GOLEN GOL HYDROPOWER PROJECT
Doc No.
DAT
E
REVISI
ON
PAG
E
01/01/201
5
TABLE OF CONTENTS
Topic------------------------------------------------------------------------------Page
EQUIPMENT------------------------------------------------------------5
6.0
MAN POWER-----------------------------------------------------------
5
7.0 SAFETY, HEALTH & ENVIRONMENTAL ISSUES
-----------------6
8.0 METHODOLOGY
------------------------------------------------------7 -9
9.0
10
SARCO JV
GOLEN GOL HYDROPOWER PROJECT
1.0
2.0
Doc No.
DAT
E
REVISI
ON
PAG
E
01/01/201
5
OBJECTIVE
The purpose of this method statement is to define the
procedure to ensure
that the proposed materials and
workmanship to be used at the above site are complying with
the condition/requirements as stipulated in Technical
Specifications.
SCOPE
The purpose of this method statement is to describe the activities and methods,
which will be used to carry out the placing of sub base and aggregate base.
3.0REFRENCE
Construction Drawings
Methodology for granular sub base and aggregate base
.0 RESPONSIBILITIES
The responsibilities for the implementation of this Method Statement are
assigned as follows:
Project Manager
Construction Manager
Supervisor
SARCO JV
GOLEN GOL HYDROPOWER PROJECT
Doc No.
DAT
E
REVISI
ON
PAG
E
01/01/201
5
5.0 EQUIPMENT
Excavator
loader
Grader
Roller
Dozer
Dump Truck
Total Station
Service Vehicle for General Workers
6.0
MANPOWER
Supervising Engineer
Foreman
Operator
Driver
Skilled Workers
surveyor
01
02
11
04
15
01
SARCO JV
GOLEN GOL HYDROPOWER PROJECT
Survey helpers
Safety Officer
7.0
Doc No.
DAT
E
REVISI
ON
PAG
E
01/01/201
5
04
01
8.0
METHODOLOGY
SARCO JV
GOLEN GOL HYDROPOWER PROJECT
Doc No.
DAT
E
REVISI
ON
PAG
E
01/01/201
5
1. Prior to placing any Sub base material, the underlying subgrade shall
be shaped and compacted in accordance to the specifications
2. The material shall be placed over the full width of the formation to the
required thickness as shown in the drawings in one layer or more, each
layer not exceeding 200mm compacted thickness.
3. In case of, space for diversion not available, than 1 st place the sub base
material in one side of center line. And after the complete approval the
consultant, start work other side of center line.
4. Each layer of Sub base shall be process as necessary to bring its moisture
content to a uniform level throughout the material suitable for compaction.
5. The Sub base shall be compacted using suitable compaction equipment
approved by the Engineer to not less than 98% of the maximum dry density.
6. The top of Sub base shall have the required thickness, shape, super
elevation, levels and grades as required in the drawings and shall be within
the tolerances as specified in the specifications.
7. In the course of the construction, the level shall be checked using auto level
or total station , set out at regular interval along both sides of the road width
8. Every layer shell be checked by the consultant jointly. And after the
consultant approval start placing the next layer.
I. REINSTATEMENT
All surface of roads, fields, paths, etc., whether public or private,
which are affected by the operations shall be restored.
SARCO JV
GOLEN GOL HYDROPOWER PROJECT
Doc No.
DAT
E
REVISI
ON
PAG
E
01/01/201
5
ATTACHMENT
A.
B.
C.
D.
E.