Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Multi-Band/Multi-Network/Multi-Vendor/Multi-Operator
In-building Solution
Author : Fengfuan 00179441
Version: V02(20130325)
www.huawei.com
Content
IBS Requirements In MBB Era
Huawei SingleDAS Solution
Cases
Outdoor
30.30%
Indoor
69.70%
Voice Services
Source: Softbank
Outdoor
10%
Indoor
90%
Drop Call
Weak Signal
Data Services
Customers complaint
Page 3
Transmission
0.01%
BTS Equipment
23%
Maintenance
2%
Beijing airport T3
China Unicom&
China Telecom
Spain subway
I&C 2.3%
De-installation 0.3%
Power
consumption
12%
CAPEX
OPEX 27%
73%
Fiber 0.6%
Transportation 0.2%
Site rental
57.99%
Telefonica/VDF/Orange
BSC 1%
Page 4
Airport
Content
IBS Requirements In MBB Era
Huawei SingleDAS Solution
Cases
Camouflage
DRH
DRH
operator/ system/vendor
No dedicated equipment rooms to
reduce CAPEX
Operator A
Operator C
GSM BTS
UMTS NodeB
GSM BTS
Slave DCU1
UMTS NodeB
Slave DCU2
Operator B
LTE eNodeB
GSM BTS
UMTS NodeB
LTE eNodeB
Master DCU
LTE eNodeB
Optical fiber
Stadium
Airport
Subway/Tunnel
Skyscraper
IP network
M2000
Core Network
Page 6
Tunnel
Optical fiber
DCU+DRH
DRH
DRH
Leaked cable
Master Unit
DRH: Distributed Remote Head ,
Remote Unit
POI(Point Of Interface)
RFU/RRU
Equipment room
GSM
Platform
RX
Operator A UMTS
POI
LTE
Antenna
DCU
TX
GSM
Operator B UMTS
LTE
RF Signal
Coupler
Page 7
SingleDAS Highlights
Excellent Performance
Flexible Deployment
Advance platform
Electronic-adjustable POI
High reliability
Unified Management
location
Smooth re-farming
Page 8
Excellent Performance
Flexible deployment
Unified management
DRH Specification
700/850/1900/AWS(Planning)
Supports 6 bands/sectors
Electronic-adjustable POI: Each RFC supports 4 operators and
Support 72 DRHs
Natural cooling
RFC:
DPC
Master DCU
12 digital port
to DRHs or
Slave DCU
RF interface to
BTS
(6~+16dBm)
Single-band
Dual band
Triple band
Up to
six band
Power Module
DRH
Slave DCU1
Slave DCU2
Slave DCU3
Power Supply
cascade to 6
Page 9
(220V to -48V)
Excellent Performance
Flexible deployment
Page 10
Unified management
Excellent Performance
Flexible deployment
Unified management
12%
Traditional FFPA
25%
30%
DPD+Doherty
DPD+A DHT
DAS3401
Reduce
Test@10dB PAR
54%
1600W
High integrated design with low power consumption
Power consumption
660W
(Triple band @40W)
Traditional repeater: Multi-chip
Page 11
DBS3900 IBS
Excellent Performance
Flexible deployment
Unified management
Multi DRHs Uplink Noise Floor Is Not Superimposed to Ensure Network Quality
Traditional Solution
Slot 0
Slot 4
Slot 7
Carrier 1 RU1
Slot 0
Slot 4
Carrier 1 DRH1
Uplink noise floor
Carrier 1 DRH2
Carrier 1 RU2
Carrier 1 DRH6
Carrier 1 RU6
Slot 7
Slot 4
Slot 7
Slot 0
Slot 4
Slot 7
Page 12
Excellent Performance
Flexible deployment
Unified management
High Performance
processes
environment test
Incoming control QC
Power capacity test
ROHS test
PIM test
100% retest
Vibration test
Rain test
Page 13
Excellent Performance
Flexible deployment
Unified management
RU
BTS
Slave DCU1
site A
BTS
New site
DRH
Slave DCU2
site B
M
U
BTS
New site
Master DCU
site C
MU
BTS B
BTS C
Reuse outdoor
macro site
Busy carrier
Idle carrier
Page 14
Excellent Performance
Flexible deployment
Unified management
Configuration
complexity
RU
RU
RFU/RRU
Operator A
DRH
Operator B
RU
DRH
Operator C
RFU/RRU
Attenuator
Operator D
Coupler
Load/POI
RF cable
DRH
Operator A
MU
Combiner
Installation is difficult
On-site configure input power with
spectrum analyzer
DRH
Operator B
M2000
Operator C
Operator D
Coupler
Load/POI
RFC
Page 15
DCU
Excellent Performance
Flexible deployment
Unified management
Easy Maintenance
Separated OM for each band
5 minutes for
triple band DRH
installation
900
2100
900
900
Page 16
2100
Excellent Performance
Flexible deployment
RU
DRH
RU
DRH
RU
DCU
New RFC
DRH
RU
MU
U2100
Sector1
F2
MU1
G900
TRx1
F1
Footprint is limited
U2100
Sector2
F2
G900
TRx1
F1
U2100
Sector1
F2
U2100
Sector2
F2
Page 17
Unified management
Excellent Performance
Flexible deployment
Unified management
Base station
LTE1800
Base station
DRH
RFC 1800
RFC
DCU
DRH
DRH
1800Mhz
900Mhz
DRH
DRH
Page 18
Excellent Performance
Flexible deployment
Unified management
MU1
RFC1
RF cable
MU2
Optical fiber
RFC2
RF cable
TRX1
TRX2
RU1
RU2
TRX1
TRX2
eNodeB
eNodeB
Optical fiber
Antenna
150000
100000
MU: 2
Optical fiber: 2
RU: 2
TRX2
TRX1
DCU: 1
Optical fiber :1
DRH :1
50000
0
Near point
Page 19
Middle point
Far point
Antenna
Excellent Performance
Flexible deployment
Unified management
GSM
GSM
LTE
LTE
OR
1800MHz
1800MHz
1800MHz
Page 20
Excellent Performance
Flexible deployment
Unified management
SingleDAS Solution
Separate Network
Two OSS
RAN
2 1
Co-OM Link
DAS REMS
RAN
M2000
RU
RAN OSS
BTS/
DBS
MU
RAN
RU
RU
DRH
HW
BTS/
DBS
RAN
DAS
Page 21
DCU
DRH
DRH
DRH
DRH
DAS
DRH
Excellent Performance
Flexible deployment
Unified management
Domain
Alarm Name
NE
Relative BTS
RAN
RRU1
DAS
DRH1
RRU1
M2000
DAS
Page 22
Excellent Performance
Flexible deployment
Unified management
RU
Abnormal DRH
Abnormal RU
dBm
DRH
RTWP: -83.5dBm
-80
-100
Frequency
-120
DRH
RU
1900
1920
1940 1960
MHz
1980
DRH
RU
DRH
RU
DCU
MU
OM Link
M2000
BTS
BTS
RTWP abnormal
RTWP abnormal
Low OPEX
Page 23
Content
IBS Requirements In MBB Era
Huawei SingleDAS Solution
Cases
Crystal Hall
Challenge
Page 25
E// RFU
RF cable
Equipment room
GSM900
14 sectors access
14sector4 carrier/sector
1800MHz 14sector4 carrier/sector
2100MHz 14sector3 carrier/sector
DCS1800
900MHz
UMTS2100
Coupler
Load
DCU
Benefit
High output power(40W per band) make less equipment, easy deployment
Page 26
Challenges
Page 27
2600
OP1
OP2
OP3
OP4
OP1
OP2
OP3
OP4
OP1
OP2
OP3
OP4
OP4
2100
1800
protect investment
900
OP1
OP2
OP3
DD800
OP1
OP2
OP3
BTS
POI
2600
DD800
Idler wheel
900/
1800/
2100
Smooth expansion to LTE
DAS
Page 28
Summary
1. Huawei innovative SingleDAS fully meet multi-band, multi-network,
multi-vendor ,multi-operator requirements.
2. Advanced digital platform ensure network high performance
3. Flexible deployment for multi-operator IBS sharing, reduce
deployment cost.
4. Easy expansion and smooth evolution, reduce network cost.
5. Unified optimization and management for DAS/RAN, guarantee
indoor user experience and improve OM efficiency.
Page 29
Thank you
www.huawei.com
Copyright2011 Huawei Technologies Co., Ltd. All Rights Reserved.
The information in this document may contain predictive statements including, without limitation, statements regarding the future financial
and operating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results and
developments to differ materially from those expressed or implied in the predictive statements. Therefore, such information is provided for
reference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.