Sei sulla pagina 1di 32

brasfield and gorrie

Student Design Competition | 2014

TABLE OF CONTENtS
Research
Concept
Site Plan
Estimates & Time Research
Design

4
8
14
20
26

site visit
Before starting the project, students
took a trip to the site they would be reconstructing, 102 South Lafayette Street.
From photographing to measuring, veryone went straight to work upon arrival.
Together, the teams gathered information
in order to get an idea of what was soon
in store.

/////////

our concept
Inspired by the arts culture of Starkville, MS, The Foundry
acts as a host and launch pad for founding companies who
specialize in handcrafted goods. The Foundry provides
a raw canvas in which local small business owners are
invited to come launch the business, create a client
base, and learn how to succeed through experience and
mentorships. The Foundrys rustic materials, yet modern
lines express the culture of Starkville by combining both
the art community and entrepreneurs who wish to create
a space that welcomes both artistic and interesting. With
local artists wanting to grow their business, the Foundry
offers a unique space to express a companys identity,
collaborate with other artists, and expand the company to
new horizons.

///////////////

brasfield & gorrie | concept

10

exterior concept 1

brasfield & gorrie | concept

exterior concept 2

interior concept

12

14

Devlivery Route
Entrance Gate
Safety Fence
Buildin g
Dumpste r
Restroom
Equipment Storage
Material Unloading Zone

brasfield & gorrie | site plan

part 1

part 2

bench detail

The connections details both focus on the benches on the


front faade. The connections show how the wood 2x4s
connect to the existing building structure and how it is
applied to it. The wood bench is bolted to the brick faade
for its own structural use.

16

East elevation

scale: 1/8=1

brasfield & gorrie | site plan

south elevation

scale: 1/8=1

18

20

MASTER FORMAT ESTIMATE

DATE: 8/27/2014

ESTIMATE # 001
PROJECT: THE FOUNDRY
LOCATION: 102 LAFAYETTE ST. STARKVILLE<MS

BLDG SF:
FEE RATE:

1,622

Master Format
DESCRIPTION

Division 1

General Requirements

1400 Quality Requirements


1400 Quality Requirements

QTY

UNIT

Mat.

Labor

$2,668.50
Roofing Test

ea

toxin Testing

ea

1500 Temporary Facilities and Controls

Bararicads 5'high 2"X4"

50

L.F

$4.77

1500 Temporary Facilities and Controls

Job site restrooms

per mo

$85.00

per mo

$500.00

80

S.F

$12.00

$6.00

Division 2

Site Construction

2500 Utility Services

Division 3

Concrete

3300 Cast-In-Place Concrete

Division 4
Division 5

Masonry

Division 6

Wood and Plastics

$21.50

$1,500.00
Temporary Utilities power and water

$1,440.00
Side Walk renovation

$1,759.31

Metals

$10,586.94

6100 Rough Carpentry (06110 Partitions)

single Bottom and double top plate 2"X6"", 24" O.C.

88.5

L.F

$3.33

$6.35

6100 Rough Carpentry (06110 Partitions)

single Bottom and double top plate 2"X4"", 16" O.C.

20.5

L.F

$3.33

$5.75

Suspended 2"X4""

1.5

M.B.F

$550.00

$1,150.00

6200 Finish Carpentry

Custom wood Facade

300

S.F

$2.75

$1.50

6200 Finish Carpentry

Custom made wood dividers, inc hardware

32

pair

$95.16

$21.50

6200 Finish Carpentry

Custom made wood shelves, inc hardware

36

ea.

$9.75

$3.75

6201 Finish Carpentry

Custom Made Checkout Counter

ea.

$1,200.00

$300.00

bituminous damp proofing sprayed on 1 coat

613

S.F

$0.23

$0.38

Roof Repair Asphalt, brush grade

33

gal

$7.15

$2.00

Aluminum, incl. trim to 25 sf

72.96

S.F

Aluminum Framing for Store fronts 1-3/4" x1-3/4"

70

L.F

Store front Door 6'X7'' Entrance Door

Imperial Marquee Awning with Flat Panels

6100 Rough Carpentry (Ceiling Framing)

6900 Wood and Plastic Restoration and Cleaning

Division 7

Thermal and Moisture Protection

7100 Dam proofing and Waterproofing

$675.88

7200 Thermal Protection


7500 Membrane Roofing
7600 Flashing and Sheet Metal
7800 Fire and Smoke Protection
7900 Joint Sealers
Doors and Windows

Division 8

8400 Entrances and Storefronts Demolition


8400 Entrances and Storefronts
8400 Entrances and Storefronts (08450 Storefront Door)
8400 Entrances and Storefronts

$7,444.79
$13.95
$9.75

$6.85

Opng.

$775.00

$105.00

ea

$1,200.00

$350.00

S.F

$6.95

$4.75

140

S.F

$14.50

$5.75

5/8" thick on walls or ceilings

250

S.F

$0.72

Drywall, screwed

500

S.F

8700 Hardware
8800 Glazing
8800 Glazing

Division 9

1'' Thick double glazed 1/4" Float, 1/4" Tempered


Finishes

9200 Plaster and Gypsum Board


9200 Plaster and Gypsum Board Demolition

brasfield & gorrie | estimates


Ceilings
9500

9500 Ceilings Demolition


9600 Flooring stained concrete
9900 Paints and Coatings
Specialties
Division 10

Division 11

Equipment

$8,004.97
$0.60
$0.29
$0.47

$0.60

1/4" thick on walls or ceilings

1622

S.F

Tile, wood fiber, 12x12 glued on suspension system

1622

S.F

concrete stain 2 cots

1622

S.f

$1.50

$1.00

Primer and 2 coats of exterior latex

539

S.F

$0.42

$0.49

$0.77

Assembly Cost
Equpmet
UNIT $

$0.00
$450.00
$650.00
$26.27
$85.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$500.00
$0.00
$0.00
$18.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$9.68
$9.08
$1,700.00
$4.25
$116.66
$13.50
$1,500.00
$0.00
$0.00
$0.00
$0.61
$0.00
$9.15
$0.00
$0.00
$0.00
$0.00
$13.95
$16.60
$880.00
$1,550.00
$0.00
$11.70
$20.25
$0.00
$1.32
$0.29
$1.07
$0.77
$2.50
$0.91
$0.00
$0.00

Total

$0.00
$450.00
$650.00
$1,313.50
$255.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,500.00
$0.00
$0.00
$1,440.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$856.68
$186.14
$2,550.00
$1,275.00
$3,733.12
$486.00
$1,500.00
$0.00
$0.00
$0.00
$373.93
$0.00
$301.95
$0.00
$0.00
$0.00
$0.00
$1,017.79
$1,162.00
$880.00
$1,550.00
$0.00
$0.00
$2,835.00
$0.00
$330.00
$145.00
$1,735.54
$1,248.94
$4,055.00
$490.49
$0.00
$0.00

Cost/Bldg.
SF

$
$
$
$

% of Total

0.28
0.40
0.81
0.16

0.63%
0.90%
1.82%
0.35%

0.92

2.08%

0.89

2.00%

0.53

0.11

1.57

0.79

2.30

0.30

0.92

1.19%
0.26%
3.54%
1.77%
5.19%
0.68%
2.08%

0.23

0.52%

0.19

0.42%

0.63

0.72

0.54

0.96

1.41%
1.61%
1.22%
2.15%

1.75

3.94%

0.20

0.09

1.07

0.77

2.50

0.30

0.46%
0.20%
2.41%
1.74%
5.63%
0.68%

7500 Membrane Roofing

Roof Repair Asphalt, brush grade

33

gal

Aluminum, incl. trim to 25 sf

72.96

S.F

Aluminum Framing for Store fronts 1-3/4" x1-3/4"

70

L.F

$7.15

$2.00

7600 Flashing and Sheet Metal


7800 Fire and Smoke Protection
7900 Joint Sealers
Doors and Windows

Division 8

8400 Entrances and Storefronts Demolition


8400 Entrances and Storefronts
8400 Entrances and Storefronts (08450 Storefront Door)
8400 Entrances and Storefronts

$7,444.79
$13.95
$9.75

$6.85

Store front Door 6'X7'' Entrance Door

Opng.

$775.00

$105.00

Imperial Marquee Awning with Flat Panels

ea

$1,200.00

$350.00

S.F

$6.95

$4.75

1'' Thick double glazed 1/4" Float, 1/4" Tempered

140

S.F

$14.50

$5.75

5/8" thick on walls or ceilings

250

S.F

$0.72

$0.60

Drywall, screwed

500

S.F

8700 Hardware
8800 Glazing
8800 Glazing

Division 9

$8,004.97

Finishes

9200 Plaster and Gypsum Board


9200 Plaster and Gypsum Board Demolition
9500 Ceilings
9500 Ceilings Demolition

Division 11
Division 12

$0.47

1622

S.F

1622

S.F

concrete stain 2 cots

1622

S.f

$1.50

$1.00

Primer and 2 coats of exterior latex

539

S.F

$0.42

$0.49

$0.77

Equipment

$10,637.00

Furnishings

12500 Furniture

Herman Miller table 30"

ea

$519.00

12500 Furniture

Herman Miller Stool

ea

$1,277.00

12500 Furniture

Plywood Lounge Chair

ea

$1,891.00

Division 13
Division 14
Division 15

$0.60

1/4" thick on walls or ceilings


Tile, wood fiber, 12x12 glued on suspension system

9600 Flooring stained concrete


9900 Paints and Coatings
Specialties
Division 10

$0.29

Special Construction
Conveying Systems

$11,922.86

Mechanical

15050 Basic Mechanical Materials and Methods


15100 Building Service Piping
15200 Process Piping
15300 Fire Protection Piping
15400 Plumbing Fixtures and Equipment

Whirlpool 40 Gallons 6-Year Regular Electric Water Heater

ea

$277.00

$150.00

15400 Plumbing Fixtures and Equipment

Sterling Southhaven 20-Gauge Double-Basin

ea

$200.00

$100.00

15400 Plumbing Fixtures and Equipment

Highline Classic Biscuit 1.28-GPF

ea

$250.00

$100.00

Plumbing Fixture Demolition

ea

includes Air condenser, Heating Coil, Supply Duct, and return air

1622

S.F

$3.00

$3.63

Electrical S.F Est includes panel, conduit, wiring, and outlets

1622

S.F

$3.50

$3.50

16500 Lighting (New Fixture)

LED Linear, Suspended Mounted, one light bar, 4' Long 37 watt

ea

$225.00

$58.50

16500 Lighting (New Fixture)

1300-HP HIGH PERFORMANCE PENDANT

ea

$50.00

$15.00

$11.50

15400 Plumbing Fixtures and Equipment Demolition

$46.00

15500 Heat-Generation Equipment


15600 Refrigeration Equipment
15700 Heating, Ventilating, and AC Equipment (HVAC)

Division 16

$15,341.00

Electrical

16050 Basic Electrical Materials and Methods


16100 Wiring Methods
16200 Electrical Power
16300 Transmission and Distribution
16400 Low-Voltage Distribution

16500 Lighting (New Fixture)


16500 Lighting Demolition

LED can recessed lighting

53

ea

Interior fluorescent fixtures, incl. supports 2x4 2 lamp

10

ea

16700 Communications
16800 Sound and Video

General Conditions
Mark up
Total Cost

$7.00
$26.00

$9.15
$0.00
$0.00
$0.00
$0.00
$13.95
$16.60
$880.00
$1,550.00
$0.00
$11.70
$20.25
$0.00
$1.32
$0.29
$1.07
$0.77
$2.50
$0.91
$0.00
$0.00
$0.00
$519.00
$1,277.00
$1,891.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$427.00
$300.00
$350.00
$46.00
$0.00
$0.00
$6.63
$0.00
$0.00
$0.00
$7.00
$0.00
$0.00
$283.50
$65.00
$18.50
$26.00
$0.00
$0.00
$0.00
$0.00
$
$
$
$

15% of total
15% of total

$301.95
$
$0.00
$0.00
$0.00
$0.00
$1,017.79
$
$1,162.00
$
$880.00
$
$1,550.00
$
$0.00
$0.00
$2,835.00
$
$0.00
$330.00
$
$145.00
$
$1,735.54
$
$1,248.94
$
$4,055.00
$
$490.49
$
$0.00
$0.00
$0.00
$519.00
$
$2,554.00
$
$7,564.00
$
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$427.00
$
$300.00
$
$350.00
$
$92.00
$
$0.00
$0.00
$10,753.86
$
$0.00
$0.00
$0.00
$11,354.00
$
$0.00
$0.00
$2,551.50
$
$195.00
$
$980.50
$
$260.00
$
$0.00
$0.00
$0.00
$1.00
$
71,982 $
10,797.34
10,797.34
93,576.93

0.19

0.42%

0.63

0.96

1.41%
1.61%
1.22%
2.15%

1.75

3.94%

0.20

0.46%
0.20%
2.41%
1.74%
5.63%
0.68%

0.72
0.54

0.09
1.07
0.77
2.50
0.30

0.32
1.57
4.66

0.72%
3.55%
10.51%

0.06

0.59%
0.42%
0.49%
0.13%

6.63

14.94%

7.00

15.77%

1.57

3.54%
0.27%
1.36%
0.36%

0.26
0.18
0.22

0.12
0.60
0.16

0.00

44

100%

Demolition

22

interior partition price analysis

We initially wanted to use glass dividers in-between the tenant spaces,


we then added wood trim to the glass. After discovering that the glass
dividers could not have shelves for the tenant to use, we decided to go
with a wood shelving system. These wooden dividers would have the see
through aspect of the glass while providing shelving for the tenants.

brasfield & gorrie | estimates

floor cost analysis

We started off using carpet and hard wood as the flooring. As the design
developed we decided that both carpet and hard wood was not aesthetically pleasing and would wear down too fast. Because of this, we
decided to go with a more economical approach, stained concrete.

24

26

brasfield & gorrie | design

design
When creating The Foundry, we wanted
the outside to grab everyones attention
in a simple, yet effective manor. We accomplished this by exhibiting a wood facade accented with both brick and aluminum.For the interior design, we decided
to imitate the facade and help carry the
simple and clean design throughout the
space. We created an open floor plan
that is made up of industrial and reclaimed materials.

/////////

28

Cody Skinner
The Foundry
102 S Lafayette, Starkville MS
P 662.893.2279
info@thefoundry.com
www.thefoundry.com

brasfield & gorrie | design

Branding
After trial and error, we finally chose a
logo that helped represent our company
in the best way. Clean and simple, our
logo can be recognized and remembered in almost any setting.

/////////

30

Potrebbero piacerti anche