DDC for Km 18.816 to Km 26.

508

TOP SHEET

NO. IRCON/CC/TN/SR-2046/DDC/14/733

Date: 12.12.101

Revised Tender Document Dt.08.01.2015


(Incorporation modification as per Corrigendum no. 1 Dt. 08.01.2015Latest circular of
IRCON)
FOR
Detailed Design Consultancy of all structures including Tunnels, bridge/viaduct and
associated works and Construction Supervision of Tunnels (T-7 and T-8) between Km18.816
to Km 26.508 in connection with Construction of Sivok (West Bengal) to Rangpo(Sikkim)
New Single line BG Railway Line Project

Financial Bid
(VOLUMEII)

Date of Opening :
Document Issued to:
D.D.No. & Issuing Bank:

For and on behalf of


IRCON INTERNATIONAL LIM

Signature of Tender/s

DDC for Km 18.816 to Km 26.508

Signature of Tender/s

BID FORMS
(Financial)

FORMB FINANCIAL BID


(The Annexures form part of formB)
To:
Chief Project Manager/Rly. Project
IRCON INTERNATIONAL LIMITED
C-4, District Centre, Saket
New Delhi-110017
Tele FAX: 011-26530478, Tele: 011-29565666, FAX: 26522000

Sir,
Having examined the Tender Documents for Detailed Design Consultancy of all
structures including Tunnels, bridge/viaduct and associated works and Construction
Supervision of Tunnels (T-7 and T-8) between Km 18.816 to Km 26.508 in connection with
Construction of Sivok (West Bengal) to Rangpo (Sikkim) New Single line BG Railway Line

Project, We undertake the aforesaid Works for Price of:


Currency

In Figures

In Words

Amount
(INR+ Euro +USD)
(To be quoted separately for INR,
Euro and USD component of the total
amount)

If our tender is accepted we will provide performance Guarantee for the due performance of
the contract as stipulated in clause 4.13 of Instructions to tenders.
Unless and until a formal Agreement is prepared and executed, this tender together with
your written acceptance thereof shall form a binding Contract between us.
We understand that you are not bound to accept the lowest or any tender you may receive.
Yours faithfully,
--------------------------------------(Signature)Authorized Representative)
(Address)

ANNEXUREB1
Format of Financial Proposal

Summary of Cost

Description

Amount

No.
(INR+ Euro +USD)
(To be quoted separately
for INR,
Euro and
USD component of the
total amount)
1

Annexure B2B DETAILED DESIGN CONSULTANCY


(Tunnels)

Annexure B2B DETAILED DESIGN


CONSULTANCY (Bridges and other works)

Annexure B2B DETAILED DESIGN CONSULTANCY


(Tunnels and Bridges)

1+2+3

Total Cost Net of Tax

Taxes and duties


TOTAL COSTS (Including Taxes and duties)

Forevaluating the bid, Foreign Currency portion shall be converted to equivalent INR on
The basis of rate of conversion of INR to USD/Euro on the first day of the month and year
of submission of bid. RBI exchange rate on the first day of the month and year of the
submission of bid shall be considered.
The amount shall be quoted both in figures and words. In case of any discrepancies, the
amount quoted in words shall be considered.
Total cost includes the cost as per clause 4.10.8(iii) of ITT.

ANNEXUREB2A
Sub: Detailed Design Consultancy of all structures including Tunnels, bridge/viaduct and
associated works and Construction Supervision of Tunnels (T-7 and T-8) between Km 18.816to
Km 26.508in connection with Construction of Sivok (West Bengal) to Rangpo (Sikkim) New
Single line BG Railway Line Project.

DETAILED DESIGN CONSULTANCY (TUNNELS)

SN.

Item

Unit

Detailed design of Tunnel T-7 and T-8 with scope


of work as per para 5.2 of the Deliverable and
Services including alignment review, cross section
design, structural design, design review during
construction with NATM approach, Construction
methodology with specific reference to schedule of
completion of tunnel, Preparation of BOQ and
specifications for construction contract & design of
all associated works required to complete the
tunnel in all respects, with deliverables as per
clause 5.2 and key dates asper clause 5.13 of
Deliverables and Services as a complete job.
Payment for this item shall be made on milestone
basis as given in the Annexure B2A1.
Detailed design of Ventilation/E&M systems for
Tunnel T-7 &T-8 with scope of work as per para
5.2 of the Deliverable and Services for ventilation,
fire protection, illumination, communication and
surveillance and other E & M Systems etc.,
Installation methodology with specific reference to
schedule of completion of tunnel, Preparation of
BOQ and specifications for procurement and
Installation contract & design of all associated
works required to complete the tunnel ventilation,
E & M, safety and surveillance in all respects as
per key dates of deliverables as per clause 5.13 of
Deliverables and Services as a complete job.
Payment for this item shall be made on mile stone
basis as given in the Annexure B2A1.
For T-7 Tunnel (3047.00 m)

Lump
sum

i)E&M works including illumination,


communication, Safety &surveillance except
ventilation system
ii)For ventilation system
For T-8 Tunnel (4166.00 m)
i)E&M works including illumination,
communication, Safety & surveillance except
ventilation system
ii)For ventilation system

Lump
sum

Rate
(To be quoted
separately for
INR, Euro and
USD
component
of the total
amount)

Amount
(INR+Euro+USD)
(To be quoted
separately for
INR, Euro and
component of
USD component
of the total
amount)

Environment Studies:
Payment for this item shall be made on milestone
basis as given in the Annexure B2A1.

Lump
sum

Total B2A

The Rates are inclusive of all costs such as support staff, round trips, transportation, office rent,
office supplies &utilities, communication, furniture, equipment, reports & documents,
residential accommodation for the Design Office personnel of Design consultant in Delhi/site.
Detailed Design Consultant has to arrange transportation, office & residential accommodation
for their Design personnel in the project area during design phase and construction phase. In the
circumstances when any of these items are provided by IRCON, cost incurred by IRCON shall
be recoverable from DDC. All cost shall be borne by the Consultant.
Tenderer may please note that chainage, co-ordinates, span of bridge, height of bridge and length
for tunnels given above are tentative and may change. Due to change in any of above parameter,
IRCON will not entertain any claim on this account.

Annexure B2A1
1

Payment for Item No. 1 of Annexure B2A shall be%


made on milestone basis as given hereunder:

%
payment

1a

Submission of Inception Report containing design


brief/philosophy and design approach, requirement of
geotech / geophysical investigations as a complete job
and acceptance thereon by IRCON. (Ref. para 5.5.1)
Submission of Pre-Final Design as a complete job and
acceptance thereon by IRCON. (Ref. para 5.5.2)

10%

1c

Submission of tender documents/ specifications for


construction of tunnels as a complete job and
acceptance
thereon by IRCON. (Ref. para 5.5.2.3)

20%

1d

Analysis/assessment of construction tender bids to


finalize
the contract for construction of tunnels as a complete
job.

20%

1e

Submission of Final Design as a complete job and


acceptance thereon by IRCON. (Ref. para 5.5.3)

30%

Payment for Item No. 2 of Annexure B2A shall be


made on milestone basis as given hereunder:

2a

Submission of Preliminary Design containing design


brief/philosophy and design approach, requirement of
ventilation/E&M/ Safety & surveillance/ fire
rescue/Emergency escape as a complete job and
acceptance thereon by IRCON. (Ref. para 5.6.1)

20%

2b

Submission of Pre Final Design as a complete job and


acceptance thereon by IRCON. (Ref. para 5.6.2)

30%

2c

Submission of Final Design as a complete job and


acceptance thereon by IRCON. (Ref. para 5.6.3)

20%

2d

Submission of tender documents/ specifications for


Supply and Installation of E&M Systems for
ventilation,
emergency rescue, safety & surveillance,
communication,
lighting, and other related items as a complete job, and
acceptance thereon by IRCON. (Ref. para 5.6.4)

20%

2e

Technical Analysis/assessment of tender bids to finalize


The E&M contracts as a complete job.

10%

1b

20%

Payment for Item No. 3 of Annexure B2A shall be


made on milestone basis as given hereunder:

3a

Environment Impact Assessment Study for Tunnel


construction including muck dumping, impact on local
hydrology and water bodies, ecology of the area and
any impact on flora/fauna & social system as a complete
job.
Submission of Environment Management Plan as a
complete job

3b

30%

70%

ANNEXUREB2B
Sub: Detailed Design Consultancy of all structures including Tunnels, bridge/viaduct and
associated works and Construction Supervision of Tunnels (T-7 and T-8) between Km
18.816 to Km 26.508in connection with Construction of Sivok (West Bengal) to
Rangpo (Sikkim) New Single line BG Railway Line Project.

SN.

Item

Detailed design consultancy services for design and


Lump drawings of two Major Bridges Br-8 and Br9(Teesta Bridge) including all items with scope of
work as per para 5.3 of the Deliverable and Services
including alignment review, design of Substructure and
Superstructure, design review during construction,
Construction methodology with specific reference to
schedule of completion of Bridges, Preparation of
BOQ and specifications for construction contract &
design of all associated works required to complete the
Bridges in all respects, with deliverables as per clause
5.3 and key dates as per clause 5.13 of Deliverables
and Services as a complete job. Payment for this item
shall be made on milestone basis as given Annexure
B2B1.
Proof check of launching scheme/s for the dry as well
as wet spans submitted by the contractor including
proof checking of the same and approval of the client
for adoption

Unit

Qty.

Rate
(To be quoted
separately for
INR, Euro and
USD component
of the total
amount)

Amount
(INR+Euro+USD)
(To be quoted
separately for
INR, Euro and
component of
USD component
of the total
amount)

Lump
sum

Scheme 2

Total B2B

DETAILED DESIGN CONSULTANCY (BRIDGES & OTHER WORKS

NOTE:
The Rates are inclusive of all costs such as support staff, round trips, transportation, office
rent, office supplies & utilities, communication, furniture, equipment, reports & documents,
residential accommodation for the Design Office personnel of Design consultant in
Delhi/site.
Detailed Design Consultant has to arrange transportation, office & residential
accommodation for their Design personnel in the project area during design phase and
construction phase. In the circumstances when any of these items are provided by IRCON,
cost incurred by IRCON shall be recoverable from DDC. All cost shall be borne by the
Consultant.
Tenderer may please note that chainage, co-ordinates, span of bridge, height of bridge and
length for tunnels given above are tentative and may change. Due to change in any of above
parameter, IRCON will not entertain any claim on this account.

Annexure B2B1

Payment for Item No. 1 of Annexure B2B shall be


made on milestone basis as given hereunder

%
payment

1a

Submission of Inception Report including preliminary


design basis and methodology, quality assurance
manual, requirement of geotech / geophysical
investigations, submission of GADs of
bridges, as a complete job and acceptance thereon by
IRCON.(Ref. para 5.5.1)

20%

1b

1c

1d
1e

1f

Submission of Pre Final Design including detailed


design and drawings of Substructures & Superstructures
for all bridges as a complete job and acceptance
thereon by IRCON /Proof consultant.(Ref. para 5.5.2)

30%

Submission of tender documents/ specifications for


construction of Substructures & Superstructures of
bridges as a complete job and acceptance thereon by
IRCON.(Ref. para 5.5.2.3)
Analysis/assessment of construction tender bids to
finalize the contract of bridge

10%

Submission of Final Design including detailed design


and drawings of Substructures & Superstructures for all
bridges as a complete job and acceptance thereon by
IRCON.(Ref. para 5.5.3)
Final payment on completion of work at site as per
approved10% design, drawings and design updates
during construction

20%

10%

10%

ANNEXUREB3
Sub: Detailed Design Consultancy of all structures including Tunnels, bridge/viaduct and associated
works and Construction Supervision of Tunnels (T-7 and T-8) between Km 18.816 to Km 26.508in
connection with Construction of Sivok (West Bengal) to Rangpo (Sikkim) New Single line BG Railway
Line Project.

CONSTRUCTION SUPERVISION including 3D monitoring etc.


SN

Description

Unit

Rate

Site services of Two nos. Tunnel Construction


cumMan70 Geotechnical. Engineer with NATM
design month support capabilities including
review, modification and up dation of tender
design, QC, construction methodology and
specifications Complete

Man
month

70

Site services of One Bridge Engineer during


construction of substructures and
superstructures of Bridges Br-8 & Br-9

Man

12

Qty.

Amount

month
3

Supervision of Erection/Launching work of


both the bridge/launching contractor

Man
month

Services of One Geologist to assess tunnel


geology in advance and provide the geological
inputs for NATM design during tunnel
construction including review, modifications
and updation for Geotech investigations
Complete

Man
month

38

Services of One Survey cum Instrumentation


Engineer for alignment control and 3D
monitoring for Tunnel Const. Engineer
including survey for review, modifications & up
dation of the alignment design Complete

Man
month

38

Services of One Ventilation/Illumination Expert


for Ventilation/E & M work during tunnel
construction for review, modifications &
updation of the ventilation/E &M design and
commissioning of the system Complete
Delhi office support including Project Head,
CAD technician and supporting staff till
commissioning of the system Complete

Man
month

Month

48

Home office support including design and other


logistic support Complete

Month

12

Total B3

NOTE:
The Rates are inclusive of all costs such as support staff, round trips, transportation outside
project area, office supplies & utilities, communication, furniture, equipment, reports &
documents, etc.
Cost of Boarding and lodging (including office & residential accommodation) for the
Construction Supervision personnel of Detailed Design consultant in the project area shall be
borne by the Consultant. In case the office and residential accommodation is provided by
IRCON to the Construction Supervision personnel of Detailed Design consultant, cost of
providing the office and residential accommodation shall be charged to DDC @ INR
20000per sqm of the plinth area. This cost is not inclusive of water, electricity, maintenance,
TV, Internet connection, boarding etc. These are to be arranged by DDC and the cost towards
the above shall be borne by DDC. Payment for Transportation vehicles shall be made as per
accepted rates. Other costs shall be borne by the consultant.
Delhi office shall be the Design Co-ordination Office for co-ordination between
Client/IRCON/Site Consultants/DDCs Home Design offices, and shall provide all necessary
services as required to develop the requisite designs, and their approval.

During the train operation phase with in DLP, if the services of ventilation/electromechanical
experts, including Home office support are required i.e. S.N. 6& 8above, the services of the
same shall be made available by the consultant. No extra payment shall be made on this
account.