Contents
Project Management Life Cycle
Introduction to Primavera P6
Advantages of Tool
Planning
Establish Project Objective
Define the Work
Determine the Time
Delineate Project Organization / Team
Establish Resource Requirement / Availability
Establish a Cost Baseline
Evaluate, Optimize and Freeze Baseline Plan
Control
Track Work Progress and Actual Cost
Compare Progress and Cost to Baseline
Use Baseline to Guide Your Decision
Update and Modify Project Model with Realistic Data
Communicate Project Goals
Evaluate Performance
Forecast, Analyze and Recommend Action
INTRODUCTION TO PRIMAVERA P6
Primavera is a comprehensive, multi-project planning
and control software, built on Oracle and Microsoft SQL
Server
databases
for
enterprise-wide
project
management scalability.
INTRODUCTION TO PRIMAVERA P6
The Project Management module provides:
Enterprise project structure (EPS)
Centralized resource management
Integrated risk management
Issue tracking
Management by threshold
Tracking feature
Work products and documents
Report wizard
Primavera P6
Planning, Monitoring and Forecasting tool
Inputs
Primavera Project
Planner
Scheduling
-WBS/Activity Codes
Critical Path
-OBS
Resource Plan
-Activities
-Relationships
-Calendars and constraints
-Resources
-Cost Accounts/Cost centers
-Monitoring data
Outputs
-Progress (planned vs. actual)
-Schedule
-Critical Path
-Consolidated Resource Plan
-Forecast
Basic Terminologies
Activity
Activities represent work to be done in order to complete a
project
OD (Original Duration)
The estimated time required to complete an activity is
called OD.
RD (Remaining Duration)
The amount of time left to complete an activity after it has
started is known as RD (Remaining Duration).
Basic Terminologies
Predecessor
The activity that effects start or finish dates of
other activities (successor activities).
Predecessor
Successor
Basic Terminologies
Successor
The activity for which start or finish dates are
dependent on other activities (predecessor
activities).
Predecessor
Successor
Basic Terminologies
Relationships (Activity Links)
Any sort of connection between two activities.
Four types of relationships:
SS (Start to Start)
FS (Finish to Start)
FF (Finish to Finish)
SF (Start to Finish)
Lag
Lag staggers or delays the relationship of one activity (predecessor)
to another (successor).
Basic Terminologies
SS Relationship between activities in which the start of a successor
activity depends on the start of its predecessor
A
Predecessor
Start-to-start
B
Successor
A
Predecessor
Lag
B
Successor
Basic Terminologies
FS Relationship in which the start of successor activity
depends on the completion of its predecessor activity
Finish-to-start
A
Predecessor
B
Successor
A
Predecessor
Lag
B
Successor
Basic Terminologies
FF Relationship in which the finish of successor activity
depends on the finish of its predecessor activity
Finish-to-Finish
A
Predecessor
B
Successor
A
Predecessor
Lag
B
Successor
Basic Terminologies
SF Relationship in which the finish of successor activity
depends on the start of its predecessor activity
Start-to-Finish
A
Predecessor
B
Successor
Predecessor
Lag
B
Successor
Basic Terminologies
ES (Early Start) and EF (Early Finish) dates
Earliest possible date by which an activity can start or finish
Basic Terminologies
TF (Total Float)
Positive Total float indicates allowable duration of delay
without affecting project finish date.
Negative or zero Total Float indicates timely completion of
the activity is critical for timely completion of the project.
Such activities are called Critical Activities
FF (Free Float)
Free float indicates allowable duration of delay in start
without affecting the start of successor activity
Such activities are called Non-critical Activities
Basic Terminologies
Constraints
Constraints are ground realities that over-rule the logical start and
finish time of an activity.
For example, a certain piece of equipment will be received on,
say, 25th of March. That equipments erection activity cannot be
started before 26th of March irrespective of the fact that the
foundation will be ready by 15th of March.
So we will simply put a constraint to this activity that it cannot
start before 26th of March. Similarly concreting work cannot be
easily done in winter months in regions where temperature goes
below freezing during winter.
Basic Terminologies
Various types of constraints can be used but most commonly used in
P6 are as follows:
Start On
Start On or Before
Start On or After
Finish On
Finish On or Before
Finish On or After
Mandatory Start/Finish
As Late As Possible
Basic Terminologies
Critical Activity
An activity that has potential of delaying a project is called a critical
activity. Such activities possess total float equal to zero or even less.
Critical Path
Chain of critical activities that has potential of delaying a project is
called Critical Path. It is the longest Path.
Critical Path Method (CPM)
A network analysis technique used to predict project duration, by
analyzing which sequence of activities (which path) has the least
amount of scheduling flexibility (the least amount of float).
Basic Terminologies
Critical Path
A
Predecessor
ES = 1
EF = 10
FS Lag=0
OD = 10
Successor
B
FS Lag = 0
ES=15
OD=6
EF=20
Predecessor
ES=1
OD=14
EF=14
Basic Terminologies
Scheduling (CPM)
The process of calculating start and end dates of
the activities. This process is carried out in two passes.
Forward Pass
The process of calculating early start and finish dates of
each activity starting from the project start date.
Backward Pass
The process of calculating late finish and start dates of
each activity starting from the project finish date.
Basic Terminologies
Man-Hours
It is yardstick for measurement of effort. For example, 4 Man-hour
will mean any of the following:
Standard Man-hours
Estimated effort per unit required to perform a job in terms of manhours.
Basic Terminologies
Earned Man-hours
It is amount of work executed in terms of standard man-hours.
Actual Man-hours
It is the man-hours actually utilized to execute work.
Basic Terminologies
Original (Base) Plan
A plan showing all activities as foreseen at start of the project.
Efficiency
It is the ratio of earned man-hours to actual man-hours.
Productivity
It is number of work units produced per man-hour spent.
Basic Terminologies
Cost Center
A Cost Center is the lowest identifiable/measurable activity to which
costs incurred can be booked.
Resource:
Anything that is required to perform an activity is
called a resource.
Basic Terminologies
Activity Network Diagram
The Activity Network displays your project as a diagram of activities
and relationships according to the work breakdown structure (WBS).
activity.
Basic Terminologies
Gantt Chart (also known as Bar Chart)
A graphical display of the open project's schedule information or the
order in which activities occur over the course of the project.
The Gantt Chart shows each activity's duration, using the timescale
specified, as a horizontal bar.
A line connecting activity bars indicates a relationship.
Data Date
The point in time that separates actual (Historical) data from future
(Scheduled) data.
GANTT CHART
The activity is scheduled according to activitys calendar, not the resource calendars. For
example, an activity to cure concrete
Resource Dependent
The assigned resource availability determines the start and finish of the activity. For
example, an inspection activity that depends on availability of an Inspector.
Level of Effort
An activity that is ongoing, such as clerical work, change management, or
project management tasks and its duration depends on its predecessor and/or
successor activities.
For example, site cleanup could be considered a level of effort activity.
WBS Summary
It represents a group of activities that share a common WBS level based on
WBS Codes & enables roll-ups of dates for the activity group.
Fixed units/time
Units/time or rate of the resource remains constant, even if the activitys
duration or work effort changes. Usually used with resource dependent
activities. For example, you have an engineer who can only work 4
hours/day.
Fixed units
In this case, budget (units or cost) is a limiting factor; i.e., the work
effort required to complete the activity does not change, even if the
activitys duration or the resource rate changes. Typically used with
resource dependent activities. Increasing resources can decrease the
activity duration.
Units Type
Progress is reported according to the accomplished & remaining work effort (units). The
percent complete is calculated from the actual and remaining units
Physical Type
Activity progress is most accurately described by personal judgment. In this case, you
manually enter the percent complete for the activity.
Structuring Projects
1. Setting-up and define EPS (Enterprise
Project Structure).
(EPS)
Enterprise Project Structure
Projects
(WBS)
Work Breakdown Structure
(OBS)
Organisational Breakdown
Structures
AREA I/C #1
AREA I/C #2
AREA I/C #n
Engr. Civil
(area #1)
Engr. Civil
(area #2)
Engr. Civil
(area #n)
Engr. Piping
(area #1)
Engr. Piping
(area #2)
Engr. Piping
(area #n)
Engr. Eqpt.
(area #1)
Engr. Eqpt.
(area #2)
Engr. Eqpt.
(area #n)
Const. Mngr.
CIVIL
Const. Mngr.
Meh.
Const. Mngr.
Elec.
A WBS is a hierarchy of
work
that
must
be
accomplished to complete
a project, which defines a
product or service to be
produced. The WBS is
structured in levels of work
detail, beginning with the
deliverable itself, and is
then
separated
into
identifiable work elements.
Civil Works
Buildings
Ware House
Equipment Fdns
Foundation
Superstructure
Finishing Works
Admin Building
Mech. Works
Tanks
Piping
Diesel Tank
1. Project
1.1 Construction
1.1.1 Discipline
1.1.1.1 Zone/Area
1.1.1.1.1 Cost Center/Activity
Discipline A
Discipline B
Area X
Area Y
Area Z
Activities P
Discipline C
OBS
Project
Project/Site Manager
Construction
Construction Manager
Discipline
Discipline In-Charge
Zone/area
Discipline Engineer
Cost center
Discipline Supervisor
Defining Resources
Resources include the personnel and equipment that perform work on
activities across all projects. Resources are generally reused between
activities and/or projects.
Creating Calendars
Create and assign calendars to each
resource and each activity. These
calendars define the available workhours in each calendar day. We can
also specify national holidays, your
organization's
holidays,
projectspecific
work/non-workdays,
and
resource vacation days. Calendar
assignments are used for activity
scheduling, tracking, and resource
leveling.
Adding activities
WBS
Task / Activity
Activity Detail form
LEVELS OF PLAN
LEVEL - 1 PLAN
Sequence of major phases e.g., E, P, C inter-phase, or Civil, Mechanical &
Electrical sequences.
LEVEL-1 PLAN
LEVELS OF PLAN
LEVEL 2 PLAN
Breaks major phases into geographic distribution
(Zone/Area) and/or disciplines e.g., Piping,
Structure, Foundation, etc.
LEVEL-2 PLAN
LEVELS OF PLAN
LEVEL - 3 PLAN
Breaks all discipline activities into Cost Centers
LEVEL-3 PLAN
LEVELS OF PLAN
LEVEL - 4 PLAN
Further breaks down work into smaller
activities e.g., material withdrawals from
stores, layout, tacking, welding, Q.C checks, etc.
LEVEL-4 PLAN
Manpower
Tools & Plants
Direct materials
Consumables
Special jigs & fixtures
Scheduling Project
Project schedule can be calculated one of two ways: when we choose the Scheduling
command or each time we make a change that affects schedule dates.
The Critical Path Method (CPM) scheduling technique is used to calculate project
schedules. CPM uses activity durations and relationships between activities to
calculate the project schedule.
Updating Progress
To update the progress of the individual activity, the following inputs are to be given in the activity detail form.
1. Start Date (If activity is started)
2. Finish Date (If activity is completed)
3. % of duration completed (if activity is in progress)
4. Remaining duration to complete the activity
Reports
Numerous reports are available in the system.
Few useful reports are:
Activity Status Report
Two Week Look-ahead
Resource and Role Assignments
Resource Loading Summary
Activity Relationships