JUFMP/JEDI Information
Consultant Services
Executive Summary
Issues
Ongoing Construction Packages
Package 1
Package 2A
Package 2B
Package 3
Package 5
6. Photo Gallery
2
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Project Information
Project Name
: JUFMP/JEDI
Loan Agreement
: 8121 ID
Effective Date
: August 8, 2012
Closing Date
Loan Amount
: USD 139,640,000
Executing Agency
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Project Components
1. Dredging and rehabilitation of selected key floodways, canals
and retention basins.: This component support the dredging and
rehabilitation of 11 floodways/canals and 4 retention basins which
have been identified as a priority sections of Jakarta flood
management system in the need of urgent rehabilitation and
improvement in flow capacities (USD 176.1 million)
2. Technical assistance for project management, social
safeguards, and capacity building: The component will support
contracts managemnt, engineering design review, construction
supervision engineers for dredging and rehabilitation works and
technical assistance for implementation of the project, including
Resettlement Policy Framework, Resettlement Plan and Grievance
Redress System (USD 13.4 million)
5
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Project Organization
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Project Location
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
:
:
:
:
:
Contractor
Contract No.
:
Notice to Proceed :
Time Period
:
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
10
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Executive Summary
Figure 1. Budget Allocation for Component 1of JUFMP
(in million USD)
Total Budget 178.7
103.5
58%
22.3
12%
53.0
30%
11
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Executive Summary
Table 1. Budget Allocation for Component 1
Executing Agencies/ Packages
DKI Jakarta
Package 1
Package 4
Package 7
DGWR
Package 2A
Package 2B
Package 6
DGCK
Package 3
Package 5
TOTAL
Budget (Loan +
APBN/D)
USD
103,492,537
36,716,418
47,014,925
19,761,194
53,000,000
31,000,000
8,125,000
13,875,000
22,250,000
6,717,421
15,532,579
178,742,537
Loan Allocation
USD
69,340,000
24,600,000
31,500,000
13,240,000
42,400,000
24,800,000
6,500,000
11,100,000
17,800,000
5,373,937
12,426,063
129,540,000
APBD/N Sharing
USD
34,152,537
12,116,418
15,514,925
6,521,194
10,600,000
6,200,000
1,625,000
2,775,000
4,450,000
1,343,484
3,106,516
49,202,537
12
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Executive Summary
Table 2. Budget Allocation for Component 2
Items
Supervision Consultant
Flood Management Information
System
Panel of Experts
Resetlement Cost (DKI Jaya)
Total Component 2
Total Project Cost (Comp 1+2)
Total
USD
10,100,000
500,000
500,000
2,800,000
13,900,000
192,642,537
Loan IBRD
USD
10,100,000
10,100,000
139,640,000
APBD/N
Sharing
USD
500,000
2,800,000
3,300,000
52,502,537
Bilateral
Grant
USD
500,000
500,000
500,000
13
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Executive Summary
Table 3. Contract Amount by Packages (IDR)
Executing Agencies/
Packages
DKI Jakarta
Package 1
Package 4
Package 7
DGWR
Package 2A
Package 2B
Package 6
DGCK
Package 3
Package 5
TOTAL
Contract Amount
284,180,000,000
284,180,000,000
334,965,463,260
260,000,000,000
74,965,463,260
208,214,431,000
68,514,386,000
139,700,045,000
827,359,894,260
Loan
190,400,600,000
190,400,600,000
267,972,370,608
208,000,000,000
59,972,370,608
166,571,544,800
54,811,508,800
111,760,036,000
624,944,515,408
APBN/D Sharing
93,779,400,000
93,779,400,000
66,993,092,652
52,000,000,000
14,993,092,652
41,642,886,200
13,702,877,200
27,940,009,000
202,415,378,852
14
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Executive Summary
Figure 4. Financial Progress (in billion IDR)
284.2
300
260.0
250
208.7
200
201.5
163.6
148.6
139.7
150
75.0
100
54.0
54.9
33.9
50
68.5
22.2
19.8
32.9
Package 1
Package 2A
Disbursed
Package 2B
Disbursement + Un-disbursement
Package 3
Package 5
Contract Amount
15
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Executive Summary
Table 4. Volume of Dredge Material of On-going Packages
Volume (thousand m3)
Package
Sign Date
Notice to
Proceed
Package 1
Nov 26,2013 Dec 02,2013
Ciliwung-Gn. Sahari
Waduk Melati
Package 2A
Nov 11,2013 Nov 11,2013
Package 2B
Nov 11,2013 Nov 11,2013
Package 3
Nov 15,2013 Nov 15,2013
Package 5
Sep 3,2014 Sep 3,2014
Tanjungan Drain
Lower Angke Drain
TOTAL
Period
(days)
730
730
730
730
730
Garbage
(m3)
2.8
1.5
1.4
18.8
20.0
0.8
6.2
0.0
6.2
48.7
Sludge
(m3)
165.6
85.1
80.5
1,007.3
513.7
48.4
253.0
11.2
241.8
1,988.0
Garbage + Weight
Sludge
(m3)
168.4
86.6
81.9
1,026.1
533.7
49.2
259.2
11.2
248.0
2,036.7
(%)
8.3
4.2
4.0
50.4
26.2
2.4
12.7
0.6
12.2
100.0
16
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Executive Summary
Table 5. Progress of Dredging Works (On-going Packages)
Package
Package 1
Trip of
Truck
Sludge
Garbage + Sludge
8,765
160.5
160.5
95.3%
4,644
84.3
84.3
97.4%
76.2
76.2
93.0%
Package 2A
4,121
48,407
806.7
806.7
78.6%
Package 2B
21,968
376.6
376.6
70.6%
Package 3
209
3.6
3.6
7.3%
Package 5
144
2.4
2.4
0.9%
144
2.4
2.4
21.7%
79,493
1,349.8
1,349.8
66.3%
Ciliwung-Gn.Sahari
Waduk Melati
Tanjungan Drain
Lower Angke Drain
TOTAL
17
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Executive Summary
Figure 5. Schedule and Progress of Construction Works (%)
74.2
Package 1
75.8
82.3
Package 2A
69.6
78.7
Package 2B
78.5
82.7
Package 3
86.5
14.1
Package 5
16.9
0
10
20
30
Progress
40
50
60
70
80
90
Schedule
18
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Issues
1. Package 1 Ciliwung-Gunung Sahari and Waduk Melati
a) Waduk Melati: (i) construction schedule for Waduk Melati
pump station needs to be precisely managed to complete
within the contract period, and (ii) guard rail as an
additional work will be installed around the Waduk (fencing
in original contract was changed to guard rail in MC 0).
b) Gunung Sahari drain: remaining works such as gaps
between embankment edge and bridges, U-ditch along the
right bank and side walk along Jl. Gunung Sahari drain
should be completed as scheduled. DKI requested to
heighten the side walk.
19
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Issues
2.
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Issues
5. Package 4 Sentiong Sunter, Waduk Sunter Utara, Waduk
21
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Issues
8. Package 7 Grogol Seketaris, Pakin, Kali Besar, Jelakeng
and Krukut.
a) Bid opened March 10, 2015. PT. Waskita Karya has the lowest
bidding price of 226.8 billion IDR.
9. LARAP
a) Houses and buildings along Upper Sunter Floodway (Package 6)
in Kayu Putih village of Pulo Gadung sub-district have been
demolished by DKI Jaya Government. PAPs of JUFMP/JEDI
located on Jatinegara Kaum were not affected by the demolition.
b) Due to problem at Lower Angke Muara, Dinas Tata Air DKI,
embankment work at Kel. Kapuk Muara modified to stone
masonry instead of concrete piles.
22
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Issues
c) LARAP reports for Sentiong Sunter, Waduk Sunter Utara and
Waduk Sunter Selatan were prepared and second socialization
is planned.
10. Construction Supervision Consultant
a) Staff of site offices have faced difficulties due to shortage of
transportation (mainly motor cycles).
b) Overtime payment for enumerators, surveyors and drivers not
yet settled.
23
World Bank
PACKAGE 1
CILIWUNG-GUNUNG SAHARI DRAIN AND WADUK MELATI
Contractor:
PT. Brantas Abipraya (Persero)
24
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
General Information
PIU
: DPU - DKI
Contractor
No Objection Letter
: No. JUFMP 1
Letter of Acceptance
: No. 14705/-7.793.2
Contract No.
Contract Amount
Signed Date
Notice to Proceed
Completion Day
Elapsed Days
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
General Information
Ciliwung Gunung Sahari Drain
SHEET PILE
4,832 m
LENGTH
OF DREDGING
5,100 m
26
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
b) Concrete Work
volume = 2,681 m3 , length = 4,300 m
reinforcement bar, deformed = 91.04 ton
c) Pilling Work
Furnishing of CCSP W-450, total = 5,178 units
Miscellaneous Works
Demolishing and disposal of existing concrete, total = 12.8 m3
Demolishing and disposal stone masonry,
total = 2,088 m3
27
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Waduk Melati
a) Dredging Works: total = 81,878 m3, progress = 76,167 m3 (93.0%)
b) Concrete Work
Total concrete = 570.25 m3, length = 1,229 m
Reinforcement bar, deformed = 30.95 ton
c) Pilling Works
Furnishing of CCSP W-450, total =1,208 units
10 m = 959 units, L 12 m = 249 units
Driving of CCSP W-450, total = 1,208 units
d) Miscellaneous Work
28
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
160.4
160
132.3
140
149.2
120
97.6
100
80
116.6
81.3
55.8
60
40
27.3
20
0
0.1 0.1
0.1
2.3
29
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Progress
77
80
72
70
62
58 58
60
53
50
69
76 74
51
4344
37 36
40
30 29
30
23
19 20
20
14
10
0
0
65 67
73
7172
4 6
15
6 10 9
30
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Package 1:
163.6
58%
75.5
26%
45.1
16%
Undisbursed
Remaining
31
BBWS CILCIS
World Bank
Contractor:
Adhi Karya-Hutama Karya-Jaya Konstruksi JV
32
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
General Information
PIU
Contractor
No Objection Letter
Letter of Acceptance
:
:
:
:
Contract No.
Amendment IV
Amendment II
Original Contract
Signed Date
Completion Day
Elapsed Days
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
KAPUK
RAYA
Sta 3+750
Replacement
of Water Gates
PILLING WORK
Target
Length
= 2,100 m
CCSP W-325 = 2,100 units
Pile 30x30
= 525 units
Finished
Length
= 1,000 m
CCSP W-325 = 1,071 units
Pile 30x30 =
175 units
KEMBANGAN
BRIDGE
PILLING WORK
Target
Length
= 5,700 m
CCSP W-325 = 5,700 units
Pile 30x30
= 1,425 units
Finished
Length
= ... m
CCSP W-325 = 5,703 units
Pile 30x30
= 1,203 units
Sta 4+500
KAPUK
PULO
BRIDGE
Sta 5+000
Sta 5+875
Sta 6+750
Sta 7+800
PILLING WORK
Length
=
4,600 m
CCSP W-325 = 110,699 units
Pile 30x30
= 390,000 units
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Cengkareng Floodway
a) Dredging Work: total = 1,026,125 m3, progress = 806,700 m3 (78.6%)
STA 0+500 - STA 7+800
b) Concrete Work
CCSP capping = 2,292.1 m3, backpile capping = 150.30 m3, walling = 86 m3
c) Pilling Work
Furnishing of CCSP W-325 and W-450, total = 8,057 units
L 12 m = 5,269 units, L 14 m = 2,948 units, L 15 m = 55 units, L 18 m = 237 units
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
806.7
800
720
711.7
640
605.5
560
457.5
480
530.1
400
377.4
320
246.7
240
134.7
160
80
0
182.5
92.8
13.7
29.4
123.4
67.1
36
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Package 2A.
90
Schedule
80
82
Progress
78
70
65
60
57
54
46
50
40
37
40
34
29
30
23
17
11
1
41
46
60
69
62
65
66
70
53
49
38
32
27
20
10
47
66
73
19
8
3
37
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
148.6
57%
58.5
23%
52.9
20%
Undisbursed
Remaining
38
BBWS CILCIS
World Bank
Contractor:
PT. Hutama Karya (Persero)
39
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
General Information
PIU
Contractor
No Objection Letter
: No. JUFMP/1
Letter of Acceptance
: No.14705/-7.793.2
Contract No.
Contract Amount
: IDR 65,258,477,570
Amendment I No.
Amendment I Amount
: IDR 74,965,463,260
Signed Date
Notice to Proceed
Completion Day
Elapsed Days
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Concrete wall
1,000 m
Concrete Wall
400 m
Concrete Wall
400 m
41
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
b) Concrete Work
c) Pilling Work
Furnishing of concrete pile 20x20x400, total = 3,600 units
Driving of concrete pile 20x20x400,
total = 2,961 units
42
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Package 2B.
400
376.6
350
314.2
334.2
300
282.7
306.5
250
243.6
200
185.0
150
126.8
100
47.6
81.3
50
3.0
57.3
16.8
43
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Package 2B.
90
80
74 73
70
64
65
79 79
68 68
56 58 59
60
51
47
44 44
50
42
37 37 37
40
31
30
24
20
13
13
10
18
14
5
13
27
29
23
17
44
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Package 2B.
21.0
28%
20.0
27%
33.9
45%
Undisbursed
Remaining
45
DG Cipta Karya
World Bank
Contractor:
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
General Information
PIU
Contractor
No Objection Letter
Contract No.
: HK.02.03/JUFMP-FSK/XI/1
Contract Amount
Signed Date
Notice to Proceed
Completion Day
Elapsed Days
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
EXISTING
SHEETPILES
48
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Cideng-Thamrin Drain
a) Dredging Work: total = 49,224 m3, progress = 3,598 m3 (7.3%)
STA 0CT-4 - STA CT-31
b) Concrete Work
Type-A (K-225), total = 998.8 m3
c) Pilling Work
Furnishing of CCSP W-325 L = 14 m, total =
602 units
L = 14 m, total =
602 units
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Package 3.
100
Schedule
90
Progress
82
79
80
70
63
87
83
71 72
64 64
62 62 62
60
48
50
41
41
40
34
26
30
21
20
10
3 5
5
0
11 10
15 13
16
47
33
25
20
50
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
14.5
21%
34.2
50%
19.8
29%
Undisbursed
Remaining
51
DG Cipta Karya
World Bank
PACKAGE 5
TANJUNGAN DRAIN AND LOWER ANGKE DRAIN
Contractor:
PT. SAC Nusantara and
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
General Information
PIU
Contractor
: PT. SAC Nusantara and PT. Penata Karya Keluarga Utama (JO)
No Objection Letter
: -
Letter of Acceptance
: No.KU.03.01/JUFMP/02/VIII/2014
Contract No.
: HK.02.03/JUFMP-FSK/IX/2
Contract Amount
Signed Date
: Sep 3, 2014
Notice to Proceed
: -
Completion Day
Elapsed Days
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
LENGTH
OF DREDGING
600 m
SHEET PILE
1,092 m
Dredging : 11,210 m3
Embankment Repair: 1,092 m
54
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
SHEET PILE
248 m
LENGTH
OF DREDGING
4,050 m
RETAINING WALL
573 m
Dredging : 241,800 m3
Embankment Repair : 821 m
55
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Tanjungan Drain
a) Dredging Works: total = 11,500 m3, progress = 4,468 m3 (38.9%)
b) Concrete Work
Total concrete = 228.3 m3
Formwork type-A2 = 182.6 m2
c) Pilling Works
Furnishing of CCSP W-500, total = 1,000 units
14 m = 600 units, L 16 m = 400 units
56
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Progress
16.9
15
13.0
10.1
10
9.0
13.6
13.0
14.1
9.3
5.5
5
2.3
0.6
3.1
3.5
0.4
0
Oct 14
Nov 14
Dec 14
Jan 15
Feb 15
Mar 15
Apr 15
57
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
22.2
16%
106.8
76%
Undisbursed
Remaining
58
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Package 1
Check list reinforcement bar STA 3 + 200
Ciliwung Gunung Sahari Drain
59
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Package 1
Activities of Dredging pump STA 0 + 850 at
Ciliwung Gunung Sahari Drain
60
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Package 1
Concrete Work for the foundation of pump
station at Waduk Melati
61
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Package 2A
62
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Package 2A
63
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Package 2B
64
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Package 3
65
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Package 3
66
MoPW&HA
World Bank
Construction Supervision Consultant for
Jakarta Urgent Flood Mitigation Project (JUFMP)/
Jakarta Emergency Dredging Initiative (JEDI)
Package 5
Mr. President, Ministry of PWHA and
Governor of DKI visited Tanjungan Drain
67