F1FC 8 rn QASThtf
FERTlLlZER COMPLEX
RECAPfTUlATIF DES FOUOS f SHEETS SCHEDULE
DOUJM[NT N'
krebs
FERTILIZER COMPLEX
,,~
19SSPQ9-OO1
f ........ I/S ... :
,~.
3/13
IG
'~-----------------------------------------------------l
I.
GENERAL
Thi, general specification covers the general painting requiremeou for the
FERTILIZER COMPLEX TO BE BUILT FOR FIFC-JORDAN FER11LIZER
COMPANY (FJFC) at BTNQASJM (PAKISTAN).
room~,
sanitation, laboratories,
- The following surfaces are not required to be coated under this specifications:
stainless stoel,
plllStic or plastiC-';:Oilted materials,
machined surfaces,
lIIuminium surfaces.
- Mechanical equipment:
,,
layer.
The additionnal painting layers will be applied at site.
Codes and stlWdardll references:
SIS
SSPC
....."'.,. ,
OOCUMENTN'
krebs
REV.
198 SP-Q9-00 I
ForMat I Siu :
"
'-
IG
4113
"
SITE CONDITIONS
The equipment will be located indoor and outdoor.
The equipmenl located indoor will be considered with the same environment than
the equiplDCllllocatcd outdoor.
The sile CODditiOIlS ace described in the docwncnt I98-SP-Pl-OO[ 'Suie data and
site conditions'.
3,
SURfACE PREPARATION
3.1.
GENEIW.
The way which the steel !ilIrl'aces have been treated i! very important for the
PRE-CLEANTNG
Remove weld splashes and any loo~ nut particles and/or ro ll ing scale,
Remove oil, grease and din by means of solvents or emulsifier"
Remove emulsifiers (;ompl~cly.
,,
""'~'"
.. _ _ ... ~....... .. " ...., ,,,' ... _ ,.., .....""""".. _ _ ""', ...... /0_ ." ,_"
, ..... "., ,
DOCU MtlH N
krebs
,) ,,
FERTILIZER COMPLEX
R~V.
198-SP-Q9-001
.".",.1 I So.. "
,.g.
5/13
10
) .) .
CLEANING
) .) . I.
Shot bl astill8.
3.3. 1. L
Genera!
Rust, rolling scale and impurities are removed by means ora blasting agent.
surmce
),), 2 .
H and clran;nll
This type of preparation will be use only, when for special reasons, cleaning with
blutillg agents ClIlllIot be used.
3.3.2. 1.
General
Hand cleaning
Before this treatment, pre-cleaning according to 1 .2. must have been applied .
The degree of cleanllllSS reql.lired is SP2/SPJ according to specification SSPCSP or St2lSt3 accordiDg to specification SIS.
-_...
,...,,,,,,,,",- ",, -
. .,
,.,.,,,.,
DOCUM[NTN'
krebs
"'10""""",."U'''''''':O'
'N.
198-SP-Q9-001
6/13
IG
PAINT SUPPLY
4 . 1,
The paints shall be delivered by the painting llWlufacturer, ready for use.
4,2.
The idcmification of the paims shall be spocifiod by the name of the painting
manufactun:l", the designation of the paint, the reference number on the catalog.
4.3.
AU paintt specified heein shall be stocked ami used in IlCCQrdaoce with this
specification and the painting nwrufaeturer's printed irutructions which shall be
All prolective ooabog specified herein shall be ddivered 10 the jobsite or to the
location w the original unopened containers with painting
manufacturer's labels indicating type, oolour, quantity afthe main ingredients, date
of manufacture, date of expiry, pot life period (for two oomponents paints), and
designated
tagS
4.5.
intact.
All containers and/or package sh.all remain unopened until required for mixing
All thinners and/or retarder~ used in the specified coatings shall be used only in
quantities and types as stated in the painting manufacturer's labels or mixing
literature.
4.7.
guarantee,
.........,. ,
krebs
..... "... ... ,......,.
~
,
-
......'.... ,. _ ,.-""
~,
'",
REV.
198SP Q9-OO 1
' _ / Sin :
'-
71)
IG
The results of eacb layer 0JJSt be of such quality and compotition that they sbaJJ
not presmt any def~ &$ cracks or blisl:ers. They .dIaJ1 also llllve I st,nding
proper adbcsioo to blasted altface.
If the coats of paim have bcooroe fouled, !hey sIWl, prior to bcing covered with
further I_yen, be thoroughly clnooM and degreued
No co.tinp shall be applied cIurioa: conditions considered to be not conductive
10 .0Wld painting pr&eti<:e, or in rain, fog, IIDOW, IIIist or wbcD thctc is a atrang
possibility of same, or wbeo. the ItmpcJBturc of the .urfa.ce iuelf or that
surroundlDg the surface ill Jeu than SQC more than 50"C, or when the relative
humidity exceeds 80 % RH.
All coats of paint shall be applied uniformly and be provided proper cover, alllO
on sharp ed~es. There sha.I.l be good adIte&ion between the .ubstrate IlDd the fuu
coat .l\pplied. Equally, good Idbesion is required bctwccn succasive coatt.
Upon application of. following layer, the previous one .hall It leu! be bard
enough to resist pressing by thumb : it 1D.I5I not ripple to any appreciable extent.
Adequate previous protection shall be provided for such 'pou which will be
ilUlccessible afterwards.
J.mperfectiOflS, damage, etc... IIhaIl be repaired and given proptf treatllltOt prior
'-
. .... _.........._......."-,,""..
,-_.--'.. -'"'---
..... . _,
uv.
krebs
,,
19S-SP-Q9-001
Sfl3
IG
'r---------------------------~
- Areas where field welds have been deposited shall be oompletely free from seale
and ollide prior 10 application of the protective system.
- The field-we1diog spots shall be touched up and treated in the same sequence as
is mentioned in the protoctive system specified.
- Dry film thickDesses sbalI nol be 'hinner than the minimum specified. The paint
.pplicalor shall be !"eSpOllSlble for the application of 5Ufficient wei film
thickness, in acwrdance with the painting ITWInufitcturcr'S instructiOIU 10 oblain
the specified dry film thickness after drying or curing. Painlers shall eheck
application rate with a ~ film thickne58 gauge as the work. proceeds.
- Surfaces completed and not meeting the standards S~ forth in this specific.tion
shall be reworked with the II8IDt number of coat~ and types of paint previously
applied 10 comply with requirements herein at the expense of the paint
applicator 10 perform the original functions.
Generally speaking, one shall not proceed to Ihe application of the subsequenl
coal5 as long as the neceSMry touch up of the preceding coat has not been
carriod out.
- Bolts and nuUi for stroctural steel (and similar applications not to be disDl6D.tlod)
~hall be coated with the relevant priming coat immediMely after mountinK.
- Boll5 and nuts for piping connections (and other similar applications wllich are
10 be eventually dismantled) shall not be painted.
... . ,
",.,
krebs
. ... ........., --
. '._'_.,.'.......
fERTILIZER COMPLEX
RfY,
DOcUMUTN'
I98-SP-Q9-001
f<w"'"~ ;
6,
'-
9/13
IG
PAINT SYSU MS
~teel
Carbon
SJ!UfI! A
AI.
Al,
Al ,
primer
Syuw B
BI.
R2 ,
Suscm C
CI.
8111$1
cl~
C2,
:iiulail Q
--
,.,.q
01
D2
I l.yer of ethyl silicate with higb cootcnt of zinc minimum dry tbicknm
1S I'm
Snl eJ11 E
.,
........ ,..,
--
E3
E4
I complementary layer of heat ruisl.iog paint based on silicone binder minimum dry Ihicknes, 25 I'm.
__
_.. .. _. ,.-........ _ ,. ..
-,,,
DO( U~ ! "TN'
krebs
,,
,
",,<WM"'
~EV.
.. '.
1[4]
19S SP-Q9-OO I
........ ISi, ~ :
System F
Oratings and steps will be hot dip galv8njud, except for DAP unit, where above
mentioned items are coated with epoxy coa.l tar (temperature: up to 1500(:).
L
At place of manufacture
Fl. All surfaces to be made free from scale and rust by pickling method.
",.
b.
preparation S13 .
F2b Touch up with bitumineous solution - minimum dry thickness 100 j,lm (brush
application).
7.
1,1.
7.2.
MECHANICAL EQUIPMENT
&low 120C
....m'.'
DOCUMlNf It'
krebs
.....
,..... . ,'....""" ",oa """"K,N' " ... 'ON"'"'
FERTILIZER COMPLEX
~fV.
198-SP-Q9-00 I
form.t I 5,,,, "
.....
,_
11113
IQ]
;+---------------------------------------------~
7,3,
PlPfNG
Piping to be identified by a basic colour and eventual identification rings as
foUows:
7.3.1.
Bulc cologn
For ino"laled or 000 painted pipes, oolored adhesive strip or slab shall be used so
as 10 show the basic colour and eventual identification ring. The correspoDdiDg
length sbaIl be approximlltivdy r:quivaleot to 2 x pipe diameter, with. minimum of
200 mm and a maximum 0(800 mrn.
Ai<
SIeaIIII condcnsa!cs
W....,
liquid fuch, oiliI
Natural gu ~1
- ....
7,),2.
703~
Ideptjljcation rings
Steam I COI1densatcs
bdow 15 kgIcm' II
above IS kglan' &
_.""""'-
""""""'"
""""
.....",.,. '
DOCUMUIT N'
krebs
,,
REV.
19S-SP-Q9-001
fofm I 5,,,, -,
"
IUl3
,~.
IG
tlamable liquids:
flash po<nt ~ .'i."l"C and tempernWTe
bclow the flash poioI
tubrA:ams
"""'" '"
PinkRAL 301$
Ycllow gro:n RAL 6018
"""
a mm-'''II
"_
"""""'"
CO2
oi<rog~
Aeids f e:lUstK:5
Fill'
Willer
-"'"""
Other liquids
to be dciined
rings are 10 be applied in an area painted with the basic colour (or with stickers).
Valves/accessories including control valves/safety valves
Ix:low 120"C
0.- cquivakm
7.4.
7,5,
"""" . ,
__... ..._
,... .....-
....m...'
OOC:U M ~ N T N'
krebs
. U<K ......" '..... UO
,,
..
198-SP-Q9-00 1
fOrm'" Sino :
7.6,
~ lV .
''''
13/ 13
IG
TAIjKS
Below 120 C
8. 1.
The check.iog of the good quality of the supplies and of the oonformity of the
wom may take place at any moment.
At any moment of the works, samples may be taken out of the ves.se1s, on the
worksite and at painting applicator's work for anaiy!is by II competent laboratory.
The che<:king operations sbal l include the verification of the conformity of the
specified painting systcIWI.
In the event of products or works not complying with the specifications, they shall
be rejected and replaced by the specified products or work$.
8.2.
ACCEPIANCE OF WORK
Acceptance of painting work including finish colour if required will take place at
the final inspection of equipment.
)
The works not cauicd out IlI:Wrding to the professional rules or with products not
io conformity with the requirements, sball be redone at the paint applicator's
expense. The charges regarding the tests M d checking of the samples found UDtrue
10 the specifications as also the further testing charges shall be at the paint
applicator's expense.
At
apparatus.
Adhesion tests may be performed after drying or curing of the last coal by means