Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
SHIFT
P
R
O
B
3/24/2015 DI
S
C
R
I
.
1/28/2015
P
R
O
B
L
E
M
D
I
S
C
R
I
P
T
I
O
N
1/29/2015
A
P
R
O
B
L
E
M
D
I
S
C
R
I
P
T
I
O
N
1/30/2015
A
P
R
O
B
L
E
M
D
I
S
C
R
I
P
T
I
O
N
1/31/2015
A
P
R
O
B
L
E
M
D
I
S
C
R
I
P
T
I
O
N
2/1/2015
2/2/2015
missing
2/3/2015
C
2/4/2015
2/5/2015
B
C
2/6/2015
2/7/2015
GOOD WAY
B
C
2/8/2015
B
C
2/9/2015
2/10/2015
B
C
2/11/2015
2/13/2015
2/14/2015
2/15/2015
2/16/2015
2/17/2015
2/18/2015
2/19/2015
SCP#1
power cutting of LT drive, hydrau
CRD fault
ENTRY MISSING
HMU fault
SCP#2
parking stop signal misses
ALC lift down (not OK)
Power cable of ALC unit was open .
Oven no 1057 pushing permissive forced
LT drive tripped
HPLA problem in oven no-1052
positioning problem in some ovens
forward stop sensor of coke levelling device adjusted
CLD drive trip in over current
Auto positioning system not OK
Coke guide problem
Auto positioning problem
CLD not moved back
Support bridge signal missed during charging
Scrapper tripped
SCP#3
Level sensor#4  malfunctioning
unit# 4 Hammer 6 HMU fault
unit# 4 Hammer 6 base position linked with 5
HPLA was down
Level sensor #4 & #5 power replaced & linked for coal feeding
CLD tripped
CGT#1
EQUIPMENTS
CGT#2
LT drive tripped
43502B power getting
CC-15 power cutting and getting
EQUIPMENTS
CGT#3
LT Encoder coupling changed with new one
BPP
Sulphur Recovery Pressure Transmitter malfunctioning
Gas valve trip
Pressure transmitter of sulphur recovery area made OK
LOCO#1
LT Problem
LOCO#2
LOCO#3
flap door not opening
BC 104 tripped in OC
SRC Tripped in OC
HPLA
CGC#1
CGC#3
cooler trip in OC
HP#2 tripped
DATE
3/24/2015
P
R
O
B
D
I
S
C
R
I
P
.
R
O
B
D
I
S
C
R
I
.
SHIFT
P
R
O
B
D
I
S
C
R
I
P
.
R
O
B
3/25/2015
D
I
S
C
R
I
P
.
R
O
B
D
I
S
C
R
I
P
R
O
B
D
I
S
C
R
I
3/26/2015
3/26/2015
SCP#1
Power cutting of LT drive, Hydraulic trip in O/L same reset
SCP#2
Hydraulic softstarter trip same reset
door repair give permanent
walky talky connector change from SCP-1
LT motor 3&6given in service previously it was bypass.
LT DRIVE#7-tripped
SCP#3
Power getting of charger & travelling
7&8 no. LT drive trip same reset.
charger drive trip same reset
door repair given
CGT#1
cover lifter N+2 side of N cylinder bypass from travel release as per operation request
EQUIPMENTS
CGT#2
CGT#3
BPP
LOCO#1
LT not taken ckeckd that it's mode was selected on lock mode.
Release it taken OK.
LOCO#2
LOCO#3
HPLA
CGC#1
CRD fault came becoz slack limit switch came.
CGC#3
walky talky connector changed from CFC-1
Motorola-walkie mouth piece and arial connector was changed from CGC#2
Batt-11
breeze pnd scraper brake and sensor adjusted
batt-10
Hoist not working
Beltway bypassed.
BC102