes

Configure the Data-Enable


the 15-Minute/24-Hour
Performance Monitoring
Function of the Equipment
Procedure

1
2
3
4

Choose Configuration > NE Time Synchronization in the Function Tree. Then, the
NE Time Synchronization page is displayed.
Right-click the NE that needs to be synchronized with the NM time. Then, click
Synchronize with NM Time.
Click Performance > NE Performance Monitor Time in the Function Tree, and then
choose the NE to be monitored.
Check 15-Minute or 24-House, and click Apply.

5
Note
1

When you are synchronizing the NE time, make sure that the system time of the
computer connected to the equipment is the local time.

2
3
4
Tools
1

6
Materials

1.12 Config Data

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 66

SN

MW Standard Operation Procedure for Axis Swap Project

1.12J

Task Description

Operator

Duration

15 minutes

Configure the Data-Set the


Extended ECC to the
Automatic Mode
Procedure

1
2
3

Use network cables to connect the EHT port and the EHT-HUB port of the SCC
board on multiple sets of equipment, as shown in the figure.
Choose Configuration > Communication > ECC Management. Then the ECC
Management page is displayed.
Double-click ECC Extended Mode. Then, select Automatic and click Apply.

4
5
Note
1
2

When there are two to four sets of the OptiX RTN equipment at one station, you need
to connect all the equipment through the cabinet-connecting ports.
When multiple sets of equipment are connected through the EHT and EHT-HUB
ports on the SCC board, you should avoid any loop of the equipment.

3
4
Tools
1

6
Materials

1.12 Config Data

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 67

SN

MW Standard Operation Procedure for Axis Swap Project

1.14A

Task Description

Operator

Duration

AC(BD)

90 minutes(Total)

Align the
AntennasPreparations

Procedure
1

Follow the microwave antenna alignment principle;

Determine the voltage values of the design receive level of the ODU, according to the
ODU RSI-Vbnc Curve and the microwave design document. (The ODU RSI-Vbnc
Curve is delivered with the ODU).

3
4
5
Note
1
2-

2-

2
3

4.5
4

Choose area

RSSI Voltage(V)

3.5

Tools

3
2.5

Multimeter

1.5
1

Materials

0.5
0
-100

-90

-80

-70

-60
-50
RS L(dB m )

1.14 Align Antennas

-40

-30

-20

Design document

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 68

SN

MW Standard Operation Procedure for Axis Swap Project

1.14B

Task Description
Align the
AntennasConnect
multimeter

20V

Duration

AC(BD)

90 minutes(Total)

Procedure

2-

Operator

Set the maximum voltage that the multimeter can detect to DC 20 V, fix the
multimeter to the tower for easy observation. Then, observe the voltage value of the
receive level when you align the antennas;

Remove the waterproof cap of the ODU RSSI port, connect the BNC connector to
the ODU RSSI port;

Connect the multimeter to the wire which connect the BNC connectorthen protect
the wire by PVC tape.

4
5
2-

Note

3-

1
2
3
4
Tools
3-

3-

1
4

Multimeter

PVC tape

2
5

3
6

Materials

1.14 Align Antennas

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 69

SN

MW Standard Operation Procedure for Axis Swap Project


1

1.14C

Task Description

Fasten the antenna


at remote site

Horizontal
Adjustment

Sit AA
Site

Operator

Duration

AC(BD)

90 minutes(Total)

Align the
AntennasHorizontal
Adjustment

Procedure
1

Fasten the antenna at the remote site, align the antenna at local site ;

On the local antenna, loosen the nuts that fix the clamps on the stand ;

Adjust the antenna in a wide range horizontally. In this manner, the antenna is
aligned roughly.During the rough adjustment, about three peak signals can be
scanned. Then, perform the fine tune around each peak signal and compare the
maximum receive level at each time of fine tune;

Immediately lock all involved loosened parts tightly after adjustment completed.

ite BB
Site
5

Note
1

180

Nuts that fix the


clamps

Notice the view from multimeter when align the antenna, looking for the maximum
view.
Tighten the four nuts on the clamps in a diagonal sequence.

3
4
Tools

1
4

Multimeter

Solid wrench

2
5

3
6

Materials

1.14 Align Antennas

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 70

SN

MW Standard Operation Procedure for Axis Swap Project

1.14D

Task Description

Operator

Duration

AC(BD)

90 minutes(Total)

Align the
AntennasHorizontal
Adjustment

Procedure
1

Level
adjustment
screw

2-

Bolt on
the stand
base

Loosen the bolts on the stand base, the bolt and the two adjustment nuts on the level
adjustment screw;

Perform the fine tune around each peak signal and compare the maximum receive
level at each time of fine tune;

When the maximum receive level is achieved,tighten the bolts on the stand base and
the nuts on the level adjustment screw to fix the antenna.

4
5
Note
1
2

2-

When aligning the antennas, you should fix one antenna and adjust the other
antenna.
Tighten all the bolts on the antenna. When tightening the bolts, you should observe
the receive level and ensure the maximum receive level.

3
4
Tools

30

1
4

Multimeter

Solid wrench

2
5

3
6

Materials

1.14 Align Antennas

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 71

SN

MW Standard Operation Procedure for Axis Swap Project


1

Vertical
Adjustment

1.14E

Task Description

Site B

Duration

AC(BD)

90 minutes(Total)

Align the
AntennasVertical
Adjustment

Fasten the antenna


at remote site

Site A

Operator

Procedure
1

Fasten the antenna at the remote site, vertically align the antenna at local site ;

Loosen the bolts that connect the antenna and the stand;

Rotate the elevation adjustment bolt with a wrench. Then, perform the fine tune
around the receive level peak in every vertical direction, and compare the maximum
receive level at each time of fine tune;

When the maximum receive level is achieved, tighten the elevation adjustment bolt to
fix the antenna .

5
2

Bolts that
connect the
antenna and
the stand

3-

Note
1

When aligning the antennas, you should fix one antenna and adjust the other
antenna.

Tighten all the bolts on the antenna. When tightening the bolts, you should observe
the receive level and ensure the maximum receive level.

3
4

Elevation
adjustment
bolt

Tools
4

3-

1
4

Multimeter

Solid wrench

2
5

3
6

Materials

30
1.14 Align Antennas

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 72

MW Standard Operation Procedure for Axis Swap Project

SN

Task Description

Operator

Duration

1.14F

Align the Antennasremote


site and alignment repeated

AC(BD)

90 minutes(Total)

Procedure

Alignment
Repeated

Site A

Site B

Site A

Site B

Follow the step 1.14A, 1.14B, 1.14C,1.14D,1.14E to align the antenna at the site B to
find the maximum value of voltage by multimeter;

Adjust the local and romte antenna repeatedly;

When the receive levels of the local ODU and remote ODU reach the design values,
the alignment is over.

4
5
Note

3-

3-

1
2

When aligning the antennas, you should fix one antenna and adjust the other
antenna.
Tighten all the bolts on the antenna. When tightening the bolts, you should observe
the receive level and ensure the maximum receive level.

3
4
Tools
1
4

Multimeter

Solid wrench

2
5

3
6

Materials

1.14 Align Antennas

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 73

SN

MW Standard Operation Procedure for Axis Swap


Project

1.15.1

Task Description
Check the hardware
installation.

Operator

Duration

BD
C

10 minutes

Procedure
1

According to the Checklist to check the hardware installation .

Take photos on key installation points of the base station according to


related requirements in the engineering documents.

Review the site quality report.

4
5
Note
1

Be sure to collect all the required data on site. This facilitates you to
compose the equipment installation completion report.

2
3
4
Tools
1

6
Materials

1.15.1 Check installation

Camera

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Check list

Page74

SN

MW Standard Operation Procedure for Axis Swap Project

1.15.2A

Task Description

Operator

Duration

15 minutes

E1 Software Loopback
Procedure

1
2
3
4

In the Function Tree, click the tributary board where the loopback is to be performed.
Choose Configuration > PDH Interface in the Function Tree. Then, the PDH
Interface page is displayed.
Select the E1 signal to be looped back. Then, double-click Tributary Loopback and
select Inloop or Outloop.
Click Apply.

5
Note
1

E1 inloop indicates that the E1 signal is looped back toward the backplane.

E1 inloop indicates that the E1 signal is looped back against the backplane.

3
4
Tools
1

Punchdown tool

6
Materials

1.15.2 Perform Tests

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 75

SN

MW Standard Operation Procedure for Axis Swap Project

1.15.2B

Task Description

Operator

Duration

15 minutes

Test the E1 Services


Procedure

1
2
3
4

Perform the hardware loopback of the E1 signal on the DDF.


Click the tributary board to be tested, and choose Configuration > PRBS Test in the
Function Tree. Then, the PRBS Test page is displayed.
Select the E1 signal to be looped back. Double-click Direction and select Tributary.
Then, set the test duration to 15 minutes.
Click Start to Test to start the PRBS test.

5
Note

The test directions of the PRBS test function as follows. In the tributary direction, the
bit errors from the local DDF to the equipment can be tested. When the remote E1
signal is looped back and the cross direction is selected at the local end, the bit
errors from the radio link to the local tributary board can be tested.

2
3
4
Tools
1

Punchdown tool

6
Materials

1.15.2 Perform Tests

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 76

SN

MW Standard Operation Procedure for Axis Swap Project


1.16A

Task Description
Disconnect the corresponding
E1 cable on Erission DDF(joint
site)

Operator

Duration

10 minutes

Procedure
1

On Erission DDF, disconnect the corresponding E1 cable from downlink IDU which is carrying the
swap site's BTS traffic

2
3
4
DDF

Erission MW

5
Note

BSC / HIT

DDF

Disconnect

DDF

1
HW MW / OSN

The originally connected E1 cable should be preserved and marked, in case of fall back.

2
3
4
Tools
1
4

Punching wire pliers

6
Materials

1.16 Swap MW link

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 77

SN

MW Standard Operation Procedure for Axis Swap Project


1.16B

Task Description
Disconnect the corresponding
E1 cable on Erission DDF (site
A)

Operator

Duration

10 minutes

Procedure
1

On Erission DDF, disconnect the E1 cable from uplink IDU which is carrying local BTS traffic

2
3
Erission Power Unit

Erission MW

Disconnect

DDF

Note

BTS
1

RFC

The originally connected E1 cable should be preserved and marked, in case of fall back.

2
3
4

Base

Tools

Rail
1
4

Punching wire pliers

6
Materials

1.16 Swap MW link

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 78

SN

Task Description

Operator

Duration

1.16C

Connect this port to the pre-laid


jumper on Erission DDF(joint
site)

10 minutes

MW Standard Operation Procedure for Axis Swap Project

Procedure
1

On Erission DDF, connect the corresponding service channel E1 cable from HW IDU to the just
plugged out Erission port

2
3
4
DD

Ericsson MW

5
Note

BSC / HIT

DD

Connect

DD

1
HW MW / OSN

2
3
4
Tools
1
4

Punching wire pliers

6
Materials

1.16 Swap MW link

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 79

SN

Task Description

Operator

Duration

1.16D

Connect this port to the pre-laid


jumper on Erission DDF(site A)

10 minutes

MW Standard Operation Procedure for Axis Swap Project

Procedure
1

On Erission DDF, connect the corresponding service channel E1 cable from HW IDU to the just
plugged out Erission port

2
3
4

Erission Power Unit


Erission MW

Connect

Note

DDF
BTS

1
2

RFC

3
4
Tools

Base
Rail

1
4

Punching wire pliers

6
Materials

1.16 Swap MW link

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 80

SN

Task Description

Operator

Duration

1.16E

Change to the original sub-band


ODU

BCD

20 minutes

MW Standard Operation Procedure for Axis Swap Project

Procedure
1

Switch off ODU on IF board.

Remove the waterproof of IF connector. Remove the IF connector, and then remove the ODU.

Install the new ODU, connect IF cable, and make waterproof for it.

4
5
Note
1

Before disconnect IF cable, must ensure ODU is switched off.

2
3
4
Tools
1

Paper knife

Diagonal pliers

2
5

3
6

Materials
1

Waterproof tape

Cable tie

1.16 Swap MW link

PVC tape

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 81

SN

Task Description

Operator

Duration

1.16F

Change HW MW link into original


frequency

D(B)

5 minutes

MW Standard Operation Procedure for Axis Swap Project

Procedure
1

Set transmit frequency on each site IDU base on TNP database .

2
3
4
5
Note
1
2
3
4
Tools
1

3
6
Materials

1.16 Swap MW link

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 82

SN

Task Description

Operator

Duration

1.16G

Perform dialing test

30 minutes

MW Standard Operation Procedure for Axis Swap Project


Procedure
1

After the base station operates normally, use the test MS to test CS services, PS services, and
SMS services.

2
3
4
5
Note
1
2
3
4
Tools
1
4

Test MS

6
Materials

1.16 Swap MW link

Huawei Confidential
Copyright Huawei Technologies Co., Ltd. All rights reserved.

Page 83