INSPECTION JOBS:
Inspection of both heaters refractory & tube thickness/hardness
Inspection of both heaters steam super heater coils
Inspection/replacement of corrosion probes (if any)
Inspection of vacuum overhead line to V-104
MISCELLANEOUS:
6/7/2015
5:41 A6/P6
Page 1 of 2
Replacement of 3 gate valve with 3 globe valve at V-01 bottom injection line to vacuum
charge pump
Replacement of 2 globe valve at P-4 discharge line
Connection of super heated steam line (vacuum side) with saturated steam line
Cleaning of nozzles/lines for Filmer/Neutralizer injection
Rectification of Steam leakages in live steam line near PI-412, steam emergency line near V-2,
steam line near H-101, steam line from H-01 to V-1 (FT-120) and pump P-3 steam inlet line
Gland packing of different valves at plant
6/7/2015
5:41 A6/P6
Page 2 of 2