Pearl GTL

Project
Shell Project No: HP-3000-QAT
Project Document Number: T- 4.234.575

Purchase Order Number:

2MH127

Tag/Item Number(s):

N/A

Unit(s):

ASU

PCWBS:

LINDE ENGINEERING

Contractor Project No:


Project Rev.: G

Page 2 of 28

5887

QATAR SHELL GTL PROJECT (PEARL)


C2 AIR SEPARATION UNITS CONSTRUCTION
K

27.11.08

Ready for Construction

SB

EO

ZG

RFC

14.08.08

Issue for Review ( Comments incorporated as per


site condition)

SB

EO

ZG

IFR

03.07.08

Issued for Review

SB

EO

ZG

IFR

15.03.08

Ready For Construction

SB

UA

ZG

RFC

21.02.08

Ready For Construction

SB

UA

ZG

RFC

13.02.08

Ready For Construction

SB

UA

MC/ZG

RFC

26.01.08

Ready for construction

SB

UA

MC/ZG

RFC

24.11.07

Company comments incorporated

IU

IO/UA

MC/ZG

CCI

01.10.07

Issued for company comments

IU

IO/UA

MC/ZG

ICC

Issued for review

BR

MC

ZG

IFR

Issued for internal review

MS

MC

ZG

IIR

GAMA
Rev.
No.

Project
Rev
No.

Date

Prepared Checked Approved


By
By
By
ORIGINATOR

Description

Status

Document Title:

ITP FOR CONCRETE WORKS

LINDE ENGINEERING
AG

Document No.

Contractor

Gama Qatar Co. W. L. L.

LOC470
GAM

ITP

QAC

GTL

023

Org.
Code

Doc.
Type

Disc.
Code

Geogr.
Area

Seq.
No

Rev.
No

Project Document Number: T-4.234.575

Vendor Code

Rev No: G

QSGTL PEARL PROJECT

Document No.: GAM-ITP-QAC-GTL-023

C2 ASU Construction Works


DATE: 27.11.08 REV. K

CONCRETE WORKS (FSI)


S. GAMA QATAR

X. CONTRACTOR QC

I: INSPECTION / TEST

Item

Activity

R: DOCUMENT REVIEW
Control Procedure
Characteristic to be Verified
Reference

Blinding Concrete

S: SURVEILANCE
H: HOLD POINT. W: WITNESS
Responsible
Acceptance Criteria
Verifying Documents
Party

T-13.376.490

Compliance with
Compaction &level
Requirements

Visual

b. Location and Level

Drawings

As per latest drawings

GAM-QCR-QACGTL-006

c. Surface inspection(FSI)

T-13.376.358 DEP34.19.20.31& T.13.377.360E

No Cracks (or) Voids in


excavated cleaned ground
surface OR in Compacted Soil

Visual

As per latest drawings

GAM-QCR-QACGTL-013

No loose Particle & Refer to


item # 7.0

GAM-QCR-QACGTL-001,006,008

e. Cleaning of excavated ground


surface(FSI)

Project Drawings
Refer to item # 7.0
;T.13.377.360E

QA/QC & Site


Engineer

f. Pouring Blinding Concrete

Refer to item # 8.b

Refer to item # 8.b

GAM-QCR-QACGTL-009,013

g . Thickness

T-13.376.358
DEP-34.19.20.31

50 mm Minimum

GAM-QCR-QACGTL-013

h. Curing

Refer to item # 9.0

Refer to item # 9.0

Visual

Manufacturer Data Sheet

Prime Coat-0.075-0.1 Kg/m2,


Neat Coat 0.6 kg/m2, Dilute
1:1 with clean water

GAM-QCR-QACGTL-031

I. Coating

T-4.234.575 Rev. G

A. THIRD PARTY (FUGRO)

a. Ground condition

d. Formwork
1.0

C. COMPANY

Page 4

QSGTL PEARL PROJECT

Document No.: GAM-ITP-QAC-GTL-023

C2 ASU Construction Works


DATE: 27.11.08 REV. K

CONCRETE WORKS (FSI)


S. GAMA QATAR

X. CONTRACTOR QC

I: INSPECTION / TEST

Item

2.0

Activity

Blinding Concrete
Testing

R: DOCUMENT REVIEW
Control Procedure
Characteristic to be Verified
Reference

Slump/Flow & Temperature

Refer to item # 13(a)

C. COMPANY

S: SURVEILANCE
H: HOLD POINT. W: WITNESS
Responsible
Acceptance Criteria
Verifying Documents
Party

Laboratory

a. Material
b.Check bar
size,lap,spacing&Location (FSI)
c. Number of bars
d. Length of bars
3.0

ASTM A615 Gr 60 & BS 4449


;T.13.377.360E
As per drawing
As per drawing

Re bar Work

QA/QC
Inspector &
Site Engineer

Form Work

Flow = 500mm to 650mm &


0
Temp 32 C - Max

Site test to every


truck & Fresh
Concrete Report

S
/
R

As per specification

Test Certificate

As per drawings and


Table 1b of ASTM A615/BS
8110-1

As per drawings

As per ACI 315

As per drawings and ACI 315

GAM-QCR-QACGTL-014

As per drawing & DEP


34.19.20.31

f. Bending

As per drawing & DEP


34.19.20.31

As per ACI 315 and or Project


Specification

g. Reinforcement surface(FSI)

ASTE A615 &DEP 34.19.20.31


;T.13.377.360E

Free from mortar, rust, oil or


other coatings

Visual

h. Placing, spacers, cover,


Splices(FSI)

As per drawing & DEP


34.19.20.31; T.13.377.360E

As per drawings and


315

GAM-QCR-QACGTL-014

b. Location, and elevation


c. Frames, and Supports(FSI)
d. Chamfer
e. Binding Wire tying check

T-4.234.575 Rev. G

e. Hook

a. Cleanliness
4.0

A. THIRD PARTY (FUGRO)

ACI

Free from Oil & Grease


STANDARD DRAWINGS
&
ACI 117, 301, AND 347
& T.13.377.360E

As Per Drawing
QC & Site
Engineer

50mm cover is maintained


As Per Drawing
No binding wires inside
the45mm concrete cover area

Visual
GAM-QCR-QACGTL-006
GAM-QCR-QACGTL-010/012/013/014
Visual

Page 5

QSGTL PEARL PROJECT

Document No.: GAM-ITP-QAC-GTL-023

C2 ASU Construction Works


DATE: 27.11.08 REV. K

CONCRETE WORKS (FSI)


S. GAMA QATAR

X. CONTRACTOR QC

I: INSPECTION / TEST

Item

Activity

R: DOCUMENT REVIEW
Control Procedure
Characteristic to be Verified
Reference

5.0

7.0

Electrical Earthing

Cleaning with
blower

S: SURVEILANCE
H: HOLD POINT. W: WITNESS
Responsible
Acceptance Criteria
Verifying Documents
Party

Concreting

T-4.234.575 Rev. G

Visual

f. Dimension checked(FSI)

As Per Drawing

GAM-QCR-QACGTL-014

To comply with the relevant


drawing for Size , type,
number,
Location , elevation &
Tolerances etc.

GAM-QCR-QACGTL-011

As per LS 443-01

Test Certificate

GAM-QCR-QACGTL-104

GAM-QCR-QACGTL-009

VISUAL

Size, type, number,


location, Elevation being
firmly supported protected
from damage before
concreting.(FSI)

b)

Location, elevation,
Protected from Damage
After Concreting.(FSI)

c)

Material

b)

Check Location &


continuity(FSI)
Check and Sign Pour
Card to Release
Concrete Pouring

Area should be clean

As per drawings ;T.13.377.360E

b. Pre pour arrangements,


Concreting Plan Approval and
concrete pour card
signed(FSI)

Site Engineer
& QA/QC
INSPECTOR

As per Drawing

DEP 63.10.08.11

T-13.376.358
DEP-34.19.20.31

a. Construction Joints(FSI)
8.0

Wax spray

a)
6.0

A. THIRD PARTY (FUGRO)

e. Form oil

a)

Anchor Bolts,
Templates and
Embedded items

C. COMPANY

Electrical
Engineer

Site Engineer
Site Engineer

T-13.376.358
DEP-34.19.20.31 ;T.13.377.360E

QA/QC
INSPECTOR

Proper Location & Continuity

Accept without foreign Material


Correct location and Surface
preparation

VISUAL

Pour Card should be Signed


by QCI &Contractor

GAM-QCR-QAC-GTL
-009/010/012/014

Page 6

QSGTL PEARL PROJECT

Document No.: GAM-ITP-QAC-GTL-023

C2 ASU Construction Works


DATE: 27.11.08 REV. K

CONCRETE WORKS (FSI)


S. GAMA QATAR

X. CONTRACTOR QC

I: INSPECTION / TEST

Item

Activity

R: DOCUMENT REVIEW
Control Procedure
Characteristic to be Verified
Reference
c. Wetting & Cleaning with water
before pouring concrete

C. COMPANY

S: SURVEILANCE
H: HOLD POINT. W: WITNESS
Responsible
Acceptance Criteria
Verifying Documents
Party

Curing (FSI)

10

Post Pour
Inspection (FSI)

DEP-34.19.20.31

Site Engineer

Free from dust, oil, nails &


wood pieces etc....

d. Concrete discharging

T-13.376.358DEP-34.19.20.31
;T.13.377.360E

Site Engineer

Should not be more Than 1.5


meters Height

e. Concrete compaction

T-13.376.358DEP-34.19.20.31
;T.13.377.360E

f. Concrete Finish

T-13.376.358 & T.13.377.360E


DEP-34.19.20.31

GAM-QCR-QACGTL-015

GAM-QCR-QACGTL-015

Visual inspection

As per approved
Repair procedure

By Vibrators
Site Engineer

9.0

A. THIRD PARTY (FUGRO)

Dampness

T-13.376.358
DEP-34.19.20.31; T.13.377.360E

Site Engineer

T-13.376.358
DEP-34.19.20.31 ;T.13.377.360E

Site Engineer

VISUAL

Immediate good finish as


Required by the Client.
10DaysCuring Period for all
Concrete

1) External Dimensions
2) Bolt positions

Visual inspection

a. Identification of Repair
requirements.
11

Repair of
Concrete(FSI)

b. Authorisation to repair
c. Repair

T-4.234.575 Rev. G

As Per Drawing

T-13.376.358
DEP-34.19.20.31 ;T.13.377.360E

QA/QC
Inspector &
Site Engineer

Page 7

QSGTL PEARL PROJECT

Document No.: GAM-ITP-QAC-GTL-023

C2 ASU Construction Works


DATE: 27.11.08 REV. K

CONCRETE WORKS (FSI)


S. GAMA QATAR

X. CONTRACTOR QC

I: INSPECTION / TEST

Item

12

Activity

Second stage
concreting if
applicable

13

Testing
a) Fresh concrete

T-4.234.575 Rev. G

R: DOCUMENT REVIEW
Control Procedure
Characteristic to be Verified
Reference

C. COMPANY

A. THIRD PARTY (FUGRO)

S: SURVEILANCE
H: HOLD POINT. W: WITNESS
Responsible
Acceptance Criteria
Verifying Documents
Party

GAM-QCR-QACGTL-015

GAM-QCR-QACGTL-017

GAM-QCR-QACGTL-010

d. Surface preparation
& Release for coating

Visual inspection

e. Painting & Coating

As per Manufacturer
Recommendation

Preparation of construction
Joint by chipping or
Sandblasting or any approved
manner

a)

DEP-34.19.20.31

Temperature test per truck

T-13.376.358
DEP-34.19.20.31

Heat of Hydration
a) Concrete structures
depth or thick 800mm or
above.
b) For large pours, plan
dimension exceeds 10m

DEP-34.19.20.31Amendments
Sec 3.21

Site Engineer

b)

Laboratory

Laboratory

Exposed loose
aggregates and
particles removed.
Area must be wetted
or soaking with water

30 c to structural concrete
0
and 32 c to Blinding Concrete
section
Temperature difference
between maximum and
0
minimum is 15 C

GAM-QCR-QACGTL-031

Laboratory Report

Page 8

QSGTL PEARL PROJECT

Document No.: GAM-ITP-QAC-GTL-023

C2 ASU Construction Works


DATE: 27.11.08 REV. K

CONCRETE WORKS (FSI)


S. GAMA QATAR

X. CONTRACTOR QC

I: INSPECTION / TEST

Item

Activity

R: DOCUMENT REVIEW
Control Procedure
Characteristic to be Verified
Reference

Flow Test
Frequency 1 Test per truck

T-13.376.358
DEP-34.19.20.31;
ASTM C 1611

C. COMPANY

S: SURVEILANCE
H: HOLD POINT. W: WITNESS
Responsible
Acceptance Criteria
Verifying Documents
Party

Laboratory/
Supplier

Compressive strength @7 & 28


days (cube sample as per BS
1881)
Testing Frequency as per
T-13.376.358 Section 3.33
Chloride content
b) Hardened
concrete

T-13.376.358
DEP-34.19.20.31

Water Absorption
Volume of permeable voids
Chloride Ion Permeability
Leak Test for
Manholes /
Pits (FSI)

T-4.234.575 Rev. G

No Leak

DEP 34.17.00.32

Lab Report
GAM-QCR-QACGTL-017

S
/
R

S
/
R

BS EN 12390-3 Testing of
Hardened concrete-strength of
test specimens

Laboratory Report/
Supplier / QCR-020

S
/
R

Maximum 0.10% by
Weight of cement

Laboratory Report
/Supplier / QCR-019

Maximum 4% by
Weight of cement

Laboratory Report
/Supplier / QCR-018

Maximum 4% at 28
And 48 days
Maximum 4% at 28
And 48 days
Very Low as per
ASTM C1202

Laboratory
Report/Supplier
Laboratory
Report/Supplier
Laboratory
Report/Supplier

No Leak

GAM-QCR-QACGTL- 026 & 144

Testing Fresh
Concrete.
Flow = 500mm to 650 mm

Laboratory

Sulphate content

c)

A. THIRD PARTY (FUGRO)

Site Engineer
& QC
Inspector

Page 9

INSPECTION CHECKLIST

EARTHWORKS
CLEARING AND GRADING
FORM NO: GAM-QCR-QAC-GTL-001
Rev.F
Location Bldg/Area :

ITP: GAM-ITP-QAC-GTL-

Date :

Drawing Reference No :

1
2
3
4
5
6
7
8
9
10
11
12

Check work site, stock pile haul roads, disposal areas and any existing utilities clearly identified N/A
Check that the Surveyor has established bench marks and confirmed elevations
Check work site and any existing utilities staked out (confirmed by surveyor or attach
surveyor's report)
Check provisions for de-watering (if appl.)
Check provisions for demolition of existing structures. (if appl.)
Check valid work permits obtained for all areas
Check site cleared of all unsuitable soil & rubbish
Check all unsuitable material hauled away to designated disposal area.
Check any retained soils are properly stock piled
Check retained soils appear acceptable and sampled as required
Check site properly graded to designated levels (confirmed by surveyor or attach surveyor's
report)
Check base soil appears acceptable & sampled as required

13 Check base scarified (if required)

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

Comments:

SIGN OFF AS ACCEPTED


GAMA QATAR
Name
Position
Signature
Date
0.

LINDE

PEARL GTL

INSPECTION CHECKLIST

SURVEYORS REPORT.
GAM-QCR-QAC-GTL-006
Rev. 0

GAM-ITP-QAC-GTL-

DATE :

REV.

Location Bldg/Area:

No :

Briefly describe the intention of the Survey and purpose giving details of the utility/ excavation.

Drawing Numbers

For Location give Marked up copy of Drawing:

Calibration Cert No :

1. Confirm that surveying equipment is calibrated


2. Check that the drawings noted above are approved for use.
3. Check all existing utilities are clearly identified and staked out
4. Confirm that the proposed excavation is clearly staked/ Marked out.
5. Confirm depth of excavation.

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

Surveyors Comments plus any additional survey information.

SIGN OFF WILL CONFIRM RELEASE TO EXCAVATE.


GAMA QATAR
Name
Position
Signature
Date
0.

LINDE

PEARL GTL

INSPECTION CHECKLIST

EXCAVATION FOR UTILITIES AND


FOUNDATIONS
FORM NO: GAM-QCR-QAC-GTL008
Rev.0
Location Bldg/Area:

ITP REF. NO: GAM-ITP-QAC-GTL-

REV-

DATE:

Drawing Reference No:

ITEM DESCRIPTION

1 Check route/area is clearly staked / Marked out by Surveyor


2 Check all existing utilities clearly identified and staked out

N/A YES NO

3 If Utility trench check that it complies with depth & width shown on drawing.
If foundation Base confirm size and depth are correct to approved drawings/ surveyors
4
report.
5 Check bedding material for foundation or Utility trench is clean and free of stones and
laid to proper depth
For drainage confirm levels falls etc mark on drawing (show levels Manhole to
6
Manhole).
7 If Geotextile is to be used confirm that it is positioned to the correct requirements.

N/A YES NO

8 Confirm base compaction test have to be performed prior to bedding.


9 Check de-watering properly maintained (if required)

N/A YES NO

10 Check trench is properly battered, framed or sheeted (if required)

N/A YES NO

N/A YES NO

N/A YES NO
N/A YES NO
N/A YES NO
N/A YES NO
N/A YES NO

1. Stage completion release to lay UTILITY or


2. Blinding for Foundation Base.
COMMENTS :

SIGN OFF AS ACCEPTED


GAMA QATAR
Name
Position
Signature
Date
0.

LINDE

PEARL GTL

QSGTL PEARL PROJECT


C2 ASU Construction Works
FORM NO:

CONCRETE POUR CARD

GAM-QCR-QAC-GTL-009

Date :

Area Location & Type of Structure


Drawing & Rev No;
Quantity Reqd(m3);

Slump(mm):
ITP NO:GAM-ITP-QAC-GTL -

Class of concrete;

Rev -

Slump Flow(mm);
Inspection

ITEMS TO BE CHECKED

QC Status

Check for Ground Condition


Check for filling and compaction
Check Minimum blinding thickness as per drawing
Coating of blind concrete
Blinding concrete satisfactory and QC released for next activity
Steel reinforcement fabrication satisfactory as per drawing
Form work Erecting Satisfactory (Dimension,Cleanliness,oil and
Support)
Anchor Bolts (see Separate survey Report)
Embedded Items fixing Satisfactory (Elec/Mech)

All setting outs verified by the surveyor including Dimensions,


Locating and Elevation.
Blowing with air compressor is Satisfactory
Pre pour Inspection Satisfactory

THE APPENDED SIGNATURE GIVES APPROVAL FOR THE PLACEMENT OF CONCRETE DETAILED ABOVE
& QC HOLD RELEASED
ORGANISATION
NAME
SIGNATURE
DATE

GAMA QATAR

LINDE

COMPANY

QSGTL PEARL PROJECT


C2 ASU Construction Works
FORM NO:
GAM-QCR-QAC-GTL-010

INSPECTION FORM FOR CONCRETE


HONEYCOMBS &CRACKS

ITP : GAM-QCR-QAC-GTLDate:

INSPECTION FORM FOR CONCRETE HONEY COMBS&CRACKS


Location Bldg/Area:

GRID :

Drawing Reference No:


ITEM
1.

DETAIL OF ACTIVITY

COMPLIANCE
YES
NO
NA

REMARKS

HONEY COMBS
1. a. Removal of unwanted concrete
1.b. Preparing of concrete with bond
1.c. Curing
1.d. Finishing

2.

CRACKS.
a) Preparation of V cut if applicable
b) Injection of Repair Solution OR
mortar
c) Curing.
d) Finishing.

Comments:
ORGANIZATIONS

GAMA QATAR

LINDE

QSGTL

Name

Signature

Date

Page 1 of 1

QSGTL PEARL PROJECT


C2 ASU Construction Works
GAM-QCR-QAC-GTL-011 EMBEDDED ITEMS INSPECTION FORM

Date :

Location Bldg / Area :

Drawings Reference No:


ACTIVITIES TO BE CHECKED

STATUS BEFORE POURING

STATUS AFTER POURING

1.latest construction drawing and revision


being used
2. check anchor bolts / embedded items
are properly located and securely fixed in
place
3. check level of anchor bolts and
alignment properly done

4. check anchor bolt, nut and washer


properly protected

REMARKS:
THE EMBEDDED ITEMS ARE CHECKED AND CONFORMANT
NAME
GAMA QC

LINDE
COMPANY

SIGNATURE
BEFORE POURING

SIGNATURE
AFTER POURING

QSGTL PEARL PROJECT


C2 ASU Construction Works
FORM NO:
GAM-QCR-QAC-GTL012

INSPECTION FORM FOR CONCRETE ITP GAM-ITP-QAC-GTLDate:


FOUNDATIONS / STRUCTURES

Area, Location & Type of Structure:

Drawing & Rev No;GAMA - QC


TYPE OF ACTIVITY
1.0
2
2.1
2.2
2.3
2.4
3
4
4.1

4.2
5
5.1
5.2
6
7
8
9
9.1
9.2
9.3
10
10.1
10.2

10.3

10.4
11.0

SIGN

DATE

LINDE
SIGN

DATE

COMPANY
SIGN

DATE

Surveying, Setting Out &


Excavation
Existing Ground / Formation
Level
Bottom Level Correct
Dimension checked
Strata acceptable
Excavation is completed and
approved for next activity
Blinding
Footing
Formworks / Rebars /
Dimensions / Cleanliness / Oil /
Support
Inserts
Pedestal
Formworks & Rebars
Anchor Bolts & Inserts
Concrete Pouring (1)
Concrete Pouring (2)
Concrete Surface Inspection
Concrete Protection
Epoxy Coating
Polyethylene Sheet
Hardboard
Backfilling
Area free of deleterious material
prior to backfilling
Layers for fill material marked on
the sides of the excavation or
with pins.
Adjacent to below ground
structures correctly coated and
protected in accordance with
project specification
Compaction test done
Final Survey Concrete As built
Page 1 of 1

INSPECTION CHECKLIST

LEAN / BLINDING
CONCRETE
FORM NO: GAM-QCR-QACGTL-013
Location Bldg/Area:

ITP REF. NO: GAM-ITP-QAC-GTL- Date :

Drawing Reference No

No :

DESCRIPTION
1 Verify surveying setting out of Base location and blinding concrete level is as per drawings

N/A YES

NO

2 Verify Base Compaction results are conforming to Specifications.

N/A YES

NO

3 Confirm thickness is to be 50mm Minimum

N/A YES

NO

4 Confirm forms are in place

N/A YES

NO

5 Blinding Concrete receival & placement inspection.

N/A YES

NO

6 Verify Concrete Curing

N/A YES

NO

N/A YES

NO

N/A YES

NO

Check application of membrane / Polyethylene is in accordance with manufacturers


instructions and specification.

8 Compressive strength to be recorded by Laboratory

COMMENTS :

SIGN OFF AS ACCEPTED


GAMA QATAR
Name
Position
Signature
Date

LINDE

QSGTL

INSPECTION CHECKLIST

CONCRETE PRE POUR


INSPECTION
FORM NO: GAM-QCRQAC-GTL-014

ITP REF. NO: GAM-ITP-QAC-GTL-

Location Bldg/Area:

Date:
GRID :

Drawing Reference Nos :

ITEM DESCRIPTION
Check that existing concrete surface properly chipped & concrete pouring place is clean
1

N/A YES

NO

N/A YES

NO

Check that rebar free from rust, damage and installed as per drawings IF REQUIRED check
N/A YES
embedded items are compliant

NO

and construction joints, if any, are adequately prepared


2 Check that form work installation is proper and release agent applied properly
3

4 Check that reinforcement Bars are the correct size as drawing

N/A YES

NO

5 Check that reinforcement are spaced correctly

N/A YES

NO

6 Check adequacy of spacers and specified concrete cover

N/A YES

NO

7 Check that Embedded items are placed as per the construction Drawings

N/A YES

NO

8 Check that Anchor Bolts are placed as per the construction Drawings.

N/A YES

NO

9 Check that Waterstop is fixed correctly if required

N/A YES

NO

10 Check that all civil piping is fixed and ready for casting

N/A YES

NO

11 Check that all electrical items are fixed and ready for casting (Earthing Plate)

N/A YES

NO

12 Check that all mechanical items are fixed and ready for casting

N/A YES

NO

13 Check that all Anchor bolts and embedded items are installed as required, if applicable.

N/A YES

NO

Comments:

SIGN OFF AS ACCEPTED


GAMA QATAR
Name
Signature
Date

LINDE

QSGTL

INSPECTION CHECKLIST

CONCRETE
POST POUR INSPECTION
GAM-ITP-QAC-GTL-

GAM-QCR-QAC-GTL-015

Date :

Location Bldg/Area:

GRID :

Drawing Reference:

POST POUR INSPECTION


CAST DATE

CAST TIME Approximately

STRIPPING DATE / TIME

Confirm Dimensional Check taken: Attach sketch or marked up drawing of dimension


taken

NA

YES NO

Confirm surveyor has reported .

NA

YES NO

Confirm Embedded items have been check and accept by Mech.

NA

YES NO

EXAMINATION OF POUR AFTER STRIPPING


Describe any surface defects and their probable cause, and what remedial measures are
necessary :

REPAIRS
If major repairs are to be carried out give repair sheet No

CURING RECORD
4.

DAY

10

11

12

13

14

CHECKED
NOTE: Water Curing Check the curing daily tick the box.

If Curing Compound is used write below Curing Compound type

GENERAL COMMENTS

SIGN OFF AS ACCEPTED ONLY AFTER COMPLETION OF ALL WORKS & CURING
GAMA QATAR

LINDE

QSGTL

Name
Signature
Date
Page 1 of 2

INSPECTION CHECKLIST

CONCRETE
POST POUR INSPECTION
GAM-ITP-QAC-GTL-

GAM-QCR-QAC-GTL-015

Date :

Location Bldg/Area:

GRID :

Drawing Reference:

THIS RECORD SHEET TO BE USED ONLY IF REQUIRED

CONCRETE REPAIR RECORD SHEET


Supervisor / Inspectors name

Date

RFI No.

Provide Sketch or photo and give brief description of repair and repair material.
Is the defect
1. HONEYCOMBING
2. SEPARATION
3. OTHER

1. Check bonding agent applied (if required)


2. Check only designated repair materials are utilised
3. Check repair materials properly applied
4. Check curing application (if required)

NA

YES NO

NA

YES NO

NA

YES NO

NA

YES NO

SIGN OFF AS ACCEPTED ONLY AFTER COMPLETION OF ALL WORKS & CURING
GAMA QATAR

LINDE

QSGTL

Name
Signature
Date
Page 2 of 2

QSGTL PEARL PROJECT


C2 ASU Construction Works
Record No. :

FRESH CONCRETE TEST


REPORT

ITP No. :

GAM-ITP-QAC-GTL-

Form No: GAM-QCR-QAC-GTL-017

No. :

SAMPLE NO.

BATCH TIME

TIME of ARRIVAL

DISCHARGE TIME

TIME of
DEPARTURE

Inspection Gr :

Mix Type:

Laboratory :

Minimum Strength at 28 Days:

Date :

Week:

CONCRETE
TIME TAKEN

TEMPERATURE (C)
SLUMP (mm)

CONCRETE

MIX CODE

NUMBER OF CUBES
CAST

CONCRETE
QUANTITY ( m3 )

AIR

REMARKS:

ORGANIZATIONS
GAMA REP
LINDE
QSGTL or its PMC

NAME

DATE

SIGNATURE

LOCATION

QSGTL PEARL
C2 ASU Construction
Works
Record No.

Hardened Concrete Sulphate


Content Test

MIX DESIGN :
SAMPLE
No.

___________________

LOCATION

Inspection Gr :

ITP No. : GAM-ITP-QAC-GTL-

Form No: GAM-QCR-QACGTL-018

No. :

Date :

Date of Sampling
______________

(L)
(Md)
Mass Ignited Barium
Mass of Sample (g)
Sulphate (g)

(C1)
Cement
Content (%)

Date of Testing :
______________
(G)
Sulphate
Content (%)

Note :
Tests were performed in accordance with B.S. 1881 Part 124
Max. Allowable Sulphate % by the Wt. of Cement = 4 %
G =L x 34.4 x 100
Md x C1

Full Name / Signature / Date


GAMA QATAR

LINDE

QSGTL

Remarks

QSGTL PEARL GTL


C2 ASU Construction
Works
Record No.

Hardened Concrete Chloride


Content Test
MIX DESIGN :

SAMPL
LOCATION
E No.

___________________
(Md)
Mass of
Sample (g)

(V5)
Silver Nitrate
Solution (ml)

Inspection Gr :

ITP No: GAM-ITP-QAC-GTL-

Form No: GAM-QCR-QACGTL-019

No. :

Date :

Date of Sampling
______________
(V6)
Thiocyanate
Solution (g)

(M)
Thiocyanate
Solution
Molarity (M)

Date of Testing :
______________
(C)
Cement
Content (%)

Note :
Tests were performed in accordance with B.S. 1881 Part 124
Max. Allowable Sulphate by the Wt. of Cement = 0.10 %

J = ( V5 V6. M

__________

) x

0.3545 x 100
_____________________

0.1

Full Name / Signature / Date


GAMA QATAR

Md x C1

LINDE

QSGTL

(J)
Chloride
Content
(%)

QSGTL PEARL PROJECT


C2 ASU Construction Works
Record No. :

CONCRETE CUBE TEST


REPORT

ITP No. : GAM-ITP-QAC-GTL-

Form No: GAM-QCR-QAC-GTL-020

No. :

Cube
No.

Date:

Slump (mm)

7 - DAYS
LOAD

STRESS

7 - DAYS
LOAD

STRESS

7 - DAYS
LOAD

STRESS

7 - DAYS
MEAN

Inspection Gr :

Mix Type :

Laboratory :

Minimum Strength at 28 Days :

Date :

Week:

28 - DAYS
LOAD

STRESS

28 - DAYS
LOAD

Remarks :
STANDARD DEVIATIONS ARE THE PRECEEDING 40 RESULTS FOR 28 DAY AVERAGE

Full Name / Signature / Date


GAMA QATAR

LINDE

QSGTL

STRESS

28 - DAYS
LOAD

STRESS

28 - DAYS
MEAN

STANDART
DEVIATION

SITE CURING
28 DAYS
LOAD

STRESS

REMARKS

C2-ASU
PEARL GTL PROJECT

REPORT NO :
DATE
MANHOLE, CATCH BASINS & PITS LEAK TEST REPORT
NO :
AREA :

LEGEND:

MANHOLE

DWG. Number

CATCH BASIN
Item No.

Date

PIT
Time

Remarks

COMPLY
NOT COMPLY

TEST COMPLETED SUCCESFULLY WITHOUT ANY VISUAL LEAK.


NOTE :

OTHERS

LEAK TEST WILL START AFTER ABSORBING WATER BY STRUCTURE IS STABILIZE.

GAMA--CONSTRUCTION
NAME
SIGNATURE
DATE

FORM. NO.: GAM-QCR-QAC-GTL-026 REV.0

GAMA--QC

LINDE

COMPANY

QSGTL PEARL PROJECT


C2 ASU Construction Works
GAM-QCR-QAC-GTL-031

PAINTING AND COATING


CHECKLIST

ITP NO:GAM-ITP-QAC-GTL-

Location Bldg/Area:

Date:

Drawing reference:

GRID :

Ref.

DETAIL OF ACTIVITY

Surface correctly prepared to


specification

Painting material correct to


specification

Paint application in accordance


with specification

4
5
6

COMPLIANCE
YES
NO
N/A

REMARKS

Each point coat is compatible to


previous coat
Paint finish is smooth and free
from runs, curtains and foreign
matters
Area is free from overspray,
spillage, debris etc.

ORGANIZATIONS
GAMA

LINDE

QSGTL or its PMC

NAME

DATE

SIGNATURE

C2 ASU PEARL GTL PROJECT


RAS LAFFAN INDUSTRIAL CITY

EARTHING INSPECTION TEST REPORT

Test No.:
Client:
Location:
Description:

System:
Project:
Relevant
Drawings &
Specifications:
Location:

Inspection - Earthing Installation


Item no

Description

Installed in accordance with relevant drawings and specifications

Earth terminal mechanical protection correct

Earth terminal supported correctly

4
5

Neutral earthing resistor resistive value at ___________ oC:


Neutral earthing resistor insulation resistance to earth:

Earth boss correctly fitted

Continuity

Accept

Reject

N/A

Accept

Reject

N/A

Inspection After concrete


Item no

Description

Location & Elevation

Proper projection

Free Movement of Threads

Resistivity

Continuity

Remarks:

GAMA QATAR

Name:
Signature:
Date:
GAM-QCR-QAC-GTL-104

LINDE

QSGTL or its PMC

MANHOLE LEAK TEST REPORT


QSGTL - C2 ASU

Project :

Report No:

Area :

Date :

Drawing No :
Size of the Structure :
Depth of Water Standing :
Test No :

Sheet No

Duration (Hrs)

Initial
Volume of
Water (Lt)

Final Volume of Initial Depth


Water (Lt)
(mm)

Initial Volume of Water :


Final Volume of Water :
Total Duration of Test :
ORGANIZATIONS
GAMA
LINDE
QSGTL or its PMC
GAM-QCR-QAC-GTL-144

Final Depth
(mm)

Difference in
Depth (mm)

Remark

COMMENTS :

NAME

SIGNATURE

DATE