Student Number
:
Module Code
:
Assignment Number :
MABENGO N.D.
48591238
FMA3602
01
QUESTION 1
The blade speed is: u
D
15
375 29.45m / s
2
30 2
V1 K N 2 gH
0.90 2 9.81 220
59.13m / s
Therefore: n
u 29.45
0.49805
V1 59.13
Pth
Pturb
3.950MW
4.22MW
0.9346
Pth gHQ
4.22 106 9810 220 Q
4.22 106
1.958m 3 / s
9810 220
Aj
Q
2V1
1.958
2 59.13
0.016556739m 2
MABENGO N.D.
48591238
FMA3602
01
dj
4A
4 0.016556739
0.1451m
QUESTION 2
Given:
H 650m
l 10km 10000m
f 0.004
d p 1m
83% 0.83
165o
d j 160mm 0.16m( we assume,because160m is too big and not realistic)
a) The power of the turbine will be obtained by:
3
d 2j
2 gH
P 1 cos
4
16
d
1 f l j
d p d p4
2
0.16
2 9.81 650
0.83 1 cos165o
4
16
10000 0.16
1 0.004 1 1
11.362MW
MABENGO N.D.
48591238
FMA3602
01
d j 0.16m
V1 CV 2 gH 0.98 2 9.81 650 110.67m / s
N 360rpm
u 0.47 110.67 52.0149m / s
u
DN
60
60u
N
60 52.0149
360
2.759m
QUESTION 3
Given:
l 1800m
H E 400m
H f 10% of H E 40m
Pturb 5000kW 5MW
N 500rpm
CV 0.98
f 0.005
a) The Diameter of the Pipe will be found by:
2
P
32 fl Q
5000
d
0.00127m 3 / s
where Q turb
gH f
gH E 9810 400
5
MABENGO N.D.
48591238
FMA3602
01
Thus,
d5
9.81 40
d 0.0412m 41.2mm
b) Area of Jets:
V1 CV 2 gh
0.98 2 9.81 400
86.817m / s
A
Q
2V1
0.00127
2 86.817
7.314 10 6 m 2
c) Pitch circle diameter of the bucket
Vb 0.46 V1
0.46 86.817
39.935m / s
Vb u
DN
60
39.935
60 39.935
500
1.525m
MABENGO N.D.
48591238
FMA3602
01
QUESTION 4
Given:
d j 71mm 0.071m
Pturb 198kW
Q 0.188m 3 / s
Pressure 1.18MPa
a) Power available (also known as Power at the base of the nozzle):
P Pressure Q
1.18 106 0.188
221.84kW
The area of the jet being: A
0.0712
4
0.00396m 2
0.188
47.47m / s
0.00396
Pk
1 QV1
2 1000
103 0.188 47.47
2000
211.82kW
Knowing that: Available Power = Jet Power + Power lost in the nozzle
We will thus have:
MABENGO N.D.
48591238
FMA3602
01
turb
Pshaft
Pavailable
198
211.84
0.892
89.2%
QUESTION 5
Given:
d j 75mm 0.075m
D 0.9m
N 320rpm
160o
n 0.46
C v 0.98
u
DN
V1
60
0.9 320
60
15.079m / s
15.079
32.78m / s
0.46
Q AV1
0.0752
4
32.78 0.144m 3 / s
P QV1 u 1 n cos160o u
MABENGO N.D.
48591238
FMA3602
01
0.90761
90.7%
Overall efficiency of the turbine
o wheel m
0.90761 0.96
0.87
87%
QUESTION 7
Given:
H 12m
Q 0.3m3 / s
N 300rpm
u f 0.162 2 gh 2.485m / s
D2 N
uf
60
D2
D2
60u f
N
60 2.485
0.1582m
300
D1 2 D2 D2 2 0.1582 0.3164m
u1
0.3164 300
60
4.97m / s
MABENGO N.D.
48591238
FMA3602
01
u w1
0 gh
tan
u1
uf
u w1
0.8 9.81 12
18.948
4.97
2.485
0.1311
18.948
7.47 o
Q D1 B u f
0.3 0.3164 B 2.485
B
0 .3
0.3164 2.485
0.121m
121mm
QUESTION 8
Given:
h g H
u1
MABENGO N.D.
48591238
FMA3602
01
u1
DN
60
60u1
D
N
60 12.684
150
1.6m
b) The angle of guide vanes:
tan
uf
u w1
3.93
0.46
8.41
tan 1 0.46
25.0460
c) Breath of rotor blade:
P
gH o
160 103
103 9.81 12.5 0.79
1.651m 3 / s
Q D1 B u f 0.92
1.651 1.6 B 3.93 0.92
1.651
18.173
0.090m
90mm
MABENGO N.D.
48591238
FMA3602
01
QUESTION 12
H 30m
30 o
28o
D 2m
N 145rpm
V1 2 gH 2 9.81 30 24.261m / s
Vb
DN
60
2 145
60
15.183m / s
V1 sin
24.261sin 30o
2.021
V1 cos Vb 24.461cos 30o 15.183
1 tan 1 2.021
63.67o
To find the hydraulic efficiency of the turbine we will proceed as follows:
13.534m / s
sin 1
sin 63.67 o
As there is no loss,Vr1 Vr 2 13.534m / s
Vw1 V1 cos 30o 24.261 cos 30o 21.01m / s
Vw 2 Vb Vr 2 cos 28o 15.183 13.534 cos 28o 3.233m / s
E
Vb Vw1 Vw 2
15.18321.01 3.233
27.513m
9.81
27.513
0.917 91.7%
30
MABENGO N.D.
48591238
FMA3602
01
QUESTION 15
P1 3800kW
P2 2500kW
N 1 250rpm
H 2 7m
H 1 11m
3
D1
D2
P1 H 2
P2 H 1
D1
D2
3800 7 4
0.87
2500 11
N 2 N1
D1 H 2
D2 H 1
N 2 250 0.87
7
11
173.5rpm
MABENGO N.D.
48591238
FMA3602
01
QUESTION 16
P1 200kW
P2 900kW
N 1 275rpm
H 2 18.5m
H 1 7m
3
D1
D2
P1 H 2
P2 H 1
D1
D2
200 18.5 4
0.97
900 7
N 2 N1
D1 H 2
D2 H 1
N 2 275 0.97
18.5
7
433.6rpm
434rpm
NS
N 2 P2
H 2 4
5
434 900
18.5 4
5
339rpm