SECTION 26 05 26
EARTHING SYSTEM
PART 1:
1.01
A
GENERAL
SECTION INCLUDES
Earthing system including, but not limited to the following:
1. Earth rods.
2. Earth conductors.
3. Earth connection bar.
4. Earthing of various systems.
1.02
RELATED SECTIONS
Section 01 31 00
Section 0133 00
Submittal Procedures.
Section 01 61 00
Section 01 78 36
Warranties.
Section 26 05 00
Section 26 05 53
Electrical Identification.
Section 26 05 19
Section 33 71 19
Section 26 11 13
Unit Substation.
Section 26 08 00
1.03
REFERENCES
SASO
IEC 60364
BS 7430
BS 7671
SEC DPS
SEC SDMS
EARTHING SYSTEM
SECTION 26 05 26 - 1
MINISTRY OF HOUSING
Western Sector Projects
Sitework & Infrastructure
OMRANIA and ASSOCIATES
G
1.04
SEC SDCS
Project Specification
SUBMITTALS
Submit manufacturers data, illustrated leaflets, dimensions, fixing details and description of
the proposed products.
1.05
QUALITY ASSURANCE
Installer: Firms regularly engaged and qualified with at least 5 years of successful installation
and experience on projects with installations similar to that required for this project.
All equipment furnished under this Specification shall conform to the requirements of IEC,
SASO and BS.
1.06
1.07
A
1.08
WARRANTY
Comply with section 01 78 36.
SEC/MUNICIPALITY COMPLIANCE
Contractor shall comply with all applicable SEC distribution material specification,
construction and planning standards for power distribution networks and municipality
specification for road lighting. Some of the specifications and standards are attached with the
contract documents for guidance, however contractor shall obtain copy of all applicable
specification and standards from the concerned authorities as required on site or instructed by
the Engineer.
Any conflict found between this project specification and SEC or municipality
specification/standards shall be immediately brought to the notice of Engineer for final
decision.
PART 2:
2.01
PRODUCTS
ACCEPTABLE MANUFACTURERS
Not Used.
2.02
A
GENERAL
All materials required for earthing system shall be furnished new and undamaged in
accordance with the requirements stated in this section.
EARTHING SYSTEM
SECTION 26 05 26 - 2
MINISTRY OF HOUSING
Western Sector Projects
Sitework & Infrastructure
OMRANIA and ASSOCIATES
Project Specification
Conduct soil electrical resistivity tests at four locations (minimum) to be advised by the
Engineer. The earthing calculations based on the test results shall be submitted for Engineers
approval, to demonstrate that the proposed design of the earthing system complies with the
Specification and standards.
A connection shall be provided from the main earth loop for medium voltage equipment in
the electricity supply authority incoming equipment room, Earth pits shall be installed in
accordance with the requirements of the electricity supply authority having jurisdiction, which
shall be isolated from the main earth loop.
2.03
EARTH RODS
Earth rods of the 'copper-weld' (copper-clad rods constructed with a minimum 0.25 mm thick
copper exterior sleeve inseparably and permanently molten-welded to a central high tensile
steel core for rigidity) type shall be used.
Earth electrodes for each system shall have an interconnected resistance to earth of not more
than 5 Ohms. Where this value is exceeded, the system shall be augmented by additional
electrodes connected in parallel spaced at approximately four meters apart until this value is
reached.
The diameter and length of earth rods shall be as per details shown on drawings or as
approved by the Engineer.
2.04
EARTH CONDUCTORS
Size of earth conductors shall be as shown on the drawings and in accordance with applicable
standards.
PVC insulated copper conductor cable shall be used for final connections from earth loop to
structures, equipment, etc and for earthing/bonding of equipment and metalwork inside the
building.
All copper to copper connections, splices, taps, etc. in conductors and at accessories for
termination shall be made by the exothermic weld process. Joints for underground installation
shall be epoxy resin encapsulated before burial.
Earth conductor in the conduit shall be continuous through the conduit run with bushing earth
connection and terminated on the panel board earthing.
2.05
A
EARTHING SYSTEM
SECTION 26 05 26 - 3
MINISTRY OF HOUSING
Western Sector Projects
Sitework & Infrastructure
OMRANIA and ASSOCIATES
Project Specification
Earth connection bars for transformer neutral and LV switchboard frame shall be separate
from earth bar for MV and transformer frame.
MV generator frame and neutral shall be connected to the same earth connection bar.
Each earth connection bar shall have a permanent label to identify the connections, together
with the wording "Main Earth Bar".
PART 3:
3.01
EXECUTION
INSPECTION
Examine the area and conditions under which the earthing systems are to be installed and
correct any unsatisfactory conditions detrimental to the timely and proper completion of the
work. Do not proceed with the work until unsatisfactory conditions have been corrected in a
manner acceptable to the Engineer.
3.02
The installation shall be carried out in accordance with IEC. The position of all conductors,
joints and terminals shall be approved by the Engineer prior to commencing the work.
All electrical equipment shall be connected to the earth with copper earth conductor. The term
"electrical equipment" shall include all metal enclosures containing electrical connections or
bare conductors. Individual devices such as solenoids, pressure switches, and limit switches
shall be exempt from this requirement unless the device requires earthing for proper
operation. Large equipment such as power distribution boards or motor control centers shall
be furnished with an earthing bus, which shall be connected at two points to the earth. All
earth connection surfaces shall be cleaned immediately prior to connection. Provide all
earthing material required but not furnished with the equipment.
All exposed non-current carrying metallic parts of all installations shall be effectively earthed.
Steel conduit systems, metallic equipment enclosures, metallic lighting fixtures, cable trays,
all non-current carrying metal parts of electrical systems and any other equipment or system
components shall be earthed and the connection shall be extended to the nearest panel board
earth or earthing bar in the sub-station.
All connections and joints for the earthing system including bonding connections shall be
made using the "Exothermic" process to produce a fused joint.
3.03
A
EARTHING SYSTEM
SECTION 26 05 26 - 4
MINISTRY OF HOUSING
Western Sector Projects
Sitework & Infrastructure
OMRANIA and ASSOCIATES
Project Specification
All connections between rods and earthing conductors shall be made by removable bolted
connections.
All earth rods shall have inspection pits as shown on the Drawings. Inspection pits shall be
constructed from pre-cast concrete. All connections to the earth rod shall be exposed when the
cover is raised. Attach a DANGER - ELECTRICITY sign to the wall of the inspection pit.
Use English and Arabic white letters on red background. Inspection pit cover shall be
constructed from cast iron.
3.04
Provide standard sizes of bare or PVC insulated stranded copper conductor for earth
continuity as required and approved by the Engineer, whether shown on the drawings or not.
The conduit system shall not be considered as continuous for earthing purposes. A separate
earth conductor shall be installed in the same conduit with the phase and neutral conductors.
The separate earth conductors shall be sized according to calculated short circuit current and
applicable standards. No earthing conductors shall be smaller than 2.5 mm2 unless this is part
of a multi-core cable. Where flexible connections are made to equipment, earthing jumpers
shall be provided. All connections of heavy gauge steel conduit system shall be checked for
good electrical continuity.
Conductors routed over concrete, steel or equipment surfaces shall be kept in close contact
with those surfaces by using fasteners located at intervals not exceeding 1 meter.
Exposed earthing conductors shall be securely fastened to the mounting surface using copper
or brass straps.
Clamps, connectors, bolts, washers, nuts and other hardware for bolted connection to earthing
system shall be of copper.
Earth conductors shall be buried at a minimum depth of 750 mm below finished grade.
Except for sub-stations and electrical rooms, the exposed earth conductor shall run in
protective pipes for runs below 900 mm from floor level. Pipes shall also be provided at
locations where conductor is likely to be subject to physical damage.
EARTHING SYSTEM
SECTION 26 05 26 - 5
MINISTRY OF HOUSING
Western Sector Projects
Sitework & Infrastructure
OMRANIA and ASSOCIATES
Project Specification
Extensions from the earth loop as shown on the Drawings shall be provided for connection to
electrical equipment. Connect the earthing conductor to equipment, earth bus, pad or lug. In
addition to the earth grid extension conductors, an earth cable to each end of the earth bus in
each assembly of power distribution board or panel boards shall be provided.
Where an earth conductor is included with the phase conductors of power circuits, the earth
conductor shall be connected to the equipment earthing facilities and to the source earth bus.
Where an earth conductor is not included with the phase conductors, the equipment shall be
earthed by connecting a separate earth cable to the equipment earthing facilities and to the
tray earthing cable or source earth bus.
3.05
A
3.06
Building low current systems including communication, control and alarm functions shall be
provided with earthing as shown on the drawings and in the relevant specification section.
Where applicable, requirements of functional earthing shall also be complied with.
The installation of earthing for building systems shall be in accordance with the
recommendations of standards, and the applicable provisions of this section.
3.07
In accordance with Section 547 of the IEE Wiring Regulations (BS 7671), bonding
conductors shall be installed in appropriate locations to ensure all simultaneously accessible
exposed or extraneous conductive parts are at equal potential. Undertake such tests and install
such supplementary bonding conductors that are necessary to ensure compliance with these
requirements.
Main equi-potential bonding conductors shall conform to the requirements of section 547-2 of
the IEE Wiring Regulations and shall have a minimum cross-sectional area of 6.0 mm2.
3.08
Earth resistance tests shall be carried out after installation of the individual earthing systems
in accordance with the specification. Earth resistance tests shall be carried out in accordance
with section 713-11 of the IEE wiring regulations 16th edition and the readings obtained shall
be officially recorded by all witnessing parties.
Prior to connection of earth rods to the earthing system, the earth resistance of individual
earth rods shall be measured by using an approved type of earth resistance tester.
After completion of all connections of the earthing system, the earth resistance shall be
measured from the earthing test point in the presence of the Engineer.
EARTHING SYSTEM
SECTION 26 05 26 - 6
MINISTRY OF HOUSING
Western Sector Projects
Sitework & Infrastructure
OMRANIA and ASSOCIATES
Project Specification
In addition to above, carry out any test(s) required to comply with the procedures of the
electricity supply authority (SEC) for power connection requirements.
All earth resistance test reports shall be submitted for the Engineers approval.
END OF SECTION
EARTHING SYSTEM
SECTION 26 05 26 - 7