Sei sulla pagina 1di 7

A

Project Report
On

Submitted in Partial fulfillment


Of
The requirements for the award of the Diploma of

Diploma in Computer Application (DCA)

Session 2015

AISECT COLLEGE
Rewa (M.P.), Pin Code 486001

Guided By:
Mr. Shivkish
Dwivedi
(Faculty)

Submitted By:
Mukesh Dubey

INDEX
CHAPTER
1

2
2

TOPIC
INTRODUCTION

Purpose

Objective

Scope
PROBLEM DEFENITION
HARDWARE & SOFTWARE REQUIREMENT

4
6

Hardware Requirement

Software Requirement
SOFTWARE SPECIFICATION

PAGE NO.

Introduction to VB.Net

Introduction to MS-Access
SYSTEM ANALYSIS

13

5
6
7
8

SYSTEM DESIGN
DATA FLOW DIAGRAM
DATABASE STRUTURE
CODING

17
18
20
22

OUTPUT
IMPLEMENTATION
LIMITATTIONS & FUTURE WORK
CONCLUSION
REFERENCES

63
74
76
77
78

9
10
11
12
13

CERTIFICATE

This is to certify that this project entitled Account


Management System submitted in partial fulfillment of
the degree of Bachelor of Commerce (CA) to the
Awadesh Pratap Singh University, Rewa through
Saraswati Science College, Rewa (M.P.) done by Ku.
Veena Pandey is an authentic work carried out by her
under my guidance. The matter embodied in this project
work has not been submitted earlier for award of any
degree or diploma to the best of my knowledge and
belief.

Date :
Place

Signature of the Guide


:

Mr. Ravi

Shrivastava
(Faculty)
S.S.C., Rewa
(M.P.)

Declaration
I, Veena Pandey, hereby declare that the project
work entitled Account Management System is an
authenticated work carried out by me Under the guidance
of Mr. Ravi Shrivastava for the partial fulfillment of the
award of the degree of BACHELOR OF COMMMERCE
(CA) and this work has not been submitted for similar
purpose anywhere else except to Saraswati Science
College,, Rewa (M.P.) affiliated to Awadesh Pratap
Singh University, Rewa.

Date:
Place:
Veena Pandey
B.Com. (CA) VI Sem.
Roll No. 1371

ACKNOWLEDGEMENT
Completing a task is never a one man effort. It is often the
result of valuable contribution of a number of individuals in a
direct or indirect manner that helps in shaping and achieving an
objective. It is very difficult for anyone to complete a project
without the active cooperation and the benefit of the advice from
the people who are experts in their field of specialization. The
satisfaction and euphoria that accompanies the successful
completion of any task would not be complete without the
mention of the people who made it possible
We are grateful to respected sir Mr. Ravi Shrivastava
Guidance, which inspired us to complete the work successfully.
We have great pleasure in expression our gratitude and obligation
to Mr. R.P. Tiwari, (Principal) Saraswati Science College, Rewa
for his noble co-operation from conception to completion of this
project.

We are equally thankful to all the staff of the Saraswati


Science College, Rewa for their cooperation, suggestions and help
in nurturing the project.
Lastly, we would like to thanks to My Family Members and all
friends and classmates for their sustained efforts and help in
reaching goal.

Veena Pandey
B.Com. (CA) VI Sem.
Roll No. 1371

Preface
Requirements definition and management is recognized as a necessary step
in the delivery of successful system s and software projects, discipline is also
required by standards, regulations, and quality improvement initiatives.
Creating and managing requirements is a challenge of IT, systems and
product development projects or indeed for any activity where you have to
manage a contractual relationship.

Organization need to effectively define

and manage requirements to ensure they are meeting needs of the


customer, while proving compliance and staying on the schedule and within
budge. The impact of a poorly expressed requirement can bring a business

out of compliance or even cause injury or death.

Requirements definition

and management is an activity that can deliver a high, fast return on


investment.
The ACCOUNT MANAGEMENT SYSTEM undertaken as a project is
based on relevant technologies. The main aim of this project is to develop
software for bank management system. This project is to develop software
for bank management system. This project has been developed to carry out
the processes easily and quickly, which is not possible with the manuals
systems, which are overcome by this software. This project is developed
using Visual Basic 6.0 language with Ms-Access as a backend.

Potrebbero piacerti anche