Sei sulla pagina 1di 276

7KLVSDJHLQWHQWLRQDOO\OHIWEODQN

Nexus 1262/1272 Meter Installation and Operation Manual Version 1.15

Published by:
Electro Industries/GaugeTech
1800 Shames Drive
Westbury, NY 11590

All rights reserved. No part of this publication may be reproduced or transmitted in


any form or by any means, electronic or mechanical, including photocopying, recording, or information storage or retrieval systems or any future forms of duplication, for
any purpose other than the purchaser's use, without the expressed written permission
of Electro Industries/GaugeTech.

2013 Electro Industries/GaugeTech


Nexus and Shark are registered trademarks of Electro Industries/GaugeTech.
Communicator EXTTM is a trademark of Electro Industries/GaugeTech.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

This page intentionally left blank.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

ii

Customer Service and Support


Customer support is available 9:00 am to 4:30 pm, Eastern Standard Time, Monday
through Friday. Please have the model, serial number and a detailed problem description available. If the problem concerns a particular reading, please have all meter
readings available. When returning any merchandise to EIG, a return materials
authorization number is required. For customer or technical assistance, repair or
calibration, phone 516-334-0870 or fax 516-338-4741.

Product Warranty
Electro Industries/GaugeTech warrants all products to be free from defects in material
and workmanship for a period of four years from the date of shipment. During the
warranty period, we will, at our option, either repair or replace any product that
proves to be defective.
To exercise this warranty, fax or call our customer-support department. You will
receive prompt assistance and return instructions. Send the instrument, transportation prepaid, to EIG at 1800 Shames Drive, Westbury, NY 11590. Repairs will be made
and the instrument will be returned.
This warranty does not apply to defects resulting from unauthorized modification,
misuse, or use for any reason other than electrical power monitoring. The Nexus
1262/1272 meter is not a user-serviceable product.

THIS WARRANTY IS IN LIEU OF ALL OTHER WARRANTIES, EXPRESSED


OR IMPLIED, INCLUDING ANY IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. ELECTRO INDUSTRIES/
GAUGETECH SHALL NOT BE LIABLE FOR ANY INDIRECT, SPECIAL OR
CONSEQUENTIAL DAMAGES ARISING FROM ANY AUTHORIZED OR
UNAUTHORIZED USE OF ANY ELECTRO INDUSTRIES/GAUGETECH
PRODUCT. LIABILITY SHALL BE LIMITED TO THE ORIGINAL COST OF
THE PRODUCT SOLD.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

iii

Use of Product for Protection


Our products are not to be used for primary over-current protection. Any protection
feature in our products is to be used for alarm or secondary protection only.

Statement of Calibration
Our instruments are inspected and tested in accordance with specifications published
by Electro Industries/GaugeTech. The accuracy and a calibration of our instruments
are traceable to the National Institute of Standards and Technology through
equipment that is calibrated at planned intervals by comparison to certified standards.

Disclaimer
The information presented in this publication has been carefully checked for
reliability; however, no responsibility is assumed for inaccuracies. The information
contained in this document is subject to change without notice.
This symbol indicates that the operator must refer to an
explanation in the operating instructions. Please see chapters 3,
6, 11 and 12 for important safety information regarding
installation and hookup of the Nexus 1262/1272 meter.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

iv

About Electro Industries/GaugeTech (EIG)


Founded in 1975 by engineer and inventor Dr. Samuel Kagan, Electro Industries/
GaugeTech changed the face of power monitoring forever with its first breakthrough
innovation: an affordable, easy-to-use AC power meter.
Thirty years since its founding, Electro Industries/GaugeTech, the leader in power
monitoring and control, continues to revolutionize the industry with the highest quality, cutting edge power monitoring and control technology on the market today. An
ISO 9001:2000 certified company, EIG sets the industry standard for advanced power
quality and reporting, revenue metering and substation data acquisition and control.
EIG products can be found on site at mainly all of today's leading manufacturers,
industrial giants and utilities.
EIG products are primarily designed, manufactured, tested and calibrated at our facility in Westbury, New York.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

This page intentionally left blank.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

vi

7DEOHRI&RQWHQWV

Table of Contents
1:Three-Phase Power Measurement

1-1

7KUHH3KDVH6\VWHP&RQILJXUDWLRQV



:\H&RQQHFWLRQ



'HOWD&RQQHFWLRQ



3RZHU(QHUJ\DQG'HPDQG



5HDFWLYH(QHUJ\DQG3RZHU)DFWRU



+DUPRQLF'LVWRUWLRQ



3RZHU4XDOLW\



2: Meter Overview

2-1

7KH1H[XV0XOWLSDUDPHWHU5HYHQXH0HWHU



$FFX0HDVXUH707HFKQRORJ\7KHRU\RI2SHUDWLRQ



$GYDQFHG0HDVXUHPHQW)XQFWLRQDOLW\



$GYDQFHG5HYHQXH%LOOLQJ&DSDELOLW\



&RPPXQLFDWLRQVDQG,2&DSDELOLWLHV



'LVSOD\6FUHHQV



$GGLWLRQDO6ZLWFKHV



1H[XV([WHUQDO,20RGXOHV



2SWLRQDO313131DQG31/('5HPRWH'LVSOD\V



1H[XV0HWHU)RUPV



1H[XV0HWHU$FFXUDF\



1H[XV0HWHU6SHFLILFDWLRQV2YHUYLHZ



1H[XV0HWHU/RJJLQJ6SHFLILFDWLRQV

5

'139/HYHO



3: Operating Instructions

3-1

1DPHSODWH,QIRUPDWLRQ



%DVLF2SHUDWLRQ



/&''LVSOD\,QIRUPDWLRQ



)LQGLQJ<RXU'LVSOD\V)LUPZDUH9HUVLRQV



Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(

72&

7DEOHRI&RQWHQWV

1H[XV3URJUDPPDEOH'LVSOD\1DYLJDWLRQ0DS



8VLQJWKH'LVSOD\&RQILJXUDWRU



8VLQJWKH%DVH3URJUDPPDEOH'LVSOD\



3UH3URJUDPPHG'LVSOD\6FUHHQV



4: Performing Meter Testing

4-1

7HVWLQJ7RROV



7HVW3XOVH/('



/&''LVSOD\



7HVW0RGH



(QWHULQJ7HVW0RGH



8VLQJ7HVW0RGH



7HVW0RGH3UHVHW$FFXPXODWRUV



([LWLQJ7HVW0RGH



5: Serial Communication Wiring

5-1

&RPPXQLFDWLRQ2YHUYLHZ



&RPPXQLFDWLQJWRWKH0HWHUWKURXJKWKH$16,7\SH,,2SWLFDO3RUW



566HULDO&RPPXQLFDWLRQ



56:LULQJ)XQGDPHQWDOV 3RUWDQG3RUW 



8VLQJWKH8QLFRP



5- 7HOHSKRQH/LQH &RQQHFWLRQ0HWHUZLWK,13


,QWHUQDO0RGHPZLWK'LDO,Q'LDO2XW 2SWLRQ



5-&RQQHFWLRQ0HWHUZLWK,13 %DVH7 2SWLRQ



0RGHP(WKHUQHW&RQQHFWLRQ0HWHUZLWK,13
&RPER&DUG 2SWLRQ



56&RQQHFWLRQ0HWHUWRWKH
31313131/(''LVSOD\



&RPPXQLFDWLRQ3RUWVRQWKH,20RGXOHV



56&RQQHFWLRQ0HWHUWR,20RGXOHV



6WHSVWR'HWHUPLQH3RZHU1HHGHG



5HPRWH&RPPXQLFDWLRQ2YHU7HOHSKRQH/LQHV
8VLQJWKH563RUW



Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(

72&

7DEOHRI&RQWHQWV

3URJUDPPLQJ0RGHPVIRU5HPRWH&RPPXQLFDWLRQ



6HOHFWHG0RGHP6WULQJV



+LJK6SHHG,QSXWV&RQQHFWLRQ



,5,*%&RQQHFWLRQV



7LPH6\QFKURQL]DWLRQ$OWHUQDWLYHV



,13,QWHUQDO0RGHPZLWK'LDO,Q'LDO2XW2SWLRQ



+DUGZDUH2YHUYLHZ



+DUGZDUH&RQQHFWLRQ



'LDO,Q)XQFWLRQ



'LDO2XW)XQFWLRQ



,132QERDUG(WKHUQHW



+DUGZDUH2YHUYLHZ



+DUGZDUH&RQQHFWLRQ



,13(WKHUQHW0RGHP&RPELQDWLRQ



+DUGZDUH2YHUYLHZ



+DUGZDUH&RQQHFWLRQ



)DFWRU\6HWWLQJV



6: Hardware Installation

6-1

0RXQWLQJWKH1H[XV6RFNHW0HWHU



&DEOH&RORU.H\



,QWHUQDO%DWWHU\,QVWDOODWLRQDQG0DLQWHQDQFH



%DWWHU\6DIHW\DQG'LVSRVDO



0RXQWLQJWKH([WHUQDO'LVSOD\V



0RXQWLQJWKH1H[XV([WHUQDO,20RGXOHV



7: Time-of-Use Function

7-1

,QWURGXFWLRQ



7KH1H[XV0HWHUV728&DOHQGDU



728)UR]HQDQG$FWLYH5HJLVWHUV



8SGDWLQJ5HWULHYLQJDQG5HSODFLQJ728&DOHQGDUV



'D\OLJKW6DYLQJVDQG'HPDQG



Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(

72&

7DEOHRI&RQWHQWV

8: Transformer Loss Compensation

8-1

,QWURGXFWLRQ



1H[XV0HWHU
V7UDQVIRUPHU/RVV&RPSHQVDWLRQ



/RVV&RPSHQVDWLRQLQ7KUHH(OHPHQW,QVWDOODWLRQV



7KUHH(OHPHQW/RVV&RPSHQVDWLRQ:RUNVKHHW



9: Using the External Displays

9-1

2YHUYLHZ



1H[XV3131/('([WHUQDO'LVSOD\



'\QDPLF5HDGLQJV0RGH



1DYLJDWLRQ0DSRI'\QDPLF5HDGLQJV0RGH



1H[XV,QIRUPDWLRQ0RGH



1DYLJDWLRQ0DSRI1H[XV,QIRUPDWLRQ0RGH



'LVSOD\)HDWXUHV0RGH



1DYLJDWLRQ0DSRI'LVSOD\)HDWXUHV0RGH



2SWLRQDO31/('([WHUQDO5HPRWH'LVSOD\6SHFLILFDWLRQV



10: External I/O Modules

10-1

+DUGZDUH2YHUYLHZ



3RUW2YHUYLHZ



,20RGXOH,QVWDOODWLRQ



3RZHU6RXUFHIRU,20RGXOHV



8VLQJWKH36,2ZLWK0XOWLSOH,20RGXOHV



6WHSVIRU$WWDFKLQJ0XOWLSOH,20RGXOHV



)DFWRU\6HWWLQJVDQG5HVHW%XWWRQ



$QDORJ7UDQVGXFHU6LJQDO2XWSXW0RGXOHV



2YHUYLHZ



1RUPDO0RGH



$QDORJ,QSXW0RGXOHV



2YHUYLHZ



1RUPDO0RGH



'LJLWDO'U\&RQWDFW5HOD\2XWSXW )RUP& 0RGXOH



Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(

72&

7DEOHRI&RQWHQWV

2YHUYLHZ



&RPPXQLFDWLRQ



1RUPDO0RGH



'LJLWDO6ROLG6WDWH3XOVH2XWSXW .<= 0RGXOH



2YHUYLHZ



&RPPXQLFDWLRQ



1RUPDO0RGH



'LJLWDO6WDWXV,QSXW0RGXOH



2YHUYLHZ



&RPPXQLFDWLRQ



1RUPDO0RGH



11: Electrical Installation

11-1

&RQVLGHUDWLRQVZKHQ,QVWDOOLQJ0HWHUV
%ODGH&RQILJXUDWLRQIRUIRU)RUPV66DQG6
:LULQJ'LDJUDPV



60HWHU0RXQWHGLQ6$$GDSWHU
12: Switchboard Meter

12-1

,QWURGXFWLRQ



/DEHOV



6SHFLILFDWLRQVDQG'LPHQVLRQV



,QVWDOODWLRQ



:LULQJ'LDJUDPV



13: Meter Calculations

13-1

0HDVXUHPHQWVDQG&DOFXODWLRQV



'HPDQG,QWHJUDWRUV



14: EN50160/IEC61000-4-15 Flicker

14-1

2YHUYLHZ



7KHRU\RI2SHUDWLRQ



Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(

72&

7DEOHRI&RQWHQWV

$7UDQVIRUPHU/RVV&RPSHQVDWLRQ6SUHDGVKHHWDQG([DPSOHV$

$&DOFXODWLQJ9DOXHV$

$([FHO6SUHDGVKHHWZLWK([DPSOH1XPEHUV$

B: Blade Configuration for Forms 9S, 36S and 45S
B-1
%)RUPV

%

%%ODGH&RQILJXUDWLRQ'UDZLQJV

%

Glossary

GL-1

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(

72&

7KUHH3KDVH3RZHU0HDVXUHPHQW

1:Three-Phase Power Measurement


7KLVLQWURGXFWLRQWRWKUHHSKDVHSRZHUDQGSRZHUPHDVXUHPHQWLVLQWHQGHGWR
SURYLGHRQO\DEULHIRYHUYLHZRIWKHVXEMHFW7KHSURIHVVLRQDOPHWHUHQJLQHHURUPHWHU
WHFKQLFLDQVKRXOGUHIHUWRPRUHDGYDQFHGGRFXPHQWVVXFKDVWKH((,+DQGERRNIRU
(OHFWULFLW\0HWHULQJDQGWKHDSSOLFDWLRQVWDQGDUGVIRUPRUHLQGHSWKDQGWHFKQLFDO
FRYHUDJHRIWKHVXEMHFW

1.1: Three-Phase System Configurations


7KUHHSKDVHSRZHULVPRVWFRPPRQO\XVHGLQVLWXDWLRQVZKHUHODUJHDPRXQWVRI
SRZHUZLOOEHXVHGEHFDXVHLWLVDPRUHHIIHFWLYHZD\WRWUDQVPLWWKHSRZHUDQG
EHFDXVHLWSURYLGHVDVPRRWKHUGHOLYHU\RISRZHUWRWKHHQGORDG7KHUHDUHWZR
FRPPRQO\XVHGFRQQHFWLRQVIRUWKUHHSKDVHSRZHUDZ\HFRQQHFWLRQRUDGHOWD
FRQQHFWLRQ(DFKFRQQHFWLRQKDVVHYHUDOGLIIHUHQWPDQLIHVWDWLRQVLQDFWXDOXVH
:KHQDWWHPSWLQJWRGHWHUPLQHWKHW\SHRIFRQQHFWLRQLQXVHLWLVDJRRGSUDFWLFHWR
IROORZWKHFLUFXLWEDFNWRWKHWUDQVIRUPHUWKDWLVVHUYLQJWKHFLUFXLW,WLVRIWHQQRW
SRVVLEOHWRFRQFOXVLYHO\GHWHUPLQHWKHFRUUHFWFLUFXLWFRQQHFWLRQVLPSO\E\FRXQWLQJ
WKHZLUHVLQWKHVHUYLFHRUFKHFNLQJYROWDJHV&KHFNLQJWKHWUDQVIRUPHUFRQQHFWLRQ
ZLOOSURYLGHFRQFOXVLYHHYLGHQFHRIWKHFLUFXLWFRQQHFWLRQDQGWKHUHODWLRQVKLSV
EHWZHHQWKHSKDVHYROWDJHVDQGJURXQG

1.1.1: Wye Connection


7KHZ\HFRQQHFWLRQLVVRFDOOHGEHFDXVHZKHQ\RXORRNDWWKHSKDVHUHODWLRQVKLSVDQG
WKHZLQGLQJUHODWLRQVKLSVEHWZHHQWKHSKDVHVLWORRNVOLNHD<)LJXUHGHSLFWVWKH
ZLQGLQJUHODWLRQVKLSVIRUDZ\HFRQQHFWHGVHUYLFH,QDZ\HVHUYLFHWKHQHXWUDO RU
FHQWHUSRLQWRIWKHZ\H LVW\SLFDOO\JURXQGHG7KLVOHDGVWRFRPPRQYROWDJHVRI
DQG ZKHUHWKHILUVWQXPEHUUHSUHVHQWVWKHSKDVHWRSKDVHYROWDJHDQG
WKHVHFRQGQXPEHUUHSUHVHQWVWKHSKDVHWRJURXQGYROWDJH 

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7KUHH3KDVH3RZHU0HDVXUHPHQW

VC

Phase 2
N
Phase 1

Phase 3
VB

VA

)LJXUH7KUHHSKDVH:\H:LQGLQJ

7KHWKUHHYROWDJHVDUHVHSDUDWHGE\RHOHFWULFDOO\8QGHUEDODQFHGORDGFRQGLWLRQV
WKHFXUUHQWVDUHDOVRVHSDUDWHGE\R+RZHYHUXQEDODQFHGORDGVDQGRWKHU
FRQGLWLRQVFDQFDXVHWKHFXUUHQWVWRGHSDUWIURPWKHLGHDORVHSDUDWLRQ7KUHH
SKDVHYROWDJHVDQGFXUUHQWVDUHXVXDOO\UHSUHVHQWHGZLWKDSKDVRUGLDJUDP$SKDVRU
GLDJUDPIRUWKHW\SLFDOFRQQHFWHGYROWDJHVDQGFXUUHQWVLVVKRZQLQ)LJXUH

VC

IC
N
IA

VB

IB

VA

)LJXUH3KDVRU'LDJUDP6KRZLQJ7KUHHSKDVH9ROWDJHVDQG&XUUHQWV

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7KUHH3KDVH3RZHU0HDVXUHPHQW

7KHSKDVRUGLDJUDPVKRZVWKHRDQJXODUVHSDUDWLRQEHWZHHQWKHSKDVHYROWDJHV
7KHSKDVHWRSKDVHYROWDJHLQDEDODQFHGWKUHHSKDVHZ\HV\VWHPLVWLPHVWKH
SKDVHWRQHXWUDOYROWDJH7KHFHQWHUSRLQWRIWKHZ\HLVWLHGWRJHWKHUDQGLVW\SLFDOO\
JURXQGHG7DEOHVKRZVWKHFRPPRQYROWDJHVXVHGLQWKH8QLWHG6WDWHVIRUZ\H
FRQQHFWHGV\VWHPV
Phase to Ground Voltage

Phase to Phase Voltage

YROWV

YROWV

YROWV

YROWV

YROWV

YROWV

YROWV

YROWV

YROWV

YROWV

7DEOH&RPPRQ3KDVH9ROWDJHVRQ:\H6HUYLFHV

8VXDOO\DZ\HFRQQHFWHGVHUYLFHZLOOKDYHIRXUZLUHVWKUHHZLUHVIRUWKHSKDVHVDQG
RQHIRUWKHQHXWUDO7KHWKUHHSKDVHZLUHVFRQQHFWWRWKHWKUHHSKDVHV DVVKRZQLQ
)LJXUH 7KHQHXWUDOZLUHLVW\SLFDOO\WLHGWRWKHJURXQGRUFHQWHUSRLQWRIWKHZ\H
,QPDQ\LQGXVWULDODSSOLFDWLRQVWKHIDFLOLW\ZLOOEHIHGZLWKDIRXUZLUHZ\HVHUYLFHEXW
RQO\WKUHHZLUHVZLOOEHUXQWRLQGLYLGXDOORDGV7KHORDGLVWKHQRIWHQUHIHUUHGWRDVD
GHOWDFRQQHFWHGORDGEXWWKHVHUYLFHWRWKHIDFLOLW\LVVWLOODZ\HVHUYLFHLWFRQWDLQV
IRXUZLUHVLI\RXWUDFHWKHFLUFXLWEDFNWRLWVVRXUFH XVXDOO\DWUDQVIRUPHU ,QWKLV
W\SHRIFRQQHFWLRQWKHSKDVHWRJURXQGYROWDJHZLOOEHWKHSKDVHWRJURXQGYROWDJH
LQGLFDWHGLQ7DEOHHYHQWKRXJKDQHXWUDORUJURXQGZLUHLVQRWSK\VLFDOO\SUHVHQWDW
WKHORDG7KHWUDQVIRUPHULVWKHEHVWSODFHWRGHWHUPLQHWKHFLUFXLWFRQQHFWLRQW\SH
EHFDXVHWKLVLVDORFDWLRQZKHUHWKHYROWDJHUHIHUHQFHWRJURXQGFDQEHFRQFOXVLYHO\
LGHQWLILHG

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7KUHH3KDVH3RZHU0HDVXUHPHQW

1.1.2: Delta Connection


'HOWDFRQQHFWHGVHUYLFHVPD\EHIHGZLWKHLWKHUWKUHHZLUHVRUIRXUZLUHV,QDWKUHH
SKDVHGHOWDVHUYLFHWKHORDGZLQGLQJVDUHFRQQHFWHGIURPSKDVHWRSKDVHUDWKHUWKDQ
IURPSKDVHWRJURXQG)LJXUHVKRZVWKHSK\VLFDOORDGFRQQHFWLRQVIRUDGHOWD
VHUYLFH

VC

Phase 3

VB

Phase 2

Phase 1

VA

)LJXUH7KUHHSKDVH'HOWD:LQGLQJ5HODWLRQVKLS

,QWKLVH[DPSOHRIDGHOWDVHUYLFHWKUHHZLUHVZLOOWUDQVPLWWKHSRZHUWRWKHORDG,QD
WUXHGHOWDVHUYLFHWKHSKDVHWRJURXQGYROWDJHZLOOXVXDOO\QRWEHEDODQFHGEHFDXVH
WKHJURXQGLVQRWDWWKHFHQWHURIWKHGHOWD
)LJXUHVKRZVWKHSKDVRUUHODWLRQVKLSVEHWZHHQYROWDJHDQGFXUUHQWRQDWKUHH
SKDVHGHOWDFLUFXLW
,QPDQ\GHOWDVHUYLFHVRQHFRUQHURIWKHGHOWDLVJURXQGHG7KLVPHDQVWKHSKDVHWR
JURXQGYROWDJHZLOOEH]HURIRURQHSKDVHDQGZLOOEHIXOOSKDVHWRSKDVHYROWDJHIRU
WKHRWKHUWZRSKDVHV7KLVLVGRQHIRUSURWHFWLYHSXUSRVHV

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7KUHH3KDVH3RZHU0HDVXUHPHQW

VBC

VCA

IC
IA
IB
VAB

)LJXUH3KDVRU'LDJUDP7KUHH3KDVH9ROWDJHVDQG&XUUHQWV'HOWD&RQQHFWHG

$QRWKHUFRPPRQGHOWDFRQQHFWLRQLVWKHIRXUZLUHJURXQGHGGHOWDXVHGIRUOLJKWLQJ
ORDGV,QWKLVFRQQHFWLRQWKHFHQWHUSRLQWRIRQHZLQGLQJLVJURXQGHG2QD
YROWIRXUZLUHJURXQGHGGHOWDVHUYLFHWKHSKDVHWRJURXQGYROWDJHZRXOGEH
YROWVRQWZRSKDVHVDQGYROWVRQWKHWKLUGSKDVH)LJXUHVKRZVWKHSKDVRU
GLDJUDPIRUWKHYROWDJHVLQDWKUHHSKDVHIRXUZLUHGHOWDV\VWHP

VC
VCA
VBC

VA

VAB
VB
)LJXUH3KDVRU'LDJUDP6KRZLQJ7KUHHSKDVH)RXU:LUH'HOWD&RQQHFWHG6\VWHP

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7KUHH3KDVH3RZHU0HDVXUHPHQW

1.1.3: Blondells Theorem and Three Phase Measurement


,QDQHQJLQHHUDQGPDWKHPDWLFLDQQDPHG$QGUH(%ORQGHOOVHWIRUWKWKHILUVW
VFLHQWLILFEDVLVIRUSRO\SKDVHPHWHULQJ+LVWKHRUHPVWDWHV
,IHQHUJ\LVVXSSOLHGWRDQ\V\VWHPRIFRQGXFWRUVWKURXJK1ZLUHVWKHWRWDOSRZHULQ
WKHV\VWHPLVJLYHQE\WKHDOJHEUDLFVXPRIWKHUHDGLQJVRI1ZDWWPHWHUVVRDUUDQJHG
WKDWHDFKRIWKH1ZLUHVFRQWDLQVRQHFXUUHQWFRLOWKHFRUUHVSRQGLQJSRWHQWLDOFRLO
EHLQJFRQQHFWHGEHWZHHQWKDWZLUHDQGVRPHFRPPRQSRLQW,IWKLVFRPPRQSRLQWLV
RQRQHRIWKH1ZLUHVWKHPHDVXUHPHQWPD\EHPDGHE\WKHXVHRI1:DWWPHWHUV
7KHWKHRUHPPD\EHVWDWHGPRUHVLPSO\LQPRGHUQODQJXDJH
,QDV\VWHPRI1FRQGXFWRUV1PHWHUHOHPHQWVZLOOPHDVXUHWKHSRZHURUHQHUJ\
WDNHQSURYLGHGWKDWDOOWKHSRWHQWLDOFRLOVKDYHDFRPPRQWLHWRWKHFRQGXFWRULQ
ZKLFKWKHUHLVQRFXUUHQWFRLO
7KUHHSKDVHSRZHUPHDVXUHPHQWLVDFFRPSOLVKHGE\PHDVXULQJWKHWKUHHLQGLYLGXDO
SKDVHVDQGDGGLQJWKHPWRJHWKHUWRREWDLQWKHWRWDOWKUHHSKDVHYDOXH,QROGHUDQD
ORJPHWHUVWKLVPHDVXUHPHQWZDVDFFRPSOLVKHGXVLQJXSWRWKUHHVHSDUDWHHOHPHQWV
(DFKHOHPHQWFRPELQHGWKHVLQJOHSKDVHYROWDJHDQGFXUUHQWWRSURGXFHDWRUTXHRQ
WKHPHWHUGLVN$OOWKUHHHOHPHQWVZHUHDUUDQJHGDURXQGWKHGLVNVRWKDWWKHGLVNZDV
VXEMHFWHGWRWKHFRPELQHGWRUTXHRIWKHWKUHHHOHPHQWV$VDUHVXOWWKHGLVNZRXOG
WXUQDWDKLJKHUVSHHGDQGUHJLVWHUSRZHUVXSSOLHGE\HDFKRIWKHWKUHHZLUHV
$FFRUGLQJWR%ORQGHOO
V7KHRUHPLWZDVSRVVLEOHWRUHGXFHWKHQXPEHURIHOHPHQWV
XQGHUFHUWDLQFRQGLWLRQV)RUH[DPSOHDWKUHHSKDVHWKUHHZLUHGHOWDV\VWHPFRXOG
EHFRUUHFWO\PHDVXUHGZLWKWZRHOHPHQWV WZRSRWHQWLDOFRLOVDQGWZRFXUUHQWFRLOV LI
WKHSRWHQWLDOFRLOVZHUHFRQQHFWHGEHWZHHQWKHWKUHHSKDVHVZLWKRQHSKDVHLQ
FRPPRQ
,QDWKUHHSKDVHIRXUZLUHZ\HV\VWHPLWLVQHFHVVDU\WRXVHWKUHHHOHPHQWV7KUHH
YROWDJHFRLOVDUHFRQQHFWHGEHWZHHQWKHWKUHHSKDVHVDQGWKHFRPPRQQHXWUDOFRQ
GXFWRU$FXUUHQWFRLOLVUHTXLUHGLQHDFKRIWKHWKUHHSKDVHV
,QPRGHUQGLJLWDOPHWHUV%ORQGHOO
V7KHRUHPLVVWLOODSSOLHGWRREWDLQSURSHU
PHWHULQJ7KHGLIIHUHQFHLQPRGHUQPHWHUVLVWKDWWKHGLJLWDOPHWHUPHDVXUHVHDFK
SKDVHYROWDJHDQGFXUUHQWDQGFDOFXODWHVWKHVLQJOHSKDVHSRZHUIRUHDFKSKDVH7KH
PHWHUWKHQVXPVWKHWKUHHSKDVHSRZHUVWRDVLQJOHWKUHHSKDVHUHDGLQJ

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7KUHH3KDVH3RZHU0HDVXUHPHQW

6RPHGLJLWDOPHWHUVFDOFXODWHWKHLQGLYLGXDOSKDVHSRZHUYDOXHVRQHSKDVHDWDWLPH
7KLVPHDQVWKHPHWHUVDPSOHVWKHYROWDJHDQGFXUUHQWRQRQHSKDVHDQGFDOFXODWHVD
SRZHUYDOXH7KHQLWVDPSOHVWKHVHFRQGSKDVHDQGFDOFXODWHVWKHSRZHUIRUWKH
VHFRQGSKDVH)LQDOO\LWVDPSOHVWKHWKLUGSKDVHDQGFDOFXODWHVWKDWSKDVHSRZHU
$IWHUVDPSOLQJDOOWKUHHSKDVHVWKHPHWHUFRPELQHVWKHWKUHHUHDGLQJVWRFUHDWHWKH
HTXLYDOHQWWKUHHSKDVHSRZHUYDOXH8VLQJPDWKHPDWLFDODYHUDJLQJWHFKQLTXHVWKLV
PHWKRGFDQGHULYHDTXLWHDFFXUDWHPHDVXUHPHQWRIWKUHHSKDVHSRZHU
0RUHDGYDQFHGPHWHUVDFWXDOO\VDPSOHDOOWKUHHSKDVHVRIYROWDJHDQGFXUUHQW
VLPXOWDQHRXVO\DQGFDOFXODWHWKHLQGLYLGXDOSKDVHDQGWKUHHSKDVHSRZHUYDOXHV7KH
DGYDQWDJHRIVLPXOWDQHRXVVDPSOLQJLVWKHUHGXFWLRQRIHUURULQWURGXFHGGXHWRWKH
GLIIHUHQFHLQWLPHZKHQWKHVDPSOHVZHUHWDNHQ
C
B
Phase B
Phase C
Node "n"

Phase A

A
N

)LJXUH7KUHH3KDVH:\H/RDG,OOXVWUDWLQJ.LUFKKRIIV/DZDQG%ORQGHOOV7KHRUHP

%ORQGHOO
V7KHRUHPLVDGHULYDWLRQWKDWUHVXOWVIURP.LUFKKRII
V/DZ.LUFKKRII
V/DZ
VWDWHVWKDWWKHVXPRIWKHFXUUHQWVLQWRDQRGHLV]HUR$QRWKHUZD\RIVWDWLQJWKH
VDPHWKLQJLVWKDWWKHFXUUHQWLQWRDQRGH FRQQHFWLRQSRLQW PXVWHTXDOWKHFXUUHQW
RXWRIWKHQRGH7KHODZFDQEHDSSOLHGWRPHDVXULQJWKUHHSKDVHORDGV)LJXUH
VKRZVDW\SLFDOFRQQHFWLRQRIDWKUHHSKDVHORDGDSSOLHGWRDWKUHHSKDVHIRXUZLUH
VHUYLFH.ULFKKRII
V/DZKROGVWKDWWKHVXPRIFXUUHQWV$%&DQG1PXVWHTXDO]HUR
RUWKDWWKHVXPRIFXUUHQWVLQWR1RGHQPXVWHTXDO]HUR
,IZHPHDVXUHWKHFXUUHQWVLQZLUHV$%DQG&ZHWKHQNQRZWKHFXUUHQWLQZLUH1E\
.LUFKKRII
V/DZDQGLWLVQRWQHFHVVDU\WRPHDVXUHLW7KLVIDFWOHDGVXVWRWKH
FRQFOXVLRQRI%ORQGHOO
V7KHRUHPWKDWZHRQO\QHHGWRPHDVXUHWKHSRZHULQWKUHHRI

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7KUHH3KDVH3RZHU0HDVXUHPHQW

WKHIRXUZLUHVLIWKH\DUHFRQQHFWHGE\DFRPPRQQRGH,QWKHFLUFXLWRI)LJXUHZH
PXVWPHDVXUHWKHSRZHUIORZLQWKUHHZLUHV7KLVZLOOUHTXLUHWKUHHYROWDJHFRLOVDQG
WKUHHFXUUHQWFRLOV DWKUHHHOHPHQWPHWHU 6LPLODUILJXUHVDQGFRQFOXVLRQVFRXOGEH
UHDFKHGIRURWKHUFLUFXLWFRQILJXUDWLRQVLQYROYLQJ'HOWDFRQQHFWHGORDGV

1.2: Power, Energy and Demand


,WLVTXLWHFRPPRQWRH[FKDQJHSRZHUHQHUJ\DQGGHPDQGZLWKRXWGLIIHUHQWLDWLQJ
EHWZHHQWKHWKUHH%HFDXVHWKLVSUDFWLFHFDQOHDGWRFRQIXVLRQWKHGLIIHUHQFHV
EHWZHHQWKHVHWKUHHPHDVXUHPHQWVZLOOEHGLVFXVVHG
3RZHULVDQLQVWDQWDQHRXVUHDGLQJ7KHSRZHUUHDGLQJSURYLGHGE\DPHWHULVWKH
SUHVHQWIORZRIZDWWV3RZHULVPHDVXUHGLPPHGLDWHO\MXVWOLNHFXUUHQW,QPDQ\
GLJLWDOPHWHUVWKHSRZHUYDOXHLVDFWXDOO\PHDVXUHGDQGFDOFXODWHGRYHUDRQHVHFRQG
LQWHUYDOEHFDXVHLWWDNHVVRPHDPRXQWRIWLPHWRFDOFXODWHWKH506YDOXHVRIYROWDJH
DQGFXUUHQW%XWWKLVWLPHLQWHUYDOLVNHSWVPDOOWRSUHVHUYHWKHLQVWDQWDQHRXVQDWXUH
RISRZHU
(QHUJ\LVDOZD\VEDVHGRQVRPHWLPHLQFUHPHQWLWLVWKHLQWHJUDWLRQRISRZHURYHUD
GHILQHGWLPHLQFUHPHQW(QHUJ\LVDQLPSRUWDQWYDOXHEHFDXVHDOPRVWDOOHOHFWULFELOOV
DUHEDVHGLQSDUWRQWKHDPRXQWRIHQHUJ\XVHG
7\SLFDOO\HOHFWULFDOHQHUJ\LVPHDVXUHGLQXQLWVRINLORZDWWKRXUV N:K $NLORZDWW
KRXUUHSUHVHQWVDFRQVWDQWORDGRIRQHWKRXVDQGZDWWV RQHNLORZDWW IRURQHKRXU
6WDWHGDQRWKHUZD\LIWKHSRZHUGHOLYHUHG LQVWDQWDQHRXVZDWWV LVPHDVXUHGDV
ZDWWVDQGWKHORDGZDVVHUYHGIRUDRQHKRXUWLPHLQWHUYDOWKHQWKHORDGZRXOG
KDYHDEVRUEHGRQHNLORZDWWKRXURIHQHUJ\$GLIIHUHQWORDGPD\KDYHDFRQVWDQW
SRZHUUHTXLUHPHQWRIZDWWV,IWKHORDGZHUHVHUYHGIRURQHKRXULWZRXOG
DEVRUEIRXUN:K,IWKHORDGZHUHVHUYHGIRUPLQXWHVLWZRXOGDEVRUERIWKDW
WRWDORURQHN:K
)LJXUHVKRZVDJUDSKRISRZHUDQGWKHUHVXOWLQJHQHUJ\WKDWZRXOGEHWUDQVPLWWHG
DVDUHVXOWRIWKHLOOXVWUDWHGSRZHUYDOXHV)RUWKLVLOOXVWUDWLRQLWLVDVVXPHGWKDWWKH
SRZHUOHYHOLVKHOGFRQVWDQWIRUHDFKPLQXWHZKHQDPHDVXUHPHQWLVWDNHQ(DFKEDU
LQWKHJUDSKZLOOUHSUHVHQWWKHSRZHUORDGIRUWKHRQHPLQXWHLQFUHPHQWRIWLPH,Q
UHDOOLIHWKHSRZHUYDOXHPRYHVDOPRVWFRQVWDQWO\
7KHGDWDIURP)LJXUHLVUHSURGXFHGLQ7DEOHWRLOOXVWUDWHWKHFDOFXODWLRQRI
HQHUJ\6LQFHWKHWLPHLQFUHPHQWRIWKHPHDVXUHPHQWLVRQHPLQXWHDQGVLQFHZH
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7KUHH3KDVH3RZHU0HDVXUHPHQW

VSHFLILHGWKDWWKHORDGLVFRQVWDQWRYHUWKDWPLQXWHZHFDQFRQYHUWWKHSRZHUUHDGLQJ
WRDQHTXLYDOHQWFRQVXPHGHQHUJ\UHDGLQJE\PXOWLSO\LQJWKHSRZHUUHDGLQJWLPHV
 FRQYHUWLQJWKHWLPHEDVHIURPPLQXWHVWRKRXUV 

80
70

kilowat t s

60
50
40
30
20
10
0
1

10

11

12

13

14

15

Time (minutes)

)LJXUH3RZHU8VHRYHU7LPH

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7KUHH3KDVH3RZHU0HDVXUHPHQW

Time
Interval
(minute)

Power
(kW)

Energy
(kWh)

Accumulated
Energy
(kWh)







































































































7DEOH3RZHUDQG(QHUJ\5HODWLRQVKLSRYHU7LPH

$VLQ7DEOHWKHDFFXPXODWHGHQHUJ\IRUWKHSRZHUORDGSURILOHRI)LJXUHLV
N:K
'HPDQGLVDOVRDWLPHEDVHGYDOXH7KHGHPDQGLVWKHDYHUDJHUDWHRIHQHUJ\XVH
RYHUWLPH7KHDFWXDOODEHOIRUGHPDQGLVNLORZDWWKRXUVKRXUEXWWKLVLVQRUPDOO\
UHGXFHGWRNLORZDWWV7KLVPDNHVLWHDV\WRFRQIXVHGHPDQGZLWKSRZHUEXWGHPDQG
LVQRWDQLQVWDQWDQHRXVYDOXH7RFDOFXODWHGHPDQGLWLVQHFHVVDU\WRDFFXPXODWHWKH
HQHUJ\UHDGLQJV DVLOOXVWUDWHGLQ)LJXUH DQGDGMXVWWKHHQHUJ\UHDGLQJWRDQ
KRXUO\YDOXHWKDWFRQVWLWXWHVWKHGHPDQG
,QWKHH[DPSOHWKHDFFXPXODWHGHQHUJ\LVN:K%XWWKLVPHDVXUHPHQWZDV
PDGHRYHUDPLQXWHLQWHUYDO7RFRQYHUWWKHUHDGLQJWRDGHPDQGYDOXHLWPXVWEH
QRUPDOL]HGWRDPLQXWHLQWHUYDO,IWKHSDWWHUQZHUHUHSHDWHGIRUDQDGGLWLRQDO
WKUHHPLQXWHLQWHUYDOVWKHWRWDOHQHUJ\ZRXOGEHIRXUWLPHVWKHPHDVXUHGYDOXHRU

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7KUHH3KDVH3RZHU0HDVXUHPHQW

N:K7KHVDPHSURFHVVLVDSSOLHGWRFDOFXODWHWKHPLQXWHGHPDQGYDOXH
7KHGHPDQGYDOXHDVVRFLDWHGZLWKWKHH[DPSOHORDGLVN:KKURUN:G
1RWHWKDWWKHSHDNLQVWDQWDQHRXVYDOXHRISRZHULVN:VLJQLILFDQWO\PRUHWKDQWKH
GHPDQGYDOXH
)LJXUHVKRZVDQRWKHUH[DPSOHRIHQHUJ\DQGGHPDQG,QWKLVFDVHHDFKEDU
UHSUHVHQWVWKHHQHUJ\FRQVXPHGLQDPLQXWHLQWHUYDO7KHHQHUJ\XVHLQHDFK
LQWHUYDOW\SLFDOO\IDOOVEHWZHHQDQGN:K+RZHYHUGXULQJWZRLQWHUYDOVWKH
HQHUJ\ULVHVVKDUSO\DQGSHDNVDWN:KLQLQWHUYDOQXPEHU7KLVSHDNRIXVDJH
ZLOOUHVXOWLQVHWWLQJDKLJKGHPDQGUHDGLQJ)RUHDFKLQWHUYDOVKRZQWKHGHPDQG
YDOXHZRXOGEHIRXUWLPHVWKHLQGLFDWHGHQHUJ\UHDGLQJ6RLQWHUYDOZRXOGKDYHDQ
DVVRFLDWHGGHPDQGRIN:KKU,QWHUYDOZLOOKDYHDGHPDQGYDOXHRIN:K
KU,QWKHGDWDVKRZQWKLVLVWKHSHDNGHPDQGYDOXHDQGZRXOGEHWKHQXPEHUWKDW
ZRXOGVHWWKHGHPDQGFKDUJHRQWKHXWLOLW\ELOO

100

kilowat t-hours

80
60
40
20
0

4
5
6
Intervals (15 mins.)

)LJXUH(QHUJ\8VHDQG'HPDQG

$VFDQEHVHHQIURPWKLVH[DPSOHLWLVLPSRUWDQWWRUHFRJQL]HWKHUHODWLRQVKLSV
EHWZHHQSRZHUHQHUJ\DQGGHPDQGLQRUGHUWRFRQWUROORDGVHIIHFWLYHO\RUWRPRQLWRU
XVHFRUUHFWO\

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7KUHH3KDVH3RZHU0HDVXUHPHQW

1.3: Reactive Energy and Power Factor


7KHUHDOSRZHUDQGHQHUJ\PHDVXUHPHQWVGLVFXVVHGLQWKHSUHYLRXVVHFWLRQUHODWHWR
WKHTXDQWLWLHVWKDWDUHPRVWXVHGLQHOHFWULFDOV\VWHPV%XWLWLVRIWHQQRWVXIILFLHQWWR
RQO\PHDVXUHUHDOSRZHUDQGHQHUJ\5HDFWLYHSRZHULVDFULWLFDOFRPSRQHQWRIWKH
WRWDOSRZHUSLFWXUHEHFDXVHDOPRVWDOOUHDOOLIHDSSOLFDWLRQVKDYHDQLPSDFWRQ
UHDFWLYHSRZHU5HDFWLYHSRZHUDQGSRZHUIDFWRUFRQFHSWVUHODWHWRERWKORDGDQG
JHQHUDWLRQDSSOLFDWLRQV+RZHYHUWKLVGLVFXVVLRQZLOOEHOLPLWHGWRDQDO\VLVRIUHDFWLYH
SRZHUDQGSRZHUIDFWRUDVWKH\UHODWHWRORDGV7RVLPSOLI\WKHGLVFXVVLRQJHQHUDWLRQ
ZLOOQRWEHFRQVLGHUHG
5HDOSRZHU DQGHQHUJ\ LVWKHFRPSRQHQWRISRZHUWKDWLVWKHFRPELQDWLRQRIWKH
YROWDJHDQGWKHYDOXHRIFRUUHVSRQGLQJFXUUHQWWKDWLVGLUHFWO\LQSKDVHZLWKWKH
YROWDJH+RZHYHULQDFWXDOSUDFWLFHWKHWRWDOFXUUHQWLVDOPRVWQHYHULQSKDVHZLWKWKH
YROWDJH6LQFHWKHFXUUHQWLVQRWLQSKDVHZLWKWKHYROWDJHLWLVQHFHVVDU\WRFRQVLGHU
ERWKWKHLQSKDVHFRPSRQHQWDQGWKHFRPSRQHQWWKDWLVDWTXDGUDWXUH DQJXODUO\
URWDWHGRRUSHUSHQGLFXODU WRWKHYROWDJH)LJXUHVKRZVDVLQJOHSKDVHYROWDJH
DQGFXUUHQWDQGEUHDNVWKHFXUUHQWLQWRLWVLQSKDVHDQGTXDGUDWXUHFRPSRQHQWV

IR

IX

)LJXUH9ROWDJHDQG&RPSOH[&XUUHQW

7KHYROWDJH 9 DQGWKHWRWDOFXUUHQW , FDQEHFRPELQHGWRFDOFXODWHWKHDSSDUHQW


SRZHURU9$7KHYROWDJHDQGWKHLQSKDVHFXUUHQW ,5 DUHFRPELQHGWRSURGXFHWKH
UHDOSRZHURUZDWWV7KHYROWDJHDQGWKHTXDGUDWXUHFXUUHQW ,; DUHFRPELQHGWR
FDOFXODWHWKHUHDFWLYHSRZHU
7KHTXDGUDWXUHFXUUHQWPD\EHODJJLQJWKHYROWDJH DVVKRZQLQ)LJXUH RULWPD\
OHDGWKHYROWDJH:KHQWKHTXDGUDWXUHFXUUHQWODJVWKHYROWDJHWKHORDGLVUHTXLULQJ
ERWKUHDOSRZHU ZDWWV DQGUHDFWLYHSRZHU 9$5V :KHQWKHTXDGUDWXUHFXUUHQW

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7KUHH3KDVH3RZHU0HDVXUHPHQW

OHDGVWKHYROWDJHWKHORDGLVUHTXLULQJUHDOSRZHU ZDWWV EXWLVGHOLYHULQJUHDFWLYH


SRZHU 9$5V EDFNLQWRWKHV\VWHPWKDWLV9$5VDUHIORZLQJLQWKHRSSRVLWHGLUHFWLRQ
RIWKHUHDOSRZHUIORZ
5HDFWLYHSRZHU 9$5V LVUHTXLUHGLQDOOSRZHUV\VWHPV$Q\HTXLSPHQWWKDWXVHV
PDJQHWL]DWLRQWRRSHUDWHUHTXLUHV9$5V8VXDOO\WKHPDJQLWXGHRI9$5VLVUHODWLYHO\
ORZFRPSDUHGWRWKHUHDOSRZHUTXDQWLWLHV8WLOLWLHVKDYHDQLQWHUHVWLQPDLQWDLQLQJ
9$5UHTXLUHPHQWVDWWKHFXVWRPHUWRDORZYDOXHLQRUGHUWRPD[LPL]HWKHUHWXUQRQ
SODQWLQYHVWHGWRGHOLYHUHQHUJ\:KHQOLQHVDUHFDUU\LQJ9$5VWKH\FDQQRWFDUU\DV
PDQ\ZDWWV6RNHHSLQJWKH9$5FRQWHQWORZDOORZVDOLQHWRFDUU\LWVIXOOFDSDFLW\RI
ZDWWV,QRUGHUWRHQFRXUDJHFXVWRPHUVWRNHHS9$5UHTXLUHPHQWVORZVRPHXWLOLWLHV
LPSRVHDSHQDOW\LIWKH9$5FRQWHQWRIWKHORDGULVHVDERYHDVSHFLILHGYDOXH
$FRPPRQPHWKRGRIPHDVXULQJUHDFWLYHSRZHUUHTXLUHPHQWVLVSRZHUIDFWRU3RZHU
IDFWRUFDQEHGHILQHGLQWZRGLIIHUHQWZD\V7KHPRUHFRPPRQPHWKRGRIFDOFXODWLQJ
SRZHUIDFWRULVWKHUDWLRRIWKHUHDOSRZHUWRWKHDSSDUHQWSRZHU7KLVUHODWLRQVKLSLV
H[SUHVVHGLQWKHIROORZLQJIRUPXOD
7RWDO3) UHDOSRZHUDSSDUHQWSRZHU ZDWWV9$
7KLVIRUPXODFDOFXODWHVDSRZHUIDFWRUTXDQWLW\NQRZQDV7RWDO3RZHU)DFWRU,WLV
FDOOHG7RWDO3)EHFDXVHLWLVEDVHGRQWKHUDWLRVRIWKHSRZHUGHOLYHUHG7KHGHOLYHUHG
SRZHUTXDQWLWLHVZLOOLQFOXGHWKHLPSDFWVRIDQ\H[LVWLQJKDUPRQLFFRQWHQW,IWKHYROW
DJHRUFXUUHQWLQFOXGHVKLJKOHYHOVRIKDUPRQLFGLVWRUWLRQWKHSRZHUYDOXHVZLOOEH
DIIHFWHG%\FDOFXODWLQJSRZHUIDFWRUIURPWKHSRZHUYDOXHVWKHSRZHUIDFWRUZLOO
LQFOXGHWKHLPSDFWRIKDUPRQLFGLVWRUWLRQ,QPDQ\FDVHVWKLVLVWKHSUHIHUUHGPHWKRG
RIFDOFXODWLRQEHFDXVHWKHHQWLUHLPSDFWRIWKHDFWXDOYROWDJHDQGFXUUHQWDUH
LQFOXGHG
$VHFRQGW\SHRISRZHUIDFWRULV'LVSODFHPHQW3RZHU)DFWRU'LVSODFHPHQW3)LVEDVHG
RQWKHDQJXODUUHODWLRQVKLSEHWZHHQWKHYROWDJHDQGFXUUHQW'LVSODFHPHQWSRZHUIDF
WRUGRHVQRWFRQVLGHUWKHPDJQLWXGHVRIYROWDJHFXUUHQWRUSRZHU,WLVVROHO\EDVHG
RQWKHSKDVHDQJOHGLIIHUHQFHV$VDUHVXOWLWGRHVQRWLQFOXGHWKHLPSDFWRIKDUPRQLF
GLVWRUWLRQ'LVSODFHPHQWSRZHUIDFWRULVFDOFXODWHGXVLQJWKHIROORZLQJHTXDWLRQ

'LVSODFHPHQW 3)

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

'RF#

FRV T

(



7KUHH3KDVH3RZHU0HDVXUHPHQW

ZKHUHTLVWKHDQJOHEHWZHHQWKHYROWDJHDQGWKHFXUUHQW VHH)LJ 
,QDSSOLFDWLRQVZKHUHWKHYROWDJHDQGFXUUHQWDUHQRWGLVWRUWHGWKH7RWDO3RZHU)DFWRU
ZLOOHTXDOWKH'LVSODFHPHQW3RZHU)DFWRU%XWLIKDUPRQLFGLVWRUWLRQLVSUHVHQWWKH
WZRSRZHUIDFWRUVZLOOQRWEHHTXDO

1.4: Harmonic Distortion


+DUPRQLFGLVWRUWLRQLVSULPDULO\WKHUHVXOWRIKLJKFRQFHQWUDWLRQVRIQRQOLQHDUORDGV
'HYLFHVVXFKDVFRPSXWHUSRZHUVXSSOLHVYDULDEOHVSHHGGULYHVDQGIOXRUHVFHQWOLJKW
EDOODVWVPDNHFXUUHQWGHPDQGVWKDWGRQRWPDWFKWKHVLQXVRLGDOZDYHIRUPRI$&
HOHFWULFLW\$VDUHVXOWWKHFXUUHQWZDYHIRUPIHHGLQJWKHVHORDGVLVSHULRGLFEXWQRW
VLQXVRLGDO)LJXUHVKRZVDQRUPDOVLQXVRLGDOFXUUHQWZDYHIRUP7KLVH[DPSOH
KDVQRGLVWRUWLRQ
1000

Amps

500

Time

500

1000

)LJXUH1RQGLVWRUWHG&XUUHQW:DYHIRUP

)LJXUHVKRZVDFXUUHQWZDYHIRUPZLWKDVOLJKWDPRXQWRIKDUPRQLFGLVWRUWLRQ
7KHZDYHIRUPLVVWLOOSHULRGLFDQGLVIOXFWXDWLQJDWWKHQRUPDO+]IUHTXHQF\
+RZHYHUWKHZDYHIRUPLVQRWDVPRRWKVLQXVRLGDOIRUPDVVHHQLQ)LJXUH

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7KUHH3KDVH3RZHU0HDVXUHPHQW

1500

Current (amps)

1000

500

0
a

2a

500

1000

1500

)LJXUH'LVWRUWHG&XUUHQW:DYHIRUP

7KHGLVWRUWLRQREVHUYHGLQ)LJXUHFDQEHPRGHOHGDVWKHVXPRIVHYHUDOVLQXVRL
GDOZDYHIRUPVRIIUHTXHQFLHVWKDWDUHPXOWLSOHVRIWKHIXQGDPHQWDO+]IUHTXHQF\
7KLVPRGHOLQJLVSHUIRUPHGE\PDWKHPDWLFDOO\GLVDVVHPEOLQJWKHGLVWRUWHGZDYHIRUP
LQWRDFROOHFWLRQRIKLJKHUIUHTXHQF\ZDYHIRUPV
7KHVHKLJKHUIUHTXHQF\ZDYHIRUPVDUHUHIHUUHGWRDVKDUPRQLFV)LJXUHVKRZV
WKHFRQWHQWRIWKHKDUPRQLFIUHTXHQFLHVWKDWPDNHXSWKHGLVWRUWLRQSRUWLRQRIWKH
ZDYHIRUPLQ)LJXUH

1000

Amps

500

Time

3rd harmonic
5th harmonic

500

7th harmonic
Total
fundamental

)LJXUH:DYHIRUPVRIWKH+DUPRQLFV

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7KUHH3KDVH3RZHU0HDVXUHPHQW

7KHZDYHIRUPVVKRZQLQ)LJXUHDUHQRWVPRRWKHGEXWGRSURYLGHDQLQGLFDWLRQRI
WKHLPSDFWRIFRPELQLQJPXOWLSOHKDUPRQLFIUHTXHQFLHVWRJHWKHU
:KHQKDUPRQLFVDUHSUHVHQWLWLVLPSRUWDQWWRUHPHPEHUWKDWWKHVHTXDQWLWLHVDUH
RSHUDWLQJDWKLJKHUIUHTXHQFLHV7KHUHIRUHWKH\GRQRWDOZD\VUHVSRQGLQWKHVDPH
PDQQHUDV+]YDOXHV
,QGXFWLYHDQGFDSDFLWLYHLPSHGDQFHDUHSUHVHQWLQDOOSRZHUV\VWHPV:HDUHDFFXV
WRPHGWRWKLQNLQJDERXWWKHVHLPSHGDQFHVDVWKH\SHUIRUPDW+]+RZHYHUWKHVH
LPSHGDQFHVDUHVXEMHFWWRIUHTXHQF\YDULDWLRQ
;/ MZ/DQG
;& MZ&
$W+]Z EXWDW+] WKKDUPRQLF Z $VIUHTXHQF\FKDQJHV
LPSHGDQFHFKDQJHVDQGV\VWHPLPSHGDQFHFKDUDFWHULVWLFVWKDWDUHQRUPDODW+]
PD\EHKDYHHQWLUHO\GLIIHUHQWO\LQWKHSUHVHQFHRIKLJKHURUGHUKDUPRQLFZDYHIRUPV
7UDGLWLRQDOO\WKHPRVWFRPPRQKDUPRQLFVKDYHEHHQWKHORZRUGHURGGIUHTXHQFLHV
VXFKDVWKHUGWKWKDQGWK+RZHYHUQHZHUQHZOLQHDUORDGVDUHLQWURGXFLQJ
VLJQLILFDQWTXDQWLWLHVRIKLJKHURUGHUKDUPRQLFV
6LQFHPXFKYROWDJHPRQLWRULQJDQGDOPRVWDOOFXUUHQWPRQLWRULQJLVSHUIRUPHGXVLQJ
LQVWUXPHQWWUDQVIRUPHUVWKHKLJKHURUGHUKDUPRQLFVDUHRIWHQQRWYLVLEOH,QVWUXPHQW
WUDQVIRUPHUVDUHGHVLJQHGWRSDVV+]TXDQWLWLHVZLWKKLJKDFFXUDF\7KHVHGHYLFHV
ZKHQGHVLJQHGIRUDFFXUDF\DWORZIUHTXHQF\GRQRWSDVVKLJKIUHTXHQFLHVZLWKKLJK
DFFXUDF\DWIUHTXHQFLHVDERYHDERXW+]WKH\SDVVDOPRVWQRLQIRUPDWLRQ6R
ZKHQLQVWUXPHQWWUDQVIRUPHUVDUHXVHGWKH\HIIHFWLYHO\ILOWHURXWKLJKHUIUHTXHQF\
KDUPRQLFGLVWRUWLRQPDNLQJLWLPSRVVLEOHWRVHH
+RZHYHUZKHQPRQLWRUVFDQEHFRQQHFWHGGLUHFWO\WRWKHPHDVXUHGFLUFXLW VXFKDV
GLUHFWFRQQHFWLRQWRDYROWEXV WKHXVHUPD\RIWHQVHHKLJKHURUGHUKDUPRQLF
GLVWRUWLRQ$QLPSRUWDQWUXOHLQDQ\KDUPRQLFVVWXG\LVWRHYDOXDWHWKHW\SHRIHTXLS
PHQWDQGFRQQHFWLRQVEHIRUHGUDZLQJDFRQFOXVLRQ1RWEHLQJDEOHWRVHHKDUPRQLF
GLVWRUWLRQLVQRWWKHVDPHDVQRWKDYLQJKDUPRQLFGLVWRUWLRQ
,WLVFRPPRQLQDGYDQFHGPHWHUVWRSHUIRUPDIXQFWLRQFRPPRQO\UHIHUUHGWRDV
ZDYHIRUPFDSWXUH:DYHIRUPFDSWXUHLVWKHDELOLW\RIDPHWHUWRFDSWXUHDSUHVHQW

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7KUHH3KDVH3RZHU0HDVXUHPHQW

SLFWXUHRIWKHYROWDJHRUFXUUHQWZDYHIRUPIRUYLHZLQJDQGKDUPRQLFDQDO\VLV7\SL
FDOO\DZDYHIRUPFDSWXUHZLOOEHRQHRUWZRF\FOHVLQGXUDWLRQDQGFDQEHYLHZHGDV
WKHDFWXDOZDYHIRUPDVDVSHFWUDOYLHZRIWKHKDUPRQLFFRQWHQWRUDWDEXODUYLHZ
VKRZLQJWKHPDJQLWXGHDQGSKDVHVKLIWRIHDFKKDUPRQLFYDOXH'DWDFROOHFWHGZLWK
ZDYHIRUPFDSWXUHLVW\SLFDOO\QRWVDYHGWRPHPRU\:DYHIRUPFDSWXUHLVDUHDOWLPH
GDWDFROOHFWLRQHYHQW
:DYHIRUPFDSWXUHVKRXOGQRWEHFRQIXVHGZLWKZDYHIRUPUHFRUGLQJWKDWLVXVHGWR
UHFRUGPXOWLSOHF\FOHVRIDOOYROWDJHDQGFXUUHQWZDYHIRUPVLQUHVSRQVHWRDWUDQVLHQW
FRQGLWLRQ

1.5: Power Quality


3RZHUTXDOLW\FDQPHDQVHYHUDOGLIIHUHQWWKLQJV7KHWHUPVSRZHUTXDOLW\DQG
SRZHUTXDOLW\SUREOHPKDYHEHHQDSSOLHGWRDOOW\SHVRIFRQGLWLRQV$VLPSOHGHILQL
WLRQRISRZHUTXDOLW\SUREOHPLVDQ\YROWDJHFXUUHQWRUIUHTXHQF\GHYLDWLRQWKDW
UHVXOWVLQPLVRSHUDWLRQRUIDLOXUHRIFXVWRPHUHTXLSPHQWRUV\VWHPV7KHFDXVHVRI
SRZHUTXDOLW\SUREOHPVYDU\ZLGHO\DQGPD\RULJLQDWHLQWKHFXVWRPHUHTXLSPHQWLQ
DQDGMDFHQWFXVWRPHUIDFLOLW\RUZLWKWKHXWLOLW\

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7KUHH3KDVH3RZHU0HDVXUHPHQW

,QKLVERRN3RZHU4XDOLW\3ULPHU%DUU\.HQQHG\SURYLGHGLQIRUPDWLRQRQGLIIHUHQW
W\SHVRISRZHUTXDOLW\SUREOHPV6RPHRIWKDWLQIRUPDWLRQLVVXPPDUL]HGLQ7DEOH

Cause

Disturbance Type

Source

,PSXOVHWUDQVLHQW

7UDQVLHQWYROWDJHGLVWXUEDQFH
VXEF\FOHGXUDWLRQ

/LJKWQLQJ
(OHFWURVWDWLFGLVFKDUJH
/RDGVZLWFKLQJ
&DSDFLWRUVZLWFKLQJ

2VFLOODWRU\
WUDQVLHQWZLWKGHFD\

7UDQVLHQWYROWDJHVXEF\FOH
GXUDWLRQ

/LQHFDEOHVZLWFKLQJ
&DSDFLWRUVZLWFKLQJ
/RDGVZLWFKLQJ

6DJVZHOO

506YROWDJHPXOWLSOHF\FOH
GXUDWLRQ

5HPRWHV\VWHPIDXOWV

,QWHUUXSWLRQV

506YROWDJHPXOWLSOH
VHFRQGVRUORQJHUGXUDWLRQ

6\VWHPSURWHFWLRQ
&LUFXLWEUHDNHUV
)XVHV
0DLQWHQDQFH

8QGHUYROWDJHRYHUYROWDJH

506YROWDJHVWHDG\VWDWH
PXOWLSOHVHFRQGVRUORQJHU
GXUDWLRQ

0RWRUVWDUWLQJ
/RDGYDULDWLRQV
/RDGGURSSLQJ

9ROWDJHIOLFNHU

506YROWDJHVWHDG\VWDWH
UHSHWLWLYHFRQGLWLRQ

,QWHUPLWWHQWORDGV
0RWRUVWDUWLQJ
$UFIXUQDFHV

+DUPRQLFGLVWRUWLRQ

6WHDG\VWDWHFXUUHQWRUYROW
DJHORQJWHUPGXUDWLRQ

1RQOLQHDUORDGV
6\VWHPUHVRQDQFH

7DEOH7\SLFDO3RZHU4XDOLW\3UREOHPVDQG6RXUFHV

,WLVRIWHQDVVXPHGWKDWSRZHUTXDOLW\SUREOHPVRULJLQDWHZLWKWKHXWLOLW\:KLOHLWLV
WUXHWKDWPD\SRZHUTXDOLW\SUREOHPVFDQRULJLQDWHZLWKWKHXWLOLW\V\VWHPPDQ\
SUREOHPVRULJLQDWHZLWKFXVWRPHUHTXLSPHQW&XVWRPHUFDXVHGSUREOHPVPD\
PDQLIHVWWKHPVHOYHVLQVLGHWKHFXVWRPHUORFDWLRQRUWKH\PD\EHWUDQVSRUWHGE\WKH
XWLOLW\V\VWHPWRDQRWKHUDGMDFHQWFXVWRPHU2IWHQHTXLSPHQWWKDWLVVHQVLWLYHWR
SRZHUTXDOLW\SUREOHPVPD\LQIDFWDOVREHWKHFDXVHRIWKHSUREOHP
,IDSRZHUTXDOLW\SUREOHPLVVXVSHFWHGLWLVJHQHUDOO\ZLVHWRFRQVXOWDSRZHUTXDOLW\
SURIHVVLRQDOIRUDVVLVWDQFHLQGHILQLQJWKHFDXVHDQGSRVVLEOHVROXWLRQVWRWKH
SUREOHP

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2: Meter Overview

2: Meter Overview
2.1: The Nexus 1262/1272 Multi-parameter Revenue Meter
The Nexus 1262/1272 transformer-rated, polyphase revenue meter is a unique
collection of metering technologies designed to fulfill advanced metering requirements. It provides high-accuracy power and energy measurements of Voltage,
current and all power values, data logging and power quality recording. The unit
makes the data available through the display, connected systems and historic logs.

2.2: Accu-MeasureTM Technology - Theory of Operation


The advanced metering capability of the Nexus 1262/1272 device is a result of EIGs
Accu-MeasureTM Digital Sensing Technology. Accu-MeasureTM technology is a
combination of high-speed sampling, high-resolution measurement and high-speed
calculation. All Voltage and current waveforms are sampled and RMS values calculated continuously every cycle. Values of Voltage, current and power are produced
every three cycles and every second.
Figure 2.1 illustrates the key processes operating within the Nexus 1262/1272
meter. The meter allows for four types of inputs and can provide outputs to an
integrated display, pulse outputs and several communication ports.
Nexus 1262/1272 Meter Processing
Voltage and current signals enter the meter and are sampled at up to 256 samples
per cycle. Each sample is resolved to a digital value using 16-bit analog-to-digital
converters. The Nexus 1272 meter has two 16-bit A/D converters and the Nexus
1262 meter has one. The first converter, which both meters have, is for the real-time
measurements. The second converter, unique to the 1272, is for the waveform
recorder. The use of two A/D converters ensures that both signals have maximum
resolution, accuracy and integrity. The second converter also isolates energy sampling
and calculations from the waveform fault recording requirements. This provides both
advanced energy and advanced waveform analysis.

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

2- 1

2: Meter Overview

Time
Synchronizing

LCD Display

Voltage Input
Circuitry
Sampling,
Multiplexing
and Signal
Conditioning
Current Input
Circuitry

8 Channel
Status Inputs

Real Time
Measurements
Processing

IR Port

LED Test
Pulse

Memory

Waveform
Recording
Processing

KYZ Output 4
Channel

Ethernet and/
or Modem

RS-485 Port #1

RS-485 Port #4

Figure 2.1: How the Nexus 1262/1272 Meter Processes Inputs

The digitized signals are then passed to the appropriate processor. Real-time
measurements are calculated in one processor and made available for meter readings
and historical logs. A separate processor performs waveform recording. Calculated
data and logs are stored in memory for delivery to displays, external systems and
download processes.
The meter includes a time synchronizing input port that accepts an industry standard
IRIG-B signal to synchronize meter time to standard universal time. If there is no
IRIG-B signal, the meter uses an internal 20 ppm crystal or the primary power line
frequency to keep meter time. The Line Frequency Clock Synchronization feature may
be enabled or disabled. If it is not enabled, the internal clock crystal provides time
synchronization. All readings and logs are time stamped to the nearest millisecond.

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

2- 2

2: Meter Overview

Eight status channels provide input of status or pulse signals. Status inputs are date/
time stamped to the nearest millisecond and placed in the event log. Pulse inputs are
multiplied by a user-supplied factor and accumulated in reading registers. These
accumulated values can also be totalized. This feature makes the Nexus 1262/1272
meter a good fit in universal metering applications. Additionally, any one input
channel can be selected to accept an End of Interval pulse from another meter.
Meter set-up parameters and all historical log data are stored in nonvolatile RAM. The
user has multiple log functionality. Data is made available through the onboard
display. Display screens are described in Chapter 3. Several additional communication
channels operate simultaneously, including the optional Ethernet/Modem Combo
Card. External systems can be connected to either of the RS485 ports or the Ethernet/Modem port. Stored data can be downloaded through the RS485 ports, the Ethernet/Modem port or the Optical port.

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

2- 3

2: Meter Overview

2.3: Advanced Measurement Functionality


2.3.1: Advanced Revenue Billing Capability
The Nexus 1262/1272 device is a full four-quadrant power and energy meter with
accuracy of within 0.06% of reading at full load unity PF. Energy measurements
include: kWh Delivered & Received, kVARh Delivered & Received, kVAh, kVARh, kWh
in each quadrant and Total kVAh. The meter measures instantaneous power and
provides multiple, simultaneous demand measurements, including time-stamped
maximum and minimum readings.
Time of Use
The Nexus meters Time of Use functionality offers the following standard
capabilities:
8 TOU schedules
Bidirectional consumption and Demand
4 seasons/year
20-year calendar
Prior month and prior season readings for each schedule
Present month and present season readings for each schedule
Prior season may also be adjusted for a programmable freeze period
Total-to-date readings for each month
Total-to-date readings for each season
Cumulative and continuous cumulative Demand
Load Aggregation/Universal Metering
Using standard pulse inputs, the Nexus 1262/1272 meter can count pulses from
external meters and accumulate usage. The pulse inputs can be used to totalize
electrical usage and utility values, such as water or gas use data. Readings include:
8 pulse inputs
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

2- 4

2: Meter Overview

Individual accumulating registers


4 totalizing registers
Totalization with Nexus meter kWh readings
Multiple Demand Windows
The Nexus 1262/1272 meter simultaneously monitors four demand structures. The
unit offers:
Block Window Demand
Rolling Window Demand
Thermal Demand
Predictive Demand
Interval length from 1 second to over one hour
Up to 15 sub-intervals
End of Interval Pulse Output (with optional 4IPO Internal KYZ capability)
End of Interval Pulse Input
Time-Stamped Max/Min Demands
The unit gathers Time-stamped Max/Min Demands for all power values. Each of the
following values is date/time stamped:
kW Demand, Delivered & Received, Max/Min
kVAR Demand, Delivered & Received, Max/Min
kVAR Coincident with kW Demand
kVA Demand, Max/Min
Amps Demand, Max/Min
Voltage Demand Max/Min

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

2- 5

2: Meter Overview

Transformer Loss Compensation


Transformer Loss Compensation adjusts for both copper and iron losses with a simple
user setup.

2.3.2: Communications and I/O Capabilities


The Nexus 1262/1272 meter features advanced communication which utilizes
multiple Com ports using open protocols. The meters multi-port design allows multiple communication connections simultaneously. The Nexus 1262/1272 system
provides a direct digital link, allowing selected data to be gathered without affecting
the meter or your data. All of the advanced features of the 1262/1272 are made
available through industry-standard Modbus and DNP 3.0 protocols. No proprietary or
closed protocols are used.
Standard Communications
ANSI Type 2 Optical port
2 RS485 serial ports
Modbus RTU/ASCII protocol
DNP 3.0 Level 2 + protocol
Speeds up to 115200 bps
Optional Communications
The Nexus 1262/1272 meter allows you to select an additional port for one of the
following uses:
INP2: Internal 56k Modem with telephone line noise rejection
INP200: Internal Ethernet TCP/IP (10/100BaseT) with multiple sockets and Modbus
TCP and DNP TCP
INP202: Combination 56k Modem and Internal Ethernet TCP/IP (10/100BaseT)

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

2- 6

2: Meter Overview

Standard Internal I/O


Extensive I/O capability is available in conjunction with all metering functions:
IRIG-B Time Synchronizing to GPS to 1 millisecond resolution
8 High-Speed Status Inputs for status detect or of load aggregation/universal
metering inputs
Four KYZ pulse outputs which can be programmed to pulse for any accumulated
reading. One of the pulse outputs can also be set for an End-of-Interval Sync Pulse.
Upgradable External I/O
The user can select from the following to connect multiple external I/O Modules for
enhanced I/O capability:
Analog Outputs
Analog Inputs
Additional Status Inputs
KYZ Outputs
Relay/ Alarm Outputs
Control Options
ElectroLogicTM Relay Control provides user-definable control outputs:
Action and/or alarm on abnormal condition
Action on Boolean logic combinations of Inputs or electrical conditions

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

2- 7

2: Meter Overview

2.3.3: Display Screens


The Nexus 1262/1272 meter features a built-in graphical back-lit FSTN LCD display
with extended temperature Voltage compensation. This allows you to view energy
data and to gather circuit diagnostic data such as Voltage, current, harmonics and
phasor information. The display is easily programmable. See Chapter 3 for details on
the Programmable Display.

2.3.4: Additional Switches


The Nexus 1262/1272 meter has additional switches & signals that help in using the
unit (see Section 3.2 for more information):
The Infrared Test Pulse can be set to pulse for +Watt-hour, -Watt-hour, +VAR-hour,
-VAR-hour and VA-hour. The pulse uses a time-modulated pulse integration which
allows the pulse to be accurate during short duration pulse tests. The pulse
integration uses industry-accepted reference standards.
The Mode Switch (magnetic reed switch) uses a magnet to switch operating modes.
The Test button is used to access Test Mode.
The Reset button is used to reset Demand.

2.3.5: Nexus External I/O Modules


A variety of optional analog or digital I/O modules mount externally to the Nexus
1262/1272 Socket meter. The Nexus 1262/1272 unit does not supply power to I/O
modules. Use a power supply, such as EIGs PSIO, to power optional I/O modules. See
Chapter 10 for details on installation and use of the Nexus External I/O modules.

2.3.6: Optional P40N/P40N+, P41N+ and P43N+ LED Remote


Displays
The Nexus 1262/1272 Socket meter features a back-lit LCD display built into the
face of the meter. In addition, Electro Industries offers optional external LED displays,
powered by a power supply (such as the PSIO). The P40N+ (and legacy P40N),
P41N+ and P43N+ displays provide easy access to information stored in the meter if
an additional display is required for remote access. See Chapter 9 for further details.

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

2- 8

2: Meter Overview

2.4: Nexus 1262/1272 Meter Forms


The Nexus 1262/1272 Socket meter offers three supported S-Based meter forms
based on the rated Voltage and hookup required by the user. Below are the form
specifications.
Form 9S can be ordered in an A-Base (Order Form 9A).
See Chapter 11 for corresponding Wiring diagrams and Appendix B for Blade
configurations.
The Switchboard Meter offers two supported Z-Based forms, 9Z and 36Z (see
Chapter 12).
NOTE: Form 45S replaces Form 5S and may also be used in 4-wire Delta circuits.
Table 1: Nexus 1262/1272 Meter Forms
Form

Hookup

9S

3E Wye or Delta

36S

2 1/2E Wye

45S

2E or 4W Delta

NOTE: See Section 2.6 for Rated Voltages.

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

2- 9

2: Meter Overview

2.5: Nexus 1262/1272 Meter Accuracy

Table 2: Nexus 1262/1272 Meter Accuracy


Value

Accuracy

Voltage

0.02%

Current

0.05%

Frequency

0.001Hz

kW

0.06%

kWh@1.0PF

0.06%

kWh@0.5PF

0.10%

kVAR

0.10%

kVA

0.10%

PF

0.10%

2.6: Nexus 1262/1272 Meter Specifications Overview


Sense Inputs
Current (AC)
Transformer (CT) rated
Two or three current inputs depending on Form (Ia, Ib, Ic)
Class 2 - 1A nominal, burden 0.000312VA@2.5A
Class 10, 20 - 5A nominal, burden 0.0125VA@25A
0.1% of nominal pick-up current
120% over-range of Meter Class
Current surge withstand (at 23o C): 100 Amps for 10 seconds, 300 Amps for 3
seconds, 500 Amps for 1 second
The current inputs are only to be connected to external current transformers.

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

2- 10

2: Meter Overview

Voltage (AC)
Blade powered unit, standard Voltage (Option S): 480V max Phase to Reference
(Va, Vb, Vc, to VRef), burden total 12V max (including power supply); 600V max
Phase to Phase (Va to Vb, Vb to Vc, Vc to Va)
Blade powered unit, low Voltage (Option LV): 69V max Phase to Reference (Va, Vb,
Vc, to VRef), burden total 12V max (including power supply); 120V between Va,
Vb, Vc inputs
Externally powered units (Options SE, DE): 480V max Phase to Reference (Va, Vb,
Vc, to VRef), burden 0.33VA@576V; 600V max between Va, Vb, Vc inputs
Input Impedance: 1Mohm/phase
20% over range of rated Voltage
2V pickup Voltage
External Power Supply Options
Standard external (Option SE): (102 to 276) Vac @50/60Hz, 12VAmax
Low Voltage external (Option DE): (18 to 60)Vdc, Burden 9W max
Separate power cord
Switchboard meter is always separately powered (option SE or DE)
Isolation
All inputs and outputs isolated to 2500 Volts
Com Ports isolated from each other to 1000 Volts
Sensing
Accu-MeasureTM Technology
16-bit A/D Inputs
True RMS

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

2- 11

2: Meter Overview

8-Channel Sample and Hold


Memory
All meter setup parameters, measurements and logs contained in nonvolatile RAM
Standard Communications
LCD display
ANSI Type 2 Optical port
Two RS485 serial ports
Modbus RTU, Modbus ASCII and DNP 3.0 protocols
Data Speeds of up to 115200 bps
Eight High-Speed Input channels
Optional Communications
INP2: 56k Modem with dial-out capabilities
INP200: Internal 10/100BaseT Ethernet with Total Web Solutions
INP202: Ethernet (INP200) / Modem (INP2) Combo card
Modbus TCP and DNP LAN/WAN
Internal 8-Channel Digital Inputs
Type: Self-excited, for dry contacts only
Wetting Voltage: 12Vdc typical
Internal 4-Channel KYZ Outputs
Type: Form A or C
On Resistance: 23-35:
Peak Voltage: 350Vdc

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

2- 12

2: Meter Overview

Continuous Load Current: 120mA


Peak Load Current: 350mA (10ms)
Off-State Leakage Current @350Vdc: 1:PA
Opto Isolation: 3750V rms (60 Hz, 1 min)
Clock Timing
IRIG-B input for synchronizing to external GPS clock signal - accuracy better than
1msec per month
Line Frequency Clock Synchronization - accuracy better than 1 second per month
Internal Clock Crystal - accuracy better than 2 minutes per month
Environmental (Temperature Specifications to Indirect Light)
Operating Temperature: (-40 to +85)C
Display Operating Temperature: (-20 to +60)C
Humidity: 95% non-condensing
Storage Temperature: (-40 to +85)C
Raintight Lexan Cover (Socket meter)
NOTE: At temperatures above 60 C the display may turn black. The display should
return to normal once the temperature has cooled. If the meter is exhibiting a heating
issue that causes the display to turn black, try shielding the meter from direct sunlight or otherwise provide some cooling effect to the meter.
Security
A hardware lock secures meter settings.
Two 10-character passwords are configurable: one password controls access to
read meter digitally; a separate password controls access to meter programming.
An additional 8 level password sequence is available by user configuration.

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

2- 13

2: Meter Overview

Internal Battery
Panasonic BR3032 3V Lithium Battery (or equivalent) maintains NVRAM and time
during outages.
Modem Battery
3V Lithium Battery with custom leads and velcro mounting maintains Dial-Back
feature during outages. Call factory for replacement battery - the part # is BAT1.
IRIG-B Port Impedance
1.8mA @ 5V
Compliance
ANSI C12.20 Class 0.2 (0.2% Accuracy)
ANSI C37.90.1 (Surge Withstand)
ANSI C62.41 (Surge Immunity)
ANSI C12.18 (Optical Port)
IEC/CISPR 14-1 (Continuous EM Disturbance)
IEC801-2 (Electrostatic Discharge)
IEC801-3 (Radiated EM Immunity)
IEC801-4 (EFT)
IEC687 (Voltage Dips and Interruptions)
IEC60687 (Class 0.2% Accuracy)
IEC 62053-22 (0.2% Accuracy)
IEC62052-11 (General Requirements; Mechanical Properties; Climactic Influences)

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

2- 14

2: Meter Overview

2.7: Nexus 1262/1272 Meter Logging Specifications


Table 3:
Model

Memory

Historical
Log 1*

Historical
Log 2*

CBEMA
/
ITIC**

Event
Log
**

Waveform
Log***

Flicker
Log**

Input
Log
**

Output
Log**

System
Events**

1272

Standard

85 Days

133 Days

512

1024

63

1536

256

1024

1024

1272

Advanced

555 Days

133 Days

512

1024

95

5120

256

1024

1024

1262

Standard

69 Days

32 Days

N/A

512

N/A

N/A

512

1024

1024

1262

Advanced

480 Days

133 Days

N/A

512

N/A

N/A

512

1024

1024

*Assumes logs store 4 scaled energy readings every 15 minutes.


**Number of events recorded (assumes 14 parameters monitored).
***Number of waveform records. Each record may be from 8 to 64 cycles in duration, depending upon
meter setup.

2.8: DNP V3.00 Level 2


Nexus 1262 and 1272 meters support DNP V3.00 Level 2
DNP Level 2 Features
Up to 136 measurements (64 Binary Inputs, 32 Binary Counters, 64 Analog Inputs)
can be mapped to DNP Static Points (over 3000) in the customizable DNP Point
Map.
Up to 16 Relays and 8 Resets can be controlled through DNP Level 2.
Report-by-Exception Processing (DNP Events) Deadbands can be set on a per-point
basis.
Available Freeze commands are Freeze, Freeze/No-Ack, Freeze with Time, and
Freeze with Time/No-Ack.
Freeze with Time commands enable the Nexus meter to have internal time-driven
Frozen and Frozen Event data. When the meter receives the time and interval, the
data is created.
For complete details, download the appropriate DNP User Manual from our website at
www.electroind.com.

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

2- 15

2: Meter Overview

This page intentionally left blank.

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

2- 16

2SHUDWLQJ,QVWUXFWLRQV

3: Operating Instructions
3.1: Nameplate Information
7KH1H[XV6RFNHWPHWHUKDVLWVRSHUDWLQJLQIRUPDWLRQUHSUHVHQWHGRQ
WKHQDPHSODWHZKLFKLVORFDWHGRQWKHIDFHRIWKHPHWHU VHHILJXUHEHORZ 6HULDO
DQG0RGHOQXPEHUVDUHRQWKH2SWLRQVODEHO VHHQH[WSDJH 
*UDSKLFDO/&'

8VHU'HILQHG$UHD

)RUP
)DFWRU
'LDJUDP






0RGH
6ZLWFK



)LJXUH0HWHU6KRZLQJ)DFHSODWH(OHPHQWV

7KHQXPEHUVLQWKHILJXUHUHSUHVHQW
0XOWLSO\E\&RQVWDQW
9ROWDJH7UDQVIRUPHU5DWLR 375DWLR
&XUUHQW7UDQVIRUPHU5DWLR VHH*ORVVDU\
3ULPDU\:DWWKRXUFRQVWDQW
&XUUHQWFODVV

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV

:DWWKRXUWHVWFRQVWDQW
$16,&)RUP1XPEHU
$16,&$FFXUDF\&ODVV
7HVW$PSHUHV

Model: NEXUS 1272-S-SWB2-20-60-SE-INP202


Serial#: 114-0074880532
Memory:

2 Meg

Class:

20

Freq.:

60 Hz

KYZ Out:

Yes

Opt. Comm:

Ethernet/Modem Combo

Power Supply:

Std. Ext 102-275V AC/DC

)LJXUH0HWHU2SWLRQV/DEHO

7KH2SWLRQV/DEHOLVORFDWHGRQWKHRXWVLGHRIWKHLQWHUQDOVKURXG,WLVSULQWHG
VSHFLILFDOO\IRUHDFKPHWHUDQGVKRZVWKHRUGHUHGRSWLRQVWKDWDUHLQFOXGHGLQWKH
PHWHU$QH[DPSOHRIDW\SLFDOODEHOLVVKRZQDERYH%HORZLVDOLVWRIRSWLRQV
DYDLODEOHIRUWKHPHWHU
Memory (1272):

Memory (1262):

6 6WDQGDUG 0RI5$0

6 6WDQGDUG .RI5$0

$ $GYDQFHG 0RI5$0

$ $GYDQFHG 0RI5$0

Communication Options:
,13'LDO2XW2SWLRQ
,13(WKHUQHW%DVH7
,13(WKHUQHW0RGHP&RPELQDWLRQ

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV

Case Style:
6:%6ZLWFKERDUG
6666RFNHWPHWHU)RUPV
$6RFNHWPHWHULQ$%DVH
Power Supply:
6(6WG([W9$&'&
66WG%ODGH3RZHUHG
'('&([W9'&
/99$&%ODGH3RZHUHG
EIG Number - Model Number plus Option Numbers ([DPSOHEHORZ 
0RGHO0HPRU\)RUP)UHT3RZHU6XSSO\,2&RPPXQLFDWLRQ
$6+]632,13

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV

3.2: Basic Operation

,QIUDUHG
7HVW
3XOVH

0RGH 0DJQHWLF5HHG
6ZLWFK
$FWLYDWH0RGH
6ZLWFKE\VZLSLQJ

DPDJQHWRQ

PHWHUVLGH
7HVW
%XWWRQ
XQGHUWKHFRYHU
5HVHW
6ZLWFK

2SWLFDO
3RUW

)LJXUH0HWHU6KRZLQJ6ZLWFKHVDQG,QGLFDWRUV

Switches and Indicators


7KHUHDUHWZRVZLWFKHVDFFHVVLEOHIURPRXWVLGHWKHPHWHUFRYHU
7KHMode6ZLWFK DOVRFDOOHGD0DJQHWLF5HHG6ZLWFK LVXVHGWRVZLWFKIURP
1RUPDO0RGHWR&LUFXLW'LDJQRVWLF0RGHRU7LPHRI8VH0RGH
7KHReset6ZLWFKLVXVHGWRUHVHW'HPDQG
$WKLUGVZLWFKWKHTest%XWWRQLVDFFHVVLEOHRQO\ZKHQWKHFRYHUKDVEHHQ
UHPRYHG7KH7HVW%XWWRQVZLWFKHVWKHPHWHUIURPRQHRIWKHRSHUDWLRQDOPRGHVWR
7HVW0RGHDQGEDFNWR1RUPDO0RGH7KH7HVW%XWWRQLVDOVRXVHGWRDFFHVV'LVSOD\
$GMXVWPHQWV0RGHGXULQJ3RZHUXS0RGH

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV

Optical Port
7KH2SWLFDOSRUWLVORFDWHGRQWKHORZHUOHIWVLGHRIWKHPHWHUIDFH:LWKWKH2SWLFDO
SRUW\RXFDQSURJUDPWKHPHWHUZLWK&RPPXQLFDWRU(;7VRIWZDUHXVLQJDQ$=RU
$8&RPPXQLFDWLRQ,QWHUIDFH RURWKHU$16,&7\SH,,PDJQHWLFRSWLFDO
FRPPXQLFDWLRQVFRXSOHU DQGDQ56FDEOH $= RUD86%FDEOH $8 WRD3&
Test Pulse
$QLQIUDUHG7HVWSXOVHLVORFDWHGRQWKHXSSHUOHIWVLGHRIWKHIDFH(QHUJ\SXOVLQJ
DSSOLFDWLRQVFDQEHFRQILJXUHGXVLQJ&RPPXQLFDWRU(;7VRIWZDUH
Phase Indicator
$3KDVHLQGLFDWRULVORFDWHGRQWKHORZHUULJKWVLGHRIWKHIDFH$%&VWD\V
LOOXPLQDWHGLIDOOWKUHHSKDVHVRI9ROWDJHDQGFXUUHQWDUHSUHVHQW$&%LQGLFDWHV
UHYHUVHGSKDVHVHTXHQFH7KHLQGLFDWRUEOLQNV$%RU&LIRQHSKDVHLVQRWSUHVHQW,I
QRSKDVHVDUHSUHVHQWWKHPHWHUWXUQVRII XQOHVV\RXKDYHDQ$X[SLJWDLOFRQQHFWHG
WRDSRZHUVRXUFH 

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV

3.3: LCD Display Information


7KH1H[XVPHWHUKDVDJUDSKLFDOEDFNOLW)671/&'SURJUDPPDEOH
GLVSOD\ZLWKH[WHQGHGWHPSHUDWXUH9ROWDJHFRPSHQVDWLRQ7KHGLVSOD\OHWV\RXYLHZ
(QHUJ\GDWDDQGJDWKHUFLUFXLWGLDJQRVWLFGDWDVXFKDV9ROWDJHFXUUHQWKDUPRQLFV
DQGSKDVRULQIRUPDWLRQ
<RXXVH&RPPXQLFDWRU(;7VRIWZDUHWRSURJUDPWKHGLVSOD\7KHGLVSOD\KDVWKUHH
9LHZPRGHVWRZKLFK\RXDVVLJQVFUHHQV7KLVOHWV\RXGHWHUPLQHZKDWGDWDLV
GLVSOD\HGDQGLQZKDWRUGHU9LHZPRGHLVWKHSULPDU\PRGHWKHRWKHUPRGHV
DXWRPDWLFDOO\UHWXUQWR9LHZPRGHDIWHUDXVHUVHWDPRXQWRILQDFWLYLW\6HWWKH
WLPHWKURXJK&RPPXQLFDWRU(;7 VHH6HFWLRQLQVWUXFWLRQVIRUWKH0LVFHOODQHRXV
WDE 7KHUHLVDOVRD7HVWPRGHDQGD6HOHFW&RPSHQVDWLRQVFUHHQ
Mode Details
$FFHVV9LHZPRGHDQG9LHZPRGHE\VZLSLQJWKH0RGH6ZLWFKZLWKDPDJQHW
VHH)LJXUH $FFHVV7HVWPRGHE\UHPRYLQJWKHFRYHU 32:(50867%(2)) 
SRZHULQJXSWKHPHWHUDQGSXVKLQJWKH7HVW%XWWRQDWDQ\WLPH6HHWKH1DYLJDWLRQ
PDSLQ6HFWLRQIRUGLVSOD\PRGHGHWDLOV
7HVWPRGHDXWRPDWLFDOO\UHWXUQVWR9LHZPRGHDIWHUDQDPRXQWRIWLPHVLQFHWKH
ODVWXVHUDFWLRQZLWKQRHQHUJ\DFFXPXODWLRQ RU DQDPRXQWRIWLPHVLQFHWKHODVW
XVHUDFWLRQSOXVWKH'HPDQGLQWHUYDOZLWKHQHUJ\DFFXPXODWLRQ7KHYDOXHVIRUWKH
DPRXQWRIWLPHVLQFHWKHODVWXVHUDFWLRQDUHVHWWKURXJK&RPPXQLFDWRU(;7 VHH
6HFWLRQLQVWUXFWLRQVIRUWKH0LVFHOODQHRXVWDE 

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV

Display Configurator
$1H[XVPHWHUZLWKWKHDSSURSULDWHILUPZDUH 8VHU3URJUDPPDEOH/&''LVSOD\5XQ
7LPH)LUPZDUHYHUVLRQ/&''LVSOD\%RRWYHUVLRQ%DVHPHWHU
V&205XQ
7LPHRUKLJKHUSRVW1RYHPEHU JLYHV\RXWKH'LVSOD\&RQILJXUDWRU
ZKLFKOHWV\RXDVVLJQXSWR/&'GLVSOD\VFUHHQVDFURVVWKHWKUHH9LHZPRGHV
7KHVHVFUHHQVFDQEHPDGHRIDQ\FRPELQDWLRQRISUHGHILQHGVFUHHQV VHH6HFWLRQ
 SUHGHILQHGVFUHHQVZLWKVRPHFXVWRPL]DWLRQDQGIXOO\FXVWRPL]HGVFUHHQV
ZLWKDQ\RIWKHPHWHU
VPHDVXUHGUHDGLQJVDQGQXPHULFFDOFXODWLRQVVXFKDVVFDOLQJ
7KH'LVSOD\&RQILJXUDWRUVIOH[LELOLW\OHWV\RXPDWFKWKHGLVSOD\VFUHHQVWRDQ\
DSSOLFDWLRQQHHGV\RXKDYH5HIHUWR6HFWLRQIRUSURJUDPPLQJGHWDLOV
Base Programmable Display
1H[XVPHWHUVZLWKDQ/&''LVSOD\5XQ7LPH)LUPZDUHYHUVLRQRIOHVVWKDQ
SUH1RYHPEHU GRQRWKDYHWKH'LVSOD\&RQILJXUDWRU)RUWKHVHPHWHUV\RXFDQ
DVVLJQXSWRSUHGHILQHGVFUHHQVSHU9LHZPRGH5HIHUWR6HFWLRQIRUSURJUDP
PLQJGHWDLOV
NOTE: 6HH6HFWLRQIRULQVWUXFWLRQVRQILQGLQJ\RXUGLVSOD\VILUPZDUHYHUVLRQ
Low Battery
/R%DWW195DP ,QWHUQDO%DWWHU\ RU/R%DWW0RGHP 0RGHP%DWWHU\ IODVKHVRQ
WKHVFUHHQHYHU\VHFRQGVZKHQWKH,QWHUQDO RU0RGHP %DWWHU\LVUXQQLQJORZ
RUZKHQLWLVQRWFOLFNHGLQWRSODFHSURSHUO\6HHLQVWDOODWLRQLQVWUXFWLRQVLQ6HFWLRQ

Test Mode
:K7HVW6DPHDVN:KVFUHHQH[FHSWLQ:KLQVWHDGRIN:K
9$5K7HVW6DPHDVN9$5VFUHHQH[FHSWLQ9$5K 4XDGUDQWV
9$K7HVW6DPHDVN9$KVFUHHQH[FHSWLQ9$K 4XDGUDQWV
:DWW5ROOLQJ'HPDQG7HVW 'HOLYHUHGDQG5HFHLYHG
:DWW%ORFN'HPDQG7HVW 'HOLYHUHGDQG5HFHLYHG

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV

Initial Display Screens


7KH1H[XVPHWHUVKLSVZLWKLQLWLDOGLVSOD\VFUHHQVZKLFKVFUROORQWKH
GLVSOD\DVVRRQDV\RXSRZHUXSWKHPHWHU7KHLQLWLDOGLVSOD\VFUHHQVDUHDVDPSOLQJ
RIWKHSUHGHILQHGVFUHHQV7\SLFDOLQLWLDOGLVSOD\VFUHHQVLQFOXGH
0HWHU'DWDLQFOXGLQJ%RRW5XQ'63%RRW'635XQ6HULDO1XPEHU3URWHFW
(QDEOHG%DXG
:K'HOLYHUHG
:K5HFHLYHG
N9$5KSHU4XDGUDQW
N9$KSHU4XDGUDQW
5ROOLQJ:'HPDQG'HOLYHUHG
5ROOLQJ:'HPDQG5HFHLYHG
%ORFN:'HPDQG'HOLYHUHG
%ORFN:'HPDQG5HFHLYHG
:'HPDQG/DVW5HVHW
&XPXODWLYH:'HPDQG
Backlight
7KH%DFNOLJKWFDQQRWEHVHWWRVWD\RQLQGHILQLWHO\,WWXUQVRIIDIWHUDSURJUDPPHG
LQWHUYDORQHKRXULVWKHPD[LPXPVHWWLQJ,IWKHEDFNOLJKWWLPHVRXWDQGLVRIIVZLSH
WKH0RGH6ZLWFKRQFHWRWXUQWKHEDFNOLJKWRQDQGUHGLUHFWWKHVFUHHQ

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV

3.3.1: Finding Your Displays Firmware Versions


7RILQG\RXU/&'GLVSOD\VILUPZDUHYHUVLRQVIROORZWKHVHVWHSV
&RQQHFWWRWKHPHWHUWKRXJK&RPPXQLFDWRU(;7VRIWZDUH
&OLFNWKHProfileLFRQLQWKH7LWOHEDU
&OLFNRevenue and Energy Settings>Display ConfigurationWRRSHQWKH'HYLFH
'LVSOD\3URJUDPDEOH6HWWLQJVVFUHHQVKRZQEHORZ

7KH/&'GLVSOD\VILUPZDUHYHUVLRQVDUHVKRZQLQWKHERWWRPOHIWSRUWLRQRIWKH
VFUHHQ,IWKH%RRWYHUVLRQLVRUKLJKHUDQGWKH5XQYHUVLRQLVRUKLJKHU
IROORZWKHLQVWUXFWLRQVLQ6HFWLRQ,IWKH%RRWDQG5XQYHUVLRQVDUHOHVVWKDQ
IROORZWKHLQVWUXFWLRQVLQ6HFWLRQ

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV

3.4: Nexus 1262/1272 Programmable Display Navigation Map




5NLESS3CROLLINGIS
3TOPPED ALLSCREENS
ASSIGNEDTOTHEMODE
SCROLLEVERYSECONDS

-/$%

3WIPE-AGNET
OVER-ODE3WITCH
/NCEFOR-ODE
4WICEFOR-ODE

0RESS4EST"UTTON
FROMANY-ODE

3WIPE-AGNET
OVER-ODE3WITCH
/NCEFOR-ODE
4WICEFOR-ODE

-/$%

0RESS4EST"UTTON
FROMANY-ODE

-/$%

3WIPE-AGNET
OVER-ODE3WITCH
/NCEFOR-ODE
4WICEFOR-ODE

0RESS4EST"UTTON
FROMANY-ODE

-ODESANDRETURN
TO-ODEAFTERAUSER
SETAMOUNTOFTIME

0/7%250
-/$%
3TARTUP3CREEN
AND3CROLLING
$EVICE3TATUS
)NFORMATION

3%,%#4#/-0%.3!4)/.

3ELECT4RANSFORMER,OSSAND#404
#OMPENSATION
0RESS4EST"UTTONTOVIEWOPTIONS
INORDER
4RANSFOMER,OSS/NLY"OTH#404
AND4RANSFORMER,OSS.O
#OMPENSATION#404/NLY
%XIT $O.OT%NTER4EST-ODE
0RESSAND(/,$4ESTBUTTONON
THEOPTIONYOUWANT

4%34-/$%
0RESS4EST"UTTON
TOSCROLLTHROUGH
4ESTSCREENS

0RESSAND(/,$4EST
"UTTONTOEXIT4EST
MODEANDRETURNTO
-ODE

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

4EST-ODERETURNS
TO-ODEAFTERAUSER
SETAMOUNTOFTIME

(



2SHUDWLQJ,QVWUXFWLRQV

3.5: Using the Display Configurator


7KH1H[XVPHWHUZLWKDSSURSULDWHILUPZDUH 8VHU3URJUDPPDEOH/&'
'LVSOD\5XQ7LPH)LUPZDUHYHUVLRQ/&''LVSOD\%RRWYHUVLRQ%DVHPHWHU
V
&205XQ7LPHRUKLJKHU JLYHV\RXWKH'LVSOD\&RQILJXUDWRU7KLVIHDWXUHOHWV
\RXFXVWRPL]HWKHPHWHU
V/&'VFUHHQVWRGLVSOD\DQ\PHDVXUHGUHDGLQJV7KH
'LVSOD\&RQILJXUDWRUIHDWXUHVWKUHH9LHZPRGHV VHH6HFWLRQ DQGKDVPHPRU\
IRUXSWRVFUHHQVGLVWULEXWHGKRZHYHU\RXZDQWDPRQJWKHWKUHH9LHZPRGHV
7KHIOH[LELOLW\RIWKH'LVSOD\&RQILJXUDWRUDOORZV\RXWRFXVWRPL]HWKH/&'GLVSOD\IRU
DQ\DSSOLFDWLRQ$GGLWLRQDOIHDWXUHVRIWKH'LVSOD\&RQILJXUDWRUDUHDVIROORZV
<RXFDQDGGVFUHHQQXPEHUVDQGRUODEHOV WLWOHV 
<RXFDQDGGVFDOLQJDQGPXOWLSOLHUIDFWRUVWRWKHVFUHHQGDWD
<RXFDQXVHWKHVFUHHQVWRYLHZGDWDIURPSXOVHLQSXWVVXFKDVZDWHUJDVVWHDP
HWF
<RXFDQXVHDFRPELQDWLRQRISUHGHILQHGDQGFXVWRPL]HGGLVSOD\V6HH6HFWLRQ
IRUDOLVWRIWKHSUHGHILQHGGLVSOD\V
IMPORTANT!<RXXVHWKH1H[XVPHWHU
V0RGEXVPDSWRLGHQWLI\WKH
GDWD\RXZDQWWRGLVSOD\LQDFXVWRPL]HGGLVSOD\VFUHHQ7KH0RGEXVPDSIRUWKH
1H[XVPHWHULVFRQWDLQHGLQWKHModus Protocol and Register Map for
Nexus 1252/1262/1272 Meters7KHPDQXDOFDQEHGRZQORDGHGIURP(,*
V
ZHEVLWHZZZHOHFWURLQGFRPSGIPRGEXVSGI
To access the Display Configurator's programming screens
&RQQHFWWRWKHPHWHUWKURXJK&RPPXQLFDWRU(;7
&OLFNWKHProfileLFRQWRRSHQWKH'HYLFH3URILOHVFUHHQ
&OLFNWKHSOXVVLJQ  QH[WWR5HYHQXHDQG(QHUJ\6HWWLQJV

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV

'RXEOHFOLFNDisplay Configuration<RXZLOOVHHWKHVFUHHQVKRZEHORZ7KHILUVW
WDELV0HWHU'LVSOD\0RGH1DPHVZKLFKOHWV\RXDVVLJQODEHOVDQGGHVFULSWLRQVWR
WKHWKUHH9LHZPRGHV

D(QWHUDWKUHHOHWWHUODEHOIRUHDFKRIWKHWKUHH9LHZPRGHV
E(QWHUDGHVFULSWLRQIRUHDFKPRGHXVLQJWKH/LQHDQG/LQH'HVFULSWLRQILHOGV
&OLFNWKH6FUHHQ$VVLJQPHQWVWDE<RXZLOOVHHWKHVFUHHQVKRZQRQWKHQH[WSDJH

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV

Display screens
available for
assignment
to View modes
Right-click
on a screen
to assign it to
View mode
or to copy it

Buttons that
let you:
Create custom
display screens,
Edit display
screens, or
Remove display
screens from
the available
screens list

View Mode
Columns

Buttons that let you: Change the order of display screens


in a View mode, or Remove display screens from a View mode

8VLQJWKHEXWWRQVRQWKHERWWRPRIWKHVFUHHQ\RXFDQ
5HWULHYHGLVSOD\VHWWLQJVIURPWKHFRQQHFWHGPHWHUE\FOLFNLQJRetrieve from
Display.
8SGDWHWKHFRQQHFWHGPHWHU
VGLVSOD\VHWWLQJVE\FOLFNLQJUpdate Display7KH
PHWHUUHERRWVDQG\RXVHHDPHVVDJHRQWKH3&VFUHHQ'HYLFH/&''LVSOD\
3URJUDPPDEOH6HWWLQJV8SGDWHG
6DYHDQ\FKDQJHV\RXKDYHPDGHWRGLVSOD\VHWWLQJVE\FOLFNLQJSave
/RDGDSUHYLRXVO\VDYHG/&'GLVSOD\ILOHE\FOLFNLQJLoadDQGVHOHFWWKHILOH\RX
ZDQWWRORDGLQWRWKLVVFUHHQ LWLVDQGVILOH 
5HWXUQWRWKHSUHYLRXVVFUHHQZLWKRXWVDYLQJDQ\FKDQJHVE\FOLFNLQJCancel
9LHZRQOLQHLQVWUXFWLRQVIRUXVLQJWKLVVFUHHQE\FOLFNLQJHelp
7KHOHIWPRVWFROXPQOLVWVDOORIWKH$YDLODEOHGLVSOD\VFUHHQV%HIRUH\RX
YHXVHGWKH
'LVSOD\&RQILJXUDWRU\RXZLOORQO\VHHWKHSUHGHILQHGGLVSOD\VFUHHQVLQWKHOLVW
2QFH\RXKDYHFUHDWHGFXVWRPL]HGVFUHHQV\RXZLOOVHHWKRVHLQWKHOLVWDVZHOO

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV

7KHRWKHUWKUHHFROXPQVOLVWWKHGLVSOD\VFUHHQVWKDWDUHDVVLJQHGWRHDFKRIWKH
WKUHH9LHZPRGHV8VHWKHVFUROOEDUVWRGLVSOD\DOORIWKHLWHPVLQWKHFROXPQV
D7RDVVLJQRQHRIWKHVFUHHQVWRD9LHZPRGHRUWRFUHDWHDQHZVFUHHQ
EDVHGRQLWFOLFNRQWKHVFUHHQLQWKHOLVWDQGULJKWFOLFN<RXZLOOVHHWKH
SRSXSPHQXVKRZQEHORZ

7RDGGWKHVFUHHQWRRQHRIWKHPRGHVRUWRDOOPRGHVFOLFNRQWKDW
LWHPLQWKHPHQX
7RFUHDWHDQHZVFUHHQEDVHGRQWKHVFUHHQFOLFNRQWKHODVWLWHPLQ
WKHPHQX VHH6WHSH 
E7RFKDQJHWKHSRVLWLRQRIVFUHHQVLQRQHRIWKH9LHZPRGHVRUWRUHPRYH
WKHVFUHHQIURPWKHPRGHFOLFNRQWKHVFUHHQLQWKH9LHZPRGHFROXPQ
DQGWKHQHLWKHU
&OLFNMove UpRUMove DownWRFKDQJHWKHSRVLWLRQRIWKHVFUHHQ
ZLWKLQWKDW9LHZPRGH7KHSRVLWLRQRIWKHVFUHHQVGHWHUPLQHVWKHLU
VFUROOLQJRUGHU
&OLFNRemoveWRUHPRYHWKHVFUHHQIURPWKDW9LHZPRGH
F7RFUHDWHDFXVWRPGLVSOD\VFUHHQFOLFNCreateLQWKH$YDLODEOH6FUHHQV
FROXPQ&RQWLQXHWRCreating a Custom Display ScreenRQWKHQH[W
SDJH
NOTEWR(GLWDFXVWRPVFUHHQFOLFNRQWKHVFUHHQLQWKH$YDLODEOH6FUHHQV
OLVWDQGWKHQFOLFNEdit7KHQXVHWKHLQVWUXFWLRQVLQCreating a Custom
Display ScreenRQWKHQH[WSDJHWRPRGLI\WKHVFUHHQ
G7RHGLWDSUHGHILQHGVFUHHQFOLFNRQWKHVFUHHQLQWKH$YDLODEOH6FUHHQV
FROXPQOLVWDQGWKHQFOLFNEdit&RQWLQXHWREditing a Pre-defined Display ScreenRQSDJH

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV

H7RFUHDWHDQHZVFUHHQEDVHGRQDQH[LVWLQJVFUHHQKLJKOLJKWWKHVFUHHQLQ
WKH$YDLODEOH6FUHHQVFROXPQOLVWULJKWFOLFNDQGVHOHFWCreate New
Screen Based on Selected Screen,I\RXDUHPDNLQJDFXVWRPVFUHHQ
IROORZWKHLQVWUXFWLRQVEHORZ,I\RXDUHMXVWFKDQJLQJWKHVFUHHQQXPEHU
RUODEHOIROORZWKHLQVWUXFWLRQVLQEditing a Pre-defined Display
ScreenRQSDJH
I7RUHPRYHDVFUHHQIURPWKHOLVWRIDYDLODEOHVFUHHQVFOLFNRQWKHVFUHHQLQ
WKH$YDLODEOH6FUHHQVFROXPQOLVWDQGWKHQFOLFNRemove7KHVFUHHQLVQR
ORQJHUGLVSOD\HGLQWKHOLVWRIDYDLODEOHVFUHHQVDQGFDQQRWEHDVVLJQHGWR
DQ\9LHZPRGH,WLVDOVRUHPRYHGIURPDQ\9LHZPRGHVLWKDVDOUHDG\
EHHQDVVLJQHGWR
&UHDWLQJD&XVWRP'LVSOD\6FUHHQ
$IWHU\RXFOLFNWKHCreateEXWWRQLQWKH$YDLODEOHVFUHHQVOLVW\RXZLOOVHHWKH/&'
6FUHHQ6HOHFWLRQVFUHHQVKRZQEHORZ

Click to create
custom screen

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV

&OLFNWKHUser definedEXWWRQLQWKH6FUHHQ7\SHER[7KHVFUHHQFKDQJHVWRDOORZ
\RXWRVHWXSWKHQHZ'LVSOD\VFUHHQ
You can
change
this
number
Select
number

of screen

items OR
1 Demand,1
Timestamp

The fields in
Screen Layout
are determined
by the number
of items you
select

These
fields are
for Modbus
Information
These fields
are for
multiplier
setup

These fields
are for
scaling
setup

<RXFDQFKDQJHWKHQXPEHUVKRZQLQWKH8VHU6FUHHQ1XPEHUILHOG7KLVILHOG
DFFHSWVDQ\QXPEHUXSWRWKUHHGLJLWVLQOHQJWK8VHQXPEHUVEHWZHHQDQGLI
\RXZDQWWKHQXPEHUWRGLVSOD\RQWKH/&'GLVSOD\VFUHHQXVHQXPEHUVEHWZHHQ
DQGLI\RXGRQ
WZDQWWKHQXPEHUWRGLVSOD\NOTE:7KH+DUPRQLFV
3KDVRUVDQG/LQH6HJPHQWVFUHHQVQHYHUGLVSOD\WKHLUQXPEHURQWKH/&'GLVSOD\
VFUHHQ
8VHWKH/D\RXW$UUDQJHPHQWILHOGWRFKRRVHZKDWILHOGV\RXZDQWWKH/&'VFUHHQWR
GLVSOD\&KRRVHHLWKHU
D7KHQXPEHURILWHPV\RXZDQWWKH/&'VFUHHQWRGLVSOD\FOLFNRQHRIWKHItem
EXWWRQV
E'LVSOD\'HPDQGDQG7LPHVWDPSILHOGVFOLFNWKH1 Demand, 1 Timestamp
EXWWRQ

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV

$IWHU\RXPDNH\RXUVHOHFWLRQWKHOHIWVLGHRIWKHVFUHHQFKDQJHVWRGLVSOD\HQWU\
ILHOGVIRUWKH,WHP V RU'HPDQGDQG7LPH6WDPSLQIRUPDWLRQ6HHWKHH[DPSOH
VFUHHQVEHORZ
Custom Screen with 3 Item Fields

The information for


these fields comes
from the meters
Modbus Register
Map

Display screen
label fields
Item entry
fields
click here to
enter the Modbus
Register containing
the item

This is where you


can specify a
multiplier for your
data
These fields let you
specify Scaling and
data display

Custom Screen with 1 Demand, 1 Timestamp Fields

See screen above


for explanation of
the fields on the
right side of the
screen

Display screen
label fields
Demand field
Timestamp
Status field
(does not display
on the LCD screen)

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV

7KHWRSILHOGLQWKH6FUHHQ/D\RXWVHFWLRQLVIRUWKHGLVSOD\VFUHHQODEHO 7LWOH 
'HSHQGLQJRQWKHQXPEHURILWHPV\RXVHOHFW\RXZLOOKDYHEHWZHHQWROLQHVIRU
DVFUHHQODEHO
,I\RXVHOHFWHGLWHPVRU'HPDQG7LPHVWDPS\RXZLOOKDYH
WZRHQWU\OLQHV
,I\RXVHOHFWHGLWHPV\RXZLOOKDYHRQHHQWU\OLQH
,I\RXVHOHFWHGLWHPV\RXZLOOQRWKDYHDQ\HQWU\ILHOGVIRUDGLV
SOD\VFUHHQODEHO WKHUHZRQ
WEHURRPRQWKHVFUHHQIRUDODEHO 
7KH,WHPHQWU\ILHOGVDOORZ\RXWRVSHFLI\WKHGDWD\RXZDQWWRGLVSOD\RQWKH/&'
VFUHHQ<RXFDQDOVRHQWHUDSUHIL[ RSWLRQDO IRUHDFKOLQHLWHPDQGDVXIIL[
RSWLRQDO IRUDOORIWKHLWHPVRQWKHGLVSOD\VFUHHQ
Example$VFUHHQFRQWDLQLQJSKDVHWRSKDVH9ROWDJHVPLJKWKDYHDVLQJOHWLWOH
9ROWV33 OLQHVRIGDWDZLWKSUHIL[HV 9DE9EF9FD DQGWKHVDPHVXIIL[ 09 
RQDOOOLQHV
7KH'HPDQG7LPHVWDPSHQWU\ILHOGVDOORZ\RXWRVSHFLI\WKH'HPDQGWKH
WLPHVWDPSDQGDQRSWLRQDOVWDWXVUHJLVWHU7KHVWDWXVUHJLVWHULVQRWGLVSOD\HGRQ
WKH/&'VFUHHQ
7RHQWHUDQLWHP
D&OLFNRQWKH,WHPODEHOER[)LHOGVWKDWRSHQXQGHUQHDWKWKHLWHPDOORZ\RX
WRHQWHUWKHVWDUWLQJYDOXHRIWKH0RGEXV5HJLVWHUFRQWDLQLQJWKHGDWDIRU
WKHLWHP8VHWKH'HFLPDOYDOXHRIWKHUHJLVWHU6HHWKHVFUHHQEHORZ
5HIHUWRWKHNexus 1252/1262/1272 Meter Modbus ManualIRUWKH
PHWHU
V0RGEXV5HJLVWHU0DS7KHPDQXDOFDQEHGRZQORDGHGIURP
(,*
VZHEVLWHZZZHOHFWURLQGFRPSGIPRGEXVSGI

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV

IMPORTANT! All of the data items you select must be the same Modbus
typeIRUH[DPSOH)7KH0RGEXVW\SHLVOLVWHGLQWKH0RGEXVPDS6HHWKH
([DPSOHEHORZ
Example:
7RVHOHFW&\FOH3KDVH$19ROWDJHILQGWKHVWDUWLQJUHJLVWHUIRUWKHILHOGLQWKH
0RGEXVPDQXDO6HHWKHILJXUHEHORZ

1 Cycle Block
00090-00093

00094-00095

10

50

1 cycle Block Time Stamp

12/31/9999 23:59:59:99

1 cycle Phase A-N Voltage

+65536 V1 / D V

$ECIMAL3TARTINGREGISTER)TEMYOUARESELECTING
IS

10 msec
1/65536 V

sec

F3

F5

-ODBUS4YPEIS&

E&OLFNUpdateWRVDYHWKHLWHP
VVWDUWLQJUHJLVWHUDGGUHVV
F(QWHUDQ\DGGLWLRQDOLWHPVLQWKHVDPHZD\
G:KHQ\RXILQLVKHQWHULQJLWHPVXVHWKHHQWU\ILHOGVLQWKHULJKWSRUWLRQRI
WKHVFUHHQWRHQWHUGHWDLOVIRUWKHLWHPV
0RGEXVW\SHDQGWRHQWHUVFDOLQJ
PXOWLSOLHUDQGGDWDGLVSOD\VHWWLQJV7KH0RGEXVW\SHLQIRUPDWLRQLVIRXQG
LQ&KDSWHURIWKHNexus 1252/1262/1272 Meter Modbus Manual6HH
WKHIROORZLQJH[DPSOH
Example:
7KHLWHPLQWKHH[DPSOHDERYHZDV0RGEXVW\SH)$Q\DGGLWLRQDOLWHPVPXVWEHWKH
VDPH0RGEXVW\SH7\SHLVGHVFULEHGLQ&KDSWHUSDJHRIWKH
0HWHU
V0RGEXVPDQXDODVVKRZQLQWKHH[FHUSWWKDWIROORZV

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV

8VHWKH0RGEXVW\SHLQIRUPDWLRQDVVKRZQEHORZ


3.5: Type F5 Secondary 1 Cycle RMS Voltage or Current


Length: 2 Registers (4 bytes)
Range: +1,048,576 V2 / 0 V2 or +65536 I2 / 0 I2(1262 or 1272)

Unit: 1/4906 V2 secondary or 1/65536 A2 secondary (1262 or 1272)


These registers together are a four-byte unsigned integer. Conversion into
secondary voltage or current involves multiplying by the appropriate scale and
taking the square root of that value.
Depending on the unit and hardware, the range and unit of voltage reading
differs. For a Nexus 1262/72 meter, the range goes to +1,048,576 V2 with a
unit of 1/4096 V2.

,QWKHH[DPSOHDERYH\RXZRXOGILQGWKHQXPEHURIUHJLVWHUVSHULWHPWKHIDFWWKDW
WKHGDWDLVXQVLJQHGDQGVFDOLQJLQIRUPDWLRQIURPWKH0RGEXVW\SHLQIRUPDWLRQ
7KHILHOGVRQWKHOHIWXQGHUQHDWKWKH0XOWLSO\E\ILHOGVOHW\RXVHWXSKRZWKHGDWD
ZLOOEHGLVSOD\HGIRUH[DPSOHVSHFLI\LQJLIWKHGDWDLVDQXPEHURUVRPHRWKHUYDOXH
ZKHWKHU\RXZDQWWKHVLJQWRGLVSOD\IRUVLJQHGGDWDZKHWKHU\RXZDQWWKHGDWD
VFDOHGWKHQXPEHURIGLJLWVDQGGHFLPDOSODFHVLQWKHILHOG&OLFNWKHSXOOGRZQ
PHQXVWRVHHDOWHUQDWHFKRLFHVIRUWKHILHOGV7KHHQWULHV\RXPDNHDIIHFWDOORIWKH
LWHPVRQWKHVFUHHQ7KHWDEOHWKDWIROORZVVKRZVWKHILHOGVDQGWKHYDOLGHQWULHVIRU
WKHP

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV

Table 1:
Entry fields

Possible entries

5HJLVWHUVSHULWHP



5HJLVWHUFRQWHQWV

%LQDU\%&'7H[W6FDOHG(QHUJ\

'DWD

6LJQHG8QVLJQHG

'LYLGHFRQWHQWVE\



0XOWLSO\E\

8VHUPXOWLSOLHU HQWHULQEODQNILHOG 37


5DWLR&75DWLR

'DWDIRUPDW

1XPEHU7H[W3RZHUIDFWRU7LPH'DWH
7LPH 'DWH6WDWXVLQGLFDWRU

1XPHULFDOVLJQ

$XWR)RUFHGQHJDWLYH)RUFHGSRVLWLYH

6KRZVLJQ

1R<HV

6FDOH

$XWR1RQHNLOR N 0HJD 0 *LJD *

7RWDOGLJLWV



'LJLWVWRWKHULJKWRIWKHGHFLPDOSODFH



2QFH\RXILQLVKPDNLQJ\RXUHQWULHVFOLFNOKWRUHWXUQWRWKH6FUHHQ$VVLJQPHQWV
WDE7KHQHZVFUHHQLVQRZOLVWHGLQWKHOHIWPRVWFROXPQ&OLFNRQLWDQGWKHQ
ULJKWFOLFNWRDVVLJQLWWRRQHRUDOORIWKH9LHZPRGHV
:KHQ\RXILQLVKSURJUDPPLQJWKH/&'GLVSOD\FOLFN
SaveWRVDYHWKH/&'3URJUDPPDEOH6HWWLQJVWRDQGVILOH
UploadWRXSORDGWKH/&'3URJUDPPDEOH6HWWLQJVWRWKHFRQQHFWHG
PHWHU
CancelWRH[LWWKHVFUHHQwithout saving any changes

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV

(GLWLQJD3UHGHILQHG'LVSOD\6FUHHQ
<RXKDYHWKHIROORZLQJRSWLRQVIRUHGLWLQJSUHGHILQHGVFUHHQV
<RXFDQHGLWWKHVFUHHQQXPEHU
<RXFDQHGLWWKHVFUHHQODEHO WLWOH 
<RXFDQFUHDWHDQHZVFUHHQEDVHGRQWKHSUHGHILQHGVFUHHQEXW\RXZLOOVWLOORQO\
EHDEOHWRFKDQJHWKHVFUHHQQXPEHUDQGRUODEHO
NOTE:6RPHRIWKHSUHGHILQHGVFUHHQVFDQQRWEHFXVWRPL]HGDVGHVFULEHGDERYH
7KHWDEOHEHORZOLVWVWKHVHSUHGHILQHGVFUHHQVDQGWHOOVZKDWFDQEHFKDQJHGLQ
WKHP

Table 2:
Pre-defined LCD
Screen Number
(Default Value)

Description

Editing Options



3KDVRUV

1RQH



9$53) )UHTXHQF\

7LWOH



+DUPRQLFV

7LWOH



6HJPHQWFKHFN

1RQH



2SWLFDO3RUW6HWWLQJV

7LWOH



&RPP3RUWV

7LWOH



1H[XV6WDWXV

7LWOH



)LUPZDUH9HUVLRQV

7LWOH



1H[XV,QIR

7LWOH



5ROOLQJ%ORFN'HPDQG

7LWOH



728(QHUJ\

7LWOH



728'HPDQG

7LWOH



7289$5K

7LWOH

:KHQ\RXFOLFNEditDIWHUVHOHFWLQJDSUHGHILQHGVFUHHQLQWKH$YDLODEOHVFUHHQV
OLVW RUULJKWFOLFNWRVHOHFWCreate a new screen based on selected screen \RX
VHHWKH/&'6FUHHQ6HOHFWLRQVFUHHQ6HHWKHH[DPSOHVFUHHQWKDWIROORZV

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV

7KHEXWWRQDWWKHWRSRIWKHVFUHHQUHIOHFWVWKHW\SHRIVFUHHQ\RXDUHHGLWLQJRU
FRS\LQJHLWKHU3UHGHILQHGRU3UHGHILQHGZLWKFXVWRPODEHOLQJ
<RXFDQRQO\FKDQJHWKHVFUHHQQXPEHUIRUDSUHGHILQHGVFUHHQ VHHH[DPSOH
VFUHHQRQWKHSUHYLRXVSDJH EXWLI\RXDUHFUHDWLQJDQHZVFUHHQEDVHGRQD
SUHGHILQHGVFUHHQ\RXFDQVHOHFWWKHSUHGHILQHGZLWKFXVWRPODEHOLQJEXWWRQ
WRFKDQJHWKHWLWOHDVZHOODVWKHQXPEHURIWKHVFUHHQ5HIHUWRWKHWDEOHRQWKH
SUHYLRXVSDJHIRUHGLWLQJOLPLWDWLRQV
)RUDSUHGHILQHGVFUHHQZLWKFXVWRPODEHOLQJ\RXFDQFKDQJHWKHVFUHHQQXP
EHUDQGDOVRWKHVFUHHQODEHO6HHWKHH[DPSOHVFUHHQWKDWIROORZV5HIHUWRWKH
WDEOHRQWKHSUHYLRXVSDJHIRUHGLWLQJOLPLWDWLRQV
NOTES:
7KH6FUHHQQXPEHUILHOGLVDWKUHHGLJLWQXPHULFILHOG8VHQXPEHUV
EHWZHHQDQGWRGLVSOD\WKHQXPEHURQWKH/&'GLVSOD\VFUHHQ
XVHQXPEHUVEHWZHHQDQGWRQRWGLVSOD\WKHQXPEHURQ
WKH/&'GLVSOD\VFUHHQ

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV

7KH+DUPRQLFV3KDVRUVDQG/LQH6HJPHQWVFUHHQVQHYHUGLVSOD\
WKHLUQXPEHURQWKH/&'GLVSOD\VFUHHQ
'HSHQGLQJRQWKHSUHGHILQHGVFUHHQ\RXKDYHEHWZHHQOLQHV
IRUVFUHHQODEHOHQWU\6FUHHQODEHOVFDQEHXSWRFKDUDFWHUVSHU
OLQH
%HORZLVDQH[DPSOHRID3UHGHILQHGZLWKFXVWRPODEHOLQJVFUHHQ
You can change the
screen number

You can
enter a
screen label

$IWHU\RXPDNH\RXUHQWULHVFOLFNOK<RXWKHQUHWXUQWRWKHSUHYLRXVVFUHHQ
6FUHHQ$VVLJQPHQWVWDE 
:KHQ\RXILQLVKSURJUDPPLQJWKH/&'GLVSOD\FOLFN
SaveWRVDYHWKH/&'3URJUDPPDEOH6HWWLQJVWRDQGVILOH
UploadWRXSORDGWKH/&'3URJUDPPDEOH6HWWLQJVWRWKHFRQQHFWHGPHWHU
CancelWRH[LWWKHVFUHHQwithout saving any changes

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV

Power and Energy Display Tab


&OLFNWKH3RZHUDQG(QHUJ\'LVSOD\WDE<RXZLOOVHHWKHVFUHHQVKRZQEHORZ

(QWHUVHWWLQJVIRU3RZHUDQG(QHUJ\
1XPEHURI'LJLWV 3ULPDU\3RZHU
'HFLPDO3RLQW/RFDWLRQ 3ULPDU\3RZHU
'LVSOD\/HDGLQJ=HURHVFKHFNLIGHVLUHG
(QHUJ\'LVSOD\
D6HOHFWWKH0XOWLSO\E\&RQVWDQWYDOXH
E&OLFNWKHFKHFNER[QH[WWR$SSO\WRWKH'HPDQG5HJLVWHUVDVZHOOLI
DSSOLFDEOH
$SUHYLHZDSSHDUVDWWKHERWWRPRIWKHVFUHHQ
NOTES:
6HWWLQJVRQWKLVVFUHHQFRQWUROWKHGLVSOD\RI(QHUJ\UHODWHGQXPEHUV%HFDUHIXO
WRPDWFKWKHYDOXHVRQWKHGLVSOD\ZLWKWKRVHLQWKHKLVWRULFDOORJV7KHVH
VHWWLQJVDSSO\WR9$KRXUV:DWWKRXUV  9$5KRXUV  DQG9$5KRXUV
HDFKTXDGUDQW LQWKHPHWHU

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV

7KH1XPEHURI'LJLWVVHWWLQJFRQWUROVWKHGLVSOD\DQGVWRUDJHRIDOOGLJLWV
GLVSOD\HGRQWKHVFUHHQDQGLWVHWVWKH5HJLVWHU5ROORYHUIRUDOO(QHUJ\W\SH
UHJLVWHUV
Miscellaneous Tab
&OLFNWKH0LVFHOODQHRXVWDE<RXZLOOVHHWKHVFUHHQVKRZQEHORZ

(QWHUVHWWLQJVLQWKH0LVFHOODQHRXVVFUHHQ
D6FUHHQ6HWWLQJV
%DFN/LJKW/HYHO2IIWR%ULJKWHVW
%DFN/LJKW7LPH %DFN/LJKWVKXWVRII PLQVHFPLQVHF
&RQWUDVW+LJKHVWWR/RZHVW
6FUROO6WRS(QDEOHGRU'LVDEOHG
3KDVRU5RWDWLRQ&ORFNZLVHRU&RXQWHUFORFNZLVH
'HPDQG6KRZQ&XPXODWLYHRU&RQWLQXRXV&XPXODWLYH
7LPHRI8VH'HPDQG%ORFN5ROOLQJRU&XPXODWLYH

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV

'DWH)RUPDW0RQWK'D\<HDURU'D\0RQWK<HDU
E2SWLFDO3RUWVHWWLQJV
%DXG5DWHRU
2SWLFDO5HFHLYH1RQ,QYHUWHGRU,QYHUWHG
F8VHU,QDFWLYLW\7LPH2XWV QXPEHURIPLQXWHVVLQFHODVWXVHUDFWLRQZKHQ
0RGHUHYHUWVWR9LHZ0RGH  6HWWLQJVDUHWRPLQXWHVZLWKPLQXWH
LQWHUYDOV 
/HDYH7HVW0RGH$IWHUB0LQXWHV
/HDYH9LHZ0RGH$IWHUB0LQXWHV
/HDYH9LHZ0RGH$IWHUB0LQXWHV
When you have finished programming the Device Display Programmable
Settings Screen
8VH%XWWRQVDVGHVFULEHGEHORZ
Update Display&OLFNWRVHQGWKHQHZVHWWLQJVWRWKHGLVSOD\ $IWHUVHWWLQJV
KDYHEHHQXSGDWHG9LHZ0RGHLVGLVSOD\HG
Retrieve from Display&OLFNWRUHWULHYHH[LVWLQJVHWWLQJV
Cancel&OLFNWRUHWXUQWRWKH&RPPXQLFDWRU(;70DLQVFUHHQZLWKRXWXSGDWLQJ
RUVDYLQJQHZVHWWLQJV
Save&OLFNWRVDYHQHZVHWWLQJVWRDILOH
:KHQ\RXILQLVKPDNLQJDQ\FKDQJHVFOLFNUpdate DisplayWRVHQGWKHQHZ
VHWWLQJVWRWKHGLVSOD\3RSXSZLQGRZVWHOO\RXWKDWWKHFKDQJHVKDYHEHHQPDGH
DQGWKHQ\RXUHWXUQWRWKH&RPPXQLFDWRU(;70DLQVFUHHQ

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV

3.6: Using the Base Programmable Display


7KH%DVH3URJUDPPDEOH'LVSOD\ SUH1RYHPEHU KDVWKHVDPHWKUHHFRQILJX
UDEOH9LHZPRGHVDVWKH'LVSOD\&RQILJXUDWRUDQGWKHWKUHHPRGHVDUHGLVSOD\HGLQ
DXWRVHTXHQFHLQWKHVDPHZD\8VLQJ&RPPXQLFDWRU(;7\RXFDQDVVLJQXSWRRI
WKHSUHGHILQHGGLVSOD\VFUHHQVWRHDFKPRGHDQ\RIWKHDYDLODEOHVFUHHQVFDQEH
XVHGLQDQ\PRGH6HH6HFWLRQIRUDOLVWRIWKHSUHGHILQHGVFUHHQV<RXFDQDOVR
DVVLJQDWKUHHGLJLWODEHODQGGHVFULSWLRQWRWKH9LHZPRGHVDQGFRQILJXUHWKHSRZHU
DQG(QHUJ\GLVSOD\DQGVFUHHQWLPHRXWVWKHVDPHZD\DVIRUWKH'LVSOD\&RQILJXUD
WRU
Programming the Base Programmable Display
&RQQHFWWRWKHPHWHUWKURXJK&RPPXQLFDWRU(;7
&OLFNWKHProfileLFRQWRRSHQWKH'HYLFH3URILOHVFUHHQ
&OLFNWKHSOXVVLJQ  QH[WWR5HYHQXHDQG(QHUJ\6HWWLQJV
'RXEOHFOLFNDisplay Configuration<RXZLOOVHHWKH0HWHU'LVSOD\0RGH1DPHV
VFUHHQ)RUWKLVVFUHHQDQGDOORIWKHVFUHHQVLQWKH'HYLFH'LVSOD\3URJUDPPDEOH
6HWWLQJVexcept forWKH6FUHHQ$VVLJQPHQWVVFUHHQIROORZWKHGLUHFWLRQVJLYHQLQ
6HFWLRQ)RUWKH6FUHHQ$VVLJQPHQWVVFUHHQIROORZWKHGLUHFWLRQVJLYHQKHUH

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV

&OLFNWKH6FUHHQ$VVLJQPHQWVWDE<RXZLOOVHHWKHVFUHHQVKRZQEHORZ

<RXU/DEHOIRUHDFKPRGHDSSHDUVDWWKHWRSRIHDFKFROXPQ(QWHUXSWR
VFUHHQVIRUHDFK9LHZPRGHLQWKH
IROORZLQJZD\
D'RXEOHFOLFNRQRQHRIWKHVHW
WLQJVRQWKHVFUHHQ<RXZLOOVHHWKH
VFUHHQVKRZQRQWKHULJKW
E6HOHFW*URXSDQG,WHPIURPWKH
SXOOGRZQPHQXVDQGFOLFNOKWR
UHWXUQWRWKH6FUHHQ$VVLJQPHQWV
VFUHHQ
NOTE:,I\RXVHOHFW7LPHRI8VHDV
WKH*URXSWKHVFUHHQFKDQJHVWR
DOORZDQ,WHPVHOHFWLRQDQGDGGL
WLRQDOVHOHFWLRQVIRU7283HULRG
DQG7285HJLVWHU6HHWKHVFUHHQ
RQWKHULJKW

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV

3.6.1: Pre-Defined Display Screens


7KH1H[XVSUHGHILQHGGLVSOD\VFUHHQVKDYHIHDWXUHVWKDWPDNHWKHPYHU\XVHU
IULHQGO\
0DQ\RIWKHVFUHHQVKDYHODUJHGLJLWV  
7KHUHDUHPDQ\VFUHHQVWRFKRRVHIURP
7KH3ROOLQJ,QGLFDWRULQWKHULJKWFRUQHURIWKH6WDWXV/LQHSURYLGHVWZRIXQFWLRQV
$EOLQNLQJLQGLFDWRUVKRZVWKDWWKHGLVSOD\LVUHFHLYLQJGDWDIURPWKHPHWHU
3RZHU)ORZLVGLVSOD\HGE\GLIIHUHQWVKDSHGLFRQV
D:KHQQRSRZHULVIORZLQJDVROLGEORFNLVGLVSOD\HG
E$QDQLPDWHGDUURZSRLQWLQJ5,*+7LQGLFDWHVSRVLWLYHSRZHUIORZ
F$QDQLPDWHGDUURZSRLQWLQJ/()7LQGLFDWHVQHJDWLYHSRZHUIORZ
%HORZLVDOLVWRIDYDLODEOHVFUHHQVZLWKVRPHH[DPSOHILJXUHV
Screen Number

Screen Name

:K'HOLYHUHG

:K5HFHLYHG

9$5K

9$5K

9$K



5ROOLQJ:'HPDQG'HO



5ROOLQJ:'HPDQG5HF



%ORFN:'HPDQG'HO



%ORFN:'HPDQG5HF



:'HPDQG/DVW5HVHW



3KDVHWR1HXWUDO9ROWDJH

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

kWh
DEL 43089263
REC 71323159
06/16/2011 3:50:44 Norm ABC

'RF#

ROLLING
W DEMAND
DEL
502.3
3:07:2003 2:07:09
06/16/2011 3:50:44 Norm ABC

(



2SHUDWLQJ,QVWUXFWLRQV



3KDVH&XUUHQW



3KDVRUV



9$53))UHTXHQF\



9D9DE+DUPRQLFV



9E9EF+DUPRQLFV



9F9FD+DUPRQLFV



,D+DUPRQLFV



,E+DUPRQLFV



,F+DUPRQLFV



7RWDOL]HU



7RWDOL]HU



7RWDOL]HU



7RWDOL]HU



7RWDOL]HU'HPDQG



7RWDOL]HU'HPDQG



7RWDOL]HU'HPDQG



7RWDOL]HU'HPDQG



&XPXODWLYH'HPDQG'HO 5HF



3KDVHWR3KDVH9ROWDJH





9$5



3)



9$

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

la HARMONICS
THD
003.67
06/18/2011 12:22:44 CDM ABC

VC IC
IB

'RF#

VA B

(

VB IA

30.02 LG
16.03 LG
17.01 LG
ABC



2SHUDWLQJ,QVWUXFWLRQV



)UHTXHQF\



6HJPHQW&KHFN





0HWHU1DPH



2SWLFDO3RUW



&RP3RUW6HWWLQJV



1H[XV6WDWXV



)LUPZDUH9HUVLRQV



1H[XV,QIR



$YHUDJH3)5HFHLYHG



$YHUDJH3)'HOLYHUHG



9$5KSHU4XDGUDQW



9$KSHU4XDGUDQW



:KSHU4XDGUDQW



4K



&XPXODWLYH'HPDQG



5ROOLQJ:LQGRZ'HPDQG



%ORFN:LQGRZ'HPDQG



3RZHU)DFWRUSHU3KDVH



3RZHU)DFWRUSHU4XDGUDQW



728:K5HF



7289$K4



7289$5K4

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV



7289$K4



7289$5K4



728:K'HO



7289$K4



7289$5K4



7289$K4



7289$5K4



728:'HPDQG5HF



728:'HPDQG'HO



7289$5'HPDQG



7289$5'HPDQG

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



2SHUDWLQJ,QVWUXFWLRQV

7KLVSDJHLQWHQWLRQDOO\OHIWEODQN

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



3HUIRUPLQJ0HWHU7HVWLQJ

4: Performing Meter Testing


7KHLQIRUPDWLRQFRQWDLQHGZLWKLQWKLVFKDSWHULVLQWHQGHGWREHDQDLGWR
TXDOLILHGPHWHULQJSHUVRQQHO,WLVQRWLQWHQGHGWRUHSODFHWKHH[WHQVLYH
WUDLQLQJQHFHVVDU\WRLQVWDOORUUHPRYHPHWHUVIURPVHUYLFH$Q\ZRUNRQRUQHDU
HQHUJL]HGPHWHUVPHWHUVRFNHWVRURWKHUPHWHULQJHTXLSPHQWSUHVHQWVWKHGDQJHURI
HOHFWULFDOVKRFNSHUVRQDOLQMXU\RUGHDWK$OOZRUNRQWKHVHSURGXFWVPXVWEHSHU
IRUPHGE\TXDOLILHGLQGXVWULDOHOHFWULFLDQVDQGPHWHULQJVSHFLDOLVWVONLY$OOZRUN
PXVWEHGRQHLQDFFRUGDQFHZLWKORFDOXWLOLW\VDIHW\SUDFWLFHVDQGRUWKHSURFHGXUHV
RXWOLQHGLQWKHFXUUHQWHGLWLRQRIWKH+DQGERRNIRU(OHFWULFLW\0HWHULQJ7KHKDQGERRN
LVDYDLODEOHIURPWKH(GLVRQ(OHFWULF,QVWLWXWH3HQQV\OYDQLD$YHQXH1::DVK
LQJWRQ'&

4.1: Testing Tools


7KH1H[XVDQGPHWHUVDUHHTXLSSHGZLWKDOLJKWHPLWWLQJGLRGH /(' IRU
FDOLEUDWLRQDQGDOLTXLGFU\VWDOGLVSOD\ZLWKWHVWVFUHHQV7KHVHWZRVWDQGDUGIHDWXUHV
SURYLGHXVHULQWHUIDFHDQGHTXLSPHQWLQWHUIDFHSRLQWVIRUPHWHUWHVWLQJ

Infrared
Test Pulse

Test Button
Under Cover

)LJXUH0HWHU7HVW3XOVHDQG7HVW%XWWRQ/RFDWLRQ

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



3HUIRUPLQJ0HWHU7HVWLQJ

4.1.1: Test Pulse LED


7KH7HVW3XOVH/('LVORFDWHGLQWKHXSSHUOHIWKDQGSRUWLRQRIWKHPHWHUIDFHDV
VKRZQLQ)LJXUH7KH7HVW3XOVH/('FRQWLQXRXVO\HPLWVFDOLEUDWLRQSXOVHV LQIUD
UHGOLJKW 7KLV/('FDQEHXVHGIRUDYDULHW\RISXOVHVLQFOXGLQJLQGLYLGXDOTXDGUDQWV
IRU:DWWKRXU9$KRXU9$5KRXUDQG:DWW'HPDQGSXOVHV(DFKFDOLEUDWLRQSXOVHLV
HTXDOWRWKHYDOXHDVVLJQHGWR.W :DWWKRXUVSHUSXOVH LQWKHPHWHUV'HYLFH3URILOH
7KHPLOOLVHFRQGGXUDWLRQRIHDFKRXWSXWSXOVHLVDOVRSURJUDPPDEOHLQWKHPHWHUV
'HYLFH3URILOH
To program the Test Pulse LED:
)URPWKH'HYLFH3URILOHPHQXLQ&RPPXQLFDWRU(;7FOLFNRevenue and Energy
Settings>Internal KYZWRFRQILJXUHWKHIROORZLQJVHWWLQJV
D$VVLJQHG&KDQQHOFKRRVHIURPVHWWLQJV
E:DWWKRXUSHU3XOVHHQWHUWKHYDOXHLQWKHVHFRQGDU\
F3XOVH:LGWKVHWIURPPVWRPV
G0RGHVHOHFWWRHQDEOHRUGLVDEOH
H)RUPVHOHFWEHWZHHQ)RUP$DQG)RUP&
&OLFNOKDQGWKHQFOLFNUpdate DeviceWRVHQGWKHQHZVHWWLQJVWRWKHPHWHU
NOTE:7KHXQLWIRUWKHFDOLEUDWLRQSXOVHVLV:DWWKRXUV7KHLQLWLDOYDOXHRIHDFKSXOVH
.W LVVHFRQGDU\:DWWKRXUVSHUSXOVH

4.1.2: LCD Display


,Q7HVW0RGHWKH/&'GLVSOD\SURYLGHVXVHUDFFHVVWRDFFXPXODWHGUHDOUHDFWLYHDQG
DSSDUHQWHQHUJ\DVZHOODV%ORFN'HPDQGIRUUHDOSRZHU7KHUHDUHHLJKWVFUHHQVLQ
7HVW0RGH:K'HO:K5HF9$5K4 49$5K4 49$K4 4
9$K4 4:DWW'HPDQG7HVW5ROOLQJDQG:DWW'HPDQG7HVW%ORFN6HH6HFWLRQ
IRUPRUHGHWDLO
7KH/&'GLVSOD\DOVRLQFOXGHVWKUHHSKDVH9ROWDJHLQGLFDWRUV7KHVHLQGLFDWRUVDUH
ODEHOHG$%DQG&WRUHSUHVHQWWKHSUHVHQFHRI9ROWDJHRQWKHODEHOHGSKDVH

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



3HUIRUPLQJ0HWHU7HVWLQJ

,I9ROWDJHLVQRWSUHVHQWRQRQHSKDVHLWVLQGLFDWRULVQRWGLVSOD\HG7KHVHLQGLFDWRUV
DOVRVKRZZKHWKHUFXUUHQWLVIORZLQJRQWKHSKDVH,IQRFXUUHQWLVIORZLQJRQDSKDVH
WKHLQGLFDWRUEOLQNVZKHQFXUUHQWLVIORZLQJWKHLQGLFDWRUVKRZVDFRQWLQXRXVO\
LOOXPLQDWHGGLJLW7KHLQGLFDWRUDOVRVKRZVSKDVHVHTXHQFH

4.2: Test Mode


7HVW0RGHDOORZVWKHPHWHUWREHWHVWHGZLWKRXWGLVWXUELQJELOOLQJGDWDRUVHWWLQJD
QHZPD[LPXP'HPDQG7HVW0RGHSHUIRUPVWKHVDPHIXQFWLRQDVVHWWLQJWKHSRLQW
HUVEDFNRQDQHOHFWURPHFKDQLFDOPHWHUDIWHUWHVWLQJ
:KLOHRSHUDWLQJLQ7HVW0RGHWKHPHWHUXVHVWKHVDPHPHDVXUHPHQWDQGFDOFXODWLRQ
SURFHVVHVWKDWDUHXVHGLQ1RUPDO0RGH7KHRQO\GLIIHUHQFHLVWKDWWKHELOOLQJ
QXPEHUVVWRUHGLQWKHPHWHUDUHQRWXSGDWHGZLWKWKHUHDOWLPHUHDGLQJ7KLV
SUHVHUYHVWKHELOOLQJQXPEHUVZKLOHWHVWLQJLVSHUIRUPHG

4.2.1: Entering Test Mode


7RHQWHU7HVW0RGH\RXPXVWE\SDVVWKHPHWHUVVHFXULW\V\VWHP,QPRVWLQVWDQFHV
WKLVUHTXLUHV\RXWRUHPRYHSRZHUIURPWKHPHWHUEUHDNWKHPHWHUVHDODQGUHPRYH
WKH/H[DQFRYHUDQGWKHQUHSRZHUWKHPHWHU

4.2.2: Using Test Mode


7KHVDPHVHOHFWHGPHDVXUHPHQWSURILOHTXDQWLWLHV GDWDDFFXPXODWLRQV WKDWDUH
FDOFXODWHGGXULQJQRUPDORSHUDWLRQDUHFDOFXODWHGLQ7HVW0RGH'LVSOD\TXDQWLWLHV
:DWWKRXU9$5KRXU9ROW$PSHUHKRXUDQG%ORFN'HPDQGTXDQWLWLHV DUHGLVSOD\HG
LQXQLWVUDWKHUWKDQNLORXQLWVLHWKHGDWDLVGLVSOD\HGDV:K9$5K9$KDQG:DWWV
UDWKHUWKDQN:KN9$5KN9$KDQGN:7KHVDPH'HPDQGYDOXHVFDOFXODWHGGXULQJ
QRUPDORSHUDWLRQDUHDOVRFDOFXODWHGLQ7HVW0RGH7KHGLVSOD\IRUPDWVLQ7HVW0RGH
DUHFKDQJHGWRSURYLGHJUHDWHUUHVROXWLRQGXULQJWHVWRSHUDWLRQV
7KHGLVSOD\GRHVQRWVFUROOZKLOHLQ7HVW0RGH(DFKLWHPUHPDLQVGLVSOD\HGXQWLOWKH
7HVW%XWWRQLVSUHVVHGZKLFKFDXVHVWKHQH[W7HVW0RGHVFUHHQWRGLVSOD\
7KHIROORZLQJWDEOHVKRZVWKHGLVSOD\VFUHHQVDYDLODEOHLQ7HVW0RGHWKHGDWD
GLVSOD\HGRQHDFKVFUHHQDQGWKHSXOVHVRXUFHIRUHDFKVFUHHQ

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



3HUIRUPLQJ0HWHU7HVWLQJ

Table 1:
Test Mode Displayed Data and Pulse Source
Test Mode

Displayed Data

Pulse Source

:K'HO

'HOLYHUHG:K(QHUJ\

N:K'HO

:K5HF

5HFHLYHG:K(QHUJ\

N:K5HF

9$5K4DQG4

9$5KLQ4XDGUDQW
9$5KLQ4XDGUDQW

N9$5KU'HO

9$5K4DQG4

9$5KLQ4XDGUDQW
9$5KLQ4XDGUDQW

N9$5KU5HF

9$K4DQG4

9$KLQ4XDGUDQW
9$KLQ4XDGUDQW

N9$KU4

9$K4DQG4

9$KLQ4XDGUDQW
9$KLQ4XDGUDQW

N9$KU4

:DWW'HPDQG5ROOLQJ

:DWW5ROOLQJ'HPDQG
'HOLYHUHG

N:+'HO

:DWW'HPDQG

:DWW%ORFN'HPDQG
'HOLYHUHG

N:K'HO

Test Mode Details


7KH5HVHW%XWWRQ 5 LVQH[WWRWKH7HVW%XWWRQ 7 ,QLWLDWHD7HVW0RGH5HVHWE\
SUHVVLQJDQGUHOHDVLQJWKH5HVHW%XWWRQZKLOHLQ7HVW0RGH$7HVW0RGH5HVHWFDXVHV
DOOWHVWTXDQWLWLHVWREHUHVHWWR]HURDQGDQHZEORFNLQWHUYDOWREHVWDUWHG7KHLWHP
GLVSOD\HGZKHQWKHUHVHWRFFXUUHGUHPDLQVLQWKHGLVSOD\EXWWKHYDOXHLVLQLWLDOL]HG
:KLOHLQ7HVW0RGHWKH7HVW3XOVH/('SXOVHVDWWKHUDWHSURJUDPPHGIRUWKHPHWHU
7KHYDOXHRIWKHSXOVHLVVHWLQWKHPHWHUV'HYLFH3URILOH VHH6HFWLRQ 7KH
PHWHUTXDQWLW\DVVLJQHGWRWKH7HVW3XOVH/('FKDQJHVDVWKHXVHUPRYHVIURPRQH
WHVWVFUHHQWRDQRWKHU7KHDVVLJQHGYDOXHVDUHGHILQHGLQWKH3XOVH6RXUFHFROXPQRI
WKHWDEOHDERYH
,QGLYLGXDOTXDGUDQWWHVWVIRU9$5KRXUVFDQEHFRPSOHWHGE\SURSHUWHVWGHVLJQ7R
WHVWVWULFWO\9$5KRXUVOLPLWWKHWHVWSDUDPHWHUVWRRQHTXDGUDQWGXULQJWHVWLQJ

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



3HUIRUPLQJ0HWHU7HVWLQJ

,QWKHHYHQWRIDSRZHURXWDJHGDWDIRU7HVW0RGH(QHUJ\'HPDQGDQG3RZHU)DFWRU
LVQRWVDYHG8SRQSRZHUXSWKHPHWHUUHWXUQVWR1RUPDO0RGH7KHWHVWGDWDLVORVW
DQGDOOUHJLVWHUVDUHUHVWRUHGWRWKHLUSUHWHVWYDOXHV
:KLOHLQ7HVW0RGHWKH,53RUWDQG&RPPXQLFDWLRQV3RUWDUHDYDLODEOHIRU
FRPPXQLFDWLRQZLWKWKHPHWHU
,Q7HVW0RGH\RXFDQSUHVHWWKHYDOXHVRIWKHHQHUJ\UHDGLQJVWKDWZLOOEHUHVWRUHGWR
WKHPHWHUZKHQ7HVW0RGHLVH[LWHGXVLQJ&RPPXQLFDWRU(;7 VHHIROORZLQJVHFWLRQ
 

4.2.3: Test Mode Preset Accumulators


7KHUHDUHWZRUHDVRQVWRXVHWKH3UHVHW$FFXPXODWRUVVFUHHQV
$PRQLWRULQ7HVW0RGHLVRXWRIVHUYLFHDQGLVWKHUHIRUHQRWPRQLWRULQJDFFXPXOD
WLRQV7KH1HZ9DOXHILHOGFDQEHXVHGWRDGMXVWIRUWKHYDOXHVQRWPRQLWRUHGZKLOH
LQ7HVW0RGH
:KHQUHSODFLQJDQROGPHWHUWKDWKDVDFFXPXODWLRQVZLWKDQHZPHWHUWKDWKDVQR
DFFXPXODWLRQVWKH1HZ9DOXHILHOGFDQEHVHWWRWKHYDOXHRIWKHH[LVWLQJDFFXPX
ODWLRQV

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



3HUIRUPLQJ0HWHU7HVWLQJ

Setting Test Mode Preset Accumulators


)URP&RPPXQLFDWRU(;7V0DLQVFUHHQVHOHFWTools>Test Mode>Preset
Accumulators<RXZLOOVHHWKHVFUHHQVKRZQEHORZ

&OLFN7DEVDWWKHWRSRIWKHVFUHHQVWRDFFHVVWKHLQGLYLGXDOVFUHHQV
(DFKVFUHHQKDVD&XUUHQW9DOXH1HZ9DOXHDQG3UHVHW%R[IRUHDFKDFFXPXOD
WRU
$QHZPHWHUKDV]HURVIRU&XUUHQW9DOXHV
6HWWLQJVFDQEHSUHVHWIRUWKHIROORZLQJVHWVRIYDOXHV
3ULPDU\(QHUJ\
6HFRQGDU\(QHUJ\
3ULPDU\(QHUJ\ 4XDGUDQWV
6HFRQGDU\(QHUJ\ 4XDGUDQWV
,QWHUQDO,QSXW$FFXPXODWRUV
.<=2XWSXW$FFXPXODWRUV

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



3HUIRUPLQJ0HWHU7HVWLQJ

4+RXUV
, 96TXDUHG7$FFXPXODWRUV
&XPXODWLYH'HPDQG 6HFRQGDU\ 
8QFRPSHQVDWHG(QHUJ\
([DPSOHVRIVRPHRIWKHVFUHHQVDUHVKRZQEHORZ
&OLFNWKH3UHVHW%R[HVIRUWKHYDOXHV\RXZDQWWRVHW
&OLFNSetWRVDYH\RXUHQWULHVRUCancel WRH[LWWKHVFUHHQZLWKRXWVDYLQJDQ\
FKDQJHV

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



3HUIRUPLQJ0HWHU7HVWLQJ

4.2.4: Exiting Test Mode


([LW7HVW0RGHLQRQHRIWKHIROORZLQJWKUHHZD\V
3UHVVDQGKROGWKH7HVW%XWWRQIRUPRUHWKDQVHFRQGV
8VHWKH7HVW0RGH7LPHRXW7LPHULIQRORDGLVSUHVHQW
8VHWKH([WHQGHG7HVW0RGH7LPHRXW7LPHULIORDGLVSUHVHQW
7KHVHRSWLRQVDUHH[SODLQHGIXUWKHULQWKHIROORZLQJVHFWLRQV
Exiting Test Mode Details:
7HVW0RGH%XWWRQ
3UHVVLQJWKH7HVW0RGH%XWWRQIRUPRUHWKDQWKUHHVHFRQGVHQGV7HVW0RGHDQG
UHWXUQVWKHPHWHUWR1RUPDO0RGH
7HVW0RGH7LPHRXW7LPHU
7KH7HVW0RGH7LPHRXW7LPHUKDVWZRPRGHVRIRSHUDWLRQGHSHQGLQJRQZKHWKHU
WKHPHWHUVHHVPHDVXUDEOHORDG
,IWKHPHWHUGRHVQRWUHFRJQL]HPHDVXUDEOHORDG
7KHPHWHUZDWFKHVIRUXVHULQWHUDFWLRQE\PRQLWRULQJDFWLYLW\RQWKH7HVW%XWWRQDQG
WKH5HVHW%XWWRQ,IQHLWKHUEXWWRQLVSXVKHGZLWKLQWKHSURJUDPPHG([LW'HOD\WLPH
WKHPHWHUH[LWV7HVW0RGHDQGUHWXUQVWR1RUPDO0RGH(DFKWLPHWKH7HVWRU5HVHW
%XWWRQLVSUHVVHGWKHPHWHUVWDUWVWKH([LW'HOD\7LPHUDJDLQ7KH([LW'HOD\WLPHLV
SURJUDPPHGLQWKHPHWHUV'HYLFH3URILOHLQWKH'HYLFH'LVSOD\3URJUDPPDEOH6HW
WLQJVVFUHHQ0LVFHOODQHRXVWDE VHH6HFWLRQ 
,IWKH0HWHUUHFRJQL]HVPHDVXUDEOHORDG
7KHPHWHUZDWFKHVWKH7HVWDQG5HVHW%XWWRQVIRUDFWLYLW\XVLQJDQH[WHQGHGWLPH
OLPLWFRQVLVWLQJRIWKH([LW'HOD\WLPHSOXVWKHSURJUDPPHG%ORFN,QWHUYDO7LPH7KLV
LQVXUHVWKDWWKHPHWHUFRPSOHWHVDIXOOEORFN'HPDQGWHVWZLWKRXWLQWHUUXSWLRQ
$IWHUH[LWLQJ7HVW0RGH
$OO7HVW0RGHGDWDLVORVWZKHQ\RXH[LW7HVW0RGH8SRQH[LWLQJ7HVW0RGHDQHZ
SRVVLEO\SDUWLDO 'HPDQGLQWHUYDODQGVXELQWHUYDOEHJLQ7KHSDVWVXELQWHUYDODVZHOO

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



3HUIRUPLQJ0HWHU7HVWLQJ

DVWKHFXUUHQWVXELQWHUYDODUH]HURHG8SRQUHWXUQLQJWR1RUPDORSHUDWLQJPRGHD
728PHWHURU'HPDQGPHWHUZLWKORDGSURILOLQJFRPSOHWHVWKHWLPHUHPDLQLQJLQWKH
FXUUHQWSDUWLDOVXELQWHUYDOVRWKDWVXEVHTXHQWVXELQWHUYDOVDUHV\QFKURQL]HGZLWKWKH
KRXUO\ERXQGDU\
0D[LPXP'HPDQGYDOXHVIRUHDFK'HPDQGLQWHJUDWLRQW\SHDUHQRWPRGLILHGZKLOHLQ
7HVW0RGH7KHSUHYLRXVO\UHFRUGHGPD[LPXPVDUHUHVWRUHGZKHQ\RXH[LW7HVW0RGH
,I\RXFKRRVHWRUHVHW'HPDQGGDWDGXULQJWHVWLQJRSHUDWLRQV\RXFDQFRPSOHWHWKLV
DFWLRQZKHQ\RXH[LW7HVW0RGHE\SUHVVLQJWKH5HVHW%XWWRQDIWHUWKHPHWHUUHWXUQV
WR1RUPDO0RGH
NOTE:1RUPDOELOOLQJDQGKLVWRULFDOORJGDWDDFFXPXODWLRQLVVXVSHQGHGGXULQJ7HVW
0RGHRSHUDWLRQ8SRQH[LWLQJ7HVW0RGHDFFXPXODWLRQRIELOOLQJDQGKLVWRULFDOORJ
TXDQWLWLHVGRHVHLWKHURIWKHIROORZLQJ
5HVXPHVIURPWKHYDOXHVLQSODFHZKHQ7HVW0RGHZDVHQWHUHG
&RQWLQXHVIURPWKH7HVW0RGH3UHVHWYDOXHV VHH6HFWLRQ

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



3HUIRUPLQJ0HWHU7HVWLQJ

7KLVSDJHLQWHQWLRQDOO\OHIWEODQN

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

5: Serial Communication Wiring


5.1: Communication Overview
7KHILJXUHEHORZVKRZVVHULDOFRPPXQLFDWLRQRSWLRQV
Optical Port to RS232
Communication Interface
(e.g., A7Z)

-ETER
Optical Port

RS232
50 Feet

-ETER
RS485

RS232

4000 Feet

50 Feet
RS485/232
Converter
(Unicom 2500)

-ETER
RS485

RS232

4000 Feet

50 Feet

4ELEPHONE,INE
&IBER/PTIC,INKOR
2ADIO,INK

RS485/232
Converter
(Modem Manager)

)LJXUH6HULDO&RPPXQLFDWLRQ

56FRPPXQLFDWLRQLVXVHGWRFRQQHFWDVLQJOH1H[XVPHWHUZLWK
DQRWKHUGHYLFHVXFKDVDFRPSXWHU578RU3/&7KHOLQNLVYLDEOHIRUXSWRIHHW
P DQGLVDYDLODEOHRQO\WKURXJKWKHPHWHUV2SWLFDOSRUWZLWKDFRPPXQLFDWLRQ
LQWHUIDFH 2SWLFDOSRUWWR56FRQYHUWHU VHHILJXUHVDQG
56FRPPXQLFDWLRQDOORZVPXOWLSOHPHWHUVWRFRPPXQLFDWHZLWKDQRWKHUGHYLFHDW
DORFDORUUHPRWHVLWH7KH,2PRGXOHVDQGH[WHUQDOGLVSOD\VXVH56WRFRPPXQL
FDWHZLWKWKHPHWHU$OO56OLQNVDUHYLDEOHIRUXSWRIHHW P 7KH
1H[XV6RFNHWPHWHUV3RUWVDQGDUHWZRZLUH56FRQQHFWLRQV XSWR
EDXG 2SWLRQDO&RPPXQLFDWLRQ&RQQHFWLRQVIRU,13 ,QWHUQDO0RGHPZLWK'LDO,Q
'LDO2XW ,13 %DVH7FRQQHFWLRQ RU,13 &RPELQDWLRQ0RGHPDQG
(WKHUQHW DUHFDEOHVZLWKDSSURSULDWHFRQQHFWRUV VHH&KDSWHUDQG)LJXUH 

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

Optical
Port

)LJXUH2SWLFDO3RUW/RFDWLRQ

5.2: Communicating to the Meter through the ANSI Type II Optical


Port
7KH2SWLFDOSRUWDOORZVWKH1H[XVPHWHUWRFRPPXQLFDWHZLWKRQHRWKHU
GHYLFHHJD3&/RFDWHGRQWKHOHIWVLGHRIWKHPHWHU
VIDFHLWSURYLGHVFRPPXQLFD
WLRQZLWKWKHPHWHUWKURXJKDQ$16,&7\SH,,0DJQHWLF2SWLFDO&RPPXQL
FDWLRQV&RXSOHUVXFKDVHLWKHU
$Q$=&RPPXQLFDWLRQ,QWHUIDFHFRQQHFWHGWRWKH56SRUWRIWKH3&
$Q$8&RPPXQLFDWLRQ,QWHUIDFHFRQQHFWHGWRWKH86%SRUWRIWKH3&
<RXFDQRUGHUWKH$=RU$8IURP(,*VZHEVWRUHZZZHOHFWURLQGFRPVWRUH6HOHFW
WKH&RPPXQLFDWLRQV3URGXFWVFDWHJRU\IURPWKHOHIWVLGHRIWKHZHESDJH
6HH)LJXUH

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

)LJXUH$= 7RS DQG$8 %RWWRP &RPPXQLFDWLRQ,QWHUIDFHV

A7Z Instructions:
2QHHQGRIWKHPDJQHWLFLQWHUIDFHVLPSO\VQDSVRQWRWKHRSWLFDOSRUWWKHPDJQHW
NHHSVLWLQSODFH7KHRWKHUHQGLVDQ56FRQQHFWLRQ,QVHUWWKDWHQGLQWRDSLQ
VHULDOSRUWRQDFRPSXWHURURWKHUGHYLFH7KH$=UHTXLUHVQRSRZHUVXSSO\$OO
SRZHULVUHFHLYHGIURPWKHKRVWFRPSXWHUVHULDOSRUWXVLQJWUDQVPLWWHUDQGUHFHLYHU

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

FLUFXLWVZLWKLQWKHSUREH7KH56VWDQGDUGOLPLWVWKHFDEOHOHQJWKWRIHHW
P 
A9U Instructions:
<RXQHHGWRGRZQORDGDQGLQVWDOOWKHGULYHUIRUWKH$8IURP(,*VZHEVLWH
ZZZHOHFWURLQGFRP$=B$8KWPO2QFHWKHGULYHULVLQVWDOOHGDWWDFKWKH$8V
PDJQHWLFLQWHUIDFHRQWRWKHPHWHUV2SWLFDOSRUWDQGDWWDFKWKH$8V86%FRQQHFWLRQ
LQWR\RXU3&

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

5.3: RS485 Serial Communication


56FRPPXQLFDWLRQDOORZVPXOWLSOHGHYLFHVWRFRPPXQLFDWHRQDEXV7KHPHWHUV
3RUWDQG3RUWDUH56WHUPLQDOVYLDEOHIRUDGLVWDQFHRIXSWRIHHW 
PHWHUV 

5.3.1: RS485 Wiring Fundamentals - (Port 1 and Port 4)


%HORZLVDGHWDLOHGYLHZRIDZLUH56FRQQHFWLRQ
From other RS485 device
Connect :

() to ()

(+) to (+)

Shield(SH) to Shield(SH)

+
SH

+
SH

Nexus
1262/1272
RS485 Port

)LJXUH56&RQQHFWLRQ'HWDLO

S 6KLHOG 7KLVLVQRWDQHDUWKJURXQGFRQQHFWLRQ<RXPXVWDOVRFRQQHFWWKH
VKLHOGWRHDUWKJURXQGDWRQHSRLQW'RQRWFRQQHFWWKHVKLHOGWRJURXQGDWPXOWLSOH
SRLQWVLWZLOOLQWHUIHUHZLWKFRPPXQLFDWLRQ
+/- 7ZRZLUH56FRPPXQLFDWLRQWHUPLQDOV &RQQHFWWKHWHUPLQDORIWKH
PHWHUSRUWWRWKHWHUPLQDORIWKHGHYLFH&RQQHFWWKHWHUPLQDORIWKHPHWHUSRUW
WRWKHWHUPLQDORIWKHGHYLFH
NOTES on RS485 Connections:
8VHDVKLHOGHGWZLVWHGSDLUFDEOH$:* PP RUODUJHUJURXQGLQJWKH
VKLHOGDWRQHHQGRQO\
(VWDEOLVKSRLQWWRSRLQWFRQILJXUDWLRQVIRUHDFKGHYLFHRQD56EXV&RQQHFW
 WHUPLQDOVWR  WHUPLQDOVFRQQHFW  WHUPLQDOVWR  WHUPLQDOV
3URWHFWFDEOHVIURPVRXUFHVRIHOHFWULFDOQRLVH
$YRLGERWKVWDUDQGWHHFRQQHFWLRQV VHH)LJXUH 
1RPRUHWKDQWZRFDEOHVVKRXOGEHFRQQHFWHGDWDQ\RQHSRLQWRQDQ56
QHWZRUNZKHWKHUWKHFRQQHFWLRQVDUHIRUGHYLFHVFRQYHUWHUVRUWHUPLQDOVWULSV

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

,QFOXGHDOOVHJPHQWVZKHQFDOFXODWLQJWKHWRWDOFDEOHOHQJWKRIDQHWZRUN,I\RXDUH
QRWXVLQJDQ56UHSHDWHUWKHPD[LPXPOHQJWKIRUFDEOHFRQQHFWLQJDOOGHYLFHV
LVIHHW PHWHUV 
)RUDQ56'DLV\&KDLQFRQQHFWLRQLQZKLFK\RXOLQNPXOWLSOHGHYLFHVLQDVHULHV
FRQQHFWVKLHOGWR560DVWHUDQGLQGLYLGXDOGHYLFHVDVVKRZQLQ)LJXUH<RX
PD\DOVRFRQQHFWWKHVKLHOGWRHDUWKJURXQGDWRQHSRLQW
7KH1H[XVPHWHUPD\EHVKLSSHGZLWKFRQQHFWRUVRQWKHHQGVRI
FDEOHVRUWKH\PD\EHVKLSSHGDVSLJWDLOV QRFRQQHFWRUV ,QWKLVFDVHDJHQHULF
WHUPLQDOEORFNLVVKLSSHGZLWKWKHPHWHU7KHWHUPLQDOEORFNKDVXSWRFRQQHF
WRUVDQGFDQEHFXWLQWRVPDOOHUVHFWLRQVZLWKDXWLOLW\NQLIH3OHDVHUHIHUWRWKH
&DEOH&RORU.H\RQSDJHVWRLI\RXDUHXVLQJSLJWDLOVRULI\RXKDYHDQ\
TXHVWLRQDERXWZKLFKFRQQHFWRULVZKLFK
7HUPLQDWLRQ5HVLVWRUV 57 DUHJHQHUDOO\XVHGRQERWKHQGVRIORQJHUOHQJWKWUDQV
PLVVLRQOLQHV7KHYDOXHRIWKH7HUPLQDWLRQ5HVLVWRUVLVGHWHUPLQHGE\WKHHOHFWULFDO
SDUDPHWHUVRIWKHFDEOH7HUPLQDWLRQ5HVLVWRUVDUHRQO\QHHGHGZLWKUXQVW\SLFDOO\
PRUHWKDQIHHWDVWKHPHWHUKDVVRPHOHYHORIWHUPLQDWLRQLQWHUQDOO\DQGXVX
DOO\UHVLVWRUVDUHQRWQHHGHG
)RULQIRUPDWLRQRQFRQQHFWLQJWKHPHWHUWRDPRGHPVHH6HFWLRQ
)LJXUHVKRZVDUHSUHVHQWDWLRQRIDQ56'DLV\&KDLQFRQQHFWLRQ<RXFDQ
FRQQHFWXSWRVODYHVLQD'DLV\&KDLQ
Master device

Last Slave device N

RT

SH

RT

Slave device 1

Slave device 2

SH

SH

Twisted pair, shielded (SH) cable

Twisted pair, shielded (SH) cable

SH

Twisted pair, shielded (SH) cable

Earth Connection, preferably at


single location

)LJXUH56'DLV\&KDLQ&RQQHFWLRQ

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

Slave device 1
SH

Long stub results T connection that can cause


interference problem!

Master device

Last Slave device N

RT

RT
Slave device 2

SH +

SH

Twisted pair, shielded (SH) cable

SH

Twisted pair, shielded (SH) cable

Twisted pair, shielded (SH) cable

Earth Connection, preferably at


single location

Twisted pair, shielded (SH) cable

Twisted pair, shielded (SH) cable

Slave device 1

Slave device 2
SH +

Master device

SH

SH

+ SH

STAR connection can cause interference


problem!

SH

Slave device 3

Slave device 4

Twisted pair, shielded (SH) cable

Twisted pair, shielded (SH) cable

)LJXUH,QFRUUHFW7DQG6WDU7RSRORJLHV

5.3.2: Using the Unicom 2500


7KH8QLFRPSURYLGHV5656FRQYHUVLRQ,QGRLQJVRLWDOORZVWKH
1H[XVPHWHUWRFRPPXQLFDWHZLWKD3&RURWKHUGHYLFH6HHWKHUnicom 2500
Installation and Operation ManualIRUDGGLWLRQDOLQIRUPDWLRQ<RXFDQRUGHUWKH
8QLFRPIURP(,*VZHEVWRUHZZZHOHFWURLQGFRPVWRUH6HOHFWWKH&RPPXQL
FDWLRQV3URGXFWVFDWHJRU\IURPWKHOHIWVLGHRIWKHZHESDJH
)LJXUHLOOXVWUDWHVWKH8QLFRPFRQQHFWLRQVIRU56

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

RS232 Port

PC

UNICOM 2500

TX(-) RX(-) TX(+) RX(+) SH

Jumpers:
Short TX(-) to RX(-) becomes (-) signal
Short TX(+) to RX(+) becomes (+) signal
SH

SH

(+)

(+)

Meters RS485 Port

(-)

(-)

)LJXUH0HWHU&RQQHFWHGWRD3&8VLQJ8QLFRP

7KH8QLFRPFDQEHFRQILJXUHGIRUHLWKHU
ZLUHRUZLUH56FRQQHFWLRQV6LQFHWKH
1H[XVPHWHUXVHVDZLUHFRQQHFWLRQ\RX

6HWVZLWFK
6HWWKH
WR'&(
%DXGUDWH

QHHGWRDGGMXPSHUZLUHVWRFRQYHUWWKH8QLFRP
%

$#

WRWKHZLUHFRQILJXUDWLRQ


$4











5$
"!





$VVKRZQLQ)LJXUH\RXFRQQHFWWKH5;



K





($

K



&$

K



DQG7;WHUPLQDOVZLWKDMXPSHUZLUHWRPDNH
WKHWHUPLQDODQGFRQQHFWWKH5;DQG
7;WHUPLQDOVZLWKDMXPSHUZLUHWRPDNHWKH
WHUPLQDO6HHWKHILJXUHRQWKHULJKWIRUWKH

6HWVZLWFK
WR)'

8QLFRPVVHWWLQJV7KH8QLFRPV%DXGUDWH

PXVWPDWFKWKH%DXGUDWHRIWKHPHWHUV56SRUW\RXVHWWKH%DXGUDWHE\WXUQ
LQJWKHVFUHZWRSRLQWDWWKHUDWH\RXZDQW

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

5.3.3: RJ11 (Telephone Line) ConnectionMeter with INP2 (Internal


Modem with Dial In/Dial Out) Option
8VH5-6WDQGDUG7HOHSKRQH/LQHWRFRQQHFWZLWKWKHPHWHU7KH5-OLQHLV
FRQQHFWHGWR&DEOHIURPWKHEDFNRIDPHWHUZLWKWKH,QWHUQDO0RGHP2SWLRQ7KH
5-FRQQHFWRULVVXSSOLHGZLWKWKHPHWHU
7KHOHQJWKRIWKHFRQQHFWLRQXVLQJ5-LQWRWKHPHWHULVYLUWXDOO\XQOLPLWHG7R
FRQQHFWZLWKRWKHUPHWHUVLQHLWKHUORFDORUUHPRWHORFDWLRQV\RX0867XVH&DEOH
)RUPRUHLQIRUPDWLRQRQWKHPHWHUZLWKWKH,132SWLRQVHH6HFWLRQ

5.3.4: RJ45 ConnectionMeter with INP200 (10/100BaseT) Option


7KH,132SWLRQFRQIRUPVWRWKH,(((%DVH7VSHFLILFDWLRQXVLQJ
XQVKLHOGHGWZLVWHGSDLU 873 ZLULQJ7KLVDOORZV\RXWRXVHLQH[SHQVLYH5-
FRQQHFWRUVDQG&$7RUEHWWHUFDEOLQJ7KH5-FRQQHFWRULVVXSSOLHGZLWKWKHPHWHU
&DEOH 
8VLQJWKLV/$1FRQQHFWLRQDOORZVPXOWLSOH3&VWRDFFHVVWKHPHWHUFRQFXUUHQWO\7KH
5-OLQHLVLQVHUWHGLQWRWKH5-FRQQHFWRURQ&DEOHFRPLQJIURPWKHERWWRPRID
PHWHUZLWKWKH(WKHUQHW2SWLRQ7KHFRQQHFWLRQXVLQJ5-LQWRWKHPHWHUFRQQHFWV
WKHPHWHUWRDQHWZRUNXVLQJ0RGEXV7&3SURWRFRORYHU(WKHUQHW
)RUPRUHLQIRUPDWLRQRQDPHWHUZLWKWKH,132QERDUG(WKHUQHW %DVH7 
VHH6HFWLRQ

5.3.5: Modem/Ethernet ConnectionMeter with INP202 (Combo


Card) Option
7KH,13LVDQH[WHQVLRQRI,13,WKDVDOOWKHIHDWXUHVRI,13SOXVDEXLOWLQ
0RGHP0RGHPDQG(WKHUQHWFDSDELOLWLHVFDQEHXVHGVLPXOWDQHRXVO\
7KHFRPPXQLFDWLRQSURWRFROVXSSRUWHGE\WKHPRGHPLV0RGEXV$6&,,7KH
&RPPXQLFDWLRQSURWRFROVXSSRUWHGE\WKH56(WKHUQHW0RGHP*DWHZD\LV0RGEXV
578,13FRQYHUWVDOOLQFRPLQJPRGHP0RGEXV$6&,,UHTXHVWVWR0RGEXV578IRU
LQWHUQDODQGJDWHZD\FRPPXQLFDWLRQ,WWKHQFRQYHUWVDOOUHVSRQVH0RGEXV578
PHVVDJHVLQWR0RGEXV$6&,,SURWRFROEHIRUHLWVHQGVWKHUHVSRQVHVWRWKHPRGHP
6RPHRIWKHIL[HGSDUDPHWHUVIRUWKH(WKHUQHW0RGHP*DWHZD\DUH'DWD%LWV(YHQ
3DULW\6WRS%LW7KH(WKHUQHW0RGHPV*DWHZD\V%DXG5DWHDQG'HOD\7LPHDUH
FRQILJXUDEOH

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

)RUPRUHLQIRUPDWLRQRQDPHWHUZLWKWKH,130RGHP(WKHUQHW&RPER&DUGVHH
6HFWLRQ

5.3.6: RS485 Connection - Meter to the P40N/P40N+/P41N+/P43N+


LED Display
&RQQHFWWKHFRPPXQLFDWLRQZLUHVRIWKHVXSSOLHG56FDEOHWRWKHPHWHUV3RUWRU
3RUW6HWWKHSRUWV%DXG5DWHWR$GGUHVVWR3URWRFROWR0RGEXV578DQG
0RGHWR6ODYHXVLQJWKHFRPPXQLFDWLRQVRIWZDUH,QVHUWWKHRWKHUHQGRIWKH
FRPPXQLFDWLRQZLUHVLQWRWKHEDFNRIWKHILUVW/(''LVSOD\
7KH1H[XVPHWHUVSRZHUVXSSO\GRHVQRWVXSSO\SRZHUWRH[WHUQDO
GLVSOD\V<RXPXVWXVHDSRZHUVRXUFHVXFKDVWKH(,*3% 9  6HH6HFWLRQ
IRU36,2GHWDLOV
56FRPPXQLFDWLRQLVYLDEOHIRUXSWRIHHW PHWHUV %HVXUHWRGRWKH
IROORZLQJ
&RQQHFWWKHVKLHOGWRWKHVKLHOG 6 WHUPLQDORQWKH'LVSOD\SRUW7KH 6 WHUPLQDO
RQWKHPHWHULVXVHGWRUHIHUHQFHWKHPHWHUVSRUWWRWKHVDPHSRWHQWLDODVWKH
VRXUFH,WLVQRWDQHDUWKJURXQGFRQQHFWLRQ<RXPD\DOVRFRQQHFWWKHVKLHOGWR
HDUWKJURXQGDWRQHSRLQW
3URYLGHWHUPLQDWLRQUHVLVWRUVDWHDFKHQGIRUORQJHUUXQV W\SLFDOO\RUPRUH 
FRQQHFWHGWRWKHDQGOLQHV57LVDSSUR[LPDWHO\2KPV

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

NOTE:7KH31DQGOHJDF\31FRQQHFWWKHVDPHZD\WKURXJKWKHSRUWRQWKH
EDFNRIWKHGLVSOD\7KHRQO\GLIIHUHQFHLVLQWKHSRUWODEHOLQJ
+

- V+

+
V
RS-485
- SH - +

RT *

+ External Power
Source
PB1 or other

P40N+ LED Display, Back View

V+
V S
B (-)
A (+)

RT *
* See RT Note on page 5-5.

**
P40N LED Display, Back View
S

**Please refer to Cable Color


Key, page 6-4,
and second bullet, page 5-5.

1262/1272 Port 4

)LJXUH31DQG/HJDF\31([WHUQDO'LVSOD\56&RQQHFWLRQ

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

5.3.7: Communication Ports on the I/O Modules

Female RS485
Side Port

I/O Port
(Size and Pin
Configuration Vary)

Male RS485
Side Port

)LJXUH,20RGXOH&RPPXQLFDWLRQ3RUWV

Female RS485 Side PortXVHWRFRQQHFWWRDQRWKHUPRGXOHVPDOH56VLGHSRUW


Male RS485 Side PortXVHWRFRQQHFWWRWKHPHWHUV3RUW VHHIROORZLQJVHFWLRQ 
RUWRFRQQHFWWRDQRWKHUPRGXOHVIHPDOH56VLGHSRUW VHH6HFWLRQ 
I/O PortXVHIRUIXQFWLRQVVSHFLILFWRWKHW\SHRIPRGXOHVL]HDQGSLQFRQILJXUDWLRQ
YDULHVGHSHQGLQJRQW\SHRIPRGXOH)RUPRUHGHWDLOUHIHUWR&KDSWHU

5.3.8: RS485 ConnectionMeter to I/O Modules


$Q56FDEOHKDUQHVVLVVXSSOLHGZLWKWKHSXUFKDVHRI0%,2 PRXQWLQJEUDFNHWV 
:LUHRQHHQGRIWKHFDEOHWRWKHPHWHUV3RUW
,QVHUWWKHRWKHUHQGRIWKHFDEOHLQWRWKHFRPPXQLFDWLRQSLQVRIWKH,2PRGXOHV
PDOH56VLGHSRUW VHH)LJXUH 6HH6HFWLRQIRUGHWDLOVRQXVLQJ
PXOWLSOH,2PRGXOHV
7KH1H[XVPHWHUVSRZHUVXSSO\GRHVQRWVXSSO\SRZHUWRWKH,2
PRGXOHV<RXPXVWXVHDSRZHUVRXUFHVXFKDVWKH(,*36,2RU3% 9 6HH
6HFWLRQIRU36,2GHWDLOV

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

56FRPPXQLFDWLRQLVYLDEOHIRUXSWRIHHW PHWHUV )ROORZWKHZLULQJ


VKRZQLQ)LJXUHDQGEHVXUHWR
&RQQHFWWKHDQGWHUPLQDOVRQWKHPHWHUWRWKHDQGWHUPLQDOVRIWKHIHPDOH
56SRUW&RQQHFWWKHVKLHOGWRWKHVKLHOG 6 WHUPLQDO7KH 6 WHUPLQDORQWKH
PHWHULVXVHGWRUHIHUHQFHWKHPHWHUVSRUWWRWKHVDPHSRWHQWLDODVWKHVRXUFH,W
LVQRWDQHDUWKJURXQGFRQQHFWLRQ<RXPD\DOVRFRQQHFWWKHVKLHOGWRHDUWKJURXQG
DWRQHSRLQW
3URYLGHWHUPLQDWLRQUHVLVWRUVDWHDFKHQGIRUORQJHUUXQV W\SLFDOO\PRUHWKDQ
 FRQQHFWHGWRWKHDQGOLQHV57LVDSSUR[LPDWHO\2KPV
NOTES:
7KHPHWHUKDVVRPHOHYHORIWHUPLQDWLRQLQWHUQDOO\DQGXVXDOO\UHVLVWRUVDUHQRW
QHHGHG
5HIHUWRWKH&DEOH&RORU.H\RQSDJHVWR

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ


Male Side Port
on I/O Module

+ + G

RT=
120 Ohms

RT=
120 Ohms

Meters Port 4

)LJXUH0HWHUDQG,20RGXOH&RQQHFWLRQV

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

5.3.9: Steps to Determine Power Needed


6LQFHWKH1H[XVPHWHUVSRZHUVXSSO\GRHVQRWVXSSO\SRZHUWRWKH,2
PRGXOHV\RXQHHGWRXVHDSRZHUVRXUFHVXFKDV(,*V36,2ZKLFKLVGHVLJQHGIRU
XVHZLWKWKH,2PRGXOHV)ROORZWKHVHVWHSVWRGHWHUPLQHKRZPDQ\36,2XQLWV\RX
QHHG
$OO,2PRGXOHVDUHVKLSSHGSUHSURJUDPPHGZLWKDEDXGUDWHRIDQG
LQGLYLGXDODGGUHVVHV5HIHUWRWKHIROORZLQJWDEOHWRGHWHUPLQHWKH9$5DWLQJVIRU
WKH,2PRGXOHV
I/O Module Factory Settings and VA Ratings
Model#

Module

Address

VA Rating

P$21

P$$QDORJ
2XWSXWV



9$

P$21

P$$QDORJ
2XWSXWV



9$

P$21

P$$QDORJ
2XWSXWV



9$

P$21

P$$QDORJ
2XWSXWV



9$

$,

P$$QDORJ
,QSXWV



9$

$,

P$$QDORJ
,QSXWV



9$

$,

9'&$QDORJ
,QSXWV



9$

$,

9'&$QDORJ
,QSXWV



9$

52

/DWFKLQJ5HOD\
2XWSXWV



9$

32

.<=3XOVH2XWSXWV



9$

',

6WDWXV,QSXWV
:HW'U\



9$

$GGWRJHWKHUWKH9$5DWLQJVIRUWKH,2PRGXOHVLQXVHWRGHWHUPLQHWRWDOSRZHU
QHHGHG
(DFK36,2VXSSOLHV9$#9'&)RUGHWDLOVRQWKH36,2VHHVHFWLRQV
DQG

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

NOTE:)RURU9'&DSSOLFDWLRQV(,*UHFRPPHQGVWKH3%SRZHUVXSSO\
Example order number3%'92 3% 
,I\RXDUHXVLQJD36,2 IRU9$&'&LQSXW RU3%\RXUPD[LPXP9$LV

5.3.10: Remote Communication Over Telephone Lines Using the


RS485 Port
8VHPRGHPV GHGLFDWHGRUGLDOXS ZKHQGHYLFHVDUHDWJUHDWGLVWDQFHV(,*
UHFRPPHQGVXVLQJ56ZLULQJZLWKD0RGHP0DQDJHU
PC at office

Originate Modem

Telephone Line

Remote Modem

Null Modem Adapter


(Not required if Modem Manager is used)

Nexus 1262/1272 Meter

RS232 to RS485
Converter
(Modem Manager
Recommended)

)LJXUH5HPRWH56&RQQHFWLRQV

8VH3RUWRU3RUWIRU56FRPPXQLFDWLRQ7KHOLQNXVLQJ56LVYLDEOHIRUXSWR
IHHW PHWHUV 
8VH&RPPXQLFDWRU(;7VRIWZDUHWRVHWWKHSRUWVEDXGUDWHWRWKHDSSURSULDWHVSHHG
IRU\RXUKDUGZDUHDQGRUQHWZRUNDQGHQDEOH0RGEXV$6&,,SURWRFRO6HHWKH
Communicator EXT User ManualIRULQVWUXFWLRQV5HPHPEHU0RGEXV578ZLOOQRW
IXQFWLRQSURSHUO\ZLWKPRGHPFRPPXQLFDWLRQ<RXmustFKDQJHWKHSURWRFROWR
0RGEXV$6&,,
<RXPXVWXVHDQ56WR56FRQYHUWHUDQGD1XOO0RGHP(,*UHFRPPHQGV
XVLQJLWV0RGHP0DQDJHU7KLVFRQYHUWHUKDVDEXLOWLQQXOOPRGHPDQGDOVRSURYLGHV
OLQHGDWDEXIIHULQJPDNLQJWKHWHOHSKRQHOLQHFRPPXQLFDWLRQUHOLDEOHPRVWFRPPHU

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

FLDOPRGHPVGRQRW)RUWKLVUHDVRQ(,*UHFRPPHQGVWKH0RGHP0DQDJHUWR
DOOHYLDWHDQ\FRPPXQLFDWLRQOLQHHUURUVWKDWPLJKWRFFXU8VLQJWKH0RGHP0DQDJHU
DOVRHOLPLQDWHVWKHQHHGWRSURJUDPGHIDXOWVHWWLQJVLQWRWKHPRGHPZKLFKPDNHV
LQVWDOODWLRQVLPSOHU

5.3.11: Programming Modems for Remote Communication


<RXPXVWSURJUDPDPRGHPEHIRUHLWFDQFRPPXQLFDWHSURSHUO\ZLWKPRVW56RU
56EDVHGGHYLFHV7KLVWDVNLVRIWHQTXLWHFRPSOLFDWHGEHFDXVHPRGHPVFDQEH
XQSUHGLFWDEOHZKHQFRPPXQLFDWLQJZLWKUHPRWHGHYLFHV
,I\RXDUHQRWXVLQJ(,*V0RGHP0DQDJHU\RXPXVWVHWWKHIROORZLQJVWULQJVWR
FRPPXQLFDWHZLWKWKHUHPRWH1H[XVPHWHU V &RQVXOW\RXUPRGHPVPDQXDOIRU
WKHSURSHUVWULQJVHWWLQJVRUVHH6HFWLRQIRUDOLVWRIVHOHFWHGPRGHPVWULQJV
NOTE: 8VHD0RGHP0DQDJHU7KHSURGXFWZDVGHVLJQHGWRPDNHWKLVWDVNSOXJDQG
SOD\:HKLJKO\UHFRPPHQGLWIRUDOOVHULDOPRGHPVROXWLRQV
Modem Connected to a Computer (the Originate Modem)
5HVWRUHPRGHPWRIDFWRU\VHWWLQJV7KLVHUDVHVDOOSUHYLRXVO\SURJUDPPHGVHWWLQJV
6HWPRGHPWRGLVSOD\5HVXOW&RGHV7KHFRPSXWHUZLOOXVHWKHUHVXOWFRGHV
6HWPRGHPWR9HUEDO5HVXOW&RGHV7KHFRPSXWHUZLOOXVHWKHYHUEDOUHVXOWFRGHV
6HWPRGHPWRXVH'756LJQDO7KLVLVQHFHVVDU\IRUWKHFRPSXWHUWRHQVXUH
FRQQHFWLRQZLWKWKHRULJLQDWHPRGHP
6HWPRGHPWRHQDEOH)ORZ&RQWURO7KLVLVQHFHVVDU\WRFRPPXQLFDWHZLWKWKH
UHPRWHPRGHPFRQQHFWHGWRWKH1H[XVPHWHU
,QVWUXFWPRGHPWRZULWHWKHQHZVHWWLQJVWRDFWLYDWHSURILOH7KLVSODFHVWKHVH
VHWWLQJVLQWRQRQYRODWLOHPHPRU\WKHVHWWLQJVZLOOWDNHHIIHFWDIWHUWKHPRGHP
SRZHUVXS
Modem Connected to the Nexus Meter (the Remote Modem)
5HVWRUHPRGHPWRIDFWRU\VHWWLQJV7KLVHUDVHVDOOSUHYLRXVO\SURJUDPPHGVHWWLQJV
6HWPRGHPWRDXWRDQVZHURQnULQJV7KLVVHWVWKHUHPRWHPRGHPWRDQVZHUWKH
FDOODIWHUnULQJV
Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

6HWPRGHPWRLJQRUH'756LJQDO7KLVLVQHFHVVDU\IRUWKH1H[XVPHWHUWRLQVXUH
FRQQHFWLRQZLWKWKHRULJLQDWHPRGHP
6HWPRGHPWRGLVDEOH)ORZ&RQWURO7KH1H[XVPHWHUV56FRPPXQLFDWLRQ
GRHVQRWVXSSRUWWKLVIHDWXUH
,QVWUXFWPRGHPWRZULWHWKHQHZVHWWLQJVWRDFWLYDWHSURILOH7KLVSODFHVWKHVH
VHWWLQJVLQWRQRQYRODWLOHPHPRU\WKHVHWWLQJZLOOWDNHHIIHFWDIWHUWKHPRGHP
SRZHUVXS
:KHQSURJUDPPLQJWKHUHPRWHPRGHPZLWKDWHUPLQDOSURJUDPPDNHVXUHWKH
EDXGUDWHRIWKHWHUPLQDOSURJUDPPDWFKHVWKH1H[XVPHWHUVEDXGUDWH

5.3.12: Selected Modem Strings


Table 1:
Modem

String/Setting

&DUGLQDOPRGHP

$7 )() .16 

=RRP)D[PRGHP9);
9%,6 .

$7 ) .6  : <

=RRP)D[PRGHP.[
'XDO0RGH

$7 ) . &6  :
<

865RERWLFV6SRUWVWHU
)D[PRGHP
',3VZLWFKVHWWLQJ

$7 ) 1 :< IRU
EDXG
8S8S'RZQ'RZQ8S8S
8S'RZQ

865RERWLFV6SRUWVWHU.
)D[PRGHP
',3VZLWFKVHWWLQJ

$7 ) :<
8S8S'RZQ'RZQ8S8S
8S'RZQ

5.3.13: High Speed Inputs Connection


7KH1H[XVPHWHUVEXLOWLQ+LJK6SHHG,QSXWVFDQEHXVHGLQWZRZD\V
$WWDFKLQJVWDWXVFRQWDFWVIURPUHOD\VEUHDNHUVRURWKHUGHYLFHVIRUVWDWXVRUZDYH
IRUPLQLWLDWLRQ
$WWDFKLQJWKH.<=SXOVHRXWSXWVIURPRWKHUPHWHUVIRUSXOVHFRXQWLQJDQGWRWDOL]LQJ
(YHQWKRXJKWKHVHLQSXWVDUHFDSDEOHRIEHLQJXVHGDVKLJKVSHHGGLJLWDOIDXOWUHFRUG
LQJLQSXWVWKH\VHUYHDGXDOSXUSRVHDV.<=FRXQWHUVDQGWRWDOL]HUV7KHIXQFWLRQLQ
Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

XVHLVSURJUDPPDEOHLQWKHPHWHUDQGLVFRQILJXUHGYLD&RPPXQLFDWRU(;75HIHUWR
WKHCommunicator EXT User ManualIRULQVWUXFWLRQVRQSURJUDPPLQJWKHVHIHDWXUHV
7KH+LJK6SHHG,QSXWVFDQEHXVHGWRVHQVHGU\FRQWDFWFORVXUHVRQO\7KHPHWHU
LQWHUQDOO\JHQHUDWHVWKHZHWWLQJ9ROWDJHIRUWKHFRQWDFWV7KHZHWWLQJ9ROWDJHLV9
'&

)LJXUH+LJK6SHHG,QSXWV&RQQHFWLRQ

5.3.14: IRIG-B Connections


,5,*%LVDVWDQGDUGWLPHFRGHIRUPDWWKDWV\QFKURQL]HVHYHQWWLPHVWDPSLQJWR
ZLWKLQPLOOLVHFRQG$Q,5,*%VLJQDOJHQHUDWLQJGHYLFHFRQQHFWHGWRWKH*36
VDWHOOLWHV\VWHPV\QFKURQL]HV1H[XVPHWHUVORFDWHGDWGLIIHUHQW
JHRJUDSKLFORFDWLRQV1H[XVPHWHUVXVHDQXQPRGXODWHGVLJQDOIURPDVDWHOOLWH
FRQWUROOHGFORFN VXFKDV$UELWHU% )RUGHWDLOVRQLQVWDOODWLRQUHIHUWRWKH8VHUV
0DQXDOIRUWKHVDWHOOLWHFRQWUROOHGFORFNLQXVH%HORZDUHLQVWDOODWLRQVWHSVDQGWLSV
WKDWZLOOKHOS\RX
Connection:
&RQQHFWWKH  WHUPLQDORIWKH1H[XVPHWHUWRWKH  WHUPLQDORIWKHVLJQDO
JHQHUDWLQJGHYLFHFRQQHFWWKH  WHUPLQDORIWKH1H[XVPHWHUWRWKH  WHUPLQDO
RIWKHVLJQDOJHQHUDWLQJGHYLFH

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

Installation
6HW7LPH6HWWLQJVIRUWKHPHWHUEHLQJLQVWDOOHG
)URPWKH&RPPXQLFDWRU(;7'HYLFH3URILOHPHQX
D&OLFNGeneral Settings>Time Settings>one of the Time Settings
linesWRRSHQWKH7LPH6HWWLQJVVFUHHQ
E6HWWKH7LPH=RQHDQG'D\OLJKW6DYLQJV 6HOHFWAutoDSTRUEnableDQG
VHWGDWHV 
F&OLFNUpdate Device ProfileWRVDYHWKHQHZVHWWLQJV 6HH&KDSWHURI
WKHCommunicator EXT Users Manual IRUGHWDLOV
%HIRUHFRQQHFWLRQFKHFNWKDWWKHGDWHRQWKHPHWHUFORFNLVFRUUHFW RU
ZLWKLQ0RQWKVRIWKHDFWXDOGDWH 7KLVSURYLGHVWKHULJKW\HDUIRUWKH
FORFN *36GRHVQRWVXSSO\WKH\HDU 
&RQQHFWWKH  WHUPLQDORIWKH1H[XVPHWHUWRWKH  WHUPLQDORIWKH
VLJQDOJHQHUDWLQJGHYLFHFRQQHFWWKH  WHUPLQDORIWKH1H[XVPHWHUWR
WKH  WHUPLQDORIWKHVLJQDOJHQHUDWLQJGHYLFH

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

Troubleshooting Tip
7KHPRVWFRPPRQVRXUFHRISUREOHPVLVDUHYHUVDORIWKHWZRZLUHV,I\RXKDYHD
SUREOHPWU\UHYHUVLQJWKHZLUHV

GP

Sa

tel

lite

Co

nn

ec

tio

IRIG-B Port

IRIG-B Time
Signal
Generating
Device

)LJXUH,5,*%&RPPXQLFDWLRQ

NOTE: 3OHDVHPDNHVXUHWKDWWKHVHOHFWHGFORFNFDQGULYHWKHDPRXQWRIZLUHGORDGV

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

5.3.15: Time Synchronization Alternatives


6HHWKHCommunicator EXT User ManualIRUGHWDLOV
IRIG-B
$OO1H[XVPHWHUVDUHHTXLSSHGWRXVH,5,*%IRUWLPHV\QFKURQL]D
WLRQ
,I,5,*%LVFRQQHFWHGWKLVIRUPRIWLPHV\QFKURQL]DWLRQWDNHVSUHFHGHQFHRYHUWKH
LQWHUQDOFORFN,IWKH*366LJQDOLVORVWWKHLQWHUQDOFORFNWDNHVRYHUWLPHNHHSLQJ
DWWKHSUHFLVHPRPHQWWKHVLJQDOLVORVW
Line Frequency Clock Synchronization
$OO1H[XVPHWHUVDUHHTXLSSHGZLWK/LQH)UHTXHQF\&ORFN6\QFKURQL]DWLRQZKLFK
PD\EHHQDEOHGRUGLVDEOHGIRUXVHLQVWHDGRI,5,*%,I/LQH)UHTXHQF\&ORFN
6\QFKURQL]DWLRQLVHQDEOHGDQGSRZHULVORVWWKHLQWHUQDOFORFNWDNHVRYHUDWWKH
SUHFLVHPRPHQWSRZHULVORVW
Internal Clock Crystal
$OO1H[XVPHWHUVDUHHTXLSSHGZLWKLQWHUQDOFORFNVFU\VWDOVZKLFKDUHDFFXUDWHWR
SSPDQGZKLFKFDQEHXVHGLI,5,*%LVQRWFRQQHFWHGDQGRU/LQH)UHTXHQF\
&ORFN6\QFKURQL]DWLRQLVQRWHQDEOHG
DNP Time Synchronization
8VLQJ&RPPXQLFDWRU(;7\RXFDQVHWWKHPHWHUWRUHTXHVWWLPHV\QFKURQL]DWLRQ
IURPWKH'130DVWHU5HTXHVWVFDQEHPDGHIURPRQFHSHUPLQXWHWRRQFHSHUGD\
6HHWKHNexus 1252/1262/1272/1500 DNP User Manual IRULQVWUXFWLRQV<RXFDQ
GRZQORDGWKHPDQXDOIURP(,*VZHEVLWH
ZZZHOHFWURLQGFRPSGI'13YB/HYHOSGI
Other Time Setting Tools
Tools>Set Device Time)RUPDQXDORU3&WLPHVHWWLQJ
Script & Scheduler7LPHVWDPSVUHWULHYHGORJVDQGGDWD

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

MV90&DQV\QFKURQL]HWLPHRQUHWULHYDOVLQWKHIRUPRIDWLPHVWDPS5HIHUWRWKH
Communicator EXT User Manual ++)&RQYHUWHULQVWUXFWLRQV IRUPRUH09
GHWDLOV

5.4: INP2 Internal Modem with Dial-In/Dial-Out Option


7KH,13,QWHUQDO0RGHPRSWLRQJLYHVWKH1H[XVPHWHU5-FRQQHFWLRQ
DVZHOODV'LDO,Q'LDO2XWUHPRWHFRPPXQLFDWLRQ

5.4.1: Hardware Overview


7KH,132SWLRQIRUWKH1H[XVPHWHUSURYLGHVDGLUHFWFRQQHFWLRQWRD
VWDQGDUGWHOHSKRQHOLQH1RDGGLWLRQDOKDUGZDUHLVUHTXLUHGWRHVWDEOLVKDFRPPXQLFD
WLRQFRQQHFWLRQEHWZHHQWKHPHWHUDQGDUHPRWHFRPSXWHU
7KHPRGHPRSHUDWHVDWXSWRNEDXG7KHLQWHUQDOFRQQHFWLRQEHWZHHQWKHPRGHP
DQGWKHPHWHULQFOXGHVDPHPRU\EXIIHU7KLVHQDEOHVWKHPRGHPWRFRQQHFWWRWKH
SKRQHOLQHDWDQ\VSHHGDQGWRFKDQJHVSHHGGXULQJWKHFRPPXQLFDWLRQFRQQHFWLRQWR
WKHUHPRWH3&7KHEXIIHUEHWZHHQWKHPHWHUDQGWKHPRGHPDOORZVWKHPHWHUWR
FRPPXQLFDWHLQWRWKHPRGHPDWDFRQVWDQWVSHHGZKLOHWKHPRGHPWHOHSKRQHOLQH
VSHHGFDQYDU\7KLVHOLPLQDWHVWKHV\QFKURQL]LQJSUREOHPVWKDWDUHFRPPRQZLWK
RWKHUGHYLFHV,WDOVRLQFUHDVHVWKHHIIHFWLYHWKURXJKSXWRIWKHFRPPXQLFDWLRQ
FKDQQHO7KLVLQWXUQGHFUHDVHVFRQQHFWLRQWLPHDQGFRQQHFWLRQFRVWV
7KHPRGHPVXSSRUWVERWKLQFRPLQJFDOOV IURPDUHPRWHFRPSXWHU DQGDXWRPDWLF
GLDORXWFDOOVZKHQDGHILQHGHYHQWPXVWEHDXWRPDWLFDOO\UHSRUWHG

5.4.2: Hardware Connection


:KHQWKH,132SWLRQLVRUGHUHGWKHUHDUHWZR5-MDFNVWKDWSLJWDLOIURPWKHEDFN
RIWKHPHWHU /LQHFRQQHFWLRQIRUWKHRXWVLGHOLQH3KRQHFRQQHFWLRQIRU\RXU
SKRQH $VWDQGDUGWHOHSKRQH5-SOXJFRQQHFWVWKHPHWHUWRDVWDQGDUG3671
3XEOLF6ZLWFKHG7HOHSKRQH1HWZRUN 7KHSKRQHMDFNLVWKHRYHUULGHRIWKHPRGHP
IXQFWLRQZKHQWKHSKRQHLVLQXVH
:LWKWKHGHYLFHFRQILJXUHGZLWKWKH,132SWLRQWKHPHWHUKDVGLDOLQFDSDELOLW\DQG
SURYLGHVUHPRWHDFFHVVWRRWKHU0RGEXVEDVHGVHULDOGHYLFHVYLDWKHPHWHUV56
*DWHZD\RYHU\RXUSKRQHOLQH7KHPHWHUZLOOUHFRJQL]HDQGUHVSRQGWRD0RGEXV
$GGUHVVRI:LWKDQ\RWKHUDGGUHVVWKHFRPPDQGSDVVHVWKURXJKWKHJDWHZD\DQG

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

EHFRPHVDYLUWXDOFRQQHFWLRQEHWZHHQWKH5HPRWH0RGEXV0DVWHUDQGDQ\0RGEXV
6ODYHFRQQHFWHGWRWKH56*DWHZD\

5.4.3: Dial-In Function


7KHPRGHPFRQWLQXRXVO\PRQLWRUVWKHWHOHSKRQHOLQHWRGHWHFWDQLQFRPLQJFDOO
:KHQDQLQFRPLQJFDOOLVGHWHFWHGWKHPRGHPZDLWVDXVHUVHWQXPEHURIULQJVDQG
WKHQDQVZHUVWKHFDOO
7KHPRGHPFDQEHSURJUDPPHGWRFKHFNIRUDSDVVZRUGRQDQLQFRPLQJFDOO,IWKH
FRUUHFWSDVVZRUGLVQRWSURYLGHGWKHPRGHPKDQJVXSRQWKHLQFRPLQJFDOO,IVHY
HUDOXQVXFFHVVIXOLQFRPLQJFDOODWWHPSWVDUHUHFHLYHGLQDVHWWLPHSHULRGWKHPRGHP
ORFNVRXWIXWXUHLQFRPLQJFDOOVIRUDXVHUVHWQXPEHURIKRXUV
:KHQDQLQFRPLQJFDOOLVVXFFHVVIXOO\FRQQHFWHGWKHFRQWURORIFRPPXQLFDWLRQVLV
SDVVHGWRWKHFDOOLQJVRIWZDUHSURJUDP7KHPRGHPUHVSRQGVWRFRPSXWHUFRPPDQGV
WRGRZQORDGGDWDRURWKHUDFWLRQVDXWKRUL]HGE\WKHPHWHUSDVVZRUGV
5HIHUWRWKHCommunicator EXT User ManualIRULQVWUXFWLRQVRQSURJUDPPLQJWKH
PRGHP

5.4.4: Dial-Out Function


7KH'LDO2XW)XQFWLRQ ,13 LVLQWHQGHGWRDOORZWKHPHWHUWRDXWRPDWLFDOO\UHSRUW
FHUWDLQFRQGLWLRQVZLWKRXWXVHULQWHUYHQWLRQ7KHPRGHPLVQRUPDOO\SROOLQJWKHPHWHU
WRGHWHUPLQHLIDQ\DEQRUPDORUUHSRUWDEOHFRQGLWLRQVH[LVW7KHPRGHPFKHFNVWKH
IROORZLQJPHWHUFRQGLWLRQVDQGSURJUDPPHGHYHQWV VHWLQ&RPPXQLFDWRU(;7 WR
GHWHUPLQHLIDFDOOVKRXOGEHSODFHG
$UHDQ\PHWHUVHWSRLQWOLPLWVH[FHHGHG"
+DVWKHVWDWXVRIKLJKVSHHGLQSXWVFKDQJHG"
+DVDZDYHIRUPEHHQUHFRUGHG"
+DVDSRZHUTXDOLW\HYHQWEHHQUHFRUGHG"
+DVDFRQWURORXWSXWFKDQJHG"
+DVWKHPHWHUH[SHULHQFHGDORVVRIFRQWUROSRZHU"

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

,VHLWKHUKLVWRU\ORJDSSURDFKLQJDIXOOFRQGLWLRQ"
,VWKHHYHQWORJDSSURDFKLQJDIXOOFRQGLWLRQ"
,VDQ\RWKHUORJDSSURDFKLQJDIXOOFRQGLWLRQ"
+DVWKHPRGHPSDVVZRUGIDLOHG"
+DVFRPPXQLFDWLRQZLWKWKHPHWHUIDLOHG"
,IDQ\RIWKHPRQLWRUHGHYHQWVH[LVWWKHPRGHPDXWRPDWLFDOO\LQLWLDWHVDFDOOWRD
VSHFLILHGORFDWLRQWRPDNHDUHSRUWRUSHUIRUPVRPHRWKHUIXQFWLRQ)RUORJIXOO
FRQGLWLRQVWKHPHWHUDXWRPDWLFDOO\GRZQORDGVWKHORJ V WKDWDUHQHDULQJWKHIXOO
VWDWH7KHPRGHPFDQEHSURJUDPPHGWRFDOOWZRGLIIHUHQWQXPEHUVWRPDNHWKH
UHTXLUHGUHSRUWV3ULPDU\DQG%DFNXS
7KHPRGHPFDQEHSURJUDPPHGZLWKDQ$6&,,VWULQJIRULGHQWLILFDWLRQSXUSRVHV,I
WKLVVWULQJLQSUHVHQWWKHPRGHPSOD\VWKHVWULQJWRWKHKRVWFRPSXWHUXSRQ
FRQQHFWLRQWRLGHQWLI\WKHPHWHUWRWKHKRVWVRIWZDUH5HIHUWRWKHCommunicator EXT
User ManualIRUSURJUDPPLQJGHWDLOV
7KHPRGHPLQFOXGHVDFRQQHFWLRQIRUDQH[WHUQDO9/LWKLXP%DWWHU\ ZLWKFXVWRP
OHDGVDQGYHOFURPRXQWLQJ WRSRZHUWKHPRGHPLIWKHPHWHUORVHVFRQWUROSRZHU
8VLQJWKHEDWWHU\WKHPRGHPLVDEOHWRFRPSOHWHDUHSRUWLQJFDOOHYHQLISRZHUWRWKH
PHWHUKDVEHHQGLVFRQQHFWHG7KLVIHDWXUHDOORZVWKHPHWHUWRUHSRUWSRZHURXWDJH
FRQGLWLRQV8QGHUQRUPDOFRQGLWLRQVWKHEDWWHU\VKRXOGSURYLGHLQH[FHVVRI\HDUV
RIVHUYLFHGXULQJVWRUDJHFRQGLWLRQV GLVFRQQHFWHGIURPWHUPLQDOV RUZKHQSURSHUO\
LQVWDOOHGLQDQHQHUJL]HGPHWHU7KHEDWWHU\VKRXOGSURYLGHPRUHWKDQRQH\HDURI
VHUYLFHGXULQJRXWDJHFRQGLWLRQV RQEDWWHU\EDFNXS $/2:%$77(5<LQGLFDWRU
DSSHDUVRQWKHGLVSOD\VFUHHQZKHQEDWWHU\SRZHULVORZ&DOOWKHIDFWRU\IRUD
UHSODFHPHQWEDWWHU\
5HSODFHPHQWRIWKHEDWWHU\LVVLPSOH:KHQRUGHUHGWKHEDWWHU\LVDWWDFKHGWRD
FDEOHZKLFKSLJWDLOVIURPWKHEDFNRIWKHPHWHUZLWKDFRQQHFWRU VHHIROORZLQJ127(
)LJXUHDQG7DEOH 
Installation steps:
5HPRYHWKHROGEDWWHU\E\GLVFRQQHFWLQJLWDWWKHFRQQHFWRU

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

,QVWDOOWKHQHZEDWWHU\E\VQDSSLQJLWLQWRWKHFRQQHFWRU
3HHODQGVWLFNWKHYHOFURDGKHVLYHVRPHZKHUHRXWVLGHWKHPHWHU RUXVHWKHROG
DGKHVLYHWRIDVWHQWKHEDWWHU\LQSODFH 
NOTE&XVWRPOHDGVDQG9HOFURPRXQWLQJDUHQRWLQFOXGHGLQVRPHHDUOLHUYHUVLRQVRI
WKH6ZLWFKERDUG0HWHU&DOOWKH(,*IDFWRU\IRULQVWDOODWLRQUHSODFHPHQWSDUW
%$77

5.5: INP200 Onboard Ethernet


7KH%DVH7(WKHUQHWRSWLRQ,13LVDIXOO\FXVWRPL]DEOHZHEVHUYHUWKDW
XVHV;0/WRSURYLGHDFFHVVWRUHDOWLPHGDWDYLDWKH,QWHUQHW(,*VQDPHIRUWKLV
G\QDPLFV\VWHPLV7RWDO:HE6ROXWLRQV7KHV\VWHPLQFRUSRUDWHVDKLJKO\SURJUDPPD
EOHQHWZRUNFDUGZLWKEXLOWLQPHPRU\WKDWLVLQVWDOOHGLQPHWHUVZLWKWKH,13
RSWLRQ(DFKFDUGFDQEHSURJUDPPHGWRSHUIRUPH[WHQVLYHPRQLWRULQJIXQFWLRQV7KH
%DVH7RSWLRQLVPXFKIDVWHUWKDQWKH%DVH7RSWLRQZKLFKGRHVQRWRIIHU7RWDO
:HE6ROXWLRQV

5.5.1: Hardware Overview


$1H[XVPHWHUZLWKWKH%DVH7(WKHUQHW2SWLRQ ,13 KDVDOO
WKHFRPSRQHQWVRIWKHVWDQGDUG1H[XVPHWHUSOXVWKHFDSDELOLW\RIFRQQHFWLRQWRD
QHWZRUNWKURXJKDQ(WKHUQHW/$1RUWKURXJKWKH,QWHUQHWYLD0RGEXV7&3'13
:$1/$1+7736073)73DQGRU'+&3
7KH,QWHUQDO1HWZRUN2SWLRQRIWKH1H[XVPHWHULVDQH[WUHPHO\YHUVDWLOHFRPPXQL
FDWLRQWRRO,W
$GKHUHVWR,((((WKHUQHWVWDQGDUGXVLQJ7&3,3
8WLOL]HVVLPSOHDQGLQH[SHQVLYH%DVH7ZLULQJDQGFRQQHFWLRQV
3OXJVULJKWLQWR\RXUQHWZRUNXVLQJWKHEXLOWLQ5-MDFN
,VSURJUDPPDEOHWRDQ\,3DGGUHVVVXEQHWPDVNDQGJDWHZD\UHTXLUHPHQWV
&RPPXQLFDWHVXVLQJWKHLQGXVWU\VWDQGDUG0RGEXV7&3SURWRFRORU'13:$1/$1

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

5.5.2: Hardware Connection


8VHVWDQGDUG5-%DVH7FDEOHWRFRQQHFWZLWKWKH1H[XVPHWHU7KH5-
OLQHLVLQVHUWHGLQWRWKH5-SRUWFRPLQJIURPWKHEDFNRIWKHPHWHUZLWKWKH,13
(WKHUQHW2SWLRQ VHH)LJXUH 
Configure the Network settings using the following steps:
8VLQJ3RUW3RUW 56FRQQHFWLRQ RUWKHRSWLFDOSRUWFRQQHFWD3&WRWKH
PHWHU$Q5656FRQYHUWHUPD\EHUHTXLUHG HJ(OHFWUR,QGXVWULHV
8QLFRP 
'RXEOHFOLFNRQ&RPPXQLFDWRU(;76RIWZDUHWRRSHQLW
&OLFNWKHQuick ConnectRUConnection ManagerLFRQLQWKHLFRQWRROEDU
&OLFNWKHSerial PortEXWWRQ0DNHVXUHGDWDPDWFKHVWKHPHWHUWKHQFOLFN
Connect
Set the Network using the following steps:
)URPWKH'HYLFH3URILOHPHQXFOLFNGeneral Settings>Communications!DQG
WKHQFOLFNRQRQHRIWKHOLVWHGSRUWV

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

<RXZLOOVHHWKH'HYLFH3URILOH&RPPXQLFDWLRQV6HWWLQJVVFUHHQ

,QWKH1HWZRUN6HWWLQJVVHFWLRQ PLGGOHRIWKHVFUHHQ HQWHUWKHIROORZLQJGDWD


SURYLGHGE\\RXU6\VWHPV$GPLQLVWUDWRU
,3$GGUHVV ([DPSOH
6XEQHW0DVN ([DPSOH
'HIDXOW*DWHZD\ ([DPSOH

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

&OLFNWKHAdvanced SettingsEXWWRQWRIXUWKHUFRQILJXUHWKH1HWZRUNFRQQHFWLRQ
7KH$GYDQFHG1HWZRUN2SWLRQ6HWWLQJVVFUHHQRSHQV

7KHWDEVDWWKHWRSRIWKHVFUHHQOHW\RXQDYLJDWHEHWZHHQVHWWLQJV'HSHQGLQJRQ
\RXUPHWHUVFRQILJXUDWLRQ\RXPD\QRWQHHGWRSURJUDPDOORIWKHVHWWLQJVVKRZQ
KHUH
D7KHILUVWWDELV6HUYLFHV 6HFXULW\VKRZQDERYH&OLFNWKHRSWLRQVWRHQDEOH
WKHPIRUWKH1HWZRUNRSWLRQHJWRHQDEOHWKH:HEVHUYHUFOLFNWKHER[QH[W
WRWKDWRSWLRQ
E&OLFNDQ\RIWKHRWKHUWDEVWRFRQILJXUHPRUHRSWLRQV VHH&KDSWHULQWKH
Communicator EXT User ManualIRUGHWDLOHGLQVWUXFWLRQV 
)73&OLHQWFRQILJXUHWKH)73VHUYHUVHWWLQJV
*(3URWRFRO (*' FRQILJXUH*(V(*'SURWRFRO LIWKHPHWHUVILUPZDUH
VXSSRUWVWKLV
$ODUP(PDLOFRQILJXUHWKHDODUPHPDLOQRWLILFDWLRQVHWWLQJV
&RPSXWHU1DPH'16VHWDQDPH'16VHUYHUV
'+&3HQDEOH'+&3IXQFWLRQDOLW\

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

)LUPZDUH8SGDWHXSGDWHWKH1HWZRUNFDUGVILUPZDUH
'13IRU/$1:$1FRQILJXUHWKHVHWWLQJVIRU'13/$1:$1 '13RYHU
WKH(WKHUQHW
F&OLFNOKWRVDYH\RXUVHWWLQJVDQGFORVHWKH$GYDQFHG1HWZRUN2SWLRQ6HWWLQJV
VFUHHQ
&OLFNOKWRVDYH\RXUFRPPXQLFDWLRQVHWWLQJVDQGFORVHWKH&RPPXQLFDWLRQV
6HWWLQJVVFUHHQ
&OLFNUpdate DeviceWRVHQGWKHQHZSURILOHWRWKHPHWHU
$IWHUWKH1HWZRUNSDUDPHWHUVDUHVHW&RPPXQLFDWRU(;7FRQQHFWVWRWKHPHWHUYLD
WKH1HWZRUNXVLQJD'HYLFH$GGUHVVRIDQGWKHDVVLJQHG,3$GGUHVV)ROORZWKHVH
VWHSV
'RXEOHFOLFNRQWKH&RPPXQLFDWRU(;7LFRQWRRSHQWKHVRIWZDUH
&OLFNWKHConnect LFRQLQWKHLFRQWRROEDU
<RXZLOOVHHWKH&RQQHFWVFUHHQ&OLFNWKHNetworkEXWWRQDWWKHWRSRIWKHVFUHHQ
7KHVFUHHQZLOOFKDQJHWRRQHUHTXHVWLQJWKHIROORZLQJLQIRUPDWLRQ
'HYLFH$GGUHVV
+RVW,3$GGUHVV SHU\RXUQHWZRUNDGPLQLVWUDWRU 
([DPSOH
1HWZRUN3RUW
3URWRFRO0RGEXV7&3
NOTE: 6HH6HFWLRQIRUWKHIDFWRU\VHWWLQJV
&OLFNWKHConnectEXWWRQDWWKHERWWRPRIWKHVFUHHQ&RPPXQLFDWRU(;7FRQQHFWV
WRWKHPHWHUYLDWKH1HWZRUN
NOTES
&RPPXQLFDWRU(;7DOZD\VFRPPXQLFDWHVYLD0RGEXV7&3ZKLFKLVWKHGHIDXOWSUR
WRFROIRU1H[XVPHWHUV

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

6HHWKHCommunicator EXT User Manual IRUPRUHGHWDLOVRQWKH1HWZRUNRSWLRQ


DQGWKH:HEVHUYHU 7RWDO:HE6ROXWLRQV 

5.6: INP202 Ethernet/Modem Combination


7KH,132SWLRQLVDQH[WHQVLRQRI,13,WKDVDOOWKHIHDWXUHVRI,13SOXVD
EXLOWLQPRGHP7KHFRPPXQLFDWLRQSURWRFROVXSSRUWHGE\WKHPRGHPLV0RGEXV
$6&,,7KHFRPPXQLFDWLRQSURWRFROVXSSRUWHGE\WKH56(WKHUQHW0RGHP
*DWHZD\LV0RGEXV578
,13FRQYHUWVDOOLQFRPLQJ0RGHP0RGEXV$6&,,UHTXHVWVWR0RGEXV578IRU
LQWHUQDODQGJDWHZD\FRPPXQLFDWLRQ,WWKHQFRQYHUWVDOOUHVSRQVH0RGEXV578
PHVVDJHVLQWR0RGEXV$6&,,DQGVHQGVWKHUHVSRQVHVWRWKHPRGHP

5.6.1: Hardware Overview


7KH1H[XVPHWHUZLWKWKH,132SWLRQKDVDOOWKHFRPSRQHQWVRIDQ
,131H[XVPHWHUSOXVDEXLOWLQPRGHP,WKDVWKHFDSDELOLW\RIFRQQHFWLQJWRD
QHWZRUNWKURXJKDQ(WKHUQHW/$1DQGZLWKRWKHUGHYLFHVYLDPRGHP

5.6.2: Hardware Connection


7KHUHDUHWKUHHFDEOHVWRFRQQHFWIRUWKH,132SWLRQ$Q56*DWHZD\FDEOHDQ
5-(WKHUQHWFDEOHDQGDQ5-0RGHPFDEOHDUHLQVHUWHGLQWRWKHFDEOHVFRPLQJ
IURPWKHEDFNRIWKH1H[XVPHWHUZLWKWKH,13(WKHUQHW0RGHP2SWLRQ5HIHU
WR)LJXUHIRUGHWDLOVRQFDEOHV
Make the software connection using the following steps:
8VLQJ3RUWRU3RUW 56FRQQHFWLRQ FRQQHFWD3&WRWKHPHWHU$Q56
56FRQYHUWHUPD\EHUHTXLUHG HJ(OHFWUR,QGXVWULHV8QLFRP 
'RXEOHFOLFNRQ&RPPXQLFDWRU(;76RIWZDUHWRRSHQLW
&OLFNWKHQuick ConnectRUWKHConnection ManagerLFRQLQWKHLFRQWRROEDU
&OLFNWKHSerial PortEXWWRQ0DNHVXUHGDWDPDWFKHVWKHPHWHUWKHQFOLFN
Connect
Set the Network using the following steps:
5HIHUWR6HFWLRQRIWKHCommunicator EXT User Manual IRUPRUHGHWDLOV 

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

)URPWKH'HYLFH3URILOHPHQXFOLFNGeneral Settings>Communications!DQG
WKHQFOLFNRQRQHRIWKHOLVWHGSRUWV
<RXZLOOVHHWKH'HYLFH3URILOH&RPPXQLFDWLRQV6HWWLQJVVFUHHQ,QWKH1HWZRUN
6HWWLQJVVHFWLRQHQWHUGDWDSURYLGHGE\\RXUV\VWHPVPDQDJHU
,3$GGUHVV ([DPSOH
6XEQHW0DVN ([DPSOH
'HIDXOW*DWHZD\ ([DPSOH
&RPSXWHU1DPH1(7:25. ([DPSOH
$IWHUWKH1HWZRUNSDUDPHWHUVDUHVHW&RPPXQLFDWRU(;7FRQQHFWVWRWKHPHWHUYLD
WKH1HWZRUNXVLQJD'HYLFH$GGUHVVRIDQGWKHDVVLJQHG,3$GGUHVV)ROORZWKHVH
VWHSV
'RXEOHFOLFNRQWKH&RPPXQLFDWRU(;7LFRQWRRSHQWKHVRIWZDUH
&OLFNWKHConnect LFRQLQWKHLFRQWRROEDU
<RXZLOOVHHWKH&RQQHFWVFUHHQ&OLFNWKHNetworkEXWWRQDWWKHWRSRIWKHVFUHHQ
7KHVFUHHQZLOOFKDQJHWRRQHUHTXHVWLQJWKHIROORZLQJLQIRUPDWLRQ
'HYLFH$GGUHVV
+RVW,3$GGUHVV SHU\RXUQHWZRUNDGPLQLVWUDWRU 
([DPSOH
1HWZRUN3RUW
3URWRFRO0RGEXV7&3
NOTE: 6HH6HFWLRQIRUWKHIDFWRU\VHWWLQJV
&OLFNWKHConnectEXWWRQDWWKHERWWRPRIWKHVFUHHQ&RPPXQLFDWRU(;7FRQQHFWV
WRWKHPHWHUYLDWKH1HWZRUN
)RUWKH0RGHPFRQQHFWLRQIROORZWKHLQVWUXFWLRQVLQ6HFWLRQ

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

5.7: Factory Settings


<RXFDQXVH&RPPXQLFDWRU(;7WRFRQQHFWWRDPHWHUZLWKWKH,13,13RSWLRQ
IRUWKHILUVWWLPHRUDWDQ\WLPHXQWLOWKHVHWWLQJVDUHFKDQJHGXVLQJWKHIROORZLQJ
IDFWRU\VHWWLQJV
'HYLFH$GGUHVV
,3$GGUHVV
1HWZRUN3RUW
3URWRFRO0RGEXV7&3

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6HULDO&RPPXQLFDWLRQ:LULQJ

7KLVSDJHLQWHQWLRQDOO\OHIWEODQN

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



6: Hardware Installation

6: Hardware Installation
6.1: Mounting the Nexus Socket Meter
The Nexus 1262/1272 Socket meter is designed to mount into a standard meter
socket. Follow the Installation Summary below or follow the installation instructions
on the meter socket to ensure that the unit is installed securely. See Dimension
figures below and on the following pages.
NOTE: For Switchboard Meter dimensions and related information, see Chapter 12.

6.96"
17.68cm

4.57"
11.61cm

6.96"
17.68cm

6.2"
15.75cm

Front View

Side View

Figure 6.1: Socket Meter Mounting Dimensions

Installation Summary
Examine the labels to verify that the meter you are installing is, in fact, the correct
form factor and service type. Make sure that the socket and meter current class
ratings are compatible.
Make sure that all communication and auxiliary power wiring is accessible in case
disconnection is required for any reason.
Before applying power to the meter, install batteries if not installed at the factory
and check the connections if they are installed. The meter has two batteries: an
Internal battery which is used to maintain non-volatile readings and the real-time
clock, and the Dial-out Modem battery, which is used by the INP2 option to dial out
on an outage.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

6-1

6: Hardware Installation

WARNING! POWER MUST BE OFF TO INSTALL THE INTERNAL BATTERY!


To install the Internal Battery, remove the Internal Shroud and place
the battery into the battery compartment with the + facing UP.
Replace the Internal Shroud. See Section 6.2.
To install the Modem Battery, with the Outer Shroud on the meter,
locate the battery cable at the back of the meter and insert the cable
connector into the cable. Use the velcro (peel and stick) to attach the
battery somewhere outside of the meter. See Section 5.4.4.
Measure the enclosure to make sure it accommodates the meter. (If it is standard
size, that wont be necessary.)
Make sure that any communications wiring from the back of the meter is fed
through the appropriate openings in your socket to allow for clean connections with
external devices.
Insert the meter into the socket, making sure that the unit blades are firmly within
the jaws of the socket.
Connect external devices to the appropriate communications wiring. See following
Figure 6.2 and Table 6.1, Cable Color Key, for communications wiring details. RJ11
and RJ45 connectors are supplied.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

6-2

6: Hardware Installation

Make sure the meter is functioning properly by running it through a test circuit.
The Nexus Socket meter has its own display built into the face of the meter.
However, you may want to install additional displays in remote locations. See
Section 6.3 for installation procedures for the Nexus P40N/P40N+/P41N+/P43N+
displays. The displays are connected to the meter via the RS485 cable supplied
with the 1262/1272 (see Figure 6.2, below). See Chapter 5 for detailed wiring
instructions.

Modem/Ethernet Combo:
Cable 4=RS485
Cable 5=RJ11 Modem
Cable 6=RJ45 Ethernet

Modem:
Cable 4=RS485
Cable 5=RJ11 Modem
Cable 7=Battery

Ethernet:
Cable 6=RJ45
Ethernet

Cable 8:
Optional
Aux Power

Cable 1: Port 1,
Port 4, IRIG-B

Optional Communication Cables

Cable 3: Optional

Cable 2: to High-Speed
Inputs

KYZ Cable

Figure 6.2: Socket Meter Rear View Showing Cables

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

6-3

6: Hardware Installation

0.87"
2.21cm

10.4"
26.42cm

IA

High

Va IB Vb IC Vc
High
High

IC

Low

IB

Low

Vn IA
Low

6.84"
17.37cm
Figure 6.3: Socket Meter Mounted in A-Base Front View

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

6-4

6: Hardware Installation

4.57
11.61cm

2.02
5.13cm
6.60
16.76cm

Figure 6.4: Socket Meter in A-Base Side View

6.1.1: Cable Color Key


Table 1: Cable Color Key
Cable
Cable 1

Signal Name

Color

Port 1 Wiring (RS485)


SHIELD

Black

Tx/Rx+

Brown

Tx/Rx-

Red

Port 4 Wiring (RS485)


SHIELD

Orange

Tx/Rx+

Yellow

Tx/Rx-

Green

IRIG-B

Electro Industries/GaugeTech
Electro Industries/GaugeTech

Blue

Purple

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

6-5

6: Hardware Installation

Table 1: Cable Color Key


Cable
Cable 2

Cable 3

Cable 4

Cable 5

Signal Name
High-Speed Inputs
Input 8

Black

Input 7

Brown

Input 6

Red

Input 5

Orange

Input 4

Yellow

Input 3

Green

Input 2

Blue

Input 1

Gray

Common

Purple

Optional KYZ Output


Normally Closed 1

Black

Common

Brown

Normally Open 1

Red

Normally Closed 2

Orange

Common

Yellow

Normally Open 2

Green

Normally Closed 3

Blue

Common

Purple

Normally Open 3

Gray

Normally Closed 4

Light Green

Common

Pink

Normally Open 4

White

RS485
SHIELD

Blue

Tx/Rx+

Green

Tx/Rx-

Red

RJ11 Modem
Label Attached

Electro Industries/GaugeTech
Electro Industries/GaugeTech

Color

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

Blue

E151701

6-6

6: Hardware Installation

Table 1: Cable Color Key


Cable

Signal Name

Cable 6

Color

RJ45 Ethernet
Label Attached

Cable 7

Blue

Battery
Label Attached

Cable 8

Black

Aux Power - DE
Positive

Red

Neutral/Negative

Black

Aux Power - SE
Positive

Black

Neutral/Negative

Black

Table 6.1: Cable Color Key

IMPORTANT NOTE! The Cable colors shown here are subject to change without notice. Refer to the CABLE LABELS for color code verification.

6.2: Internal Battery Installation and Maintenance


CAUTION! - BATTERY INSTALLATION OR REPLACEMENT MUST BE DONE
WITH POWER OFF!
Depending on its age, the Nexus 1262/1272 meter could be equipped with either of
two types of batteries:
Older meters are equipped with 3V Lithium cell 2032.
Meters shipped after February, 2010 are equipped with 3V Lithium cell
Panasonic BR3032.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

6-7

6: Hardware Installation

Examine the specific meter and be sure to install the correct battery.

Figure 6.5: Meter without Internal Shroud

The Internal battery maintains NVRAM and time during outages. It is located on one
of the vertical panels inside the Internal Shroud (see Figure 6.5). Under normal
conditions, the battery should provide in excess of 10 years of service during storage
conditions (disconnected from terminals) or when properly installed in an energized
meter. The battery should provide more than one year of service during outage
conditions (time on battery backup). A LOW BATTERY indicator on the display screen
tells you when replacement is needed.
Follow these steps to install the battery:
1. Before replacing the battery, download all memory files to your computer, as data
may be lost.
2. Remove power from the meter.
3. Remove the external meter cover and the internal shroud.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

6-8

6: Hardware Installation

4. Remove the old battery with a screwdriver or similar tool.


5. Place the new battery in the battery holder.
IMPORTANT! You must insert the replacement battery into the holder correctly.
Otherwise proper contact will not be achieved and the meter may lose log memory
and time functions.

Figure 6.6: Battery Holder Detail

a. Make sure the + on the battery is facing UP and toward you.


b. Insert the RIGHT SIDE of the battery UNDER the 2 clips on the right side of the
holder while gently pushing the battery against the INSIDE RIGHT WALL of the
battery holder (Side A in Figure 6.6).
c. Gently push the LEFT SIDE of the battery in until it snaps into place (Side B in
Figure 6.6).
6. Replace the internal shroud and the external meter cover.
7. Power up the meter.
8. Reset meter time using Communicator software, unless IRIG-B is connected. (If
IRIG-B is connected, time is synchronized automatically.)
NOTE: Replacement of the Modem Battery is explained in Section 5.4.4.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

6-9

6: Hardware Installation

6.2.1: Battery Safety and Disposal


Dispose of batteries in accordance with local, state and federal hazardous waste
regulations. For disposal outside the United States, follow your countrys disposal
guidelines.

6.3: Mounting the Optional External Displays


The Nexus 1262/1272 meter has its own LCD Display on the meter face. The
optional Nexus LED Displays: P40N+, P41N+ and P43N+ (as well as the legacy
P40N) may be used where additional displays are desired. The dimensions of the
P40N and P40N+ are different - see the figures on the next page. The display mounts
using a standard ANSI C39.1 drill plan. Secure the four mounting studs to the back of
the panel with the supplied hardware. See Chapter 9 for details on the external
displays.
Six feet of RS485 communication/power cable harness is supplied. Allow for at least a
1.25-inch (3.17cm) diameter hole in the mounting panel for the cable harness. See
Chapter 5 for wiring details.
The display is powered by an external power source, such as the PSIO, which supplies
12 VDC.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

6 - 10

6: Hardware Installation

4.38 Sq.
(11.12 cm)

NOTE: The P40N is not intended for


new applications.

.75
1.438 Sq. (1.91
(3.65 cm) cm)
P40N Front Dimensions

P40N Side Dimensions

Legacy P40N Dimensions

P40N+ Front and Side Dimensions


Figure 6.6: P40N/P40N+ Mounting Dimensions

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

6 - 11

6: Hardware Installation

3.375/8.572cm
1.688/
4.287cm

4x 0.200/
0.508cm

3.375/
8.572cm

04.00/10.16cm
Figure 6.7: P40N/P40N+ ANSI Mounting

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

6 - 12

6: Hardware Installation

6.4: Mounting the Nexus External I/O Modules


Connect multiple I/O modules by inserting male RS485 side ports into female side
ports, then screw each module into the next, using a flathead screwdriver. Work from
left to right.
Secure the mounting brackets to both ends of a group of I/O modules or both sides of
an individual module, using the screws supplied (#440 pan-head screws). Next,
secure the brackets to a flat surface using a #8 screw with a lock washer.

5.629/14.30cm
3X 1.301/3.305cm
Mounting Bracket

1.125/2.858cm

.090/.229cm

Mounting Bracket
4.188/10.638cm

Figure 6.8: I/O Modules Mounting Diagram, Overhead View

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

6 - 13

6: Hardware Installation

Mounting Brackets (MBIO)

Female RS485
Side Port

I/O Port
(Size and Pin
Configuration Vary)

Male RS485
Side Port

Figure 6.9: Single I/O Module with Mounting Brackets

IMPORTANT! The Nexus 1262/1272 meter does not supply power to the I/O modules. You must use an external power supply, such as the EIG PSIO (12V Output).
Figure 6.11 shows mounting with the PSIO.

Mounting Bracket

Mounting Bracket
6.879/13.088cm

/N
0OWER)N

.

,

3.437/8.729cm

$!.'%2

0OWER3UPPLY
03)/

2.200/5.588cm

-AX0OWER6!
)NPUT6OLTAGE 6$#

1.100/2.54cm

 6!#$#
/UTPUT6OLTAGE6$#

%LECTRO)NDUSTRIES'AUGE4ECH

WWWELECTROINDCOM

.618/1.570cm

1.301/3.305cm

Figure 6.10: I/O Modules Mounting Dimensions, Front View

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

6 - 14

6: Hardware Installation

1.73/4.4cm
Figure 6.11: I/O Modules with PSIO Power Supply

Refer to Figure 6.12 and Section 5.3.8 for PSIO and I/O Module wiring instructions.

Auxiliary Power
(PSIO) is supplied
through pins 3 and 4
Connection though
SHIELD, + and - to
meters Port 4

072
072
3HIELD

Figure 6.12: I/O Module Wiring Detail

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

6 - 15

6: Hardware Installation

This page intentionally left blank.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

6 - 16

7LPHRI8VH)XQFWLRQ

7: Time-of-Use Function
7.1: Introduction
$7LPHRI8VH 728 XVDJHVWUXFWXUHWDNHVLQWRDFFRXQWWKHTXDQWLW\RIHQHUJ\XVHG
DQGWKHWLPHDWZKLFKLWZDVFRQVXPHG7KH1H[XVPHWHUV728
IXQFWLRQDYDLODEOHZLWKWKH&RPPXQLFDWRU(;7VRIWZDUHLVGHVLJQHGWRDFFRPPRGDWH
DYDULHW\RISURJUDPPDEOHUDWHVWUXFWXUHV7KH728IXQFWLRQDFFXPXODWHVGDWDEDVHG
RQWKHWLPHVFKHPHSURJUDPPHGLQWRWKH1H[XVPHWHU
6HHWKHCommunicator EXT User ManualIRUGHWDLOVRQSURJUDPPLQJWKH1H[XV
PHWHUV728FDOHQGDUDQGUHWULHYLQJ728GDWD

7.2: The Nexus Meters TOU Calendar


$1H[XVPHWHUV728FDOHQGDUVHWVWKHSDUDPHWHUVIRU728GDWDDFFXPXODWLRQ<RX
PD\VWRUHXSWRWZHQW\FDOHQGDUVLQWKH1H[XV0HWHUDQGDQXQOLPLWHGDPRXQWRI
FDOHQGDUILOHVRQ\RXUFRPSXWHU
7KH728FDOHQGDUSURILOHDOORZV\RXWRDVVLJQDSURJUDPPDEOHXVDJHVFKHGXOHHJ
:HHNGD\:HHNHQG+ROLGD\WRHDFKGD\RIWKHFDOHQGDU\HDU<RXPD\FUHDWH
XSWRGLIIHUHQW728VFKHGXOHV
(DFK728VFKHGXOHGLYLGHVWKHKRXUGD\LQWRILIWHHQPLQXWHLQWHUYDOVIURP
WR<RXPD\DSSO\RQHRIHLJKWGLIIHUHQWSURJUDPPDEOHUHJLV
WHUVHJ3HDN2II3HDN6KRXOGHU3HDNWRHDFKILIWHHQPLQXWHLQWHUYDO
7KH1H[XVPHWHUVWRUHV
$FFXPXODWLRQVRQDVHDVRQDOEDVLVXSWRIRXUVHDVRQVSHU\HDU
$FFXPXODWLRQVRQDPRQWKO\EDVLV
6HDVRQDODQGPRQWKO\DFFXPXODWLRQVPD\VSDQRQH\HDULQWRWKHQH[W(DFKVHDVRQ
DQGPRQWKLVGHILQHGE\DSURJUDPPDEOHVWDUWELOOLQJGDWHZKLFKLVDOVRWKHHQGGDWH
RIWKHSULRUVHDVRQRUPRQWK
$VHDVRQHQGVDWPLGQLJKWRIWKHGD\EHIRUHWKHVWDUWRIWKHQH[WVHDVRQ
$PRQWKHQGVDWPLGQLJKWRIWKHPRQWKVELOOLQJGD\

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7LPHRI8VH)XQFWLRQ

,IWKH\HDUHQGVDQGWKHUHLVQRQHZFDOHQGDU728DFFXPXODWLRQVZLOOVWRS,ID
FDOHQGDULVSUHVHQWIRUWKHIROORZLQJ\HDU728DFFXPXODWLRQVFRQWLQXHXQWLOWKHQH[W
PRQWKO\ELOOGDWHRUQH[WVWDUWRIVHDVRQLVUHDFKHG$FFXPXODWLRQFDQVSDQLQWRWKH
IROORZLQJ\HDU
,IQRIROORZLQJ\HDULVSUHVHQWWKHODVWDFFXPXODWLRQIRUWKH\HDUZLOOHQGRQ


7.3: TOU Frozen and Active Registers


7KH1H[XVPHWHUVWRUHVDFFXPXODWLRQVIRUWKHSULRUWLPHSHULRGV:KHQWKHHQGRID
ELOOLQJSHULRGLVUHDFKHGWKH$FWLYHSHULRGRIWLPHEHFRPHVVWRUHGDV)UR]HQ7KH
UHJLVWHUVDUHWKHQFOHDUHGDQGDFFXPXODWLRQVUHVXPHXVLQJWKHQH[WVHWRI728
VFKHGXOHVDQGUHJLVWHUDVVLJQPHQWVIURPWKHVWRUHGFDOHQGDU
)UR]HQDQG$FWLYH$FFXPXODWLRQVDUHDOZD\VDYDLODEOH

7.4: Updating, Retrieving and Replacing TOU Calendars


&RPPXQLFDWRU(;7VRIWZDUHUHWULHYHV728FDOHQGDUVIURPWKH1H[XVPHWHURUIURP
WKHFRPSXWHUVKDUGGULYHIRUUHYLHZDQGHGLW
8SWRDPD[LPXPRIWZHQW\\HDUO\FDOHQGDUVFDQEHVWRUHGLQWKH1H[XVPHWHUDW
DQ\JLYHQWLPH<RXPD\UHWULHYHWKHPRQHDWDWLPHDQHZFDOHQGDUFDQEHVWRUHG
ZKLOHDFXUUHQWFDOHQGDULVLQXVH
$FFXPXODWLRQVGRQRWVWRSGXULQJFDOHQGDUXSGDWHV,IDFDOHQGDULVUHSODFHGZKLOHLQ
XVHWKHDFFXPXODWLRQVIRUWKHFXUUHQWSHULRGZLOOFRQWLQXHXQWLOWKHVHWHQGGDWH$W
WKDWSRLQWWKHFXUUHQWWLPHZLOOEHFRPHWKHQHZVWDUWWLPHDQGWKHVHWWLQJVRIWKH
QHZFDOHQGDUZLOOEHXVHG
5HVHWWKHFXUUHQWDFFXPXODWLRQVLI\RXUHSODFHDFDOHQGDULQXVH$UHVHWFOHDUVRQO\
WKHFXUUHQWDFFXPXODWLRQUHJLVWHUV7KLVFDXVHVWKHFXUUHQWDFFXPXODWLRQVWRXVHWKH
SUHVHQWGDWHDVWKHVWDUWDQGDFFXPXODWHWRWKHQH[WQHZHQGGDWHZKLFKZLOOEH
WDNHQIURPWKHQHZFDOHQGDU2QFHVWRUHGSULRUDFFXPXODWLRQVDUHDOZD\VDYDLODEOH
DQGFDQQRWEHUHVHW6HHWKHCommunicator EXT User ManualIRULQVWUXFWLRQVRQ
UHVHWWLQJ728DFFXPXODWLRQV

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7LPHRI8VH)XQFWLRQ

$WWKHHQGRIDGHILQHGSHULRGFXUUHQWDFFXPXODWLRQVDUHVWRUHGWKHUHJLVWHUVDUH
FOHDUHGDQGDFFXPXODWLRQVIRUWKHQH[WSHULRGEHJLQ:KHQWKH\HDUERXQGDU\LV
FURVVHGWKHVHFRQGFDOHQGDULISUHVHQWLVXVHG7RUHWDLQFRQWLQXLW\\RXKDYHXSWR
RQH\HDUWRUHSODFHWKHROGFDOHQGDUZLWKRQHIRUWKHIROORZLQJ\HDU

7.5: Daylight Savings and Demand


7RXVH'D\OLJKW6DYLQJV7LPH\RXPXVWHQDEOHLWLQWKH1H[XVPHWHUV'HYLFH
3URILOH7LPH6HWWLQJV&OLFN$XWR'67ZKLFKVHWV'D\OLJKW6DYLQJV7LPHDXWRPDWLFDOO\
IRUWKH8QLWHG6WDWHV21/< <RXFDQDOVRVHOHFW8VHU'HILQHGDQGHQWHUWKHGHVLUHG
GDWHVIRU'D\OLJKW6DYLQJV7LPH6HH&KDSWHULQWKHCommunicator EXT User
ManualIRUGHWDLOV
7RVHW'HPDQG,QWHUYDOVIURPWKH'HYLFH3URILOHVHOHFWRevenue & Energy
Settings > Demand Integration IntervalsDQGVHWWKHGHVLUHGLQWHUYDOV&OLFN
OK
7RVHW&XPXODWLYH'HPDQG7\SHIURPWKH'HYLFH3URILOHFOLFNRevenue & Energy
Settings > Cumulative Demand TypeDQGVHOHFW%ORFNRU5ROOLQJ:LQGRZ&OLFN
OK

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7LPHRI8VH)XQFWLRQ

7KLVSDJHLQWHQWLRQDOO\OHIWEODQN

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7UDQVIRUPHU/RVV&RPSHQVDWLRQ

8: Transformer Line Loss Compensation


8.1: Introduction
7KH(GLVRQ(OHFWULF,QVWLWXWH
V+DQGERRNIRU(OHFWULFLW\0HWHULQJ1LQWK(GLWLRQGHILQHV
/RVV&RPSHQVDWLRQDV
$PHDQVIRUFRUUHFWLQJWKHUHDGLQJRIDPHWHUZKHQWKHPHWHULQJSRLQWDQGSRLQWRI
VHUYLFHDUHSK\VLFDOO\VHSDUDWHGUHVXOWLQJLQPHDVXUDEOHORVVHVLQFOXGLQJ,5ORVVHV
LQFRQGXFWRUVDQGWUDQVIRUPHUVDQGLURQFRUHORVVHV7KHVHORVVHVPD\EHDGGHGWRRU
VXEWUDFWHGIURPWKHPHWHUUHJLVWUDWLRQ
/RVVFRPSHQVDWLRQPD\EHXVHGLQDQ\LQVWDQFHZKHUHWKHSK\VLFDOORFDWLRQRIWKH
PHWHUGRHVQRWPDWFKWKHHOHFWULFDOORFDWLRQZKHUHFKDQJHRIRZQHUVKLSRFFXUV0RVW
RIWHQWKLVDSSHDUVZKHQPHWHUVDUHFRQQHFWHGRQWKHORZ9ROWDJHVLGHRISRZHUWUDQV
IRUPHUVZKHQWKHDFWXDORZQHUVKLSFKDQJHRFFXUVRQWKHKLJKVLGHRIWKHWUDQV
IRUPHU7KLVFRQGLWLRQLVLOOXVWUDWHGLQ)LJXUH

Ownership Change
M

)LJXUH/RZ9ROWDJH0HWHULQJ,QVWDOODWLRQ5HTXLULQJ/RVV&RPSHQVDWLRQ

,WLVJHQHUDOO\OHVVH[SHQVLYHWRLQVWDOOPHWHULQJHTXLSPHQWRQWKHORZ9ROWDJHVLGHRI
DWUDQVIRUPHUDQGLQVRPHFRQGLWLRQVRWKHUOLPLWDWLRQVPD\DOVRLPSRVHWKHUHTXLUH
PHQWRIORZVLGHPHWHULQJHYHQWKRXJKWKHDFWXDORZQHUVKLSFKDQJHRFFXUVRQWKH
KLJK9ROWDJHVLGH
7KHQHHGIRUORVVFRPSHQVDWHGPHWHULQJPD\DOVRH[LVWZKHQWKHRZQHUVKLSFKDQJHV
VHYHUDOPLOHVDORQJDWUDQVPLVVLRQOLQHZKHUHLWLVVLPSO\LPSUDFWLFDOWRLQVWDOOPHWHU
LQJHTXLSPHQW2ZQHUVKLSPD\FKDQJHDWWKHPLGZD\SRLQWRIDWUDQVPLVVLRQOLQH
ZKHUHWKHUHDUHQRVXEVWDWLRQIDFLOLWLHV,QWKLVFDVHSRZHUPHWHULQJPXVWDJDLQEH
FRPSHQVDWHG7KLVFRQGLWLRQLVVKRZQLQ)LJXUH

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7UDQVIRUPHU/RVV&RPSHQVDWLRQ

Point of Ownership
Change

)LJXUH-RLQW2ZQHUVKLS/LQH0HHWLQJ5HTXLULQJ/RVV&RPSHQVDWLRQ

$VLQJOHPHWHUFDQQRWPHDVXUHWKHORVVHVLQDWUDQVIRUPHURUWUDQVPLVVLRQOLQH
GLUHFWO\,WFDQKRZHYHULQFOXGHFRPSXWDWLRQDOFRUUHFWLRQVWRFDOFXODWHWKHORVVHV
DQGDGGRUVXEWUDFWWKRVHORVVHVWRWKHSRZHUIORZPHDVXUHGDWWKHPHWHUORFDWLRQ
7KLVLVWKHPHWKRGXVHGIRUORVVFRPSHQVDWLRQLQWKH1H[XVPHWHU5HIHUWR$SSHQ
GL[$LQWKLVPDQXDODQG$SSHQGL[%RIWKHCommunicator EXT User ManualIRU
GHWDLOHGH[SODQDWLRQDQGLQVWUXFWLRQVIRUXVLQJWKH7UDQVIRUPHU/LQH/RVV&RPSHQVD
WLRQIHDWXUHRIWKH1H[XVPHWHU
7KHFRPSXWDWLRQDOFRUUHFWLRQVXVHGIRUWUDQVIRUPHUDQGWUDQVPLVVLRQOLQHORVVFRP
SHQVDWLRQDUHVLPLODU,QERWKFDVHVQRORDGORVVHVDQGIXOOORDGORVVHVDUHHYDOXDWHG
DQGDFRUUHFWLRQIDFWRUIRUHDFKORVVOHYHOLVFDOFXODWHG+RZHYHUWKHFDOFXODWLRQRI
WKHFRUUHFWLRQIDFWRUVWKDWPXVWEHSURJUDPPHGLQWRWKHPHWHUGLIIHUIRUWKHWZRGLI
IHUHQWDSSOLFDWLRQV)RUWKLVUHDVRQWKHWZRPHWKRGRORJLHVZLOOEHWUHDWHGVHSDUDWHO\
LQWKLVFKDSWHU
,QWKH1H[XVPHWHU/RVV&RPSHQVDWLRQLVDWHFKQLTXHWKDWFRPSXWDWLRQDOO\
DFFRXQWVIRUDFWLYHDQGUHDFWLYHSRZHUORVVHV7KHPHWHUFDOFXODWLRQVDUHEDVHGRQ
WKHIRUPXODVEHORZ7KHVHHTXDWLRQVGHVFULEHWKHDPRXQWRIDFWLYH :DWWV DQGUHDF
WLYH 9$5V SRZHUORVWGXHWRERWKLURQDQGFRSSHUHIIHFWV UHIOHFWHGWRWKHVHFRQGDU\
RIWKHLQVWUXPHQWWUDQVIRUPHUV 
7RWDO6HFRQGDU\:DWW/RVV
 0HDVXUHG9ROWDJH&DOSRLQW9ROWDJH [/:)(  0HDVXUHG&XUUHQW&DO
3RLQW&XUUHQW [/:&8 [)XOOVFDOH6HFRQGDU\9$

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7UDQVIRUPHU/RVV&RPSHQVDWLRQ

7RWDO6HFRQGDU\9$5/RVV
 0HDVXUHG9ROWDJH&DOSRLQW9ROWDJH [/9)(  0HDVXUHG&XUUHQW&DO
3RLQW&XUUHQW [/9&8 [)XOOVFDOH6HFRQGDU\9$
7KH9DOXHVIRU/:)(/:&8/9)(DQG/9&8DUHGHULYHGIURPWKHWUDQV
IRUPHUDQGPHWHULQIRUPDWLRQDVGHPRQVWUDWHGLQWKHIROORZLQJVHFWLRQV
7KHFDOFXODWHGORVVFRPSHQVDWLRQYDOXHVDUHDGGHGWRRUVXEWUDFWHGIURPWKHPHD
VXUHG:DWWVDQG9$5V7KHVHOHFWLRQRIDGGLQJRUVXEWUDFWLQJORVVHVLVPDGHWKURXJK
WKHPHWHU
VSURILOHZKHQSURJUDPPLQJWKHPHWHU VHHWKHIROORZLQJVHFWLRQIRU
LQVWUXFWLRQV 7KHPHWHUXVHVWKHFRPELQDWLRQRIWKHDGGVXEWUDFWVHWWLQJDQGWKH
GLUHFWLRQDOGHILQLWLRQRISRZHUIORZ DOVRLQWKHSURILOH WRGHWHUPLQHKRZWRKDQGOHWKH
ORVVHV/RVVHVZLOOEHDGGHGWRRUVXEWUDFWHGIURP GHSHQGLQJRQZKHWKHUDGGRU
VXEWUDFWLVVHOHFWHG WKH5HFHLYHG3RZHUIORZ)RUH[DPSOHLIORVVHVDUHVHWWR$GG
WRDQGUHFHLYHGSRZHUHTXDOVN:DQGORVVHVDUHHTXDOWRN:WKHQWKHWRWDO
PHWHUHGYDOXHZLWKORVVFRPSHQVDWLRQZRXOGEHN:IRUWKHVHVDPHVHWWLQJVLI
WKHPHWHUPHDVXUHGN:RIGHOLYHUHGSRZHUWKHWRWDOPHWHUHGYDOXHZLWKORVV
FRPSHQVDWLRQZRXOGEHN:
6LQFHWUDQVIRUPHUORVVFRPSHQVDWLRQLVWKHPRUHFRPPRQORVVFRPSHQVDWLRQPHWKRG
WKHPHWHUKDVEHHQGHVLJQHGIRUWKLVDSSOLFDWLRQ/LQHORVVFRPSHQVDWLRQLVFDOFXODWHG
LQWKHPHWHUXVLQJWKHVDPHWHUPVEXWWKHSHUFHQWYDOXHVDUHFDOFXODWHGE\DGLIIHUHQW
PHWKRGRORJ\
1H[XVPHWHUWUDQVIRUPHUORVVFRPSHQVDWLRQ
3HUIRUPVFDOFXODWLRQVRQHDFKSKDVHRIWKHPHWHUIRUHYHU\PHDVXUHPHQWWDNHQ
XQEDODQFHGORDGVDUHKDQGOHGDFFXUDWHO\
&DOFXODWHVQXPHULFDOO\HOLPLQDWLQJWKHHQYLURQPHQWDOHIIHFWVWKDWFDXVHLQDFFXUD
FLHVLQHOHFWURPHFKDQLFDOFRPSHQVDWRUV
3HUIRUPVELGLUHFWLRQDOORVVFRPSHQVDWLRQ
5HTXLUHVQRDGGLWLRQDOZLULQJWKHFRPSHQVDWLRQRFFXUVLQWHUQDOO\
,PSRVHVQRDGGLWLRQDOHOHFWULFDOEXUGHQZKHQSHUIRUPLQJORVVFRPSHQVDWLRQ

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7UDQVIRUPHU/RVV&RPSHQVDWLRQ

/RVV&RPSHQVDWLRQLVDSSOLHGWRVHFRQGSHUSKDVH:DWW9$5UHDGLQJVDQGEHFDXVH
RIWKDWDIIHFWVDOOVXEVHTXHQWUHDGLQJVEDVHGRQVHFRQGSHUSKDVH:DWW9$5UHDG
LQJV7KLVPHWKRGUHVXOWVLQORVVFRPSHQVDWLRQEHLQJDSSOLHGWRWKHIROORZLQJTXDQWL
WLHV
7RWDO3RZHU
'HPDQGVSHUSKDVHDQGWRWDO 7KHUPDO%ORFN )L[HG :LQGRZ5ROOLQJ 6OLGLQJ 
:LQGRZDQG3UHGLFWLYH:LQGRZ
0D[LPXPDQGPLQLPXP'HPDQGV
(QHUJ\DFFXPXODWLRQV
.<=RXWSXWRI(QHUJ\DFFXPXODWLRQV
NOTE/RVV&RPSHQVDWLRQLVGLVDEOHGZKHQWKHPHWHULVSODFHGLQ7HVW0RGH

8.2: Nexus 1262/1272 Meter's Transformer Loss Compensation


7KH1H[XVPHWHUSURYLGHVFRPSHQVDWLRQIRUDFWLYHDQGUHDFWLYHSRZHUTXDQWLWLHVE\
SHUIRUPLQJQXPHULFDOFDOFXODWLRQV7KHIDFWRUVXVHGLQWKHVHFDOFXODWLRQVDUHGHULYHG
HLWKHU
%\FOLFNLQJWKH7/&&DOFXODWRUEXWWRQRQWKH7UDQVIRUPHU/RVVVFUHHQRIWKH'HYLFH
3URILOHWRRSHQWKH(,*/RVV&RPSHQVDWLRQ&DOFXODWRULQ0LFURVRIW([FHO
%\ILJXULQJWKHYDOXHVIURPWKHZRUNVKHHWVKRZQKHUHDQGLQ$SSHQGL[%RIWKH
Communicator EXT User Manual
(LWKHUZD\\RXHQWHUWKHGHULYHGYDOXHVLQWRWKH&RPPXQLFDWRU(;7VRIWZDUH
WKURXJKWKH'HYLFH3URILOH7UDQVIRUPHUDQG/LQH/RVV&RPSHQVDWLRQVFUHHQ
7KH&RPPXQLFDWRU(;7VRIWZDUHDOORZV\RXWRHQDEOHWUDQVIRUPHUORVVFRPSHQVDWLRQ
IRUORVVHVGXHWRFRSSHUDQGLURQLQGLYLGXDOO\RUVLPXOWDQHRXVO\/RVVHVFDQHLWKHUEH
DGGHGWRRUVXEWUDFWHGIURPPHDVXUHGUHDGLQJV5HIHUWR$SSHQGL[%LQWKHCommunicator EXT User ManualIRULQVWUXFWLRQV
/RVVFRPSHQVDWLRQYDOXHVPXVWEHFDOFXODWHGEDVHGRQWKHPHWHULQVWDOODWLRQ$VD
UHVXOWWUDQVIRUPHUORVVYDOXHVPXVWEHQRUPDOL]HGWRWKHPHWHUE\FRQYHUWLQJWKH
EDVH9ROWDJHDQGFXUUHQWDQGWDNLQJLQWRDFFRXQWWKHQXPEHURIHOHPHQWVXVHGLQWKH
Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7UDQVIRUPHU/RVV&RPSHQVDWLRQ

PHWHULQJLQVWDOODWLRQ)RUWKUHHHOHPHQWPHWHUVWKHLQVWDOODWLRQPXVWEHQRUPDOL]HG
WRWKHSKDVHWRQHXWUDO9ROWDJHDQGWKHSKDVHFXUUHQWLQWZRHOHPHQWPHWHUVWKH
LQVWDOODWLRQPXVWEHQRUPDOL]HGWRWKHSKDVHWRSKDVH9ROWDJHDQGWKHSKDVHFXUUHQW
7KLVSURFHVVLVGHVFULEHGLQWKHIROORZLQJVHFWLRQV

8.2.1: Loss Compensation in Three Element Installations


/RVVFRPSHQVDWLRQLVEDVHGRQWKHORVVDQGLPSHGDQFHYDOXHVSURYLGHGRQWKHWUDQV
IRUPHUPDQXIDFWXUHU
VWHVWUHSRUW$W\SLFDOWHVWUHSRUWZLOOLQFOXGHDWOHDVWWKHIROORZ
LQJLQIRUPDWLRQ
0DQXIDFWXUHU
8QLWVHULDOQXPEHU
7UDQVIRUPHU09$UDWLQJ 6HOI&RROHG
7HVW9ROWDJH
1RORDGORVVZDWWV
/RDGORVVZDWWV RUIXOOORDGORVVZDWWV
([FLWLQJFXUUHQW#9ROWDJH
,PSHGDQFH
7KHWUDQVIRUPHU09$UDWLQJLVJHQHUDOO\WKHORZHVW09$UDWLQJ WKHVHOIFRROHGRU2$
UDWLQJ RIWKHWUDQVIRUPHUZLQGLQJ7KHWHVW9ROWDJHLVJHQHUDOO\WKHQRPLQDO9ROWDJH
RIWKHVHFRQGDU\RUORZ9ROWDJHZLQGLQJ)RUWKUHHSKDVHWUDQVIRUPHUVWKHVHYDOXHV
ZLOOW\SLFDOO\EHWKHWKUHHSKDVHUDWLQJDQGWKHSKDVHWRSKDVH9ROWDJH$OORIWKHWHVW
PHDVXUHPHQWVDUHEDVHGRQWKHVHWZRQXPEHUV3DUWRIWKHSURFHVVRIFDOFXODWLQJWKH
ORVVFRPSHQVDWLRQSHUFHQWDJHVLVFRQYHUWLQJWKHWUDQVIRUPHUORVVYDOXHVEDVHGRQWKH
WUDQVIRUPHUUDWLQJVWRWKHEDVHXVHGE\WKHPHWHU
&RUUHFWFDOFXODWLRQRIORVVFRPSHQVDWLRQDOVRUHTXLUHVNQRZOHGJHRIWKHPHWHU
LQVWDOODWLRQ,QRUGHUWRFDOFXODWHWKHORVVFRPSHQVDWLRQVHWWLQJV\RXZLOOQHHGWKH
IROORZLQJLQIRUPDWLRQUHJDUGLQJWKHPHWHUDQGWKHLQVWDOODWLRQ
1XPEHURIPHWHUHOHPHQWV

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7UDQVIRUPHU/RVV&RPSHQVDWLRQ

3RWHQWLDOWUDQVIRUPHUUDWLR 375
&XUUHQWWUDQVIRUPHUUDWLR &75
0HWHUEDVH9ROWDJH
0HWHUEDVHFXUUHQW
7KLVVHFWLRQLVOLPLWHGWRDSSOLFDWLRQRI1H[XVPHWHUVWRWKUHHHOHPHQWPHWHULQJ
LQVWDOODWLRQV$VDUHVXOWZHNQRZWKDW
1XPEHURIPHWHULQJHOHPHQWV 
0HWHUEDVH9ROWDJH 9ROWV
0HWHUEDVHFXUUHQW $PSV

8.2.1.1: Three-Element Loss Compensation Worksheet

Table 1:
&RPSDQ\

6WDWLRQ
1DPH

'DWH

7UI%DQN
1R

7UI0DQI

7UI6HULDO
1R

&DOFXODWLRQ
E\
7UDQVIRUPHU'DWD IURP7UDQVIRUPHU0DQXIDFWXUHU
V7HVW6KHHW

Table 2:
Winding

Voltage

MVA

Connection

+9+LJK

<

;9/RZ

<

<97HUWLDU\

<

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7UDQVIRUPHU/RVV&RPSHQVDWLRQ

Table 3:
Value

Watts Loss
3KDVH

3KDVH

3KDVHN:

1R/RDG/RVV
/RDG/RVV
(QWHU3KDVHRU3KDVHYDOXHV,I3KDVHYDOXHVDUHHQWHUHGFDOFXODWH3KDVH
YDOXHVE\GLYLGLQJ3KDVHYDOXHVE\WKUHH&RQYHUW3KDVH/RVV:DWWVWR3KDVH
N:E\GLYLGLQJ3KDVH/RVV:DWWVE\

Table 4:
Value

3-Phase MVA

1-Phase MVA

1-Phase kVA

6HOI&RROHG5DWLQJ
(QWHU3KDVHRU3KDVHYDOXHV,I3KDVHYDOXHVDUHHQWHUHGFDOFXODWH3KDVH
YDOXHVE\GLYLGLQJ3KDVHYDOXHVE\WKUHH&RQYHUW3KDVH6HOI&RROHG09$WR
3KDVHN9$E\PXOWLSO\LQJE\

Table 5:
([FLWLQJ&XUUHQW
,PSHGDQFH

Table 6:
9DOXH

3KDVHWR3KDVH

3KDVHWR1HXWUDO

7HVW9ROWDJH 9ROWV
)XOO/RDG&XUUHQW $PSV
7HVW9ROWDJHLVJHQHUDOO\3KDVHWR3KDVHIRUWKUHHSKDVHWUDQVIRUPHUV&DOFXODWH
3KDVHWR1HXWUDO9ROWDJHE\GLYLGLQJ3KDVHWR3KDVH9ROWDJHE\WKHVTXDUHURRWRI
&DOFXODWH)XOO/RDG&XUUHQWE\GLYLGLQJWKH 3KDVHN:6HOI&RROHG5DWLQJ E\WKH
3KDVHWR1HXWUDO9ROWDJH DQGPXOWLSO\LQJE\

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7UDQVIRUPHU/RVV&RPSHQVDWLRQ

Meter/Installation Data

Table 7:
,QVWUXPHQW7UDQVIRUPHUV

1XPHUDWRU

'HQRPLQDWRU

0XOWLSOLHU

3RWHQWLDO7UDQVIRUPHUV
&XUUHQW7UDQVIRUPHUV
3RZHU0XOWLSOLHU> 370XOWLSOLHU [ &70XOWLSOLHU @
(QWHUWKH1XPHUDWRUDQG'HQRPLQDWRUIRUHDFKLQVWUXPHQWWUDQVIRUPHU)RUH[DPSOH
D37ZLWKDUDWLRRIKDVDQXPHUDWRURUDGHQRPLQDWRURUDQGD
PXOWLSOLHURI   

Table 8:
0HWHU6HFRQGDU\9ROWDJH 9ROWV



0HWHU6HFRQGDU\&XUUHQW $PSV



Base Conversion Factors

Table 9:
4XDQWLW\

7UDQV
IRUPHU

0XOWLSOLHU

7UI,76HF

0HWHU%DVH

9ROWDJH



&XUUHQW

0HWHU7UI

)RU7UDQVIRUPHU9ROWDJHHQWHUWKH3KDVHWR1HXWUDOYDOXHRI7HVW9ROWDJHSUHYLRXVO\
FDOFXODWHG)RU7UDQVIRUPHU&XUUHQWHQWHUWKH)XOO/RDG&XUUHQWSUHYLRXVO\FDOFX
ODWHG)RU0XOWLSOLHUVHQWHUWKH37DQG&7PXOWLSOLHUVSUHYLRXVO\FDOFXODWHG
7UI,76HFRQGDU\LVWKH%DVH9DOXHRI9ROWDJHDQG&XUUHQWDWWKH,QVWUXPHQW7UDQV
IRUPHU6HFRQGDU\RIWKH3RZHU7UDQVIRUPHU7KHVHQXPEHUVDUHREWDLQHGE\GLYLGLQJ
WKH7UDQVIRUPHU9ROWDJHDQG&XUUHQWE\WKHLUUHVSHFWLYH0XOWLSOLHUV7KH0HWHU7UI
YDOXHVIRU9ROWDJHDQG&XUUHQWDUHREWDLQHGE\GLYLGLQJWKH0HWHU%DVHYDOXHVE\WKH
7UI,76HFRQGDU\YDOXHV

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7UDQVIRUPHU/RVV&RPSHQVDWLRQ

/RDG/RVVDW7UDQVIRUPHU
No-Load Loss Watts (kW) 3KDVHN:1R/RDG/RVV BBBBBBBBBBBBBB
No-Load Loss VA (kVA)

 ([FLWLQJ&XUUHQW   3KDVHN9$6HOI&RROHG5DWLQJ 

  BBBBBBBBBBBBBB   BBBBBBBBBBBBBBBB 


BBBBBBBBBBBBBBBN9$
No-Load Loss VAR (kVAR) 6457 1R/RDG/RVVN9$  1R/RDG/RVVN:   
6457 BBBBBBBBBBBBBBBBB  BBBBBBBBBBBBBBBB 
6457 BBBBBBBBBBBBBBBBBB  BBBBBBBBBBBBBBBBB
6457 BBBBBBBBBBBBBBBBB  BBBBBBBBBBBBBBBBBBBB
Full-Load Loss Watts (kW) 3KDVH.Z/RDG/RVV BBBBBBBBBBBBBB
Full-Load Loss VA (kVA)  ,PSHGDQFH   3KDVHN9$6HOI&RROHG5DWLQJ 
  BBBBBBBBBBBBBB   BBBBBBBBBBBBBBBB 
BBBBBBBBBBBBBBBN9$
Full-Load Loss VAR (kVAR) 6457 )XOO/RDG/RVVN9$  )XOO/RDG/RVVN:  
6457 BBBBBBBBBBBBBBBBB  BBBBBBBBBBBBBBBB 
6457 BBBBBBBBBBBBBBBBBB  BBBBBBBBBBBBBBBBB
6457 BBBBBBBBBBBBBBBBB  BBBBBBBBBBBBBBBBB

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7UDQVIRUPHU/RVV&RPSHQVDWLRQ

1RUPDOL]H/RVVHVWR0HWHU%DVH

Table 10:
4XDQWLW\

9DOXH
DW7UI
%DVH

07)DFWRU

07)DFWRU
9DOXH

([S

1R/RDG
/RVVN:

1R/RDG
/RVVN9$5

/RDG/RVV
N:

/RDG/RVV
N9$5

07)DFWRU
Z([S

9DOXH
DW
0HWHU
%DVH

(QWHU9DOXHDW7UDQVIRUPHU%DVHIRUHDFKTXDQWLW\IURPFDOFXODWLRQVDERYH(QWHU
0HWHU7UI)DFWRUYDOXHIURP%DVH&RQYHUVLRQ)DFWRUFDOFXODWLRQVDERYH&DOFXODWH07
)DFWRUZLWK([SRQHQWE\UDLVLQJWKH07)DFWRUWRWKHSRZHULQGLFDWHGLQWKH([S RU
([SRQHQW FROXPQ
&DOFXODWHWKH9DOXHDW0HWHU%DVHE\PXOWLSO\LQJWKH 07)DFWRUZ([S WLPHVWKH
9DOXHDW7UI%DVH 
/RVV:DWWV3HUFHQWDJH9DOXHV
Meter Base kVA   370XOWLSOLHU   &70XOWLSOLHU 
  BBBBBBBBBBBB   BBBBBBBBBBB 
BBBBBBBBBBBBBBBB

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7UDQVIRUPHU/RVV&RPSHQVDWLRQ

&DOFXODWH/RDG/RVV9DOXHV

Table 11:
4XDQWLW\

9DOXHDW
0HWHU%DVH

0HWHU%DVH
N9$

/RVVDW
0HWHU%DVH

4XDQWLW\

1R/RDG
/RVVN:

/RVV
:DWWV)(

1R/RDG
/RVVN9$5

/RVV
9$5V)(

/RDG/RVV
N:

/RVV
:DWWV&8

/RDG/RVV
N9$5

/RVV
9$5V&8

(QWHU9DOXHDW0HWHU%DVHIURP1RUPDOL]H/RVVHVVHFWLRQ(QWHU0HWHU%DVHN9$
IURPSUHYLRXVFDOFXODWLRQ&DOFXODWH/RVVDW0HWHU%DVHE\GLYLGLQJ 9DOXHDW
0HWHU%DVH E\ 0HWHU%DVHN9$ DQGPXOWLSO\LQJE\
(QWHUFDOFXODWHG/RVV:DWWVYDOXHVLQWRWKH1H[XVPHWHUXVLQJ&RPPXQLFDWRU
(;7VRIWZDUH5HIHUWR$SSHQGL[%RIWKHCommunicator EXT User ManualIRU
LQVWUXFWLRQV

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



7UDQVIRUPHU/RVV&RPSHQVDWLRQ

7KLVSDJHLQWHQWLRQDOO\OHIWEODQN

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



8VLQJWKH([WHUQDO'LVSOD\V

9: Using the External Displays


9.1: Overview
7KH1H[XV6RFNHWPHWHUVKDYHDEDFNOLW/&'GLVSOD\EXLOWLQWRWKH
PHWHU,QDGGLWLRQ(OHFWUR,QGXVWULHVRIIHUVDQRSWLRQDOH[WHUQDOGLVSOD\SRZHUHGE\
DQDGGLWLRQDOSRZHUVXSSO\ VXFKDVWKH36,2 7KH31 DQGWKHOHJDF\31 LV
DQ/('GLVSOD\WKDWSURYLGHVHDV\WRXVHDFFHVVWRWKHLQIRUPDWLRQVWRUHGLQWKH
1H[XVPHWHU
3OXJWKH1H[XVH[WHUQDOGLVSOD\LQWRWKH3RUWRU3RUWZLULQJFRQQHFWLRQXVLQJWKH
56FDEOHVXSSOLHG VHH&KDSWHUIRUZLULQJGHWDLOV 7KHGLVSOD\RSHUDWHVDW
EDXG7RXVHWKHGLVSOD\RQDQRWKHUSRUWFRQILJXUHWKDWSRUWWRRSHUDWHDWEDXG
XVLQJ&RPPXQLFDWRU(;7VRIWZDUHVHHWKHCommunicator EXT User Manual IRU
LQVWUXFWLRQV

9.2: Nexus P40N/P40N+ LED External Display


7KH1H[XV3131/('H[WHUQDOGLVSOD\KDVWKUHHPRGHV
'\QDPLF5HDGLQJV0RGH VHFWLRQVDQG
1H[XV,QIRUPDWLRQ0RGH VHFWLRQVDQG
'LVSOD\)HDWXUHV0RGH VHFWLRQVDQG
(DFK0RGHLVGLYLGHGLQWR*URXSV0RVW*URXSVDUHIXUWKHUEURNHQGRZQLQWR
5HDGLQJV
8VHWKH02'(EXWWRQWRVFUROOEHWZHHQ0RGHV
8VHWKH83'2:1DUURZVWRVFUROOIURP*URXSWR*URXSZLWKLQHDFK0RGH
8VHWKH/()75,*+7DUURZVWRVFUROOIURP5HDGLQJWR5HDGLQJZLWKLQHDFK*URXS
8VH&RPPXQLFDWRU(;7VRIWZDUHWR)ODVK8SGDWHWKH3131H[WHUQDOGLVSOD\
6HHWKHCommunicator EXT User ManualIRULQVWUXFWLRQV

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



8VLQJWKH([WHUQDO'LVSOD\V

7KH1H[XV31/('H[WHUQDOGLVSOD\KDVD86%SRUWRQWKHIURQWIRUGLUHFWGDWD
GRZQORDGV<RXFDQFRQQHFWWRWKH86%SRUWZLWK&RPPXQLFDWRU(;7WRSROODQGFRQ
ILJXUHWKHPHWHUDWWDFKHGWRWKHGLVSOD\7RXVHWKH86%IROORZWKHVHLQVWUXFWLRQV
8VHWKH1H[XV6HULHV3URGXFW&'VKLSSHGZLWK\RXUPHWHUWRLQVWDOOWKH
&RPPXQLFDWRU(;7VRIWZDUHDQGWKHGULYHUIRUWKH3186%SRUW
D,QVHUWWKH&'LQWR\RXU3&
V&'GULYH7KHVFUHHQVKRZQEHORZRSHQVLQ\RXU
%URZVHU

E&OLFNWKHNexus Technical DocumentsEXWWRQ7KHIROORZLQJVFUHHQRSHQVLQ


\RXU%URZVHU

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



8VLQJWKH([WHUQDO'LVSOD\V

F7RLQVWDOO&RPPXQLFDWRU(;7VRIWZDUHDQGWKHGULYHUIRUWKH31
L&OLFNRQWKHCommunicator EXT 3.0EXWWRQDQGFOLFNRun LQWKH
ZLQGRZWKDWRSHQV7KHVRIWZDUHLVLQVWDOOHG
LL&OLFNRQWKHUSB DriverEXWWRQFOLFNRun LQWKHZLQGRZWKDWRSHQV
7KH31GULYHULVLQVWDOOHG
&RQQHFWWKH86%FDEOHIURP
\RXU3&WRWKHSRUWXVLQJD
86$$0DOHWR86%%0DOH
FDEOHDWWDFKWKH86%$
FRQQHFWRUWRWKH3&DQG
DWWDFKWKH86%%FRQQHFWRU
WRWKH3186%SRUW6HH
)LJXUH


)LJXUH86%%0DOH&RQQHFWRUDQG3186%3RUW

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



8VLQJWKH([WHUQDO'LVSOD\V

2QFHWKH86%FDEOHLVFRQQHFWHGWRWKH31WKHGLVSOD\FOHDUVDQGWKHPHVVDJH
86%LQ8VHVFUROOVDWWKHERWWRPRIWKHGLVSOD\$GGLWLRQDOO\WKH86%/('LFRQ
OLJKWVXSZKHQWKH86%FRQQHFWLRQLVEHLQJXVHG
<RXFRQQHFWWRWKH86%SRUWXVLQJ&RPPXQLFDWRU(;7VRIWZDUHWKHVDPHZD\\RX
FRQQHFWWRDPHWHUZLWKWKHVRIWZDUH)ROORZWKHVHLQVWUXFWLRQV
'HWHUPLQHZKLFKSRUWWKH3&
V86%LVXVLQJ
D2Q\RXU3&FOLFNStart>Settings>Control Panel
E'RXEOHFOLFNWKHSystemIROGHU
F&OLFNWKHHardwareWDE<RXZLOOVHHWKHVFUHHQEHORZ

G&OLFNWKHDevice ManagerEXWWRQ<RXZLOOVHHDOLVWRIWKHFRPSXWHU
VKDUGZDUH
GHYLFHV

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



8VLQJWKH([WHUQDO'LVSOD\V

H&OLFNWKHSOXVVLJQQH[WWR3RUWV &20 /37 7KH&20SRUWVDUHGLVSOD\HG1RWH


WKH&20QXPEHUIRUWKH86%6HULDO3RUW7KLVLVWKHQXPEHU\RXZLOOXVHWR
FRQQHFWWRWKH31WKURXJK&RPPXQLFDWRU(;76HHWKHILJXUHEHORZ

2SHQ&RPPXQLFDWRU(;7VRIWZDUHDQGFOLFNWKHConnectLFRQLQWKH,FRQEDU6HH
WKHVFUHHQVKRZQEHORZ

&OLFNWKHSerial PortEXWWRQLILWVQRWDOUHDG\VHOHFWHG
6HWWKH%DXG5DWHWR ,WXVHVEHFDXVHLWVKDUHVDQH[LVWLQJ&RPSRUW
IRUGLVSOD\HGUHDGLQJV
&OLFNWKHAvailable PortsEXWWRQDQGVHOHFWWKH86%&203RUWQXPEHUIURPWKH
GURSGRZQOLVW
3URWRFROVKRXOGEH0RGEXV578
)ORZ&RQWUROVKRXOGEH1RQH

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



8VLQJWKH([WHUQDO'LVSOD\V

(FKR0RGHVKRXOGEH1R(FKR
&OLFNConnect7KHVRIWZDUHFRQQHFWVWRWKHPHWHUWKURXJKWKH315HIHUWR
WKHCommunicator EXT User's ManualIRUSURJUDPPLQJLQVWUXFWLRQV &OLFN
Help>ContentsIURPWKH&RPPXQLFDWRU(;77LWOH%DUWRYLHZWKHPDQXDORQOLQH

9.3: Dynamic Readings Mode


7KH([WHUQDO'LVSOD\SXWVLWVHOILQWKH'\QDPLF5HDGLQJV0RGHXSRQSRZHUXS8VH
WKH02'(EXWWRQWRDFFHVVWKH'\QDPLF5HDGLQJVIURPRWKHU0RGHV8VHWKH83
'2:1DUURZVWRQDYLJDWHIURP*URXSWR*URXSZLWKLQWKLV0RGH6HH6HFWLRQIRU
D1DYLJDWLRQPDSRIWKH'\QDPLF5HDGLQJV0RGH
Group 1: Phase to Neutral Voltages 8VHWKH/HIW5LJKWDUURZVWRDFFHVVWKH
IROORZLQJUHDGLQJVLQRUGHU
9ROWV$1%1&1
0D[LPXP9ROWV$1%1&1
0LQLPXP9ROWV$1%1&1
9ROWV$1%1&17+'
9ROWV$1%1&10D[LPXP7+'
9ROWV$1%1&10LQLPXP7+'
Group 2: Phase to Phase Voltages 8VHWKH/HIW5LJKWDUURZVWRDFFHVVWKHIROORZ
LQJUHDGLQJVLQRUGHU
9ROWV$%%&&$
0LQLPXP9ROWV$%%&&$
0D[LPXP9ROWV$%%&&$
Group 3: Current 8VHWKH/HIW5LJKWDUURZVWRDFFHVVWKHIROORZLQJUHDGLQJVLQ
RUGHU
&XUUHQW$%&

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



8VLQJWKH([WHUQDO'LVSOD\V

0D[LPXP&XUUHQW
0LQLPXP&XUUHQW
&XUUHQW7+'
&XUUHQW0D[LPXP7+'
&XUUHQW0LQLPXP7+'
&XUUHQW&DOFXODWHG10HDVXUHG1
0D[LPXP&XUUHQW&DOFXODWHG10HDVXUHG1
Group 4: Watt/VAR 8VHWKH/HIW5LJKWDUURZVWRDFFHVVWKHIROORZLQJUHDGLQJVLQ
RUGHU
N:DWWN9$5
0D[LPXPN:DWWN9$5&R,QN9$5
0D[LPXPN:DWWN9$5&R,QN9$5
%ORFN )L[HG :LQGRZ$YHUDJH0D[LPXPN:DWWN9$5&R,QN9$5
3UHGLFWLYH5ROOLQJ 6OLGLQJ :LQGRZ0D[LPXPN:DWWN9$5&R,QN9$5
Group 5:VA/PF/Frequency 8VHWKH/HIW5LJKWDUURZVWRDFFHVVWKHIROORZLQJUHDG
LQJVLQRUGHU
N9$3)ODJ+]
0D[LPXPN9$+]
0LQLPXPN9$+]
0D[LPXP4XDGUDQW7RWDO3)
0LQLPXP4XDGUDQW7RWDO3)
0D[LPXP4XDGUDQW7RWDO3)
0LQLPXP4XDGUDQW7RWDO3)

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



8VLQJWKH([WHUQDO'LVSOD\V

0D[LPXP4XDGUDQW7RWDO3)
0LQLPXP4XDGUDQW7RWDO3)
0D[LPXP4XDGUDQW7RWDO3)
0LQLPXP4XDGUDQW7RWDO3)
Group 6: Delivered Energy 8VHWKH/HIW5LJKWDUURZVWRDFFHVVWKHIROORZLQJUHDG
LQJVLQRUGHU
N:DWWKU4XDGUDQW4XDGUDQW 3ULPDU\
N9$5KU4XDGUDQW 3ULPDU\
N9$5KU4XDGUDQW 3ULPDU\
Group 7: Received Energy 8VHWKH/HIW5LJKWDUURZVWRDFFHVVWKHIROORZLQJUHDG
LQJVLQRUGHU
N:DWWKU4XDGUDQW4XDGUDQW 3ULPDU\
N9$5KU4XDGUDQW 3ULPDU\
N9$5KU4XDGUDQW 3ULPDU\
Group 8: Accumulations 8VHWKH/HIW5LJKWDUURZVWRDFFHVVWKHIROORZLQJUHDG
LQJVLQRUGHU
N,W$
N,W%
N,W&
N9W$
N9W%
N9W&

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



8VLQJWKH([WHUQDO'LVSOD\V

Group 9: Phase Angles 8VHWKH/HIW5LJKWDUURZVWRDFFHVVWKHIROORZLQJUHDGLQJV


LQRUGHU
3KDVH$QJOH9DQEQFQ
3KDVH$QJOH,DEF
3KDVH$QJOH9DEEFFD
3KDVH6HTXHQFH

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



8VLQJWKH([WHUQDO'LVSOD\V

9.4: Navigation Map of Dynamic Readings Mode


8VH/HIW5LJKWDUURZNH\VWRQDYLJDWH5HDGLQJV
8VH8S'RZQDUURZVWRVFUROOEHWZHHQJURXSV
5HDGLQJV
*
U
R
X
S
V

1 Second Volts
AN,BN,CN

Maximum Volts
AN,BN,CN

Minimum Volts
AN,BN,CN

%THD Volts
AN,BN,CN

1 Second Volts
AB,BC,CA

Minimum Volts
AB,BC,CA

Maximum Volts
AB,BC,CA

Return to
First
Reading

1 Second
IA,IB,IC

Maximum
IA,IB,IC

1 Second
kWatt, kVAR

+Max kWatt,
+kVAR,CoIn
kVAR

1 Second
kVA, PF
lag,
Frequency

Max
kVA,
Freq

Positive
kWatthour
Q1+Q4

Min
kVA,
Freq

Minimum
IA,IB,IC

%THD
IA,IB,IC

-Max kWatt,
-kVAR,CoIn
kVAR

Block WinAvg Max


+kWatt,
+kVAR,CoIn kVAR

Max Q1,
Total PF

Positive
kVARhr
Q1

Min Q1,
Total PF

Max Q2,
Total PF

Negative
kVARhr
Q4

Return to
First
Reading

Negative
kWatthr
Q2+Q3

Positive
kVARhr
Q2

Negative
kVARhr
Q3

Return to
First
Reading

2
kI t A

2
kI t B

2
kI t C

2
kV t A

Phase Angles V
AN,BN,CN

Phase Angles I
A,B,C

Max %THD
IA,IB,IC

Phase Angles V
AB,BC,CA

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Max %THD
Volts
AN,BN,CN

Min %THD
Volts
AN,BN,CN

Min %THD
IA,IB,IC

1 Second
INc,INm

Pred Roll Win Avg


+kWatt,
+kVAR,CoIn kVAR

Min Q2,
Total PF

Max Q3,
Total PF

2
kV t B

Phase
Sequence

'RF#

Return to
First
Reading

Return to
First
Reading

Return to
First
Reading

Min Q3,
Total PF

2
kV t C

Min Q4,
Total PF

Min Q4,
Total PF

Return to
First
Reading

Return to
First
Reading

Return to First
Reading

(



8VLQJWKH([WHUQDO'LVSOD\V

9.5: Nexus Information Mode


8VHWKH02'(EXWWRQWRDFFHVVWKH1H[XV,QIRUPDWLRQ0RGHIURPRWKHU0RGHV8VH
WKH83'2:1DUURZVWRQDYLJDWHIURP*URXSWR*URXSZLWKLQWKLV0RGH6HH6HFWLRQ
IRUD1DYLJDWLRQPDSRIWKH1H[XV,QIRUPDWLRQ0RGH
Group 1: Device Time
0HWHU7LPH
Group 2: Communication Settings 8VHWKH/HIW5LJKWDUURZVWRDFFHVVWKHIROORZ
LQJUHDGLQJVLQRUGHU
&RPPXQLFDWLRQ6HWWLQJV3RUW%DXG$GGU3URWRFRO
&RPPXQLFDWLRQ6HWWLQJV3RUW%DXG$GGU3URWRFRO
&RPPXQLFDWLRQ6HWWLQJV3RUW%DXG$GGU3URWRFRO
&RPPXQLFDWLRQ6HWWLQJV3RUW%DXG$GGU3URWRFRO
Group 3: PT/CT Ratios 8VHWKH/HIW5LJKWDUURZVWRDFFHVVWKHIROORZLQJUHDGLQJV
LQRUGHU
375DWLR
&75DWLR
Group 4: External Display Units
3ULPDU\6HFRQGDU\
6HOHFWHLWKHU3ULPDU\RU6HFRQGDU\XQLWVIRUWKH([WHUQDO'LVSOD\XVLQJWKH&RPPXQL
FDWRU(;7VRIWZDUH VHHWKHCommunicator EXT User Manual 
:KHQ3ULPDU\LVVHOHFWHGWKH'LVSOD\VKRZVDOOUHDGLQJVLQ3ULPDU\XQLWVEDVHGRQ
WKHXVHUSURJUDPPHG37DQG&75DWLRV
:KHQ6HFRQGDU\LVVHOHFWHGWKH'LVSOD\VKRZVDOOUHDGLQJVLQ6HFRQGDU\XQLWV
Group 5: Firmware Versions and Serial Numbers 8VHWKH/HIW5LJKWDUURZVWR
DFFHVVWKHIROORZLQJUHDGLQJVLQRUGHU

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



8VLQJWKH([WHUQDO'LVSOD\V

5XQ7LPH([WHUQDO'LVSOD\5XQ7LPH'635XQ7LPH&RPP
%RRW([WHUQDO'LVSOD\%RRW'63%RRW&RPP
6HULDO1XPEHU([WHUQDO'LVSOD\6HULDO1XPEHU1H[XV0RQLWRU

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



8VLQJWKH([WHUQDO'LVSOD\V

9.6: Navigation Map of Nexus Information Mode


8VH/HIW5LJKWDUURZNH\VWRQDYLJDWH5HDGLQJV
8VH8S'RZQDUURZVWRVFUROOEHWZHHQJURXSV
5HDGLQJV
*
U
R
X
S
V

Meter Time

Comm
Settings
Port 1

Comm
Settings
Port 2

PT Ratio

CT Ratio

Return
To
First Reading

Boot
Display,
DSP, Comm

Serial #
Display, Serial
# Monitor

Comm
Settings
Port 3

Return
To
First Reading

Comm
Settings
Port 4

Display
Primary/Secondary

Run-time
Display,
DSP, Comm

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Return
To
First
Reading

'RF#

(



8VLQJWKH([WHUQDO'LVSOD\V

9.7: Display Features Mode


8VHWKH0RGHEXWWRQWRDFFHVVWKH'LVSOD\)HDWXUHV0RGHIURPRWKHUPRGHV8VHWKH
8S'RZQDUURZVWRQDYLJDWHIURPJURXSWRJURXSZLWKLQWKLVPRGH6HH6HFWLRQ
IRUD1DYLJDWLRQPDSRIWKH'LVSOD\)HDWXUHVPRGH
Group 1: Reset Max/Min
3UHVVEnterWRUHVHWWKH0D[DQG0LQYDOXHV
NOTE,IWKH3DVVZRUG3URWHFWLRQIHDWXUHKDVEHHQHQDEOHGWKURXJK&RPPXQLFDWRU
(;7VRIWZDUH\RXZLOOQHHGWRHQWHUDSDVVZRUGWRUHVHWWKH0D[0LQUHDGLQJV)ROORZ
WKLVSURFHGXUH
3UHVVEnter
(QWHUWKHSDVVZRUGRQHFKDUDFWHUDWDWLPHE\SUHVVLQJWKH8SRU'RZQDUURZV
(DFKSDVVZRUGFKDUDFWHUEHJLQVDVDQ$3UHVVWKH8SDUURZWRLQFUHPHQWWKH
FKDUDFWHUIURP$=DQGWKHQIURP3UHVVWKH'RZQDUURZWRGHFUHPHQWWKH
FKDUDFWHUIURP$WRDQGWKHQIURP=$ 
3UHVVSetWRHQWHUHDFKFKDUDFWHULQWKHSDVVZRUG
:KHQWKHHQWLUHSDVVZRUGLVVKRZQRQWKH'LVSOD\VFUHHQSUHVVEnter
2QFHWKHSDVVZRUGLVHQWHUHGFRUUHFWO\SUHVVEnterDJDLQWRUHVHWWKH0D[0LQ
YDOXHV
Group 2: Reset Energy
3UHVVEnterWRUHVHWWKH(QHUJ\UHDGLQJV
NOTE,IWKH3DVVZRUG3URWHFWLRQIHDWXUHKDVEHHQHQDEOHGWKURXJK&RPPXQLFDWRU
(;7VRIWZDUH\RXZLOOQHHGWRHQWHUDSDVVZRUGWRUHVHWWKH(QHUJ\UHDGLQJV)ROORZ
VWHSVDERYH7KHQSUHVVEnterDJDLQWRUHVHWHQHUJ\
Group 3: Display Baud Rate/Address
Group 4: Display Communication Protocol
Group 5: EIG Use Only

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



8VLQJWKH([WHUQDO'LVSOD\V

Group 6: EIG Use Only


Group 7: Lamp Test
3UHVVEnterWRFRQGXFWDQ/('WHVW
Group 8: Display Scroll ON/OFF
3UHVVEnterWRWXUQWKHVFUROOIHDWXUHRQRURII:KHQWKHVFUROOIHDWXUHLVRQWKH
31H[WHUQDOGLVSOD\VFUROOVWKURXJKWKHILUVWUHDGLQJRIHDFKJURXSLQWKH'\QDPLF
5HDGLQJVPRGH,IDEXWWRQLVSUHVVHGGXULQJWKHVFUROOVFUROOLQJSDXVHVIRURQH
PLQXWH

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



8VLQJWKH([WHUQDO'LVSOD\V

9.8: Navigation Map of Display Features Mode


8VH8S'RZQDUURZVWRVFUROOEHWZHHQJURXSV
*
U
R
X
S
V

Reset Max/Min

Reset Energy

Baud
Rate/Address

Communication
Protocol

Lamp Test

Display Scroll
On/Off

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



8VLQJWKH([WHUQDO'LVSOD\V

9.9: Optional P40N+ LED External Remote Display Specifications

Specification

P40N+/P41N+/P43N+ Displays

0D[LPXP,QSXW9ROWDJH

9'&

0LQLPXP,QSXW9ROWDJH

9'&

0D[LPXP3RZHU&RQVXPSWLRQ

:

1RPLQDO3RZHU&RQVXPSWLRQ

$SSUR[LPDWHO\:

2SHUDWLQJ7HPSHUDWXUH5DQJH

WR R& WR R)

2YHUDOO'LPHQVLRQV +[:['

[[LQFKHV[[
FP

7KHOHJDF\31GLPHQVLRQVDUH[[LQFKHV[[FP

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



8VLQJWKH([WHUQDO'LVSOD\V

7KLVSDJHLQWHQWLRQDOO\OHIWEODQN

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



10: External I/O Modules

10: External I/O Modules


10.1: Hardware Overview
All Nexus External I/O modules have the following components:
Female RS485 Side Port: use to connect to another modules male RS485 side port.
Male RS485 Side Port: use to connect to the Nexus 1250/1252 Meters Port 3 or 4
or to another modules female RS485 side port. See Section 5.3.8 for wiring detail.
I/O Port: used for functions specific to the type of module; size and pin configuration vary depending on type of module.
Reset Button: Press and hold for three seconds to reset the modules baud rate to
57600 and its address to 247 for 30 seconds.
LEDs: when flashing, signal that the module is functioning.
Mounting Brackets (MBIO): used to secure one or more modules to a flat surface.

Mounting Brackets (MBIO)

Female RS485
Side Port

I/O Port

LEDs

(Size and Pin


Configuration Vary)

Male RS485
Side Port

Reset Button
Figure 10.1: I/O Module Components

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

10 - 1

10: External I/O Modules

10.1.1: Port Overview


All Electro Industries I/O Modules have ports through which they interface with other
devices. The port configurations are variations of the four types shown below.
Four Analog Outputs

Eight Analog Outputs

(0-1mA and 4-20mA)

(0-1mA and 4-20mA)

0-1mA
Analog Output
Module

0-1mA
Analog Input
Module

COM

COM

OUT 1

OUT 1

OUT 2

OUT 2

OUT 3

OUT 3

OUT 4

OUT 4
OUT 5
OUT 6
OUT 7
OUT 8

RESET

RESET

Eight Analog Inputs

Four Relay Outputs or

(0-1mA, 0-20mA,

Four KYZ Pulse Outputs

0-5Vdc, 0-10Vdc) or
Eight Status Inputs

NO

0-1mA
Analog Input
Module

NO

COM
INPUT 1
INPUT 2
INPUT 3
INPUT 4
INPUT 5
INPUT 6

NO

K
Y
Z

NO

O
U
T
P
U
T
S

NO
C

NO
NO

INPUT 7
C
INPUT 8

RESET

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

NO
RESET

Doc#

E151701

10 - 2

10: External I/O Modules

10.2: I/O Module Installation


See Section 5.3.8 for wiring instructions for the external I/O Modules, and Section 6.4
for hardware installation instructions.

10.2.1: Power Source for I/O Modules


The Nexus 1262/1272 does not supply power to the I/O Modules. You must use an
external power source, such as the EIG PSIO (12V). Refer to Section 5.3.9 to
determine power needed.

Figure 10.2: PSIO Power Supply Side View, Showing Male RS485 Port

TX

CT

On

RX

0-1mA
Analog Input
Module

Power In

COM

N(-)

INPUT 1
INPUT 2
INPUT 3
INPUT 4

L(+)

DANGER

PowerPSIO
Supply
Max Power: 12 VA
Input Voltage: 12-60V DC
90-240V AC/DC
Output Voltage: 12V DC

RESET

ElectroIndustries/GaugeTech

www.electroind.com

Figure 10.3: Power Flow from PSIO to I/O Module

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

10 - 3

10: External I/O Modules

On
Power In

N(-)

L(+)

DANGER

PowerPSIO
Supply
Max Power: 12 VA
Input Voltage: 12-60V DC
90-240V AC/DC
Output Voltage: 12V DC

ElectroIndustries/GaugeTech

www.electroind.com

POWER +
POWER -

Figure 10.4: PSIO Side and Top Labels (Labels are Red and White)

10.3: Using the PSIO with Multiple I/O Modules


Mounting
bracket

Female
RS485
side Port

0-1mA
Analog Input
Module

CT

RX

TX

RX

TX

0-1mA
Analog Output
Module

CT

CT

TX

Female
RS485
Side Port

Communication
ONLY
(A+, B- and
Shield)
RX

LEDs

On

0-1mA
Analog Input
Module

COM

COM

COM

OUT 1

INPUT 1

INPUT 1

OUT 2

INPUT 2

INPUT 2

Power In

N(-)

!
DANGER

OUT 3

INPUT 3

INPUT 3

OUT 4

INPUT 4

INPUT 4

INPUT 5

INPUT 5

Max Power: 12 VA

INPUT 6

INPUT 6

Input Voltage: 12-60V DC

INPUT 7

INPUT 7

INPUT 8

INPUT 8

RESET

RESET

Control
Power

L(+)

PowerPSIO
Supply
90-240V AC/DC
Output Voltage: 12V DC

RESET

ElectroIndustries/GaugeTech

www.electroind.com

Reset Button
Mounting Bracket
I/O Port (Size and pin configuration vary)

Figure 10.5: PSIO Used with Multiple I/O Modules

NOTE: As shown, the PSIO must be to the right of I/O Modules when viewing the side
label.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

10 - 4

10: External I/O Modules

10.3.1: Steps for Attaching Multiple I/O Modules


1. Each I/O module in a group must be assigned a unique address. See the
Communicator EXT User Manual for details on configuring and programming the
I/O Modules.
2. Determine how many power sources (such as the PSIO) are needed for the number
of modules in use. See Sections 5.3.9 for details.
3. Starting with the left module and using a slotted screw driver, fasten the first I/O
Module to the left Mounting Bracket. The left Mounting Bracket is the one with the
PEM. Fasten the internal screw tightly into the left Mounting Bracket.
4. Next, slide the female RS485 port into the male RS485 side port to connect the
next I/O module to the left module. Fasten together enough to grab but do not
tighten.
5. One by one combine the modules together.
6. Attach the PSIO (power supply) to the right of the group of I/O Modules it is
supplying with power.
NOTE: The PB1 can also be used as a Low Voltage Power Supply. It must be mounted
separately.
7. Once you have combined all the I/O modules and power supplies together for the
group, fasten tightly. This final tightening will lock the whole group together as a
unit.
8. Attach the right Mounting Bracket to the right side of the group using the small
Phillips head screws provided.
9. Mount the group of modules on a secure, flat surface. This procedure will insure
that all modules stay connected securely.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

10 - 5

10: External I/O Modules

10.4: Factory Settings and Reset Button


Factory Settings:
All Nexus I/O Modules are shipped with a preset address and a baud rate of 57600.
See following sections for I/O Module addresses.
Reset Button:
If there is a communication problem or if you are unsure of a modules address and
baud rate, press and hold the RESET button for 3 seconds; the module will reset to a
default address of 247 at 57600 baud rate for 30-seconds. This enables you to
interrogate the I/O using the Communicator EXT software; see the Modbus
Communicating I/O Modules User Manual.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

10 - 6

10: External I/O Modules

10.5: Analog Transducer Signal Output Modules

Table 1:
Analog Transducer Signal Output Module Specifications
Model Numbers

1mAON4: 4-channel analog output 01mA


1mAON8: 8-channel analog output 01mA
20mAON4: 4-channel analog output 4-20mA
20mAON8: 8-channel analog output 4-20mA

Accuracy

0.1% of Full Scale

Scaling

Programmable

Communication

RS485, Modbus RTU


Programmable Baud Rates: 4800, 9600, 19200,
38400, 57600

Power Requirement

15-20VDC @50-200mA

Operating Temperature

(-20 to +70)o C/(-4 to +158)o F

Maximum Load Impedance

01mA: 10k Ohms; 4-20mA: 500 Ohms

Factory Settings

Modbus Address: 1mAON4: 128; 1mAON8: 128;


20mAON4: 132; 20mAON8: 132
Baud Rate: 57600
Transmit Delay Time: 0

Default Settings (Reset Button)

Modbus Address: 247


Baud Rate: 57600
Transmit Delay Time: 20msec

10.5.1: Overview
The Analog Transducer Signal Output Modules (01mA or 420mA) are available in
either a 4- or 8-channel configuration. Maximum registers per request, read or write,
is 17 registers.
All outputs share a single common point. This is also an isolated connection (from
ground).
The Modbus Map for the Analog Output Module (and operating details) can be found in
the Modbus Communicating I/O Modules Manual.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

10 - 7

10: External I/O Modules

10.5.2: Normal Mode


Normal Mode is the same for the 0-1mA and the 4-20mA Analog Output Modules
except for the number of processes performed by the modules.
Both devices:
1. Accept new values through communication.
2. Output current loops scaled from previously accepted values.
The 0-1mA module includes one more process in its Normal Mode:
3. Read and average the A/D and adjust values for Process 2 above.
The device will operate with the following default parameters:
Address:

247 (F7H)

Baud Rate:

57600 Baud

Transmit Delay Time:

20 msec

Normal Operation is prevented by a number of occurrences. See Section 10.4 for


details.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

10 - 8

10: External I/O Modules

10.6: Analog Input Modules


Table 2:
Analog Input Module Specifications
Model Numbers

8AI1: 8-channel analog input 01mA


8AI2: 8-channel analog input 020mA
8AI3: 8-channel analog input 05VDC
8AI4: 8-channel analog input 010VDC

Accuracy

0.25% of Full Scale

Scaling

Programmable

Communication

RS485, Modbus RTU


Programmable Baud Rates: 4800, 9600, 19200,
38400, 57600

Power Requirement

15-20VDC @50-200mA

Operating Temperature

(-20 to +70)o C/(-4 to +158)o F

Maximum Load Impedance

01mA: 10k Ohms; 4-20mA: 500 Ohms

Factory Settings

Modbus Address: 8AI1: 136; 8AI2: 140; 8AI3: 144;


8AI4: 148
Baud Rate: 57600
Transmit Delay Time: 0

Default Settings (Reset Button)

Modbus Address: 247


Baud Rate: 57600
Transmit Delay Time: 20msec

10.6.1: Overview
The Analog Input Modules (01mA, 020mA, 05Vdc and 010Vdc) are available in
8-channel format. Maximum registers per request, read or write, is 17 registers.
All inputs share a single common point. This is also an isolated connection (from
ground).
The Modbus Map for the Analog Output Module (and operating details) can be found in
the Modbus Communicating I/O Modules Manual.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

10 - 9

10: External I/O Modules

10.6.2: Normal Mode


In Normal Mode, the Input Module:
1. Reads and averages the A/D and adjusts values for process 2.
2. Calculates the percentage of Input Value.
NOTE: The percentage value of the Input is stored in Input Value Registers (Registers
04097-04104).
The device will operate with the following default parameters:
Address:

247 (F7H)

Baud Rate:

57600 Baud

Transmit Delay Time:

20 msec

Normal Operation is prevented by a number of occurrences. See Section 10.4 for


details.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

10 - 10

10: External I/O Modules

10.7: Digital Dry Contact Relay Output (Form C) Module

Digital Dry Contact Relay Output Module Specifications


Model Number

4RO1: 4 matching relay outputs

Contact Type

Changeover (SPDT)

Relay Type

Mechanically latching

Communication

RS485, Modbus RTU


Programmable Baud Rates: 4800, 9600, 19200,
38400, 57600

Power Requirement

2.0W max @ 12-20VDC

Operating Temperature

(-20 to +70)o C/(-4 to +158)o F

Switching Voltage

AC 250V / DC 30V

Switching Power

1250VA / 150W

Switching Current

5A

Mechanical Life

5 x 107 switching operations

Electrical Life

105 switching operations at rated current

Factory Settings

Modbus Address: 156


Baud Rate: 57600
Transmit Delay Time: 0

Default Settings (Reset Button)

Modbus Address: 247


Baud Rate: 57600
Transmit Delay Time: 20msec

10.7.1: Overview
The Relay Output Module consists of four Latching Relay Outputs. In Normal Mode,
the device accepts commands to control the relays. Relay output modules are triggered by limits programmed with the Communicator EXT software. See the Communicator EXT User Manual for details on programming limits.
The Modbus Map for the Analog Output Module (and operating details) can be found in
the Modbus Communicating I/O Modules Manual.
Each latching relay will hold its state in the event of a power loss.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

10 - 11

10: External I/O Modules

10.7.2: Communication
Maximum registers per request, read or write, is 4 registers.
The device will operate with the following default parameters:
Address:

247 (F7H)

Baud Rate:

57600 Baud

Transmit Delay Time:

20 msec

Some situations will cause the device to operate with the above Default Parameters.
See Section 10.4 for details of Default Mode.

10.7.3: Normal Mode


Normal Mode consists of one process: the device accepts new commands to control
the relays.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

10 - 12

10: External I/O Modules

10.8: Digital Solid State Pulse Output (KYZ) Module

Digital Solid State Pulse Output Module Specifications


Model Number

4PO1

Communication

RS485, Modbus RTU


Programmable Baud Rates: 4800, 9600, 19200,
38400, 57600

Power Requirement

15-20VDC @50-200mA

Operating Temperature

(-20 to +70)o C/(-4 to +158)o F

Voltage Rating

Up to 300VDC

Commands Accepted

Read and Write with at least 4 registers of data per


command

Memory

256 Byte IC EEPROM for storage of programmable settings and non-volatile memory

Factory Settings

Modbus Address: 160


Baud Rate: 57600
Transmit Delay Time: 0

Default Settings (Reset Button)

Modbus Address: 247


Baud Rate: 57600
Transmit Delay Time: 20msec

10.8.1: Overview
The KYZ Pulse Output Modules have 4 KYZ Pulse Outputs and accept Read and Write
Commands with at least 4 registers of data per command. Digital Solid State Pulse
Output (KYZ) Modules are user programmed to reflect VAR-hours, WATT-hours, or VAhours. See the Modbus Communicating I/O Modules User Manual for details on programming the module.
The Modbus Map for the KYZ Pulse Output Module (and operating details) can be
found in the Modbus Communicating I/O Modules Manual.
NC = Normally Closed; NO = Normally Open; C = Common.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

10 - 13

10: External I/O Modules

10.8.2: Communication
Maximum registers per request, read or write, is 4 registers.
The device will operate with the following Default Mode Parameters. See Section 10.4
for details.
Address:

247 (F7H)

Baud Rate:

57600 Baud

Transmit Delay Time:

20 msec

10.8.3: Normal Mode


Energy readings are given to the device frequently. The device generates a pulse at
each channel after a certain energy increase.
Normal Operation consists of three processes:
1. The first process accepts writes to registers 04097 - 04112. Writes can be up to
four registers long and should end on the fourth register of a group (register
04100, or registers 04103-04112 or registers 04109-04112). These writes can be
interpreted as two-byte, four-byte, six-byte or eight-byte energy readings. The
reception of the first value for a given channel provides the initial value for that
channel. Subsequent writes will increment the Residual for that channel by the difference of the old value and the new value. The previous value is then replaced
with the new value. Attempting to write a value greater than the programmed Rollover Value for a given channel is completely ignored and no registers are modified.
If the difference is greater than half of the programmed Rollover Value for a given
channel, the write does not increment the Residual but does update the Last Value.
Overflow of the Residual is not prevented.
2. The second process occurs in the main loop and attempts to decrement the Residual by the Programmed Energy/Pulse Value. If the Residual is greater than the Programmed Energy/Pulse Value and the Pending Pulses Value for that channel has not
reached the maximum limit, then Residual is decremented appropriately and the
Pending Pulses is increased by two, signifying two more transitions and one more
pulse.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

10 - 14

10: External I/O Modules

3. The third process runs from a timer which counts off pulse widths from the Programmable Minimum Pulse Width Values. If there are Pulses Pending for a channel
and the delay has passed, then the Pulses Pending is decremented for that channel
and the Output Relay is toggled.
Operation Indicator (0000H = OK, 1000H = Problem):
Bit 1:1 = EEPROM Failure
Bit 2:1 = Checksum for Communications Settings bad
Bit 3:1 = Checksum for Programmable Settings bad
Bit 4:1 = 1 or mor Communications Settings are invalid
Bit 5:1 = 1 or more Programmable Settings are invalid
Bit 6:1 = 1 or more Programmable Settings have been modified
Bit 7:1 = Forced Default by Reset Value
Bit 15:1 = Normal Operation of the device is disabled

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

10 - 15

10: External I/O Modules

10.9: Digital Status Input Module

Digital Status Input Module Specifications


Model Number

8DI1

Communication

RS485, Modbus RTU


Programmable Baud Rates: 4800, 9600, 19200,
38400, 57600

Power Requirement

15-20VDC @50-200mA

Operating Temperature

(-20 to +70)o C/(-4 to +158)o F

Voltage Rating

Up to 300VDC

Detection

Wet/Dry, Auto-detect

Memory

256 Byte I2C EEPROM for storage of programmable


settings and non-volatile memory

Factory Settings

Modbus Address: 164


Baud Rate: 57600
Transmit Delay Time: 0

Default Settings (Reset Button)

Modbus Address: 247


Baud Rate: 57600
Transmit Delay Time: 20msec

10.9.1: Overview
The Digital Status Input Module is used either for additional status detect or for accumulating pulses from external equipment, such as power meters, water meters, etc.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

10 - 16

10: External I/O Modules

10.9.2: Communication
Maximum registers per request, read or write, is 4 registers.
The device will operate with the following Default Mode Parameters. See Section 10.4
for details.
Address:

247 (F7H)

Baud Rate:

57600 Baud

Transmit Delay Time:

20 msec

10.9.3: Normal Mode


The device polls the inputs at 100Hz (once every 10 msec), debouncing the inputs
and incrementing the Transition Accumulators for each channel as appropriate.
The inputs are represented by Channel 1 in the LSB through Channel 8 in the MSB of
the low order byte of the register.
The Modbus Map for the Digital Status Input Modules (and operating details) can be
found in the Modbus Communicating I/O Modules Manual.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

10 - 17

10: External I/O Modules

This page intentionally left blank.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

10 - 18

11: Electrical Installation

11: Electrical Installation


The Nexus 1262/1272 Socket meter supported forms and their wiring configurations are shown in this chapter. The forms are based on the rated Voltage and hookup
required for your application. (Custom forms and configurations are also available
from EIG.)

11.1: Considerations When Installing Meters


Installation of the Nexus 1262/1272 meter must be performed only by
qualified personnel who follow standard safety precautions during all
procedures. Those personnel should have appropriate training and
experience with high voltage devices. Appropriate safety gloves, safety
glasses and protective clothing are recommended.
During normal operation of the Nexus meter, dangerous voltages flow through
many parts of the unit, including: Terminals and any connected CTs (Current Transformers) and PTs (Potential Transformers), all I/O Modules and their circuits. All
Primary and Secondary circuits can, at times, produce lethal voltages and
currents. Avoid contact with any current-carrying surfaces.
Do not use the meter or any I/O device for primary protection or in an
energy-limiting capacity. The meter can only be used as secondary protection.
Do not use the meter for applications where failure of the meter may cause harm or
death.
Do not use the meter for any application where there may be a risk of fire.
All meter terminals should be inaccessible after installation.
Do not apply more than the maximum voltage the meter or any attached device can
withstand. Refer to meter and/or device labels and to the Specifications for all devices
before applying voltages. Do not HIPOT/Dielectric test any Outputs, Inputs or Communications terminals.
The current inputs are only to be connected to external current transformers.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

11 - 1

11: Electrical Installation

EIG recommends the use of Fuses for voltage leads and power supply, and shorting
blocks to prevent hazardous voltage conditions or damage to CTs, if the meter needs
to be removed from service. CT grounding is optional.
NOTE: IF THE EQUIPMENT IS USED IN A MANNER NOT SPECIFIED BY
THE MANUFACTURER, THE PROTECTION PROVIDED BY THE
EQUIPMENT MAY BE IMPAIRED.
NOTE: THERE IS NO REQUIRED PREVENTIVE MAINTENANCE OR
INSPECTION NECESSARY FOR SAFETY. HOWEVER, ANY REPAIR OR
MAINTENANCE SHOULD BE PERFORMED BY THE FACTORY.
DISCONNECT DEVICE: The following part is considered the
equipment disconnect device.
A SWITCH OR CIRCUIT-BREAKER SHALL BE INCLUDED IN THE END-USE EQUIPMENT
OR BUILDING INSTALLATION. THE SWITCH SHALL BE IN CLOSE PROXIMITY TO THE
EQUIPMENT AND WITHIN EASY REACH OF THE OPERATOR. THE SWITCH SHALL BE
MARKED AS THE DISCONNECTING DEVICE FOR THE EQUIPMENT.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

11 - 2

11: Electrical Installation

11.2: Blade Configuration for Forms 9S, 36S, and 45S


Detailed drawings of the Blade configurations are shown below and on the next page.
There are two configurations because the 9S and the 36S are the same.
NOTE: The forms referred to in this chapter comply with ANSI forms 9S, 36S and
45S.

Figure 11.1: Form 9S & 36S Base with Knock Out Holes

Figure 11.2: Form 45S Base with Knock Out Holes

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

11 - 3

11: Electrical Installation

11.3: Wiring Diagrams


Choose from the supported meter forms based on the rated Voltage and hookup
required for your application. Corresponding wiring diagrams appear on the following
pages. If the connection diagram you need is not listed, contact EIG for a custom connection diagram. Form 9S mounted in an A/S Adapter is shown in Figure 11.19.
NOTE: Form 45S replaces Form 5S and may also be used in 4-wire circuits.

Table 1:
Form

9S

36S

45S

9S in S/A

Description

Figure#

Wye, no PTs, 3 CTs

11.3

Wye, 3 PTs, 3 CTs

11.4

4-Wire Delta, no PTs, 3 CTs

11.5

4-Wire Delta, 3 PTs, 3 CTs

11.6

4-Wire Delta, no PTs, 2 CTs

11.7

4-Wire Delta, 2 PTs, 2 CTs

11.8

3-Wire Delta, no PTs, 2 CTs

11.9

3-Wire Delta, 2 PTs, 2 CTs

11.10

2.5 EL Wye, no PTs, 3 CTs

11.11

2.5 EL Wye, 2 PTs, 3 CTs

11.12

Wye, no PTs, 3 CTs

11.13

Wye, 2 PTs, 3 CTs

11.14

3-wire Delta, no PTs, 2 CTs

11.15

3-wire Delta, 2 PTs, 2 CTs

11.16

4-wire Delta, no PTs, 2 CTs

11.17

4-wire Delta, 2 PTs, 2 CTs

11.18

Form 9S Mounted in S/A Adapter


(showing connectors)

11.19

Table 11.1: Nexus 1262/1272 Meter Forms

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

11 - 4

11: Electrical Installation

FORM: 9S (TRANSFORMER RATED)


SERVICE: WYE, 4WIRE
NO PTs, 3 CTs

3
N

LINE

   

2











LOAD
Figure 11.3: Form 9S Wye, no PTs, 3 CTs
The protective ground connections for the transformers are omitted in the diagrams and are not required
for the meter to work properly. However, we strongly recommend those connections to reduce shock
hazard.
Shorting switches (blocks) for the current transformers secondary side are also not shown. To prevent
electrical shock we recommended you use such shorting switches (blocks). Make sure the CTs secondary are shorted before disconnecting them from the meters current input terminals.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

11 - 5

11: Electrical Installation

FORM: 9S (TRANSFORMER RATED)


SERVICE: WYE, 4WIRE
3 PTs, 3 CTs

3
N

LINE

   

2











LOAD
Figure 11.4: Form 9S Wye, 3 PTs, 3 CTs
The protective ground connections for the transformers are omitted in the diagrams and are not required
for the meter to work properly. However, we strongly recommend those connections to reduce shock
hazard.
Shorting switches (blocks) for the current transformers secondary side are also not shown. To prevent
electrical shock we recommended you use such shorting switches (blocks). Make sure the CTs secondary are shorted before disconnecting them from the meters current input terminals.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

11 - 6

11: Electrical Installation

FORM: 9S (TRANSFORMER RATED)


SERVICE: DELTA, 4WIRE
NO PTs, 3 CTs
LINE

   












LOAD
Figure 11.5: Form 9S 4-Wire Delta, no PTs, 3 CTs
The protective ground connections for the transformers are omitted in the diagrams and are not required
for the meter to work properly. However, we strongly recommend those connections to reduce shock
hazard.
Shorting switches (blocks) for the current transformers secondary side are also not shown. To prevent
electrical shock we recommended you use such shorting switches (blocks). Make sure the CTs secondary are shorted before disconnecting them from the meters current input terminals.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

11 - 7

11: Electrical Installation

FORM: 9S (TRANSFORMER RATED)


SERVICE: DELTA, 4WIRE
3 PTs, 3 CTs
LINE

   












LOAD
Figure 11.6: Form 9S 4-Wire Delta, 3 PTs, 3 CTs
The protective ground connections for the transformers are omitted in the diagrams and are not required
for the meter to work properly. However, we strongly recommend those connections to reduce shock
hazard.
Shorting switches (blocks) for the current transformers secondary side are also not shown. To prevent
electrical shock we recommended you use such shorting switches (blocks). Make sure the CTs secondary are shorted before disconnecting them from the meters current input terminals.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

11 - 8

11: Electrical Installation

FORM: 9S (TRANSFORMER RATED)


SERVICE: DELTA, 4WIRE
NO PTs, 2 CTs

LINE
2

  









LOAD
Figure 11.7: Form 9S 4-Wire Delta no PTs, 2 CTs
The protective ground connections for the transformers are omitted in the diagrams and are not required
for the meter to work properly. However, we strongly recommend those connections to reduce shock
hazard.
Shorting switches (blocks) for the current transformers secondary side are also not shown. To prevent
electrical shock we recommended you use such shorting switches (blocks). Make sure the CTs secondary are shorted before disconnecting them from the meters current input terminals.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

11 - 9

11: Electrical Installation

FORM: 9S (TRANSFORMER RATED)


SERVICE: DELTA, 4WIRE
2 PTs, 2 CTs
LINE

  









LOAD
Figure 11.8: Form 9S 4-Wire Delta, 2 PTs, 2 CTs
The protective ground connections for the transformers are omitted in the diagrams and are not required
for the meter to work properly. However, we strongly recommend those connections to reduce shock
hazard.
Shorting switches (blocks) for the current transformers secondary side are also not shown. To prevent
electrical shock we recommended you use such shorting switches (blocks). Make sure the CTs secondary are shorted before disconnecting them from the meters current input terminals.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

11 - 10

11: Electrical Installation

FORM: 9S (TRANSFORMER RATED)


SERVICE: DELTA, 3WIRE
NO PTs, 2 CTs

LINE
2

  









LOAD
Figure 11.9: Form 9S 3-Wire Delta, no PTs, 2 CTs
The protective ground connections for the transformers are omitted in the diagrams and are not required
for the meter to work properly. However, we strongly recommend those connections to reduce shock
hazard.
Shorting switches (blocks) for the current transformers secondary side are also not shown. To prevent
electrical shock we recommended you use such shorting switches (blocks). Make sure the CTs secondary are shorted before disconnecting them from the meters current input terminals.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

11 - 11

11: Electrical Installation

FORM: 9S (TRANSFORMER RATED)


SERVICE: DELTA, 3WIRE
2 PTs, 2 CTs
LINE

  









LOAD
Figure 11.10: Form 9S 3-Wire Delta, 2 PTs, 2 CTs
The protective ground connections for the transformers are omitted in the diagrams and are not required
for the meter to work properly. However, we strongly recommend those connections to reduce shock
hazard.
Shorting switches (blocks) for the current transformers secondary side are also not shown. To prevent
electrical shock we recommended you use such shorting switches (blocks). Make sure the CTs secondary are shorted before disconnecting them from the meters current input terminals.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

11 - 12

11: Electrical Installation

FORM: 36S (TRANSFORMER RATED)


SERVICE: WYE, 4WIRE
NO PTs, 3 CTs

3
N

LINE
  

2










LOAD
Figure 11.11: Form 36S 2.5 Element Wye, no PTs, 3 CTs
The protective ground connections for the transformers are omitted in the diagrams and are not required
for the meter to work properly. However, we strongly recommend those connections to reduce shock
hazard.
Shorting switches (blocks) for the current transformers secondary side are also not shown. To prevent
electrical shock we recommended you use such shorting switches (blocks). Make sure the CTs secondary are shorted before disconnecting them from the meters current input terminals.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

11 - 13

11: Electrical Installation

FORM: 36S (TRANSFORMER RATED)


SERVICE: WYE, 4WIRE
2 PTs, 3 CTs

3
N

LINE

   

2










LOAD
Figure 11.12: Form 36S 2.5 Element Wye, 2 PTs, 3 CTs
The protective ground connections for the transformers are omitted in the diagrams and are not required
for the meter to work properly. However, we strongly recommend those connections to reduce shock
hazard.
Shorting switches (blocks) for the current transformers secondary side are also not shown. To prevent
electrical shock we recommended you use such shorting switches (blocks). Make sure the CTs secondary are shorted before disconnecting them from the meters current input terminals.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

11 - 14

11: Electrical Installation

FORM: 45S (TRANSFORMER RATED)


SERVICE: WYE, 4WIRE
NO PTs, 3 CTs

3
N

LINE

   

2








LOAD
Figure 11.13: Form 45S Wye, no PTs, 3 CTs
The protective ground connections for the transformers are omitted in the diagrams and are not required
for the meter to work properly. However, we strongly recommend those connections to reduce shock
hazard.
Shorting switches (blocks) for the current transformers secondary side are also not shown. To prevent
electrical shock we recommended you use such shorting switches (blocks). Make sure the CTs secondary are shorted before disconnecting them from the meters current input terminals.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

11 - 15

11: Electrical Installation

FORM: 45S (TRANSFORMER RATED)


SERVICE: WYE, 4WIRE
2 PTs, 3 CTs

3
N

LINE

   

2








LOAD
Figure 11.14: Form 45S Wye, 2 PTs, 3 CTs
The protective ground connections for the transformers are omitted in the diagrams and are not required
for the meter to work properly. However, we strongly recommend those connections to reduce shock
hazard.
Shorting switches (blocks) for the current transformers secondary side are also not shown. To prevent
electrical shock we recommended you use such shorting switches (blocks). Make sure the CTs secondary are shorted before disconnecting them from the meters current input terminals.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

11 - 16

11: Electrical Installation

FORM: 45S (TRANSFORMER RATED)


SERVICE: DELTA, 3WIRE
NO PTs, 2 CTs

LINE
  

2






LOAD




Figure 11.15: Form 45S 3-Wire Delta, no PTs, 2 CTs

The protective ground connections for the transformers are omitted in the diagrams and are not required
for the meter to work properly. However, we strongly recommend those connections to reduce shock
hazard.
Shorting switches (blocks) for the current transformers secondary side are also not shown. To prevent
electrical shock we recommended you use such shorting switches (blocks). Make sure the CTs secondary are shorted before disconnecting them from the meters current input terminals.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

11 - 17

11: Electrical Installation

FORM: 45S (TRANSFORMER RATED)


SERVICE: DELTA, 3WIRE
2 PTs, 2 CTs

LINE
  

2









LOAD
Figure 11.16: Form 45S 3-Wire Delta, 2 PTs, 2 CTs
The protective ground connections for the transformers are omitted in the diagrams and are not required
for the meter to work properly. However, we strongly recommend those connections to reduce shock
hazard.
Shorting switches (blocks) for the current transformers secondary side are also not shown. To prevent
electrical shock we recommended you use such shorting switches (blocks). Make sure the CTs secondary are shorted before disconnecting them from the meters current input terminals.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

11 - 18

11: Electrical Installation

FORM: 45S (TRANSFORMER RATED)


SERVICE: DELTA, 4WIRE
NO PTs, 2 CTs

LINE
  







LOAD




Figure 11.17: Form 45S 4-Wire Delta, no PTs, 2 CTs

The protective ground connections for the transformers are omitted in the diagrams and are not required
for the meter to work properly. However, we strongly recommend those connections to reduce shock
hazard.
Shorting switches (blocks) for the current transformers secondary side are also not shown. To prevent
electrical shock we recommended you use such shorting switches (blocks). Make sure the CTs secondary are shorted before disconnecting them from the meters current input terminals.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

11 - 19

11: Electrical Installation

FORM: 45S (TRANSFORMER RATED)


SERVICE: DELTA, 4WIRE
2 PTs, 2 CTs

LINE
  










LOAD
Figure 11.18: Form 45S 4-Wire Delta, 2 PTs, 2 CTs
The protective ground connections for the transformers are omitted in the diagrams and are not required
for the meter to work properly. However, we strongly recommend those connections to reduce shock
hazard.
Shorting switches (blocks) for the current transformers secondary side are also not shown. To prevent
electrical shock we recommended you use such shorting switches (blocks). Make sure the CTs secondary are shorted before disconnecting them from the meters current input terminals.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

11 - 20

11: Electrical Installation

11.: 9S Meter Mounted in S/A Adapter


Any of the 9S Forms can be mounted in an S/A Adapter, such as the one shown below.
The socket meter is pushed into the S/A Adapter until the meter snaps into place.
The blades on the back of the socket meter make the proper connection. See Figures
11.1 to 11.8 for the 9S wiring diagrams.

Figure 11.19: Form 9S mounted in an S/A Adapter (front removed)

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

11 - 21

11: Electrical Installation

This page intentionally left blank

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

11 - 22

12: Switchboard Meter

12: Switchboard Meter


12.1: Introduction

9.25" (235 mm)

6.85" (174 mm)

Figure 12.1: Switchboard Meter Dimensions, Front

This chapter gives you a brief overview of the Nexus 1262/1272 Switchboard
option. The Switchboard meter gives you all the features of the Socket meter in a
compact case. Easy installation or disconnection is the primary benefit of choosing
this option. The Switchboard system lets you install or rack out the meter in two
easy steps. Minimal manual wiring is required to connect or disconnect the meter.
The Switchboard meter operates in the same way as the Socket meter.
There are a few differences between the two meter options:
The labels on the face and the shroud of the meter will be slightly different,
depending on options selected (see Section 12.2 for label detail)

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

12 - 1

12: Switchboard Meter

The wiring Forms are 9Z and 36Z and the wiring is different (see Section 12.5)
Dimensions are different (see Section 12.3)
Installation is different (and even easier!) (see Section 12.4)
CAUTION! The Power Supply Input on the Switchboard unit is configured
differently. Please check wiring carefully.

12.2: Labels
The labels on the Switchboard meter are similar to those on the Socket meter. Forms
are 9Z and 36Z and there may be some additional items, depending upon the options
selected. See Chapter 3 for a description of the components on the front and shroud
labels.

Figure 12.2: Switchboard Meter, Front View

Mfg. Date:

2/2/2011

Serial#:

40/83003

Model: NEXUS 1262S-SWB-20-60HZ-4IPO-INP2


Memory:

4 Meg:

Options:

Freq.:

50Hz

KYZ Out: NO

Opt. Comm:
Power Supply:

NONE

No Optional Com
56-82.8V AC

Notes:

Figure 12.3: Sample of Switchboard Options Label

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

12 - 2

12: Switchboard Meter

12.3: Specifications and Dimensions


The Switchboard meter specifications are the same as those of the Socket meter,
except for meter dimensions. The Switchboard meter is essentially the Socket meter
in an oblong case. The dimensions are given in figures 12.1 (Front View), 12.4 (Back
View) and 12.5 (Side View). See Chapter 2 for meter specifications.
6.13" (15.57cm)

Y K Z
CH1

K Z Y K Z Y K Z
| Y CH2
| CH3 | CH4 |

S (-) (+)
COM4

8 7 6 5 4 3 2 1 C
HIGH SPEED

L N PE
Power In

Vc

Network Phone Line

Ia - Hi

Ib - Hi

Va

Ic - Hi

9.0" (22.86cm)

8.5" (21.59cm)

4.38" (11.12cm)

(-) (+) S (-) (+)


|
IRIG-B COM1

S (1) (+)
Gateway

Vn

Lo

Lo

Lo

Vb

0.19" (.48cm)

0.50" (1.27cm)

5.60" (14.22cm)
6.58" (16.71cm)

Figure 12.4: Switchboard Meter Dimensions, Back

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

12 - 3

12: Switchboard Meter

6.25" (15.88cm)

8.5" (21.6 cm)

2.0"
5.08cm

7.0" (17.78cm)
9.0" (22.86cm)

Figure 12.5: Switchboard Meter Dimensions, Side

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

12 - 4

12: Switchboard Meter

0.188
(0.477cm)

6.125
(15.557cm)
5.750
(14.605cm)
+.010/.025cm/ - .001/.0025cm

R0.10 TYP

2.296 (5.831cm)

4X 0.250
(0.635cm)

8.625 (21.907cm)

4.375 (11.112cm)

Figure 12.6: Switchboard Meter Cutout

IMPORTANT! Check drill holes for the mounting screw you are using, to insure that
the mounting screw fits the box tightly enough to hold the box in place. You can use a
washer for a slightly smaller mounting screw.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

12 - 5

12: Switchboard Meter

12.4: Installation
The Switchboard meter provides easy installation and removal from installation.
IMPORTANT! Before installing the meter, check the battery connections (see
Sections 6.2 and 5.4.4).
1.Insert the case into a prepared mounting hole. Secure with mounting screws.
2. Slide the meter into the case and secure it by sliding the chassis levers until they
snap into place. Connectors for the following are located on the back of the meter.
The connectors automatically plug into the available connectors on the mounting
board (see Figure 12.8).
Pulse Outputs - Four Channels
Status Inputs
Phone
Line/Network
Power In
COM4, COM1
IRIG-B
Modem Gateway RS485
3. Position the Switchboard case front against the four screw holes and secure it by
turning the four built-in screws in each of the corners. See Figure 12.7.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

12 - 6

12: Switchboard Meter

Built-in
Screws

Figure 12.7: Switchboard Case Front Showing 4 Screw Holes

Figure 12.8: Switchboard Meter Back Showing Connectors

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

12 - 7

12: Switchboard Meter

12.5: Wiring Diagrams


The wiring of the Switchboard meter is similar to that of the Socket meter.

Table 1:
Form

9Z

36Z

Description

Figure#

Wye, no PTs, 3 CTs

12.9

Wye, 3 PTs, 3 CTs

12.10

4-Wire Delta, no PTs, 3 CTs

12.11

4-Wire Delta, 3 PTs, 3 CTs

12.12

3-Wire Delta, no PTs, 2 CTs

12.13

3-Wire Delta, 2 PTs, 2 CTs

12.14

3-Wire Delta, no PTs, 2 CTs

12.15

3-Wire Delta, 2 PTs, 2 CTs

12.16

3-Wire Delta, 2 PTs, 3 CTs

12.19

3-Wire Delta, no PTs, 3 CTs

12.20

2.5 EL Wye, no PTs, 3 CTs

12.17

2.5 EL Wye, 2 PTs, 3 CTs

12.18

Table 12.1: Switchboard Meter Configurations

The meter snaps into place and is secured with levers and screws. All input and
output connections are made automatically as the meter is installed. (Refer to Section
12.4 and Figure 12.8.)
Wiring options are shown in Figures 12.9 through 12.20.
NOTE: For special requirements, contact our service department.
CAUTION! All wiring should be done by a licensed professional. Actual installation
procedures, materials, equipment and connections must conform to applicable codes
and standards. See Section 11.1 for important safety considerations.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

12 - 8

12: Switchboard Meter

SERVICE: WYE, 4WIRE


NO PTs, 3 CTs

3
Y K Z
CH1

K Z Y K Z Y K Z
| Y CH2
| CH3 | CH4 |

(-) (+) S (-) (+)


|
IRIG-B COM1

S (-) (+)
COM4

S (1) (+)
Gateway

8 7 6 5 4 3 2 1 C
HIGH SPEED

L N PE
Power In

Network Phone Line

Vc

Ia - Hi

Ib - Hi

Caution: Power Supply Input


on new units is configured
differently.
Please check wiring carefully.

Va

Ic - Hi
+

Vn

Lo

Lo

Lo

Vb

LINE












LOAD

Figure 12.9: 9Z Transformer Rated Wye, no PTs, 3 CTs


The protective ground connections for the transformers are omitted in the diagrams and are not required
for the meter to work properly. However, we strongly recommend those connections to reduce shock
hazard.
Shorting switches (blocks) for the current transformers secondary side are also not shown. To prevent
electrical shock we recommended you use such shorting switches (blocks). Make sure the CTs secondary are shorted before disconnecting them from the meters current input terminals.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

12 - 9

12: Switchboard Meter

SERVICE: WYE, 4WIRE


3 PTs, 3 CTs

3
Y K Z
CH1

K Z Y K Z Y K Z
| Y CH2
| CH3 | CH4 |

(-) (+) S (-) (+)


|
IRIG-B COM1

S (-) (+)
COM4

S (1) (+)
Gateway

8 7 6 5 4 3 2 1 C
HIGH SPEED

L N PE
Power In

Network Phone Line

Vc

Ia - Hi

Ib - Hi

Caution: Power Supply Input


on new units is configured
differently.
Please check wiring carefully.

Va

Ic - Hi
+

Vn

Lo

Lo

Lo

Vb

LINE












LOAD

Figure 12.10: 9Z Transformer Rated Wye, 3 PTs, 3 CTs


The protective ground connections for the transformers are omitted in the diagrams and are not required
for the meter to work properly. However, we strongly recommend those connections to reduce shock
hazard.
Shorting switches (blocks) for the current transformers secondary side are also not shown. To prevent
electrical shock we recommended you use such shorting switches (blocks). Make sure the CTs secondary are shorted before disconnecting them from the meters current input terminals.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

12 - 10

12: Switchboard Meter

SERVICE: DELTA, 4WIRE


NO PTs, 3 CTs

3
Y K Z
CH1

K Z Y K Z Y K Z
| Y CH2
| CH3 | CH4 |

(-) (+) S (-) (+)


|
IRIG-B COM1

S (-) (+)
COM4

S (1) (+)
Gateway

8 7 6 5 4 3 2 1 C
HIGH SPEED

L N PE
Power In

Network Phone Line

Vc

Ia - Hi

Ib - Hi

Caution: Power Supply Input


on new units is configured
differently.
Please check wiring carefully.

Va

Ic - Hi
+

Vn

Lo

Lo

Lo

Vb

LINE












LOAD

Figure 12.11: 9Z Transformer Rated 4-Wire Delta, no PTs, 3 CTs


The protective ground connections for the transformers are omitted in the diagrams and are not required
for the meter to work properly. However, we strongly recommend those connections to reduce shock
hazard.
Shorting switches (blocks) for the current transformers secondary side are also not shown. To prevent
electrical shock we recommended you use such shorting switches (blocks). Make sure the CTs secondary are shorted before disconnecting them from the meters current input terminals.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

12 - 11

12: Switchboard Meter

SERVICE: DELTA, 4WIRE


3 PTs, 3 CTs

3
Y K Z
CH1

K Z Y K Z Y K Z
| Y CH2
| CH3 | CH4 |

(-) (+) S (-) (+)


|
IRIG-B COM1

S (-) (+)
COM4

S (1) (+)
Gateway

8 7 6 5 4 3 2 1 C
HIGH SPEED

L N PE
Power In

Network Phone Line

Vc

Ia - Hi

Ib - Hi

Caution: Power Supply Input


on new units is configured
differently.
Please check wiring carefully.

Va

Ic - Hi
+

Vn

Lo

Lo

Lo

Vb

LINE












LOAD

Figure 12.12: 9Z Transformer Rated 4-Wire Delta, 3 PTs, 3 CTs


The protective ground connections for the transformers are omitted in the diagrams and are not required
for the meter to work properly. However, we strongly recommend those connections to reduce shock
hazard.
Shorting switches (blocks) for the current transformers secondary side are also not shown. To prevent
electrical shock we recommended you use such shorting switches (blocks). Make sure the CTs secondary are shorted before disconnecting them from the meters current input terminals.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

12 - 12

12: Switchboard Meter

SERVICE: DELTA, 4WIRE


NO PTs, 2 CTs

3
Y K Z
CH1

K Z Y K Z Y K Z
| Y CH2
| CH3 | CH4 |

(-) (+) S (-) (+)


|
IRIG-B COM1

S (-) (+)
COM4

S (1) (+)
Gateway

8 7 6 5 4 3 2 1 C
HIGH SPEED

L N PE
Power In

Network Phone Line

Vc

Ia - Hi

Ib - Hi

Caution: Power Supply Input


on new units is configured
differently.
Please check wiring carefully.

Va

Ic - Hi
+

Vn

Lo

Lo

Lo

Vb

LINE










LOAD

Figure 12.13: 9Z Transformer Rated 3-Wire Delta, no PTs, 2 CTs


The protective ground connections for the transformers are omitted in the diagrams and are not required
for the meter to work properly. However, we strongly recommend those connections to reduce shock
hazard.
Shorting switches (blocks) for the current transformers secondary side are also not shown. To prevent
electrical shock we recommended you use such shorting switches (blocks). Make sure the CTs secondary are shorted before disconnecting them from the meters current input terminals.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

12 - 13

12: Switchboard Meter

SERVICE: DELTA, 4WIRE


2 PTs, 2 CTs

3
Y K Z
CH1

K Z Y K Z Y K Z
| Y CH2
| CH3 | CH4 |

(-) (+) S (-) (+)


|
IRIG-B COM1

S (-) (+)
COM4

S (1) (+)
Gateway

8 7 6 5 4 3 2 1 C
HIGH SPEED

L N PE
Power In

Network Phone Line

Vc

Ia - Hi

Ib - Hi

Caution: Power Supply Input


on new units is configured
differently.
Please check wiring carefully.

Va

Ic - Hi
+

Vn

Lo

Lo

Lo

Vb

LINE











LOAD

Figure 12.14: 9Z Transformer Rated 3-Wire Delta, 2 PTs, 2 CTs


The protective ground connections for the transformers are omitted in the diagrams and are not required
for the meter to work properly. However, we strongly recommend those connections to reduce shock
hazard.
Shorting switches (blocks) for the current transformers secondary side are also not shown. To prevent
electrical shock we recommended you use such shorting switches (blocks). Make sure the CTs secondary are shorted before disconnecting them from the meters current input terminals.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

12 - 14

12: Switchboard Meter

SERVICE: DELTA, 3WIRE


NO PTs, 2 CTs

3
Y K Z
CH1

K Z Y K Z Y K Z
| Y CH2
| CH3 | CH4 |

(-) (+) S (-) (+)


|
IRIG-B COM1

S (-) (+)
COM4

S (1) (+)
Gateway

8 7 6 5 4 3 2 1 C
HIGH SPEED

L N PE
Power In

Network Phone Line

Vc

Ia - Hi

Ib - Hi

Caution: Power Supply Input


on new units is configured
differently.
Please check wiring carefully.

Va

Ic - Hi
+

Vn

Lo

Lo

Lo

Vb

LINE










LOAD

Figure 12.15: 9Z Transformer Rated 3-Wire Delta, no PTs, 2 CTs


The protective ground connections for the transformers are omitted in the diagrams and are not required
for the meter to work properly. However, we strongly recommend those connections to reduce shock
hazard.
Shorting switches (blocks) for the current transformers secondary side are also not shown. To prevent
electrical shock we recommended you use such shorting switches (blocks). Make sure the CTs secondary are shorted before disconnecting them from the meters current input terminals.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

12 - 15

12: Switchboard Meter

SERVICE: DELTA, 3WIRE


2 PTs, 2 CTs

3
Y K Z
CH1

K Z Y K Z Y K Z
| Y CH2
| CH3 | CH4 |

(-) (+) S (-) (+)


|
IRIG-B COM1

S (-) (+)
COM4

S (1) (+)
Gateway

8 7 6 5 4 3 2 1 C
HIGH SPEED

L N PE
Power In

Network Phone Line

Vc

Ia - Hi

Ib - Hi

Caution: Power Supply Input


on new units is configured
differently.
Please check wiring carefully.

Va

Ic - Hi
+

Vn

Lo

Lo

Lo

Vb

LINE










LOAD

Figure 12.16: 9Z Transformer Rated 3-Wire Delta, 2 PTs, 2 CTs


The protective ground connections for the transformers are omitted in the diagrams and are not required
for the meter to work properly. However, we strongly recommend those connections to reduce shock
hazard.
Shorting switches (blocks) for the current transformers secondary side are also not shown. To prevent
electrical shock we recommended you use such shorting switches (blocks). Make sure the CTs secondary are shorted before disconnecting them from the meters current input terminals.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

12 - 16

12: Switchboard Meter

SERVICE: 2.5 EL WYE,


NO PTs, 3 CTs

3
Y K Z
CH1

K Z Y K Z Y K Z
| Y CH2
| CH3 | CH4 |

(-) (+) S (-) (+)


|
IRIG-B COM1

S (-) (+)
COM4

S (1) (+)
Gateway

8 7 6 5 4 3 2 1 C
HIGH SPEED

L N PE
Power In

Network Phone Line

Vc

Ia - Hi

Ib - Hi

Caution: Power Supply Input


on new units is configured
differently.
Please check wiring carefully.

Va

Ic - Hi
+

Vn

Lo

Lo

Lo

Vb

LINE











LOAD

Figure 12.17: 36Z 2.5 Element Wye, no PTs, 3 CTs


The protective ground connections for the transformers are omitted in the diagrams and are not required
for the meter to work properly. However, we strongly recommend those connections to reduce shock
hazard.
Shorting switches (blocks) for the current transformers secondary side are also not shown. To prevent
electrical shock we recommended you use such shorting switches (blocks). Make sure the CTs secondary are shorted before disconnecting them from the meters current input terminals.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

12 - 17

12: Switchboard Meter

SERVICE: 2.5 EL WYE


2 PTs, 3 CTs

3
Y K Z
CH1

K Z Y K Z Y K Z
| Y CH2
| CH3 | CH4 |

(-) (+) S (-) (+)


|
IRIG-B COM1

S (-) (+)
COM4

S (1) (+)
Gateway

8 7 6 5 4 3 2 1 C
HIGH SPEED

L N PE
Power In

Network Phone Line

Vc

Ia - Hi

Ib - Hi

Caution: Power Supply Input


on new units is configured
differently.
Please check wiring carefully.

Va

Ic - Hi
+

Vn

Lo

Lo

Lo

Vb

LINE











LOAD

Figure 12.18: 36Z 2.5 Element Wye, 2 PTs, 3 CTs


The protective ground connections for the transformers are omitted in the diagrams and are not required
for the meter to work properly. However, we strongly recommend those connections to reduce shock
hazard.
Shorting switches (blocks) for the current transformers secondary side are also not shown. To prevent
electrical shock we recommended you use such shorting switches (blocks). Make sure the CTs secondary are shorted before disconnecting them from the meters current input terminals.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

12 - 18

12: Switchboard Meter

SERVICE: DELTA, 3WIRE


2 PTs, 3 CTs

3
Y K Z
CH1

K Z Y K Z Y K Z
| Y CH2
| CH3 | CH4 |

(-) (+) S (-) (+)


|
IRIG-B COM1

S (-) (+)
COM4

S (1) (+)
Gateway

8 7 6 5 4 3 2 1 C
HIGH SPEED

L N PE
Power In

Network Phone Line

Vc

Ia - Hi

Ib - Hi

Caution: Power Supply Input


on new units is configured
differently.
Please check wiring carefully.

Va

Ic - Hi
+

Vn

Lo

Lo

Lo

Vb

LINE












LOAD

Figure 12.19: Delta, 3-wire, 2 PTs, 3 CTs


The protective ground connections for the transformers are omitted in the diagrams and are not required
for the meter to work properly. However, we strongly recommend those connections to reduce shock
hazard.
Shorting switches (blocks) for the current transformers secondary side are also not shown. To prevent
electrical shock we recommended you use such shorting switches (blocks). Make sure the CTs secondary are shorted before disconnecting them from the meters current input terminals.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

12 - 19

12: Switchboard Meter

SERVICE: DELTA, 3WIRE


NO PTs, 3 CTs

3
Y K Z
CH1

K Z Y K Z Y K Z
| Y CH2
| CH3 | CH4 |

(-) (+) S (-) (+)


|
IRIG-B COM1

S (-) (+)
COM4

S (1) (+)
Gateway

8 7 6 5 4 3 2 1 C
HIGH SPEED

L N PE
Power In

Network Phone Line

Vc

Ia - Hi

Ib - Hi

Caution: Power Supply Input


on new units is configured
differently.
Please check wiring carefully.

Va

Ic - Hi
+

Vn

Lo

Lo

Lo

Vb

LINE











LOAD

Figure 12.20: Delta, 3-wire, No PTs, 3 CTs


The protective ground connections for the transformers are omitted in the diagrams and are not required
for the meter to work properly. However, we strongly recommend those connections to reduce shock
hazard.
Shorting switches (blocks) for the current transformers secondary side are also not shown. To prevent
electrical shock we recommended you use such shorting switches (blocks). Make sure the CTs secondary are shorted before disconnecting them from the meters current input terminals.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

Doc#

E151701

12 - 20

0HWHU&DOFXODWLRQV

13: Meter Calculations


13.1: Measurements and Calculations
7KH1H[XV0HWHUPHDVXUHVPDQ\GLIIHUHQWSRZHUSDUDPHWHUV)ROORZLQJ
LVDOLVWRIWKHIRUPXODVXVHGWRSHUIRUPFDOFXODWLRQVZLWKVDPSOHVIRU:\HDQG'HOWD
VHUYLFHV
6DPSOHVIRU:\HYDYEYFLDLELFLQ
6DPSOHVIRU'HOWDYDEYEFYFDLDLELF
5RRW0HDQ6TXDUH 506 RI3KDVH9ROWDJHV1 QXPEHURIVDPSOHV
)RU:\H[ DEF

v
VRMS x

2
x (t )

t 1

5RRW0HDQ6TXDUH 506 RI/LQH&XUUHQWV1 QXPEHURIVDPSOHV


)RU:\H[ DEFQ
)RU'HOWD[ DEF

i
I RMS x

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

2
x (t )

t 1

'RF#

(



0HWHU&DOFXODWLRQV

5RRW0HDQ6TXDUH 506 RI/LQH9ROWDJHV1 QXPEHURIVDPSOHV


)RU:\H[\ DERUEFRUFD

(v

x( t )

 v y( t ) ) 2

t 1

VRMS xy

)RU'HOWD[\ DEEFFD

2
xy ( t )

t 1

VRMS xy

3RZHU :DWWV SHUSKDVH1 QXPEHURIVDPSOHV


)RU:\H[ DEF

v
WX

x (t )

x ix ( t )

t 1

$SSDUHQW3RZHU 9$ SHUSKDVH
)RU:\H[ DEF

VAx

Electro Industries/GaugeTech
Electro Industries/GaugeTech

VRMS X x I RMS X

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



0HWHU&DOFXODWLRQV

5HDFWLYH3RZHU 9$5 SHUSKDVH


)RU:\H[ DEF

VAx2  W x2

VAR x
4SHU3KDVH
)RU:\H[ DEF

3VAR X  W

$FWLYH3RZHU :DWWV 7RWDO1 QXPEHURIVDPSOHV


)RU:\H

Wa  Wb  Wc

WT
)RU'HOWD

ab ( t )

WT

x ia (t )  vbc (t ) x ic ( t )

t 1

5HDFWLYH3RZHU 9$5 7RWDO1 QXPEHURIVDPSOHV


)RU:\H

VART

Electro Industries/GaugeTech
Electro Industries/GaugeTech

VARa  VARb  VARc

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



0HWHU&DOFXODWLRQV

)RU'HOWD

VART = (VRMSab

N
vab (t ) ia (t )

I RMSa ) t =1
N

(VRMSbc

N
vbc (t ) ic (t )

I RMSc ) t =1
N

$SSDUHQW3RZHU 9$ 7RWDO
)RU:\H

VAT

VAa  VAb  VAc

)RU'HOWD

VAT

WT2  VART2

QT

Qa  Qb  Qc

7RWDO4
)RU:\H

)RU'HOWD

QT

Electro Industries/GaugeTech
Electro Industries/GaugeTech

3VART  WT
2

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



0HWHU&DOFXODWLRQV

7RWDO(QHUJLHV
[\ :7:K7RU9$579$5K7RU9$79$K7RU474K7

x
y

3600sec.

3RZHU)DFWRU 3) 
)RU:\H[ DEF7
)RU'HOWD[ 7

P Fx

Wx
V Ax

7RWDO$YHUDJH3RZHU)DFWRU
[ 4XDGUDQWV  SRVLWLYH:K 4XDGUDQWV  QHJDWLYH:K

PFT _ Avg x

Whx
VAhx

3KDVH$QJOHV
[ DEF

x cos1 PFx

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



0HWHU&DOFXODWLRQV

7RWDO+DUPRQLF'LVWRUWLRQ 7+' 
)RU:\H[ YDYEYFLDLELF
)RU'HOWD[ LDLELFYDEYEFYFD

RMS
127

xh

h 2

THD

RMS x1

.)DFWRU
[ LDLELF

127

h x RMS

xh

RMS

h 1
127

KFactor

xh

h 1

9ROWDJH,PEDODQFH1 QXPEHURIVDPSOHV


 vb  vc

N
RMSva  RMSvb  RMSvc

Imb v

&XUUHQW,PEDODQFH

Imb

Electro Industries/GaugeTech
Electro Industries/GaugeTech

RMS
I

RMS

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

IA

I CalcN

 RMS I  RMS I
B

'RF#

(



0HWHU&DOFXODWLRQV

13.2: Demand Integrators


3RZHUXWLOLWLHVWDNHLQWRDFFRXQWERWKHQHUJ\FRQVXPSWLRQDQGSHDNGHPDQGZKHQ
ELOOLQJFXVWRPHUV3HDNGHPDQGH[SUHVVHGLQNLORZDWWV N: LVWKHKLJKHVWOHYHORI
GHPDQGUHFRUGHGGXULQJDVHWSHULRGRIWLPHFDOOHGWKHLQWHUYDO7KH1H[XV
VXSSRUWVWKHIROORZLQJPRVWSRSXODUFRQYHQWLRQVIRUDYHUDJLQJGHPDQGDQG
SHDNGHPDQG%ORFN:LQGRZ'HPDQG5ROOLQJ:LQGRZ'HPDQG7KHUPDO'HPDQG
DQG3UHGLFWLYH:LQGRZ'HPDQG<RXFDQSURJUDPDQGDFFHVVDOOFRQYHQWLRQV
FRQFXUUHQWO\ZLWKWKH&RPPXQLFDWRU(;7VRIWZDUH VHHWKHCommunicator EXT User
Manual 
Block (Fixed) Window Demand:
7KLVFRQYHQWLRQUHFRUGVWKHDYHUDJH DULWKPHWLFPHDQ GHPDQGIRUFRQVHFXWLYHWLPH
LQWHUYDOV XVXDOO\PLQXWHV 
([DPSOH$W\SLFDOVHWWLQJRIPLQXWHVSURGXFHVDQDYHUDJHYDOXHHYHU\PLQXWHV
DWHWF IRUSRZHUUHDGLQJRYHUWKHSUHYLRXVILIWHHQPLQXWH
LQWHUYDO HWF 
Rolling (Sliding) Window Demand:
5ROOLQJ:LQGRZ'HPDQGIXQFWLRQVOLNHPXOWLSOHRYHUODSSLQJ%ORFN:LQGRZ'HPDQGV
7KHSURJUDPPDEOHVHWWLQJVSURYLGHGDUHWKHQXPEHUDQGOHQJWKRIGHPDQGVXELQWHU
YDOV$WHYHU\VXELQWHUYDODQDYHUDJH DULWKPHWLFPHDQ RISRZHUUHDGLQJVRYHUWKH
VXELQWHUYDOLVLQWHUQDOO\FDOFXODWHG7KLVQHZVXELQWHUYDODYHUDJHLVWKHQDYHUDJHG
DULWKPHWLFPHDQ ZLWKDVPDQ\SUHYLRXVVXELQWHUYDODYHUDJHVDVSURJUDPPHGWR
SURGXFHWKH5ROOLQJ:LQGRZ'HPDQG
([DPSOH:LWKVHWWLQJVRIILYHPLQXWHVXELQWHUYDOVVXELQWHUYDODYHUDJHVDUHFRP
SXWHGHYHU\PLQXWHV HWF IRUSRZHUUHDGLQJVRYHUWKHSUHYL
RXVILYHPLQXWHLQWHUYDO 
HWF )XUWKHUHYHU\PLQXWHVWKHVXELQWHUYDODYHUDJHVDUHDYHUDJHGLQJURXSVRI
HWF WRSURGXFHDILIWHHQ [ PLQXWHDYHUDJHHYHU\
PLQXWHV UROOLQJ VOLGLQJ HYHU\PLQXWHV  HWF 

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



0HWHU&DOFXODWLRQV

Thermal Demand:
7UDGLWLRQDODQDORJ:DWWKRXU :K PHWHUVXVHKHDWVHQVLWLYHHOHPHQWVWRPHDVXUH
WHPSHUDWXUHULVHVSURGXFHGE\DQLQFUHDVHLQFXUUHQWIORZLQJWKURXJKWKHPHWHU$
SRLQWHUPRYHVLQSURSRUWLRQWRWKHWHPSHUDWXUHFKDQJHSURYLGLQJDUHFRUGRI
GHPDQG7KHSRLQWHUUHPDLQVDWSHDNOHYHOXQWLODVXEVHTXHQWLQFUHDVHLQGHPDQG
PRYHVLWDJDLQRUXQWLOLWLVPDQXDOO\UHVHW7KH1H[XVPLPLFVWUDGL
WLRQDOPHWHUVWRSURYLGH7KHUPDO'HPDQGUHDGLQJV
(DFKVHFRQGDVDQHZSRZHUOHYHOLVFRPSXWHGDUHFXUUHQFHUHODWLRQIRUPXODLV
DSSOLHG7KLVIRUPXODUHFRPSXWHVWKHWKHUPDOGHPDQGE\DYHUDJLQJDVPDOOSRUWLRQRI
WKHQHZSRZHUYDOXHZLWKDODUJHSRUWLRQRIWKHSUHYLRXVWKHUPDOGHPDQGYDOXH7KH
SURSRUWLRQLQJRIQHZWRSUHYLRXVLVSURJUDPPDEOHVHWE\DQDYHUDJLQJLQWHUYDO7KH
DYHUDJLQJLQWHUYDOUHSUHVHQWVDFKDQJHLQWKHUPDOGHPDQGWRDVWHSFKDQJHLQ
SRZHU
Predictive Window Demand:
3UHGLFWLYH:LQGRZ'HPDQGHQDEOHVWKHXVHUWRIRUHFDVWDYHUDJHGHPDQGIRUIXWXUH
WLPHLQWHUYDOV7KH1H[XVXVHVWKHGHOWDUDWHRIFKDQJHRID5ROOLQJ:LQGRZ
'HPDQGLQWHUYDOWRSUHGLFWDYHUDJHGHPDQGIRUDQDSSURDFKLQJWLPHSHULRG7KHXVHU
FDQVHWDUHOD\RUDODUPWRVLJQDOZKHQWKH3UHGLFWLYH:LQGRZUHDFKHVDVSHFLILFOHYHO
WKHUHE\DYRLGLQJXQDFFHSWDEOHGHPDQGOHYHOV7KH1H[XVFDOFXODWHV
3UHGLFWLYH:LQGRZ'HPDQGXVLQJWKHIROORZLQJIRUPXOD
([DPSOH8VLQJWKHSUHYLRXVVHWWLQJVRIILYHPLQXWHLQWHUYDOVDQGDQHZVHWWLQJRI
SUHGLFWLRQIDFWRUWKHZRUNLQJRIWKH3UHGLFWLYH:LQGRZ'HPDQGFRXOGEH
GHVFULEHGDVIROORZV
$WZHKDYHWKHDYHUDJHRIWKHVXELQWHUYDOVIURP
DQG,QILYHPLQXWHV  ZHZLOOKDYHDQDYHUDJHRIWKHVXELQWHU
YDOVDQG ZKLFKZHNQRZ DQG ZKLFKZHGR
QRW\HWNQRZ $VDJXHVVZHZLOOXVHWKHODVWVXELQWHUYDO  DVDQ
DSSUR[LPDWLRQIRUWKHQH[WVXELQWHUYDO  $VDIXUWKHUUHILQHPHQWZH
ZLOODVVXPHWKDWWKHQH[WVXELQWHUYDOPLJKWKDYHDKLJKHUDYHUDJH  WKDQWKH
ODVWVXELQWHUYDO$VZHSURJUHVVLQWRWKHVXELQWHUYDO IRUH[DPSOHXSWR WKH
3UHGLFWLYH:LQGRZ'HPDQGZLOOEHWKHDYHUDJHRIWKHILUVWWZRVXELQWHUYDOV 
 WKHDFWXDOYDOXHVRIWKHFXUUHQWVXELQWHUYDO  DQG

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



0HWHU&DOFXODWLRQV

WKHSUHGLFWLRQIRUWKHUHPDLQGHURIWKHVXELQWHUYDORIWKHRIWKH
VXELQWHUYDO
RI6XELQWHUYDOV Q
6XELQWHUYDO/HQJWK /HQ
3DUWLDO6XELQWHUYDO/HQJWK &QW
3UHGLFWLRQ)DFWRU 3FW

Table 1:
6XEQ

6XE

6XE

3DUWLDO

3UHGLFW

/HQ

/HQ

/HQ

&QW

/HQ

Len 1

Value

Sub

i 0

Len

Cnt 1

Value

Partial

i 0

Cnt

n2

Valuei

Len  Cnt

u 1 
Partial  i 0
u Pct

n
Len

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



0HWHU&DOFXODWLRQV

n2
Subi Sub  Sub Len  Cnt

0
n 1
u
u Pct
i 0


2 x(n  1) Len
n 1

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



(1,(&)OLFNHU

14: EN50160/IEC61000-4-15 Flicker


14.1: Overview
)OLFNHULVWKHVHQVDWLRQH[SHULHQFHGE\WKHKXPDQYLVXDOV\VWHPZKHQVXEMHFWHGWR
FKDQJHVLQWKHLOOXPLQDWLRQLQWHQVLW\RIOLJKWVRXUFHV7KHSULPDU\HIIHFWVRI)OLFNHUDUH
KHDGDFKHVDQGLUULWDELOLW\VRPHWLPHV)OLFNHUFDQWULJJHUHSLOHSWLFILWV
,(&DQGIRUPHU,(&GHVFULEHWKHPHWKRGVXVHGWRGHWHUPLQH)OLFNHU
VHYHULW\6LQFHWKLVSKHQRPHQRQLVVWULFWO\UHODWHGWRWKHVHQVLWLYLW\DQGUHDFWLRQRI
LQGLYLGXDOVLWFDQRQO\EHVWXGLHGRQDVWDWLVWLFDOEDVLVE\VHWWLQJXSVXLWDEOHH[SHUL
PHQWVDPRQJSHRSOH

14.2: Theory of Operation


)OLFNHUFDQEHFDXVHGE\YROWDJHYDULDWLRQVZKLFKLQWXUQDUHFDXVHGE\YDULDEOH
ORDGVVXFKDVDUFIXUQDFHVODVHUSULQWHUVDQGPLFURZDYHRYHQV,QRUGHUWRPRGHO
WKHH\HEUDLQFKDQJHZKLFKLVDFRPSOH[SK\VLRORJLFDOSURFHVVWKHVLJQDOIURPWKH
SRZHUQHWZRUNKDVWREHSURFHVVHGZKLOHFRQIRUPLQJZLWK)LJXUHVKRZQRQ
SDJH
%ORFNFRQVLVWVRIVFDOLQJFLUFXLWU\DQGDQDXWRPDWLFJDLQFRQWUROIXQFWLRQWKDWQRU
PDOL]HVLQSXW9ROWDJHVWR%ORFNVDQG)RUWKHVSHFLILHG+]RSHUDWLRQWKH
9ROWDJHVWDQGDUGLV9506
%ORFNUHFRYHUVWKH9ROWDJHIOXFWXDWLRQE\VTXDULQJWKHLQSXW9ROWDJHVFDOHGWRWKH
UHIHUHQFHOHYHO7KLVVLPXODWHVWKHEHKDYLRURIDODPS
%ORFNLVFRPSRVHGRIDFDVFDGHRIWZRILOWHUVDQGDPHDVXULQJUDQJHVHOHFWRU,Q
WKLVLPSOHPHQWDWLRQDORJFODVVLILHUFRYHUVWKHIXOOVFDOHLQXVHVRWKHJDLQVHOHFWLRQ
LVDXWRPDWLFDQGQRWVKRZQKHUH7KHILUVWILOWHUHOLPLQDWHVWKH'&FRPSRQHQWDQG
WKHGRXEOHPDLQVIUHTXHQF\FRPSRQHQWVRIWKHGHPRGXODWHGRXWSXW7KHFRQILJXUD
WLRQFRQVLVWVRID+]/RZ+LJK3DVVILOWHUDQGD3ROH%XWWHUZRUWK/RZ3DVV
ILOWHUORFDWHGDW+]7KHVHFRQGILOWHULVDZHLJKWLQJILOWHUWKDWVLPXODWHVWKH
UHVSRQVHRIWKHKXPDQYLVXDOV\VWHPWRVLQXVRLGDO9ROWDJHIOXFWXDWLRQVRIDFRLOHG
ILODPHQWJDVILOOHGODPS :9 7KHILOWHULPSOHPHQWDWLRQRIWKLVIXQFWLRQ
LVDVVSHFLILHGLQ,(&

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



(1,(&)OLFNHU

%ORFNLVFRPSRVHGRIDVTXDULQJPXOWLSOLHUDQGD/RZ3DVVILOWHU7KH+XPDQ
)OLFNHU6HQVDWLRQYLDODPSH\HDQGEUDLQLVVLPXODWHGE\WKHFRPELQHGQRQOLQHDU
UHVSRQVHRI%ORFNVDQG
%ORFNSHUIRUPVDQRQOLQHVWDWLVWLFDOFXPXODWLYHSUREDELOLW\DQDO\VLVRIWKHIOLFNHU
OHYHO%ORFNDOORZVGLUHFWFDOFXODWLRQRIWKHHYDOXDWLRQSDUDPHWHUV3VWDQG3OW
)OLFNHULVFRPSXWHGXVLQJWKHWKUHHSKDVHWRQHXWUDO9ROWDJHVLQ:\HFRQILJXUDWLRQV
DQGWKHWKUHHSKDVHWRSKDVH9ROWDJHVZKHQLQ'HOWD(YDOXDWLRQRFFXUVLQWKHIROORZ
LQJIRUPV,QVWDQWDQHRXV6KRUW7HUPRU/RQJ7HUP
,QVWDQWDQHRXV)OLFNHU(YDOXDWLRQ$QRXWSXWRIIURP%ORFNFRUUHVSRQGVWR
WKH5HIHUHQFH+XPDQ)OLFNHU3HUFHSWLELOLW\7KUHVKROGIRURIWKHSRSXODWLRQ
7KLVYDOXHLVPHDVXUHGLQ3HUFHSWLELOLW\8QLWV 38 DQGLVODEHOHG3LQVW7KLVLVDUHDO
WLPHYDOXHDQGLWLVFRQWLQXRXVO\XSGDWHG
6KRUW7HUP)OLFNHU(YDOXDWLRQ$QRXWSXWRIIURP%ORFN FRUUHVSRQGLQJWRWKH
3VWYDOXH FRUUHVSRQGVWRWKHFRQYHQWLRQDOWKUHVKROGRILUULWDELOLW\SHU,(&
,QRUGHUWRHYDOXDWHIOLFNHUVHYHULW\WZRSDUDPHWHUVKDYHEHHQGHILQHGRQHIRU
WKHVKRUWWHUPFDOOHG3VW GHILQHGLQWKLVVHFWLRQ DQGRQHIRUWKHORQJWHUPFDOOHG
3OW GHILQHGLQWKHQH[WVHFWLRQ 
7KHVWDQGDUGPHDVXUHPHQWWLPHIRU3VWLVPLQXWHV3VWLVGHULYHGIURPWKHWLPH
DWOHYHOVWDWLVWLFVREWDLQHGIURPWKHOHYHOFODVVLILHULQ%ORFNRIWKHIOLFNHUPHWHU
7KHIROORZLQJIRUPXODLVXVHG

Pst

0.0314 P0.1  0.0525 P1s  0.0657 P3 s  0.28 P10 s  0.08 P50 s

ZKHUHWKHSHUFHQWLOHV3  3  3  3  3  DUHWKHIOLFNHUOHYHOV


H[FHHGHGIRUDQGRIWKHWLPHGXULQJWKHREVHUYDWLRQSHULRG7KH
VXIIL[6LQWKHIRUPXODLQGLFDWHVWKDWWKHVPRRWKHGYDOXHVKRXOGEHXVHG7KH
VPRRWKHGYDOXHVDUHREWDLQHGXVLQJWKHIROORZLQJIRUPXODV
3 V   3  3  3  
3 V   3  3  3  
3 V   3  3  3  3  3  
3 V   3  3  3  

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



(1,(&)OLFNHU

7KHVHFRQGPHPRU\WLPHFRQVWDQWLQWKHIOLFNHUPHWHUHQVXUHVWKDW3  FDQQRW


FKDQJHDEUXSWO\DQGQRVPRRWKLQJLVQHHGHGIRUWKLVSHUFHQWLOH
/RQJ7HUP)OLFNHU(YDOXDWLRQ7KHPLQXWHSHULRGRQZKLFKWKHVKRUWWHUPIOLFNHU
VHYHULW\LVEDVHGLVVXLWDEOHIRUVKRUWGXW\F\FOHGLVWXUEDQFHV)RUIOLFNHUVRXUFHV
ZLWKORQJDQGYDULDEOHGXW\F\FOHV HJDUFIXUQDFHV LWLVQHFHVVDU\WRSURYLGHFUL
WHULDIRUORQJWHUPDVVHVVPHQW)RUWKLVSXUSRVHWKHORQJWHUP3OWLVGHULYHGIURP
WKHVKRUWWHUPYDOXHVRYHUDQDSSURSULDWHSHULRG%\GHILQLWLRQWKLVLVVKRUW
WHUPYDOXHVRIPLQXWHVHDFKRYHUDSHULRGRIKRXUV7KHIROORZLQJIRUPXODLV
XVHG


Plt

3
sti

i 1

ZKHUH3VWL L  DUHFRQVHFXWLYHUHDGLQJVRIWKHVKRUWWHUPVHYHULW\3VW

14.2.1: Summary:
Flicker &KDQJHVLQWKHLOOXPLQDWLRQRIOLJKWVRXUFHVGXHWRF\FOLFDO9ROWDJH
YDULDWLRQV
Pinst ,QVWDQWDQHRXVIOLFNHUYDOXHVLQ3HUFHSWLELOLW\8QLWV 38 
Pst 9DOXHEDVHGRQPLQXWHDQDO\VLV
Plt 9DOXHEDVHGRQ3VWYDOXHV
Measurement Procedure:
2ULJLQDO6LJQDOZLWKDPSOLWXGHYDULDWLRQV
6TXDUHGHPRGXODWRU
:HLJKWHGILOWHU
/RZSDVVILOWHUVWRUGHU
6WDWLVWLFDOFRPSXWLQJ

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



(1,(&)OLFNHU

Data available:
3VW3VW0D[3VW0LQYDOXHVIRUORQJWHUPUHFRUGLQJ
3OW3OW0D[3OW0LQYDOXHVIRUORQJWHUPUHFRUGLQJ


Simulation Of Eye Brain Response


Block 1

Block 2

Block 3

Voltage
Detector
and Gain
Control
Square
Law
Demodulator
Input
Voltage
Adaptor

High Pass
Filter
(DC
Removal)
Low
Pass Filter
(Carrier
Removal

Weighting
Filter

Block 4

Squaring
Multiplier

1st
Order
Sliding
Mean
Filter

Block 5

A/D
Converter
Sampling
Rate
>50Hz

Minimum
64 level
Classifier

Output
Interface

Programming of short and


long observation periods

Output Recording
Instantaneous Flicker in
Perceptibility Units
(Pinst)



Output and Data Display


Pst Max/Min Pst
Plt Max/Min Plt

)LJXUH6LPXODWLRQRI(\H%UDLQ5HVSRQVH

14.3: Flicker Setup


<RXPXVWVHWXSVHYHUDOSDUDPHWHUVWRSURSHUO\FRQILJXUH)OLFNHU
6HOHFWWKHProfileLFRQIURP&RPPXQLFDWRU(;7
V,FRQEDU
)URPWKH'HYLFH3URILOHVFUHHQGRXEOHFOLFNPower Quality and Alarm
Settings>EN50160/IEC61000-4-30 Flicker<RXZLOOVHHWKHVFUHHQVKRZQ
EHORZ

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



(1,(&)OLFNHU

6HOHFWWKH)UHTXHQF\RIRSHUDWLRQ+]LVWKHDSSURYHGIUHTXHQF\DFFRUGLQJ
WR)OLFNHUVWDQGDUGV$+]LPSOHPHQWDWLRQLVDYDLODEOHDQGFDQEHVHOHFWHG
5HPHPEHUWKH9ROWDJHLVQRUPDOL]HG)RU+]WKHQRUPDOL]HG9ROWDJHLV
9DQGIRU+]WKHQRUPDOL]HG9ROWDJHLV9
6HOHFWD6KRUW7HUP7HVW7LPH 367 WLPHUDQJHIURPWRPLQXWHV7KH
VWDQGDUGPHDVXUHPHQWSHULRGLVQRPLQDOO\PLQXWHV
6HOHFWD/RQJ7HUP7HVW7LPH 3/7 WLPHUDQJHIURPWRPLQXWHV7KH
VWDQGDUGPHDVXUHPHQWLVQRPLQDOO\3VWSHULRGV PLQXWHV 3OWWLPH
PXVWDOZD\VEHHTXDOWRRUJUHDWWKDQDQGDPXOWLSOHRI3VWWLPH7KLVLV
UHIOHFWHGLQWKHDYDLODEOHVHOHFWLRQV
&OLFNOKZKHQ\RXDUHILQLVKHG

14.4: Flicker Polling Screen


)URPWKH&RPPXQLFDWRU(;77LWOHEDUVHOHFWReal-Time Poll>Power Quality and
Alarms>Flicker<RXZLOOVHHWKHVFUHHQVKRZQEHORZ

Main screen
7KLVVHFWLRQGHVFULEHVWKH0DLQ6FUHHQIXQFWLRQV7KHVHIXQFWLRQVDUHIRXQGRQWKH
OHIWVLGHRIWKHVFUHHQ

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



(1,(&)OLFNHU

7LPH
6WDUW5HVHWLVWKHWLPHZKHQ)OLFNHUZDVVWDUWHGRUUHVHW$5HVHWRI)OLFNHUFDXVHV
WKH0D[0LQYDOXHVWREHFOHDUHGDQGUHVWDUWVWKH)OLFNHU3VWDQG3OWWLPHUV$6WDUW
RI)OLFNHULVDOVRHTXLYDOHQWWRD5HVHWLQWKDWWKH367DQG3/7DUHUHVWDUWHGDQGWKH
0D[0LQ9DOXHVDUHFOHDUHG
6WRSFRUUHVSRQGVWRWKHWLPHZKHQ)OLFNHULVWXUQHGRII
&XUUHQWLVWKHFXUUHQWFORFNWLPH
1H[W3VWLVWKHFRXQWGRZQWLPHWRZKHQWKHQH[W3VWYDOXHLVDYDLODEOH
1H[W3OWLVWKHFRXQWGRZQWLPHWRZKHQWKHQH[W3OWYDOXHLVDYDLODEOH
6WDWXV
,QGLFDWHVWKHFXUUHQWVWDWXV$FWLYH 2Q6WRSSHG 2II
)UHTXHQF\
%DVHLVWKHRSHUDWLQJIUHTXHQF\ RU+] VHOHFWHGLQWKH(1)OLFNHU
VFUHHQ VHH6HFWLRQ 
&XUUHQWLVWKHUHDOWLPHIUHTXHQF\PHDVXUHPHQWRIWKHDSSOLHG9ROWDJH
%DVH9ROWDJH
7KHQRUPDOL]HG9ROWDJHIRUWKHVHOHFWHGIUHTXHQF\ 9IRU+]RU9IRU
+] 
)OLFNHU0RQLWRULQJ
&OLFNLQJRQStopFDXVHV)OLFNHUWRVWRSEHLQJSURFHVVHGDQGIUHH]HVDOOWKHFXUUHQW
YDOXHV6WRS7LPHLVUHFRUGHGDQGWKHFXUUHQW0D[0LQYDOXHVDUHFOHDUHG
&OLFNLQJRQStart VWDUWV)OLFNHUSURFHVVLQJ6WDUW7LPHLVUHFRUGHG
&OLFNLQJRQReset FDXVHVWKH0D[0LQYDOXHVWREHFOHDUHGDQGUHVWDUWVWKH)OLFNHU
3VWDQG3OWWLPHUV

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



(1,(&)OLFNHU

8VHWKHWDEVDWWKHWRSRIWKHVFUHHQWRQDYLJDWHWRWKH,QVWDQWDQHRXV6KRUW7HUP
DQG/RQJ7HUP5HDGLQJVYLHZVVKRZQRQWKHULJKWVLGHRIWKHVFUHHQ
Instantaneous Readings:
NOTE:7KH,QVWDQWDQHRXVYLHZLVWKHGHIDXOWRIWKLVVFUHHQ 6HHWKHVFUHHQSLFWXUHG
RQWKHSUHYLRXVSDJH ,I\RXDUHLQWKH6KRUWRU/RQJ7HUPYLHZVFOLFNRQWKH,QVWDQ
WDQHRXVWDEWRGLVSOD\WKLVYLHZ
7KH38YDOXHV3LQVWIRU9ROWDJH,QSXWV9D9EDQG9FDUHGLVSOD\HGKHUHDQGDUH
FRQWLQXRXVO\XSGDWHG7KHFRUUHVSRQGLQJ&XUUHQW9ROWDJHYDOXHVIRUHDFKFKDQQHO
DUHGLVSOD\HGIRUUHIHUHQFH
Short Term Readings:
&OLFNRQWKH6KRUW7HUPWDEWRDFFHVVDVFUHHQFRQWDLQLQJWKUHHJURXSVRI3VWUHDGLQJV
VKRZQEHORZ 

3VW5HDGLQJV'LVSOD\HG
&XUUHQW3VWYDOXHVIRU9D9EDQG9FDQGWKHWLPHRIFRPSXWDWLRQ
&XUUHQW3VW0D[YDOXHVIRU9D9EDQG9FVLQFHWKHODVWUHVHWDQGWKHWLPHRIWKH
ODVWUHVHW

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



(1,(&)OLFNHU

&XUUHQW3VW0LQYDOXHVIRU9D9EDQG9FVLQFHWKHODVWUHVHWDQGWKHWLPHRIWKHODVW
UHVHW
Long Term Readings:
&OLFNRQWKH/RQJ7HUPWDEWRDFFHVVDVFUHHQFRQWDLQLQJWKUHHJURXSVRI3OW
UHDGLQJV VKRZQEHORZ 

3OW5HDGLQJV'LVSOD\HG
&XUUHQW3OWYDOXHVIRU9D9EDQG9FDQGWKHWLPHRIFRPSXWDWLRQ
&XUUHQW3OW0D[YDOXHVIRU9D9EDQG9FVLQFHWKHODVWUHVHWDQGWKHWLPHRIWKHODVW
UHVHW
&XUUHQW3OW0LQYDOXHVIRU9D9EDQG9FVLQFHWKHODVWUHVHWDQGWKHWLPHRIWKHODVW
UHVHW
&OLFNOKWRH[LWWKH(1,(&)OLFNHU3ROOLQJVFUHHQFOLFNPrintWR
SULQWDOORIWKH5HDGLQJVYLHZV

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



(1,(&)OLFNHU

14.5: Logging
7KH1H[XVPHWHULVFDSDEOHRIORJJLQJ)OLFNHUYDOXHVLQDQLQGHSHQGHQW
ORJ:KHQ)OLFNHULVRQHQWULHVDUHPDGHLQWRWKHORJLQDFFRUGDQFHZLWKWKHWLPHV
WKDWDVVRFLDWHGYDOXHVRFFXU3VW3VW0D[3VW0LQ3OW3OW0D[3OW0LQ6WDUW5HVHW
DQG6WRSWLPHVDUHDOOUHFRUGHG$OOYDOXHVFDQEHGRZQORDGHGWRWKH/RJ9LHZHU
ZKHUHWKH\DUHDYDLODEOHIRUJUDSKLQJRUH[SRUWWRDQRWKHUSURJUDPVXFKDV([FHO$OO
)OLFNHUYDOXHVDUHSUHGHILQHGDQGFDQQRWEHFKDQJHG5HIHUWR&KDSWHURIWKH
Communicator EXT User ManualIRUDGGLWLRQDOLQVWUXFWLRQVFRQFHUQLQJWKH)OLFNHUORJ

14.6: Polling through a Communication Port


7KH3LQVW3VW3VW0D[3VW0LQ3OW3OW0D[3OW0LQYDOXHVFDQEHSROOHGWKURXJKWKH
&RPPXQLFDWLRQV3RUW5HIHUWRWKH1H[XVPHWHUV
0RGEXVDQG'13
0DSSLQJPDQXDOVIRUUHJLVWHUDVVLJQPHQWVDQGGDWDGHILQLWLRQV

14.7: Log Viewer


2SHQ/RJ9LHZHUE\VHOHFWLQJWKHOpen LogsLFRQIURP&RPPXQLFDWRU(;7
V,FRQ
EDU
8VLQJWKHPHQXVDWWKHWRSRIWKHVFUHHQVHOHFWDPHWHUWLPHUDQJHVDQGYDOXHVWR
DFFHVV
&OLFNWKHFlickerLFRQ
7KHYDOXHVDQGWKHDVVRFLDWHGWLPHVWDPSV ZKHQWKHYDOXHVRFFXUUHG DUHGLVSOD\HG
LQDJULGER[8VHWKHEXWWRQVDWWKHERWWRPRIWKHVFUHHQWRFUHDWHDJUDSKRUH[SRUW
WKHGDWDWRDQRWKHUSURJUDP
*UDSKHGYDOXHVLQFOXGH3VWDQG3OW9D9EDQG9F
'LVSOD\HGYDOXHVLQFOXGH3VWDQG3OW0D[DQG0LQIRU9D9EDQG9F
NOTE0D[DQG0LQYDOXHVDUHRQO\GLVSOD\HGWKH\FDQQRWEHJUDSKHG+RZHYHU
0D[DQG0LQYDOXHVDUHDYDLODEOHIRUH[SRUW

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



(1,(&)OLFNHU

14.8: Performance Notes


3VWDQG3OWDYHUDJHWLPHDUHV\QFKURQL]HGWRWKHFORFN HJIRUDPLQXWHDYHUDJH
WKHWLPHVZLOORFFXUDWHWF 7KHDFWXDOWLPHRIWKHILUVWDYHUDJHFDQEHOHVV
WKDQWKHVHOHFWHGSHULRGWRDOORZIRULQLWLDOFORFNV\QFKURQL]DWLRQ
,IWKHZURQJIUHTXHQF\LVFKRVHQ HJ+]VHOHFWLRQIRUDV\VWHPRSHUDWLQJDW
+] )OLFNHUZLOOVWLOORSHUDWHEXWWKHFRPSXWHGYDOXHVZLOOQRWEHYDOLG7KHUHIRUH
\RXVKRXOGVHOHFWWKHIUHTXHQF\VHWWLQJZLWKFDUH
8VHUVHWWLQJVDUHVWRUHG,I)OLFNHULVRQDQGSRZHULVUHPRYHGIURPWKHPHWHU)OLFNHU
ZLOOVWLOOEHRQZKHQSRZHUUHWXUQV7KLVFDQFDXVHJDSVLQWKHORJJHGGDWD
7KH0D[DQG0LQYDOXHVDUHVWRUHGDQGDUHQRWORVWLIWKHXQLWLVSRZHUHGGRZQ
)OLFNHUPHHWVWKHUHTXLUHPHQWVRI,(&DQGIRUPHU,(&5HIHUWRWKRVH
VSHFLILFDWLRQVIRUPRUHGHWDLOVLIQHHGHG0HWHUVZLWKWKH)OLFNHURSWLRQDOVRPHHWWKH
,(&FRQIRUPDQFHVWDQGDUGVIRU)OLFNHU5HIHUWRFKDSWHUVDQGLQWKH
Communicator EXT User ManualIRUDGGLWLRQDOLQIRUPDWLRQ
2SHUDWLRQLVDW9IRU+]DQG9IRU+]DVSHUVSHFLILFDWLRQ,IWKHLQSXW
9ROWDJHLVGLIIHUHQWWKHV\VWHPZLOOQRUPDOL]HLWWR9RU9IRUFRPSXWDWLRQDO
SXUSRVHV

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(



$7/&6SUHDGVKHHWDQG([DPSOHV

A: Transformer Line Loss Compensation Spreadsheet and Examples


A.1: Calculating Values
7UDQVIRUPHU/RVV&RPSHQVDWLRQLVGLVFXVVHGLQ&KDSWHU9DOXHVIRUWKUHHHOHPHQW
LQVWDOODWLRQVFDQEHFDOFXODWHGLQWZRZD\V
Through an Excel Spreadsheet:
&OLFNWKHTLC CalculatorEXWWRQRQWKH7UDQVIRUPHU/RVVVFUHHQRIWKHPHWHUV
'HYLFH3URILOH7KH7/&&DOFXODWRUEXWWRQDFWLYDWHVDQ([FHO6SUHDGVKHHWEXW21/<
LI\RXKDYH06([FHOLQVWDOOHGRQ\RXUFRPSXWHU$FRS\RIWKH([FHO6SUHDGVKHHWLV
VKRZQRQWKHIROORZLQJSDJHVZLWKH[DPSOHQXPEHUV
(QWHUWKHUHTXLUHGGDWDLQWRWKH([FHO6SUHDGVKHHW7KH([FHOSURJUDPZLOOFDOFX
ODWHWKHYDOXHVQHHGHGIRUWKH7UDQVIRUPHU/RVVVFUHHQRIWKH'HYLFH3URILOH
(QWHUWKHYDOXHVLQWRWKH'HYLFH3URILOH
Manually:
8VHWKHZRUNVKHHWIRXQGLQ&KDSWHU7KUHH(OHPHQW/RVV&RPSHQVDWLRQ:RUN
VKHHWWRFDOFXODWHWKHYDOXHVE\KDQG5HIHUWRWKH1RWHVXQGHUHDFKVHFWLRQ
(QWHUYDOXHVEDVHGRQWKHWUDQVIRUPHUPDQXIDFWXUHUVWHVWUHSRUW7KHZRUNVKHHWLV
SURJUHVVLYHDQGQRWHVXQGHUHDFKVHFWLRQZLOOJXLGH\RXWRWKHQH[WVHFWLRQ
(QWHUWKHYDOXHVLQWRWKH'HYLFH3URILOH

A.2: Excel Spreadsheet with Example Numbers


,I\RXKDYH06([FHOLQVWDOOHGLQ\RXUFRPSXWHUXVHWKHTLC CalculatorEXWWRQRQ
WKH7UDQVIRUPHU/RVVVFUHHQRIWKH'HYLFH3URILOH5HIHUWRWKHVSUHDGVKHHWFRSLHV
ZLWKH[DPSOHQXPEHUVIRXQGRQWKHIROORZLQJSDJHV
IMPORTANT! Refer to Appendix B of the Communicator EXT User Manual for
additional instructions and information on the Transformer Line Loss
application.

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(

$

$7/&6SUHDGVKHHWDQG([DPSOHV

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(

$

$7/&6SUHDGVKHHWDQG([DPSOHV

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(

$

$7/&6SUHDGVKHHWDQG([DPSOHV

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(

$

$7/&6SUHDGVKHHWDQG([DPSOHV


Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(

$

$7/&6SUHDGVKHHWDQG([DPSOHV

7KLVSDJHLQWHQWLRQDOO\OHIWEODQN

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(

$

%%ODGH&RQILJXUDWLRQIRU)RUPV666

B: Blade Configuration for Forms 9S, 36S and


45S
B.1: 1262/1272 Forms
)RXUVXSSRUWHGIRUPVIRUWKH1H[XV6RFNHWPHWHUVZLWKWKHLUZLULQJ
FRQILJXUDWLRQVDUHVKRZQLQ&KDSWHU7KRVHIRUPVDUHEDVHGRQWKHUDWHG9ROWDJH
DQGKRRNXSUHTXLUHGIRU\RXUDSSOLFDWLRQ &XVWRPIRUPVDQGFRQILJXUDWLRQVDUHDOVR
DYDLODEOHIURP(,*
7KHWKUHHVXSSRUWHGIRUPVZLWKZLULQJFRQILJXUDWLRQVIRUWKH1H[XV
6RFNHWPHWHUVDUHOLVWHGEHORZ
9S
:\HQR37VRU37V&7V
:LUH'HOWDQR37VRU37V&7V
(/:\HQR37VRU37V&7V
:LUH'HOWDQR37VRU37V&7V
:LUH'HOWDQR37VRU37V&7V
36S
(/:\HQR37VRU37V&7V
45S
:\HQR37VRU37V&7V
:LUH'HOWDQR37VRU37V&7V
:LUH'HOWDQR37VRU37V&7V

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(

%

%%ODGH&RQILJXUDWLRQIRU)RUPV666

B.2: Blade Configuration Drawings


'HWDLOHGGUDZLQJVRIWKH%ODGHFRQILJXUDWLRQVDUHRIIHUHGEHORZ7KHUHDUHWZR
FRQILJXUDWLRQVEHFDXVHWKH6DQGWKH6DUHWKHVDPH7KHUHLVDGUDZLQJVKRZLQJ
WKHNQRFNRXWKROHVIRUHDFKFRQILJXUDWLRQ
NOTE:7KHIRUPVUHIHUUHGWRLQWKLVDSSHQGL[FRPSO\ZLWK$16,IRUPV66DQG
6

)LJXUH%)RUP6 6%DVHZLWK.QRFN2XW+ROHV

)LJXUH%)RUP6%DVHZLWK.QRFN2XW+ROHV

Electro Industries/GaugeTech
Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions


The Leader In Power Monitoring and Smart Grid Solutions

'RF#

(

%

*ORVVDU\

Glossary
6HFRQG9DOXHV

7KHVHYDOXHVDUHWKH506YDOXHVRIWKHLQGLFDWHG
TXDQWLW\DVFDOFXODWHGDIWHUDSSUR[LPDWHO\
PLOOLVHFRQGV F\FOHV RIVDPSOLQJ

6HFRQG9DOXHV

7KHVHYDOXHVDUHWKH506YDOXHVRIWKHLQGLFDWHG
TXDQWLW\DVFDOFXODWHGDIWHURQHVHFRQG 
F\FOHV RIVDPSOLQJ

$ODUP

$QHYHQWRUFRQGLWLRQLQDPHWHUWKDWFDQFDXVHD
WULJJHURUFDOOEDFNWRRFFXU

$QQXQFLDWRU

$VKRUWODEHOWKDWLGHQWLILHVSDUWLFXODUTXDQWLWLHVRU
YDOXHVGLVSOD\HGIRUH[DPSOHN:K

$YHUDJH &XUUHQW 

:KHQDSSOLHGWRFXUUHQWYDOXHV $PSV WKH


DYHUDJHLVDFDOFXODWHGYDOXHWKDWFRUUHVSRQGVWR
WKHWKHUPDODYHUDJHRYHUDVSHFLILHGWLPH


LQWHUYDO

7KHLQWHUYDOLVVSHFLILHGE\WKHXVHULQWKHPHWHU
SURILOH7KHLQWHUYDOLVW\SLFDOO\PLQXWHV
6R$YHUDJH$PSVLVWKHWKHUPDODYHUDJHRI$PSV
RYHUWKHSUHYLRXVPLQXWHLQWHUYDO7KHWKHUPDO
DYHUDJHULVHVWRRIWKHDFWXDOYDOXHLQHDFK
WLPHLQWHUYDO)RUH[DPSOHLIDFRQVWDQW$PS
ORDGLVDSSOLHGWKHWKHUPDODYHUDJHZLOOLQGLFDWH
DPSVDIWHURQHWLPHLQWHUYDODPSVDIWHU
WZRWLPHLQWHUYDOVDQGDPSVDIWHUWKUHHWLPH
LQWHUYDOV
$YHUDJH ,QSXW3XOVH

:KHQDSSOLHGWR,QSXW3XOVH$FFXPXODWLRQVWKH

$FFXPXODWLRQV

$YHUDJHUHIHUVWRWKHEORFN IL[HG ZLQGRZ


DYHUDJHYDOXHRIWKHLQSXWSXOVHV

Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions'RF#

(

*/

*ORVVDU\

$YHUDJH 3RZHU 

:KHQDSSOLHGWRSRZHUYDOXHV :DWWV9$5V9$ 
WKHDYHUDJHLVDFDOFXODWHGYDOXHWKDWFRUUHVSRQGV
WRWKHWKHUPDODYHUDJHRYHUDVSHFLILHGWLPH
LQWHUYDO
7KHLQWHUYDOLVVSHFLILHGE\WKHXVHULQWKHPHWHU
SURILOH7KHLQWHUYDOLVW\SLFDOO\PLQXWHV
6RWKH$YHUDJH:DWWVLVWKHWKHUPDODYHUDJHRI
:DWWVRYHUWKHSUHYLRXVPLQXWHLQWHUYDO7KH
WKHUPDODYHUDJHULVHVWRRIWKHDFWXDOYDOXH
LQHDFKWLPHLQWHUYDO)RUH[DPSOHLIDFRQVWDQW
N:ORDGLVDSSOLHGWKHWKHUPDODYHUDJHZLOO
LQGLFDWHN:DIWHURQHWLPHLQWHUYDON:DIWHU
WZRWLPHLQWHUYDOVDQGN:DIWHUWKUHHWLPH
LQWHUYDOV

%LW

$XQLWRIFRPSXWHULQIRUPDWLRQHTXLYDOHQWWRWKH
UHVXOWRIDFKRLFHEHWZHHQWZRDOWHUQDWLYHV <HV
1R2Q2IIIRUH[DPSOH 
2UWKHSK\VLFDOUHSUHVHQWDWLRQRIDELWE\DQ
HOHFWULFDOSXOVHZKRVHSUHVHQFHRUDEVHQFH
LQGLFDWHVGDWD

%LQDU\

5HODWLQJWRDV\VWHPRIQXPEHUVKDYLQJDVLWV
EDVH GLJLWVDQG 

%ORFN:LQGRZ$YJ
3RZHU 

7KH%ORFN )L[HG :LQGRZ$YHUDJHLVWKHDYHUDJH


SRZHUFDOFXODWHGRYHUDXVHUVHWWLPHLQWHUYDO
W\SLFDOO\PLQXWHV7KLVFDOFXODWHGDYHUDJH
FRUUHVSRQGVWRWKHGHPDQGFDOFXODWLRQV
SHUIRUPHGE\PRVWHOHFWULFXWLOLWLHVLQPRQLWRULQJ
XVHUSRZHUGHPDQG 6HH5ROOLQJ:LQGRZ
$YHUDJH

Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions'RF#

(

*/

*ORVVDU\

%\WH

$JURXSRIELQDU\GLJLWVSURFHVVHGDVDXQLWE\D
FRPSXWHU RUGHYLFH DQGXVHGHVSHFLDOO\WR
UHSUHVHQWDQDOSKDQXPHULFFKDUDFWHU

&%(0$&XUYH

$9ROWDJHTXDOLW\FXUYHHVWDEOLVKHGRULJLQDOO\E\
WKH&RPSXWHU%XVLQHVV(TXLSPHQW0DQXIDFWXUHUV
$VVRFLDWLRQ7KH&%(0$&XUYHGHILQHV9ROWDJH
GLVWXUEDQFHVWKDWFRXOGFDXVHPDOIXQFWLRQRU
GDPDJHLQPLFURSURFHVVRUGHYLFHV
7KHFXUYHLVFKDUDFWHUL]HGE\9ROWDJHPDJQLWXGH
DQGWKHGXUDWLRQZKLFKWKH9ROWDJHLVRXWVLGHRI
WROHUDQFH 6HH,7,&&XUYH

&KDQQHO

7KHVWRUDJHRIDVLQJOHYDOXHLQHDFKLQWHUYDOLQD
ORDGSURILOH

&ROG/RDG3LFNXS

7KLVYDOXHLVWKHGHOD\IURPWKHWLPHFRQWURO
SRZHULVUHVWRUHGWRWKHWLPHZKHQWKHXVHUZDQWV
WRUHVXPHGHPDQGDFFXPXODWLRQ

&5&)LHOG

&\FOLF5HGXQGDQF\&KHFN)LHOG 0RGEXV
FRPPXQLFDWLRQ LVDQHUURUFKHFNVXP
FDOFXODWLRQWKDWHQDEOHVD6ODYHGHYLFHWR
GHWHUPLQHLIDUHTXHVWSDFNHWIURPD0DVWHU
GHYLFHKDVEHHQFRUUXSWHGGXULQJWUDQVPLVVLRQ,I
WKHFDOFXODWHGYDOXHGRHVQRWPDWFKWKHYDOXHLQ
WKHUHTXHVWSDFNHWWKH6ODYHLJQRUHVWKHUHTXHVW

&7 &XUUHQW 5DWLR

$&XUUHQW7UDQVIRUPHU5DWLRLVXVHGWRVFDOHWKH
YDOXHRIWKHFXUUHQWIURPDVHFRQGDU\YDOXHXSWR
WKHSULPDU\VLGHRIDQLQVWUXPHQWWUDQVIRUPHU

&XPXODWLYH'HPDQG

7KHVXPRIWKHSUHYLRXVELOOLQJSHULRGPD[LPXP
GHPDQGUHDGLQJVDWWKHWLPHRIELOOLQJSHULRG
UHVHW7KHPD[LPXPGHPDQGIRUWKHPRVWUHFHQW
ELOOLQJSHULRGLVDGGHGWRWKHSUHYLRXVO\

Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions'RF#

(

*/

*ORVVDU\

DFFXPXODWHGWRWDORIWKHPD[LPXPGHPDQGV
'HPDQG

7KHDYHUDJHYDOXHRISRZHURUDVLPLODUTXDQWLW\
RYHUDVSHFLILHGSHULRGRIWLPH

'HPDQG,QWHUYDO

$VSHFLILHGWLPHRYHUZKLFKGHPDQGLVFDOFXODWHG

'LVSOD\

8VHUFRQILJXUDEOHYLVXDOLQGLFDWLRQRIGDWDLQD
PHWHU

'13

$UREXVWQRQSURSULHWDU\SURWRFROEDVHGRQ
H[LVWLQJRSHQVWDQGDUGV'13LVXVHGWR
RSHUDWHEHWZHHQYDULRXVV\VWHPVLQHOHFWULFDQG
RWKHUXWLOLW\LQGXVWULHVDQG6&$'$QHWZRUNV

((3520

1RQYRODWLOHPHPRU\(OHFWULFDOO\(UDVDEOH
3URJUDPPDEOH5HDG2QO\0HPRU\WKDWUHWDLQVLWV
GDWDGXULQJDSRZHURXWDJHZLWKRXWQHHGIRUD
EDWWHU\$OVRUHIHUVWRPHWHUV)/$6+PHPRU\

(QHUJ\5HJLVWHU

3URJUDPPDEOHUHFRUGWKDWPRQLWRUVDQ\HQHUJ\
TXDQWLW\([DPSOH:DWWKRXUV9$5KRXUV
9$KRXUV

(WKHUQHW

$W\SHRI/$1QHWZRUNFRQQHFWLRQWKDWFRQQHFWV
WZRRUPRUHGHYLFHVRQDFRPPRQFRPPXQL
FDWLRQVEDFNERQH$Q(WKHUQHW/$1FRQVLVWVRIDW
OHDVWRQHKXEGHYLFH WKHQHWZRUNEDFNERQH ZLWK
PXOWLSOHGHYLFHVFRQQHFWHGWRLWLQDVWDUFRQILJX
UDWLRQ7KHPRVWFRPPRQYHUVLRQVRI(WKHUQHWLQ
XVHDUH%DVH7DQG%DVH7DVGHILQHGLQ
,(((VWDQGDUGV+RZHYHUVHYHUDORWKHU
YHUVLRQVRI(WKHUQHWDUHDOVRDYDLODEOH

)OLFNHU

)OLFNHULVWKHVHQVDWLRQWKDWLVH[SHULHQFHGE\WKH
KXPDQYLVXDOV\VWHPZKHQLWLVVXEMHFWHGWR

Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions'RF#

(

*/

*ORVVDU\

FKDQJHVRFFXUULQJLQWKHLOOXPLQDWLRQLQWHQVLW\RI
OLJKWVRXUFHV,(&DQGIRUPHU,(&
GHVFULEHWKHPHWKRGVXVHGWRGHWHUPLQH
)OLFNHUVHYHULW\
+DUPRQLFV

0HDVXULQJYDOXHVRIWKHIXQGDPHQWDOFXUUHQWDQG
9ROWDJHDQGSHUFHQWRIWKHIXQGDPHQWDO

+HDUWEHDW3XOVH

(QHUJ\LQGLFDWRURQWKHIDFHRIWKH1H[XV
PHWHUSXOVHVDUHJHQHUDWHGSHUWKH
SURJUDPPHG.HYDOXH

,77KUHVKROG

'DWDZLOOQRWDFFXPXODWHXQWLOFXUUHQWUHDFKHV
SURJUDPPHGOHYHO

,QWHJHU

$Q\RIWKHQDWXUDOQXPEHUVWKHQHJDWLYHVRI
WKRVHQXPEHUVRU]HUR

,QWHUQDO0RGHP

$QRSWLRQDOPRGHPZLWKLQWKHPHWHUVHQFORVXUH
WKDWFRQQHFWVWRWKH5-WHOHSKRQHFRQQHFWRU

,QYDOLG5HJLVWHU

,QWKH1H[XVPHWHUV0RGEXV0DSWKHUHDUH
JDSVEHWZHHQ5HJLVWHUV)RUH[DPSOHWKHQH[W
5HJLVWHUDIWHULV$Q\XQPDSSHG
5HJLVWHUVWRUHVQRLQIRUPDWLRQDQGLVVDLGWREH
LQYDOLG

,7,&&XUYH

$QXSGDWHGYHUVLRQRIWKH&%(0$&XUYHWKDW
UHIOHFWVIXUWKHUVWXG\LQWRWKHSHUIRUPDQFHRI
PLFURSURFHVVRUGHYLFHV7KHFXUYHFRQVLVWVRID
VHULHVRIVWHSVEXWVWLOOGHILQHVFRPELQDWLRQVRI
9ROWDJHPDJQLWXGHDQGGXUDWLRQWKDWZLOOFDXVH
PDOIXQFWLRQRUGDPDJH

.H

Electro Industries/GaugeTech

N:KSHUSXOVHLHWKHHQHUJ\

The Leader In Power Monitoring and Smart Grid Solutions'RF#

(

*/

*ORVVDU\

N:K

.LORZDWWKRXUVN:[GHPDQGLQWHUYDOLQKRXUV

.<=2XWSXW

2XWSXWZKHUHWKHUDWHRIFKDQJHVEHWZHHQDQG
UHIOHFWVWKHPDJQLWXGHRIDPHWHUHGTXDQWLW\

/&'

/LTXLG&U\VWDO'LVSOD\

/('

/LJKW(PLWWLQJ'LRGH

0D[LPXP'HPDQG

7KHODUJHVWGHPDQGFDOFXODWHGGXULQJDQ\LQWHUYDO
RYHUDELOOLQJSHULRG

0RGEXV$6&,,

$OWHUQDWHYHUVLRQRIWKH0RGEXVSURWRFROWKDW
XWLOL]HVDGLIIHUHQWGDWDWUDQVIHUIRUPDW7KLV
YHUVLRQLVQRWGHSHQGHQWXSRQVWULFWWLPLQJDVLV
WKH578YHUVLRQ7KLVLVWKHEHVWFKRLFHIRU
WHOHFRPPXQLFDWLRQVDSSOLFDWLRQV YLDPRGHPV 

0RGEXV578

7KHPRVWFRPPRQIRUPRI0RGEXVSURWRFRO
0RGEXV578LVDQRSHQSURWRFROVSRNHQE\PDQ\
ILHOGGHYLFHVWRHQDEOHGHYLFHVIURPPXOWLSOH
YHQGRUVWRFRPPXQLFDWHLQDFRPPRQODQJXDJH
'DWDLVWUDQVPLWWHGLQDWLPHGELQDU\IRUPDW
SURYLGLQJLQFUHDVHGWKURXJKSXWDQGWKHUHIRUH
LQFUHDVHGSHUIRUPDQFH

1HWZRUN

$FRPPXQLFDWLRQVFRQQHFWLRQEHWZHHQWZRRU
PRUHGHYLFHVWRHQDEOHWKRVHGHYLFHVWRVHQGWR
DQGUHFHLYHGDWDIURPRQHDQRWKHU,QPRVW
DSSOLFDWLRQVWKHQHWZRUNLVHLWKHUDVHULDOW\SHRU
D/$1W\SH

195$0

1RQYRODWLOH5DQGRP$FFHVV0HPRU\DEOHWR
NHHSWKHVWRUHGYDOXHVLQPHPRU\HYHQGXULQJ
WKHORVVRIFLUFXLWRUFRQWUROSRZHU+LJKVSHHG
195$0LVXVHGLQWKH1H[XVPHWHUWRJDWKHU

Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions'RF#

(

*/

*ORVVDU\

PHDVXUHGLQIRUPDWLRQDQGWRLQVXUHWKDWQR
LQIRUPDWLRQLVORVW
2SWLFDO3RUW

$SRUWWKDWIDFLOLWDWHVLQIUDUHGFRPPXQLFDWLRQZLWK
DPHWHU8VLQJDQ$16,&7\SH,,PDJQHWLF
RSWLFDOFRPPXQLFDWLRQVFRXSOHUDQGDQ56
FDEOHIURPWKHFRXSOHUWRD3&WKHPHWHUFDQEH
SURJUDPPHGZLWK&RPPXQLFDWRU(;7VRIWZDUH

3DFNHW

$VKRUWIL[HGOHQJWKVHFWLRQRIGDWDWKDWLV
WUDQVPLWWHGDVDXQLW([DPSOHDVHULDOVWULQJRI
ELWE\WHV

3HUFHQW  7+'

3HUFHQW7RWDO+DUPRQLF'LVWRUWLRQ 6HH7+'

3URWRFRO

$ODQJXDJHWKDWLVVSRNHQEHWZHHQWZRRUPRUH
GHYLFHVFRQQHFWHGRQDQHWZRUN

375DWLR

3RWHQWLDO7UDQVIRUPHU5DWLRXVHGWRVFDOHWKH
YDOXHRIWKH9ROWDJHWRWKHSULPDU\VLGHRIDQ
LQVWUXPHQWWUDQVIRUPHU$OVRUHIHUUHGWRDV97
5DWLR

3XOVH

7KHFORVLQJDQGRSHQLQJRIWKHFLUFXLWRIDWZR
ZLUHSXOVHV\VWHPRUWKHDOWHUQDWHFORVLQJDQG
RSHQLQJRIRQHVLGHDQGWKHQWKHRWKHURIDWKUHH
ZLUHV\VWHP ZKLFKLVHTXDOWRWZRSXOVHV 

45HDGLQJV

4LVWKHTXDQWLW\REWDLQHGE\ODJJLQJWKHDSSOLHG
9ROWDJHWRDZDWWPHWHUE\GHJUHHV9DOXHVDUH
GLVSOD\HGRQWKH8QFRPSHQVDWHG3RZHUDQG4
5HDGLQJVVFUHHQ

Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions'RF#

(

*/

*ORVVDU\

4XDGUDQW
3URJUDPPDEOH9DOXHVDQG
)DFWRUVRQWKH1H[XV
PHWHU

:DWWDQG9$5IORZLVW\SLFDOO\UHSUHVHQWHGXVLQJ
DQ;<FRRUGLQDWHV\VWHP7KHIRXUFRUQHUVRIWKH
;<SODQHDUHUHIHUUHGWRDVTXDGUDQWV0RVW
SRZHUDSSOLFDWLRQVODEHOWKHULJKWKDQGFRUQHUDV
WKHILUVWTXDGUDQWDQGQXPEHUWKHUHPDLQLQJ
TXDGUDQWVLQDFRXQWHUFORFNZLVHURWDWLRQ)ROORZ
LQJDUHWKHSRVLWLRQVRIWKHTXDGUDQWV
VWXSSHUULJKWQGXSSHUOHIWUGORZHUOHIW
DQGWKORZHUULJKW
3RZHUIORZLVJHQHUDOO\SRVLWLYHLQTXDGUDQWV
DQG
9$5IORZLVSRVLWLYHLQTXDGUDQWVDQG
7KHPRVWFRPPRQORDGFRQGLWLRQVDUH
4XDGUDQWSRZHUIORZSRVLWLYH9$5IORZ
SRVLWLYHLQGXFWLYHORDGODJJLQJRUSRVLWLYH
SRZHUIDFWRU
4XDGUDQWSRZHUIORZQHJDWLYH9$5IORZ
SRVLWLYHFDSDFLWLYHORDGOHDGLQJRUQHJDWLYH
SRZHUIDFWRU

5HJLVWHU

$QHQWU\RUUHFRUGWKDWVWRUHVDVPDOODPRXQWRI
GDWD

5HJLVWHU5ROORYHU

$SRLQWDWZKLFKD5HJLVWHUUHDFKHVLWVPD[LPXP
YDOXHDQGUROOVRYHUWR]HUR

5HVHW

/RJVDUHFOHDUHGRUQHZ RUGHIDXOW YDOXHVDUH


VHQWWRFRXQWHUVRUWLPHUV

5ROOLQJ:LQGRZ

7KH5ROOLQJ 6OLGLQJ :LQGRZ$YHUDJHLVWKH

$YHUDJH 3RZHU 

DYHUDJHSRZHUFDOFXODWHGRYHUDXVHUVHWWLPH
LQWHUYDOWKDWLVGHULYHGIURPDVSHFLILHGQXPEHURI
VXELQWHUYDOVHDFKRIDVSHFLILHGWLPH)RU

Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions'RF#

(

*/

*ORVVDU\

H[DPSOHWKHDYHUDJHLVFDOFXODWHGRYHUD
PLQXWHLQWHUYDOE\FDOFXODWLQJWKHVXPRIWKH
DYHUDJHRIWKUHHFRQVHFXWLYHPLQXWHLQWHUYDOV
7KLVGHPDQGFDOFXODWLRQPHWKRGRORJ\KDVEHHQ
DGRSWHGE\VHYHUDOXWLOLWLHVWRSUHYHQWFXVWRPHU
PDQLSXODWLRQRIN:GHPDQGE\VLPSO\VSUHDGLQJ
SHDNGHPDQGDFURVVWZRLQWHUYDOV
56

$W\SHRIVHULDOQHWZRUNFRQQHFWLRQWKDWFRQQHFWV
WZRGHYLFHVWRHQDEOHFRPPXQLFDWLRQEHWZHHQ
WKHGHYLFHV$Q56FRQQHFWLRQFRQQHFWVRQO\
WZRSRLQWV'LVWDQFHEHWZHHQGHYLFHVLVW\SLFDOO\
OLPLWHGWRIDLUO\VKRUWUXQV
&XUUHQWVWDQGDUGVUHFRPPHQGDPD[LPXPRI
IHHWEXWVRPHXVHUVKDYHKDGVXFFHVVZLWKUXQV
XSWRIHHW
&RPPXQLFDWLRQVVSHHGLVW\SLFDOO\LQWKHUDQJHRI
ELWVSHUVHFRQGWRELWVSHUVHFRQG
56FRQQHFWLRQFDQEHDFFRPSOLVKHGXVLQJ3RUW
RIWKH1H[XVPHWHU

56

$W\SHRIVHULDOQHWZRUNFRQQHFWLRQWKDWFRQQHFWV
WZRRUPRUHGHYLFHVWRHQDEOHFRPPXQLFDWLRQ
EHWZHHQWKHGHYLFHV$Q56FRQQHFWLRQDOORZV
PXOWLGURSFRPPXQLFDWLRQIURPRQHWRPDQ\
SRLQWV
'LVWDQFHEHWZHHQGHYLFHVLVW\SLFDOO\OLPLWHGWR
DURXQGWRZLUHIHHW
&RPPXQLFDWLRQVVSHHGLVW\SLFDOO\LQWKHUDQJHRI
ELWVSHUVHFRQGWRELWVSHUVHFRQG

6DJ

$9ROWDJHTXDOLW\HYHQWGXULQJZKLFKWKH506
9ROWDJHLVORZHUWKDQQRUPDOIRUDSHULRGRIWLPH
W\SLFDOO\IURPF\FOHWRPLQXWH

Electro Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions'RF#

(

*/

*ORVVDU\

6HFRQGDU\5DWHG

$Q\5HJLVWHURUSXOVHRXWSXWWKDWGRHVQRWXVH
DQ\&7RU37 97 5DWLR

6HULDO3RUW

7KHW\SHRISRUWXVHGWRGLUHFWO\LQWHUIDFHZLWKD
GHYLFHXVLQJWKH56VWDQGDUG

6ZHOO

$9ROWDJHTXDOLW\HYHQWGXULQJZKLFKWKH506
9ROWDJHLVKLJKHUWKDQQRUPDOIRUDSHULRGRIWLPH
W\SLFDOO\IURPF\FOHWRPLQXWH

7''

7KH7RWDO'HPDQG'LVWRUWLRQRIWKHFXUUHQW
ZDYHIRUP7KHUDWLRRIWKHURRWVXPVTXDUHYDOXH
RIWKHKDUPRQLFFXUUHQWWRWKHPD[LPXPGHPDQG
ORDGFXUUHQW 6HHHTXDWLRQEHORZ 
NOTE7KH7''GLVSOD\HGLQWKH+DUPRQLFV
VFUHHQLVFDOFXODWHGE\&RPPXQLFDWRU(;7
VRIWZDUHXVLQJWKH0D[$YHUDJH'HPDQG

1TDD

7+'

I 22  I 32  I 42  I 52  ...x100%
IL

7RWDO+DUPRQLF'LVWRUWLRQLVWKHFRPELQHGHIIHFW
RIDOOKDUPRQLFVPHDVXUHGLQD9ROWDJHRUFXUUHQW
7KH7+'QXPEHULVH[SUHVVHGDVDSHUFHQWRIWKH
IXQGDPHQWDO)RUH[DPSOHD7+'LQGLFDWHV
WKDWWKHPDJQLWXGHRIDOOKDUPRQLFGLVWRUWLRQ
PHDVXUHGHTXDOVRIWKHPDJQLWXGHRIWKH
IXQGDPHQWDO+]TXDQWLW\7KH7+'GLVSOD\HG
LVFDOFXODWHGE\\RXU1H[XVPHWHU

7LPH6WDPS

$VWRUHGUHSUHVHQWDWLRQRIWKHWLPHRIDQHYHQW
7LPH6WDPSFDQLQFOXGH\HDUPRQWKGD\KRXU
PLQXWHVHFRQGDQG'D\OLJKW6DYLQJV7LPH
LQGLFDWLRQ

Electro Industries/GaugeTech

'RF#
The Leader In Power Monitoring and Smart Grid Solutions

(

*/

*ORVVDU\

728

7LPHRI8VH

8QFRPSHQVDWHG
3RZHU

9$:DWWDQG9$5UHDGLQJVQRWDGMXVWHGE\
7UDQVIRUPHU/RVV&RPSHQVDWLRQ

977KUHVKROG

'DWDZLOOVWRSDFFXPXODWLQJZKHQ9ROWDJHIDOOV
EHORZSURJUDPPHGOHYHO

9ROWDJH,PEDODQFH

7KHUDWLRRIWKH9ROWDJHRQDSKDVHWRWKHDYHUDJH
9ROWDJHRQDOOSKDVHV

9ROWDJH4XDOLW\(YHQW

$QLQVWDQFHRIDEQRUPDO9ROWDJHRQDSKDVH7KH
HYHQWVWKHPHWHUWUDFNVLQFOXGHVDJVVZHOOV
LQWHUUXSWLRQVDQGLPEDODQFHV

975DWLR

7KH9ROWDJH7UDQVIRUPHU5DWLRLVXVHGWRVFDOHWKH
YDOXHRIWKH9ROWDJHWRWKHSULPDU\VLGHRIDQ
LQVWUXPHQWWUDQVIRUPHU$OVRUHIHUUHGWRDV37
5DWLR

9ROWDJH9DE

9DE9EF9FDDUHDOO3KDVHWR3KDVH9ROWDJH
PHDVXUHPHQWV7KHVH9ROWDJHVDUHPHDVXUHG
EHWZHHQWKHWKUHHSKDVH9ROWDJHLQSXWVWRWKH
PHWHU

9ROWDJH9DQ

9DQ9EQ9FQDUHDOO3KDVHWR1HXWUDO9ROWDJHV
DSSOLHGWRWKHPRQLWRU7KHVH9ROWDJHVDUH
PHDVXUHGEHWZHHQWKHSKDVH9ROWDJHLQSXWVDQG
9QLQSXWWRWKHPHWHU7HFKQRORJLFDOO\WKHVH
9ROWDJHVFDQEHPHDVXUHGHYHQZKHQWKHPHWHU
LVLQD'HOWDFRQILJXUDWLRQDQGWKHUHLVQRFRQQHF
WLRQWRWKH9QLQSXW+RZHYHULQWKLVFRQILJX
UDWLRQWKHVH9ROWDJHVKDYHOLPLWHGPHDQLQJDQG
DUHW\SLFDOO\QRWUHSRUWHG

Electro Industries/GaugeTech

'RF#
The Leader In Power Monitoring and Smart Grid Solutions

(

*/

*ORVVDU\

9ROWDJH9DX[

7KLVLVWKHIRXUWK9ROWDJHLQSXWPHDVXUHGIURP



EHWZHHQWKH9DX[DQG9UHILQSXWV7KLVLQSXWFDQ
EHVFDOHGWRDQ\YDOXH+RZHYHUWKHDFWXDOLQSXW
9ROWDJHWRWKHPHWHUVKRXOGEHRIWKHVDPH
PDJQLWXGHDVWKH9ROWDJHVDSSOLHGWRWKH9D9E
DQG9FWHUPLQDOV

Electro Industries/GaugeTech

'RF#
The Leader In Power Monitoring and Smart Grid Solutions

(

*/

Potrebbero piacerti anche