ANPQP V2.

3
Communication Kit

Available in June 2013

DQDOMQ C.Sarlange

Index
New Revision Summary
New Revision Contents
1. Commonised Renault/Nissan Requirements
2. Reinforced Requirements for Supplier Management
3. Simplify Requirements (Renault)
4. Clarified Activities for Product Development
5. Standardization of Requirements (Nissan)
6. Other Changes
Deployment
DQDOMQ C.Sarlange

PROPRIETE RENAULT

New Revision Summary


Main Request
Collect together all requirements developed since V2.2 publication and
incorporate into the new revision
Improve usability by changing format etc.
Alliance
Study and improve Sub-Supplier Management.
Reinforce Change Management for Process/ Facility Site Change Management.
Include the ISO 26262 requirement for Special Characteristics Management.
Renault
Reduce the number of ANPQP requirements and focus on product and process
conformity by eliminating duplicate items
Ensure consistency with Renaults V3P milestones and Lean ANPQP
Nissan
Incorporate a procedure for 4. Product Development to clarify the required
documentation
Incorporate reinforced requirements for Environmental Requirements.
DQDOMQ C.Sarlange

PROPRIETE RENAULT

New Revision Summary


1. Commonised Renault/Nissan Requirements
Commonised Supplier Contact Directory and Design Potential FMEA
2. Reinforced Requirements for Supplier Management
Reinforced Sub-Supplier Management such as CSCC format to clarify
sub-suppliers development experience during the early phase.
Reinforced Supplier Inspection Report including Renaults Part Status
Report
Reinforced Change Management such as Process/ Facility Site Change
Management to find 4M changes earlier.
3. Simplified Requirements (Renault)
Reduce the number of ANPQP requirements and focus on product and process
conformity by eliminating duplicate items.
Ensure consistency with Renaults V3P milestones and Lean ANPQP.

.
DQDOMQ C.Sarlange

PROPRIETE RENAULT

New Revision Summary

4. Clarification of Activities for Product Development (Alliance / Nissan)


Product Development Element re-structured to clarify Special Characteristics
activity.
Clarification of which tools are required during a Full Process Design Review as
Nissan Unique requirement.

5. Standardization of Requirements (Nissan)


Standardized Nissan unique requirements for Environmental requirement
and Project Development Record.

6. Other Changes

DQDOMQ C.Sarlange

PROPRIETE RENAULT

Index

New Revision Summary


New Revision Contents
1. Commonised Renault/Nissan Requirements
2. Reinforced Requirements for Supplier Management
3. Simplify Requirements (Renault)
4. Clarified Activities for Product Development
5. Standardization of Requirements (Nissan)
6. Other Changes

DQDOMQ C.Sarlange

PROPRIETE RENAULT

New Revision Contents


1. Commonized Renault/Nissan Requirements

1) Supplier Contact Directory (Activity 3.1)


To define a new common submission timing.
2) Design Potential FMEA (Activity 4.1)
To commonize DFMEA / Product AMDEC as general requirement.

DQDOMQ C.Sarlange

PROPRIETE RENAULT

New Revision Contents


2. Reinforced Requirements for Supplier Management
2.1 Sub-supplier Management (Activity 2.1)
Several items have been added to clarify the development experience of subsuppliers.
.
Add the development responsibility and experience of sub-suppliers, in
order to confirm sub-supplier maturity and actions to study quality
during development
Add the items

DQDOMQ C.Sarlange

Tier 5N

Country

State, City

PROPRIETE RENAULT

Vehicle manufacturer
and vehicle model

Tier 4

Development
experience of the
Tier N supplier
(Where the supplier
has development
responsibility)

Development experience

Tier 3

Product
Feature

Development responsibility
of the Tier N supplier

Tier 2

New for the supplier

Plant Name
Tier 1

Supplier
Name

Plant/Proce Method /
ss/Line
technology
Renault/Nissan specified

Location

Business
Experience

Manufacturing Plant

New for the Tier N supplier

Product Structure

Manufacturing Feature

New commodity for Tier1

Supplier Feature

New for the supplier

Format CSCC

New Revision Contents


2. Reinforced Requirements for Supplier Management
2.1 Sub-supplier Management (Activity 2.1)
The submission level of a Low level supplier has changed from 3 to 2 to
secure sub-supplier management.

Raise submission level

DQDOMQ C.Sarlange

PROPRIETE RENAULT

Add activity timing

New Revision Contents


2. Reinforced Requirements for Supplier Management
6.1 Design Verification and Product / Process Validation
he
The Renault
Part Status Report has been incorporated into the Alliance
Inspection Report to clarify the origin of the delivered parts.
Format Inspection Report

Format Part Status Report

Format Inspection Report

DQDOMQ C.Sarlange

PROPRIETE RENAULT

New Revision Contents


2. Reinforced Requirements for Supplier Management
9.2 Process/ Facility Site Change Management
For reinforcement of 4M change management, the submission timing of a
request has changed before a planned implementation from 20 working
days to 3 months (13weeks).

Submission
For Process Changes, the
Process / Facility Site Change
Request document shall be
submitted at least 20 working
days before the planned
implementation.

DQDOMQ C.Sarlange

Submission
For Process Changes, the
Process / Facility Site Change
Request document shall be
submitted at least 3 months
before initiation of any physical
change or move.

PROPRIETE RENAULT

New Revision Contents


3. Simplify Requirements (Renault)
3. Simplifies Requirements (Renault)
Removal of duplicate items:
Elimination of repeated activities eg: Traceability and Labeling (11.2) is
also considered in logistic conditions (10.2) and standard 0010415
Elimination of ANPQP outputs List of Project Risks and relate action plan
/ Quality Plan (3.3): Already included in the output Supplier internal
Design Review Record (4.3)

DQDOMQ C.Sarlange

PROPRIETE RENAULT

New Revision Contents


4. Clarification of Activities for Product Development
4. Product Development
The required activities and tools have been clarified to secure the
implementation of Product Development. (Nissan unique)
Clarify activities and tools(Nissan)

DQDOMQ C.Sarlange

PROPRIETE RENAULT

New Revision Contents


4. Clarification of Activities for Product Development
4. Product Development
To secure implementation of Full Process DR / Quick DR, the activity timings
and submission levels have been clarified. (Nissan unique)

Clarify activity timing

Change submission level

DQDOMQ C.Sarlange

PROPRIETE RENAULT

New Revision Contents


5. Standardization of Requirements (Nissan)
11.3 Environmental requirements
Standardized Substance Data Input Standard by IMDS as NES M0302.
Reinforced requirement of Material Investigation report, it is required to be
attached to the Inspection Report.

DQDOMQ C.Sarlange

PROPRIETE RENAULT

New Revision Contents


6. Other Changes
1) Added a new self-calculating format to the updated Inspection Report.

Format Inspection Report

Add self-calculation

DQDOMQ C.Sarlange

PROPRIETE RENAULT

New Revision Contents


6. Other Changes
2) Updated the Other Supply Requirement in the Alliance Supplier
Guide (ASG)

NISSAN updated requirement

DQDOMQ C.Sarlange

PROPRIETE RENAULT

Index
New Revision Summary
New Revision Contents
1. Commonised Renault/Nissan Requirements
2. Reinforced Requirements for Supplier Management
3. Simplify Requirements (Renault)
4. Clarified Activities for Product Development
5. Standardization of Requirements (Nissan)
6. Other Changes
Deployment
DQDOMQ C.Sarlange

PROPRIETE RENAULT

Deployment

 Publication in Supplier Portal + information




June, 1st, 2013

 Trainings
 1st ANPQP v2.3 training session : September 2013

 ANPQP V2.3 Deployment


 All projects with a RFQ sent after publication .
 All changes with a RFQ sent after publication.


ANPQPV2.3 deployment in Corporate ANPQP IS


 As soon as the 1st Supplier nomination in ANPQP 2.3 deployment

DQDOMQ C.Sarlange

PROPRIETE RENAULT

End