Sei sulla pagina 1di 23

Agenda

1. Resource Management in China Mobile


2. Converging E2E Resource View
3. Practice of TMF Frameworx

4. Q&A

Challenges
Service Fulfillment
Lack of solution to support service provisioning under the converged
network environment
Lack of the E2E view for available/used resource information in service
provisioning

Resource Data Maintenance


Lack of information management for cross domain and multitechnologies resources
Lack of an efficient method to confirm the accuracy of the resource data

Information Sharing
Lack of a unified entry to guarantee the consistency of the resource
information
Lack of a unified resource database to sharing the information to other
systems

Target
Network should be Visible, Controllable, Analyzable, Traceable
--- Dr. Liu Aili, VP of China Mobile
Converged Network Management
Building unified resource model of fulltechnology network
Building a converged resource database
Building E2E resource view
Enhancing resource configuration capability

Flexible Data Sharing


Data collecting, comprising and discovering
Providing resource view to other system
Information sharing interface/bus

Efficient and Flexible Service Fulfillment


Rebuilding and standardizing SF process flow
Building the correlation between customer,
service and network resources
Pre-sale supporting
Resource dispatching, activating

Lifecycle Management
Rebuilding and standardizing resource
lifecycle process flow
Full-technology resource dispatching and
data maintaining flow

Main Capability
Integrated Resource Management System

Implemented

Resource Application
Customer View
Network View Business View
Topology View

SLA
Fulfillment

Cfg

Ongoing

Deferred

Data Shared Service

GIS App
Spatial View
e-Map

Resource Planning
Solution Plan Planning Cfg

Service Fulfillment
Shard Entity

Alarm

Business Model Mgt


Solution Design
Capacity Query

Resource Provision
Request
Assign
Provision

Archive

Resource Alarm Analysis


Fulfillment
Fault
Rule Cfg

Inventory

Resource Bulk Change


Lock
Cfg
Query

Service Query
Shared Info

Business Query

Resource Inventory Management


Business Entity Mgt
Catalog
Provision
Template

Instance

Asset Mgt
Equipment
Link
GIS

Code

Region Mgt
Location
Site
Coverage

Asset Mgt
Asset Card
Asset Sync

Data Loader
NMS
Entering

Topology Mgt
Network
Customer

Statistics Analysis
Reporting
Query

Sync

Room

Networking Mgt
Transmission
Data
Access

Lifecycle Mgt
Lifecycle
Fault Tracking

Wireless

Region

Specialty

Customized

Asset Info

Criteria

System Management
Model Mgt
Modeling
Publish
Rule

Import/Export

Naming Mgt
Rule
Service

Log

System Mgt
RBAC

Configuration Batch Change

User

Data Quality Mgt


Fault-tolerant Verification

Import/Export
Import
Export

Dictionary

Managed Resource Scope


GSM, TD-SCDMA, PON, Core, IP, Transmission, TD-LTE (on-going),
Device, Rack, Shelf, Slot, Card, Port, IP Address, VPN,

Main Capability
Workspace

Portal View, Task-driven

Resource CV management

Organizing data display as a staff CV


Information Attribute Configurable

End-to-End Resource View

Full-technology E2E resource view, Shared topology

Data Collecting

Automation of data collecting


Visualized configuration UI

Main Capabilities (Service Fulfillment Supporting)


GIS Presale-Supporting

E2E Resource View

Data Configuring

Process Flow Monitor

Case Study (One Branch of China Mobile)


It stored 140M resource entries, and more than 30K orders of enterprise
customer service
The IRMS supported to share more than 100 types of resource information
between 17 systems
Network cut over
efficiency improving
circuit number per
min 33entries/min

Service provisioning
efficiency improving
60

48.3h

40

48.3h

20
0

After

Service Provisioning

Enterprise customer : 1923 orders


/ month
Home customer : 7308 orders /
month

98.41%

66%

50%
20

25%

1.1entry/min
Before

100%
75%

40

25.5h

Data accuracy increase

Before

0%

After

Cut cover

Mar.

Data Collection

Service Area : 18 cities

Network domains : 5

Order Number : 24k

Equipment vendors : 9

MTTR : shorter to 1/28

LSTP cut over efficiency : increase


30 times

Sept.

Agenda

1. Resource Management in China Mobile


2. Converging E2E Resource View
3. Practice of TMF Frameworx

4. Q&A

Why E2E Resource View ?

Real network is
invisible

?
Relationship between
customer, product, and
resource?

Lack of tools on
Visible data consistency
checking

Impact-analysis on crossdomain network?

Case 1: Resource Relation Management


Site

Circuit

Device

Port

Transmission Circuit

Outside Plant
Optical Circuit

Case 2: Network Resource Association


Wireless

BSC
BSC Circuit

Outside Plant

Transmission Circuit

Case 3: Enterprise Leased Line


Customer

Outside Plant

Product

Resource

Case 4:

Pre-sale

Support

Customer location input

Access type selection

Detail Info
1.
2.
3.
4.

Customer location input


Choose SDH/PON/PDH/Fiber/
List all available device/fiber
List all available port/bandwidth

Case 5:
1

Problem location & Impact Analysis

Problem logic optical circuit location

Impact Analysis

OTDR distance information input

Nearest manhole located

Fundamental of E2E Resource View


Unified model

Combining inside and outside plant resources


Outside plant

Interface

Inside Plant

Manhole
Pole

Physical Data

Logic Data

Equipment
container/slot/
card/port

Service Model

Service Information

FrameLineup

Inside
Resource

Spatial

Outside plant

Name

Standard
Address

Optical Segment

Customer site
Jumping
Association

Circuit

Customer

Pipe segment
Pole segment

Equipment
Shelves

Equipment
Terminal

Customer

Association

Association
ODFDDF

Logic Fiber Circuit

Optical circuit

Customer
Equipment

Agenda

1. Resource Management in China Mobile


2. Converging E2E Resource View
3. Practice of TMF Frameworx

4. Q&A

Utilization of Business Process Framework


China Mobile constructed Integrated Resource
Management System referring the Business Process
Framework.

Integrated Resource Management System

Implemented

Resource Application
Customer View
Network View Business View
Topology View

SLA
Fulfillment
Alarm

Cfg

Business Model Mgt


Solution Design
Capacity Query

Request
Provision

Assign
Archive

Resource
Application
Resource Provision
Resource Alarm Analysis

Asset Mgt
Equipment
Link
Code
GIS

Region Mgt
Location
Site
Room
Coverage

Fulfillment
Inventory

Fault
Rule Cfg

Lifecycle Mgt
Lifecycle
Fault Tracking

Resource Inventory
Networking
Mgt
Topology Mgt
Management
Transmission
Data
Network
Customer
Access

Wireless

Region

Deferred

Data Shared Service

GIS App
Spatial View
e-Map

Resource Planning
Solution Plan Planning Cfg

Resource Bulk Change


Lock
Cfg
Business Query
Query

Resource Inventory Management


Business Entity Mgt
Catalog
Provision
Instance
Template

Ongoing

Specialty

Asset Mgt
Asset Card
Asset Sync

Statistics Analysis
Reporting
Query
Criteria
Customized

Service Fulfillment
Shard Entity

Service Query
Shared Info

Data
Share

Data Loader
NMS
Entering
Asset Info
Sync

System Management
Model Mgt
Modeling
Publish
Import/Export
Rule

Naming Mgt
Rule
Service
Configuration Batch Change

System Mgt
Log
RBAC
Dictionary
User

System Management

Data Quality Mgt


Fault-tolerant Verification

Import/Export
Import
Export

Utilization of Information Framework


SID Information Model -> CMCC Network Resource Infrastructure Model

1
Unification
Stability

Scalability

CMCC Network Resource Infrastructure Model -> Core Model of Specialty

Core Model of Specialty -> Extended Model of Specialty

Infrastructure Model

Wireless Resource Model

CompoundResource

ResourceElement

ResourceCollection

Pipe

0..n

Network

0..1

0..1

0..n

0..1

0..n

SubNetwork

0..n

LogicalDevice

0..n

Location

NetworkNode
0..1
0..1
0..1
0..1

BSC

0..1

0..n

0..n

DeviceInterface

BSC

BTS

1..n 1

0..n

PhysicalDevice

GSM

GSM

0..1

LayerNetwork

0..n Hardware 0..n

Utilization of Information Framework


Shared Information Model

CMCC Infrastructure of Network Resource Model


ResourceFacingService

CompoundResource

LogicalResource

PhysicalResources

Location

TD Networks Model

GSM Networks Model


GSM
0..1

TD

0..1
0..1

0..n

0..n

0..n

0..1

0..n

0..1

0..1

TD

GSM

0..n

0..n

0..1

0..1

0..n

0..n

2..n

2..n

0..n

0..n

0..n

0..n

0..1

0..n

0..n

RNC

0..1

0..1 0..1

0..n

0..1

0..n

0..1

0..n
PCU

BSC
0..1

BTS
0..1

0..n

0..1

0..1 0..n 0..1

0..n

0..n

0..n

0..n

0..n

0..1

0..n
0..1

0..n

0..1

0..1

0..n

0..1

0..1

0..n

0..1

0..n 0..n

0..n

0..n

0..n

NodeB
0..1

0..1

0..n

0..1

BTS

BSC

0..1

NodeB

RNC

0..n
NodeB

0..n

0..n

0..n

0..1

0..1

0..n
0..1
0..n

0..1

0..n

0..n

0..n

0..n

RRU

1..n

BBU

0..1

1..n
0..1 0..1

0..1

0..n

1..n

The core models have 14 specialty technology packages, More than 200
classes,4000 attributes,600 relationships

0..n

In the future

Participation and contribution of TMF standards


Proposal on converged network inventory management requirements
Standardization of interface between inventory system and other systems
For example, the topology information sharing

Enhance the resource data auto-collected capabilities of


equipments north interface
E.g. Rack, shelf, slot, card , port, etc

Agenda

1System Overview
2E2E Resource View
3TM Forum Frameworx

4Q&A

Thanks

Q&A

Potrebbero piacerti anche