Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
High PerformanceRun-around-coil-system
Energy Recovery
The heat capacity transferred to the outside air is not generated afresh but recovered through heat recovery from the
extract air. The use of heat recovery units
in air-conditioning-systems results in a
higher capital investment but results in
much lower operation costs. A feasibility
study determines whether the installation
of a heat recovery unit is economic.
Run-around-coil-systems
2 m/s
70 %
11.8 C / 13,2 % r. h.
22 C / 10 % r. h.
-1.8 C / 50 % r. h.
-12 C / 85 % r. h.
1:1
25 %
System description
to the supply air. Humidity cannot be
Operation of the AL-KO
I For dehumidifying an additional heat
transferred between the air-flows Berun-around-coil-system
recovery system exchanger is installed
IU
se of high performance heat exchangers cause the exhaust air temperature is
after the dehumidifying cooler. During
in a multiple countercurrent circuit. This raised in the exhaust air heat exchanger,
dehumidifying operation the energy meit leaves the building without moisture.
achieves high annual utilisation ratios
dium will first be directed over the heat
I Depending on the type of humidifier
of 80 %.
recovery reheater to raise the supply air
I Each heat exchanger has only one mode (evaporation humidifier, high pressure
temperature. The thereby reduced water
nebuliser, air washer) the humidificaof air-flowing through (fresh or extract
temperature considerably reduces the
tion is able to use service water, demin- outlet temperature at the heat recovery
air) so that germs and contamination
eralized or adul terate water.
cannot be transferred.
coil. This system circuit saves approxiI The AL-KO outside air heater can be
I The system is used during the winter
mately 20 % cooling capacity.
divided in accordance with VDI 6022.
period to pre-heat the fresh air and in
The defroster with wide fin spacing, inthe summer to pre-cool the fresh air
stalled before the filter, raises the outthrough adiabatic cooling of the exside air temperature sufficiently to avoid
tract air.
frost formation on the filter medium
I Because of humidification of the exand thus ensures compliance with the
tract air during summer period the air
relative humidity required by VDI 6022.
is cooled and the cooling transferred
DVE
Hybrid humidifier
ETA
EHA
ZL
Hydraulic
Modul
pump-hotwater 50/30
performance
control
M VE
pump-hotwater 50/30
MID
PTH
M
SUP
SN
ODA
Aircabin Laupheim
Bio Centrum Kln
Bhringer Ingelheim
Creavis Marl I. BA
Creavis Marl II. BA
Diakonie Bremen
Ehrmann Moskau
FHG IZI Labore Leipzig
Franziskus Stift Lohne
Fraunhofer Erlangen II. BA
Fraunhofer ITEM Hannover
Main Station Dresden
Heiligenhafen
IFOK Rostock
Jogu Mainz lecture rooms
Clinic Siloah
Maritim Hotel Berlin
Coiseum Heilgenhafen
PTB Braunschweig
Rehab Kirchberg Luxembourg
Residenztheatre Mnchen
Rietberg museum Schweiz
Schlke & Mayr
Technic centre Warnemnde
TIH Hannover
Kln university facilities
SUP total
m3 / h
ETA total
m 3/h
E-Mail madelene.laeth@al-ko.de
www.al-ko.com
Heat
recovery
Energy
recovery
Re-heating
during
summ time
via energy
recovery
Runaroundcoilsystem
Adiabatic
humidifying
of ETA
Hybrid
humidifying
of ETA
Fax
Number
of units