ANALYSIS OF DATA FOR GAS LEAK PROBLEMS IN GENERATOR

GENERATOR MTCE.
08/01/2007

The corrective action taken on the stage-II gas drier like replacing the
12 mm rubber cord with 3mm permanite gasket and modifying the top cover
of the gas drier was reviewed and the problem has considerably reduced.
The problem of frequent failure of the ET vacuum pump and the last
committee decision to change the raw water with DM water as it was originally
available , was reviewed and the modification has been carried out in one
pump in unit No. 4 and one pump in unit no. 6 and the pump is performance
is good. Originally between 2001 to 2005 there were totally 24 major
reconditioning work in ET Vacuum pump and now after modification the no. of
complaints on ET Vacuum pump has come down. The committee decided to
implement in the modification during the next major shut down in other pumps
also.
The unit No. 1 vibration problem is to be followed up after rolling of the
T.G. As the seal ring and the bearing is changed and the L.P and H.P and I.P
rotors are changed it is expected that the vibration problem will be solved.

R,Chandrasekar
AEE/E

C.UNNIKRISHNAN
CM/E

R.ELANGOVAN
ACM/E

A.JEGADEESAPANDIAN
ACM/E

M.KAMALANAYANAN
DGM/E

ANALYSIS OF DATA FOR ET VACUUM PUMP PROBLEM IN STATOR


WATER SYSTEM
UNIT
UNIT IV

DATE
21/03/2002

LOCATION
ETVP 4A heavy
water leakage
ETVP 4A seals
damaged
ETVP 4A seals
leak
ETVP 4B seals
leak
ETVP 4A seals
leak
Routine change

UNIT IV

09/01/2003

UNIT IV

02/06/2003

UNIT IV

2/11/2004

UNIT IV

20/11/2004

UNIT IV

22/04/2005

UNIT V
UNIT V
UNIT V

19/07/2003
08/08/2003
18/03/2004

UNIT V

05/10/2004

UNIT V
UNIT V

07/10/2004
03/03/2005

UNIT VI
UNIT VI
UNIT VI
UNIT VI

22/03/2002
20/06/2002
12/03/2003
17/01/2004

UNIT VII

22/2/2001

ETVP 5A
ETVP 5B
ETVP 5B Seal
Leak
ETVP 5A -seal
water insufficient
ETVP 5B
ETVP 5B seal
water hose
punctured
ETVP
ETVP
ETVP-6A
ETVP-6A. Seal
damaged
ETVP-7A

UNIT VII
UNIT VII
UNIT VII
UNIT VII
UNIT VII
UNIT VII
UNIT VII

30/5/2001
29/06/2001
21/8/2001
18/02/2003
13/01/2004
14/01/2004
25/04/2005

ETVP-7B
ETVP-7A
ETVP-7B
ETVP-7A
ETVP-7A
ETVP-7B
ETVP 7B

REMARKS
Blocked drain released and the
water flow regulated
Replaced with new one
Pump overhauled
Pump overhauled
Pump overhauled
Pump removed for erecting new
pump
Pump overhauled
Pump overhauled
Pump overhauled
Flexible hose provided
New pump provided
New hose provided.
Seal water line blockage cleared
Seal water line blockage cleared
Spare pump provided
Pump removed for overhaul.
Coupling spider damaged
coupling damages due to
foundation bolt
Bearing noise bearing replaced
Bearing seals changed
Bearing seals replaced
Seals changed
Overhauled
Overhauled
New pump provided

The problem is attributed to raw water damaging the seals. It is proposed to introduce
DM water in the closed circuit. For that budgetary offer has been sought from the firm