Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Unit
Qty
Excavation
Road base (below pcc & grade slab)
m3
m3
74
14
26
30
1,924.00
420.00
A1.1
m3
16
1040
16,640.00
A1.2
A1.3
A1.4
m3
m3
m2
1
56
23
1300
1040
72
1,300.00
58,240.00
1,656.00
S#
A Substructure
A
A1
Description
Total
80,180.00
A2 SuperStructure
A2.1
RCC Columns, Beams, lintels and stair
A2.2
RCC Roof, Parapets etc
m3
m3
14
21
1235
1300
17,290.00
27,300.00
A3
m3
73
1800
131,400.00
A4
Nos.
136
108
14,688.00
190,678.00
m2
m2
m2
220
114
70
91
85
91
20,020.00
9,690.00
6,370.00
36,080.00
LM
18
150
2,700.00
L/S
2000
2,000.00
nos.
nos.
3
6
2300
520
6,900.00
3,120.00
14,720.00
E Woodwork Drawing
E1
E2
E2.1
E2.2
E2.3
E2.4
E2.5
E2.6
LM
1950
13,650.00
nos.
2,900.0
5,800.00
nos.
2,900.0
5,800.00
nos.
2,900.0
2,900.00
nos.
2,900.0
2,900.00
nos.
1,900.0
1,900.00
nos.
2,900.0
11,600.00
44,550.00
m2
m2
66
294
20
65
1,320.00
19,110.00
m2
145
1,015.00
21,445.00
m2
m2
m2
13
43
13
125
32
95
1,625.00
1,376.00
1,235.00
4,236.00
Pantry
02
m2
125
750.00
m2
29
125
3,625.00
m2
LM
6
10
95
20
570.00
200.00
5,145.00
Store
03
m2
m2
m2
6
29
6
45
35
95
270.00
1,015.00
570.00
1,855.00
Toilet Gents
04
m2
14
125
1,750.00
m2
73
125
9,125.00
m2
13
95
1,235.00
12,110.00
Toilet Handicapped
05
Floor 300x600 Non-slip porcelain Tiles on thin
Interior Wall 300x600 Polished Porcelain tiles
Ceiling 600x600 Moisture Resistant tiles
m2
m2
m2
9
31
11
125
125
95
1,125.00
3,875.00
1,045.00
6,045.00
Toilet Ladies
06
m2
14
125
1,750.00
m2
m2
74
12
125
125
9,250.00
1,500.00
12,500.00
Battery Room
07
m2
m2
m2
23
58
23
45
35
95
1,035.00
2,030.00
2,185.00
5,250.00
Roof Deck
08
09
10
m2
92
55
5,060.00
m2
92
55
5,060.00
m2
48
40
1,920.00
12,040.00
m2
m2
m2
350
250
140
95
85
85
33,250.00
21,250.00
11,900.00
m2
122
35
4,270.00
m2
122
35
4,270.00
74,940.00
m2
92
20
1,840.00
1,840.00
H 1.4 Glazing
J
K
L
M
N
P
Q
R
LS
LS
LS
1
1
1
4500
2500
2500
4,500.00
2,500.00
2,500.00
LS
4500
4,500.00
LS
LS
LS
1
1
4500
9000
n/a
4,500.00
9,000.00
27,500.00
TOTAL PRICE
551,114.00