Sei sulla pagina 1di 30

RESUMEN DEL PRESUPUESTO TOTAL P

N
0
1
2
3
4

PRESUPUESTO DE SUPERVIS

RESUMEN DEL PRESUPUESTO TOTAL PACHACHACA


PRESUPUESTO PARCIAL
PRESUPUESTO
ABANDONO
PRESUPUESTO
PRESUPUESTO
PRESUPUESTO
PRESUPUESTO
SUBTOTAL

DE LA FORMULACIN DEL PLAN DE


DE
DE
DE
DE

COSTO
INDIRECTO
%

ELABORACION DEL EXPEDIENTE TCNICO


OBRAS DE ABANDONO
ACTIVIDADES DE MANTENIMIENTO
MONITOREO AMBIENTAL

GASTOS GENERALES
UTILIDAD
TOTAL

15%
10%

PRESUPUESTO DE SUPERVISIN
PRESUPUESTO DE SUPERVISIN
GASTOS GENERALES
UTILIDAD
TOTAL

15%
10%

TAL PACHACHACA
COSTO DIRECTO
S/.
S/.
S/.

S/.

S/.
689,250.00
835,000.00
20,697,460.97
S/. 88,000.00
S/. 57,000.00
22,366,710.97

COSTO TOTAL
S/.

S/. 3,355,006.65
S/. 2,236,671.10
S/. 27,958,388.71

RVISIN
S/.

1,188,000.00
S/. 178,200.00
S/. 118,800.00
S/. 1,485,000.00

PRESUPUESTO DE OBRAS DEL ABANDONO DE LA CENTRAL HIDROELCTRICA DE PACHACHACA


No
II

Descripcin

PRESUPUESTO DE OBRAS DE ABANDONO


UNIDAD
CANTIDAD

PU

0.00 Trabajos Preliminares


0.01 Movilizacin y desmovilizacin
0.02 Campamento provisional
0.03 Operacin y mantenimiento campamento
0.04 Talleres
0.05 Cartel de obra
0.06 Caminos temporales
0.07 Emparejamiento de superficies

Global
meses
meses
meses
Unidad
Km
m2

1
6
6
6
1
5
20000

S/.
S/.
S/.
S/.
S/.
S/.
S/.

S/.
50,000.00
50,000.00
40,000.00
10,000.00
5,000.00
200,000.00
10.00

1.00 Canal de derivacin


1.01 Suministro de material de relleno para canal
1.02 Relleno del Canal de derivacin
1.03 Suministro e instalacion de Tubera para Marh Tnel
1.04 Demolicin del canal Rumichaca

m3
m3
m
Global

89370.58
89370.58
13000
1

S/.
S/.
S/.
S/.

13.00
50.00
100.00
200,000.00

2.00 Tneles
2.01 Bloqueo o taponamiento de tneles
2.02 Accesos temporales

m2
km

820.8 S/.
14 S/.

500.00
200,000.00

3.00 Cmara de Carga: Taza Nueva


3.01 Demolicin de Cmara de carga
3.02 Desmontaje de Compuertas a tuberas forzadas
3.03 Desmontaje de Compuertas de alivio

m3
kg
m3

30 S/.
300 S/.
200 S/.

200.00
2.00
40.00

m3
m3
ml
m3
Global

50
100
2000
380
2

S/.
S/.
S/.
S/.
S/.

40.00
40.00
5.00
15.00
3,100.00

4.00 Cmara de carga: Taza Vieja


4.01 Relleno de zona de Compuerta de duelas
4.02 Relleno de zona de Compuerta de Alivio
4.03 Demolicion Caseta de comunicacin antigua
4.04 Demolicion Caseta de comunicacin actual
4.05 Desmontaje Cerco perimtrico
4.06 Relleno de Vertedero de alivio lateral y Descarga libre
4.07 Desmontaje de Puente-Muelle metlico
4.08 Eliminacion de material de desmonte

m3
m3
m3
m3
ml
m3
kg
m3

40
50
20
40
2000
30
2000
180

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

50.00
50.00
40.00
40.00
5.00
100.00
2.00
15.00

5.00 Tubera forzada


5.01 Demolicin de Tubera de duelas
5.02 Desmontaje deTubera forzada
5.03 Demolicin de anclajes de concreto
5.04 Desmontaje de Cerco de proteccin
5.05 Eliminacin de material de desmonte

km
kg
m3
m
m3

2.6
2164128
263
2000
263

S/.
S/.
S/.
S/.
S/.

30,000.00
3.50
500.00
10.00
15.00

7200
1600
6
3

S/.
S/.
S/.
S/.

40.00
20.00
7,000.00
12,000.00

3.04 Demolicin de Caseta abandonada de vigilancia


3.05 Demolicin de Caseta de vigilancia
3.06 Desmontaje de Cerco perimtrico
3.07 Eliminacin de material de desmonte
3.08 Anlisis de Suelos y Sedimentos

6.00 Casa de Mquinas


6.01 Demolicin del Edificio
6.02 Demolicin de canal de desfogue al ro Yauli
6.03 Desmontaje de las 6 Turbinas
6.04 Desmontaje de los 3 Generadores

m3
m3
und.
und.

6.05 Desmontaje de las 3 Excitatrices


6.06 Desmontaje de las Bombas
6.07 Desmontaje de Sala de control
6.08 Desmontaje de la gra Puente y equipos complementarios
6.09 Eliminacin de material de desmonte
7.00 Plan de Manejo de Residuos y Efluentes
Riego de zona de trabajo para mitigar la contaminacin-polvo (Incl. costo
7.01
de agua y transporte surtidor a obra )*
7.02 Mantenimiento de maquinaria
7.03 Manejo de Residuos Slidos (EPS-RS)
7.04 Contenedores de residuos slidos
7.05 Alquiler de baos porttiles
7.06 Limpieza y retiro de basura, maleza a zona aledaa**
7.07 Limpieza permanente de la obra**
7.08 Sealizacin
7.09 Abastecimiento de EPP***
8.00 Plan de Contingencia
8.01 Equipos de evacuacin, bsqueda y rescate de uso colectivo
8.02 Equipos de evacuacin, bsqueda y rescate de uso individual
8.03 Equipos de contingencias para derrame de producto qumico
8.04 Equipos de contingencias para incendio
9.00 Rehabilitacion Final
9.01 Actividades de Revegetacin
SUB TOTAL

und.
und.
und.
und.
m3

3
veces/semana
Bimestral
Semanal

3
3
1
1
8800

S/.
S/.
S/.
S/.
S/.

4,000.00
2,000.00
10,000.00
5,000.00
15.00

72 S/.

100.00

2
24
7
5

S/.
S/.
S/.
S/.

1,500.00
300.00
90.00
400.00

10 S/.
150 S/.

500.00
103.00

1
1
2
3

S/.
S/.
S/.
S/.

250.00
300.00
1,500.00
250.00

5 S/.

3,440.00

NOTAS:
No se valoriza la recuperacion de las tuberias forzadas, ni los equipos de las centrales, adems de compuertas
La estacin meterolgica, se estima ser transferida a Senamhi u otra entidad que tome los datos de la estacin

La Lnea de Transmisin no se considera, no forma parte del abandono


No se presupuesta el Embalse Pomacocha, no forma parte del abandono
* Riego se realizara 3 veces por semana
** Estas actividades las realizan los mismo obreros contratados para el Proyecto
***Contemplado para 50 obreros mas 3 recambios

FORMULACIN DEL PLAN DE ABANDONO


CANTIDAD
TIEMPO

No Descripcin
I
Formulacin del Plan de Abandono
1.0 Jefe de Ingeniera
2.0 Ingeniero Civil
3.0 Ingeniero Residente
4.0 Ingeniero Elctrico
5.0 Ingeniero de Costos
6.0 Ingeniero Ambiental
7.0 Ingeniero Asistente
6.0 Ingeniero Mecnico
8.0 Topgrafos
9.0 Dibujantes
10.0 Secretarias
11.0 Choferes
12.0 Vehculos
13.0 Oficinas
14.0 Materiales de campo
15.0 Materiales de oficina
SUB TOTAL

Mes
1
1
1
1
1
1
1
1
3
2
2
2
2
1
Global
Global

4
4
4
2
4
4
4
1
3
3
3
3
3
3

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

PU
S/.
22,000.00
20,000.00
12,500.00
12,500.00
12,500.00
12,500.00
10,000.00
6,250.00
12,000.00
5,000.00
5,000.00
5,000.00
8,000.00
8,000.00

TOTAL S/.

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

S/.
88,000.00
80,000.00
50,000.00
25,000.00
50,000.00
50,000.00
40,000.00
6,250.00
108,000.00
30,000.00
30,000.00
30,000.00
48,000.00
24,000.00
10,000.00
20,000.00
689,250.00

No
II

Descripcin

PRESUPUESTO DEL EXPEDIENTE TCNICO


CANTIDAD
TIEMPO

Elaboracin del expediente Tcnico


1.00 Jefe de Ingeniera
2.00 Ingenieros asistentes
3.00 Topgrafos
4.00 Portamiras
5.00 Dibujantes
6.00 Secretarias
7.00 Choferes
8.00 Vehculos
9.00 Oficinas
10.00 Materiales de campo
11.00 Materiales de oficina
SUB TOTAL

Mes
1
3
3
6
3
2
3
3
1
Global
Global

3
3
3
3
3
3
3
3
3

NTE TCNICO
PU

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

S/.
25,000.00
20,000.00
15,000.00
5,000.00
10,000.00
5,000.00
5,000.00
10,000.00
10,000.00

TOTAL S/.

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

S/.
75,000.00
180,000.00
135,000.00
90,000.00
90,000.00
30,000.00
45,000.00
90,000.00
30,000.00
30,000.00
40,000.00
835,000.00

No
III

SUPERVISIN DE OBRAS
Descripcin
CANTIDAD
TIEMPO
mes
1.00 Ingeniero Supervisor
1
2.00 Ingenieros Asistentes
3
3.00 Inspectores
3
4.00 Dibujantes
2
5.00 Secretarias
2
6.00 Choferes
2
7.00 Vehculos
2
8.00 Oficinas
1
9.00 Materiales de oficina
1

SUB TOTAL
GASTOS GENERALES
UTILIDAD
TOTAL

6
6
6
6
6
6
6
6
6

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

PU
S/.
25,000.00
20,000.00
15,000.00
12,000.00
5,000.00
5,000.00
5,000.00
10,000.00
4,000.00
0.15
0.10

TOTAL S/.
S/.
S/. 150,000.00
S/. 360,000.00
S/. 270,000.00
S/. 144,000.00
S/.
60,000.00
S/.
60,000.00
S/.
60,000.00
S/.
60,000.00
S/.
24,000.00
S/. 1,188,000.00
S/. 178,200.00
S/.
118,800.00
S/. 1,485,000.00

ALTERNATIVA DE PRESUPUESTO DEL ABANDONO DE LA CENTRAL HIDROELCTRICA PA


Dejando Intacta la Casa de Mquinas
No

ELEMENTO

UNIDAD

0.00 Trabajos Preliminares


0.01 Movilizacin y desmovilizacin
0.02 Campamento provisional
0.03 Operacin y mantenimiento campamento
0.04 Talleres
0.05 Cartel de obra
0.06 Caminos temporales
0.07 Emparejamiento de superficies

Global
meses
meses
meses
Unidad
Km
m2

1.00 Canal de derivacin


1.01 Suministro de material de relleno para canal
1.02 Relleno del Canal de derivacin
1.03 Suministro e instalacion de Tubera para Marh Tnel
1.04 Demolicin del canal Rumichaca

m3
m3
m
Global

2.00 Tneles
2.01 Bloqueo o taponamiento de tneles
2.02 Accesos temporales
3.00 Cmara de Carga: Taza Nueva
3.01 Demolicin de Cmara de carga
3.02 Desmontaje de Compuertas a tuberas forzadas
3.03 Desmontaje de Compuertas de alivio
3.04 Demolicin de Caseta abandonada de vigilancia
3.05 Demolicin de Caseta de vigilancia
3.06 Desmontaje de Cerco perimtrico
3.07 Eliminacin de material de desmonte
3.08 Anlisis de Suelos y Sedimentos
4.00 Cmara de carga: Taza Vieja
4.01 Relleno de zona de Compuerta de duelas
4.02 Relleno de zona de Compuerta de Alivio
4.03 Demolicion Caseta de comunicacin antigua
4.04 Demolicion Caseta de comunicacin actual
4.05 Desmontaje Cerco perimtrico
4.06 Relleno de Vertedero de alivio lateral y Descarga libre
4.07 Desmontaje de Puente-Muelle metlico

m3
km

m3
kg
m3
m3
m3
ml
m3
Global

m3
m3
m3
m3
ml
m3
kg

4.08 Eliminacion de material de desmonte

m3

5.00 Tubera forzada


5.01 Demolicin de Tubera de duelas
5.02 Desmontaje deTubera forzada
5.03 Demolicin de anclajes de concreto
5.04 Desmontaje de Cerco de proteccin
5.05 Eliminacin de material de desmonte

km
kg
m3
m
m3

7.00 Plan de Manejo de Residuos y Efluentes


7.01

Riego de zona de trabajo para mitigar la contaminacin-polvo (Incl. costo


de agua y transporte surtidor a obra )*

7.02 Mantenimiento de maquinaria


7.03 Manejo de Residuos Slidos (EPS-RS)
7.04 Contenedores de residuos slidos
7.05 Alquiler de baos porttiles
7.06 Limpieza y retiro de basura, maleza a zona aledaa**
7.07 Limpieza permanente de la obra**
7.08 Sealizacin
7.09 Abastecimiento de EPP***

3
veces/s
emana
Bimestral
Semanal

8.00 Plan de Contingencia


8.01 Equipos de evacuacin, bsqueda y rescate de uso colectivo
8.02 Equipos de evacuacin, bsqueda y rescate de uso individual
8.03 Equipos de contingencias para derrame de producto qumico
8.04 Equipos de contingencias para incendio
9.00 Rehabilitacion Final
9.01 Actividades de Revegetacin
SUB TOTAL

* Riego se realizara 3 veces por semana


** Estas actividades las realizan los mismo obreros contratados para el Proyecto
***Contemplado para 50 obreros mas 3 recambios

HIDROELCTRICA PACHACHACA
Mquinas
CANTIDAD

PU

TOTAL S/.

1
6
6
6
1
5
20000

S/.
S/.
S/.
S/.
S/.
S/.
S/.

50,000.00
50,000.00
40,000.00
10,000.00
5,000.00
200,000.00
10.00

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

50,000.00
300,000.00
240,000.00
60,000.00
5,000.00
1,000,000.00
200,000.00
1,855,000.00

89370.58
89370.58
13000
1

S/.
S/.
S/.
S/.

13.00
50.00
100.00
200,000.00

S/.
S/.
S/.
S/.
S/.

1,161,817.54
4,468,529.00
1,300,000.00
200,000.00
7,130,346.54

500.00 S/.
200,000.00 S/.
S/.

410,400.00
2,800,000.00
3,210,400.00

820.8 S/.
14 S/.

30
300
200
50
100
2000
380
1

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

200.00
2.00
40.00
40.00
40.00
5.00
15.00
1,200.00

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

6,000.00
600.00
8,000.00
2,000.00
4,000.00
10,000.00
5,700.00
1,200.00
37,500.00

40
50
20
40
2000
30
2000

S/.
S/.
S/.
S/.
S/.
S/.
S/.

50.00
50.00
40.00
40.00
5.00
100.00
2.00

S/.
S/.
S/.
S/.
S/.
S/.
S/.

2,000.00
2,500.00
800.00
1,600.00
10,000.00
3,000.00
4,000.00

180 S/.

2.6
2164128
263
2000
263

S/.
S/.
S/.
S/.
S/.

72 S/.
2
24
7
4

S/.
S/.
S/.
S/.

10 S/.
120 S/.

1
1
2
3

S/.
S/.
S/.
S/.

5 S/.

15.00 S/.
S/.
30,000.00
3.50
500.00
10.00
15.00

2,700.00
26,600.00

S/.
S/.
S/.
S/.
S/.
S/.

78,000.00
7,574,446.93
131,250.00
20,000.00
3,937.50
7,807,634.43

100.00 S/.

7,200.00

1,500.00
300.00
90.00
400.00

S/.
S/.
S/.
S/.

500.00 S/.
103.00 S/.
S/.
250.00
300.00
1,500.00
250.00

S/.
S/.
S/.
S/.
S/.

3,000.00
7,200.00
630.00
1,600.00
**
**
5,000.00
12,360.00
36,990.00
250.00
300.00
3,000.00
750.00
4,300.00

3,440.00 S/.
17,200.00
S/. 20,125,970.97

ALTERNATIVA DE PRESUPUESTO DEL ABANDONO DE LA CENTRAL HIDROELCTRICA PA


Dejando la tubera Forzada y la Casa de Mquinas
No

ELEMENTO

UNIDAD

0.00
0.01
0.02
0.03
0.04
0.05
0.06
0.07

Trabajos Preliminares
Movilizacin y desmovilizacin
Campamento provisional
Operacin y mantenimiento campamento
Talleres
Cartel de obra
Caminos temporales
Emparejamiento de superficies

Global
meses
meses
meses
Unidad
Km
m2

1.00
1.01
1.02
1.03
1.04

Canal de derivacin
Suministro de material de relleno para canal
Relleno del Canal de derivacin
Suministro e instalacion de Tubera para Marh Tnel
Demolicin del canal Rumichaca

m3
m3
m
Global

2.00
2.01
2.02

Tneles
Bloqueo o taponamiento de tneles
Accesos temporales

3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
3.08

Cmara de Carga: Taza Nueva


Demolicin de Cmara de carga
Desmontaje de Compuertas a tuberas forzadas
Desmontaje de Compuertas de alivio
Demolicin de Caseta abandonada de vigilancia
Demolicin de Caseta de vigilancia
Desmontaje de Cerco perimtrico
Eliminacin de material de desmonte
Anlisis de Suelos y Sedimentos

4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07

Cmara de carga: Taza Vieja


Relleno de zona de Compuerta de duelas
Relleno de zona de Compuerta de Alivio
Demolicion Caseta de comunicacin antigua
Demolicion Caseta de comunicacin actual
Desmontaje Cerco perimtrico
Relleno de Vertedero de alivio lateral y Descarga libre
Desmontaje de Puente-Muelle metlico

m3
km

m3
kg
m3
m3
m3
ml
m3
Global

m3
m3
m3
m3
ml
m3
kg

4.08

Eliminacion de material de desmonte

m3

7.00 Plan de Manejo de Residuos y Efluentes


7.01

Riego de zona de trabajo para mitigar la contaminacin-polvo (Incl. costo


de agua y transporte surtidor a obra )*

7.02 Mantenimiento de maquinaria


7.03 Manejo de Residuos Slidos (EPS-RS)
7.04 Contenedores de residuos slidos
7.05 Alquiler de baos porttiles
7.06 Limpieza y retiro de basura, maleza a zona aledaa**
7.07 Limpieza permanente de la obra**
7.08 Sealizacin
7.09 Abastecimiento de EPP***

3
veces/s
emana
Bimestral
Semanal

8.00 Plan de Contingencia


8.01 Equipos de evacuacin, bsqueda y rescate de uso colectivo
8.02 Equipos de evacuacin, bsqueda y rescate de uso individual
8.03 Equipos de contingencias para derrame de producto qumico
8.04 Equipos de contingencias para incendio
9.00 Rehabilitacion Final
9.01 Actividades de Revegetacin
SUB TOTAL

* Riego se realizara 3 veces por semana


** Estas actividades las realizan los mismo obreros contratados para el Proyecto
***Contemplado para 50 obreros mas 3 recambios

HIDROELCTRICA PACHACHACA
asa de Mquinas
CANTIDAD

PU

TOTAL S/.

1
6
6
6
1
5
20000

S/.
S/.
S/.
S/.
S/.
S/.
S/.

50,000.00
50,000.00
40,000.00
10,000.00
5,000.00
200,000.00
10.00

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

50,000.00
300,000.00
240,000.00
60,000.00
5,000.00
1,000,000.00
200,000.00
1,855,000.00

89370.58
89370.58
13000
1

S/.
S/.
S/.
S/.

13.00
50.00
100.00
200,000.00

S/.
S/.
S/.
S/.
S/.

1,161,817.54
4,468,529.00
1,300,000.00
200,000.00
7,130,346.54

500.00 S/.
200,000.00 S/.
S/.

410,400.00
2,800,000.00
3,210,400.00

820.8 S/.
14 S/.

30
300
200
50
100
2000
380
1

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

200.00
2.00
40.00
40.00
40.00
5.00
15.00
1,200.00

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

6,000.00
600.00
8,000.00
2,000.00
4,000.00
10,000.00
5,700.00
1,200.00
37,500.00

40
50
20
40
2000
30
2000

S/.
S/.
S/.
S/.
S/.
S/.
S/.

50.00
50.00
40.00
40.00
5.00
100.00
2.00

S/.
S/.
S/.
S/.
S/.
S/.
S/.

2,000.00
2,500.00
800.00
1,600.00
10,000.00
3,000.00
4,000.00

180 S/.

15.00 S/.
S/.

2,700.00
26,600.00

72 S/.

100.00 S/.

7,200.00

2
24
7
4

S/.
S/.
S/.
S/.

1,500.00
300.00
90.00
400.00

S/.
S/.
S/.
S/.

3,000.00
7,200.00
630.00
1,600.00
**
**

10 S/.
120 S/.

1
1
2
3

S/.
S/.
S/.
S/.

5 S/.

500.00 S/.
103.00 S/.
S/.
250.00
300.00
1,500.00
250.00

5,000.00
12,360.00
36,990.00

S/.
S/.
S/.
S/.
S/.

250.00
300.00
3,000.00
750.00
4,300.00

3,440.00 S/.
S/.

17,200.00
12,314,036.54

PRESUPUESTO VALORIZANDO LOS EQUIPOS Y TUBERIAS DEL ABANDONO DE LA CENTRAL HID


No

ELEMENTO

UNIDAD

0.00 Trabajos Preliminares


0.01 Movilizacin y desmovilizacin
0.02 Campamento provisional
0.03 Operacin y mantenimiento campamento
0.04 Talleres
0.05 Cartel de obra
0.06 Caminos temporales
0.07 Emparejamiento de superficies

Global
meses
meses
meses
Unidad
Km
m2

1.00 Canal de derivacin


1.01 Suministro de material de relleno para canal
1.02 Relleno del Canal de derivacin
1.03 Suministro e instalacion de Tubera para Marh Tnel
1.04 Demolicin del canal Rumichaca

m3
m3
m
Global

2.00 Tneles
2.01 Bloqueo o taponamiento de tneles
2.02 Accesos temporales
3.00 Cmara de Carga: Taza Nueva
3.01 Demolicin de Cmara de carga
3.02 Desmontaje de Compuertas a tuberas forzadas
3.03 Desmontaje de Compuertas de alivio
3.04 Demolicin de Caseta abandonada de vigilancia
3.05 Demolicin de Caseta de vigilancia
3.06 Desmontaje de Cerco perimtrico
3.07 Eliminacin de material de desmonte
3.08 Anlisis de Suelos y Sedimentos
4.00 Cmara de carga: Taza Vieja
4.01 Relleno de zona de Compuerta de duelas
4.02 Relleno de zona de Compuerta de Alivio
4.03 Demolicion Caseta de comunicacin antigua
4.04 Demolicion Caseta de comunicacin actual
4.05 Desmontaje Cerco perimtrico
4.06 Relleno de Vertedero de alivio lateral y Descarga libre
4.07 Desmontaje de Puente-Muelle metlico

m3
km

m3
kg
m3
m3
m3
ml
m3
Global

m3
m3
m3
m3
ml
m3
kg

4.08 Eliminacion de material de desmonte

m3

5.00 Tubera forzada


5.01 Demolicin de Tubera de duelas
5.02 Desmontaje deTubera forzada
5.03 Demolicin de anclajes de concreto
5.04 Desmontaje de Cerco de proteccin
5.05 Eliminacin de material de desmonte

km
kg
m3
m
m3

6.00 Casa de Mquinas


6.01 Demolicin del Edificio
6.02 Demolicin de canal de desfogue al ro Yauli
6.03 Desmontaje de las 6 Turbinas
6.04 Desmontaje de los 3 Generadores
6.05 Desmontaje de las 3 Excitatrices
6.06 Desmontaje de las Bombas
6.07 Desmontaje de Sala de control
6.08 Desmontaje de la gra Puente y equipos complementarios
6.09 Eliminacin de material de desmonte

m3
m3
und.
und.
und.
und.
und.
und.
m3

7.00 Plan de Manejo de Residuos y Efluentes


Riego de zona de trabajo para mitigar la contaminacin-polvo (Incl. costo
7.01
de agua y transporte surtidor a obra )*
7.02 Mantenimiento de maquinaria
7.03 Manejo de Residuos Slidos (EPS-RS)
7.04 Contenedores de residuos slidos
7.05 Alquiler de baos porttiles
7.06 Limpieza y retiro de basura, maleza a zona aledaa**
7.07 Limpieza permanente de la obra**
7.08 Sealizacin
7.09 Abastecimiento de EPP***
8.00 Plan de Contingencia
8.01 Equipos de evacuacin, bsqueda y rescate de uso colectivo
8.02 Equipos de evacuacin, bsqueda y rescate de uso individual
8.03 Equipos de contingencias para derrame de producto qumico
8.04 Equipos de contingencias para incendio
9.00 Rehabilitacion Final
9.01 Actividades de Revegetacin
SUB TOTAL
****
VALOR DE RECUPERACIN DE COMPONENTES PRINCIPALES

3
veces/s
emana
Bimestral
Semanal

6.00 Equipos maquinas y mecanismos de la casa de mquinas


5.00 Tubera forzada
MONTO DE RECUPERACIN
ESTIMADO PTIMO

kv
kg

* Riego se realizara 3 veces por semana


** Estas actividades las realizan los mismo obreros contratados para el Proyecto
***Contemplado para 50 obreros mas 3 recambios
**** Se valorizan los equips electromecnicos y tuberas de acero

NOTAS:

*Al presupuesto de obra se resta los ingresos por la venta de equipos electromecnicos y tuberia

DE LA CENTRAL HIDROELCTRICA PACHACHACA


CANTIDAD

PU

TOTAL S/.

1
6
6
6
1
5
20000

S/.
S/.
S/.
S/.
S/.
S/.
S/.

50,000.00
50,000.00
40,000.00
10,000.00
5,000.00
200,000.00
10.00

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

50,000.00
300,000.00
240,000.00
60,000.00
5,000.00
1,000,000.00
200,000.00
1,855,000.00

89370.58
89370.58
13000
1

S/.
S/.
S/.
S/.

13.00
50.00
100.00
200,000.00

S/.
S/.
S/.
S/.
S/.

1,161,817.54
4,468,529.00
1,300,000.00
200,000.00
7,130,346.54

500.00 S/.
200,000.00 S/.
S/.

410,400.00
2,800,000.00
3,210,400.00

820.8 S/.
14 S/.

30
300
200
50
100
2000
380
1

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

200.00
2.00
40.00
40.00
40.00
5.00
15.00
1,200.00

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

6,000.00
600.00
8,000.00
2,000.00
4,000.00
10,000.00
5,700.00
1,200.00
37,500.00

40
50
20
40
2000
30
2000

S/.
S/.
S/.
S/.
S/.
S/.
S/.

50.00
50.00
40.00
40.00
5.00
100.00
2.00

S/.
S/.
S/.
S/.
S/.
S/.
S/.

2,000.00
2,500.00
800.00
1,600.00
10,000.00
3,000.00
4,000.00

180 S/.

15.00 S/.
S/.

2,700.00
26,600.00

2.6
2164128
263
2000
263

S/.
S/.
S/.
S/.
S/.

30,000.00
3.50
500.00
10.00
15.00

S/.
S/.
S/.
S/.
S/.
S/.

78,000.00
7,574,446.93
131,250.00
20,000.00
3,937.50
7,807,634.43

7200
1600
6
3
3
3
1
1
8800

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

40.00
20.00
7,000.00
12,000.00
4,000.00
2,000.00
10,000.00
5,000.00
15.00

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

288,000.00
32,000.00
42,000.00
36,000.00
12,000.00
6,000.00
10,000.00
5,000.00
132,000.00
563,000.00

100.00 S/.

7,200.00

72 S/.
2
24
7
4

S/.
S/.
S/.
S/.

1,500.00
300.00
90.00
400.00

S/.
S/.
S/.
S/.

3,000.00
7,200.00
630.00
1,600.00
**
**

10 S/.
120 S/.

1
1
2
3

S/.
S/.
S/.
S/.

5 S/.

500.00 S/.
103.00 S/.
S/.
250.00
300.00
1,500.00
250.00

5,000.00
12,360.00
36,990.00

S/.
S/.
S/.
S/.
S/.

250.00
300.00
3,000.00
750.00
4,300.00

3,440.00 S/.
S/.

17,200.00
20,684,670.97

9000.00 S/.
2164127.69 S/.

romecnicos y tuberias de acero

1,200.00 S/.
2.00 S/.
S/.
S/.

10,800,000.00
4,328,255.39
15,128,255.39
5,556,415.58

PRESUPUESTO G
PRESUPUESTO DE FORMULACIN DEL PLAN DE ABANDONO
PRESUPUESTO DE ELABORACION DE EXPEDIENTE TECNICO
PRESUPUESTO DEL ABANDONO DE OBRA
PRESUPUESTO DE ACTIVIDADES DE MANTENIMIENTO
PRESUPUESTO DE MONITOREO AMBIENTAL
SUBTOTAL
GATOS GENERALES
UTILIDAD
MONTO

PR

OPCIONES DE PRESUPUESTOS

Presupuesto sin tocar casa de Mquinas **


Presupuesto sin tocar tuberia forzada y casa de Mquinas ***
Presupuesto del abandono total incluyendo el monto de recuperacion
por la venta de equipos electromecnicos y tuberia forzada. ****

PRESUPUESTO GLOBAL EXCLUYENDO SUPERVISIN

PRESUPUESTO PTIMO

MONTOS

PRESUPUESTO PTIMO GLOBAL


EXCLUYENDO SUPERVISIN

S/.
S/.

S./
20,125,970.97 S/.
12,314,036.54 S/.

S/.

5,556,415.58 S/.

S./

MONTOS PTIMOS TOTALES IN


UTILIDADE

15%
21,795,220.97 S/. 3,269,283.15
13,983,286.54 S/. 2,097,492.98
7,225,665.58 S/. 1,083,849.84

S/.
S/.
S/.

S/.
15% S/.
10% S/.
S/.

689,250.00
835,000.00
20,697,460.97
S/. 88,000.00
S/. 57,000.00
22,366,710.97
3,355,006.65
2,236,671.10
27,958,388.71

TOS PTIMOS TOTALES INCLUYENDO GASTOS Y


UTILIDADES

S/.
S/.

10%
2,179,522.10 S/.
1,398,328.65 S/.

S/.
27,244,026.21
17,479,108.18

S/.

722,566.56 S/.

9,032,081.98