Sei sulla pagina 1di 39

GOVERNMENT OF MONTENEGRO

MINISTRY OF SUSTAINABLE
DEVELOPMENT & TOURISM

PRELIMINARY DESIGN FOR WWTP CETINJE &


SEWERAGE NETWORK WITH FACILITIES

BOOK 5 WASTE WATER TREATMENT


PLANT
Volume 5.5.3 Electrical Design additional
installations

MAY 2013.

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

GENERAL PROJECT CONTENT


No.

NAME OF PROJECT PART


GEOTECHNICAL STUDY
HYDROLOGICAL STUDY ON RAINFALL AND FLOW

BOOK 1

GENERAL BOOK

BOOK 2

SEWAGE NETWORK

BOOK 3

ATMOSPHERIC NETWORK

BOOK 4

HYDRAULIC TUNNEL BELVEDER

BOOK 5

WASTE WATER TREATMENT PLANT (WWTP)

Volume 5.1

Process design

Volume 5.2

Hydraulic design

Volume 5.3

Architectural design

Volume 5.4

Mechanical design

Volume 5.5.1

Electrical design new TS

Volume 5.5.2

Electrical design electrical equipment for the treatment process and


SCADA

Volume 5.5.3

Electrical design additional installations

Volume 5.6

Previous expropriation study

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 1

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

TERMS OF REFERENCE

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 2

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

TABLE OF CONTENT
1. TECHNICAL DESCRIPTION .............................................................................................................. 4
2. TECHNICAL CALCULATIONS .......................................................................................................... 7
2.1. CALCULATION OF CABLE CAPACITY................................................................................................... 7
2.2. CALCULATION OF VOLTAGE DROP...................................................................................................... 9
2.3. INDIRECT CONTACT PROTECTION - SYSTEM TN-C/S ....................................................................... 11
2.4. DETERMINATION OF LIGHTNING PROTECTION LEVEL .................................................................... 15
2.5. GROUNDING CHECK............................................................................................................................. 17
2.6. CALCULATION OF FOUNDATION GROUNDING RESISTANCE ......................................................... 18

3. SPECIAL ADDENDUM ON THE MEASURES APPLIED AND SAFETY AT WORK......................... 20


3.1. GENERAL ............................................................................................................................................... 20

4. GENERAL TECHNICAL REQUIREMENTS...................................................................................... 21


4.1. GENERAL ............................................................................................................................................... 21
4.2. HIGH VOLTAGE CURRENT ................................................................................................................... 22
4.3. GROUNDING .......................................................................................................................................... 23
4.4. LIGHTNING PROTECTION SYSTEM ..................................................................................................... 24

5. LIST OF STANDARDS AND REGULATIONS .................................................................................. 25


6. MATERIAL SPECIFICATION DTS ................................................................................................... 26
6.1. RECAPITULATION ................................................................................................................................. 37

7. DRAWINGS ...................................................................................................................................... 38

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 3

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

1. TECHNICAL DESCRIPTION
STRUCTURE:
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18

Wastewater treatment plant (WWTP) - Budva which has the following


units:
Mechanical treatment - Huber unit
Sand trap
Equalization basin
SBR sequential batch reactor (basins)
Compressor station
Retaining reservoir
Pumping stations for water to filter
Dosage of AL-sulphate solution
Sand filters under pressure
UV disinfection
Monitoring station at the outlet
System for thickening of sludge excess
System for conditioning of sludge excess
System for the dehydration of sludge
Commanding building
Guard house
Auxiliary diesel generator
Transformer and medium voltage power supply

CONSTRUCTION LOCATION:

Cetinje, Dobrsko selo

SUBJECT OF THIS DESIGN (VOLUME 5.5.3) ARE MARKED STRUCTURES


1.

ELECTRICAL INSTALLATIONS

Connection of structures to the outer low-voltage network is executed according to the


technical conditions of Electricity distribution company Cetinje;
Power supply of structures is done from outer new DTS 10/0, 4 kV, 1x630 kVA, "NEWWWTP" DTS has resolved by electrical design, volume 5.5.1 - Transformer station DTS
10/0, 4kV, 1x630kVA. Measuring of electrical energy consumption is at 10 kV side of the
multifunction electricity meter of active and reactive energy, maximum indicator and TF
receiver for registration of lower tariff;
Main distribution board of the technological equipment has been installed in the
commanding facility. All local distribution boards designed for the installations of general
lighting, sockets and heating consumers, ventilation and air conditioning of individual
buildings are supplied from the main distribution board.
Installation of main supply cables is done by electrical design book F2 - Electrical
equipment for the treatment process and SCADA;
From the local distribution boards to the consumers, cables of PP-Y and PP00 0.6 / 1 kV,
Cu, PVC / PVC type are being used. Laying of cables is visible on the wall, on the wall
beneath the mortar, in the concrete and at the penetration points in the pipes of
corresponding diameter.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 4

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

System of electrical lighting


Lighting will be general and antipanic emergency lighting system,. It is anticipated
according to the necessary brightness and space purpose. Modern fluorescent linear and
compact tubes and metal halogen sources will be used as light sources.
In the corridors, halls and stairways, as well as at evacuation routes, above the exit doors
and places with larger number of people, installation of antipanic emergency lighting
system is projected with own Ni-Cd batteries provided for the autonomy of work for a period
of 1h.
Luminaires are resistant to high temperatures and made of hard combustible halogen-free
material.
Due to a possible ceiling finishing work, proper ceiling recessed and ceiling mounted
luminaires are foreseen.
Level and quality of illumination is determined by the recommendations of IEC.
Lighting control system:
Local - switches.
System of plugs and cables of consumers for heating, ventilation and air conditioning
Setting the required number of single-phase and three phase sockets is foreseen for the
consumers as well as the necessary number of general-purpose sockets.
Outer lighting is foreseen according to user needs and technology requirements with HQL
metal-halide light sources.
Power supply and control of outer lighting is done from the guard house - manually and
automaticaly (selection is done in a commanding building). The level of brightness is in
accordance with the recommendations of IEC.
Grounding and lightning protection system
Classic lightning installation is foreseen, configuration according to the given basis and
defined security zone. Ground electrode is foreseen as a ring foundation grounding. To
foresee strips placed in the foundation, during concreting, in the lower layer below the
hydroinsulation, with periodic welding for reinforcement and making of tapped and earth
connection.
Installation of heating and air-conditioning consumers
Socket outlets for connection of electrical heating devices and split system are foreseen.
Protections
Protection against direct voltage is foreseen by proper selection and installation of
equipment, which proper handling prevents the touch of parts under voltage .
Protection against indirect voltage is foreseen with automatic swithing off of power
supply in the TN-C-S system.
Main potential equalization is foreseen by connection of all metal parts of the nonelectrical installation on the busbar Cu 30x5mm, in a separate cabinet with a cover. Busbar
is connected to the foundation grounding of the structure with FeZn tape 25x4mm. All
outlets should be visibly and permanently marked, according to the installation and
connected equipment.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 5

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

Interior lightning protection system is, due to the very significant measurement and
regulation equipment, upgraded with overvoltage protection. Appropriate surge outlets are
provided in the main distribution box of technological equipment. Class of surge outlets in
the building is B.
Additional potential equalizations are foreseen in all technical facilities by connecting all
metal parts to the grounding hot dip galvanized tape FeZn 25x4mm on room wall, which is
using the shortest way connected to the foundation grounding.
Special potential equalizations are provided in sanitary facilities, by connecting all metal
parts on the busbar in the potential equalization box, with bonding conductor P/F
4mm. Busbar in the box is connected to the PE busbar in the supply board with bonding
conductor P/F 6mm .
Foundation grounding is provided by laying hot dip galvanized tape FeZn 25x4mm in the
lower zone of the ground, under a layer of insulation. From foundation grounding, outlets for
connecting lightning protection outlet lines, main and additional potential equalizations,
metal door frames, gutter verticals etc. are foreseen.
External lightning protection system is foreseen with standard hot dip galvanized stripe
arrester FeZn 25x4mm and the required number of outlets, set at the facade of the building,
up to foundation grounding. At each outlet line, measuring - disconnecting joint s foreseen,
on the wall at h = 1.6 m from the ground level. Type and place of arrester installation is in
the calculated level of protection.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 6

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

2. TECHNICAL CALCULATIONS
2.1. CALCULATION OF CABLE CAPACITY

Dimensioning of supply lines is based on:


1. permitted thermal stress
2. permitted percentage voltage drop
Selected conductor section must meet both criteria, and here we will check the criterion
no. 1.

a) Current (3 phases) is calculated using the formula:

I=

Pj
3 U cos

(A)

where:
Pj -

power (W)

U-

line voltage (V)

cos
-power factor (1)

b) Current (single phase) is calculated using the formula

I=

Pj
U cos
(A)

where:
U phase voltage
c) Based on such calculated current, for which the circuit is designed, selection of
protection device and conductor section is done according to the JUS N.B2.743 and JUS
N.B2.752.
For the calculated current I (A), selection of device is done, which protects the cable
against overload, first higher rated current In (for engines with high starting currents,
selection is made according to manufacturer).
Operating features of the device that protects the cable against overload, must fulfill two
conditions:
1.

Ib In Iz

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 7

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

2.

where:

I2 1,45 Iz

Ib is the design current, the actual current to be carried by the cable


Iz - is the current carrying capacity of the cable in the situation where it is

installed
Iz = K x Ik
- Ik is the tabulated current for a single circuit at an ambient
temperature of 30C (JUS N.B2.752).
- K=Kt x Kn - correction factor
- Kt is the correction factor for ambient temperature - JUS
N.B2.752
- Kn is the correction factor for grouping JUS N.B2.752
In is the rating of the protecting fuse or circuit breaker
I2 is the operating current for the fuse or circuit breaker (the current at
which the fuse blows or the circuit breaker opens)

operating current during the specified time for switches

fuse current during the specified time for fuses GI

fuse current during the specified time for fuses GII

In of protection device
melting fuses:
up to 40A
4-10A
10-25A
over 25A
adjustable switch: up to 63A
over 63A
motor protection
switch;
all In

I2/In
2,10
1,90
1,75
1,60
1,35
1,25
1,20

STANDARDS
IEC 269
VDE 0636
JUS N.E5.206
IEC 157
VDE 0660 T.101
IEC 292
VDE 0660 T.1
VDE 0660 T.104

Thus defined overload protection does not provide complete protection in certain cases,
such as exceeding current of prolonged duration, which is less than I2. During designing it
was assured that circuits had not been exposed to prolonged low overloads.

Calculation results are presented in tables.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 8

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

Instal.

Relation

power

Simultaneous
power

Ib

Power

Type and section

factor

Id

A Correction.

cable

Iz

In

factors
(A)

1.45*Iz Comment
K

from

to

Pi(kW)

Pjm(kW)

cos

(A)

(mm)

K1

K2

(A)

(A)

DTS

RO-1

202,22

0,7

141,55

215,32

PP00 4x240

297 D

297

250 1,60 269,16

(A)

RO-1

RO-kpz

97,50

0,55

53,63

0,96

84,97

PP00 4x35

117 C

117

100 1,45

117

YES
YES

RO-1

RO-p

7,18

0,70

5,02

0,96

7,9616

PP00 5x10

52

52

40

1,45

52

YES

RO-1

RO-sr

3,00

1,00

3,00

0,96

4,7536

PP00 5x16

67

67

40

1,45

67

YES

RO-kpz

RT-po

21,16

0,55

11,64

0,96

18,441

PP00 5x10

54

0,8

43,2

40

1,45

43,2

YES

RO-kpz

RT-pr

28,82

0,55

15,85

0,96

25,116

PP00 5x16

73

0,8

58,4

50

1,45

58,4

YES

RO-kpz

RT-st

47,17

0,55

25,94

0,96

41,108

PP00 5x16

73

0,8

58,4

50

1,45

58,4

YES

RT-pr

str.kr.12

3,00

1,00

3,00

0,96

4,7536

PP00 5x2,5

23

0,8

18,4

16

1,45

18,4

YES

Table: Selection of inlet lines in relation to the permanent allowed currents and overload
protection check

2.2. CALCULATION OF VOLTAGE DROP

Dimensioning of supply lines is based on:


1. permitted thermal stress
2. permitted percentage voltage drop

Selected conductor section according to criteria no. 1 is checked using criterion no.2.
a) For three-phase line, percentage relative voltage drop is calculated using following
formula

u % = 100

(l P )
j

S U 2 (%)

where:
l - cable length (m)
- specific conductance (m/mm )
S - conductor section (mm )
U - line voltage (V)
Pj - simultaneous stress (kW)

If the formula includes:


IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 9

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

(l P ) in kWm
j

- S in mm
- = 57 m/mm for copper
- V = 400V

We obtain

u % = 0.012

(l P )
j

(%)

Above formula for aluminum conductor takes the form ( = 36m/mm )

u % = 0.019

(l P )
j

(%)

b) For single phase percentage relative voltage drop is calculated using following formula

u % = 100

2 (l Pj )

S U 2 (%)

where similar inclusion as in the (a) with U = 230V we obtain

u% = 0.0725

(l P )
j

(%)

Above formula for aluminum conductor takes the form

u% = 0115
.

(l P )
j

(%)

c) For motors (elevators, etc.) with high starting torque, it is necessary to calculate
voltage drop when starting in their supplying line. Here, according to the manufacturer Ip =
n In , so:

Ppj = 3 V I p cos = 3 U n I n cos = n Pj

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 10

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

P
)

Pjel = Pj =
(

u p % = 100

u p % = 100

(l n P )
j

S U

(%), ie.

n (l Pj )

S U 2 (%)

Values of voltage drops should be less than the allowable voltage drops for each case,
according to the regulations.

Calculation results are presented in table.

power

Instal.

Simultaneous
power

to

Pi(kW)

Pjm(kW)

Relation
from

Power

Cable

Type and section

factor

length

cable

cos

(m)

Section

Voltage drop

Comment

total

To permitted

(mm)

voltage drop
satisfy
satisfy

DTS

RO-1

202,22

0,7

141,55

30,0

PP00 4x240

240

0,219

0,219

RO-1

RO-kpz

97,50

0,55

53,63

0,96

10,0

PP00 4x35

35

0,198

0,417

RO-1

RO-p

7,18

0,70

5,02

0,96

45,0

PP00 5x10

10

0,292

0,511

RO-1

RO-sr

3,00

1,00

3,00

0,96

10,0

PP00 5x16

16

0,024

0,244

satisfy

RO-kpz

RT-po

21,16

0,55

11,64

0,96

15,0

PP00 5x10

10

0,225

0,643

satisfy

RO-kpz

RT-pr

28,82

0,55

15,85

0,96

10,0

PP00 5x16

16

0,128

0,545

satisfy

RO-kpz

RT-st

47,17

0,55

25,94

0,96

16,0

PP00 5x16

16

0,335

0,752

satisfy

RT-pr

str.kr.12

3,00

1,00

3,00

0,96

12,0

PP00 5x2,5

2,5

0,186

0,731

satisfy

satisfy

Table: Calculation of voltage drop

2.3. INDIRECT CONTACT PROTECTION - SYSTEM TN-C/S

Indirect contact protection by JUS N.B2.741 is effective if the protective device


characteristics and the circuit impedance are such that in case of negligible impedance
fault between phase and protective conductor or insulated conductive part, anywhere in
the installation, automatic power off happens in the specified time. This requirement is
satisfied if the following condition is fulfilled:

Zs I a U 0

where:

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 11

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS
Zs - fault loop impedance comprising the source, under voltage conductor to the point of
fault and the protective conductor between the fault point and source,
U0 rated voltage to ground,
Ia - current that provides a protective device effect for the automatic power off within time
duration specified in the table below:
U0 (V)
120
230
277
400
>400

td (s)
0,8
0,4
0,4
0,2
0,1

Maximum time off, given in the table, meet for the final circuits which supplies sockets or
directly without sockets class 1 hand devices or portable devices which are moved by
hand during use.
Longer time off, not exceeding 5s, is allowed for power supply circuits and circuits that do
not require time off given in the table.
Fault loop impedance is calculated using following formula:
2

Zs = R p + X p

()

where:
Rp ohmic loop resistance ()
Xp - inductive loop resistance ()
For the calculated value of faulty current, Ia, failure time off is read from the characteristics
of the protective device (fuse, switch).
The protective device is well chosen if the following condition has been fulfilled:

t < td
b) If the power supply of network is via the transformer, the upper limits are calculated as:

n= n

n= n

Rp = Rt + Rn
n =1

Xp = Xt + Xn
();

n =1

()

Rt - ohmic resistance of phase winding transformer on the low voltage side


Xt - inductive resistance of phase winding transformer on the low voltage side
Rn - ohmic resistance of certain sections of lines
Xn - inductive resistance of certain sections of lines
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 12

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

TRANSFORMER RESISTANCES
Ohmic and inductive resistance of transformer are calculated using following formula:

Rt =

u r V2
100 S nt (, %, kV, MVA)

Xt =

u x V2
100 S nt (, %, kV, MVA)

where:
V - line voltage (V)
Snt power of the transformer (MVA)

ur =

100 PCu
S nt
(%), where PCu are copper losses (kW)

ux = uk ur

(%), where uk is short circuit voltage (%)

For some transformers with typical power, we have following values (10/0.4kV):
Snt(kVA)
250
400
630
1000

uk(%)
4
4
4
6

ur(%)
1.30
1.15
1.03
1.35

ux(%)
3.78
3.83
3.87
5.85

Rt(/phase)
0.0080
0.0060
0.0026
0.0022

CABLE RESISTANCES
Ohmic and inductive resistance are calculated using general formulas:

R=

l ( rf + r0 )
n
();

X=

l (xf + x0 )
n
();

where:
l -

cable lenght (km)

r0 -

ohmic resistance of zero conductor cable (/km)

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 13

Xt(/phase)
0.024
0.015
0.010
0.009

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS
rf -

ohmic resistance of phase conductor cable (/km)

x0 -

inductive resistance of zero conductor cable (/km)

xf -

inductive resistance of phase conductor cable (/km)

n - number of parallel laid cables to supply one low-voltage cabinet

Cables with characteristic sections have the following values (ohmic resistance of cables
are adjusted to a temperature of 70C working cable temperature, R70 = 1.2 R20;
conductor = copper)
S(mm )
1.5
2.5
4
6
10
16
25

r(/km)
16.560
9.072
5.640
3.732
2.208
1.392
0.881

x(/km)
0.115
0.110
0.107
0.100
0.094
0.090
0.086

S(mm )
35
50
70
95
120
150
185

r(/km)
0.635
0.469
0.324
0.234
0.185
0.151
0.120

x(/km)
0.083
0.083
0.082
0.082
0.080
0.080
0.080

c) If the power supply of network is directly from the generator (without transformer) it
shall be:

n=n

n= n

Rp = Rg + Rn

Xp = Xg + Xn
();

n =1

n =1

()

Rg - ohmic resistance of generator winding


Xg - inductive resistance of generator winding
Rn , Xn cable resistances (previously discussed)

GENERATOR RESISTANCES
Inductive resistance of generator is calculated using following formula:

"

Xg =

xd Ug

100 S g

(/phase)

where:
Ug operational voltage (kV)
Sg - generator power (MVA)
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 14

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS
xd" - initial reactance of the generator (%) (12 - 15%)

Active resistance of the generator applies:

R g = 015
. Xg

(/phase)

Calculation results are presented in table.


Od

Do

S / SPE

*Rk

*Xk

RDIONICE

XDIONICE

ZS

Ia

ZS x I a

(mm )

(km)

(W/km)

(W/km)

(W)

(W)

(W)

(W)

(W)

(A)

(V)

0,0026

0,01

Trafo

630kVA

DTS

RO-1

240/240

0,03

0,12

0,08

0,0036

0,0024

0,0062

0,0124

0,0139

2700

37,43

RO-1

RO-kpz

35/35

0,01

0,635

0,083

0,00635

0,00083

0,01255

0,01323

0,0182

1000

18,24

RO-kpz

RT-pr

16/16

0,01

1,392

0,09

0,01392

0,0009

0,02647

0,01413

0,03

400

12,00

RT-pr

str.kr.12

2.5/2.5

0,012

9,072

0,11

0,10886

0,00132

0,13533

0,01545

0,1362

120

16,35

2.4. DETERMINATION OF LIGHTNING PROTECTION LEVEL

The goal of determination of protection is to decrease level of damage risk below


maximum tolerable due to direct lightning into the protected object. Determining the
appropriate level of protection for lightning protection installation can be provided based
on the frequency of direct lightning strikes into the object Nd and the adopted frequency of
lightning strike Nc. If the Nd Nc lightning protection system is not required. If Nd Nc
computational efficiency of lightning protection system is Er = 1-Nc/Nd, lightning protection
system is required, and protection level is determined by the table:
PROTECTION LEVEL
1. with additional measures
I nivo
II nivo
III nivo
IV nivo
1.

EFFICIENCY
E 0,98
0,95 E 0,98
0,90 E 0,95
0,80 E 0,90
0,00 E 0,80

Determination of the adopted value of lightning strike Nc.

Value of Nc is estimated based on the analysis of the damage risk, considering


factors related to the structure such as type of the structure, structure content, structure
purpose, consequences of lightning strike to the structure.
Nc is determined from the realization:
Nc= 3 x 10- / C1xC2xC3xC4
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 15

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS
Coefficient C1 (type of building construction), C2 (structure content), C3 (Purpose) and C4
(consequences of lightning strike to the structure) are taken from table B1 to B 4 (JUS N.
B4. 801). For this facility following values are adopted:
C1=1;

C2=1;

C3=1;

C4=1

For the adopted values:


Nc=0,003

2.

Determination of the frequency of direct lightning strike Nd.


According to JUS N.B.801 article 4.2. average annual value of Nd is:
Nd=Ng Ae 10-6
where:
Nd - frequency of direct lightning strike (no.of strikes/year.)
Ae - equivalent receiving structure surface (m2)
Ng density of lightning in the ground (no.of strikes/km2 year.)

3.

Determination of Ng

If the value of lightning density in the ground Ng is not known, it can be


approximated using the equation
Ng ~ 0,04Td1.25

where Td is the number of thunderstorm days during 1 year period taken from the
isokeraunic map JUS N.B4.803 and for the area with the observed object, it is 49 so that
the
Ng=5,185

4.

Determination of Ae

According to JUS N.B4.801 article 4.2 equivalent receiving area is defined as the
area of ground that has the same frequency of direct lightning strikes as structure. It is
calculated from the geometric image constructions and depends on the position of the
structure and terrain configuration. Since the observed object is located on the flat ground,
equivalent surface is calculated from the formula:
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 16

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS
Ae = a x b + 6h (a+b) + 9 x h2
where:
a and b - building sides to be protected (m) a=17,1m; b=11,2m
h

- height of the protected building (m) h=14,5m

For this structure it is obtained:


Ae= 17,1 x 11,2 + 6 x 14,5(17,1+11,2) + 9 x 3,14 x 14,52 = 8595.3 m2

From the calculated values of Ng and Ae it is obtained


Nd = 5,185x8595,3x 10-6= 0,0445
Since the Nd> Nc lightning protection is required, efficiency E is

Nc

0,003

E 1- ----- = 1- ---------------- = 0,932


Nd

0,0445

and the required level of protection is II.


Spot width of the receiving system is 10 x 10m, a distance of outlet lines is 15m.

2.5. GROUNDING CHECK

Minimum grounding lengths of lightning protection system are given in figure 2 of JUS IEC
1024-1 standard.
in accordance with this standard, following can be applied:
A type grounding (radial or vertical grounding)
B type grounding (ring or foundation grounding)
In our case, type B is adopted (foundation grounding) and the mean geometric radius (r)
of the grounding should not be less than l1:

r l1
Area covered by a foundation grounding:
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 17

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

P = 191,58 m 2
Diameter of the circle that has the same surface as the foundation of the building is:

4 P

D =

4 191

D =

D = 15,6m
Mean geometric radius is:

D
2

r = 7,8m
Minimum length of the grounding is l1 = 5m and therefore:

r >

which means that the foundation grounding is of sufficient length in terms of JUS IEC
1024-1 standard.

2.6. CALCULATION OF FOUNDATION GROUNDING RESISTANCE


FeZn tape of 25x4 mm was placed in the bottom layer of concrete during foundation
concreting at 5 cm from the bottom surface of the foundation.
Specific resistance of concrete MB300 is 3500 /m and the total resistance of concrete
bed is
b = 3500 x 0,05 = 175 /m

Specific ground resistance is z = 200 /m thus the total resistance is


u = b + z = 175 + 200 = 375 /m

Resistance of a contour made of ground is calculated by the formula

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 18

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

Rt =

8 L2
ln(
)
2L ah

L = 107 m, total length of the lead placed along the reinforcement commanding building
h = 1,05 m, digging depth
a = 25 mm, length of a wider side of rectangular cross section of FeZn tape

375
8 * 107 2
ln(
Rt =
) = 7,761
2 107 0.025 1.05

Since 7.76 is less than 20 , grounding meets requirements set by the regulations.
Since this facility is connected to the system of joint grounding complex and to the lead
laid in parallel with future VN cables DTS, the actual resistance value will be far less.

Head designer:
________________________
Momcilo Bubnjevic, B.Sc. Electrical
engineer

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 19

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

3. SPECIAL ADDENDUM ON THE MEASURES APPLIED AND SAFETY AT


WORK

3.1. GENERAL
Pursuant to the provisions of Law on safety at work (Official Gazette of the Republic of
Montenegro no.79/04) Addendum on the safety at work was formed during preparation of
technical documentation, which points to the dangers and hazards that can occur during
the work.
Addendum contains following chapters:

4.1.

Risks and hazards that can occur at structures, electrical plants and
installations

4.2.

Foreseen measures to eliminate risks and hazards

4.3.

General notes and commitments

4.4.

Conclusion

Head designer:
________________________
Momcilo Bubnjevic, B.Sc. Electrical
engineer

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 20

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

4. GENERAL TECHNICAL REQUIREMENTS

4.1. GENERAL
These technical requirements are an integral part of the study and they are
obligatory for the Contractor and Investor.
Investor is obliged to delegate execution of work to the authorized corporate
organization, for the Supervision of the works to determine a person who has
authority for Supervision.
Electrical installation should be done according to the attached plans, technical
description and BoQ.
Before commencement of the work, Contractor is required to check project at site
and to make necessary corrections occured for any reason, in cooperation with
Supervisory authority. He is also obliged to point out the necessary amendments
and possible rational solutions to the Investor.
For the all possible changes to the project and variations of any kind, both in terms
of technical solution and in terms of material selection, the consent of the Investor
must be obtained ie. of his professional Supervisory authority. In case of not doing
this, the Contractor shall be responsible for all modifications and works performed
based on them.
Contractor shall keep a diary of works on this project. Unforeseen works or increase
foreseen quantity and material consumption, as well as changes of works must be
previously approved by the Investor or his Supervisory authority, and the Contractor
is required to register them in the diary, which is further verified by the Supervisory
authority or Investor.
During the works, it should take care not to damage already constructed objects and
installations. In addition, reinforced concrete and steel structures can be grinded and
chase cut only with the written consent of the building Supervisory authority.
Contractors (if more than one) are required to carry out the works in compliance with
time, space and technics.
Before commencement of the work, Contractor must be warned on the placement,
of el. distribution box and boards and the main supply cables.
All foreseen works must be performed by skilled personnel, taking into account the
quality of work.
Installations must be performed according to the text and graphic part of the project
and the applicable regulations for this type of installation. All material to be installed
must comply with the standards and be of premium quality. Material which does not
meet this requirement cant be installed.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 21

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS
Contractor will register in documents all changes made during the work
performance, and he is obliged to hand over one copy of the Investor.
During the works, the Contractor shall take into account all requirements of hygienetechnical protection regulations.
After completion of the work, Contractor will review the safety of all installations and
facilities. In case of some deficiencies, they must be removed before submission to
the Investor for handling.
For the correctness of the work performed, Contractor gives warranty under the
terms of the Agreement, from the date of certificate of acceptance. Any defect that
occurs during the operation, and caused by using poor quality materials or unsolid
workmanship, Contractor shall remove without any right to compensation.
Contact voltage protection is performed by a special conductor (yellow-green). Metal
parts of installation elements, as well as all metal construction of the building, which
normally are not, but in case of insulation break can be under voltage, connect with
a protective line.
Functioning of protection against contact voltage must be checked before using the
installation.
On all distribution boxes must be warning plates, schemes (inside), marks of
el. circles, switch positions, etc.
Inspect the coupling of metal structures and perform bypass at places of bad joint
within lightning protection system.
After finalisation, it is necessary to make measurement of the ground resistance and
issue certificate of completed measurement.
Commissioning installations and facilities into continuous operation can be executed
only upon the completion of inspection and license to use.

4.2. HIGH VOLTAGE CURRENT


These technical requirements are addition and an integral part of the installation of
high voltage current, and as such are required for Contractor. Everything that
eventually has not been provided by description and by the project itself, but is
necessary for the correctness of installations, the Contractor is required to perform
on time and notify the Supervisory authority of the Investor.
Installation must be performed in all according to the drawings, BoQ and JUS
regulations applicable to this type of installation.
Deviations from the project during the works, is not permitted without the consent of
the Designer or Supervisory authority.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 22

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS
PP conductors must be laid in the wall, beneath the mortar in a straight line only,
and only horizontally and vertically, while diagonally laying is not allowed. In case of
horizontal laying of PP conductor, make sure that the two conductors are located at
least 10 mm between each other, and at least 30 cm from the ceiling. In case of
vertical laying, make sure that the conductor is located from the wall opening
wallcorners at least 15 cm.
Protective layer of mortar over the PP conductor must not be less than 6 mm.
Connecting of conductors shall be permitted only in distribution cabinets, distribution
boxes and devices, using the VS and KV clips.
Distribution box, microswitch box or plug box are laid directly into the mortared wall,
and fixed with a plaster.
Outlets for lighting points on the wall and ceiling must be done only by using boxes
and cable glands.
During parallel laying of telephone lines with power lines, ensure that space
between them is not less than 20 cm.
The distance between the telephone and signal cables must not be less than 10
cm. Crossing the phone lines and signaling systems with installation of high voltage
current lines should be avoided. At the crossing points, signal lines - cables
perpendiculary schould be placed in plastic pipes, and power lines in metal pipes.
Installation of light switches set to the open side of the door, and at a height of 1.5
m, and schuko socket boxes at 0.8 m above the floor. Distribution boards place at a
height of 1.5 m.
After completion of lightning protection system, make connection of grounding GRO
conductors to the common grounding electrode.

4.3. GROUNDING
Galvanized steel strip 25 x 4mm will be used for ground as a material.
Busbar for potential equalization, lightning outlets, etc. are connected to the ground
electrode.
When preparing the ground electrode, it is necessary to provide professional work
and collaboration with the construction contractor.
All outlets from the ground (for SIP, lightning leads, lift and telecommunication box
guides) shall be of galvanized steel strip 25 x 4 mm. Interconnection of strips in the
ground and for outlets to perform by welding or by crossing coupling JUS N B4 936.
Contractor is required to register construction of the ground basis in a diary and
construction book with certification of the Supervisory authority of the Investor.
Upon the completion of works, the Contractor will provide a certificate of inspection
and measurement of transient grounding resistance.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 23

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

4.4. LIGHTNING PROTECTION SYSTEM


When developing a lightning protection installation, Contractor is obliged to comply
with technical regulations on lightning rod.
Installation of lightning rod will be done with galvanized steel strip 25x4mm .
Lines (of strips) must be placed over the appropriate supports at the proper
distance.
All metal masses on the roof (chimneys, climbing irons, gutters, antennas, cover
metal sheets, etc..) should be connected to the lightning protection installation, using
appointed materials.
Lines in lightning installation must be derived from the as possible long pieces, the
number of extensions must be minimized.
While laying outlets in the facade beneath panels or mortar, lead should be
previously protected from corrosion using coating based on bitumen.
Joining of galvanized steel strips should be done with crossing couplings, and with
appropriate couplings when connecting to the metal mass.
Tested joints of lightning rod should be set at a height of 1.6 m from the ground level
into the facade wall.

Head designer:
________________________
Momcilo Bubnjevic, B.Sc. Electrical
engineer

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 24

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

5. LIST OF STANDARDS AND REGULATIONS


In preparation of Final design, following rules and recommendations were used:
1.

The Law on Spatial Planning and Construction (Official Gazette of the Republic of Montenegro
no. 51/08).

2.

The Telecommunications Law (Official Gazette of the Republic of Serbia no. 44/03)

3.

The Law on Protection and Rescue (Official Gazette of the Republic of Montenegro no.
13/07, 05/08)

4.

The Law on safety at work (Official Gazette of the Republic of Montenegro no. 79/04)

5.

Regulation on technical standards for low voltage electrical installations (Official Gazette
of SFRY no.53/88, 54/88 i 28/95)

6.

Fire detection and fire alarms JUS-ISO 8421 / 95

7.

JUS N.A5.070/1982. Degrees of protection of electrical equipment, provided by


enclosures. Classification and type tests

8.

JUS N.B2.741/1989 El. installation of low voltage. Protection against electric shock

9.

JUS N.B2.743/1989 Electrical installations in buildings


Low-voltage electrical installations -Safety requirements Protection against overcurrent

10. JUS N.B2.751/1986. Electrical installations in buildings


Selection and erection of electrical equipment regarding external influences
11. JUS N.B2.754/1986 Electrical installations in buildings
Earthing arrangements and protective conductors
12. Instruction on doing telephone installation and gland, ZJPTT
13. Valid PTT regulations, standards for equipment, cables and fittings.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 25

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

6. MATERIAL SPECIFICATION DTS

No.

DESCRIPTION

Unit

Quantity

Unit
price
EUR

Total price
EUR

Commanding building and guard house

THIS BoQ CONSISTS OF:

A2.

Procurement, transport and storage of material, tools


and equipment at construction site, as given in
certain items.
Delivery of all material mentioned in certain items and
all small unspecified material required for complete
and qualitative construction of installation.

A3.

Installation and connection as given in certain items


according to valid regulations for qualitative work.

A4.

Testing and commissioning in proper operation


already completed installation.

A5.

Bringing into proper condition all eventually damaged


points at already performed works.

A1.

A8.

All used materials must comply with applicable


standards and be of premium quality.
All works must be carried out by skilled personnel
and fully in accordance to applicable regulations for
these types of work.
Besides the value of all necessary material and
manpower, the price includes all taxes on labor and
material.

A9.

Price includes the preparation of eventually


necessary shop drawing documentation.

A10.

BoQ is given per unit of completely finished position.

A11.

Final works and handing over installation to the


Investor.

A6.

A7.

INSTALLATION CABLES
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 26

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

No.

1.1

DESCRIPTION

Unit

Quantity

Unit
price
EUR

Total price
EUR

CABLES FOR POWER SUPPLY OF SOCKETS AND


FIXED OUTLETS
The position includes the connection from distribution
boxes to sockets and fixed outlets of general and
technological purpose. Cables are laid on a preprepared routes in the wall and concrete in PVC
pipes of the corresponding diameter

Type and cross section of cables are in accordance


with copper lodes and PVC insulation. They are laid
on/in the wall, beneath mortar in the PVC pipes.

1.1.1

PP-Y 3x2.5 mm

670

3.00

2,010.00

1.1.1

PP-Y 5x2.5 mm

75

4.15

311.25

total 1.1:

1.2

1.2.1

2.

2,321.25

CABLES FOR POWER SUPPLY OF LUMINAIRES


Cables for luminaires shall be laid in PVC pipes
previously embedded in the concrete walls and
ceilings and in/on the wall under mortar.
Type and cross section of cables are in accordance
with copper lodes and PVC insulation. Cables are
laid on a pre-prepared routes in the wall and concrete
in PVC pipes of the corresponding diameter
PP-Y 3x1,5 mm

820

1.94

1,588.75

total1.2:

1,588.75

TOTAL 1:

3,910.00

PVC PIPES

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 27

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

No.

DESCRIPTION

Unit

Quantity

Unit
price
EUR

Total price
EUR

Delivery, transport and installation during concreteing


of walls, ceilings and floors, of below given pvc pipes.
Paying per pipe running meter:
2.1

16mm

(flexible)

1650

1.81

2,990.63

2.2

19mm

(flexible)

83

2.10

174.30

TOTAL 2.

3,164.93

DISTRIBUTION BOXES
Distribution box is designed for power supply of
lighting, sockets, technological connections, fixed
outlets, etc.
Case is with the door, lock and key. The box will
contain construction for carring equipment, made of
mounting rails.
Equipment is placed above the protective plate. Box
dimensions are determined by the number of
modules width 18 mm. Box case (its metal parts) is
visibly bypassed with a protective rail (ground).
Warning plates and nameplats are set on box door.
Box should be installed on wall.
Box should be protected from moisture and other
objects using IP-40.
Position covers all required materials, wiring wires,
plastic channels, terminals, rails for neutral line
connection, rails for connection of protective lines,
marking numbers, etc.

3.1.

RO-p Prisma Plus Pack dimensions HxWxD


1080x555x200mm, similar to "Merlin Gerin" or to the
following incorporated equipment:
1 pcs. Four - pole current protection switch 415V,
25A, I= 0,3 A, selective, for mounting on DIN rail,
similar to ID "Merlin Gerin".
3 pcs of white LED indicator lamp, Un=230V, 50Hz,
0,3W, for mounting on DIN rail
4 pcs. single-pole circuit breaker C60N/10A, 6/10kA,
type 'B", for mounting on DIN rail, similar to "Merlin
Gerin".
5 pcs. single-pole circuit breaker C60N/16A, 6/10kA,
type 'B", for mounting on DIN rail, similar to "Merlin
Gerin".
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 28

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

No.

3.2.

DESCRIPTION
3 pcs. single-pole circuit breaker C60N/32A, 6/10kA,
type 'B", for mounting on DIN rail, similar to "Merlin
Gerin".
other small unspecified material: copper bus bars,
cable glands and terminals, insulators, bolts, clips,
etc.

Unit

Quantity

Unit
price
EUR

Payment per box

pcs

395.00

395.00

pcs

450.00

450.00

Total price
EUR

RT-po Prisma Plus Pack dimensions HxWxD


1080x555x200mm, similar to "Merlin Gerin" or to the
following incorporated equipment:
1 pcs. four - pole current protection switch 415V,
25A, I= 0,3 A, selective, for mounting on DIN rail,
similar to ID "Merlin Gerin".
3 pcs of white LED indicator lamp, Un=230V, 50Hz,
0,3W, for mounting on DIN rail
3 pcs. single-pole circuit breaker C60N/10A, 6/10kA,
type 'B", for mounting on DIN rail, similar to "Merlin
Gerin".
6 pcs. single-pole circuit breaker C60N/16A, 6/10kA,
type 'B", for mounting on DIN rail, similar to "Merlin
Gerin".
2 pcs. three-pole circuit breaker C60N/16A, 6/10kA,
type 'B", for mounting on DIN rail, similar to "Merlin
Gerin".
2 pcs. three-pole circuit breaker C60N/25A, 6/10kA,
type 'B", for mounting on DIN rail, similar to "Merlin
Gerin".
3 pcs. single-pole circuit breaker C60N/32A, 6/10kA,
type 'B", for mounting on DIN rail, similar to "Merlin
Gerin".
other small unspecified material: copper bus bars,
cable glands and terminals, insulators, bolts, clips,
etc.
Payment per box

3.3.

RO-kzp Prisma Plus Pack dimensions HxWxD


1080x555x200mm, similar to "Merlin Gerin" or to the
following incorporated equipment:
1 pcs. three-pole circuit breaker C60N/40A, 6/10kA,
type 'B", for mounting on DIN rail, similar to "Merlin
Gerin".
2 pcs. three-pole circuit breaker C60N/50A, 6/10kA,
type 'B", for mounting on DIN rail, similar to "Merlin
Gerin".
other small unspecified material: copper bus bars,
cable glands and terminals, insulators, bolts, clips,
etc.
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 29

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

No.

DESCRIPTION
Payment per box

3.4.

Unit

Quantity

Unit
price
EUR

pcs

185.00

185.00

pcs

190.00

190.00

Total price
EUR

RO-sr Prisma Plus Pack dimensions HxWxD


1080x555x200mm, similar to "Merlin Gerin" or to the
following incorporated equipment:
2 pcs. single-pole circuit breaker C60N/6A, 6/10kA,
type 'B", for mounting on DIN rail, similar to "Merlin
Gerin".
1 pcs. three-pole circuit breaker C60N/40A, 6/10kA,
type 'B", for mounting on DIN rail, similar to "Merlin
Gerin".
1 pcs. single-pole circuit breaker C60N/50A, 6/10kA,
type 'B", for mounting on DIN rail, similar to "Merlin
Gerin".
1 pcs. four - pole contactor 40A, for mounting on DIN
rail, similar to "Merlin Gerin".
1 pcs. photo-relay, for mounting on DIN rail, similar to
"Merlin Gerin".
other small unspecified material: copper bus bars,
cable glands and terminals, insulators, bolts, clips,
etc.
Payment per box

3.5.

RT-pr Prisma Plus Pack dimensions HxWxD


1080x555x200mm, similar to "Merlin Gerin" or to the
following incorporated equipment:
1 pcs. four - pole current protection switch 415V,
25A, I= 0,3 A, selective, for mounting on DIN rail,
similar to ID "Merlin Gerin".
3 pcs of white LED indicator lamp, Un=230V, 50Hz,
0,3W, for mounting on DIN rail
5 pcs. single-pole circuit breaker C60N/10A, 6/10kA,
type 'B", for mounting on DIN rail, similar to "Merlin
Gerin".
13 pcs. single-pole circuit breaker C60N/16A, 6/10kA,
type 'B", for mounting on DIN rail, similar to "Merlin
Gerin".
2 pcs. three-pole circuit breaker C60N/16A, 6/10kA,
type 'B", for mounting on DIN rail, similar to "Merlin
Gerin".
1 pcs. three-pole circuit breaker C60N/25A, 6/10kA,
type 'B", for mounting on DIN rail, similar to "Merlin
Gerin".
3 pcs. single-pole circuit breaker C60N/32A, 6/10kA,
type 'B", for mounting on DIN rail, similar to "Merlin
Gerin".
other small unspecified material: copper bus bars,
cable glands and terminals, insulators, bolts, clips,
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 30

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

No.

DESCRIPTION

Unit

Quantity

Unit
price
EUR

pcs

465.00

465.00

pcs

520.00

520.00

Total price
EUR

etc.

Payment per box

3.6.

RT-st Prisma Plus Pack dimensions HxWxD


1080x555x200mm, similar to "Merlin Gerin" or to the
following incorporated equipment:
1 pcs. four - pole current protection switch 415V,
25A, I= 0,3 A, selective, for mounting on DIN rail,
similar to ID "Merlin Gerin".
3 pcs of white LED indicator lamp, Un=230V, 50Hz,
0,3W, for mounting on DIN rail
4 pcs. single-pole circuit breaker C60N/10A, 6/10kA,
type 'B", for mounting on DIN rail, similar to "Merlin
Gerin".
30 pcs. single-pole circuit breaker C60N/16A, 6/10kA,
type 'B", for mounting on DIN rail, similar to "Merlin
Gerin".
3 pcs. single-pole circuit breaker C60N/50A, 6/10kA,
type 'B", for mounting on DIN rail, similar to "Merlin
Gerin".
other small unspecified material: copper bus bars,
cable glands and terminals, insulators, bolts, clips,
etc.
Payment per box

TOTAL 3.

LUMINAIRES
Luminaires are installed in full set with lampholders,
bulbs, fluo and compact tubes, starters, fuses and
other equipment necessary for quality work.

4.1

Luminaire marked with FL1


Ceiling-mounted luminaire with casing and
transparent diffuser made of injected, UV stabilized,
V2 self-extinguishing, halogen-free polycarbonate,
with polyurethane waterproof gasket and parabolic,
shiny reflector type TITAN - BS103 2 x T26 36W/840,
G13, 230V, IP65, electronic circuit equipment class
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

2,205.00

PAGE 31

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

No.

4.2

DESCRIPTION
A2, with light source of 36W/840. Supplier Buck.

Unit

Quantity

Unit
price
EUR

Payment per piece.

pcs

23

52.20

1,200.60

pcs

76.25

533.75

pcs

54

75.83

4,094.55

pcs

41

100.30

4,112.30

Luminaire marked with FL2


Ceiling-mounted luminaire with casing made of
extruded aluminum with transparent polycarbonate
diffuser, 418 RIGO 1 x T16 14W/840, G5, 230V,
IP43, IK03, electronic circuit equipment, with fluo light
source of 14W/840. Supplier Buck.
Payment per piece.

4.3

Luminaire marked with FL3


Ceiling-mounted luminaire with transparent diffuser,
type Linea DT 2xT16 28W/840, G5, IP40.
Luminaire is delivered with electronic circuit
equipment and fluo light source of 28W/840. Supplier
Buck.
Payment per piece.

4.4

Luminaire marked with FL4


Ceiling-mounted luminaire made of white painted
steel sheet 0.6mm thick, with double parabolic,
Darklight, bright raster to limit flashing, made of
MiroSilver aluminum; Light Output Ratio 82%, type
ORIEN DL 414 4xT16 14W/840, G5, IP20,
electronic circuit equipment and fluo light source of
14W/840. Supplier Buck.
Payment per piece.

4.5

Total price
EUR

Luminaire marked with FLC1


Ceiling-mounted luminaire made of injected, UV
stabilized, V2 self-extinguishing, halogen-free
polycarbonate, 1544 GLOBO 1 x A55 100W, E27,
IP65, IK0. Luminaire comes with a 100W
incandescent bulb, and assembly equipment.
Supplier Buck.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 32

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

No.

DESCRIPTION
Payment per piece.

4.5

Unit

Quantity

Unit
price
EUR

pcs

13

26.25

341.25

pcs

51.25

205.00

Total price
EUR

Luminaire marked with P1


EMERGENCY LIGHTING LUMINAIRE (IP40) Ceiling-mounted anti-panic luminaire with local power
in standby circuit, made of injected, UV stabilized, V2
self-extinguishing, halogen-free polycarbonate with
transparent diffuser, AESTETICA 8SE3-40, 1xT16
8W, 230V, G5, IP40, work autonomy of 3 hours,
electronic circuit devices, including battery, inverter,
light source and the corresponding label on adhesive
foil. Supplier Buck.
Payment per piece.

TOTAL 4:

10,487.45

INSTALLATION TOOLS
GENERAL: Positions include delivery, transport,
storage at site, incorporation of installation material
and tools of halogen-free plastic, etc. modular
program -Mosaic "Legrand" in the color chosen by
architect and user.

5.1

Single-phase "Schuko" plug P+N+PE 250V 16A,


IP20 for wall mounting, full set with pvc dose
1x 60mm and single decorative mask for horizontal
mounting, similar to type Mosaic- "Legrand "

pcs

43

18.75

806.25

5.2

Single-phase "Schuko" plug single P+N+PE 250V


16A, IP55 with cover for wall mounting and pvc dose,
similar to Plexo -"Legrand"

pcs

26.25

183.75

5.3

Single-phase "Schuko" plug double P+N+PE 250V


16A,IP20 for mounting in wall, full set with pvc dose
2x60mm single decorative mask for horizontal
mounting, similar to type Mosaic-"Legrand"

pcs

15

30.00

450.00

5.4

Three-phase "Schuko" plug 3P+N+PE 250V


16A,IP20 for wall mounting, full set with pvc dose

pcs

25.00

75.00

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 33

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

Unit

Quantity

Unit
price
EUR

5.5

Ordinary switches, 250V 10A, for wall mounting with


PVC distribution box 1x 60mm single decorative
mask for horizontal mounting, similar to type Mosaic"Legrand"

pcs

15.00

60.00

5.6

Single pole switches, 250V 10A, for wall mounting


with PVC "OG" distribution box in protection IP44-55,
similar to type Plexo 55 -"Legrand"

pcs

31

20.00

620.00

5.7

Two-way switches, 250V 10A, for wall mounting with


PVC "OG" distribution box in protection IP44-55,
similar to type
Plexo 55 -"Legrand"

pcs

20.00

160.00

No.

DESCRIPTION
60mm and single decorative mask for horizontal
mounting, supplier "Nopal".

Total price
EUR

TOTAL 5:

6.1

POTENTIAL EQUALIZATION INSTALLATION

C-39. Delivery and installation in plumbing wet nodes


of potential equalization box of type C-39
Full set is paid per piece.

6.2

2,355.00

pcs

10.00

40.00

pcs

15.00

60.00

Production of copper clamps and connection of


heating pipes, water supply and sewerage network
using lead joints pads with the potential equalization
box of type C-39. conductor NYM-J4 mm , which is laid through the already foreseen
PVC pipe diameter 16mm. Connection of C-39 with a
protective busbar in the distribution box is done using
cable NYM-J 6 mm
Average length of the installation is 10m.
Full set is paid per piece.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 34

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

No.

DESCRIPTION

Unit

Quantity

Unit
price
EUR

Total price
EUR

TOTAL 6:

7.1

100.00

FINAL WORKS AND HANDING OVER


INSTALLATION TO THE INVESTOR

After completion of the works on the previously


mentioned installations, contractor is obligated to do:
- patching of walls at installation points
- removing of any technical aesthetic errors of
executed installations in the fracility
- cleaning of premises and removal of construction
waste.
Upon inspection of done works, to make all
necessary regulated foreseen tests, such as:
- Measurement of cable insulation resistance,
electrical equipment and devices of individual and
entirely finished installation
- testing the functionality of devices and equipment
as well as the functionality of the entire installation,
- testing the protection against contact voltage in the
installation,
- measuring the voltage drop at the consumers
connection
- measurement of transient resistance grounding,
etc.
After measurements, the Contractor will make the
protocol and provide Investor with all necessary
certificates with verification of obtained values.
For all executed works and incorporated material
procured by the Contractor, he is obliged to give a
written guarantee in accordance with valid
regulations and existing contractual obligations.
Issuing all necessary instructions for the subsequent
maintenance is also the obligation of the Contractor.

7.2

Develop as-built design based on the certified survey


done during the construction of the installation. Study
must include all the changes that have occurred
during the works and must be certified by an official
stamp of the organization which made required
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 35

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

No.

DESCRIPTION
surveys and by the Investor.

Unit

Quantity

Unit
price
EUR

Total price
EUR

During the installation, all changes must be included


to a copy of the study. The changes must be certified
by the Contractor and the Supervisor.

TOTAL 7:

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

550.00

PAGE 36

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

6.1. RECAPITULATION

RECAPITULATION OF HIGH VOLTAGE CURRENT:

INSTALLATION CABLES

3,910.00

PVC PIPES

3,164.93

DISTRIBUTION BOX

2,205.00

LUMINAIRES

10,487.45

INSTALLATION TOOLS

2,355.00

POTENTIAL EQUALIZATION INSTALLATION

100.00

FINAL WORKS AND HANDING OVER


INSTALLATION TO THE INVESTOR

550.00

TOTAL HIGH VOLTAGE CURRENT:

22,772.38

Tax base:

22,772.38

VAT 17%

3,871.30

TOTAL INCLUDING TAX

26,643.68

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 37

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.5.3 ELECTRICAL DESIGN ADDITIONAL INSTALLATIONS

7. DRAWINGS
1. General layout - External lighting and grounding
2. Commanding building installation of lighting and outlets basement plan
3. Commanding building installation of lighting and outlets ground plan
4. Commanding building installation of lighting and outlets floor plan
5. Gate facility installation of lighting and outlets plan
6. Commanding building RO-1 single-line diagram
7. Commanding building RO-2 single-line diagram
8. Commanding building RO-kpz single-line diagram
9. Commanding building RT-po single-line diagram
10. Commanding building RO-pr single-line diagram
11. Commanding building RO-st single-line diagram
12. Guard house installation - RO-p single-line diagram
13. Circuit lighting - RO-sr single-line diagram

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012