Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
16 August 2011
TABLE OF CONTENTS
1. INTRODUCTION
2. PLATFORM TYPES
3. FIELD LAYOUT
4. PLATFORM TERMINOLOGY
5. FIXED OFFSHORE PLATFORM DESIGN
6. INFORMATION FLOW
1. INTRODUCTION
Proposed : To support Oil & Gas facilities, i.e., Production, Export of
Liquid and Gas, Drilling and Living Quarter.
1. INTRODUCTION
Onshore &
offshore
Liquefaction
Reinjection
compressors
GTL
Methane (C1)
Associated Gas
&
Non Associated Gas
Regional
consumers
-Power plant
-Fuel gas
Steam
cracker
(Ethylene)
Ethane (C2)
C3/C4
C5-12
C5-20
CO2
Sulphur
Water
Petrochemicals
- Methanol
- Ammonia
- Hydrogen
LPG
Gasoline
Condensate
2. PLATFORM TYPES
Fixed Platform
Floating Platform
Subsea
3. FIELD LAYOUT
Fixed Platform Field Layout (Sample)
3. FIELD LAYOUT
3. FIELD LAYOUT
Floating Platform Field Layout (Sample)
3. FIELD LAYOUT
4. TERMINOLOGY
10
4. TERMINOLOGY
Jacket / Sub-structure
Leg
Horizontal framing
Conductor framing
Can
Knee braces
Sea deck walkway
Conductors
Curved
Straight
Piles
Through leg
Pile cluster / Skirt Pile
Batter v/s straight
Grouted v/s ungrouted
11
4. TERMINOLOGY
Miscellaneous and Appurtenances
Risers and clamp
Caissons / casings
Boatlanding
Barge bumper / fender
J-tube
Flooding / grouting tube
Launch cradle
Mudmat
Anodes
12
Owner Specification
Chevron (CES), PTTEP (TOTAL and Arthit), etc.
Weight Control
Purpose :
For monitoring the weight and centre of gravity (C.O.G) of all
component parts of a platform
Platfrom weight and Center of Gravity (CoG) is Critical for:
Fabrication and Ladout
Capacity of support foundation during fabrication
Loadout reaction to confirm loadout equipment and skid beams
Offshore Installation
Capacity of sea transportation and offshore lifting barge/vessel
Weight Control
Contingency and Tolerances :
Expressed in terms of a percentage of Base Weight are to allow for weight
changes due to the uncertainty of the data, lack of design or final selected
vendor data.
Sample of Contingency and Tolerances Percentage
Weight Control
Responsibilities :
Lead Structural Engineer
Assign weight control engineer on the project
Interface, co-ordinate and collect weight data from discipline
- Snow/Ice
- Earthquake
Pre-Service Loads
- Motion Force
- Mating Load
Pre-service Conditions
- Loadout
- Transportation
- Lifting
- Launch
- Floating
- Upending
- On-bottom Stability
- Pile Stick-up & Drivability
4
6. FLOW OF INFORMATION
Flow of Information during Execution Stage
Required Information
Company Specifications
Company Reference/Standard Drawings
Site Environment Data
Geotechnical/Soil Data
Internal Information
Piping Plot Plan / Equipment Layout
Mechanical Equipment List and weight
E&I Equipment List and weight
Safety Drop object, Fire and Blast study
Vendor Drawing
Equipment Dimension and weight
Offshore Structural
Client
Deliverables
Document and Report
Basis of Design
Project Specification
Weight Control Report
Design Calculation Report
Other Documents
Site Survey Report
MTO
BOM
Drawing
General Note and Standard Drawing
Topside Drawings
Jacket & Pile Drawings
Demolition Drawings
Offshore Installation Sequence
Drawings
3D BOCAD model
3D PDMS model
Thank you
www.technip.com