SAUDI ARAMCO ID/PID -18-MAY-05 - REV 0(Standards Cutoff - March 2012)

Rev 6
SAIC NUMBER

SAUDI ARAMCO INSPECTION CHECKLIST


Final Fill Inspection

SAIC-A-1006

PROJECT TITLE

WBS / BI / JO NUMBER

EQUIPMENT ID NUMBER(S)

EQUIPMENT DESCRIPTION

LAYOUT DRAWING NUMBER

REV. NO.

SCHEDULED INSPECTION DATE & TIME

ACTUAL INSPECTION DATE & TIME

31-Mar-12
DATE APPROVED
QR NUMBER

30-Apr-13

Civil

CONTRACTOR / SUBCONTRACTOR

EQPT CODE

SYSTEM ID.

PURCHASE ORDER NUMBER

PLANT NO.

EC / PMCC / MCC NO.


QUANTITY INSP.

MH's SPENT

TRAVEL TIME

SAUDI ARAMCO USE ONLY


SAUDI ARAMCO TIP NUMBER

SAUDI ARAMCO ACTIVITY NUMBER

SAUDI ARAMCO INSPECTION LEVEL

CONTRACTOR INSPECTION LEVEL

WORK PERMIT REQUIRED?

ITEM
No.

ACCEPTANCE CRITERIA

REFERENCE

A1

Cohesive fill under footings, grade beams, mats, buildings and process
areas shall have been compacted to at least 90% of Modified Proctor
Density to ASTM D1557 or per project requirements, whichever is higher.

SAES-A-114
Sec. 6.3.2.5

A2

Cohesionless fill under footings, grade beams, mats, buildings and


process areas shall have been compacted to 70% relative density per
ASTM D4253 and D4254 or per project requirements, whichever is
higher.

SAES-A-114
Sec. 6.3.2.5

A3

Fill under foundations with static loads over 320kPa (6500psf) and
foundations for vibrating or heavy equipment, and for asphalt and
concrete pavements, fill shall be compacted to 85% of relative density for
cohesionless soils or 95% of maximum density per ASTM D1557 for
cohesive materials, or per project requirements whichever is higher.

SAES-A-114
Sec. 6.3.2.5

A4

Compacted surfaces of fill and backfill shall be finish graded to the cross
sections, lines, grades and elevations as indicated on the drawings.

SAES-A-114
Sec. 6.3.2.11

A5

Fill Material' shall be used for all fills except where 'Select Fill Material' is
specified. As a minimum, 'Select Fill Material' shall be used within 0.6 m
(2 ft) of the bottom elevation of foundations, spread footings, or slabs-ongrade when fill is required to achieve final grade. 'Select Fill Material'
shall also be specified for backfill which will be in contact with concrete or
steel structures.

SAES-A-114
Sec. 6.2

PASS

FAIL

N/A

RE-INSP DATE

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-A-114 -- Excavation and Backfill, 23 February 2010

Contractor / Third-Party
Construction Representative*

Saudi Aramco
PMT Representative

Work is Complete and Ready for Inspection:


Name, Initials and Date:

T&I Witnessed

QC Record Reviewed

Work Verified

T&I Witnessed

QC Record Reviewed

Work Verified

T&I Witnessed

QC Record Reviewed

Work Verified

Name, Initials and Date:

QC Inspector

PID Representative
Performed Inspection

Work / Rework May Proceed

Name, Initials and Date:

Name, Initials and Date:

QC Supervisor

Proponent and Others


Quality Record Approved:

Name, Sign and Date:

Name, Organization,
Initials and Date:

*Person Responsible for Completion of Quality Work / Test