Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Project Specification
SECTION 26 11 13
UNIT SUBSTATIONS
PART 1:
1.01
A
GENERAL
SECTION INCLUDES
Factory assembled 13.8 kV unit substations with all associated equipment and accessories
including, but not limited to, the following:
1. Skid, enclosure and compartments.
2. MV termination box.
3. Power transformer.
4. LV compartment.
5. Concrete foundation.
1.02
RELATED SECTIONS
Section 01 31 00
Section 0133 00
Submittal Procedures.
Section 01 61 00
Section 01 75 00
Starting of Systems.
Section 01 77 00
Contract Close-out.
Section 01 78 36
Warranties.
Section 03 30 00
Section 26 05 00
Section 26 05 53
Electrical Identification.
Section 26 27 00
Section 26 05 26
Earthing System.
Section 26 08 00
1.03
REFERENCES
SSA 421
SSA 422
IEC 60044-1
IEC 60044-2
UNIT SUBSTATIONS
SECTION 26 11 13 - 1
MINISTRY OF HOUSING
Western Sector Projects
Sitework & Infrastructure
OMRANIA and ASSOCIATES
Project Specification
IEC 60076
Power Transformers.
IEC 60114
Indicating Instruments.
IEC 60137
IEC 60185
Current Transformers.
IEC 60228
IEC 60229
IEC 60255
Electric Relays.
IEC 60296
IEC 60337
IEC 60354
IEC 60364
IEC 60376
IEC 60408
IEC 60439
IEC 60502-2
IEC 60529
IEC 60551
IEC 60811
IEC 60947
IEC 61330
SEC DPS
SEC SDMS
AA
SEC SDCS
1.04
Switch
SUBMITTALS
UNIT SUBSTATIONS
SECTION 26 11 13 - 2
MINISTRY OF HOUSING
Western Sector Projects
Sitework & Infrastructure
OMRANIA and ASSOCIATES
Project Specification
Submit list of tools, test equipment, spare parts and ancillary equipment.
Submit factory test reports verifying that the unit substation and associated equipment have
successfully passed all routine tests including tests for interruption of load and fault currents.
Type tests results shall be submitted, when required by the Engineer.
Include erection and assembly drawings, complete information regarding tightening and
securing with bolts or studs. Information furnished shall include torque wrench settings or
complete details of other tightening procedures recommended for bus joints, connector
attachments and contact attachments.
Submit all required documents to Saudi Electricity Company (SEC) and obtain their
approval.
1.05
QUALITY ASSURANCE
Manufacturer: Firms regularly engaged in the manufacture of unit substations including power
transformers and LV distribution panels of types, sizes and ratings required, whose products
have been in satisfactory use in similar service for not less than 5 years. Preference shall be
given to the local manufacturers and agents/suppliers.
Installer: Firms regularly engaged and qualified with at least 5 years of successful installation
experience on projects with electrical installation work similar to that required for the project.
All equipment for unit substations shall be from the same manufacturer and comply with the
requirements of SASO, IEC and Saudi Electricity Company (SEC) having jurisdiction and
shall be approved for use by SEC.
1.06
Handle unit substation carefully to prevent breakage, denting or scoring the finish. Store
equipment at an indoor location and protect from weather. When outdoor storage is
necessary, elevate well above ground and enclose with durable, waterproof wrapping and
protect from direct sun.
Unit substations shall be protected, handled and stored in accordance with manufacturers
instructions.
1.07
A
1.08
WARRANTY
Comply with section 01 78 36.
SEC/MUNICIPALITY COMPLIANCE
Contractor shall comply with all applicable SEC distribution material specification,
construction and planning standards for power distribution networks and municipality
specification for road lighting. Some of the specifications and standards are attached with the
contract documents for guidance, however contractor shall obtain copy of all applicable
specification and standards from the concerned authorities as required on site or instructed by
the Engineer.
Any conflict found between this project specification and SEC or municipality
UNIT SUBSTATIONS
SECTION 26 11 13 - 3
MINISTRY OF HOUSING
Western Sector Projects
Sitework & Infrastructure
OMRANIA and ASSOCIATES
Project Specification
PRODUCTS
ACCEPTABLE MANUFACTURERS
Not Used.
2.02
GENERAL
All materials used in the manufacture and installation of unit substations shall be of high quality
and of proven suitability for the functions they will perform and the conditions they will meet in
service.
All materials shall be suitable for the climatic conditions given in section 26 05 00. Provide
and apply any current de-rating due to ambient temperature, if required.
Metal enclosure or hut for unit substations shall have lighting, small power, ventilation and
other miscellaneous requirements as per SEC standards and approved by the Engineer.
2.03
All the components of unit substation such as power transformer with MV termination box and
detachable LV compartment shall all be mounted on a common galvanized steel skid and
housed in an enclosure.
Enclosure and skid shall have adequate mechanical strength for lifting, mounting, and
transportation of the unit substation as one unit. Lifting provision of unit substation shall be an
integral part of the skid.
The MV termination box and LV compartment shall be weatherproof and of robust construction
and shall be provided with watershed top. It shall be manufactured from galvanized sheet steel
or aluminium-zinc alloy of at least 3 or 2 mm thickness respectively.
Adequate ventilation on the back side of MV termination box and LV compartment of unit
substation shall be provided to permit natural circulation of air. The ventilation apertures shall
be screened with galvanized steel or aluminium-zinc alloy double mesh to prevent entry of
vermin and other foreign bodies.
Galvanizing and surface protection of enclosure and skid against corrosion, painting and finish
color (Cement gray RAL 7033) shall comply with the requirements as given in SEC material
specifications.
UNIT SUBSTATIONS
SECTION 26 11 13 - 4
MINISTRY OF HOUSING
Western Sector Projects
Sitework & Infrastructure
OMRANIA and ASSOCIATES
Project Specification
Access doors of LV compartment and power transformer shall be integrated as a part of the
enclosure body. These doors shall be hinged, press fit type gasketed and fitted with a heavyduty locking bar to secure it at the top and bottom. A central handle, locking bar, handle integral
lock and pad locking provision shall be provided as given in the SEC material specifications.
All doors shall be provided with door stoppers and locking at open position to protect from
swinging in order to avoid accident.
All door hinges shall be concealed and made of stainless steel or brass.
All doors shall be bonded to the framework (enclosure) by a bolted removable 35 mm2 tinned
copper braid.
All parts of equal size and shape shall be interchangeable. The general design shall be made
with minimum number of joints.
All bolted electrical joints shall be secured by means of corrosion proof steel fasteners. These
fasteners (bolts, nuts, and washers) shall be galvanized in compliance with SEC material
specifications.
All fasteners except the transformer shall not be accessible from outside of the enclosure of unit
substation.
Maximum overall dimensions of unit substations with enclosures shall be as given below:
Width
Height
1500
2200
1800
Two gasketed openings of 250 mm x 250 mm on the front of LV compartment door shall be
provided for the provision of connecting cables from a mobile generator in emergency situation.
These openings shall be provided with M8 size, round, non-slotted bolted cover with nuts and
washers. Unbolting of these covers shall be accessible from inside of the unit substation only.
The gasket of these openings shall be pressure fit type.
Two (2) holes for unit substations up to 500 kVA and four holes (4) for substations exceeding
500 kVA, each 13 mm diameter for installation of mobile generators cables shall be provided
on vertically extended LV bus-bars.
Aluminum name plates for the transformer and the low voltage compartment with information
as required in SEC material specifications including item identification for the unit substation
shall be fixed inside the left door of the low voltage compartment.
2.04
A
MV TERMINATION BOX
Medium voltage termination box shall be part of transformer and shall be located as per SEC
material specifications and standard practices.
UNIT SUBSTATIONS
SECTION 26 11 13 - 5
MINISTRY OF HOUSING
Western Sector Projects
Sitework & Infrastructure
OMRANIA and ASSOCIATES
Project Specification
Medium voltage termination box shall enclose cable clamps, grounding connectors and medium
voltage bushings.
Medium voltage termination box shall have adequate size for terminating three single core or
one three core MV cables as per SEC material specifications, sizes as shown on drawings (e.g.
50 to 70 mm2 aluminium or copper) with heat/cold/pre-mold termination. This box shall have
single gasketed cover with removable bolts. Bottom plate shall be in two halves and cable entry
with steel knockouts suitable for above cables. Loose rubber bushings shall be provided inside
of this box for these knockouts.
2.05
POWER TRANSFORMER
Power transformers shall be suitable for unit substation, outdoor ground-mounted type, having
two separate mineral oil immersed copper windings in hermetically sealed mild steel tanks and
generally comply with all applicable clauses of SEC material specifications.
MV bushings shall be located horizontally on the right hand side (facing unit substation from
the front) in a cable termination box. Bushing shall be suitable for M16 bolted type connection
with heat/cold shrinkable or pre-moulded termination with separable elbow connectors.
MV and LV bushings shall be identified, labeled and printed with black paint as follows:
1.
MV bushings: U V W.
2.
LV bushings: u v w n.
The no-load and load losses of power transformers shall not exceed the maximum acceptable
values given in SEC material specification. The values of losses submitted in the
manufacturers catalogues for approval shall be treated as guaranteed values and any increase in
these values at the time of testing shall not be accepted.
The cooling of transformer shall be by natural circulation of oil internal to the transformer and
external air i.e. ONAN.
The transformer shall be supplied initially filled with Class 1 un-inhibited transformer mineral
oil complying with IEC 60296.
Oil level & temperature indicators and off-load tap changer operating knob shall easily be
accessible / readable and operate-able from LV panel compartment with adequate safety. Oil
temperature indicator shall be equipped with tripping contact if requested and specified in the
tender / data schedule.
Oil drainage / sample and pressure relief valves shall on the transformer and easily accessible
from the transformer compartment.
Transformer shall be fitted with a lockable 5 positions, manual, off-load tap changer having
taps at + 5 %, 0 %, + 2.5 %; unless otherwise mentioned on the drawings or elsewhere in the
tender documents.
UNIT SUBSTATIONS
SECTION 26 11 13 - 6
MINISTRY OF HOUSING
Western Sector Projects
Sitework & Infrastructure
OMRANIA and ASSOCIATES
2.
3.
Short circuit current that transformer should withstand for two (2) seconds is:
a.
b.
c.
25 times full load current for ratings of 50, 100, 200, 300 kVA.
20 times full load current for ratings of 500 kVA.
17 times full load current for ratings of 1000 and 1500 kVA.
4.
5.
6.
Impedance voltage at normal tap: 4 % (upto 300 kVA), 5 % (500 kVA), 6 % (> 500 kVA).
7.
Insulation Level:
a.
b.
c.
Project Specification
At the rated power, the transformer shall comply with the following maximum temperature rise
limits:
1.
2.
3.
4.
Top oil:
Windings:
Hot spot:
Average temperature due to short circuit:
45 C.
50 C.
98 C.
250 C.
The noise level emitted by a transformer at full load shall not exceed 48 dB. Measurements
shall be in accordance with IEC 60551.
The power transformers shall be supplied with all necessary fittings required for the satisfactory
operation of the transformers as per SEC requirements and material specifications and shall
include, but not limited to, the following:
1.
2.
3.
4.
5.
6.
7.
8.
9.
2.06
Temperature indicator.
Pressure relief vent.
Oil level indicator.
Lifting lugs.
Tank earthing points.
Oil filling and drain facility.
HV and LV cable support clamps.
Engraved name plate with all details.
Skid base.
LV COMPARTMENT
Low voltage (LV) compartment shall comply with SEC material specifications and the
applicable requirements of section 26 27 00.
As an option if shown on tender drawings, LV distribution panel for bulk power supply shall be
UNIT SUBSTATIONS
SECTION 26 11 13 - 7
MINISTRY OF HOUSING
Western Sector Projects
Sitework & Infrastructure
OMRANIA and ASSOCIATES
Project Specification
equipped with main circuit breaker without outgoing MCCBs and provision for direct
connection of customer cables on the bus-bar.
D
The LV distribution panel shall be enclosed with lockable doors. All live metal shall be
insulated and the operator shall not be able to accidentally come into contact with live
connections or bus-bars when energized. All cable terminations shall be easily accessible from
front, fully shrouded and shall permit connections to be made with adjacent circuits live.
All insulating material shall be non-hygroscopic and resistant to tracking and cracking.
LV distribution panel complete with all its fittings and attachments shall be capable of
withstanding the effects of direct solar radiation at their installed locations. The temperature of
metal surfaces exposed to direct solar radiation shall be regarded as 75 C, plus the effect of
any internal heating.
All parts shall of equal size and shape shall be interchangeable. The general design shall be
made with minimum number of joints.
Three (3) current transformers conforming to IEC 60185 shall be installed at the incoming busbars of LV distribution panel for metering purpose. CT secondary neutral point shall be earthed.
The current ratings of CTs shall be selected according to the power transformer rating as
indicated in SEC material specifications.
Following items related to LV distribution panel shall be provided and installed in compliance
with the requirements given in SEC distribution material specifications and distribution
construction standards:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
L
2.07
Provide an aluminium name plate fixed inside of left door of the LV panel, engraved with all
required information in Arabic and English as mentioned in SEC material specifications.
CONCRETE FOUNDATION
UNIT SUBSTATIONS
SECTION 26 11 13 - 8
MINISTRY OF HOUSING
Western Sector Projects
Sitework & Infrastructure
OMRANIA and ASSOCIATES
Project Specification
Prefabricated steel reinforced concrete foundation shall be used for the installation of unit
substations. This foundation shall be unified suitable to accommodate 300, 500, 1000 and 1500
kVA substations.
The concrete foundation shall be constructed in accordance with SEC standard details. Cast in
situ concreting shall not be done without prior approval of SEC.
Agree with and obtain approval of SEC for the suitability of the dimensions of foundations,
trenches, openings and all other civil works details of the concrete foundation before
fabrication.
PART 3:
3.01
EXECUTION
INSPECTION
Examine the area for unit substations and the conditions under which they are to be installed,
and correct any unsatisfactory conditions detrimental to the proper and timely completion of the
work. Do not proceed with the work until unsatisfactory conditions have been corrected in a
manner acceptable to the Engineer.
Agree with the manufacturer for the suitability of the civil works for foundations which shall
be compatible with equipment and all sizes and details shall be checked and confirmed before
concrete is poured, or revised with the approval of the Engineer where necessary.
It is the contractor's sole responsibility to supply all materials required for the construction of
concrete base in the correct location and to the specified dimensions, level and grade and to
connect all incoming and outgoing cables.
3.02
INSTALLATION
Install unit substations in accordance with the requirements given in SEC distribution material
specifications, SEC distribution construction standards, manufacturer's written instructions,
recognized industry practices and comply fully with SASO and IEC.
Install unit substations on concrete foundations using the appropriate lifting gear to ensure that
no damage occurs. When correctly located, the units shall be anchored in position and tested
before and after connecting the incoming and outgoing cables.
Provide foundation bolts and grout them in cement concrete floor using non-shrinkable
material approved by the Engineer. All installation materials for physically erecting the unit
substations such as anchor bolts, nuts, washers, supporting steel, etc. shall be provided and
installed by the contractor. Install the unit upright and in level. It shall be firmly and rigidly
bolted on the floor and concrete supports.
Tighten all bolts and studs in accordance with the torque wrench settings and procedures as
recommended by the manufacturer. Provide calibrated hand torque wrenches, necessary
platforms, equipment and personnel for checking by Engineer when required.
Earthing of substations shall be carried out in accordance with the requirements given in SEC
material specifications, SEC distribution construction standards and section 26 05 26.
3.03
UNIT SUBSTATIONS
SECTION 26 11 13 - 9
MINISTRY OF HOUSING
Western Sector Projects
Sitework & Infrastructure
OMRANIA and ASSOCIATES
Project Specification
Perform dielectric strength or insulation resistance test of all equipment in unit substations and
the substation as a complete unit after installation and fixation in place.
Carry out tests to prove the operation of all LV switches and circuit breakers. Simulate fault on
protective relays and devices.
Perform ratio test and other field tests of all current and voltage transformers according to
SASO and IEC requirements.
Testing of power transformers including the following tests as a minimum shall be performed:
1. Ratio tests on rated voltage connection and all tap connections.
2. Polarity and phase rotation tests the rated voltage connection.
3. No-load loss at rated voltage on the rated voltage connection.
4. Exiting current at rated voltage on the rated connection.
5. Impedance and load loss at rated current on the rated voltage connection at each unit and on
the top extremes of one unit.
3.04
ADJUSTMENTS
Adjust protective relays and devices to provide adequate over current protection and selective
tripping with downstream devices according to short circuit and protection coordination study
and after proper coordination with the protection settings of the Saudi Electricity Company
(SEC) having jurisdiction.
3.05
TRAINING
Provide instruction and training to the Owners staff for the operation and maintenance of
equipment. Provide a minimum of twenty four (24) hours training to be divided between
classroom and hands-on training as required by the Owner.
Agree the training schedule (dates, time, duration of each class, etc.) with the owner at least
one month before the actual training programme is scheduled.
3.06
A
END OF SECTION
UNIT SUBSTATIONS
SECTION 26 11 13 - 10