Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
1. Statement of Objectives
(a) Goals and objectives of your proposed project with measurable outcomes
The main objective of the project is to design, develop and validate the concept
of applying opportunistic networks and respective cognitive inventory systems for
efficient application/ service/ content provisioning in the future. In order to achieve this
main objective, the project will conduct work addressing the various technical challenges,
which closely relate to the detailed objectives of the project.
(b) Scope. Itemized list of deliverables of the system with respect to the functionality of
the system user and management reports. Further, include the limitations.
Viewing Reports The system has the ability to view all the inventory
reports
of the other departments. These reports include the issues that are encountered by the
departments in their operations.
Reports The ability to generate reports from all the departments.
Security levels This system provides high level security for data leaking as only
admin and employee people can access the database no changes can be made in it until it
verifies the user login id and password.
Integration to all departments under Enterprise Operation System- The
integrated inventory system has the access to all the departments, but it can only view and
print the reports of the said departments.
Limitations of the system
Cant manage any inventory of all departments except for viewing and printing of reports
only.
(c) Reasons for choosing the proposed project?
We are not the one who chooses our system. The module chooses by draw lots.
(d) Your strategy for getting started:
For us, our strategies for getting started are,
Then the proponent start to studying the Java Eclipse in the coding, Java
Netbeans in designing and the MySQL as a database of the system.
Hardware Requirements
Servers
Name
Description
Service enabled
Java software installation
Name
Description
Printers
Description
Supports Router / Access Point / Range
Extender Multi-modes.
Concurrent
Connectivity
Frequency.
Dual
band
Wireless
for 2/4GHz and 5GHz
Name
Description
CPU
Display Resolution
Memory
Approximate 1GB
Hard Disk
Name
Description
Software Requirements
Network Operating System
Name
Windows XP Professional
Description
It is designed to use the expanded 64-bit
memory address space provided by the
x86-64 architecture.
Ubuntu
Windows 7 Ultimate
Antivirus
Name
Avast Free
Description
This can ensure the protection of your
computers from viruses and spyware thanks
to its powerful and advanced detection
engines.
Browsers
Name
Opera Mini
Description
It is a web browser designed primarily for
mobile phones, Smartphones and personal
Mozilla Firefox
digital assistants.
It uses the Gecko layout engine to render
Google Chrome
web.
It is now one of the more widely used
Workstations
Name
Description
Microsoft Excel
Microsoft Word
released by Microsoft.
It is a popular word processing software, is
essential for producing documents both at
home and work.
Application
Name
LibreOffice
Description
It is the full-featured suite of office apps
that costs nothing and runs on everything.
Description
Multi connections Database
Network Specification
Local Area Network
Name
Star Network
Description
It is one of the most common computer
network topologies consists of one central
switch, hub or computer, which acts as a
conduit to transmit messages.
(b) How do you intend to obtain access for these facilities? Indicate the location,
frequency of access to use these facilities and its approximate durations on monthly /
weekly / daily basis.
It can be access with the use of the internet. The web address is
www.eos.com/inventorydeployment. There are different kinds of users in this system, it
depends to the level of privileges on which part of it they can access and if available
modify.
(c) How do you intend to demonstrate your project work? Indicate access to software,
hardware, data required for the demonstration.
We demonstrate our project work by using laptop or desktop and with the
software Java, and MySQL Connection.
(d) Will the final system be tested / evaluated by real users:
Yes, it is tested by the users.
(e) State the way of generating test data/ test cases:
If our system works properly, it means the system is success and generate
properly according to our plan.
(f) State the way of determining the acceptability / success of final system:
If the system reaches the company qualification and if the company is satisfied
with the system functions.
(g) The procedure to evaluate the performance of the system:
We let our panels and clients to test the system by then the researchers can know
the parts that are weak and needs to take some changes. The same works for the good
parts.
3. The Work Plan
Use a project management tool such as Microsoft Project. Include each schedule
in separate sheet. A schedule should fit into a single A4 page.
(a) The project schedule (using a Gant chart):
(b) The production schedule for the project study (using a Gant Chart)
4. Additional Information (only for clarifications)
Letada, Christine O.
Martinez, Jernely Anne A.
Palomata, Marilou S.
Roque, Chloe Janine B.
Santos, Debbie Colynn B.
Santos, Rosemarie M.
Group/Individual Signature
Date: / /
Adviser 2 (optional-Pilot
Client)
Name
Designation
Work Place
Address
Philippines
Academic/
MSIT
Professional
Qualifications/
Membership
Email
rommelconstantino@yahoo.com
Address
Cielito Homes Caloocan City
Telephone
I hereby confirm that I have undertaken to supervise
the project mentioned above and I do certify that I am not a
member of the Project Examination Board (PEC) of BCP.
Advisers
Signature
..
Date:
.
Date:
Work carried out/achievements since the last meeting with the adviser/PEC/panel
member:
We are already finishing doing the Chapter 1 and Chapter 2 its fully done and
sooner the chapter 3.2 onwards.
Work in arrears:
We are currently doing the Chapter 3.2 and goin-0p9g in Chapter 4 and Chapter 5.
Eventually we are in half doing our documentation in 3.2 and were focusing in
our system Interface and also our documentation.
Problems encountered:
We are encountered the difficult problems in our system and of course were
waiting the different top issues of every department.
We are encountered the difficult problems in our system and of course were
waiting the different top issues of every department.
Next meeting:
Letada, Christine O.
Martinez, Jernely Anne A.
Palomata, Marilou S.
Roque, Chloe Janine B.
Santos, Debbie Colynn B.
Santos, Rosemarie M.
.
Signature of group/individual
.
Signature of Adviser
Time:
Work carried out/achievements since the last meeting with the adviser/PEC/panel
member:
We are done doing already the Chapter 1 and Chapter 2 and we are currently
revising the Chapter 3 onwards.
Work in arrears:
We are currently doing the chapter 3.2 and onwards to Chapter 4 and Chapter 5
Chapter 6. Also we are in half documentation in 3.2 and were focusing now in an
diagrams of our documentation
Problems encountered:
Were planning to design our final interface especially the whole Architectural
Diagram, Activity diagram and so on.
Next meeting: Date: August 12, 2014 to August 15, 2014 From: 5.45P.M To: 6:00P.M
Letada, Christine O.
Martinez, Jernely Anne A.
Palomata, Marilou S.
Roque, Chloe Janine B.
Santos, Debbie Colynn B.
Santos, Rosemarie M.
.
Signature of group/individual
.
Signature of Adviser
To. 5:55P.M
Work carried out/achievements since the last meeting with the adviser/PEC/panel
members:
Work in arrears:
We are currently doing the Chapter 4 and onwards to Chapter 5 soon. Also we are
double Check our documentation in Chapter 3.2 and focusing now in interfaces.
Problems Encountered:
Were carried out/ the major decision taken in our whole system like in Interaction
Diagram and Sequential Diagram, Architectural Diagram.
Next meeting: Date: August 22, 2014 to August 26, 2014 From: 5:45P.M To: 6:00P.M
Letada, Christine O.
.
Signature of group/individual
.
Signature of Adviser