Before starting the project, students
took a trip to the site they would be reconstructing, 102 South Lafayette Street.
From photographing to measuring, veryone went straight to work upon arrival.
Together, the teams gathered information
in order to get an idea of what was soon
in store.
/////////
our concept
Inspired by the arts culture of Starkville, MS, The Foundry
acts as a host and launch pad for founding companies who
specialize in handcrafted goods. The Foundry provides
a raw canvas in which local small business owners are
invited to come launch the business, create a client
base, and learn how to succeed through experience and
mentorships. The Foundrys rustic materials, yet modern
lines express the culture of Starkville by combining both
the art community and entrepreneurs who wish to create
a space that welcomes both artistic and interesting. With
local artists wanting to grow their business, the Foundry
offers a unique space to express a companys identity,
collaborate with other artists, and expand the company to
new horizons.
///////////////
10
exterior concept 1
exterior concept 2
interior concept
12
14
Devlivery Route
Entrance Gate
Safety Fence
Buildin g
Dumpste r
Restroom
Equipment Storage
Material Unloading Zone
part 1
part 2
bench detail
16
East elevation
scale: 1/8=1
south elevation
scale: 1/8=1
18
20
DATE: 8/27/2014
ESTIMATE # 001
PROJECT: THE FOUNDRY
LOCATION: 102 LAFAYETTE ST. STARKVILLE<MS
BLDG SF:
FEE RATE:
1,622
Master Format
DESCRIPTION
Division 1
General Requirements
QTY
UNIT
Mat.
Labor
$2,668.50
Roofing Test
ea
toxin Testing
ea
50
L.F
$4.77
per mo
$85.00
per mo
$500.00
80
S.F
$12.00
$6.00
Division 2
Site Construction
Division 3
Concrete
Division 4
Division 5
Masonry
Division 6
$21.50
$1,500.00
Temporary Utilities power and water
$1,440.00
Side Walk renovation
$1,759.31
Metals
$10,586.94
88.5
L.F
$3.33
$6.35
20.5
L.F
$3.33
$5.75
Suspended 2"X4""
1.5
M.B.F
$550.00
$1,150.00
300
S.F
$2.75
$1.50
32
pair
$95.16
$21.50
36
ea.
$9.75
$3.75
ea.
$1,200.00
$300.00
613
S.F
$0.23
$0.38
33
gal
$7.15
$2.00
72.96
S.F
70
L.F
Division 7
$675.88
Division 8
$7,444.79
$13.95
$9.75
$6.85
Opng.
$775.00
$105.00
ea
$1,200.00
$350.00
S.F
$6.95
$4.75
140
S.F
$14.50
$5.75
250
S.F
$0.72
Drywall, screwed
500
S.F
8700 Hardware
8800 Glazing
8800 Glazing
Division 9
Division 11
Equipment
$8,004.97
$0.60
$0.29
$0.47
$0.60
1622
S.F
1622
S.F
1622
S.f
$1.50
$1.00
539
S.F
$0.42
$0.49
$0.77
Assembly Cost
Equpmet
UNIT $
$0.00
$450.00
$650.00
$26.27
$85.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$500.00
$0.00
$0.00
$18.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$9.68
$9.08
$1,700.00
$4.25
$116.66
$13.50
$1,500.00
$0.00
$0.00
$0.00
$0.61
$0.00
$9.15
$0.00
$0.00
$0.00
$0.00
$13.95
$16.60
$880.00
$1,550.00
$0.00
$11.70
$20.25
$0.00
$1.32
$0.29
$1.07
$0.77
$2.50
$0.91
$0.00
$0.00
Total
$0.00
$450.00
$650.00
$1,313.50
$255.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,500.00
$0.00
$0.00
$1,440.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$856.68
$186.14
$2,550.00
$1,275.00
$3,733.12
$486.00
$1,500.00
$0.00
$0.00
$0.00
$373.93
$0.00
$301.95
$0.00
$0.00
$0.00
$0.00
$1,017.79
$1,162.00
$880.00
$1,550.00
$0.00
$0.00
$2,835.00
$0.00
$330.00
$145.00
$1,735.54
$1,248.94
$4,055.00
$490.49
$0.00
$0.00
Cost/Bldg.
SF
$
$
$
$
% of Total
0.28
0.40
0.81
0.16
0.63%
0.90%
1.82%
0.35%
0.92
2.08%
0.89
2.00%
0.53
0.11
1.57
0.79
2.30
0.30
0.92
1.19%
0.26%
3.54%
1.77%
5.19%
0.68%
2.08%
0.23
0.52%
0.19
0.42%
0.63
0.72
0.54
0.96
1.41%
1.61%
1.22%
2.15%
1.75
3.94%
0.20
0.09
1.07
0.77
2.50
0.30
0.46%
0.20%
2.41%
1.74%
5.63%
0.68%
33
gal
72.96
S.F
70
L.F
$7.15
$2.00
Division 8
$7,444.79
$13.95
$9.75
$6.85
Opng.
$775.00
$105.00
ea
$1,200.00
$350.00
S.F
$6.95
$4.75
140
S.F
$14.50
$5.75
250
S.F
$0.72
$0.60
Drywall, screwed
500
S.F
8700 Hardware
8800 Glazing
8800 Glazing
Division 9
$8,004.97
Finishes
Division 11
Division 12
$0.47
1622
S.F
1622
S.F
1622
S.f
$1.50
$1.00
539
S.F
$0.42
$0.49
$0.77
Equipment
$10,637.00
Furnishings
12500 Furniture
ea
$519.00
12500 Furniture
ea
$1,277.00
12500 Furniture
ea
$1,891.00
Division 13
Division 14
Division 15
$0.60
$0.29
Special Construction
Conveying Systems
$11,922.86
Mechanical
ea
$277.00
$150.00
ea
$200.00
$100.00
ea
$250.00
$100.00
ea
includes Air condenser, Heating Coil, Supply Duct, and return air
1622
S.F
$3.00
$3.63
1622
S.F
$3.50
$3.50
LED Linear, Suspended Mounted, one light bar, 4' Long 37 watt
ea
$225.00
$58.50
ea
$50.00
$15.00
$11.50
$46.00
Division 16
$15,341.00
Electrical
53
ea
10
ea
16700 Communications
16800 Sound and Video
General Conditions
Mark up
Total Cost
$7.00
$26.00
$9.15
$0.00
$0.00
$0.00
$0.00
$13.95
$16.60
$880.00
$1,550.00
$0.00
$11.70
$20.25
$0.00
$1.32
$0.29
$1.07
$0.77
$2.50
$0.91
$0.00
$0.00
$0.00
$519.00
$1,277.00
$1,891.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$427.00
$300.00
$350.00
$46.00
$0.00
$0.00
$6.63
$0.00
$0.00
$0.00
$7.00
$0.00
$0.00
$283.50
$65.00
$18.50
$26.00
$0.00
$0.00
$0.00
$0.00
$
$
$
$
15% of total
15% of total
$301.95
$
$0.00
$0.00
$0.00
$0.00
$1,017.79
$
$1,162.00
$
$880.00
$
$1,550.00
$
$0.00
$0.00
$2,835.00
$
$0.00
$330.00
$
$145.00
$
$1,735.54
$
$1,248.94
$
$4,055.00
$
$490.49
$
$0.00
$0.00
$0.00
$519.00
$
$2,554.00
$
$7,564.00
$
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$427.00
$
$300.00
$
$350.00
$
$92.00
$
$0.00
$0.00
$10,753.86
$
$0.00
$0.00
$0.00
$11,354.00
$
$0.00
$0.00
$2,551.50
$
$195.00
$
$980.50
$
$260.00
$
$0.00
$0.00
$0.00
$1.00
$
71,982 $
10,797.34
10,797.34
93,576.93
0.19
0.42%
0.63
0.96
1.41%
1.61%
1.22%
2.15%
1.75
3.94%
0.20
0.46%
0.20%
2.41%
1.74%
5.63%
0.68%
0.72
0.54
0.09
1.07
0.77
2.50
0.30
0.32
1.57
4.66
0.72%
3.55%
10.51%
0.06
0.59%
0.42%
0.49%
0.13%
6.63
14.94%
7.00
15.77%
1.57
3.54%
0.27%
1.36%
0.36%
0.26
0.18
0.22
0.12
0.60
0.16
0.00
44
100%
Demolition
22
We started off using carpet and hard wood as the flooring. As the design
developed we decided that both carpet and hard wood was not aesthetically pleasing and would wear down too fast. Because of this, we
decided to go with a more economical approach, stained concrete.
24
26
design
When creating The Foundry, we wanted
the outside to grab everyones attention
in a simple, yet effective manor. We accomplished this by exhibiting a wood facade accented with both brick and aluminum.For the interior design, we decided
to imitate the facade and help carry the
simple and clean design throughout the
space. We created an open floor plan
that is made up of industrial and reclaimed materials.
/////////
28
Cody Skinner
The Foundry
102 S Lafayette, Starkville MS
P 662.893.2279
info@thefoundry.com
www.thefoundry.com
Branding
After trial and error, we finally chose a
logo that helped represent our company
in the best way. Clean and simple, our
logo can be recognized and remembered in almost any setting.
/////////
30