Brick Works
Item
1
2
3
4
5
6
7
8
9
Description
Unit
Qty
Material
Labour
Thin bed adhesive / Mortar
Fixing (FB2)
Fixing (Dowels bar for brickworks)
Skim Coat (Material + Labour + Mesh)
External Render (Material + Labour)
Plastering (Material + Labour)
Wastage (3% AAC, 5% Brick)
m2
m2
m2
m2
m2
m2
m2
m2
m2
10,916.00
10,916.00
10,916.00
10,916.00
10,916.00
10,916.00
10,916.00
10,916.00
Total (RM)
m2
12,800,000.00 2.25%
12,800,000.00
4%
288,000.00
512,000.00
uites With Commercial Space on Lot 3493, Bintulu Town District, Bintulu
Date: 22-10-2013
Brick Works
LeichtBric
Rate (RM/m2) Amount (RM)
33.33
363,866.67
10.80
117,892.80
1.80
19,648.80
1.00
10,916.00
7.50
81,870.00
1.01
-
Clay Brick
Rate (RM/m2) Amount (RM)
18.31
199,847.60
10.80
117,892.80
4.00
43,664.00
0.30
3,274.80
20.75
226,507.00
1.05
-
594,194.27
591,186.20
288,000.00
512,000.00
Remarks
Air-Conditioning Work
Ele.
Tenderer
1
Tie's Air-Conditioning & Engineering
H&K Engineering
Insulation
Refrigerant pipeworks c/w
Superlon elastomeric nitrile
closed cell thermal
insulation
Refrigerant pipeworks c/w
Superlon elastomeric nitrile
closed cell thermal
insulation in metal trunking
above ceiling
Supply and return air-cond
duct c/w insulation, supply
air diffusers & return air
grilles
Armaflex insulation for
piping run above ceiling
(horizontal)
GI TDC Joint Supply &
Return Air Bare Duct c/w
bracket support, internal
insulation of 1/2" PE foam,
GI Double deflection c/w
OBD, GI egg crate, GI
plenum box c/w PE foam,
GI ducted 4-way SAG,
GI RAG, GI Return box c/w
PE foam
Pre-insulated pipe
onditioning Works
Weatherproof Coat
Drain Pipe
PVC condensate drain pipe
to floor trap, plug top
Wiring
Wiring/power supply in
UPVC conduit
Mechanical Ventilation
Exhaust fan c/w bracket, GI
duct, exhaust air grille